LTC 263-2022 G.O. Bond for Arts & CultureMIAMI BEACH OFFICE OF THE CITY MANAGER L TC # 263-2022 LETTER TO COMMISSION TO: Honorable Mayor Dan Gelber and Members of the City Commission FROM , Alina T. Hudak, City Manager fx;,c~ .. f,< DATE : July 1, 2022 SUBJECT : G.O. Bond for Arts & Culture The purpose of this Letter to the Commission ("L TC") is to advise you that attached Exhibits A and B have been forwarded to the members of the G.O. Bond Oversight Committee via hard copy binder package and email version. Three meetings have been scheduled via ZOOM for review of 17 individual projects including stakeholder interviews and Q & A on Tuesday, July 5 and Wednesday, July 6. The Committee will also gather on Thursday, July 14 to deliberate and finalize their recommendation to the City Commission as requested by the Commission at the June 22 meeting . All three meetings are open to the public and have been advertised through the City's social media platforms . The July 14 meeting will also be advertised in the Miami Herald Neighbor's section. The electronic exhibits are also posted on the City's G.O. Bond website and can be accessed via the link below: https://docmgmt.miamibeachfl.gov/Weblink/DocView.aspx?id=281564&dbid=0&repo=CityClerk For more information , please contact Maria Hernandez at mariahernandez@miamibeachfl.gov or Adrian Morales at adrianmorales@miamibeachfl.gov. Attachments: Exhibit A-G .O . Bond for Arts and Culture Exhibit B -Appendix ATH / MH F :\cmgr\$ALL\GO Bond Program\GO Bond for Arts and Culture\G .O . Bond for Arts & Culture.docx G.O. Bond for Arts & Culture EXHIBIT A G.O. BOND for ARTS & CULTURE Table of Contents •Introduction •Financial Summary •Additional Information o Organizational Structure & Current Funding Sources o Current G.O. Bond or Capital Improvement Funds for Facilities o Tax Projection Options – to Follow via email •Projects A.City-Owned Assets 1.Bass Museum of Art 2.Miami City Ballet 3.Fillmore Miami Beach 4.Colony Theater 5.Miami Beach Botanical Garden 6.Art Deco Welcome Center – Miami Design Preservation League 7.New World Symphony 8.Holocaust Memorial Miami Beach 9.Byron Carlyle Theater Renovation 10.North Beach Senior Center - UNIDAD 11.Miami New Drama at Collins Park Garage 12.Rhythm Foundation at Miami Beach Bandshell B.Culture / Art Institutions Not City-Owned 13.The Wolfsonian 14.The Jewish Museum of Florida C.Other Projects / Enhancements 15.Artistic Playgrounds 16.Underwater Reefline Project 17.Living Shorelines & Mangrove Restoration •Appendix o Commission and Committee Memorandums o Reports Arts & Culture G.O. Bond Introduction The City of Miami Beach has a plethora of cultural assets and organizations benefiting its community. Many of these assets require capital improvements which are limited by the City's annual capital budget. Since October 2021, the possibility of a new Arts and Culture G.O. Bond has moved through the following City Commission and Committee discussions. These are available in the Appendix section of the binder: •October 13, 2021: The Mayor and Commission referred an item to the Finance the Finance and Economic Resiliency Committee (FERC) to discuss the possible issuance of a General Obligation Bond (G.O. Bond) to fund arts and culture , which would be subject to voter referendum. •October 22, 2021: FERC directed the Administration to work on an inventory of needs for the City's arts and cultural assets. •February 25, 2022: FERC reviewed the gathered inventory and directed the Administration to brief members of the City Commission with the funding requests. •March 30, 2022: FERC reviewed a revised project list for a possible arts and culture G.O. Bond and made a motion to have the item discussed for further direction by the City Commission. •May 4, 2022: The Item was deferred to the June 22, 2022 Commission Meeting. •June 22, 2022: The Mayor and City Commission favorably considered the idea of issuing a G.O. Bond for Arts and Culture, directing the existing G.O. Bond Oversight Committee to review and vet the proposed project list and to provide a recommendation. The Facilities and Fleet Management Department has led the effort of meeting with various Arts and Culture institutions to itemize an inventory of capital project needs and requests. The Department also collaborated with other City Departments to identify deferred maintenance opportunities and other capital needs. The list of project requests and itemized costs is being provided to the G.O. Bond Oversight Committee as part of this packet for its consideration and recommendation . There are now three G.O. Bond Oversight Committee meetings scheduled to discuss the proposed Arts and Culture bond specifically. During these meetings, the Committee will hear directly from each institution on the list about their project needs and requests. At the conclusion of these meetings, the Committee will provide a formal recommendation to the Mayor and Commission on how to proceed with a final project list and budget(s) that would be considered for a new Arts and Culture G.O. Bond. Ultimately, the bond must be approved by voters as part of a November election referendum vote. CITY-OWNED CULTURAL INSTITUTIONS Cultural GO Bond Total 1 Bass Museum of Art 23,650,000$ 2 Miami City Ballet 19,460,000$ 3 Fillmore Miami Beach 26,950,000$ 4 Colony Theater 6,930,000$ 5 Miami Beach Botanical Garden 5,800,000$ 6 Art Deco Welcome Center - Miami Design Preservation League 1,310,000$ 7 New World Symphony 8,000,000$ 8 Holocaust Memorial Miami Beach 6,620,000$ 9 Byron Carlyle Theater Renovation 28,310,000$ 10 North Beach Senior Center - UNIDAD 1,810,000$ 11 Miami New Drama at Collins Park Garage 7,100,000$ 12 Rhythm Foundation at Miami Beach Bandshell 3,490,000$ City-Owned Cultural Institutions Total $139,430,000 OTHER CULTURAL INSTITUTIONS - NOT CITY OWNED Cultural GO Bond Total 13 The Wolfsonian 14,200,000$ 14 The Jewish Museum of Florida 1,080,000$ Other Cultural Institutions Total $15,280,000 OTHER PROJECTS / ENHANCEMENTS Cultural GO Bond Total 15 Artistic Playgrounds 7,100,000$ 16 Underwater Reefline Project 16,760,000$ 17 Living Shorelines & Mangrove Restoration 4,260,000$ Other Projects Total $28,120,000 TOTAL $182,830,000 Estimated Management Fees $14,626,400 GRAND TOTAL $197,456,400 G.O. BOND for ARTS & CULTURE Project Total Cost Summary G.O. Bond for Arts & Culture - All Projects Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Bass Museum of Art Proposed Enhancements New projector and screen for Museum Courtyard 63,900 - 63,900 Automatic shade system for Museum Courtyard 106,500 - 106,500 Audio Induction Loop for Museum Courtyard 39,760 - 39,760 Lumitrix event lighting system for Museum Courtyard 63,900 - 63,900 Commercial grade overhead door for Museum Café 56,800 - 56,800 Enhanced A/V equipment for Museum Creativity Center 92,300 - 92,300 Programmable automatic shades for Museum Creativity Center 106,500 - 106,500 Adjustable gallery tack lighting for Museum Creativity Center 21,300 - 21,300 Audio Induction Loop for Museum Creativity Center 56,800 - 56,800 Replace transformer for LED lighting at Museum Lobby 14,200 - 14,200 Museum wide beacon- based wayfinding system 56,800 - 56,800 Enhanced exterior lighting for Museum façade and Museum Courtyard 106,500 - 106,500 WiFi access points throughout Collins Park for enhanced patronage reporting 248,500 - 248,500 Lumitrix display lighting for exterior art installations 63,900 - 63,900 Wall mounted ladder replacement 15,620 - 15,620 Bass Museum Exhaust System Renewal - 17,040 17,040 Bass Museum Exterior Lighting Renewal - 90,880 90,880 Bass Museum Plumbing Fixture Renewal (Classroom Wing)- 23,856 23,856 Bass Museum Retaining Wall Tile Replacement - 29,252 29,252 Bass Museum Water Coolers Renewal - 23,430 23,430 Bass Museum Rooftop Package Unit Renewal - 119,280 119,280 Bass Museum Clean Steam Humidifier Reneval - 132,060 132,060 Bass Museum Emergency Lighting Replacement - 66,740 66,740 Bass Museum Condenser Pump Renewal - 46,860 46,860 Bass Museum Multipurpose Place Maker Space 19,170,000 - 19,170,000 Bass Museum Plumbing Fixture Renewal (Classroom Wing)- 23,856 23,856 Fire Alarm system replacement - 2,130,000 2,130,000 62922 - Bass Museum Exterior Wall Repairs - 55,380 55,380 64623 - Bass Museum Gallery Floor Renovation - 320,920 320,920 64223 - Bass Museum Interior Gallery Wall - 89,460 89,460 63923 - Bass Museum Keystone Seal - 89,460 89,460 64823 - Bass Museum Tranquility Fountain - 65,320 65,320 Grand Total (Rounded to the nearest ten thousand)$20,310,000 $3,340,000 $23,650,000 Subcontractor Trade Cost $14,290,000 $2,350,000 $16,640,000 Contractor, General Conditions, Overhead & Profit (20%)$2,860,000 $470,000 $3,330,000 Owner Contingency (15%)$2,150,000 $350,000 $2,500,000 Permitting (5%)$720,000 $120,000 $840,000 Estimated Bond Fee (2%)$290,000 $50,000 $340,000 Miami City Ballet Proposed Enhancements Miami City Ballet Office Area Flooring Replacement -154,297 154,297 Miami City Ballet Studio Blackout Shades -38,482 38,482 64023 - Facility-wide Variable Air Volume (VAV) Box Replacements -74,550 74,550 Electronic HVAC Filtration - UV-C Lights in rooftops units 49,700 -49,700 Dry Wall Repairs and Paint at Studios 1-5, 7, 8 and Common Areas -205,900 205,900 Harlequin "Marley" Floors - Studios 4,5,6,8, Hallway 1 & 2 -284,000 284,000 Wolfson Theater A/V Upgrades 783,840 -783,840 Elevator Modernization -525,400 525,400 Wardrobe Utility Renovation 205,900 -205,900 LED Lamp Replacement (Facility-wide, including balconies)-243,530 243,530 Bottled Water Filling Stations (3)14,200 -14,200 Hands Free Faucets and Toilet Flushometers Upgrade -213,000 213,000 Restroom Exhaust System renewal -35,500 35,500 Acoustical Ceiling Panel renewal -106,500 106,500 HVAC Ductwork renewal -741,240 741,240 Systems Furniture 489,900 -489,900 Lobby Security Enhancements 113,600 -113,600 Stair Finish Renewal (rubber treading)-68,160 68,160 Loading Dock Flooding Repair -355,000 355,000 Studio Black Out Shades 170,400 -170,400 3rd Floor Wood Floors Replacement -184,600 184,600 Project Management Fees (Balance Commercial Real Estate)--- Defensive Architectural Enhancements to Collins Park Boardwalk 21,300 -21,300 64323 - Miami City Ballet Access Control -71,000 71,000 64523 - Miami City Ballet Board Room Carpet -124,960 124,960 63022 - Miami City Ballet Exit Sign Renewal -103,660 103,660 64423 - Miami City Ballet UV Light Retrofit -46,860 46,860 Workforce Housing - Miami City Ballet's Floor 7,849,605 -7,849,605 Digital enhancement of MCB lobby and studios 4,402,000 -4,402,000 Technology upgrade of administrative offices 1,065,000 -1,065,000 LED Screen and Flooring for Outdoor Performances 710,000 -710,000 --- Grand Total (Rounded to the nearest ten thousand)$15,876,000 $3,584,000 $19,460,000 Subcontractor Trade Cost $11,180,000 $2,520,000 $13,700,000 Contractor, General Conditions, Overhead & Profit (20%)$2,236,000 $504,000 $2,740,000 Owner Contingency (15%)$1,680,000 $380,000 $2,060,000 Permitting (5%)$560,000 $130,000 $690,000 Estimated Bond Fee (2%)$220,000 $50,000 $270,000 Proposed GO Bond for Arts Culture Page 1 of 5 G.O. Bond for Arts & Culture - All Projects Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Fillmore Miami Beach Proposed Enhancement Auditorium furniture and finishes replacement 1,680,428 - 1,680,428 First Floor Lighting and Finish Upgrades (FOH)2,635,619 - 2,635,619 Second Floor Lighting and Finish Upgrades (FOH)1,310,546 - 1,310,546 Third Floor Lighting and Finish Upgrades (FOH)936,206 - 936,206 Fourth Floor Exit Corridor- Painting and Carpet Replacement (FOH)58,532 - 58,532 Repairs to Existing Catwalk 47,570 - 47,570 Structural Panels at Stage Roof Penthouse + Lapeyre Stair 74,550 - 74,550 Exterior Window and Door Replacement 378,970 - 378,970 Exterior Structural Repairs 467,890 - 467,890 Driveway Redesign and enhanced pedestrian area 467,180 - 467,180 Basement Lighting and Finish Upgrades 1,381,404 - 1,381,404 First Floor Lighting and Finish Upgrades (BOH)705,115 - 705,115 Second Floor Lighting and Finish Upgrades (BOH)384,479 - 384,479 New Second Floor VIP Area 1,704,000 - 1,704,000 New Commercial Kitchen 852,000 - 852,000 Acoustical Improvements at Dressing Rooms/ Corridors 71,000 - 71,000 Asbestos, Lead Paint, IAQ Abatement Allowance - 284,000 284,000 Freight Elevator renewal - 700,060 700,060 Exhaust System renewal - 497,000 497,000 Chilled Water Piping renewal - 2,307,500 2,307,500 HVAC Replacements - 1,195,356 1,195,356 Electrical Enhancements (including FA allowance)- 1,742,340 1,742,340 Plumbing Enhancements (facility-wide)- 51,830 51,830 Upgrades to Existing Fire Protection System - 287,245 287,245 Emergency Lighting renewal - 452,980 452,980 Fillmore Miami Beach Exterior Window and Door Replacement - 316,944 316,944 Fillmore Restoration of Mermaid Sculpture at Fillmore Miami Beach - 140,580 140,580 Theatrical Systems Upgrade 4,092,440 - 4,092,440 New LED Marquee Sign 1,704,000 - 1,704,000 Grand Total (Rounded to the nearest ten thousand)$18,960,000 $7,990,000 $26,950,000 Subcontractor Trade Cost $13,350,000 $5,620,000 $18,970,000 Contractor, General Conditions, Overhead & Profit (20%)$2,670,000 $1,130,000 $3,800,000 Owner Contingency (15%)$2,000,000 $850,000 $2,850,000 Permitting (5%)$670,000 $280,000 $950,000 Estimated Bond Fee (2%)$270,000 $110,000 $380,000 Colony Theater Proposed Enhancement Lighting & Projection System 1,096,240 - 1,096,240 Sound System Redesign & Replacement 1,153,395 - 1,153,395 Replace Acoustical Drapes, Main Drape, & Soft Goods 255,600 - 255,600 Stage rigging and mechanics 248,500 - 248,500 New JLG driveable vertical mast lift 28,400 - 28,400 Loading Dock doors and liftgate 71,000 - 71,000 Facility-wide expansion & storage 482,800 - 482,800 Facility-wide Security, Access & Communication Systems Upgrade 264,120 - 264,120 Emergency Lighting renewal - 15,620 15,620 Domestic Water Pump renewal - 73,840 73,840 Accessibility Enhancements 227,200 - 227,200 Lobby & front entry renovations 667,400 - 667,400 62221 - Restroom renovation & expansion 532,500 - 532,500 New Carpeting & Theater Seating 695,800 - 695,800 Entry door/storefront replacement - 312,400 312,400 Roof hatch replacement - 42,600 42,600 Colony Theater Acoustic Curtains and Resonators - 52,540 52,540 62321 - Colony Theater Exterior Painting - 237,424 237,424 Colony Theater North Awning Replacement - 12,212 12,212 Colony Theater Restroom Exhaust Fan Renewal - 23,430 23,430 64123 - Colony Theater Impact Glass - 146,260 146,260 63222 - Colony Theater Exit Sign Renewal - 51,120 51,120 62421 - Colony Theater Led Lights Upgrade - 56,800 56,800 66720 - Colony Theater Sound and Video - 151,940 151,940 Grand Total (Rounded to the nearest ten thousand)$5,750,000 $1,180,000 $6,930,000 Subcontractor Trade Cost $4,040,000 $830,000 $4,870,000 Contractor, General Conditions, Overhead & Profit (20%)$810,000 $170,000 $980,000 Owner Contingency (15%)$610,000 $120,000 $730,000 Permitting (5%)$210,000 $40,000 $250,000 Estimated Bond Fee (2%)$80,000 $20,000 $100,000 Miami Beach Botanical Garden Proposed Enhancement Resiliency & Sustainability Initiatives 3,491,780 - 3,491,780 Pond pump replacements - 21,300 21,300 Irrigation upgrades 42,600 - 42,600 New pathways for high traffic areas 71,000 - 71,000 New accessible routes to Native Garden and Gazebo 213,000 - 213,000 Dedicated electrical panel for Short-Term Events 7,100 - 7,100 New safety and landscape lighting 56,800 - 56,800 Security cameras and alarm system 49,700 - 49,700 Exit Sign renewal - 15,620 15,620 Proposed GO Bond for Arts Culture Page 2 of 5 G.O. Bond for Arts & Culture - All Projects Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Catering kitchen expansion 42,600 -42,600 Expanded event storage areas 355,000 -355,000 HVAC replacement -170,400 170,400 New ceiling fans -28,400 28,400 New A/V equipment for Banyan and Butterfly Rooms 92,300 -92,300 New sliding glass doors at Banyan Room 106,500 -106,500 Expansion of outdoor event area 71,000 -71,000 Enhanced technology infrastructure 142,000 -142,000 New Japanese Garden 710,000 -710,000 Miami Beach Botanical Garden HVAC Ductwork -30,246 30,246 Interior Renovations for Miami Beach Botanical Garden -59,356 59,356 Grand Total (Rounded to the nearest ten thousand)$5,460,000 $340,000 $5,800,000 Subcontractor Trade Cost $3,840,000 $230,000 $4,070,000 Contractor, General Conditions, Overhead & Profit (20%)$770,000 $50,000 $820,000 Owner Contingency (15%)$580,000 $40,000 $620,000 Permitting (5%)$190,000 $20,000 $210,000 Estimated Bond Fee (2%)$80,000 $0 $80,000 Art Deco Welcome Center - Miami Design Preservation League Proposed Enhancement Art Deco Welcome Center Ship's Ladder /Roof Access Renewal -14,200 14,200 Additional Funding for Art Deco Museum Expansion 1,136,000 -1,136,000 Enhanced Exterior and Interior Lighting 142,000 -142,000 Grand Total (Rounded to the nearest ten thousand)$1,290,000 $20,000 $1,310,000 Subcontractor Trade Cost $900,000 $10,000 $910,000 Contractor, General Conditions, Overhead & Profit (20%)$180,000 $10,000 $190,000 Owner Contingency (15%)$140,000 $0 $140,000 Permitting (5%)$50,000 $0 $50,000 Estimated Bond Fee (2%)$20,000 $0 $20,000 New World Symphony Proposed Enhancement Upgraded Theatrical Lighting 1,988,000 -1,988,000 Elevator Modernization -1,065,000 1,065,000 New LED Marquee Sign for East Façade 1,065,000 -1,065,000 Facility-wide Surge Protection 213,000 -213,000 New Pergola for Roof Garden 1,065,000 -1,065,000 Exterior Paint and Stucco Repairs -355,000 355,000 Flood Barriers 923,000 -923,000 Acoustical Resurfacing of Performance Hall "Sails"710,000 -710,000 Replace Acoustic Panels Throughout NWC 213,000 -213,000 Replace Fire Alarm System -362,100 362,100 Grand Total (Rounded to the nearest ten thousand)$6,190,000 $1,810,000 $8,000,000 Subcontractor Trade Cost $4,350,000 $1,260,000 $5,610,000 Contractor, General Conditions, Overhead & Profit (20%)$870,000 $260,000 $1,130,000 Owner Contingency (15%)$660,000 $190,000 $850,000 Permitting (5%)$220,000 $70,000 $290,000 Estimated Bond Fee (2%)$90,000 $30,000 $120,000 Holocaust Memorial Miami Beach Proposed Enhancement Interior repair and replacement of center arm structure -355,000 355,000 Repatina of center arm structure including surface sculptures 426,000 -426,000 Replacement of broken Jerusalem stones -568,000 568,000 Regrouting of all walkway stones 284,000 -284,000 Renovate center water feature and seal leaks (including filters)-710,000 710,000 Install new bicycle rack 710 -710 Tech for State of the Art walking tour for visitors 213,000 -213,000 State of the Art Security bollards at west side frontage 248,500 -248,500 State of the Art telephone system for visitor info 106,500 -106,500 Remodel security booth for 24-hour security staff 71,000 -71,000 Renovations to Visitor Welcome Center 142,000 -142,000 Renovations to Public Restrooms 213,000 -213,000 Wayfinding and Directional Signage 7,100 -7,100 Technology upgrade for Visitor Center 142,000 -142,000 New outdoor walkway to classroom 177,500 -177,500 Replacement of pond lamps -710,000 710,000 New lilies for pond feature 14,200 -14,200 Security Gate for rear entrance 213,000 -213,000 New CBS wall at rear of Memorial/West side of MBBG 532,500 -532,500 Roof replacement for Classroom, Admin. Office, Security Booth and Visitor’s Center -355,000 355,000 New flooring for Classroom, Admin. Office, Security Booth and Visitor’s Center 42,600 -42,600 New Security System and Surveillance Cameras 1,065,000 -1,065,000 Grand Total (Rounded to the nearest ten thousand)$3,910,000 $2,710,000 $6,620,000 Subcontractor Trade Cost $2,750,000 $1,900,000 $4,650,000 Contractor, General Conditions, Overhead & Profit (20%)$550,000 $380,000 $930,000 Owner Contingency (15%)$410,000 $290,000 $700,000 Permitting (5%)$140,000 $100,000 $240,000 Estimated Bond Fee (2%)$60,000 $40,000 $100,000 Proposed GO Bond for Arts Culture Page 3 of 5 G.O. Bond for Arts & Culture - All Projects Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Byron Carlyle Theater Renovation Proposed Enhancement Complete Renovation of Byron Carlyle Theater (including spaces for enhanced programming)*28,288,939 -28,288,939 Grand Total (Rounded to the nearest ten thousand)$28,310,000 $0 $28,310,000 Subcontractor Trade Cost $19,930,000 $0 $19,930,000 Contractor, General Conditions, Overhead & Profit (20%)$3,990,000 $0 $3,990,000 Owner Contingency (15%)$2,990,000 $0 $2,990,000 Permitting (5%)$1,000,000 $0 $1,000,000 Estimated Bond Fee (2%)$400,000 $0 $400,000 * Per Conditions Assessment & Recommendations Report prepared by M.C. Harry Associates (5/11/21) North Beach Senior Center - UNIDAD Proposed Enhancement New sound system and acoustical controls at Community Room 284,000 -284,000 New tables and seating for Community Room 71,000 -71,000 Catering Kitchen Expansion for Senior Meal Program 355,000 -355,000 Restoration of Historic Coral Rock House (Home of Miami Beach Hispanic Community Center)710,000 -710,000 Unidad Senior Center Accoustical Finish Enhancements -84,916 84,916 61320 - Unidad Building Door Renewal -89,460 89,460 61420 - Unidad Building Window Seal Renewal -56,800 56,800 65320 - Unidad Building Interior & Exterior Painting -127,800 127,800 Grand Total (Rounded to the nearest ten thousand)$1,420,000 $390,000 $1,810,000 Subcontractor Trade Cost $1,000,000 $260,000 $1,260,000 Contractor, General Conditions, Overhead & Profit (20%)$200,000 $60,000 $260,000 Owner Contingency (15%)$150,000 $40,000 $190,000 Permitting (5%)$50,000 $20,000 $70,000 Estimated Bond Fee (2%)$20,000 $10,000 $30,000 Miami New Drama at Collins Park Garage Proposed Enhancement Buildout for Miami New Drama at Collins Park Garage 7,100,000 -7,100,000 Grand Total (Rounded to the nearest ten thousand)$7,100,000 $0 $7,100,000 Subcontractor Trade Cost $5,000,000 $0 $5,000,000 Contractor, General Conditions, Overhead & Profit (20%)$1,000,000 $0 $1,000,000 Owner Contingency (15%)$750,000 $0 $750,000 Permitting (5%)$250,000 $0 $250,000 Estimated Bond Fee (2%)$100,000 $0 $100,000 Rhythm Foundation at Miami Beach Bandshell Proposed Enhancement Back of House Improvements - - Canopy Phase 3 - - Restroom Upgrades 213,000 213,000 Rear Platform Upgrade - - Canopy Projection Mapping - - Park Entrance Upgrade - - Park Performance, Architectural and Landscape Lighting - - Grand Total (Rounded to the nearest ten thousand)$3,280,000 $210,000 $3,490,000 Subcontractor Trade Cost $2,300,000 $150,000 $2,450,000 Contractor, General Conditions, Overhead & Profit (20%)$460,000 $30,000 $490,000 Owner Contingency (15%)$350,000 $20,000 $370,000 Permitting (5%)$120,000 $10,000 $130,000 Estimated Bond Fee (2%)$50,000 $0 $50,000 Proposed GO Bond for Arts Culture Page 4 of 5 I I I I I I I I I I I I I I I I I I I I I G.O. Bond for Arts & Culture - All Projects Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) The Wolfsonian Proposed Enhancement Proposed Expansion and New Washington Ave. Entrance 14,200,000 -14,200,000 Grand Total (Rounded to the nearest ten thousand)$14,200,000 $0 $14,200,000 Subcontractor Trade Cost $10,000,000 $0 $10,000,000 Contractor, General Conditions, Overhead & Profit (20%)$2,000,000 $0 $2,000,000 Owner Contingency (15%)$1,500,000 $0 $1,500,000 Permitting (5%)$500,000 $0 $500,000 Estimated Bond Fee (2%)$200,000 $0 $200,000 The Jewish Museum of Florida Proposed Enhancement Facility-wide Enhancements 1,065,000 -1,065,000 Grand Total (Rounded to the nearest ten thousand)$1,080,000 $0 $1,080,000 Subcontractor Trade Cost $750,000 $0 $750,000 Contractor, General Conditions, Overhead & Profit (20%)$150,000 $0 $150,000 Owner Contingency (15%)$120,000 $0 $120,000 Permitting (5%)$40,000 $0 $40,000 Estimated Bond Fee (2%)$20,000 $0 $20,000 Artistic Playgrounds Proposed Enhancement Artistic upgrades / playground activation 7,100,000 -7,100,000 Grand Total (Rounded to the nearest ten thousand)$7,100,000 $0 $7,100,000 Subcontractor Trade Cost $5,000,000 $0 $5,000,000 Contractor, General Conditions, Overhead & Profit (20%)$1,000,000 $0 $1,000,000 Owner Contingency (15%)$750,000 $0 $750,000 Permitting (5%)$250,000 $0 $250,000 Estimated Bond Fee (2%)$100,000 $0 $100,000 Underwater Reefline Project Proposed Enhancement Multi-phase 9-mile Artificial Reef Project 16,756,000 -16,756,000 Grand Total (Rounded to the nearest ten thousand)$16,760,000 $0 $16,760,000 Subcontractor Trade Cost $11,800,000 $0 $11,800,000 Contractor, General Conditions, Overhead & Profit (20%)$2,360,000 $0 $2,360,000 Owner Contingency (15%)$1,770,000 $0 $1,770,000 Permitting (5%)$590,000 $0 $590,000 Estimated Bond Fee (2%)$240,000 $0 $240,000 Living Shorelines & Mangrove Restoration Proposed Enhancement Scope of Work to be developed by CMB Environment & Sustainability Dept. 4,260,000 -4,260,000 Grand Total (Rounded to the nearest ten thousand)$4,260,000 $0 $4,260,000 Subcontractor Trade Cost $3,000,000 $0 $3,000,000 Contractor, General Conditions, Overhead & Profit (20%)$600,000 $0 $600,000 Owner Contingency (15%)$450,000 $0 $450,000 Permitting (5%)$150,000 $0 $150,000 Estimated Bond Fee (2%)$60,000 $0 $60,000 Proposed GO Bond for Arts Culture Page 5 of 5 I I I I I I I I I I I I I I I I I I I I I I I I I I I I Organizational Structure & Current Funding Sources A.City-Owned Assets 1.Bass Museum of Art (501 c 3 Not for Profit) - The Bass is managed through an annual Letter Agreement between the City and the “Friends of the Bass Museum of Art”. The Letter Agreement supports the Bass annually in the amount of $905,000. The Bass’ Cultural Arts Council Grant for FY 22 is $23,688 plus $70,000 in COVID relief funding. 2.Miami City Ballet (501 c 3 Not for Profit) Cultural Arts Council Grant for FY 22 is $22,176 plus $70,000 in COVID relief funding. 3.Fillmore Miami Beach – City-owned property. Managed through Live Nation. 4.Colony Theater- The Colony Theatre is operated through a Management Agreement with Miami New Drama (501 c 3 Not for Profit). The current Management Agreement for the Colony is for 5 years and will expire on September 30, 2023. The Agreement allocates $500k annually ($420,000 for Management and $80,000 for Utilities Reimbursement, paid quarterly). Miami New Drama’s Cultural Arts Council Grant for FY 22 is $23,436 plus $65,000 in COVID relief funding. 5.Miami Beach Botanical Garden (501 c 3 Not for Profit- Miami Beach Garden Conservancy, Inc.) Cultural Arts Council Grant for FY 22 is $22,176 plus $60,000 in COVID relief funding. 6.Art Deco Welcome Center – Miami Design Preservation League (501 c 3 Not for Profit) Cultural Arts Council Grant for FY 22 is $21,420 and $65,000 in COVID relief funding; plus $100k sponsorship for Art Deco Weekend 7.New World Symphony- (501 c 3 Not for Profit) As we mentioned yesterday, NWS received funding in the previous GO Bond for the 4k upgrade($3.8M) Cultural Arts Council Grant for FY 22 is $27, 342 plus $70,000 in COVID relief funding. 8.Holocaust Memorial Miami Beach (501 c 3 Not for Profit) Cultural Arts Council Grant for FY 22 $22,176 plus $65,000 in COVID relief funding 9.Byron Carlyle Theater Renovation- City-owned property. Closed. 10.North Beach Senior Center- City-owned. Managed by UNIDAD. 11.Miami New Drama at Collins Park Garage- Please see above for Miami New Drama (501 c 3) 12.Rhythm Foundation at North Beach Bandshell (501 c 3 Not for Profit) The Rhythm Foundation has a Management Agreement with the Parks Department that allocates $45,000 per year. Cultural Arts Council Grant for FY 22 $23,184 plus $65,000 in COVID relief funding B.Culture / Art Institutions Not City-Owned (Please note these as FIU owned Facilities) 1.The Wolfsonian- FIU - Qualifies as a Cultural Anchor due to status as “cultural departments within an institution of higher learning (college or university) with tax-exempt status under other subsections of 501(c)(3)” Cultural Arts Council Grant for FY 22 is $26,754 plus $70,000 in COVID relief funding. 2.The Jewish Museum of Florida – FIU Qualifies as a Cultural Anchor due to status as “cultural departments within an institution of higher learning (college or university) with tax-exempt status under other subsections of 501(c)(3)” Cultural Arts Council Grant for FY 22 is $21,672 plus $65,000 in COVID relief funding. Notes: *All of the Cultural Anchors (501 c 3 organizations) receive funding through various sources, including private donations, foundations, grants and public funds. **The amounts indicated above do not reflect facilities management services provided by City. List of Current G.O. Bond Funds Allocated for Facilities The following institutions have requested new funds from the proposed Arts & Culture G.O. Bond and have already been allocated some funds from the existing G.O. Bond Program. New World Symphony Project: GO#19: Soundscape Park Scope: Enhance the local arts & culture facility with upgraded WALLCAST technology and equipment, installing a custom 4K ultra high-definition display system; construct a permanent restroom and storage facility. Amount: $4,500,000 Tranche: 1 Phase: 4K Technology is completed ($3.8 million). Restrooms & Storage is in Design ($700,000) The Colony Theatre Project: GO#26: Roofs for Cultural Facilities - Colony Theatre Roof Scope: Replace the roof at the Colony Theatre with a new sustainable roof. Amount: $300,000 Tranche: 1 Phase: Completed The Fillmore Project: GO#26: Roofs for Cultural Facilities - Fillmore Roof Scope: Replace the roof at The Fillmore with a new sustainable roof. Amount: $1,900,000 Tranche: 1 Phase: Completed Miami City Ballet Project: GO#26: Roofs for Cultural Facilities – Miami City Ballet Roof Scope: Replace the roof at Miami City Ballet with a new sustainable roof. Amount: $758,000 Tranche: 1 Phase: Completed Miami Design Preservation League Project: GO#28: Art Deco Museum Scope: Expand the museum facility on Ocean Drive to increase size and reconfigure layouts of multiuse space; reconfigure infrastructure to accommodate exhibit, ancillary and community need. Amount: $2,000,000 Tranche: 2 Phase: Future Living Shorelines Project: GO#39: Seawalls & Shorelines Scope: Raise public seawalls to the updated minimum height standard (5.7 NAVD) in areas most vulnerable to sea level rise and street flooding; incorporate living shorelines with natural vegetation, native species and other green infrastructure. Amount: $10,000,000 Tranche: 1 & 2 Phase: Tranche 1 is in Construction. Tranche 2 is Future. Tax Projection Options To Follow The Bass Organization Background: The Bass is Miami Beach’s contemporary art museum. Focusing on exhibitions of international contemporary art, The Bass presents mid-career and established artists reflecting the spirit and international character of Miami Beach. The Bass seeks to expand the interpretation of contemporary art by incorporating disciplines of contemporary culture, such as design, fashion and architecture, into the exhibition program. The exhibition program encompasses a wide range of media and artistic points of view that bring new thought to the diverse cultural context of Miami Beach. Central to the museum’s mission, The Bass maintains a vigorous education program for lifelong learning and visitors of all ages. The Bass IDEAS education initiative uses art as a catalyst for creativity and positive growth, especially in the area of early childhood education. The active school program led by the City of Miami Beach called STEAM+, takes The Bass IDEAS off-site by engaging children in Miami-Dade County Public Schools and integrating arts education into the curriculum. Use of Funds The Bass, as explicitly stated in its mission, “shares the power of contemporary art through experiences that excite, challenge and educate.” Implicit in this vision is to evolve by including nontraditional museum audiences and new generations via new technologies. The Bass proposes first, to upgrade its existing building infrastructure with updates and improvements listed, enhancing visitor experience and the museums’ ability to serve the public. Additionally, the museum proposes building an indoor/outdoor structure that opens its doors (literally) and serves as a multi-use cultural place maker – a space to convene community in the form of a gathering space, café, and non-traditional art exhibition space adjacent to The Bass’ southwestern flank. This multi-purpose concept would convert the small, quite unattractive, and under-utilized parking lot adjacent to the museum into a social space following the originally designed footprint envisioned by the Pritzker prize winning architect Arata Isozaki. Recognizing that Miami Beach needs to maintain its competitiveness as an urban neighborhood, The Bass proposes building a multi-use space that is reflective of our contemporary times: a space that would expand The Bass’ capacity by addressing EXISTING program NEEDS and capacities such as providing a stage and space for the Collins Park monthly jazz series and restarting its popular MISO on the park, a giant screen to present The Bass’ growing collection of new media art, and FUTURE programming such as movie nights and an artist-designed mini golf, among others. This structure would serve as a cultural place maker in Collins Park and forcefully offer an alternative to other public convening destinations like the Design District or Bayfront Park near PAMM. Programmed, managed, funded, and marketed by The Bass, this flexible space would provide for year-round cultural programming. Bringing this vision to reality is The Bass’ natural next step. Estimated Project Timeline The design and architecture cost would commence immediately, with construction beginning in January 2024. Benefits to Taxpayers The main benefit to taxpayers would be increased quality of life, with the area serving as a center for various programming such as movie nights, jazz concerts and informal café gatherings. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful, improvements will be funded for the capital campaign amongst museum donors. The scope of this project is slightly smaller than the museum’s 2017 expansion. List of Capital Improvements Multi-Use Programmable Space ($10,000,000) Indoor/Outdoor space for programming Projector and screen ($45,000) New projector and screen for the Museum Courtyard Courtyard Automatic shade system ($75,000) Automatic shade system for Museum Courtyard Courtyard Audio Induction Loop ($28,000) Audio Induction Loop for Museum Courtyard Lumitrix interior lighting system ($45,000) Lumitrix event lighting system for Museum Courtyard Commercial grade overhead door ($40,000) Commercial grade overhead door for Museum Café Enhanced A/V equipment ($65,000) Enhanced A/V equipment for Museum Creativity Center Creativity Center Automatic shade system ($75,000) Programmable automatic shades for the Museum Creativity Center Gallery tack lighting ($15,000) Adjustable gallery tack lighting for Museum Creativity Center Creativity Center Audio Induction Loop ($40,000) New projector and screen for the Museum Courtyard Lobby Transformer ($10,000) Replace transformer for LED lighting at Museum Lobby Beacon-based wayfinding system ($40,000) Museum wide beacon-based wayfinding system Exterior lighting enhancements ($75,000) Enhanced exterior lighting for Museum façade and Museum Courtyard Collins Park WiFi access points ($175,000) WiFi access points throughout Collins Park for enhanced patronage reporting Lumitrix exterior lighting system ($45,000) Lumitrix display lighting for exterior art installations Replaced wall mounted ladder ($11,000) Wall mounted ladder replacement G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Bass Museum of Art Proposed Enhancements New projector and screen for Museum Courtyard 63,900 - 63,900 Automatic shade system for Museum Courtyard 106,500 - 106,500 Audio Induction Loop for Museum Courtyard 39,760 - 39,760 Lumitrix event lighting system for Museum Courtyard 63,900 - 63,900 Commercial grade overhead door for Museum Café 56,800 - 56,800 Enhanced A/V equipment for Museum Creativity Center 92,300 - 92,300 Programmable automatic shades for Museum Creativity Center 106,500 - 106,500 Adjustable gallery tack lighting for Museum Creativity Center 21,300 - 21,300 Audio Induction Loop for Museum Creativity Center 56,800 - 56,800 Replace transformer for LED lighting at Museum Lobby 14,200 - 14,200 Museum wide beacon- based wayfinding system 56,800 - 56,800 Enhanced exterior lighting for Museum façade and Museum Courtyard 106,500 - 106,500 WiFi access points throughout Collins Park for enhanced patronage reporting 248,500 - 248,500 Lumitrix display lighting for exterior art installations 63,900 - 63,900 Wall mounted ladder replacement 15,620 - 15,620 Bass Museum Exhaust System Renewal - 17,040 17,040 Bass Museum Exterior Lighting Renewal - 90,880 90,880 Bass Museum Plumbing Fixture Renewal (Classroom Wing)- 23,856 23,856 Bass Museum Retaining Wall Tile Replacement - 29,252 29,252 Bass Museum Water Coolers Renewal - 23,430 23,430 Bass Museum Rooftop Package Unit Renewal - 119,280 119,280 Bass Museum Clean Steam Humidifier Reneval - 132,060 132,060 Bass Museum Emergency Lighting Replacement - 66,740 66,740 Bass Museum Condenser Pump Renewal - 46,860 46,860 Bass Museum Multipurpose Place Maker Space 19,170,000 - 19,170,000 Bass Museum Plumbing Fixture Renewal (Classroom Wing)- 23,856 23,856 Fire Alarm system replacement - 2,130,000 2,130,000 62922 - Bass Museum Exterior Wall Repairs - 55,380 55,380 64623 - Bass Museum Gallery Floor Renovation - 320,920 320,920 64223 - Bass Museum Interior Gallery Wall - 89,460 89,460 63923 - Bass Museum Keystone Seal - 89,460 89,460 64823 - Bass Museum Tranquility Fountain - 65,320 65,320 Grand Total (Rounded to the nearest ten thousand)$20,310,000 $3,340,000 $23,650,000 Subcontractor Trade Cost $14,290,000 $2,350,000 $16,640,000 Contractor, General Conditions, Overhead & Profit (20%)$2,860,000 $470,000 $3,330,000 Owner Contingency (15%)$2,150,000 $350,000 $2,500,000 Permitting (5%)$720,000 $120,000 $840,000 Estimated Bond Fee (2%)$290,000 $50,000 $340,000 Proposed GO Bond for Arts Culture Miami City Ballet, Inc. Organization Background Miami City Ballet (MCB) located in the heart of South Beach and led by Artistic Director Lourdes Lopez, Miami City Ballet nurtures dancers, creates innovative collaborations, and opens avenues of inclusivity within classical ballet. Founded in 1985 by Toby Lerner Ansin and Founding Artistic Director Edward Villella, MCB boasts a repertory of 110 ballets, including 18 world premieres. The Company serves 100,000 patrons annually through performances and programs in Miami Beach, across South Florida, and touring engagements. The Company is anchored in its signature building in Miami Beach, and uses this facility to rehearse throughout the year and provide community programming in its Wolfson Theater. Founded in 1993, Miami City Ballet School has grown into one of the nation’s most prestigious dance academies. Providing enrichment through holistic dance education, MCB School offers $500,000 in annual scholarships, to students from diverse socioeconomic strata. Each school year, more than 400 students—many from Miami Beach—participate in MCB School’s ballet training program. Ancillary programs include several summer intensives, choreographic training workshops, and open community classes for the public—all of which attract nearly 1,500 students annually. All School classes are conducted at the main facility in Miami Beach. Serving 12,000+ annually in schools, communities and social service centers, community engagement programs use the power of ballet to uplift, unite, enchant, and bring joy. MCB collaborates with community partners including the City of Miami Beach to bring STEAM curriculum into Title I Schools, several Title I Schools to bring the Explore Dance After-School arts instruction, and with venues such as the Colony Theatre, to host the Ballet for Young People free performance program and Company performances. Use of Funds Miami City Ballet’s facility at 2200 Liberty Avenue is owned by the City of Miami Beach, who purchased the building in 2005. MCB has a 40-year lease and pays the City of Miami Beach a $97,000 annual maintenance and capital reserve fee. Miami City Ballet’s 3-story professional dance facility houses administrative offices, eight state-of- the-art studios, performance space for small productions, a wardrobe shop and costume storage, physical therapy facilities, fitness and dressing rooms, box office operations, and production offices. Funds from the GO Bond will support the second phase of Miami City Ballet’s multi-phase capital maintenance and improvement plan. The scope of work includes deferred maintenance and facility upgrades, upgrades to the Wolfson 200-seat theatre, and other studio and facility improvements. Estimated Project Timeline All projects are ready to begin upon approval of the GO Bond, with completion in 36 months. Benefits to Taxpayers A cultural staple in the heart of South Beach for two decades, this facility is integral to the development of our performances by the professional company, to the holistic training and preparation of students to be versatile 21 st century dancers, and for the planning and execution of community engagement programming. MCB is a hub for year-round cultural activity for arts patrons, dancers, community organizations, and visiting and local artists. As one of the nation’s leading ballet companies and training academies, MCB highlights the cultural excellence Miami Beach has to offer. Both Miami Beach residents, along with visitors from all over the world will benefit from upgrades to this state-of-the-art facility by enhancing the visitor experience. Continued investment in facility and technology upgrades will preserve the integrity of the building and ensure the long-term sustainability of this state-of-the-art dance facility in the state and in the country. Technology enhancements and upgrades to the Wolfson 200-Seat Theater will increase access to quality cultural arts programming and education with the ability to record and live-stream programs and performances to Miami Beach residents and beyond. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Improvements would not occur without funding from the GO Bond. Past capital improvements were completed in June 2021, with the help of a $360,000 Cultural Facilities grant from the Florida Division of Arts & Culture that was matched 2:1 with funds held in our accounts at the City of Miami Beach. MCB completed a 3-year facility upgrade that included necessary structural upgrades to the building: roof repair; repair and painting of the exterior; and replacement of HVAC, new exterior windows, studio lighting, and studio flooring. List of Capital Improvements Wolfson Theater Upgrades $937,402 The Wolfson Theater, which encompasses MCB’s main rehearsal studio, can be leveraged further to showcase the arts in Miami Beach. Technology upgrades to allow streaming of performances, rehearsals and other community programs. Collins Park Neighborhood Association can utilize for meetings and with enhancements can improve access to community. Lighting, projection, audio, and black-out curtains are part of the envisioned budget items. Studio Conversion Capabilities $202,267 Currently MCB’s main facility has eight ballet studios but limited large group meeting space. To optimize the utility of the current facilities, funds will be used to convert a studio space, when classes and rehearsal are not in session, for conference meeting use. This conference space would be available for groups of 20-50 meeting participants including Trustee meetings, parent conferences, and community forums. Technology upgrades would allow streaming and remote participation. Lighting, projection, audio, noise- reduction features, and black-out curtains are part of the envisioned budget items. Other Studio & Facility Upgrades $2,038,710 The main building is in need of upgrades to enhance its functionality. Harlequin marley floors in studios and hallways, wardrobe utility renovation, acoustical ceiling panel renewal, systems furniture, lobby security enhancements, studio black-out shades, and replacement of carpet on third floor with wood. Deferred Maintenance & Facility Upgrades $1,251,962 Facility-wide variable air volume Box replacements, electronic HVAC filtration & UV-C lights in the rooftop units, dry wall repairs and paint in studios/common areas, elevator modernization, LED lamp replacement, bottled water filling stations, hands-free faucets and toilet flushometers upgrade, restroom exhaust system renewal, HVAC ductwork renewal, and Stair finish renewal (rubber treading). Public Works Upgrades $369,659 Loading dock flooding repair, defensive architectural enhancements to Collins Park boardwalk. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Miami City Ballet Proposed Enhancements Miami City Ballet Office Area Flooring Replacement - 154,297 154,297 Miami City Ballet Studio Blackout Shades - 38,482 38,482 64023 - Facility-wide Variable Air Volume (VAV) Box Replacements - 74,550 74,550 Electronic HVAC Filtration - UV-C Lights in rooftops units 49,700 - 49,700 Dry Wall Repairs and Paint at Studios 1-5, 7, 8 and Common Areas - 205,900 205,900 Harlequin "Marley" Floors - Studios 4,5,6,8, Hallway 1 & 2 - 284,000 284,000 Wolfson Theater A/V Upgrades 783,840 - 783,840 Elevator Modernization - 525,400 525,400 Wardrobe Utility Renovation 205,900 - 205,900 LED Lamp Replacement (Facility-wide, including balconies)- 243,530 243,530 Bottled Water Filling Stations (3)14,200 - 14,200 Hands Free Faucets and Toilet Flushometers Upgrade - 213,000 213,000 Restroom Exhaust System renewal - 35,500 35,500 Acoustical Ceiling Panel renewal - 106,500 106,500 HVAC Ductwork renewal - 741,240 741,240 Systems Furniture 489,900 - 489,900 Lobby Security Enhancements 113,600 - 113,600 Stair Finish Renewal (rubber treading)- 68,160 68,160 Loading Dock Flooding Repair - 355,000 355,000 Studio Black Out Shades 170,400 - 170,400 3rd Floor Wood Floors Replacement - 184,600 184,600 Project Management Fees (Balance Commercial Real Estate)- - - Defensive Architectural Enhancements to Collins Park Boardwalk 21,300 - 21,300 64323 - Miami City Ballet Access Control - 71,000 71,000 64523 - Miami City Ballet Board Room Carpet - 124,960 124,960 63022 - Miami City Ballet Exit Sign Renewal - 103,660 103,660 64423 - Miami City Ballet UV Light Retrofit - 46,860 46,860 Workforce Housing - Miami City Ballet's Floor 7,849,605 - 7,849,605 Digital enhancement of MCB lobby and studios 4,402,000 - 4,402,000 Technology upgrade of administrative offices 1,065,000 - 1,065,000 LED Screen and Flooring for Outdoor Performances 710,000 - 710,000 - - - Grand Total (Rounded to the nearest ten thousand)$15,876,000 $3,584,000 $19,460,000 Subcontractor Trade Cost $11,180,000 $2,520,000 $13,700,000 Contractor, General Conditions, Overhead & Profit (20%)$2,236,000 $504,000 $2,740,000 Owner Contingency (15%)$1,680,000 $380,000 $2,060,000 Permitting (5%)$560,000 $130,000 $690,000 Estimated Bond Fee (2%)$220,000 $50,000 $270,000 Proposed GO Bond for Arts Culture Fillmore Miami Beach Organization Background The City of Miami Beach has a lease arrangement with Live Nation to operate and maintain the Theater. They will work with the City regarding these significant necessary enhancements. Use of Funds Major renovation and improvement to this over 50-year-old facility. Estimated Project Timeline Approximately 24 months. Benefits to Taxpayers The ongoing operation of this Theater with these significant improvements will allow the continuation of entertainment to Miami Beach residents and visitors. Shows that will entertain then of thousands of children and adults with an enhanced atmosphere will thrive alongside the new Miami Beach Convention Center and Hotel. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Improvements cannot be made without funding from the GO Bond. List of Capital Improvements $1,485,517 - Auditorium furniture and finishes replacement $2,329,918 - First Floor Lighting and Finish Upgrades (FOH) $1,158,538 - Second Floor Lighting and Finish Upgrades (FOH) $827,617 - Third Floor Lighting and Finish Upgrades (FOH) $51,743 - Fourth Floor Exit Corridor- Painting and Carpet Replacement (FOH) $42,052 - Repairs to Existing Catwalk Structural Panels at Stage Roof Penthouse + Lapeyre Stair $65,903 - Structural Panels at Stage Roof Penthouse + Lapeyre Stair $335,014 - Exterior Window and Door Replacement $413,620 - Exterior Structural Repairs $412,993 - Driveway Redesign and enhanced pedestrian area $1,221,177 - Basement Lighting and Finish Upgrades $623,330 - First Floor Lighting and Finish Upgrades (BOH) $339,884 - Second Floor Lighting and Finish Upgrades (BOH) $1,506,356 - New Second Floor VIP Area $753,178 - New Commercial Kitchen $62,765 - Acoustical Improvements at Dressing Rooms/ Corridors $251,059 - Asbestos, Lead Paint, IAQ Abatement Allowance $618,861 - Freight Elevator renewal $439,354 - Exhaust System renewal $2,039,857 - Chilled Water Piping renewal $1,056,709 - HVAC Replacements $1540249 - Electrical Enhancements (including FA allowance) $45,818 - Plumbing Enhancements (facility-wide) $253,928 - Upgrades to Existing Fire Protection System $400,440 - Emergency Lighting renewal $3,617,764 - Theatrical Systems Upgrade $1,506,356 - New LED Marquee Sign G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Fillmore Miami Beach Proposed Enhancement Auditorium furniture and finishes replacement 1,680,428 - 1,680,428 First Floor Lighting and Finish Upgrades (FOH)2,635,619 - 2,635,619 Second Floor Lighting and Finish Upgrades (FOH)1,310,546 - 1,310,546 Third Floor Lighting and Finish Upgrades (FOH)936,206 - 936,206 Fourth Floor Exit Corridor- Painting and Carpet Replacement (FOH)58,532 - 58,532 Repairs to Existing Catwalk 47,570 - 47,570 Structural Panels at Stage Roof Penthouse + Lapeyre Stair 74,550 - 74,550 Exterior Window and Door Replacement 378,970 - 378,970 Exterior Structural Repairs 467,890 - 467,890 Driveway Redesign and enhanced pedestrian area 467,180 - 467,180 Basement Lighting and Finish Upgrades 1,381,404 - 1,381,404 First Floor Lighting and Finish Upgrades (BOH)705,115 - 705,115 Second Floor Lighting and Finish Upgrades (BOH)384,479 - 384,479 New Second Floor VIP Area 1,704,000 - 1,704,000 New Commercial Kitchen 852,000 - 852,000 Acoustical Improvements at Dressing Rooms/ Corridors 71,000 - 71,000 Asbestos, Lead Paint, IAQ Abatement Allowance - 284,000 284,000 Freight Elevator renewal - 700,060 700,060 Exhaust System renewal - 497,000 497,000 Chilled Water Piping renewal - 2,307,500 2,307,500 HVAC Replacements - 1,195,356 1,195,356 Electrical Enhancements (including FA allowance)- 1,742,340 1,742,340 Plumbing Enhancements (facility-wide)- 51,830 51,830 Upgrades to Existing Fire Protection System - 287,245 287,245 Emergency Lighting renewal - 452,980 452,980 Fillmore Miami Beach Exterior Window and Door Replacement - 316,944 316,944 Fillmore Restoration of Mermaid Sculpture at Fillmore Miami Beach - 140,580 140,580 Theatrical Systems Upgrade 4,092,440 - 4,092,440 New LED Marquee Sign 1,704,000 - 1,704,000 Grand Total (Rounded to the nearest ten thousand)$18,960,000 $7,990,000 $26,950,000 Subcontractor Trade Cost $13,350,000 $5,620,000 $18,970,000 Contractor, General Conditions, Overhead & Profit (20%)$2,670,000 $1,130,000 $3,800,000 Owner Contingency (15%)$2,000,000 $850,000 $2,850,000 Permitting (5%)$670,000 $280,000 $950,000 Estimated Bond Fee (2%)$270,000 $110,000 $380,000 Proposed GO Bond for Arts Culture Colony Theatre Organization Background The Colony Theatre is a city-owned 1935 historic building located on Lincoln Road. A number of renovations over the years have transformed the Colony into a 417-seat theater for live stage performance. The last such renovation ($6.5M) was in 2006. Since 2016 the Colony Theatre has been managed and operated by Miami New Drama, a Miami Beach Cultural Anchor with a mission of developing diverse, relevant new plays and musicals in conversation with the community. Under Miami New Drama’s management, the Colony Theater welcomes over 40,000 people annually, including thousands of Miami-Dade students. The largest bilingual theater in America, Miami New Drama has grown into an award-winning, nationally recognized regional theater with a national reputation for serving the Miami Beach and Miami-Dade communities with diverse, groundbreaking work. Use of Funds With its last renovation in 2006, the Colony Theatre’s systems, public areas, and equipment are out of date and have for been slated for improvement for years, most recently in a 2018 renovation plan by historic architect Richard Heisenbottle. Current equipment is not up to modern theatrical standards and is incompatible with the level of work audiences expect to see produced on its stage. Miami New Drama currently invests hundreds of thousands of dollars annually to enhance inadequate systems with rented equipment. The proposed projects would bring the facility up to industry standard while providing historically appropriate upgrades to public areas, and enhancing and restoring the building exterior. Estimated Project Timeline Plans and permitting process would commence upon project funding, and work would be scheduled over 36 months in stages in order to minimize operations interruption. Benefits to Taxpayers The Colony Theater is a historic jewel in the collection of Miami Beach’s facilities. It is the last remaining cultural facility on Lincoln Road, and the only venue for professional theater in Miami Beach. The residents of Miami Beach deserve a professional theater that is on par with facilities in other cities such as Sarasota, Jupiter, West Palm Beach, Aventura, and Coral Gables. Increasing the production capacity of the theater will make it more attractive to producers wishing to partner with Miami New Drama to develop nationally noteworthy, Broadway-bound productions. Every year, tens of thousands of Miami-Dade residents travel to Miami Beach to attend performances at the Colony. A restored, world-class facility would not only better serve Miami Beach residents, but also increase the Greater Miami-Dade draw, and theater’s already sizable economic impact. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Without GO Bond funding a small portion of these items might eventually be completed through city facility maintenance, and capital improvements. The majority would likely go unrealized. List of Capital Improvements Lighting and Projection System Upgrade ($1,035,000) The current equipment list is inadequate for professional theatrical lighting designers and many fixtures are out-dated or in need of repair. Replacement and enhancement with LED technology, programmable fixtures, and modern spotlights. The existing movie projector requires enhancement with additional projector positions and the proper operating computer system. Sound System Redesign and Replacement ($1,088,000) The existing sound system is poorly designed and obsolete. Musical productions by Miami New Drama have required 100% rental replacement of the existing system, cabling, sound board, and speakers. A new system would bring design, positioning and specification to industry standard. Stage Rigging and Mechanics ($235,000) The current rigging system is a traditional rope and counterweight system requiring manual operation. Repair and enhancement would increase motorization, efficiency, and safety. Replace Acoustical Drapes, Main Drape, & Soft Goods ($242,000) Needed replacement of the auditorium draperies was specified in the 2018 Heisenbottle assessment. New JLG drivable vertical mast lift ($27,000) Loading dock doors & liftgate ($67,000) The awkward placement and small size of the existing loading dock is a limiting factor to the type and scale of scenery and equipment that can be loaded into The Colony. Replacement of the doors and liftgate would provide a feasible, low-impact improvement. Facility-wide expansion & storage ($456,000) The Colony lacks the amount of storage and personnel dressing and workspaces required by a professional theater. This expansion would optimize unused areas of the building and seek to maximize dressing rooms, green rooms, currently inadequate laundry facilities, and all back of house areas. Facility-wide Security, Access & Communication Systems Upgrade ($250,000) Obsolete security and communication systems would be greatly improved with the installation of fiber, high-speed internet, new cameras and trackable key card access. Domestic Water Pump renewal, Roof hatch replacement, Emergency Lighting Renewal ($260,000) Accessibility Enhancements ($215,000) There are public and private areas that are currently lacking in accessibility accommodations. This would address deficiencies in balcony seating, box office, and backstage accessibility. Lobby & Front Entry Renovations ($630,000) Long slated for renovation and included in the Heisenbottle plan, the outer and inner lobbies are in disrepair. Storefront windows are in need of replacement to impact glass. Restroom Renovation & Expansion ($500,000) Also included in the 2018 Heisenbottle plan is a much needed expansion and renovation of the lobby bathrooms, currently used by Miami New Drama and Segafredo patrons. New Carpeting & Theater Seating ($650,000) The existing carpet is inadequate for commercial traffic and has been flagged for replacement along with the auditorium seating, much of which is broken and creates safety hazards for patrons. Exterior Renovation ($295,000) Exterior paint and stucco repair, replacement awnings, and an exterior lighting package would serve to highlight the historic beauty of the Colony Theatre day and night and draw visitors to the facility. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Colony Theater Proposed Enhancement Lighting & Projection System 1,096,240 - 1,096,240 Sound System Redesign & Replacement 1,153,395 - 1,153,395 Replace Acoustical Drapes, Main Drape, & Soft Goods 255,600 - 255,600 Stage rigging and mechanics 248,500 - 248,500 New JLG driveable vertical mast lift 28,400 - 28,400 Loading Dock doors and liftgate 71,000 - 71,000 Facility-wide expansion & storage 482,800 - 482,800 Facility-wide Security, Access & Communication Systems Upgrade 264,120 - 264,120 Emergency Lighting renewal - 15,620 15,620 Domestic Water Pump renewal - 73,840 73,840 Accessibility Enhancements 227,200 - 227,200 Lobby & front entry renovations 667,400 - 667,400 62221 - Restroom renovation & expansion 532,500 - 532,500 New Carpeting & Theater Seating 695,800 - 695,800 Entry door/storefront replacement - 312,400 312,400 Roof hatch replacement - 42,600 42,600 Colony Theater Acoustic Curtains and Resonators - 52,540 52,540 62321 - Colony Theater Exterior Painting - 237,424 237,424 Colony Theater North Awning Replacement - 12,212 12,212 Colony Theater Restroom Exhaust Fan Renewal - 23,430 23,430 64123 - Colony Theater Impact Glass - 146,260 146,260 63222 - Colony Theater Exit Sign Renewal - 51,120 51,120 62421 - Colony Theater Led Lights Upgrade - 56,800 56,800 66720 - Colony Theater Sound and Video - 151,940 151,940 Grand Total (Rounded to the nearest ten thousand)$5,750,000 $1,180,000 $6,930,000 Subcontractor Trade Cost $4,040,000 $830,000 $4,870,000 Contractor, General Conditions, Overhead & Profit (20%)$810,000 $170,000 $980,000 Owner Contingency (15%)$610,000 $120,000 $730,000 Permitting (5%)$210,000 $40,000 $250,000 Estimated Bond Fee (2%)$80,000 $20,000 $100,000 Proposed GO Bond for Arts Culture Miami Beach Botanical Garden Organization Background The mission of the Miami Beach Botanical Garden is to promote environmental enjoyment, stewardship and sustainability through education, the arts, and interaction with the natural world. Our garden is a unique, subtropical oasis of beauty and tranquility within an urban setting—a community resource that refreshes, inspires, and engages our visitors. Use of Funds Funds would be used to create a resilient and sustainable public green space, more authentic cultural and educational experiences, and an enhanced arts and culture space as well as for facility upgrades to diversify the types of events hosted in the Garden. Estimated Project Timeline Facility upgrades and improvements can be completed within 12-18 months. The larger component, to become a model of resiliency and sustainability, will take an estimated 3-5 years to complete. Benefits to Taxpayers The Miami Beach Botanical Garden aims to become a community model of resiliency and sustainability. Adding both functional and artistic infrastructure would enhance resident quality of life, protect and prepare the Garden for climate change and sea level rise, and build on the Miami Beach brand of being a leader in resiliency and sustainability while enhancing its arts and culture offerings. The benefits to the community would include flood risk mitigation, health and environmental benefits, and educational resources for adapting homes and yards. The Garden would serve as a prototype for various strategies that can be observed, tested, adapted, and deployed throughout the City. The project would also attract students to observe and learn about resiliency strategies and would be an opportunity for the City to attract eco-tourism. The use of solar power throughout the garden and rainwater for irrigation would both help the City in its goal of getting to net zero emissions as well as save taxpayer money spent on electricity and water. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Without a GO Bond, the Garden would seek grant funding and explore a capital campaign. List of Capital Improvements Model of resiliency and sustainability ($3.4m) With this funding, the Garden would explore the options for an already built environment with mature landscaping, including a catch basin and/or artistic cisterns, LEED certified buildings, green roofs, permeable pavement, solar power, and resilient landscaping. Facility Updates/Upgrades ($900,000) While many area gardens charge admission fees, events support the operating costs of the Miami Beach Botanical Garden and allow it to remain open to the public six days a week with free admission. MBBG’s goal is to diversify these events to reduce the impact on the community as well as the Garden and add low-impact daytime activation of underutilized indoor spaces for conferences, retreats, etc. including a larger kitchen area with increased storage, HVAC replacement, sliding glass doors for the Banyan Room, expansion of the outdoor event area, new kitchen, enhanced technology and new A/V equipment, new ceiling fans, and a dedicated electrical panel for short term events. New Japanese Garden ($650,000) The Japanese Garden is one of the most popular spaces in the Botanical Garden, providing the perfect backdrop for photos and quiet spaces to sit and reflect. MBBG would like to enhance the area with more offerings that are reflective of an authentic Japanese garden and expand its cultural and educational features. Accessibility ($200,000) MBBG’s goal is to have as much of the garden as possible be accessible to everyone. This item would provide accessible pathways to the Gazebo and Native Garden. Garden Improvements ($130,000) New irrigation system and new pathways for high traffic areas and a new pump to improve the water quality of the centerpiece ponds. Safety and Security ($120,000) With more people visiting the garden, improved safety and security systems are a high priority. These include security cameras, a new alarm system, and exit sign renewal. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Miami Beach Botanical Garden Proposed Enhancement Resiliency & Sustainability Initiatives 3,491,780 - 3,491,780 Pond pump replacements - 21,300 21,300 Irrigation upgrades 42,600 - 42,600 New pathways for high traffic areas 71,000 - 71,000 New accessible routes to Native Garden and Gazebo 213,000 - 213,000 Dedicated electrical panel for Short-Term Events 7,100 - 7,100 New safety and landscape lighting 56,800 - 56,800 Security cameras and alarm system 49,700 - 49,700 Exit Sign renewal - 15,620 15,620 Catering kitchen expansion 42,600 - 42,600 Expanded event storage areas 355,000 - 355,000 HVAC replacement - 170,400 170,400 New ceiling fans - 28,400 28,400 New A/V equipment for Banyan and Butterfly Rooms 92,300 - 92,300 New sliding glass doors at Banyan Room 106,500 - 106,500 Expansion of outdoor event area 71,000 - 71,000 Enhanced technology infrastructure 142,000 - 142,000 New Japanese Garden 710,000 - 710,000 Miami Beach Botanical Garden HVAC Ductwork - 30,246 30,246 Interior Renovations for Miami Beach Botanical Garden - 59,356 59,356 Grand Total (Rounded to the nearest ten thousand)$5,460,000 $340,000 $5,800,000 Subcontractor Trade Cost $3,840,000 $230,000 $4,070,000 Contractor, General Conditions, Overhead & Profit (20%)$770,000 $50,000 $820,000 Owner Contingency (15%)$580,000 $40,000 $620,000 Permitting (5%)$190,000 $20,000 $210,000 Estimated Bond Fee (2%)$80,000 $0 $80,000 Proposed GO Bond for Arts Culture Miami Design Preservation League Organization Background Miami Design Preservation League is a not-for-profit preservation and arts organization which preserves, protects, and promotes the architectural, cultural, social, and environmental integrity of Miami Beach and the surrounding areas. Use of Funds The main use of funds will be additional resources for the Art Deco Museum Expansion. The expansion, part of the 2018 GO Bond, will allow for enhanced programs and activities at the center. In addition, funds are sought to enhance the visitor experience with interior and exterior lighting improvements. Those are estimated at $100,000. These combined upgrades will support our continued work towards accreditation by the American Alliance of Museums. Estimated Project Timeline 2025-2027 Benefits to Taxpayers MDPL’s Art Deco Welcome Center is a cultural hub on Ocean Drive, greeting approximately 120,000 annual visitors. Our facility is Miami Beach’s only cultural institution open 7 days a week and it serves as a great first-stop on a visit to the Art Deco District. The facility was substantially renovated in 2009 with major funding from a County GO Bond as well as City of Miami Beach funding. In addition, the Art Deco Museum offers year round exhibits and programs. The museum is free for all Miami-Dade County residents and has a nominal $5 admission for others. Since 2009 and up through 2021, the resort taxes of our city have more than doubled. We believe that an upgraded visitor center and museum which matches the level of visitor the we currently attract, will help move forward progress in our vibrant tropical, historic community. To that end, MDPL has committed to raising over $1MM for its museum master plan through various stakeholders. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful, we will need to seek alternative funding for the upgrades. Since the building is city owned, one option would be to seek funding through the regular budget process. Another option would be to request a match challenge from the city. MDPL successfully undertook a fundraising match challenge of $175,000 for its Museum Master Plan from the City of Miami Beach. The GO Bond would be a significant help as it would allow us to focus our funds on programs and activities, vs building improvements. List of Capital Improvements ●Additional Funding for Art Deco Museum Expansion ($800,000) The GO Bond of 2018 provided $2MM towards the rooftop expansion. However, given increasing construction costs and uncertainty about the final project cost, the additional funds will ensure that the project can be completed without delay or pause ●Enhanced Exterior and Interior Lighting ($100,000) To improve safety on the exterior of the building and to install museum-grade lighting in the exhibition hall G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Art Deco Welcome Center - Miami Design Preservation League Proposed Enhancement Art Deco Welcome Center Ship's Ladder /Roof Access Renewal - 14,200 14,200 Additional Funding for Art Deco Museum Expansion 1,136,000 - 1,136,000 Enhanced Exterior and Interior Lighting 142,000 - 142,000 Grand Total (Rounded to the nearest ten thousand)$1,290,000 $20,000 $1,310,000 Subcontractor Trade Cost $900,000 $10,000 $910,000 Contractor, General Conditions, Overhead & Profit (20%)$180,000 $10,000 $190,000 Owner Contingency (15%)$140,000 $0 $140,000 Permitting (5%)$50,000 $0 $50,000 Estimated Bond Fee (2%)$20,000 $0 $20,000 Proposed GO Bond for Arts Culture New World Symphony, Inc. Organization Background The New World Symphony, America’s Orchestral Academy (NWS), prepares graduates of music programs for leadership roles in professional orchestras and ensembles. NWS Fellows take advantage of the innovative performance facilities and state-of-the art practice and ensemble rooms of the Frank Gehry-designed New World Center (NWC), the campus of NWS. Use of Funds NWC was completed in January 2011. It is also used by dozens of local and national organizations each year for their own events. Much of the original technical, functional, and safety infrastructure and equipment has or soon will be reaching end of useful life. NWS has a 20-year capital replacement and upgrade plan that is updated regularly; the total estimated cost of all projects is currently about $31 million. A portion of the allowable spend from NWS’ endowment fund supports the annual capital budget but needs far exceed the amount available. Additional funds must be raised, as they have in the past, from public and private sources; on occasion, NWS has taken out a loan in order to undertake time-sensitive work. Estimated Project Timeline The projects below are in the 20-year plan and should be addressed in the next 12-36 months, most of which must be scheduled during the summer months when there are fewer NWS and third-party activations at NWC. Benefits to Taxpayers NWC hosts hundreds of community events and activities each year, many of which are free. Signature WALLCAST® events are but one example of benefits to residents and visitors. Investing in upkeep and improvements protects taxpayer dollars that were used, in part, to construct NWC, which in turn sits on public land. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? As noted above, NWS funds its capital needs from a variety of sources, including endowment spend, public and private fundraising, and even debt. It’s a constant juggle to match funding to projects and to undertake projects in a timely manner to avoid disruptions to use, service, and safety. The amount requested, in total, is less than the amount NWS raised to fund the entire 4K upgrade that was completed in 2021. List of Capital Improvements Flood Barriers $650,000 This project would fortify the most at-risk portion of the building from flooding through the installation of passive automatic flood barriers to provide protection from 100- and 500- year. Barriers will automatically activate without the need of electricity or people by using the flood water’s hydrostatic pressure to raise the barriers, and automatically lower when the flood recedes to their normal hidden position. Upon approval, work with the vendor and engineering team would begin in early fall 2022 to allow time for permitting and work starting in the beginning of summer 2023. Facility Wide Power Stabilization (Electrical Surge & Drops) $150,000 FPL estimates an average of 49 annual power disturbances at NWC. This does not include power issues due to storms, planned outages, or repairs. Due to the extremely expensive and sensitive technology housed inside the building, some purchased via past GO Bonds, NWS must install equipment onsite to protect it against power drops and surges caused by these disturbances. This equipment may include upgrades to the following systems: UPS systems, battery storage, switchgear, generators, transfer switches, surge protection upstream of specific equipment, and lightning protection. 02/24/2022 Exterior Paint and Stucco Repairs $250,000 This project represents the first comprehensive repair, repaint, and building envelope waterproofing since its opening in 2011. Upon approval an updated quote is needed from the vendor as it is valid for only 60 days. Work is estimated to take five to six weeks, weather permitting. Replace Main Fire Alarm Panel $255,000 The original fire alarm panel has been deemed obsolete by vendor (Siemens). Along with ancillary devices, it will no longer be supported by the manufacturer after June 2022 due to supply chain issues. Once approved NWS will request quotes from proprietary (Siemens, JCI) and non-proprietary fire alarm vendors for this replacement. Acoustical Resurfacing of Performance Hall “Sails” $500,000 One of the most prominent design features inside the performance hall are the five acoustical “sails” floating above the stage, which double as large projection screens. The original finish on the sails has discolored from normal wear and tear and a water leak that stained one of them. The finish is important to the acoustics of the performance hall. Called Baswaphon, it requires special removal, prep, and application methods. Work requires extensive masking and protection of lighting, seating and stage areas and can be done during the summer of 2024. Replacement of Acoustical Panels Throughout NWC $150,000 There are about 1100 acoustical panels in almost all spaces at NWC. These panels are sound absorbing acoustical foam panels wrapped in specialized white canvas. Original to the opening of the building, these panels have begun to yellow and stain from the reaction to UV light and the glue used to adhere the canvas, in addition to normal dirt and dust accumulation. This discoloration is very evident since the panels are hung everywhere in the building against pure white walls. This work can be scheduled around building programs but ideally done in the summer. Elevator Modernization $750,000 NWC has two passenger elevators and one freight elevator. As seen with many pieces of equipment, supply chain issues and manufacturer decisions have made equipment obsolete before their normal end of life. This modernization will improve safety and reliability of the elevators. Upgraded Theatrical Lighting $1,400,000 VariLite no longer supports or makes replacement parts for the original lighting in the performance hall, and numerous parts have failed over recent seasons. NWS needs to replace the Vari-Lite automated lighting fixtures with new LED technology. Purchase includes new fixtures, power relay units and additional cables and hanging hardware. This upgrade is scheduled for summer 2023. New LED Marquee Sign for East Façade $750,000 The original LED marquee no longer works and needs to be replaced. This work can start once funding is secured. New Pergola for Roof Garden $750,000 The original gumbo limbo trees on the roof are dying. Using the signature cloud-shaped steel shapes in Soundscape Park that are draped with bougainvillea as inspiration, Frank Gehry has designed a simple pergola, or trellis, that can be installed in the existing planter boxes, and these too will be covered with bougainvillea. This will require minimal maintenance and link the roof garden more directly with Soundscape Park. This work can start once funding is secured. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) New World Symphony Proposed Enhancement Upgraded Theatrical Lighting 1,988,000 - 1,988,000 Elevator Modernization - 1,065,000 1,065,000 New LED Marquee Sign for East Façade 1,065,000 - 1,065,000 Facility-wide Surge Protection 213,000 - 213,000 New Pergola for Roof Garden 1,065,000 - 1,065,000 Exterior Paint and Stucco Repairs - 355,000 355,000 Flood Barriers 923,000 - 923,000 Acoustical Resurfacing of Performance Hall "Sails"710,000 - 710,000 Replace Acoustic Panels Throughout NWC 213,000 - 213,000 Replace Fire Alarm System - 362,100 362,100 Grand Total (Rounded to the nearest ten thousand)$6,190,000 $1,810,000 $8,000,000 Subcontractor Trade Cost $4,350,000 $1,260,000 $5,610,000 Contractor, General Conditions, Overhead & Profit (20%)$870,000 $260,000 $1,130,000 Owner Contingency (15%)$660,000 $190,000 $850,000 Permitting (5%)$220,000 $70,000 $290,000 Estimated Bond Fee (2%)$90,000 $30,000 $120,000 Proposed GO Bond for Arts Culture Holocaust Memorial Miami Beach Organization Background Now over 30 years old, the Holocaust Memorial Miami Beach engages people of all ages and backgrounds, adults and students, over the meaning of the Holocaust where over 6 million Jews and other peoples were murdered. This is accomplished through an outside facility and film, cultural exhibitions, guest speakers, music, tours, and Holocaust Survivor testimony that leads to empathy and engagement for the participant. Although World War II ended nearly 80 years ago, recent incidences of antisemitism and Holocaust denial signify the pervasive and growing intolerance throughout the United States. The Holocaust Memorial Miami Beach promotes an open- minded civil society and culture. It is an iconic, unique and powerful venue that imparts a universal message. Visitors are encouraged to reflect on the moral, ethical and spiritual questions that arise through their experiences at the Holocaust Memorial and through its year-round cultural programming. Since its dedication, the Holocaust Memorial has remained an integral contributor and element of the physical and cultural landscape of Miami Beach, providing cultural activities and events, author presentations, film screenings, musical performances and panel discussions to the local community and visitors. The Memorial has welcomed more than 2.6 million visitors, including more than 300,000 students. It annually teaches more than 90,000 visitors each year about the dangers of unchecked hatred and the corresponding need to prevent future genocides, prejudices and intolerances. The Memorial developed an app and a special customized 28-minute film. Finally, HMC provides professional development for educators and docents to ensure continued Holocaust education and cultural programs. Use of Funds Replace, Repair and Modernize the 30-year Holocaust Memorial which has been weathered and is in need of modernization since its creation in 1990. This project will accommodate current and future needs to meet the evolution of the Miami Beach cultural scene. The Memorial, nestled between other cultural institutions such as the New World Symphony, The Bass Museum, and the New Convention Center will continue to play a significant role with its outdoor artistic installations, its guided tours, films, storytelling and school visits, culminating in over 90,000 guests a year. This project for the Memorial reflects a city in transformation and recognition of the importance of our cultural environment. Estimated Project Timeline Project timeline will be 3-4 years for completion. Benefits to Taxpayers There is no fee for residents to enter the Holocaust Memorial Miami Beach, to experience our gardens of contemplation or any part or program of the Memorial at any time. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful improvements will not be funded in the immediate future. Funding for the Holocaust Memorial and its policy of ‘no fee’ is enabled by its yearly fundraising program and its supporters. Capital improvements in the past have been primarily for the Arm of Love and Anguish, the centerpiece of the Memorial, and the only sculpture like this in the world. Repairs to the arm are required every 2 years and have been part of our fundraising efforts. List of Capital Improvements $250,000 Interior repair and replacement of center arm structure $300,000 Repatina of outside of center arm structure including 100 sculptures on the arm $400,000 Replacement of 150 broken Jerusalem stones $200,000 Regrouting of all walkway stones to prevent further corrosion $500,000 Renovate center water feature and seal leaks including addition of filters $500.00 Bicycle rack $150,000 State of the Art walking tour for visitors with latest technology for 100,000 visitors each year $175,000 State of the Art Security bollards at west side frontage of Memorial $75,000 State of the Art telephone system for easy access for visitors calling for information $50,000 Remodel security booth for 24-hour security staff $100,000 Remodel and repair visitor welcome center $150,000 Remodel public bathrooms $5,000 Create direction signage for visitors on where to begin and what to see at Memorial $100,000 Create technology for upgraded visitor visit including maps and information about the memorial for cell phone usage $125,000 New outdoor walkway for students to reach the classroom $500,000 Remodel or replacement of 40 lamps surrounding Pond $10,000 Addition of 100 new lilies to beautify pond feature $150,000 State of the Art Security gate for back entrance to Botanical Garden $375,000 Addition of a new wall to protect back of Memorial and west side of Botanical Garden $250,000 Replacement of new roof for classroom, administration office, security booth and visitor center $30,000 Retile floor in 4 rooms $750,000 State of the Art Security System and Surveillance Cameras G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Holocaust Memorial Miami Beach Proposed Enhancement Interior repair and replacement of center arm structure - 355,000 355,000 Repatina of center arm structure including surface sculptures 426,000 - 426,000 Replacement of broken Jerusalem stones - 568,000 568,000 Regrouting of all walkway stones 284,000 - 284,000 Renovate center water feature and seal leaks (including filters)- 710,000 710,000 Install new bicycle rack 710 - 710 Tech for State of the Art walking tour for visitors 213,000 - 213,000 State of the Art Security bollards at west side frontage 248,500 - 248,500 State of the Art telephone system for visitor info 106,500 - 106,500 Remodel security booth for 24-hour security staff 71,000 - 71,000 Renovations to Visitor Welcome Center 142,000 - 142,000 Renovations to Public Restrooms 213,000 - 213,000 Wayfinding and Directional Signage 7,100 - 7,100 Technology upgrade for Visitor Center 142,000 - 142,000 New outdoor walkway to classroom 177,500 - 177,500 Replacement of pond lamps - 710,000 710,000 New lilies for pond feature 14,200 - 14,200 Security Gate for rear entrance 213,000 - 213,000 New CBS wall at rear of Memorial/West side of MBBG 532,500 - 532,500 Roof replacement for Classroom, Admin. Office, Security Booth and Visitor’s Center - 355,000 355,000 New flooring for Classroom, Admin. Office, Security Booth and Visitor’s Center 42,600 - 42,600 New Security System and Surveillance Cameras 1,065,000 - 1,065,000 Grand Total (Rounded to the nearest ten thousand)$3,910,000 $2,710,000 $6,620,000 Subcontractor Trade Cost $2,750,000 $1,900,000 $4,650,000 Contractor, General Conditions, Overhead & Profit (20%)$550,000 $380,000 $930,000 Owner Contingency (15%)$410,000 $290,000 $700,000 Permitting (5%)$140,000 $100,000 $240,000 Estimated Bond Fee (2%)$60,000 $40,000 $100,000 Proposed GO Bond for Arts Culture The Byron Carlyle Theater Organization Background: The Byron Carlyle Theater complex is located at 500 71st Street, between Byron Avenue and Carlyle Avenue, where it opened in 1968 as twin cinemas hosting first-run movies. The City purchased the Byron Carlyle Theater from the WBC Broadcasting Corporation in 2001 and partially renovated it to spur economic development and bolster the North Beach arts and culture scene. The western portion of the building was occupied by Living Arts Trust d/b/a O Cinema from 2014-2018. The eastern portion of the building remained uninhabited, and in 2019, the Theater was permanently closed. The North Beach community and the City Commission have expressed interest in exploring various uses for the building, primarily as a theater or cultural center, but are also considering potential use as a museum, a business incubator, university use, gallery space, artist studios, a film or arts center, as well as retail or office space. Since its closure, there have been several discussions held regarding the condition and future of the Byron Carlyle. On September 13, 2021, the City issued a survey to better understand the community’s desire for the future of the Byron Carlyle. On October 26, 2021, the results were published via LTC 452-2021. According to the results, most respondents (59%) indicated they would prefer to moderately or fully renovate the existing theater and maintain public access and use. Additionally, on April 27 and 28, 2022, public meetings were held to gather community feedback on the Theater’s redevelopment. All groups were adamant about maintaining or creating a significant cultural component that is accessible to the neighborhood and visitors. Use of Funds In May 2021, M.C. Harry & Associates prepared a Conditions Assessment and Recommendations report. The existing building conditions, including recommendations for repairs and improvements to the venue and /or building replacement were provided. This information coupled with information gathered from the community charettes, will be utilized for the complete redevelopment of the Byron Carlyle Theater. Estimated Project Timeline Project development is scheduled to begin during the 2024 budget cycle. New construction will require approximately 2-3 years to complete. Benefits to Taxpayers Provide a multi-use cultural venue that is accessible to the community and visitors. List of Capital Improvements • New Construction of the Byron Carlyle Theater: $28,310,000 This project would provide a multi-use theater and cultural center involving the complete reconstruction of the building. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Byron Carlyle Theater Renovation Proposed Enhancement Complete Renovation of Byron Carlyle Theater (including spaces for enhanced programming)*28,288,939 - 28,288,939 Grand Total (Rounded to the nearest ten thousand)$28,310,000 $0 $28,310,000 Subcontractor Trade Cost $19,930,000 $0 $19,930,000 Contractor, General Conditions, Overhead & Profit (20%)$3,990,000 $0 $3,990,000 Owner Contingency (15%)$2,990,000 $0 $2,990,000 Permitting (5%)$1,000,000 $0 $1,000,000 Estimated Bond Fee (2%)$400,000 $0 $400,000 * Per Conditions Assessment & Recommendations Report prepared by M.C. Harry Associates (5/11/21) Proposed GO Bond for Arts Culture UNIDAD at the North Beach Senior Center Organization Background: The North Beach Senior Center is a City-owned building located at 7251 Collins Avenue. The Center provides programs and recreational activities to the City’s elder community. On February 14, 2018, the City awarded UNIDAD of Miami Beach, Inc. (UNIDAD) funding for the creation of meal programs to serve the North Beach community. UNIDAD complements its meals program by offering a variety of enrichment programming funded through various sources. The City’s Parks and Recreation Department regularly collaborates with UNIDAD to offer additional programming. The North Beach Senior Center is a hub providing elder residents a plethora of social activities. The multi-purpose Center’s sound system is outdated and challenged by the facility’s architecture. Moreover, the facility could benefit from several enhancements to better utilize the space to meet the Center’s programmatic needs. Use of Funds G.O. Bond funds will be utilized to enhance the venue to support activities and programs. Funding would improve the multi-purpose rooms, acoustic systems, and catering kitchen, all benefitting the elder residents in the community. Estimated Project Timeline Projects are scheduled to occur at beginning of the 2024 budget. Benefits to Taxpayers Provide a multi-use venue that affords enhanced programming and activities to the community’s elder population. List of Capital Improvements • New Sound and Acoustical system: $284,000: Installation of sound system and acoustical control in the Second Floor Community Room • New tables and seating for Community Room: $71,000 Purchase 12 new round tables and seating for 120 seniors for North Beach Senior Cente r. • Expansion of Catering Kitchen: $355,000 Expand and upgrade catering kitchen and catering equipment for senior meal program . • Restoration of Historic Coral Rock House (Home of Miami Beach Hispanic Community Center): $710,000 Rehab and restoration of historic Coral Rock House, 1701 Normandy Drive G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) North Beach Senior Center - UNIDAD Proposed Enhancement New sound system and acoustical controls at Community Room 284,000 - 284,000 New tables and seating for Community Room 71,000 - 71,000 Catering Kitchen Expansion for Senior Meal Program 355,000 - 355,000 Restoration of Historic Coral Rock House (Home of Miami Beach Hispanic Community Center)710,000 - 710,000 Unidad Senior Center Accoustical Finish Enhancements - 84,916 84,916 61320 - Unidad Building Door Renewal - 89,460 89,460 61420 - Unidad Building Window Seal Renewal - 56,800 56,800 65320 - Unidad Building Interior & Exterior Painting - 127,800 127,800 Grand Total (Rounded to the nearest ten thousand)$1,420,000 $390,000 $1,810,000 Subcontractor Trade Cost $1,000,000 $260,000 $1,260,000 Contractor, General Conditions, Overhead & Profit (20%)$200,000 $60,000 $260,000 Owner Contingency (15%)$150,000 $40,000 $190,000 Permitting (5%)$50,000 $20,000 $70,000 Estimated Bond Fee (2%)$20,000 $10,000 $30,000 Proposed GO Bond for Arts Culture Miami New Drama – Collins Park Garage Organization Background: Miami New Drama, a Miami Beach Cultural Anchor with a mission of developing diverse, relevant new plays and musicals in conversation with the community. Since 2016, Miami New Drama has successfully activated the Colony Theatre where they perform diverse, groundbreaking work. Miami New Drama’s robust programming at the Colony Theatre limits their ability to expand educational programming. The Collins Park Cultural Center at the Collins Park Garage would serve as the educational hub, allowing for consistent workshops for adults and youth, camps and theatre for young audiences as well as a black box studio Benefits to Taxpayers Miami New Drama will prove to be a transformative economic catalyst to the Collins Park neighborhood. The already developing cultural campus, currently home to the Miami City Ballet, The Bass, and the Miami-Dade Library would be enhanced by day and night activations that will bring people and cars to the Collins Park Garage and solidify the area as a cultural hub for the community. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? At this time the City has not yet identified any funding source for the landlord contributions. List of Capital Improvements Miami New Drama Studio Theater 200 seat flexible theater space. Programming to include: world class theater in an intimate setting, Spanish language programming, theater for young audiences, film screenings, special events, cultural partner and community programming Community Education and Rehearsal Space Outward facing to the street so pedestrians can see into the theatre. Home for Miami New Drama classes, workshops, educational programming and camps. Ongoing community activities including Monday Night Dance Seniors. Event space for Miami New Drama and other community organizations, combinable with the Studio Theater. Costume Design Studio A space that would serve as a tailor and fitting studio for Miami New Drama productions, as well as hosting skill building education through craft and sewing. Creating Miami Beach jobs and artist residencies in textiles arts that can be featured in the lobby gallery. The Living Room A cultural lounge open all day, to include rotating art installations from partner non-profits featuring early- mid career marginalized artists. A coffee bar and a book shop curated by Books & Books. Collins Park Café A dynamic and instantly welcoming neighborhood café serving sustainable sourced coffee, world-class affordable cuisine and featuring a carefully curated roster of cutting-edge live music. This is a non- profit/private partnership between an experienced restaurateur and Miami New Drama. Office Space Will serve as the Miami New Drama headquarters. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Miami New Drama at Collins Park Garage Proposed Enhancement Buildout for Miami New Drama at Collins Park Garage 7,100,000 - 7,100,000 Grand Total (Rounded to the nearest ten thousand)$7,100,000 $0 $7,100,000 Subcontractor Trade Cost $5,000,000 $0 $5,000,000 Contractor, General Conditions, Overhead & Profit (20%)$1,000,000 $0 $1,000,000 Owner Contingency (15%)$750,000 $0 $750,000 Permitting (5%)$250,000 $0 $250,000 Estimated Bond Fee (2%)$100,000 $0 $100,000 Proposed GO Bond for Arts Culture I I I I I I I Rhythm Foundation at North Beach Bandshell Organization Background The Rhythm Foundation has been presenting outstanding international music in Miami Beach for more than 30 years, and we look back at a body of work that now spans decades. When we began in 1988, Miami was a different place than the international crossroads we know now. In 2015, the City of Miami Beach awarded Rhythm Foundation the management of the North Beach Bandshell. We launched a well-rounded schedule of 75+ events per year - a mix of free community and civic events, cultural programs, popular music and large productions - that welcome the entire South Florida and visitor community to the Bandshell. The management was extended with options through to 2028, which coincided with important capital improvements to the facility including the installation of a canopy to provide weather protection, improved seating, and technical upgrades. Use of Funds GO Bond investment into the Miami Beach Bandshell will be used to support and enhance operations at the venue, continuing its position as a valuable community asset. Our management of the Bandshell for the City has greatly increased use and attendance at the venue. The professional productions taking place at the venue desperately require an expansion of back of house facilities to sustain and grow these production demands. The Rhythm Foundation has outgrown the small back of house area currently at the Bandshell, and needs this expansion for production facilities to keep up with the level of increased professional touring that is coming to the venue, office spaces, media production facilities and storage. In addition a series of improvements is planned to construct an addition to the backstage to support our efforts and refortify the existing power, lighting and audio equipment from the 2011 renovation. Many items would have been funded by the general budget for planned replacements and repairs, approving the GO Bond would allow the residents of Miami Beach to save those dollars within the city’s budget. Estimated Project Timeline Projects are scheduled to occur beginning in the 2023 budget. New construction will require an additional 2-3 years to complete. Benefits to Taxpayers We attract over 75,000 visitors each year across 100+ events. Guests visit Miami Beach for our programs from all over South Florida and beyond, with the Bandshell acting as a key attraction and economic engine for the North Beach business community. Recurring annual festivals include North Beach Music Festival, Ground Up Music Festival, AfroRoots Music Festival, & Global Cuba Festival, each bringing their unique audience to the area. Programs are also documented and packaged for media distribution, further enhancing the reach and impact of the presenter. Our goal is to enhance our TV and media broadcast startup into a state of the art media laboratory for use by Rhythm Foundation & the Miami Beach cultural community. We form an integral fabric on which dozens of cultural organizations in our community use to create unique cultural offerings. This investment will ensure Miami Beach Bandshell as a beacon for the performing arts in the decades ahead. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? The Bandshell has enjoyed regular line item funding support going back to the 2011 upgrade through the installation of the canopy in 2020. The Rhythm Foundation continues to invest funds raised for enhancement of the equipment at the venue, including the LED lights & LED Screen, backline, film and video systems, & concessions program. In 2021 Rhythm Foundation received a $1.5 Million grant from the Knight Foundation to continue to invest in technology implementations and programming at the North Beach Bandshell. List of Capital Improvements Back of House Improvements ($1,500,000) o Create an 2 story addition to the existing back of house that will contain: A Second Floor of the building to house TV and Broadcast Production Control Room & Administrative Office Spaces; The First Floor will be utilized for vital storage and production prep areas for Concessions, Equipment, Production Storage; Create within the Concessions Room a small kitchen suitable for food handling and preparation; Create a structure to enclose the waste containers for trash and recycling, accessible by Waste Management 24/7; Create a storage structure to enclose the theater chairs and carts; and Create an elevator and two means of egress. o Reposition the existing fence line to meet the new property line as provided by Ocean Terrace Streetscaping Program. o Realign the driveway & loading dock to allow for two trucks to be parked at once, one in the loading dock, and another staged adjacent to it. o Relocate or enclose within new construction the existing utility infrastructure (A/C compressor, FPL panel, etc.) Canopy Phase 3 ($200,000) Design and Fabrication of a discreet, retractable extension of our stage covering to protect musicians and equipment located at the edge of our existing stage or potential temporary stage extensions used from time to time. This equipment would live in the retracted position, not affecting the historic design. Restroom Upgrades ($150,000) Renovation of existing Restrooms within the facility, augment the quality of the restroom and increase the number of fixtures for public facilities and backstage. Rear Platform Upgrade ($200,000) Upgrade the temporary riser platform to a permanent weatherproof flooring surface of the same design, preferably in matching terrazzo to the dancefloor with power and data connection. Venue Projection Mapping ($250,000) Purchase and design of projection system for use on the stage façade and canopy. Bandshell Cafe ($250,000) Bandshell Beachfront Cafe will offer a showcase for local talent. Concluding each evening with a sunset performance, activating daytime use of Bandshell Park for the residents and visitors. Park Performance, Architectural and Landscape Lighting ($150,000) Park Performance, Architectural & Landscape Lighting - Install lighting for the Bandshell architectural perimeter interior and exterior of the venue as well as the palm trees throughout the park. Roof Repairs ($150,000) Regrade and repair the existing concrete roofs within the North and South Towers, allowing drainage. Upgrades to the Stage Theatrical Grid ($50,000) Additional routing for electrical service and structural mounts dedicated to stage lighting. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Rhythm Foundation at Miami Beach Bandshell Proposed Enhancement Back of House Improvements - - Canopy Phase 3 - - Restroom Upgrades 213,000 213,000 Rear Platform Upgrade - - Canopy Projection Mapping - - Park Entrance Upgrade - - Park Performance, Architectural and Landscape Lighting - - Grand Total (Rounded to the nearest ten thousand)$3,280,000 $210,000 $3,490,000 Subcontractor Trade Cost $2,300,000 $150,000 $2,450,000 Contractor, General Conditions, Overhead & Profit (20%)$460,000 $30,000 $490,000 Owner Contingency (15%)$350,000 $20,000 $370,000 Permitting (5%)$120,000 $10,000 $130,000 Estimated Bond Fee (2%)$50,000 $0 $50,000 Proposed GO Bond for Arts Culture The Wolfsonian–Florida International University Organization Background The Wolfsonian was built as a private research center in 1995. Upon its gifting to the State of Florida in 1997, our mission and operational scale expanded to embrace a very large Florida International University student body and faculty in research and activities. K-12 educational initiatives followed. Serving the public became core to our work while we continued to host fellows and scholars from around the world. The Wolfsonian–FIU is now a globally renown museum, library, and research center that illustrates the persuasive power of art and design. With more than 200,000 objects, the collection contains a vast universe of ideas: household appliances that sped the pace of work; designs that bridged cultures; architectural plans fueled by ambition; and propaganda that helped turn the tides of war. Rooted in the greatest century of growth and change humanity has ever known—1850 to 1950—The Wolfsonian traces the odyssey from agrarian to urban, colonial empires to Cold War superpowers, the first spike of the Transcontinental Railroad to the advent of television. The Wolfsonian offers an agreeable setting for the appreciation of art and design and a forum (virtual and in- person) that enhances Miami Beach’s civic life. Our ability to offer such experiences is enhanced by partner organizations: Miami Design Preservation League; City of Miami Beach’s STEAM+ program; O Cinema Miami Beach; AIA; AIGA; Bookleggers’ Library; New World Symphony; O, Miami Poetry Festival; Design Miami; and Art Basel Miami Beach. The museum typically draws 25,000 to 30,000 visitors each year. It produces three major exhibitions, several smaller installations, and a contemporary artist project, in addition to over 100 public programs such as tours, talks, family programs, and films. The intent of exhibitions and programs is to shed further light on key people, issues, and events from the past. At the same time, we strive to link this historical collection to the concerns and passions of people living today. Use of Funds Our building was not conceived for the scale and purpose now expected of it. Nor was it considered how we would display of large-scale works, period rooms, allow public access to collection storage areas, or host classes in a dedicated space. Nor do our current event spaces have the capacity or critical support areas to create meaningful revenue to support the mission. The current entryway is foreboding, unwelcoming, and flood-prone. A single- passenger elevator is not sufficient if the crowd in the building grows past 200. The expansion seeks to alleviate these issues. The Wolfsonian–FIU’s expansion must balance two central values: honoring the historic integrity of our existing 1927 Mediterranean Revival building and updating the site to meet the complex needs of 21st-century audiences. Our focus is on addressing climate-control concerns and minimizing environmental impacts. In addressing the museum’s day-to-day operations, the design would streamline visitor flow and create a more transparent, welcoming experience for pedestrians and guests. The project goals are to: Enhance accessibility and visibility of The Wolfsonian–FIU collection Create programmatic and digital lab spaces for residents and the FIU community Leverage earned income through event rentals and commercial leasing Protect and preserve the collection Estimated Project Timeline The goal for completion of the expansion is the Fall of 2027, assuming the success of fundraising efforts. Benefits to Taxpayers The expansion’s primary goal is to deeply embed The Wolfsonian–FIU into the fabric and character of Miami Beach. Our planned expansion will: Triple our programmatic space, adding over 30,000 SF Substantially increasing the number of artworks on view Create a transparent new street and lobby presence Create state-of-the-art classrooms, studio environments, and digital labs Incorporate open-air green spaces (garden, terraces, and roofs) Offer spacious and adaptable mixed-use spaces for curatorial, educational, or rental needs Have enhanced spaces for lease for local retail businesses If GO Bond is not successful, how will improvements be funded? How do the capital requests compare to past fundraising efforts? A capital campaign for the expansion is underway. The campaign goal is $20.0 million, of which $10.0 million will be funded by the Miami Dade County Building Better Communities General Obligation Bonds. The project will require substantial funding before starting full design and construction, so without the GO bond, there is a greater risk that funding results might not meet timeline expectations and delay delivery of the expansion. List of Capital Improvements Wolfsonian Facility Expansion $10,000,000 The Wolfsonian has developed a transformational expansion plan for its Washington Avenue location to create a welcoming entrance and more transparent presence on Washington Avenue. It includes up to 50,000 square feet of public galleries and program space and countless new opportunities for learning and exploring. The total project estimate (inclusive of design, construction, and contingency) is $20.0 million, of which $10.0 million will be funded by the Miami Dade County Building Better Communities General Obligation Bonds—leaving a remaining funding goal of $10.0 million. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) The Wolfsonian Proposed Enhancement Proposed Expansion and New Washington Ave. Entrance 14,200,000 - 14,200,000 Grand Total (Rounded to the nearest ten thousand)$14,200,000 $0 $14,200,000 Subcontractor Trade Cost $10,000,000 $0 $10,000,000 Contractor, General Conditions, Overhead & Profit (20%)$2,000,000 $0 $2,000,000 Owner Contingency (15%)$1,500,000 $0 $1,500,000 Permitting (5%)$500,000 $0 $500,000 Estimated Bond Fee (2%)$200,000 $0 $200,000 Proposed GO Bond for Arts Culture I I I I I I I Jewish Museum of Florida-FIU Organization Background The Jewish Museum of Florida-FIU (JMOF-FIU) shares the story of over 250 years of Florida Jewish history, art, and culture with all members of Miami Beach’s vibrant community. Our goal is to explore and illustrate the richness and diversity of Jewish life as well as the unique ways in which Florida Jews influence and are influenced by the historic and cultural dynamics of Florida, the nation, and the world. JMOF-FIU is also dedicated to multicultural education and, through the lens of Florida Jewish history, seeks to highlight issues of discrimination against all marginalized people. Through exhibitions, public programs, and our extensive archival collection, we demonstrate how the challenges of the immigrant experience are shared by all ethnic groups in Florida. Use of Funds In order to improve the museum experience for local and international visitors alike, JMOF-FIU seeks $750,000 as part of the City of Miami Beach’s GO Bond Program. Funding will go toward five future-focused improvements: 1. Design and installation of a new LED lighting system in each of our three galleries; 2. Repair and upgrade of exterior walls, including painting, repair of our historic railings, and installation of a wheelchair accessible ramp at the front of the museum; 3. Installation of a new exterior lighting system to highlight the beauty and significance of the historic building in the South of Fifth neighborhood and additional landscape; 4. Installation of parking lot security gates; and 5. Redesign and remodel of our collections and storage department. Estimated Project Timeline Upon receipt, funds can be deployed for construction and development within the range of six to twelve months. It is estimated that the aforementioned improvements will take approximately one to two years to complete. Benefits to Taxpayers The five revitalization efforts listed above will enhance taxpayers’ museum experience and quality of life in a number of ways. The installation of a new LED lighting system in the museum’s galleries will address accessibility issues pertaining to vision and allow for greater appreciation of our exhibitions and greater visibility during programs. Repairs and upgrades to the museum’s exterior will not only render the building more aesthetically pleasing but will also allow visitors of all ages and abilities to access the museum via its front entrance. Likewise, the installation of a new exterior lighting system will render the premises more secure while also allowing guests, passersby, and locals to appreciate the building’s historic Art Deco design. The installation of parking lot security gates will improve security. Finally, the redesign and remodel of our collections and storage department will ensure that the over 100,000 priceless artifacts housed at JMOF-FIU are properly maintained, stored, and cared for. This improvement will not only assist with organization, but will guarantee the museum’s ability to continue its mission of collecting, preserving, and interpreting Florida Jewish history. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If JMOF-FIU does not receive the requested funds as part of the City of Miami Beach’s GO Bond Program, the museum will seek funding for improvements through a combination of other grants and private donations. List of Capital Improvements LED LIGHTING ($450,000) The design and installation of a new LED lighting system in each of our three galleries. REPAIR & PAINTING ($50,000) Repair and upgrade of exterior walls, including painting, repair of our historic railings, and installation of a wheelchair accessible ramp at the front of the museum. EXTERIOR LIGHTING ($35,000) Installation of a new exterior lighting system and additional landscape to highlight the beauty and significance of the historic building in the South of Fifth neighborhood and for additional safety and security. SECURITY GATES ($65,000) Installation of parking lot security gates. REBUILD COLLECTIONS DEPARTMENT ($150,000) Design and remodel of our collections and storage department. G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) The Jewish Museum of Florida Proposed Enhancement Facility-wide Enhancements 1,065,000 - 1,065,000 Grand Total (Rounded to the nearest ten thousand)$1,080,000 $0 $1,080,000 Subcontractor Trade Cost $750,000 $0 $750,000 Contractor, General Conditions, Overhead & Profit (20%)$150,000 $0 $150,000 Owner Contingency (15%)$120,000 $0 $120,000 Permitting (5%)$40,000 $0 $40,000 Estimated Bond Fee (2%)$20,000 $0 $20,000 Proposed GO Bond for Arts Culture I I I I I I I Artistic Playgrounds Background: The City is in the process of upgrading many of its playgrounds. The current G.O. Bond Program is funding the following 10 playgrounds: • Marjory Stoneman Douglas Park (Being delivered this month) • Maurice Gibb Park (Being delivered June 2024) • Bayshore Park (Being delivered June 2024) • North Shore Park & Youth Center • Palm Island Park • Flamingo Park • La Gorce Park • South Pointe Park • Fisher Park • Tatum Park Use of Funds These funds could be used to upgrade the design of future playgrounds within the ones already funded above or additional playgrounds throughout the City. Estimated Project Timeline Over the course of the next several years. Benefits to Taxpayers Playgrounds are safe spaces where children can develop cognitive, physical, and emotional skills. Artistic playgrounds add creativity and beauty to the community and enhance the City’s iconic public spaces. An example of the quality of an artistic playground can be found at the current 500 Alton site where a “Rosie the Elephant” theme by Monstrom was installed. The future Maurice Gibb Park “You Should be Dancing” playground will be installed over the next couple of years. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? The funds would need to be identified in future budget cycles and staff will seek grant funding opportunities. List of Capital Improvements Artistic Playgrounds – various locations G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Artistic Playgrounds Proposed Enhancement Artistic upgrades / playground activation 7,100,000 - 7,100,000 Grand Total (Rounded to the nearest ten thousand)$7,100,000 $0 $7,100,000 Subcontractor Trade Cost $5,000,000 $0 $5,000,000 Contractor, General Conditions, Overhead & Profit (20%)$1,000,000 $0 $1,000,000 Owner Contingency (15%)$750,000 $0 $750,000 Permitting (5%)$250,000 $0 $250,000 Estimated Bond Fee (2%)$100,000 $0 $100,000 Proposed GO Bond for Arts Culture I I I I I I I 500 Alton Park “Rosie the Elephant” MONSTRUM at MAURICE GIBB MEMORIAL PARK “You Should Be Dancing” By MONSTRUM View Facing East “You Should Be Dancing” By Monstrum View Facing South “You Should Be Dancing” By Monstrum View Facing West “You Should Be Dancing” By Monstrum View Facing North “You Should Be Dancing” By Monstrum Flügger Wood Tex Dækkende (NCS Color Codes) S 9000 -N S 1000-N S 5m0 -B90G S 6020-Y60R S 2050-B700 S 1080-YB0 R S 6502-B S 2005-Y20R S l 030 -Y20R S 1080-Y S 5030-R90B MONSTRUM OUR PHILOSOPHY FOCUS ON ARTISTIC QUALITY GATHERING PLACES FOR KIDS AND ADULTS ALIKE MOt-.SlllUM ha,_ dcd,o.m:d ioc1'" c( =-' ,r,d ~ ~ c pase.ior, r bN-girou 1~ PD)' d.c ll"C! m ITD'Y c,duH1m l•::bo,, c playgraund and.OU' pb~ er-gage leer. 'ti gs. s:or, ond~ bf. hes.a-nog,opt, oi caplaygrout,d!.1:x-c...:imco -ploltefl'\ ,.i,.,,., alt-:,ge n,e ~ bdt,,,., I...,/ g, ~r,g _... .. pc:cplo a== COtT'lfTILJn1res INSPIRING KIDS TO MOVE lrameon, ~~v-d W"l'JQ.4fflna::hJu:.i~orr :ii hc-nid:arer'Q! t ,; I "' .•. U'ltt nav,gc:-tmg ~ h::n,i: b ex;n:.def '-Qr d :d,,1--he; ctealc= n,r.,.~trd U'"dc:::rbeo, es:icnt "<"' "!I and .,,/1 "'9 Ire rl-cll<rgos lh• ~ ft'Ceef,,.... h....d.an:i d...dr,p)<IC• oti equotiy,,cpc, THE 4 STEPS TOWARDS A MONSTRUM PLAYGROUND -------------------------------------------------------------------------------------► 1 FIRST INQUIRY Th e: ftr,i m e fing ·he r rn m s oncl o mbin on s ore d1sn1s.,i>d on n ligr-,.ar:! o ri 2 DESIGN DEVELOPMENT l f11h e10sign developmen t, tt,o t ha niE and cancap t ofthE r,lo ~·g r"u nrl ore d -"c l <>d pon nnrl V r!\l l lly n rase n~f;'c;i rn thF l lrtn 111 !.k e>tt.11 -f(J l'l'I. OuroHor,: 4-w 3 PLANNING & PRODUCTION ~h d e~i~n wi11 oe m od p 1o ducib le nd oftor rdi. 5,e n i into rooucrio n CERTIFICATION Al l pl y9ioo1 1d s m e cer lifi d 1c,;.o rrl m, tc oprli cab le sr,t eiy ,km<imd s l:>llfom Hu:,y ove rn II VQ(~Sh<'lr• OurolloFJ : Appro ~. 4 monH, fro ," $tori or production 4 SHIPPING & INSTALLATION We can c1rran9 3hi p pin ond in stolloti :m fo dha c ustorn °r Ourotion: 1-8 wee 1 FIRST INQU IRY 2. DESIGN DEVELOPMENT BRAINSTO MING ::,ne,i;c.n:rpisx~ we·op?Cert-:rl t' •,,tt,t+-~ct.,stc,mc,f DETAILING ccrnru-:~1 c;o,-.r,-pcrtar-•~,rac.t~ g L-ei ~ondt"Nire..J.ff't:ltT" re.lef'qUty,INC'f' ~·-.1..ltbe fl"!Clf"QJCdb r-re :..:r !Ct'1tocb;~urt"9tt'Ctalom tha~are-mdcr~to~~c the bas.I procz::=~ lf--ohJc • quedo~ .• be~~ n♦g~ratoral l-e-r-11 ~g,w..p Arett-tecccryspeio fr-qi.. 'rs,.t, ~ rogtb cdor.:,poeess.c.,.. • blgts .Jft'CI°" a:lt-e~ 3. PLANNING & PRODUCTION 4. SHIPPING & INSTALLATION The Reefline Organization Background: The Reefline will be a series of artist-designed, and scientist-informed artificial reefs within swimming distance of Miami Beach. The Reefline is a singular investment in civic infrastructure, public art, and environmental protection that will pay dividends over the coming decades and attract ecologically-minded tourists and lovers of art. The Reefline will demonstrate to the world how tourism, artistic expression, and the creation of critical habitat can be aligned. Reefline collaborates with leading partners in artificial reef structure design and deployment such as Coral Morphologic, Ocean Rescue Alliance (ORA) and University of Miami (UM). Supplementing artificial reefs with materials researched by ORA will add structural complexity around the artistic reef site; thus, incorporating artificial reefs that enhance complex marine habitat, enable restoration, and integrate eco-friendly materials. The Reefline is an interdisciplinary project using art and sculpture to highlight the often - overlooked marine habitats and biodiversity just off the shoreline of Miami Beach. The Reefline brings to Miami Beach the combined talents of an organizational team of visionary curators, scientists, architects, engineers, fabricators, change-makers, and artists to create a world-class destination featuring the most biologically productive, and artistically-attractive underwater sculpture galleries on the planet. Connecting each of these sculptural installations will be a series of artificial reef modules designed by architectural powerhouse Office for Metropolitan Architecture (OMA) (designers of the Faena Forum, New Museum NYC, and Fondazione Prada, to name a few.). These modules will serve as the connective tissue that snorkelers/kayakers can follow from one artist’s sculptural installation to the next. Over a series of phases, through multiple years, The Reefline will start from 4th street, and grow northward parallel the length of Miami Beach to Haulover Inlet. These sculptures and the connecting modules will create habitat that will attract marine life where previously there was only a desert of sand. Ongoing scientific monitoring will make The Reefline an active site for research into artificial reef development, coral settlement and transplantation, and community engagement with local ecological issues. Specifically, the first phase of The Reefline is reactivating an area previously permitted by DERM for artificial reefs. In 2003 a Municipal resolution (#2003-25203) was passed by the City of Miami Beach in support of this area to serve as a site of artificial reef deployment. The two-decade-old Jose Cuervo Reef serves as a proof-of-concept for how artificial reefs can attract snorkelers and create habitat in the sandy area within swimming distance from shore. Use of Funds Funds would be used to finalize all permitting, scientific research related to the reef sculptures, and most importantly, produce and deploy the various phases of the ReefLine. Our goal is to deploy the first phase, Concrete Coral, by Leandro Erlich in 2023 and c omplete all following phases within the next 5 years. Once the first phase is deployed, we will work with scientists to deploy instruments that collect data on water chemistry and colonization of marine life and corals over time. BLPS will share this data with the City of Miami Beach and other agencies to inform and improve future artificial reef deployments in Miami and South Florida. Additionally, once The Reefline is open to the public, BLPS will seek to gather information from locals and tourists to maximize the cultural, environmental, and social impact of this project to improve the public perception of Miami Beach’s natural resources and put it on the map as an ecotourism destination. Estimated Project Timeline With funding, the first phase can be produced and deployed in 2023. To extend the Reefline north, new deployment areas will need to be permitted, because most of Miami -Dade County’s artificial reef sites are further offshore. To support design and permitting, each deployment site will require a benthic marine resources survey, sediment thickness testing, and bathymetry. To meet the estimated Project timeline, permitting can be done at the same time for the different deployment sites. Permits are valid for 2 - 5 years and can be modified, extended, or reverified to ensure the deployments are performed prior to permit expiration. The goal is to deploy the various phases every 6 months to a year thus completing the 7 miles within the next 5 years. Benefits to Taxpayers The Reefline will provide the local community (and tourists) with a free-access opportunity to engage directly with Miami’s marine biological diversity without the need for expensive boats or scuba diving equipment. By deploying a series of sculptures and modules within swimming distance from shore (~900’), people will be able to simply snorkel from the beach sand to see reef life that is otherwise more likely to be encountered farther offshore. Reefline will support increasing ecotourism opportunities helping both the local economy while reducing the economic barrier of entry to these types of potentially life-changing underwater experiences. We hope to inspire and educate the community about the importance of our natural marine resources, and the need to conserve it. In partnership with ORA and Coral Morphologic, the ReefLine will engage the community by establishing educational and research programs at each reef site. These programs include engaging the public with monitoring reefs, out planting coral, monitoring fish populations, educational workshops, tourism research, and much more, thus offering the public and opportunity to be a part of scientific research and restoration. This research will extend established ORA scientific programs that contribute to novel research, restoration, and conservation. By using art and sculpture, we aim to draw greater interest from the public, as well as attract tourists interested in Miami’s art scene to the beauty of its nature. Over time, these sculptures will be naturally colonized by sponges and corals that result in ever-evolving, living artworks that serve as a true collaboration between humans and nature. In addition to the underwater sculptures themselves, The Reefline project will incorporate informational signage in the public parks (starting with Marjory Stoneman Douglas Park) that educates about the importance of healthy reefs, removing trash from the beach, and using coral- safe sunscreen. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO BOND funding for Reefline is not successful, the timeline for intervention and implementation will be delayed significantly. More than likely, the space of time from project launch to completion will be tripled or even quadrupled, should this funding not materialize via this critical GO BOND funding stream. Although annual funding for Reefline continues to be robust, drawing from a diverse source of local and national individual, public, and private sector support, this project calls for a much more substantive funding source in order to make lasting and imperative climate justice change. Significantly delaying this project will pose serious threats to coastal Miami, and to the City of Miami Beach in particular. T he quality of ocean and beach life we enjoy as residents, and the great draw for tourists from around the corner and around the globe, has the potential to expand with GO BOND funding, or to simply disappear with inaction and delayed response. List of Capital Improvements (Breakdown of budget and how it will be used) • Production Costs for 8 - 10 deployments: $6,8321,830 o Includes retaining wall and barrier material, production of all sculptures, shipping, installation/underwater deployment • Permitting and logistics for 8 -10 deployments: $1,865,000 o Includes all marine engineering plus expenses, surveys, environmental permitting, testing, insurance, and open call • Production Staff & Experts for 8 - 10 deployments: $1,675,000 o Includes masterplan architects, producer, artists, biologists consultants, production managers, contractor building and assistants • Education, Communications & Marketing Efforts for 8 - 10 deployments: $665,000 o Includes educational campaigns, communications, printing, opening events, tourism activities, and web design • Miscellaneous expenses for 8 - 10 deployments: $460,000 o Includes grant writing, accounting, modeling, project documentation, and misc. project expenses • Contingency for 8 - 10 deployments: $250,000 G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Underwater Reefline Project Proposed Enhancement Multi-phase 9-mile Artificial Reef Project 16,756,000 - 16,756,000 Grand Total (Rounded to the nearest ten thousand)$16,760,000 $0 $16,760,000 Subcontractor Trade Cost $11,800,000 $0 $11,800,000 Contractor, General Conditions, Overhead & Profit (20%)$2,360,000 $0 $2,360,000 Owner Contingency (15%)$1,770,000 $0 $1,770,000 Permitting (5%)$590,000 $0 $590,000 Estimated Bond Fee (2%)$240,000 $0 $240,000 Proposed GO Bond for Arts Culture I I I I I I I 1 "' .::, -I C0 z THE REEFLINE 2 ABOUT REEFLINE A LARGE-SCALE ENVIRONMENTAL PUBLIC ART PROJECT OFF THE SHORE OF MIAMI BEACH Developed by BlueLab Preservation Society in partnership with the City of Miami Beach and Coral Morphologic, the ReefLine will feature environmentally-functioning artwork sculptures that will be placed in 15-20 feet depth of water, at a swimmable distance from shore. These works will be developed by major international artists and designers, to be completed in several phases, with the first phase slated to open December 2021. The project will span approximately 9 miles long at completion. SUPPORTERS City of Miami Beach Knight Foundation The Blavatnik Family Foundation Private philanthropists and art col- lectors State artificial reef grant funding Partnerships with local hotels and tourism boards. Harvard NOAA 7\ FUTURE REEFLINE PHASES VESSEL EXCLUSION ZONE REEFLINE BOAT ROUTE REEFLINE BOAT DOCK STATIONS 41 ::, ..., CD z THE REEFLINE 3 A cultural entrepreneur, Ximena Caminos is a creative powerhouse. Internationally renown as a non-traditional curator, she’s a cultural agitator who pioneered new ways to approach and discuss contemporary art and cultural manifestations at large. Part of the Harvard GDS Think Tank for “The Future of American Cities”, Ximena is one of the most unconventional intellectuals of her generation, her spirit and life experiences bloomed into a multifaceted career, making art, culture, design, and place-making the foundation of all her endeavors. Due to her keen post-disciplinary approach bridging culture, community- building, and urban development, she has been appointed Artistic Visionary Planner for The Underline, the largest public art project in the US. Ximena is known for an idiosyncratic approach to the presentation, discussion, and exhibition of contemporary art forms, building new models and platforms to catalyze experimentation across the Arts, Sciences, Philosophy, Tech, Politics, and Urbanism. She has collaborated with the most relevant disruptors of our time—from artists to architects, poets to social leaders—including Jenny Holzer, architect Rem Koolhaas and Norman Foster. Ximena has been shaping the global scene for more than two decades. Watch her latest intervention at Art Basel with Leandro Erlich here. Former Artistic Director and Chair of Faena Art, Partner and CCO of the multi- awarded Faena Districts, under her leadership, Faena has placed art and culture at the forefront of all its endeavors. In 2017 Caminos founded the cross-disciplinary cultural platform HoneyLab. Member of the New Museum Leadership Council, Founding Member of the Solomon R. Guggenheim Museum’s Latin American Circle Partner and Advisor to Art Basel Cities. She is an XPrize Ambassador and the recipient of many Awards, amongst them the Knight Foundation Arts Champion Award and Knight Foundation Arts Challenge AwardShe has been featured many times in Vogue, The New York Times, Financial Times, Wallpaper Magazine, WSJ Magazine, Miami Herald, and Forbes, to name a few. Ximena has published a series of books, working with Studio Job and Rizzoli — including the Faena Aleph trilogy—as well as several art catalogs and journals. XIMENA CAMINOS Founder | Artistic Director “THIS SERIES OF ARTIST-DESIGNED AND SCIENTIST-INFORMED ARTIFICIAL REEFS WILL DEMONSTRATE TO THE WORLD HOW TOURISM, ARTISTIC EXPRESSION, AND THE CREATION OF CRITICAL HABITAT CAN BE ALIGNED. THE REEFLINE IS A SINGULAR INVESTMENT IN CIVIC INFRASTRUCTURE, PUBLIC ART AND ENVIRMENTAL PROTECTION THAT WILL PAY DIVIDENDS OVER THE COMING DECADES AND ATTRACT ECOLOGICALLY-MINDED TOURISTS AND ART LOVERS.” ~~ESEJ?v 'i-~ -1,,. V ~ 4J .:, ..J al z THE 1REEFLINE 4 CURATORIAL ADVISORY BRANDI REDDICK Cultural Affairs Manager, City of Miami Beach JEROME SANS Co-Founder Palais de Tokyo, Paris, Director of Ullens Center for Contemporary Art in Beijing (UCCA), Contemporary Arts Curator, KATE FLEMING Vice Chair of BlueLab, Director of Bridge Initiative SHANTELLE RODRIGUEZ Director of Experiential Arts Centers, SUPERBLUE 41 .:, ..J al z THE REEFLI INE 5 EXPERTS COLIN FOORD Coral Morphologic co- founder, Marine Biologist, Coral Aquaculturist, Artist & Filmmaker SHOHEI SHIGEMATSU Partner at OMA, Reefline Master Planner OMA Architecture Studio DIEGO LIRMAN Professor of Marine Biology & Ecology, University of Miami ELIZABETH WHEATON Head of Environment and Sustainability, City of Miami Beach JOSH BERNSTEIN Explorer, Educator, CEO of Explorer At Large LANDOLF RHODES-BARBARIGOS Assistant Professor, University of Miami College of Engineering BRIAN K. HAUS Professor, Chair of the Ocean Sciences Department, University of Miami Rosenstiel School of Marine and Atmospheric Sciences CUMMINGS | CEDERBERG Consulting and Engineering Firm, Marine and Coastal Environments TORI LINDER American Conservationist and Storyteller Program Director, Path of the Panther 4J .:, ..J al THE 1REEFLINE 6 The deployment of new artificial reef substrate and sculptures over this now-sandy bottom will serve to restore this once vibrant habitat, smothered via the transport of sand that results from beach renourishment. EXPANDING EXISTING ARTIFICIAL REEFS Sand from previous beach renourishment projects on South Beach has washed back offshore, smothering the natural hard bottom reef as it moves northward. White areas are sand, dark areas are reefs and colonized hard bottom. Note the plume of milky dredge silt from government cut in (above) bottom right. "' .:, .,J CCI z THE 1REEFLINE 7 BlueLab Preservation Society will curate a select group of artists for the first phase of underwater installations and limit the materials they can work with to limestone or cement. Oolitic limestone and cement is well-proven for use as an artificial reef structure since the porosity and chemical makeup of the structure is ideal for coral growth and reef habitat. In order to protect the artists’ sculptures, a barrier of concrete modules (or limestone boulders) will be deployed around them to lessen the impact of wave energy during storms and swells. Most importantly, these modules will create the actual ‘Line’ that connects all the installations and serves as a snorkel trail, while also greatly expanding the size and effectiveness of the artificial reef site. REEFLINE INSTALLATIONS ..., 4, .::, ..J al z THE REEFLINE 8 PHASE 1: CONCRETE CORAL BY LEANDRO ERLICH 9 The natural evolution and permanent underwater incarnation of Order of Importance, a site specific sand traffic jam shown in Miami Beach during Art Basel 2019 (pictured above). This underwater incarnation of this installation, Concrete Coral, will offer an entirely new reading of the impermanence displayed in Order of Importance. As opposed to the sand cars shown on the beach, these submarine sculptures do not degrade over time. Instead, they will be colonized by life and merge with the natural environment. Our fear of being “underwater” (as a consequence of climate change) will also be transmuted into the generation of new homes for underwater lifeforms and the development of a new marine ecosystem. CONCRETE CORAL 22 CONCRETE SCULPTURES UNDER THE SEA 10 -• - • . • 11 PHASE 2: OMA 4J .:, ..J al THE 1REEFLINE 12 PHASE 2: OMA CONCEPTUALIZATIONS Base Module Coral Topiary ..., 0 z THE iREEFLINE 13 PHASE 3: OPEN CALL ACCEPTING DESIGN CONCEPTUALIZATIONS WITHIN ENVIRONMENTAL PARAMETERS Design pictured by OMA THE REEFLINE 14 CONCLUSION The ReefLine is an investment that will quickly pay for itself by highlighting the fact that Miami is the only US city bordered by two National Parks, and has a unique marine environment just a stone’s throw away from it’s world- renowned beaches. The ReefLine will serve as a living monument to the current era of sea level rise and the need for rapid adaptation in a warming climate. Investment in an artificial reef that is equal parts sculpture gallery, marine habitat, and snorkel/dive attraction is a cost-effective way at garnering significant media coverage for Miami Beach’s green (and blue) ethos to enhance coastal resilience and provide critical marine habitat for reef organisms. 15 FUTURE MASTERPLAN 16 PRESS hr ' 1·kl .'u1 d r ·a ( arl , ill' • 1 ·n 111 Financial Times CNN Style J : i mii rt l~ t t news art r efwill b in ll d j1 off ch. £mp · o.n rt Miami Herald Artnet 1oce el parque de e cultura submarin , abrira en iam· CNN Espanol The Art Newspaper The Guardian HYPEBEAST MAD . M ' . ti _ 1gn __ ,am, ac _ Underwater Sculpture Par HYPEBEAST 4J .:, ..J al z THE 1REEFL I NE 17 ABOUT BLUELAB The BlueLab Preservation Society is a 501(c)3 non-profit foundation with a focus on building positive community impact that will help address ocean pollution, water quality, climate change, environmental and social issues. Led by its Chair, Ximena Caminos, The BlueLab Preservation Society uses art, science, culture and design as galvanizing channels for its sustainability program, developing responsive strategies and solutions with a clear core mission. MISSION To activate and drive the spirit of venture capital fundraising towards projects whose return on investment is a healthier environment for future generations. To support local, state, and national governments in the preservation of environmentally-sensitive areas, restoration of coral reef and mangrove habitats, management of fisheries, sustainability of ecotourism, and the cleanup of rivers, lakes and oceanic sources of pollution. To create social opportunities that foster conversation between scientists, the tourism industry, engineers, artists, designers, NGO’s, philanthropists, and the local and global community. To promote Miami as a global hub of coral science, artificial reef development, and future climate change adaptation. ' ~~ESEJ?v 'i-~ -1,,. V ~ 4J .:, ..J al z THE 1REEFLINE 18 ARE YOU ONE OF US? We are a group of creators, thinkers, and leaders that have come together to collaborate and support projects that bring awareness, catalyze and create solutions to the world’s largest problems. WELCOME@BLUELAB.ORG Living Shorelines & Mangrove Restoration Background: A priority of the City of Miami Beach is to implement living shorelines that can complement grey infrastructure in its on-going climate adaptation work. There are several hybrid seawalls and living shorelines already in construction or design, but the City wishes to expand this effort to additional locations Citywide. Living shorelines use a combination of bank stabilization and habitat restoration techniques to reinforce the shoreline, minimize coastal erosion, and maintain coastal processes while protecting, restoring, enhancing, and creating natural habitat for aquatic plants and wildlife. Use of Funds These funds would be in addition to the $10 million already allocated toward resilient seawalls and living shorelines on public property that is part of the existing G.O. Bond Program. The funds would focus on developing living shorelines at the highest-ranked sites for living shoreline viability. Estimated Project Timeline Over the course of the next several years. Benefits to Taxpayers Living shorelines not only protect the park and local community from sea level rise and the impacts of severe weather conditions, but they also restore and enhance natural habitats for birds, fish and other marine life through various structural and organic mat erials, including terrestrial and aquatic vegetation as well as oyster reefs that provide the additional benefit of improving water quality in Biscayne Bay, a priority for the city, county and The Nature Conservancy. Living seawalls will prepare the City for the future. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? The funds would need to identified in future budget cycles and staff will seek grant funding opportunities. List of Capital Improvements Living shoreline and Mangrove implementation – various locations G.O. Bond for Arts & Culture Enhancements/Non-CR&R) Total (w/Markup) City CR&R Total (w/Markup) Cultural GO Bond Total (w/Markup) Living Shorelines & Mangrove Restoration Proposed Enhancement Scope of Work to be developed by CMB Environment & Sustainability Dept. 4,260,000 - 4,260,000 Grand Total (Rounded to the nearest ten thousand)$4,260,000 $0 $4,260,000 Subcontractor Trade Cost $3,000,000 $0 $3,000,000 Contractor, General Conditions, Overhead & Profit (20%)$600,000 $0 $600,000 Owner Contingency (15%)$450,000 $0 $450,000 Permitting (5%)$150,000 $0 $150,000 Estimated Bond Fee (2%)$60,000 $0 $60,000 Proposed GO Bond for Arts Culture I I I I I I I Nature Based Shoreline Assessment City of Miami Beach Florida October 2021 Prepared for: City of Miami Beach Environmental & Sustainability Department 1700 Convention Center Drive Miami Beach, Florida 33139 Prepared by: Cummins Cederberg, Inc. 7550 Red Road, Suite 217 Miami, FL 33143 T: +1 305 741 6155 F: +1 305 974 1969 CumminsCederberg.com CONDENSED REPORT CUMMINS I CEDERBERG Coastal & Marine Engineering Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page i EXECUTIVE SUMMARY Cummins Cederberg, Inc. was engaged by City of Miami Beach to assess the viability of implementing living shorelines along existing City-owned seawall segments. The viability of each site would be assessed based on length, water depths, structure condition, navigation impacts, upland use, constructability, and wave exposure. A score of 1-3 would be given for each parameter and the total score for each site tallied. A review of the City Wide Seawall Investigation Report, Seawall Priority map, aerial imagery, and ground imagery were conducted to aid in the scoring. Site investigations were carried out by a coastal engineer to document existing conditions of the project site and general observations not noted in the previous sources. The following sites were ranked highest for implementing a living shoreline based on the results of the assessment: ▪ Bayside Lane ▪ Julia Tuttle Causeway and Alton Road South ▪ West 40th Street Parking Lot ▪ Pine Tree Park ▪ Indian Beach Park ▪ 6860 Indian Creek Drive ▪ Park View Island Canal ▪ Beach View Park and Fire Station #3 ▪ North Bay Road – North End ▪ South Pointe Park The following conclusions were obtained for each of the top 10 sites: ▪ Most City-owned shoreline segments are of limited length, making significant vegetation expansion difficult. However, many sites could be converted to a conventional rock revetment shoreline in lieu of a seawall. Rock revetments typically have significantly more marine growth and potential for localized vegetation such as mangroves compared to a standard seawall. ▪ Mangroves are ubiquitous along the Bayside Lane and Parkview Island Canal shorelines. Invasive vegetation should be removed and large voids filled to grade, allowing new mangrove seedlings deposited by the surrounding trees to germinate. ▪ The west 2550 feet of Julia Tuttle Causeway and Alton Road South exhibits the longest usable and continuous site length. A shallow region of sand has accreted in front of the existing seawall. The shallow region is exposed during low tide and submerged during high tide and is an environment suitable for mangrove plantings. ▪ The east 300 feet of the Julia Tuttle Causeway and Alton Road South seawall shows signs of critical failure which must be addressed. The interchange region has significant greenspace for landward expansion of a living shoreline without obstructing the Biscayne Waterway inlet. Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page ii ▪ The existing West 40th Street Parking Lot seawall shows signs of advanced deterioration and is poorly suited to address future sea level rise. It should either be replaced or enhanced with a living shoreline. Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page iii ▪ Pine Tree Park may benefit from living shoreline enhancements on the southernmost 500 feet of the property. Removal of the dominant seaside mahoe and other invasive plants to be replanted with mangroves is advised, and revetment restacking as needed. ▪ Indian Beach Park and Beach View Park, while short on upland space, do have ample waterward clearance for living shoreline development and are good candidates. ▪ 6860 Indian Creek Drive currently shows a seawall in good condition. A living shoreline could be constructed seaward of the existing seawall or when the seawall is due for replacement. ▪ Living shoreline enhancements to South Pointe Park may not be feasible due the high wave from hurricane waves and boat wakes. A wave analysis should be performed prior to installing a living shoreline to determine if suitable.. Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page 3 Figure 1.1 Site Locations • Site Location c::J City Boundary 0.25 0.5 1 Miles 0 CUMMINS I CEDERBERG ' Coa~tal & Marin1: l:ngin1:1:ring Miami I Fort Lauderdale I Jupiter I Tallahassee 7550 Red Road , Suite 217, South Miam i, FL 33143 T: +1 305-741-6155 F: +1 305-974-1 969 www.cumm in scederberg.com Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page 26 5 CONCLUSIONS AND RECOMMENDATIONS An assessment of 118 City owned shoreline segments in the City of Miami Beach was performed for the purposes of potential living shoreline implementation. 54 sites were removed from the assessment because they were under or directly adjacent to a roadway bridge, or replaced or repaired within the last ten years. The remaining 64 sites were then given a score based on seven factors: length, anticipated water depths, structure condition, navigation impacts, upland use, constructability, and wave exposure. Ten sites were selected for further investigations including an engineering site visit and preliminary environmental assessment. The assessment yielded the following conclusions and recommendations related to the ten highest-ranked sites and shoreline segments in general: ▪ Most City-owned shoreline segments are of limited length, making significant vegetation expansion difficult. However, many sites could be converted to a conventional rock revetment shoreline in lieu of a seawall. Rock revetments typically have significantly more marine growth and potential for localized vegetation such as mangroves compared to a standard seawall. ▪ Mangroves are abundant along the Bayside Lane and Parkview Island Canal shorelines. Invasive vegetation should be removed and large voids filled to grade, allowing new mangrove seedlings deposited by the surrounding trees to germinate. ▪ The west 2,550 feet of Julia Tuttle Causeway and Alton Road South exhibits the longest usable and continuous site length. A shallow region of sand has accreted in front of the existing seawall. The shallow region is exposed during low tide and submerged during high tide and is an environment suitable for mangrove plantings. ▪ The east 300 feet of the Julia Tuttle Causeway and Alton Road South seawall shows signs of critical failure which must be addressed. The interchange region has significant greenspace for landward expansion of a living shoreline without obstructing the Biscayne Waterway entrance. ▪ The existing West 40th Street Parking Lot seawall shows signs of advanced deterioration and is poorly suited to address future sea level rise due to the low elevation. As part of rehabilitating the shoreline, a living shoreline could be implemented. ▪ Pine Tree Park may benefit from living shoreline enhancements on the southernmost 500 feet of the property. Removal of the dominant seaside mahoe and other invasive plants to be replanted with mangroves is advised, and revetment restacking as needed. ▪ Indian Beach Park and Beach View Park, while short on upland space, do have ample waterward clearance for living shoreline development and are good candidates. Citywide Living Shoreline Viability Assessment, City of Miami Beach November 2021 www.CumminsCederberg.com Page 27 ▪ 6860 Indian Creek Drive currently shows a seawall in good condition; thus, it is anticipated any rehabilitation will not be in the short term. When the structure is due for replacement, the City should consider a living shoreline. ▪ Living shoreline enhancements to the majority of South Pointe Park’s shoreline is highly cautioned as hurricane waves, storm surge, and boat wakes are frequent and may uproot or considerably damage planted vegetation, unless extremely well-sheltered. Commission Memorandum Date: June 22, 2022 Subject: Discuss and if necessary, take action regarding the possible issuance of a G.O. Bond for Arts and Culture EXHIBIT B City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov TO: FROM: DATE: SUBJECT: COMMISSION MEMORANDUM Honorable Mayor Dan Gelber and Members of the City Commission Alina T. Hudak, City Manager f?ue: � �6 ( June 22, 2022 DISCUSS AND IF NECESSARY, TAKE ACTION REGARDING THE POSSIBLE ISSUANCE OF A G.O. BOND FOR ARTS AND CULTURE BACKGROUND The City of Miami Beach has a plethora of cultural assets and organizations benefiting its community. Many of these assets require capital improvements which are limited by the City's annual capital budget. On October 13, 2021, at the request of Commissioner Ricky Arriola, the Mayor and City Commission approved the referral of item C4-N to the Finance and Economic Resiliency Committee (the Committee), to discuss the possible issuance of a General Obligation Bond (G.O. Bond) to fund arts and culture. Consequently, at its October 22, 2021, meeting, the Committee discussed funding arts and culture capital projects within the City. Following the discussion, the Committee issued direction to the Administration to work on an inventory of needs for the City's arts and cultural assets, as well as a recommendation to continue the discussion. ANALYSIS Pursuant to the Committee's direction, the Facilities and Fleet Management Department worked in conjunction with the operators and tenants of various cultural institutions within the City to gather an inventory of capital needs and requests. The proposed enhancements contemplate capital, acoustics/sound system, technology, and activating public spaces. The Department also collaborated with other departments to identify opportunities. Moreover, the Department identified and compiled capital needs from multiple facility conditions assessments (FCAs) which provided the data on deferred maintenance, deficiencies, and future capital needs, including the buildings' envelope, mechanical, electrical, and plumbing systems. Collectively, this provided the framework for the inventory of proposed capital improvements projects. On February 25, 2022, the Committee reviewed the item, and directed the Administration to brief members of the City Commission with the proposed requests. Input from several members was gathered which contributed to further refining the inventory list. On March 30, 2022, the Committee reviewed the revised project list. After deliberation, the Committee made a motion to have the item discussed at the May 2022 City Commission meeting for further discussion and direction. Subsequently, the discussion was deferred to June 2022. ;J\IA/\/\1 EACH During that time, the Facilities and Fleet Management Department continued to meet with stakeholders to address costs previously undetermined in the original request to further refine the project list. Consequently, this memorandum has been updated and replaces the proposed request of $115M that would have been contemplated at the May meeting. Moreover, on June 14, 2022, the Cultural Anchors issued a case summary detailing the requests of the proposed G.O. Bond, incorporated herein as Attachment B. Attached for the Mayor and City Commission's review is a draft inventory (Attachment A), proposing enhancements totaling over $143M This is a preliminary iteration that considers costs to implement these projects if adopted, and provides opportunities to continue the discussion of addressing the capital needs of our facilities as well as how to further augment the cultural venues and anchors in the community. Should a General Obligation Bond be considered, it is important to note the potential fiscal impact to homeowners. The estimated annual cost to an average homeowner (based on a property with $596K taxable value) is depicted below for a bond at $100M, $150M, $200M, and $250M: Bond Program Amount Annual Debt Service Equivalent Millage Annual Cost to Rate Average Homeowner $100M 6,000,000 0.1732 $108 $150M 9,000,000 0.2598 $163 $200M 12,000,000 0.3464 $217 $250M 15,000,000 0.4330 $271 CONCLUSION The Administration recommends the Committee consider the capital enhancements detailed herein for a proposed G.O. Bond for arts and culture. The Bond would allow the City to address capital needs that are currently unfunded. Should the Commission move forward with a favorable consideration of issuing a G.O. Bond, this item will be subject to voter referendum. Attachments A -Proposed G.O. Bond for Enhancement of CMB Cultural Facilities B -Cultural Anchors Proposal Attachement A Proposed G.O. Bond for Enhancement of CMB Cutlural Facilities City-owned Assets 11:1ass Museum or Art Proposed Enhancement New projector and screen for Museum Courtyard Automatic shade svstem for Museum Courtvard Audio Induction Loop for Museum Courtyard Lumitrix event liahtina svstem for Museum Courtvard Commercial Qrade overhead door for Museum Cafe Enhanced AN eauioment for Museum Creativitv Center ProQrammable automatic shades for Museum Creativity Center Adiustable aallerv tack liahtina for Museum Creativity Center Audio Induction Loco for Museum Creativitv Center Reolace transformer for LED liQhtinQ at Museum Lobby Museum wide beacon-based wavfindina svstem Enhanced exterior lighting for Museum facade and Museum Courtyard WiFi access points throughout Collins Park for enhanced oatronaae reportinQ Lumitrix disolav liahtina for exterior art installations Wall mounted ladder replacement Exhaust Svstem renewal Condenser Pumo renewal Rooftoo Packaae Unit renewal Clean Steam Humidifier renewal Emeraencv lightina replacement Fire Alarm svstem replacement Multi-ouroose place maker space Subtotal PermittinQ (2%) Contractor General Conditions Overhead and Profit (22%) Owner Contingency (10%) Total bv Cateaorv TOTAL 1M1am1 1.,;rcy 1:1a11ec Proposed Enhancement Facility-wide Variable Air Volume (VAV) Box Reolacements Electronic HVAC Filtration -UV-C Liahts in rooftops units Dry Wall Reoairs and Paint at Studios 1-5, 7, 8 and Common Areas Harleauin "Marlev" Floors -Studios 4 5 6 8 Hallway 1 & 2 Wolfson Theater AN Uoarades Elevator Modernization Wardrobe Utilitv Renovation LED Lamp Replacement (Facility-wide includinq balconies) Bottled Water Fillina Stations /3l Hands Free Faucets and Toilet Flushometers Uoarade Restroom Exhaust System renewal Acoustical Ceilina Panel renewal HVAC Ductwork renewal Svstems Furniture Lobby Security Enhancements Stair Finish Renewal /rubber treading) Loadina Dock Floodina Reoair Studio Black Out Shades 3 rd Floor Wood Floors Reolacement Proiect Manaaement Fees /Balance Commercial Real Estate) Defensive Architectural Enhancements to Collins Park Boardwalk Subtotal Permittina 12% Contractor General Conditions Overhead and Profit (22% Owner Continaencv (10% Total bv Cateaol'II TOTAL Proposed GO Bond for Arts Culture Projected Cost for Projected Cost for City's orooosed GO Bond CR&R Proaram $45 000.00 $75 000.00 $28 000.00 $45 000.00 $40,000.00 $65,000.00 $75 000 00 $15 000.00 $40,000.00 $10,000.00 $40,000.00 $75,000.00 $175,000.00 $45,000.00 $11,000.00 $12,000.00 $33 000.00 $84,000.00 $93,000.00 $47 000.00 $1,500,000.00 $13 500 000.00 $784,000.00 $15 269 000.00 $15,680.00 $305 380.00 $172,480.00 $3 359 180.00 $78,400.00 $1 526 900.00 $1,050,560.00 $20 460 460.00 $21,500,000.00 Projected Cost for Projected Cost for City's orooosed GO Bond CR&R Proaram $52,500.00 $35,000.00 $145,000.00 $200 000.00 $552 000.00 $370,000.00 $145,000.00 $171 500.00 $10 000.00 $150 000.00 $25 000 00 $75,000.00 $522 000 00 $345,000.00 $80,000.00 $48 000.00 $250 000.00 $120 000.00 $130,000.00 $69 899.00 $15,000 $1 371 899.00 $2 139 000.00 $27 437.98 $42 780.00 $301 817.78 $470 580.00 $137 189.90 $213 900.00 $1 838 344.66 $2 866 260.00 $4,700,000.00 Page 1 of 5 Attachement A Proposed G.0. Bond for Enhancement of CMB Cutlural Facilities City-owned Assets 1-111more MIamI tseacn Proposed Enhancement Auditorium furniture and finishes replacement First Floor Liahtina and Finish Uoarades <FOH) Second Floor Lic:ihtinc:i and Finish Uparades (FOH) Third Floor Liahtina and Finish Uoarades IFOH) Fourth Floor Exit Corridor-Painting and Carpet Replacement 1FOH) Repairs to Existinc:i Catwalk Structural Panels at Stace Roof Penthouse + Laoevre Stair Exterior Window and Door RePlacement Exterior Structural Repairs Drivewav Redesian and enhanced oedestrian area Basement Liahtina and Finish Uparades First Floor Liahtina and Finish Upgrades (BOH) Second Floor Liahtina and Finish Uparades (BOH) New Second Floor VIP Area New Commercial Kitchen Acoustical Improvements at Dressinc:i Rooms/ Corridors Asbestos Lead Paint IAQ Abatement Allowance Freight Elevator renewal Exhaust Svstem renewal Chilled Water Pipina renewal HVAC Reolacements Electrical Enhancements (includina FA allowance) Plumbina Enhancements (facility-wide) Uoarades to Existina Fire Protection Svstem Emergency Lic:ihtinQ renewal Theatrical Svstems LJparade New LED Marquee Sic:in Contractor General Conditions 1.;0Iony I neater Proposed Enhancement Liahtina & Proiection Svstem Sound System Redesic:in & Replacement Reolace Acoustical Draoes, Main Draoe Stacie ric:ic:iinc:i and mechanics New JLG driveable vertical mast lift Loadina Dock doors and liftaate Facility-wide expansion & storac:ie Subtotal Permittina (2%) Overhead and Profit (22%) Owner Continc:iency (10%) Total by Catec:iorv TOTAL & Soft Goods Facilitv-wide Securitv, Access & Communication Svstems Uoarade Emergency Lic:ihtinc:i renewal Domestic Water Pumo renewal Accessibility Enhancements Lobbv & front entry renovations Restroom renovation & expansion New Carpetina & Theater Seatina Entry door/storefront replacement Roof hatch reolacement Subtotal Permittina 12%) Contractor General Conditions Overhead and Profit 122% Owner Continaency 110% Total by Cateaorv TOTAL Proposed GO Bond for Arts Culture Projected Cost for orooosed GO Bond $1,183,400.00 $1,856 070.00 $922,920.00 $659 300.00 $41,220.00 $33 500.00 $52,500.00 $266,880.00 $329 500.00 $329,000.00 $972 820.00 $496 560.00 $270,760.00 $1 200 000.00 $600 000.00 $50 000.00 $2,882,000.00 $1,200,000.00 $13 346 430.00 $266 928.60 $2 936 214.60 $1 334 643.00 $17 884 216.20 Projected Cost for City's CR&R Proaram $200 000.00 $493 000.00 $350 000.00 $1 625 000.00 $841 800.00 $1 227 000.00 $36 500.00 $202 285.00 $319 000.00 $5 294 585.00 $105 891.70 $1 164 808.70 $529 458.50 $7 094 743.90 $25,000,000.00 Projected Cost for proposed GO Bond $772 000.00 $812,250.00 $180,000.00 $175,000.00 $20 000.00 $50,000.00 $340,000.00 $186 000.00 $160,000.00 $470,000.00 $375 000.00 $490 000.00 $4 030 250.00 $80 605.00 $886 655.00 $403 025.00 $5 400 535.00 Projected Cost for City's CR&R Program $11 000.00 $52 000.00 $220 000.00 $30 000.00 $313 000.00 $6 260.00 $68 860.00 $31 300.00 $419 420.00 $5,800,000.00 Page 2 of 5 - I Attachement A Proposed G.O. Bond for Enhancement of CMB Cutlural Facilities City-owned Assets 1m1am1 tseacn 1:1otamca1 uaraen Proposed Enhancement Projected Cost for Projected Cost for City's orooosed GO Bond CR&R Proaram Resiliencv & Sustainabilitv Initiatives $2,459,000.00 Pond oump replacements $15 000.00 lrriaation uoarades $30,000.00 New oathways for high traffic areas $50 000.00 New accessible routes to Native Garden and Gazebo $150 000.00 Dedicated electrical panel for Short $5,000.00 Term Events New safety and landscape lighting $40,000.00 Securitv cameras and alarm svstem $35 000.00 Exit Sian renewal $11 000.00 Caterina kitchen exoansion $30,000.00 Exoanded event storaae areas $250 000.00 HVAC replacement $120 000.00 New ceilina fans $20,000.00 New NV equipment for Banyan and Butterfly Rooms $65 000.00 New slidina alass doors at Banvan Room $75 000.00 Expansion of outdoor event area $50 000.00 Enhanced technoloav infrastructure $100,000.00 New Japanese Garden $500,000.00 Subtotal $3 839 000.00 $166 000.00 Permitting (2%) $76 780.00 $3 320.00 Contractor General Conditions Overhead and Profit (22%) $844 580.00 $36 520.00 Owner Contingency 110%) $383 900.00 $16 600.00 Total bv Cateoorv $5 144 260.00 $222 440.00 TOTAL $5,400,000.00 Art Deco Welcome Center -Miami Design Preservation League Proposed Enhancement Projected Cost for proposed GO Bond Additional Fundina for Art Deco Museum Expansion $800,000.00 Enhanced Exterior and Interior Lighting $100,000.00 Subtotal $900,000.00 Permitting (2%) $18,000.00 Contractor General Conditions Overhead and Profit (22%) $198,000.00 Owner Continaencv (10%1 $90,000.00 Total $1,200,000.00 _New woria ::;ympnony Proposed Enhancement Projected Cost for Projected Cost for City"s orooosed GO Bond CR&R Proaram Upgraded Theatrical Lighting $1 400,000.00 Elevator Modernization $750 000.00 New LED Marquee Sian for East Facade $750 000.00 Facility-wide Surge Protection $150,000.00 New Peraola for Roof Garden $750,000.00 Exterior Paint and Stucco Repairs $250 000.00 Flood Barriers $650,000.00 Acoustical Resurfacina of Performance Hall "Sails" $500,000.00 Reolace Acoustic Panels Throughout NWC $150 000.00 Replace Fire Alarm Svstem $255 000.00 Subtotal $4 350 000.00 $1 255 000.00 Permittina {2%1 $87 000.00 $25 100.00 Contractor General Conditions Overhead and Profit {22%1 $957 000.00 $276 100.00 Owner Continaencv {10%1 $435 000.00 $125 500.00 Total bv Cateaorv $5 829 000.00 $1 681 700.00 TOTAL $7,500,000.00 Proposed GO Bond for Arts Culture Page 3 of 5 I . . Attachement A Proposed G.O. Bond for Enhancement of CMB Cutlural Facilities City-owned Assets IMo1ocaust Memona1 M1am1 tseacn Proposed Enhancement Projected Cost for Projected Cost for City's orooosed GO Bond CR&R Proaram Interior repair and replacement of center arm structure $250,000.00 Reoatina of center arm structure includina surface sculotures $300 000.00 Reolacement of broken Jerusalem stones $400,000.00 Rearoutina of all walkwav stones $200 000.00 Renovate center water feature and seal leaks (includinq filters) $500 000 00 Install new bicvcle rack $500.00 Tech for State of the Art walkinq tour for visitors $150,000.00 State of the Art Securitv bollards at west side frontaqe $175 000 00 State of the Art telephone svstem for visitor info $75,000.00 Remodel security booth for 24-hour security staff $50 000.00 Renovations to Visitor Welcome Center $100 000.00 Renovations to Public Restrooms $150 000.00 Wavfindina and Directional Sianaae $5,000.00 Technoloqy upqrade for Visitor Center $100 000 00 New outdoor walkwav to classroom $125,000.00 Replacement of pond lamps $500,000.00 New lilies for oond feature $10 000.00 Security Gate for rear entrance $150 000.00 New CBS wall at rear of Memorial/West side of MBBG $375 000.00 Roof replacement for Classroom, Admin. Office, Security Booth and $250,000.00 Visitor's Center New flooring for Classroom, Adm in. Office, Security Booth and $30,000.00 Visitor's Center New Security System and Surveillance Cameras $750 000.00 Subtotal $2 745 500.00 $1 900 000.00 Permittinq (2%' $54 910.00 $38 000.00 Contractor General Conditions Overhead and Profit (22%' $604 010.00 $418 000.00 Owner Contingency (10%) $274 550.00 $190 000.00 Total bv Cateaorv $3 678 970.00 $2 546 000.00 TOTAL $6,200,000.00 Itsyron o.,any1e I neater l'<enovauon Proposed Enhancement Projected Cost for proposed GO Bond Complete Renovation of Byron Carlyle Theater (including spaces for $19,921,788.00 enhanced proqramminal* Owner Continaencv 110%) $1,992,178.80 TOTAL $21,900,000.00 • Per Conditions Assessment & Recommendations Report prepared by M.C. Harry Associates (5/11/21) umaaa - Norm tseacn ::;emor 1.,;emer Proposed Enhancement Projected Cost for proposed GO Bond New sound system and acoustical controls at Communitv Room $200,000.00 New tables and seatinq for Community Room $50,000.00 Caterina Kitchen Expansion for Senior Meal Proaram $250,000.00 Restoration of Historic Coral Rock House (Home of Miami Beach $500,000.00 Hispanic Community Center) Subtotal $1,000,000.00 Permittina 12%) $20,000.00 Contractor General Conditions Overhead and Profit 122% $220,000.00 Owner Continaencv 110% $100,000.00 TOTAL $1,300,000.00 I0.,Mts I ounsm ana o.,unure uepanmem Proposed Enhancement Projected Cost for Proposed GO Bond Buildout for Miami New Drama at Collins Park Garaqe $5,000,000.00 Subtotal $5,000,000.00 Permittinq (2%) $100,000.00 Contractor General Conditions Overhead and Profit (22%) $1,100,000.00 Owner Continaency (10%1 $500,000.00 TOTAL $6,700,000.00 Proposed GO Bond for Arts Culture Page 4 of 5 Attachement A Proposed G.O. Bond for Enhancement of CMB Cutlural Facilities City-owned Assets , 11e "'"ymm i-ounaauon at Norm tseacn tsanasnen Proposed Enhancement Projected Cost for Projected Cost for City's orooosed GO Bond CR&R Proaram Back of House Improvements $1,500 000.00 Canoov Phase 3 $200,000.00 Restroom Upcirades $150,000.00 Rear Platform Uoarade $200 000.00 Canopy Proiection Mappinci $100,000.00 Park Entrance Uoarade $150,000.00 Park Performance, Architectural and Landscape Liahtina $150,000.00 Subtotal $2 300 000.00 $150 000.00 Permittina (2% $46 000.00 $3 000.00 Contractor General Conditions Overhead and Profit (22% $506 000.00 $33 000.00 Owner Continaency (10%' $230 000.00 $15 000.00 Total by CateQOI"', $3 082 000.00 $201 000.00 TOTAL $3 300 000.00 ..,..,., .-,aygrouna upraaes Proposed Enhancement Projected Cost far proposed GO Bond Artistic uparades / Playaround activation $5,000,000.00 Subtotal $5,000,000.00 Permittina (2%' $100,000.00 Contractor General Conditions Overhead and Profit (22%' $1,100,000.00 Owner Contin<1ency 110%' $500,000.00 TOTAL $6,700,000.00 Ii-roposea "'eerune r-roiecc Proposed Enhancement Projected Cost for proposed GO Bond Multi-phase 9-mile Artificial Reef Project TOTAL $11,800,000.00 Ii-roposea Mangrove Kestorauon cnort Proposed Enhancement Projected Cost for proposed GO Bond Scope of Work to be developed by CMB Environment & $3,000,000.00 Sustainability TOTAL Other Culture/ Arts Institutions (Not City-owned) , ne wonsornan Proposed Enhancement Proposed Expansion and New Washington Ave. , ne Jew,sn Museum or r-,onaa Proposed Enhancement Facility-wide Enhancements Summary Potential CRR Request: Total (Enhancements+ CRR) GOB Request lmplentation costs estimated (3 positions) Proposed GO Bond for Arts Culture Entrance TOTAL TOTAL TOTAL Projected Cost far proposed GO Bond $10,000,000.00 Projected Cost far proposed GO Bond $35,500,000.00 $142,800,000.00 $350,000.00 $143,200,000.00 $750,000.00 Page 5 of 5 ' Attachment B MIAMI BEACH POTENTIAL 2022 CULTURAL GENERAL OBLIGATION BOND ISSUANCE As of June 14, 2022 Drafted by the Cultural Anchors Attachment B Table of Contents 2022 Potential Cultural GO Bond Stakeholders ........................................................................................................ 1 2022 General Obligation Bond Financial Summary .................................................................................................. 2 The Bass ...................................................................................................................................................................... 3 Miami City Ballet, Inc ................................................................................................................................................. 5 Fillmore Miami Beach ................................................................................................................................................ 7 Colony Theatre ........................................................................................................................................................... 9 Miami Beach Botanical Garden .............................................................................................................................. 11 Miami Design Preservation League ........................................................................................................................ 13 New World Symphony, Inc ..................................................................................................................................... 14 Holocaust Memorial Miami Beach ......................................................................................................................... 16 Rhythm Foundation at North Beach Bandshell ..................................................................................................... 18 The Wolfsonian-Florida International University ................................................................................................. 20 Jewish Museum of Florida-FIU ............................................................................................................................... 22 COMMISSION MEMORANDUM -Dated May 4, 2022 ........................................................................................... 24 Attachment B MIAM BEAC 2022 Potential Cultural GO Bond Stakeholders THE BASS THE f ILLMORE MIAMIBEAC11Mi 11'·111 1/1Ml,111111i ♦New World Symphony T H E A T E R NORTH BEACH'" BANDSHELL �HUi'ilH�I FOUNDATION UNIDAD OF MIAMI BEACH I The Wolfsonian Flu. J Jewish Museumof Florida BYRC> I C ARLYL COLONY THEATRE MiAMI NEW DRAMA Attachment B 2022 General Obligation Bond Financial Summary Institutional Description Amount Fillmore Miami Beach $ 23,400,000 Byron Carlyle Theater Renovation *21,913,966 Reef line Project *11,800,000 The Wolfsonian -FIU 10,000,000 New World Symphony 7,600,000 CMB Tourism and Culture Department *6,700,000 Playground Upgrades *6,700,000 Holocaust Memorial Miami Beach 6,300,000 Colony Theater -Miami New Drama 5,900,000 Miami Beach Botanical Garden 5,400,000 Miami City Ballet 4,800,000 Bass Museum of Art 3,500,000 Mangrove Restoration Effort *3,000,000 Uni dad -North Beach Senior Center 1,400,000 Welcome Center -Miami Design Preservation League 1,300,000 Rhythm Foundation at North Beach Bandshell 1,100,000 The Jewish Museum of Florida 750,000 Grand Total $ 121,563,966 *City of Miami Beach Projects All amounts above include a 2% Permitting Fee, 22% General Contractor Overhead, 10% Contingency. 2 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors The Bass Amount Requested: $13,500,000 Organization Background: The Bass is Miami Beach's contemporary art museum. Focusing on exhibitions of international contemporary art, The Bass presents mid-career and established artists reflecting the spirit and international character of Miami Beach. The Bass seeks to expand the interpretation of contemporary art by incorporating disciplines of contemporary culture, such as design, fashion and architecture, into the exhibition program. The exhibition program encompasses a wide range of media and artistic points of view that bring new thought to the diverse cultural context of Miami Beach. Central to the museum's mission, The Bass maintains a vigorous education program for lifelong learning and visitors of all ages. The Bass IDEAS education initiative uses art as a catalyst for creativity and positive growth, especially in the area of early childhood education. The active school program led by the City of Miami Beach called STEAM+, takes The Bass IDEAS off-site by engaging children in Miami-Dade County Public Schools and integrating arts education into the curriculum. Use of Funds The Bass, as explicitly stated in its mission, "shares the power of contemporary art through experiences that excite, challenge and educate." Implicit in this vision is to evolve by including nontraditional museum audiences and new generations via new technologies. The Bass proposes first, to upgrade its existing building infrastructure with updates and improvements listed, enhancing visitor experience and the museums' ability to serve the public. Additionally, the museum proposes building an indoor/outdoor structure that opens its doors (literally) and serves as a multi-use cultural place maker - a space to convene community in the form of a gathering space, cafe, and non-traditional art exhibition space adjacent to The Bass' southwestern flank. This multi-purpose concept would convert the small, quite unattractive, and under-utilized parking lot adjacent to the museum into a social space following the originally designed footprint envisioned by the Pritzker prize winning architect Arata lsozaki. Recognizing that Miami Beach needs to maintain its competitiveness as an urban neighborhood, The Bass proposes building a multi-use space that is reflective of our contemporary times: a space that would expand The Bass' capacity by addressing EXISTING program NEEDS and capacities such as providing a stage and space for the Collins Park monthly jazz series and restarting its popular MISO on the park, a giant screen to present The Bass' growing collection of new media art, and FUTURE programming such as movie nights and an artist-designed mini golf, among others. This structure would serve as a cultural place maker in Collins Park and forcefully offer an alternative to other public convening destinations like the Design District or Bayfront Park near PAMM. Programmed, managed, funded, and marketed by The Bass, this flexible space would provide for year-round cultural programming. Bringing this vision to reality is The Bass' natural next step. Estimated Project Timeline The design and architecture cost would commence immediately, with construction beginning in January 2024. Benefits to Taxpayers The main benefit to taxpayers would be increased quality of life, with the area serving as a center for various programming such as movie nights, jazz concerts and informal cafe gatherings. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful, improvements will be funded for the capital campaign amongst museum donors. The scope of this project is slightly smaller than the museum's 2017 expansion. 3 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors List of Capital Improvements •Multi-Use Programmable Space ($10,000,000) Indoor/Outdoor space for programming •Projector and screen ($45,000) New projector and screen for the Museum Courtyard •Courty ard Automatic shade system ($75,000) Automatic shade system for Museum Courtyard •Courty ard Audio Induction Loop ($28,000) Audio Induction Loop for Museum Courtyard •Lumitrix interior lighting system ($45,000) Lumitrix event lighting system for Museum Courtyard •Commercial grade overhead door ($40,000) Commercial grade overhead door for Museum Cafe •Enhanced A/V equipment ($65,000) Enhanced A/V equipment for Museum Creativity Center •Creativity Center Automatic shade system ($75,000) Programmable automatic shades for the Museum Creativity Center •Gallery tack lighting ($15,000) Adjustable gallery tack lighting for Museum Creativity Center •Creativity Center Audio Induction Loop ($40,000) New projector and screen for the Museum Courtyard •Lobby Transformer ($10,000) Replace transformer for LED lighting at Museum Lobby •Beacon-based wayfinding system ($40,000) Museum wide beacon-based wayfinding system •Exterior lighting enhancements ($75,000) Enhanced exterior lighting for Museum fa<;ade and Museum Courtyard •Collins Park WiFi access points ($175,000) WiFi access points throughout Collins Park for enhanced patronage reporting •Lumitrix exterior lighting system ($45,000) Lumitrix display lighting for exterior art installations •Replaced wall mounted ladder ($11,000) Wall mounted ladder replacement 4 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Miami City Ballet, Inc. Amount Requested: $4,800,000 Organization Background Miami City Ballet (MCB) located in the heart of South Beach and led by Artistic Director Lourdes Lopez, Miami City Ballet nurtures dancers, creates innovative collaborations, and opens avenues of inclusivity within classical ballet. Founded in 1985 by Toby Lerner Ansin and Founding Artistic Director Edward Villella, MCB boasts a repertory of 110 ballets, including 18 world premieres. The Company serves 100,000 patrons annually through performances and programs in Miami Beach, across South Florida, and touring engagements. The Company is anchored in its signature building in Miami Beach, and uses this facility to rehearse throughout the year and provide community programming in its Wolfson Theater. Founded in 1993, Miami City Ballet School has grown into one of the nation's most prestigious dance academies. Providing enrichment through holistic dance education, MCB School offers $500,000 in annual scholarships, to students from diverse socioeconomic strata. Each school year, more than 400 students-many from Miami Beach-participate in MCB School's ballet training program. Ancillary programs include several summer intensives, choreographic training workshops, and open community classes for the public-all of which attract nearly 1,500 students annually. All School classes are conducted at the main facility in Miami Beach. Serving 12,000+ annually in schools, communities and social service centers, community engagement programs use the power of ballet to uplift, unite, enchant, and bring joy. MCB collaborates with community partners including the City of Miami Beach to bring STEAM curriculum into Title I Schools, several Title I Schools to bring the Explore Dance After-School arts instruction, and with venues such as the Colony Theatre, to host the Ballet for Young People free performance program and Company performances. Use of Funds Miami City Ballet's facility at 2200 Liberty Avenue is owned by the City of Miami Beach, who purchased the building in 2005. MCB has a 40-year lease and pays the City of Miami Beach a $97,000 annual maintenance and capital reserve fee. Miami City Ballet's 3-story professional dance facility houses administrative offices, eight state-of­ the-art studios, performance space for small productions, a wardrobe shop and costume storage, physical therapy facilities, fitness and dressing rooms, box office operations, and production offices. Funds from the GO Bond will support the second phase of Miami City Ballet's multi-phase capital maintenance and improvement plan. The scope of work includes deferred maintenance and facility upgrades, upgrades to the Wolfson 200-seat theatre, and other studio and facility improvements. Estimated Project Timeline All projects are ready to begin upon approval of the GO Bond, with completion in 36 months. Benefits to Taxpayers A cultural staple in the heart of South Beach for two decades, this facility is integral to the development of our performances by the professional company, to the holistic training and preparation of students to be versatile 21st century dancers, and for the planning and execution of community engagement programming. MCB is a hub for year-round cultural activity for arts patrons, dancers, community organizations, and visiting and local artists. As one of the nation's leading ballet companies and training academies, MCB highlights the cultural excellence Miami Beach has to offer. Both Miami Beach residents, along with visitors from all over the world will benefit from upgrades to this state-of-the-art facility by enhancing the visitor experience. Continued investment in facility and technology upgrades will preserve the integrity of the building and ensure the long-term sustainability of this state-of-the-art dance facility in the state and in the country. Technology enhancements and upgrades to the Wolfson 200-Seat Theater will increase access to quality cultural arts programming and education with the ability to record and live-stream programs and performances to Miami Beach residents and beyond. 5 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Improvements would not occur without funding from the GO Bond. Past capital improvements were completed in June 2021, with the help of a $360,000 Cultural Fac i lities grant from the Florida Division of Arts & Culture tha t was matched 2:1 with funds held in our accounts at the City of Miami Beach . MCB completed a 3-year facility upgrade that included necessary structural upgrades to the building : roof repair; repair and painting of the exterior; and replacement of HVAC, new exterior windows, stud;o lighting, and studio flooring. List of Capital Improvements • Wolfson Theater Upgrades $937,402 The Wolfson Theater, which encompasses MCB's main rehearsal studio, can be leveraged further to showcase the arts in Miami Beach. Technology upgrades to allow streaming of performances, rehearsals and other community programs. Collins Park Neighborhood Association can utilize for meetings and with enhancements can improve access to community . Lighting, projection, audio , and black-out curtains are part of the envisioned budget items . • Studio Conversion Capabilities $202,267 Currently MCB 's main facil ity has eight ballet studios but limited large group meeting space . To optimize the utility of the current facilities, funds will be used to convert a studio space, when classes and rehearsal are not in session, for conference meeting use . This conference space would be available for groups of 20-50 meeting participants including Trustee meetings, parent conferences, and community forums. Technology upgrades would allow streaming and remote participation . Lightihg, projection, audio, hoise- reduction features, and black-out curtains are part of the envisioned budget items . • Other Studio & Facility Upgrades $2,038,710 The main building is in need of upgrades to enhance its functionality. Harlequin marley floors in studios and hallways, wardrobe utility renovation, acoust ical ceiling panel renewal, systems furniture, lobby securlty enhancements, studio black-out shades , and replacement of carpet on third floor w fth wood. • Deferred Maintenance & Facility Upgrades $1,251,962 Facility-wide. variable air volume Box rep lac ements, electronic HVAC filtration & UV-C lights in the rooftop units, dry wall repairs and paint in studios/common areas, elevator modernization, LED lamp replacement, bottled water filling stations, hands-free faucets and toilet flushometers upgrade, restroom exhaust system renewal, HVAC ductwork renewal, and Stair f i nish renewal (rubber treading). • Public Works Upgrades $369,659 Loading dock flooding repair, defensive architectural enhancements to Collins Park boardwalk . 6 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Fillmore Miami Beach Amount Requested: $23,400,000 Organization Background The City of Miami Beach has a lease arrangement with Live Nation to operate and maintain the Theater. They will work with the City regarding these significant necessary enhancements. Use of Funds Major renovation and improvement to this over SO-year-old facility. Estimated Project Timeline Approximately 24 months. Benefits to Taxpayers The ongoing operation of this Theater with these significant improvements will allow the continuation of entertainment to Miami Beach residents and visitors. Shows that will entertain then of thousands of children and adults with an enhanced atmosphere will thrive alongside the new Miami Beach Convention Center and Hotel. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Improvements cannot be made without funding from the GO Bond. List of Capital Improvements •$1,485,517 -Auditorium furniture and finishes replacement •$2,329,918 -First Floor Lighting and Finish Upgrades (FOH) •$1,158,538 -Second Floor Lighting and Finish Upgrades (FOH) •$827,617 -Third Floor Lighting and Finish Upgrades (FOH) •$51,743 -Fourth Floor Exit Corridor-Painting and Carpet Replacement (FOH) •$42,052 -Repairs to Existing Catwalk Structural Panels at Stage Roof Penthouse+ Lapeyre Stair •$65,903 - Structural Panels at Stage Roof Penthouse+ Lapeyre Stair •$335,014 -Exterior Window and Door Replacement •$413,620 -Exterior Structural Repairs •$412,993 -Driveway Redesign and enhanced pedestrian area •$1,221,177 - Basement Lighting and Finish Upgrades •$623,330 -First Floor Lighting and Finish Upgrades (BOH) •$339,884 - Second Floor Lighting and Finish Upgrades (BOH) 7 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors •$1,506,356 -New Second Floor VIP Area •$753,178 -New Commercial Kitchen •$62,765 -Acoustical Improvements at Dressing Rooms/ Corridors •$251,059 - Asbestos, Lead Paint, IAQ Abatement Allowa nce •$618,861 -Freight Elevator renewal •$439,354 -Exhaust System renewal •$2,039,857 -Chilled Water Piping renewal •$1,056,709 -HVAC Replacements •$1540249 -Electrical Enhancements (including FA allowance) •$45,818 -Plumbing Enhancements (facility-wide) •$253,928 -Upgrades to Existing Fire Protection System •$400,440 -Emergency Lighting renewal •$3,617,764 -Theatrical Systems Upgrade •$1,506,356 -New LED Marquee Sign 8 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Colony Theatre Amount Requested: $5,950,000 Organization Background The Colony Theatre is a city-owned 1935 historic building located on Lincoln Road. A number of renovations over the years have transformed the Colony into a 417-seat theater for live stage performance. The last such renovation ($6.SM) was in 2006. Since 2016 the Colony Theatre has been managed and operated by Miami New Drama, a Miami Beach Cultural Anchor with a mission of developing diverse, relevant new plays and musicals in conversation with the communit y. Under Miami New Drama's management, the Colony Theater welcomes over 40,000 people annually, including thousands of Miami-Dade students. The largest bilingual theater in America, Miami New Drama has grown into an award-winning, nationally recognized regional theater with a national reputation for serving the Miami Beach and Miami-Dade communities with diverse, groundbreaking work. Use of Funds With its last renovation in 2006, the Colony Theatre's systems, public areas, and equipment are out of date and have for been slated for improvement for years, most recently in a 2018 renovation plan by historic architect Richard Heisenbottle. Current equipment is not up to modern theatrical standards and is incompatible with the level of work audiences expect to see produced on its stage. Miami New Drama currently invests hundreds of thousands of dollars annually to enhance inadequate systems with rented equipment. The proposed projects would bring the facility up to industry standard while providing historically appropriate upgrades to public areas, and enhancing and restoring the building exterior. Estimated Project Timeline Plans and permitting process would commence upon project funding, and work would be scheduled over 36 months in stages in order to minimize operations interruption. Benefits to Taxpayers The Colony Theater is a historic jewel in the collection of Miami Beach's facilities. It is the last remaining cultural facility on Lincoln Road, and the only venue for professional theater in Miami Beach. The residents of Miami Beach deserve a professional theater that is on par with facilities in other cities such as Sarasota, Jupiter, West Palm Beach, Aventura, and Coral Gables. Increasing the production capacity of the theater will make it more attractive to producers wishing to partner with Miami New Drama to develop nationally noteworthy, Broadway-bound productions. Every year, tens of thousands of Miami-Dade residents travel to Miami Beach to attend performances at the Colony. A restored, world-class facility would not only better serve Miami Beach residents, but also increase the Greater Miami-Dade draw, and theater's already sizable economic impact. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Without GO Bond funding a small portion of these items might eventually be completed through city facility maintenance, and capital improvements. The majority would likely go unrealized. List of Capital Improvements •Lighting and Projection System Upgrade ($1,035,000) The current equipment list is inadequate for professional theatrical lighting designers and many fixtures are out-dated or in need of repair. Replacement and enhancement with LED technology, programmable fixtures, and modern spotlights. The existing movie projector requires enhancement with additional projector positions and the proper operating computer system. 9 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors •Sound System Redesign and Replacement ($1,088,000) The existing sound system is poorly designed and obsolete. Musical productions by Miami New Drama have required 100% rental replacement of the existing system, cabling, sound board, and speakers. A new system would bring design, positioning and specification to industry standard. •Stage Rigging and Mechanics ($235,000) The current rigging system is a traditional rope and counterweight system requiring manual operation. Repair and enhancement would increase motorization, efficiency, and safety. •Replace Acoustical Drapes, Main Drape, & Soft Goods ($242,000) Needed replacement of the auditorium draperies was specified in the 2018 Heisenbottle assessment. •New JLG drivable vertical mast lift ($27,000) •Loading dock doors & liftgate ($67,000) The awkward placement and small size of the existing loading dock is a limiting factor to the type and scale of scenery and equipment that can be loaded into The Colony. Replacement of the doors and liftgate would provide a feasible, low-impact improvement. •Facility-wide expansion & storage ($456,000) The Colony lacks the amount of storage and personnel dressing and workspaces required by a professional theater. This expansion would optimize unused areas of the building and seek to maximize dressing rooms, green rooms, currently inadequate laundry facilities, and all back of house areas. •Facility-wide Security, Access & Communication Systems Upgrade ($250,000) Obsolete security and communication systems would be greatly improved with the installation of fiber, high-speed internet, new cameras and trackable key card access. •Domestic Water Pump renewal, Roof hatch replacement, Emergency Lighting Renewal ($260,000) •Accessibility Enhancements ($215,000) There are public and private areas that are currently lacking in accessibility accommodations. This would address deficiencies in balcony seating, box office, and backstage accessibility. •Lobby & Front Entry Renovations ($630,000) Long slated for renovation and included in the H eisenbottle plan, the outer and inner lobbies are in disrepair. Storefront windows are in need of replacement to impact glass. •Restroom Renovation & Expansion ($500,000) Also included in the 2018 Heisenbottle plan is a much needed expansion and renovation of the lobby bathrooms, currently used by Miami New Drama and Segafredo patrons. •New Carpeting & Theater Seating ($650,000) The existing carpet is inadequate for commercial traffic and has been flagged for replacement along with the auditorium seating, much of which is broken and creates safety hazards for patrons. •Exterior Renovation ($295,000) Exterior paint and stucco repair, replacement awnings, and an exterior lighting package would serve to highlight the historic beauty of the Colony Theatre day and night and draw visitors to the facility. 10 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Miami Beach Botanical Garden Amount Requested: $5,400,000 Organization Background The mission of the Miami Beach Botanical Garden is to promote environmental enjoyment, stewardship and sustainability through education, the arts, and interaction with the natural world. Our garden is a unique, subtropical oasis of beauty and tranquility within an urban setting-a community resource that refreshes, inspires, and engages our visitors. Use of Funds Funds would be used to create a resilient and sustainable public green space, more authentic cultural and educational experiences, and an enhanced arts and culture space as well as for facility upgrades to diversify the types of events hosted in the Garden. Estimated Project Timeline Facility upgrades and improvements can be completed within 12-18 months. The larger component, to become a model of resiliency and sustainability, will take an estimated 3-5 years to complete. Benefits to Taxpayers The Miami Beach Botanical Garden aims to become a community model of resiliency and sustainability. Adding both functional and artistic infrastructure would enhance resident quality of life, protect and prepare the Garden for climate change and sea level rise, and build on the Miami Beach brand of being a leader in resiliency and sustainability while enhancing its arts and culture offerings. The benefits to the community would include flood risk mitigation, health and environmental benefits, and educational resources for adapting homes and yards. The Garden would serve as a prototype for various strategies that can be observed, tested, adapted, and deployed throughout the City. The project would also attract students to observe and learn about resiliency strategies and would be an opportunity for the City to attract eco-tourism. The use of solar power throughout the garden and rainwater for irrigation would both help the City in its goal of getting to net zero emissions as well as save taxpayer money spent on electricity and water. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? Without a GO Bond, the Garden would seek grant funding and explore a capital campaign. List of Capital Improvements •Model of resiliency and sustainability ($3.4m) With this funding, the Garden would explore the options for an already built environment with mature landscaping, including a catch basin and/or artistic cisterns, LEED certified buildings, green roofs, permeable pavement, solar power, and resilient landscaping. •Facility Updates/Upgrades ($900,000) While many area gardens charge admission fees, events support the operating costs of the Miami Beach Botanical Garden and allow it to remain open to the public six days a week with free admission. MBBG's goal is to diversify these events to reduce the impact on the community as well as the Garden and add low-impact daytime activation of underutilized indoor spaces for conferences, retreats, etc. including a larger kitchen area with increased storage, HVAC replacement, sliding glass doors for the Banyan Room, 11 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors expansion of the outdoor event area, new kitchen, enhanced technology and new A/V equipment, new ceiling fans, and a dedicated electrical panel for short term events. •New Japanese Garden ($650,000) The Japanese Garden is one of the most popular spaces in the Botanical Garden, providing the perfect backdrop for photos and quiet spaces to sit and reflect. MBBG would like to enhance the area with more offerings that are reflective of an authentic Japanese garden and expand its cultural and educational features. •Accessibility ($200,000) MBBG's goal is to have as much of the garden as possible be accessible to everyone. This item would provide accessible pathways to the Gazebo and Native Garden. •Garden Improvements ($130,000) New irrigation system and new pathways for high traffic areas and a new pump to improve the water quality of the centerpiece ponds. •Safety and Security ($120,000) With more people visiting the garden, improved safety and security systems are a high priority. These include security cameras, a new alarm system, and exit sign renewal. 12 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Miami Design Preservation League Amount Requested: $900,000 Organization Background Miami Design Preservation League is a not-for-profit preservation and arts organization which preserves, protects, and promotes the architectural, cultural, social, and environmental integrity of Miami Beach and the surrounding areas. Use of Funds The main use of funds will be additional resources for the Art Deco Museum Expansion. The expansion, part of the 2018 GO Bond, will allow for enhanced programs and activities at the center. In addition, funds are sought to enhance the visitor experience with interior and exterior lighting improvements. Those are estimated at $100,000. These combined upgrades will support our continued work towards accreditation by the American Alliance of Museums. Estimated Project Timeline 2025-2027 Benefits to Taxpayers MDPL's Art Deco Welcome Center is a cultural hub on Ocean Drive, greeting approximately 120,000 annual visitors. Our facility is Miami Beach's only cultural institution open 7 days a week and it serves as a great first-stop on a visit to the Art Deco District. The facility was substantially renovated in 2009 with major funding from a County GO Bond as well as City of Miami Beach funding. In addition, the Art Deco Museum offers year round exhibits and programs. The museum is free for all Miami-Dade County residents and has a nominal $5 admission for others. Since 2009 and up through 2021, the resort taxes of our city have more than doubled. We believe that an upgraded visitor center and museum which matches the level of visitor the we currently attract, will help move forward progress in our vibrant tropical, historic community. To that end, MDPL has committed to raising over $1MM for its museum master plan through various stakeholders. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful, we will need to seek alternative funding for the upgrades. Since the building is city owned, one option would be to seek funding through the regular budget process. Another option would be to request a match challenge from the city. MDPL successfully undertook a fundraising match challenge of $175,000 for its Museum Master Plan from the City of Miami Beach. The GO Bond would be a significant help as it would allow us to focus our funds on programs and activities, vs building improvements. List of Capital Improvements •Additional Funding for Art Deco Museum Expansion {$800,000) The GO Bond of 2018 provided $2MM towards the rooftop expansion. However, given increasing construction costs and uncertainty about the final project cost, the additional funds will ensure that the project can be completed without delay or pause •Enhanced Exterior and Interior Lighting {$100,000) To improve safety on the exterior of the building and to install museum-grade lighting in the exhibition hall 13 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors New World Symphony, Inc. Amount Requested: $5,605,000 Organization Background The New World Symphony, America's Orchestral Academy (NWS), prepares graduates of music programs for leadership roles in professional orchestras and ensembles. NWS Fellows take advantage of the innovative performance facilities and state-of-the art practice and ensemble rooms of the Frank Gehry-designed New World Center (NWC), the campus of NWS. Use of Funds NWC was completed in January 2011. It is also used by dozens of local and national organizations each year for their own events. Much of the original technical, functional, and safety infrastructure and equipment has or soon will be reaching end of useful life. NWS has a 20-year capital replacement and upgrade plan that is updated regularly; the total estimated cost of all projects is currently about $31 million. A portion of the allowable spend from NWS' endowment fund supports the annual capital budget but needs far exceed the amount available. Additional funds must be raised, as they have in the past, from public and private sources; on occasion, NWS has taken out a loan in order to undertake time-sensitive work. Estimated Project Timeline The projects below are in the 20-year plan and should be addressed in the next 12-36 months, most of which must be scheduled during the summer months when there are fewer NWS and third-party activations at NWC. Benefits to Taxpayers NWC hosts hundreds of community events and activities each year, many of which are free. Signature WALLCAST ® events are but one example of benefits to residents and visitors. Investing in upkeep and improvements protects taxpayer dollars that were used, in part, to construct NWC, which in turn sits on public land. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? As noted above, NWS funds its capital needs from a variety of sources, including endowment spend, public and private fundraising, and even debt. It's a constant juggle to match funding to projects and to undertake projects in a timely manner to avoid disruptions to use, service, and safety. The amount requested, in total, is less than the amount NWS raised to fund the entire 4K upgrade that was completed in 2021. List of Capital Improvements •Flood Barriers $650,000 This project would fortify the most at-risk portion of the building from flooding through the installation of passive automatic flood barriers to provide protection from 100-and 500-year. Barriers will automatically activate without the need of electricity or people by using the flood water's hydrostatic pressure to raise the barriers, and automatically lower when the flood recedes to their normal hidden position. Upon approval, work with the vendor and engineering team would begin in early fall 2022 to allow time for permitting and work starting in the beginning of summer 2023. •Facility Wide Power Stabilization (Electrical Surge & Drops) $150,000 FPL estimates an average of 49 annual power disturbances at NWC. This does not include power issues due to storms, planned outages, or repairs. Due to the extremely expensive and sensitive technology housed inside the building, some purchased via past GO Bonds, NWS must install equipment onsite to protect it against power drops and surges caused by these disturbances. This equipment may include upgrades to the following systems: UPS systems, battery storage, switchgear, generators, transfer switches, surge protection upstream of specific equipment, and lightning protection. 14 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors •Exterior Paint and Stucco Repairs $250,000 This project represents the first comprehensive repair, repaint, and building envelope waterproofing since its opening in 2011. Upon approval an updated quote is needed from the vendor as it is valid for only 60 days. Work is estimated to take five to six weeks, weather permitting. •Replace Main Fire Alarm Panel $255,000 The original fire alarm panel has been deemed obsolete by vendor (Siemens). Along with ancillary devices, it will no longer be supported by the manufacturer after June 2022 due to supply chain issues. Once approved NWS will request quotes from proprietary (Siemens, JCI) and non-proprietary fire alarm vendors for this replacement. •Acoustical Resurfacing of Performance Hall "Sails" $500,000 One of the most prominent design features inside the performance hall are the five acoustical "sails" floating above the stage, which double as large projection screens. The original finish on the sails has discolored from normal wear and tear and a water leak that stained one of them. The finish is important to the acoustics of the performance hall. Called Baswaphon, it requires special removal, prep, and application methods. Work requires extensive masking and protection of lighting, seating and stage areas and can be done during the summer of 2024. •Replacement of Acoustical Panels Throughout NWC $150,000 There are about 1100 acoustical panels in almost all spaces at NWC. These panels are sound absorbing acoustical foam panels wrapped in specialized white canvas. Original to the opening of the building, these panels have begun to yellow and stain from the reaction to UV light and the glue used to adhere the canvas, in addition to normal dirt and dust accumulation. This discoloration is very evident since the panels are hung everywhere in the building against pure white walls. This work can be scheduled around building programs but ideally done in the summer. •Elevator Modernization $750,000 NWC has two passenger elevators and one freight elevator. As seen with many pieces of equipment, supply chain issues and manufacturer decisions have made equipment obsolete before their normal end of life. This modernization will improve safety and reliability of the elevators. •Upgraded Theatrical Lighting $1,400,000 Vari Lite no longer supports or makes replacement parts for the original lighting in the performance hall, and numerous parts have failed over recent seasons. NWS needs to replace the Vari-Lite automated lighting fixtures with new LED technology. Purchase includes new fixtures, power relay units and additional cables and hanging hardware. This upgrade is scheduled for summer 2023. •New LED Marquee Sign for East Fa�ade $750,000 The original LED marquee no longer works and needs to be replaced. This work can start once funding is secured. •New Pergola for Roof Garden $750,000 The original gumbo limbo trees on the roof are dying. Using the signature cloud-shaped steel shapes in Soundscape Park that are draped with bougainvillea as inspiration, Frank Gehry has designed a simple pergola, or trellis, that can be installed in the existing planter boxes, and these too will be covered with bougainvillea. This will require minimal maintenance and link the roof garden more directly with Soundscape Park. This work can start once funding is secured. 15 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Holocaust Memorial Miami Beach Amount Requested: $4,645,500 Organization Background Now over 30 years old, the Holocaust Memorial Miami Beach engages people of all ages and backgrounds, adults and students, over the meaning of the Holocaust where over 6 million Jews and other peoples were murdered. This is accomplished through an outside facility and film, cultural exhibitions, guest speakers, music, tours, and Holocaust Survivor testimony that leads to empathy and engagement for the participant. Although World War II ended nearly 80 years ago, recent incidences of antisemitism and Holocaust denial signify the pervasive and growing intolerance throughout the United States. The Holocaust Memorial Miami Beach promotes an open­ minded civil society and culture. It is an iconic, unique and powerful venue that imparts a universal message. Visitors are encouraged to reflect on the moral, ethical and spiritual questions that arise through their experiences at the Holocaust Memorial and through its year-round cultural programming. Since its dedication, the Holocaust Memorial has remained an integral contributor and element of the physical and cultural landscape of Miami Beach, providing cultural activities and events, author presentations, film screenings, musical performances and panel discussions to the local community and visitors. The Memorial has welcomed more than 2.6 million visitors, including more than 300,000 students. It annually teaches more than 90,000 visitors each year about the dangers of unchecked hatred and the corresponding need to prevent future genocides, prejudices and intolerances. The Memorial developed an app and a special customized 28-minute film. Finally, HMC provides professional development for educators and docents to ensure continued Holocaust education and cultural programs. Use of Funds Replace, Repair and Modernize the 30-year Holocaust Memorial which has been weathered and is in need of modernization since its creation in 1990. This project will accommodate current and future needs to meet the evolution of the Miami Beach cultural scene. The Memorial, nestled between other cultural institutions such as the New World Symphony, The Bass Museum, and the New Convention Center will continue to play a significant role with its outdoor artistic installations, its guided tours, films, storytelling and school visits, culminating in over 90,000 guests a year. This project for the Memorial reflects a city in transformation and recognition of the importance of our cultural environment. Estimated Project Timeline Project timeline will be 3-4 years for completion. Benefits to Taxpayers There is no fee for residents to enter the Holocaust Memorial Miami Beach, to experience our gardens of contemplation or any part or program of the Memorial at any time. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If the GO Bond is not successful improvements will not be funded in the immediate future. Funding for the Holocaust Memorial and its policy of 'no fee' is enabled by its yearly fundraising program and its supporters. Capital improvements in the past have been primarily for the Arm of Love and Anguish, the centerpiece of the Memorial, and the only sculpture like this in the world. Repairs to the arm are required every 2 years and have been part of our fundraising efforts. 16 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors List of Capital Improvements •$250,000 Interior repair and replacement of center arm structure •$300,000 Repatina of outside of center arm structure including 100 sculptures on the arm •$400,000 Replacement of 150 broken Jerusalem stones •$200,000 Regrouting of all walkway stones to prevent further corrosion •$500,000 Renovate center water feature and seal leaks including addition of filters •$500.00 Bicycle rack •$150,000 State of the Art walking tour for visitors with latest technology for 100,000 visitors each year •$175,000 State of the Art Security bollards at west side frontage of Memorial •$75,000 State of the Art telephone system for easy access for visitors calling for information •$50,000 Remodel security booth for 24-hour security staff •$100,000 Remodel and repair visitor welcome center •$150,000 Remodel public bathrooms •$5,000 Create direction signage for visitors on where to begin and what to see at Memorial •$100,000 Create technology for upgraded visitor visit including maps and information about the memorial for cell phone usage •$125,000 New outdoor walkway for students to reach the classroom •$500,000 Remodel or replacement of 40 lamps surrounding Pond •$10,000 Addition of 100 new lilies to beautify pond feature •$150,000 State of the Art Security gate for back entrance to Botanical Garden •$375,000 Addition of a new wall to protect back of Memorial and west side of Botanical Garden •$250,000 Replacement of new roof for classroom, administration office, security booth and visitor center •$30,000 Retile floor in 4 rooms •$750,000 State of the Art Security System and Surveillance Cameras 17 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Rhythm Foundation at North Beach Bandshell Amount Requested: $3,417,000 Organization Background The Rhythm Foundation has been presenting outstanding international music in Miami Beach for more than 30 years, and we look back at a body of work that now spans decades. When we began in 1988, Miami was a different place than the international crossroads we know now. In 2015, the City of Miami Beach awarded Rhythm Foundation the management of the North Beach Bandshell. We launched a well-rounded schedule of 75+ events per year - a mix of free community and civic events, cultural programs, popular music and large productions -that welcome the entire South Florida and visitor community to the Bandshell. The management was extended with options through to 2028, which coincided with important capital improvements to the facility including the installation of a canopy to provide weather protection, improved seating, and technical upgrades. Use of Funds GO Bond investment into the Miami Beach Bandshell will be used to support and enhance operations at the venue, continuing its position as a valuable community asset. Our management of the Bandshell for the City has greatly increased use and attendance at the venue. The professional productions taking place at the venue desperately require an expansion of back of house facilities to sustain and grow these production demands. The Rhythm Foundation has outgrown the small back of house area currently at the Bandshell, and needs this expansion for production facilities to keep up with the level of increased professional touring that is coming to the venue, office spaces, media production facilities and storage. In addition a series of improvements is planned to construct an addition to the backstage to support our efforts and refortify the existing power, lighting and audio equipment from the 2011 renovation. Many items would have been funded by the general budget for planned replacements and repairs, approving the GO Bond would allow the residents of Miami Beach to save those dollars within the city's budget. Estimated Project Timeline Projects are scheduled to occur beginning in the 2023 budget. New construction will require an additional 2-3 years to complete. Benefits to Taxpayers We attract over 75,000 visitors each year across 100+ events. Guests visit Miami Beach for our programs from all over South Florida and beyond, with the Bandshell acting as a key attraction and economic engine for the North Beach business community. Recurring annual festivals include North Beach Music Festival, Ground Up Music Festival, AfroRoots Music Festival, & Global Cuba Festival, each bringing their unique audience to the area. Programs are also documented and packaged for media distribution, further enhancing the reach and impact of the presenter. Our goal is to enhance our TV and media broadcast startup into a state of the art media laboratory for use by Rhythm Foundation & the Miami Beach cultural community. We form an integral fabric on which dozens of cultural organizations in our community use to create unique cultural offerings. This investment will ensure Miami Beach Bandshell as a beacon for the performing arts in the decades ahead. If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? The Bandshell has enjoyed regular line item funding support going back to the 2011 upgrade through the installation of the canopy in 2020. The Rhythm Foundation continues to invest funds raised for enhancement of the equipment at the venue, including the LED lights & LED Screen, backline, film and video systems, & concessions 18 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors program. In 2021 Rhythm Foundation received a $1.S Million grant from the Knight Foundation to continue to invest in technology implementations and programming at the North Beach Bandshell. List of Capital Improvements •Back of House Improvements ($1,500,000) o Create an 2 story addition to the existing back of house that will contain: A Second Floor of the building to house TV and Broadcast Production Control Room & Administrative Office Spaces; The First Floor will be utilized for vital storage and production prep areas for Concessions, Equipment, Production Storage; Create within the Concessions Room a small kitchen suitable for food handling and preparation; Create a structure to enclose the waste containers for trash and recycling, accessible by Waste Management 24/7; Create a storage structure to enclose the theater chairs and carts; and Create an elevator and two means of egress. o Reposition the existing fence line to meet the new property line as provided by Ocean Terrace Streetscaping Program. o Realign the driveway & loading dock to allow for two trucks to be parked at once, one in the loading dock, and another staged adjacent to it. o Relocate or enclose within new construction the existing utility infrastructure (A/C compressor, FPL panel, etc.) •Canopy Phase 3 ($200,000) Design and Fabrication of a discreet, retractable extension of our stage covering to protect musicians and equipment located at the edge of our existing stage or potential temporary stage extensions used from time to time. This equipment would live in the retracted position, not affecting the historic design. •Restroom Upgrades ($150,000) Renovation of existing Restrooms within the facility, augment the quality of the restroom and increase the number of fixtures for public facilities and backstage. •Rear Platform Upgrade ($200,000) Upgrade the temporary riser platform to a permanent weatherproof flooring surface of the same design, preferably in matching terrazzo to the dancefloor with power and data connection. •Venue Projection Mapping ($250,000) Purchase and design of projection system for use on the stage fa�ade and canopy. •Bandshell Cafe ($250,000) Bandshell Beachfront Cafe will offer a showcase for local talent. Concluding each evening with a sunset performance, activating daytime use of Bandshell Park for the residents and visitors. •Park Performance, Architectural and Landscape Lighting ($150,000) Park Performance, Architectural & Landscape Lighting -Install lighting for the Bandshell architectural perimeter interior and exterior of the venue as well as the palm trees throughout the park. •Roof Repairs ($150,000) Regrade and repair the existing concrete roofs within the North and South Towers, allowing drainage. •Upgrades to the Stage Theatrical Grid ($50,000) Additional routing for electrical service and structural mounts dedicated to stage lighting. 19 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors The Wolfsonian-Florida International University Amount Requested: $10,000,000 Organization Background The Wolfsonian was built as a private research center in 1995. Upon its gifting to the State of Florida in 1997, our mission and operational scale expanded to embrace a very large Florida International University student body and faculty in research and activities. K-12 educational initiatives followed. Serving the public became core to our work while we continued to host fellows and scholars from around the world. The Wolfsonian-FIU is now a globally renown museum, library, and research center that illustrates the persuasive power of art and design. With more than 200,000 objects, the collection contains a vast universe of ideas: household appliances that sped the pace of work; designs that bridged cultures; architectural plans fueled by ambition; and propaganda that helped turn the tides of war. Rooted in the greatest century of growth and change humanity has ever known-1850 to 1950-The Wolfsonian traces the odyssey from agrarian to urban, colonial empires to Cold War superpowers, the first spike of the Transcontinental Railroad to the advent of television. The Wolfsonian offers an agreeable setting for the appreciation of art and design and a forum (virtual and in­ person) that enhances Miami Beach's civic life. Our ability to offer such experiences is enhanced by partner organizations: Miami Design Preservation League; City of Miami Beach's STEAM+ program; O Cinema Miami Beach; AIA; AIGA; Bookleggers' Library; New World Symphony; 0, Miami Poetry Festival; Design Miami; and Art Basel Miami Beach. The museum typically draws 25,000 to 30,000 visitors each year. It produces three major exhibitions, several smaller installations, and a contemporary artist project, in addition to over 100 public programs such as tours, talks, family programs, and films. The intent of exhibitions and programs is to shed further light on key people, issues, and events from the past. At the same time, we strive to link this historical collection to the concerns and passions of people living today. Use of Funds Our building was not conceived for the scale and purpose now expected of it. Nor was it considered how we would display of large-scale works, period rooms, allow public access to collection storage areas, or host classes in a dedicated space. Nor do our current event spaces have the capacity or critical support areas to create meaningful revenue to support the mission. The current entryway is foreboding, unwelcoming, and flood-prone. A single­ passenger elevator is not sufficient if the crowd in the building grows past 200. The expansion seeks to alleviate these issues. The Wolfsonian-FIU's expansion must balance two central values: honoring the historic integrity of our existing 1927 Mediterranean Revival building and updating the site to meet the complex needs of 21st-century audiences. Our focus is on addressing climate-control concerns and minimizing environmental impacts. In addressing the museum's day-to-day operations, the design would streamline visitor flow and create a more transparent, welcoming experience for pedestrians and guests. The project goals are to: •Enhance accessibility and visibility of The Wolfsonian-FIU collection •Create programmatic and digital lab spaces for residents and the FIU community •Leverage earned income through event rentals and commercial leasing •Protect and preserve the collection Estimated Project Timeline The goal for completion of the expansion is the Fall of 2027, assuming the success of fundraising efforts. 20 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Benefits to Taxpayers The expansion's primary goal is to deeply embed The Wolfsonian-FIU into the fabric and character of Miami Beach. Our planned expansion will: •Triple our programmatic space, adding over 30,000 SF •Substantially increasing the number of artworks on view •Create a transparent new street and lobby presence •Create state-of-the-art classrooms, studio environments, and digital labs •Incorporate open-air green spaces (garden, terraces, and roofs) •Offer spacious and adaptable mixed-use spaces for curatorial, educational, or rental needs •Have enhanced spaces for lease for local retail businesses If GO Bond is not successful, how will improvements be funded? How do the capital requests compare to past fundraising efforts? A capital campaign for the expansion is underway. The campaign goal is $20.0 million, of which $10.0 million will be funded by the Miami Dade County Building Better Communities General Obligation Bonds. The project will require substantial funding before starting full design and construction, so without the GO bond, there is a greater risk that funding results might not meet timeline expectations and delay delivery of the expansion. List of Capital Improvements •Wolfsonian Facility Expansion $10,000,000 The Wolfsonian has developed a transformational expansion plan for its Washington Avenue location to create a welcoming entrance and more transparent presence on Washington Avenue. It includes up to 50,000 square feet of public galleries and program space and countless new opportunities for learning and exploring. The total project estimate (inclusive of design, construction, and contingency) is $20.0 million, of which $10.0 million will be funded by the Miami Dade County Building Better Communities General Obligation Bonds-leaving a remaining funding goal of $10.0 million. 21 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors Jewish Museum of Florida-FIU Amount Requested: $750,000 Organization Background The Jewish Museum of Florida-FIU (JMOF-FIU) shares the story of over 250 years of Florida Jewish history, art, and culture with all members of Miami Beach's vibrant community. Our goal is to explore and illustrate the richness and diversity of Jewish life as well as the unique ways in which Florida Jews influence and are influenced by the historic and cultural dynamics of Florida, the nation, and the world. JMOF-FIU is also dedicated to multicultural education and, through the lens of Florida Jewish history, seeks to highlight issues of discrimination against all marginalized people. Through exhibitions, public programs, and our extensive archival collection, we demonstrate how the challenges of the immigrant experience are shared by all ethnic groups in Florida. Use of Funds In order to improve the museum experience for local and international visitors alike, JMOF-FIU seeks $750,000 as part of the City of Miami Beach's GO Bond Program. Funding will go toward five future-focused improvements: 1.Design and installation of a new LED lighting system in each of our three galleries; 2.Repair and upgrade of exterior walls, including painting, repair of our historic railings, and installation of a wheelchair accessible ramp at the front of the museum; 3.Installation of a new exterior lighting system to highlight the beauty and significance of the historic building in the South of Fifth neighborhood and additional landscape; 4.Installation of parking lot security gates; and 5.Redesign and remodel of our collections and storage department. Estimated Project Timeline Upon receipt, funds can be deployed for construction and development within the range of six to twelve months. It is estimated that the aforementioned improvements will take approximately one to two years to complete. Benefits to Taxpayers The five revitalization efforts listed above will enhance taxpayers' museum experience and quality of life in a number of ways. The installation of a new LED lighting system in the museum's galleries will address accessibility issues pertaining to vision and allow for greater appreciation of our exhibitions and greater visibility during programs. Repairs and upgrades to the museum's exterior will not only render the building more aesthetically pleasing but will also allow visitors of all ages and abilities to access the museum via its front entrance. Likewise, the installation of a new exterior lighting system will render the premises more secure while also allowing guests, passersby, and locals to appreciate the building's historic Art Deco design. The installation of parking lot security gates will improve security. Finally, the redesign and remodel of our collections and storage department will ensure that the over 100,000 priceless artifacts housed at JMOF-FIU are properly maintained, stored, and cared for. This improvement will not only assist with organization, but will guarantee the museum's ability to continue its mission of collecting, preserving, and interpreting Florida Jewish history. 22 Attachment B City of Miami Beach GO Bond Proposal for Miami Beach Cultural Anchors If GO Bond is not successful, how will improvements be funded. How do the capital requests compare to past fundraising efforts? If JMOF-FIU does not receive the requested funds as part of the City of Miami Beach's GO Bond Program, the museum will seek funding for improvements through a combination of other grants and private donations. List of Capital Improvements •LED LIGHTING ($450,000) The design and installation of a new LED lighting system in each of our three galleries. •REPAIR & PAINTING ($50,000} Repair and upgrade of exterior walls, including painting, repair of our historic railings, and installation of a wheelchair accessible ramp at the front of the museum. •EXTERIOR LIGHTING ($35,000) Installation of a new exterior lighting system and additional landscape to highlight the beauty and significance of the historic building in the South of Fifth neighborhood and for additional safety and security. •SECURITY GATES ($65,000) Installation of parking lot security gates. •REBUILD COLLECTIONS DEPARTMENT ($150,000} Design and remodel of our collections and storage department. 23 Commission Memorandum Date: May 4, 2022 Subject: Discuss and if necessary, take action regarding the possible issuance of a G.O. Bond for Arts and Culture Al City of Miami Beach, 1700 Convention Center Drive, Miami Beach , Florida 33139 , www .mlamibeachfl.gov TO: FROM : DATE: SUBJECT : COMMISSION MEMORANDUM Honorable Mayor Dan Gelber and Members of the City Commiss ion Alina T . Hudak, City Manag May 4, 2022 DISCUSS AND IF NECESSARY, TAKE ACTION REGARDING THE POSSIBLE ISSUANCE OF A G .O. BOND FOR ARTS AND CULTURE BACKGROUND The City of Miami Beach has a plethora of cultural assets and organizations benefiting its commun ity . Many of these assets require capital improvements which are limited by the City's annual capital budget. On October 13, 2021 , at the request of Commissioner Ricky Arriola , the Mayor and City Commission approved the referral of item C4-N to the Finance and Economic Resiliency Committee (the Committee), to discuss the possfble issuance of a General Obligation Bond (G .O. Bo nd) to fund arts and culture . Consequen tl y, at its October 22 , 2021 , meeting, the Committee discussed funding arts and culture cap ital projects w ithin the City . Following the discussion , the Committee issued direction to the Administration to work on an inventory of needs for the City's arts and cultural assets , as well as a recommendation to continue the discussion . ANALYSIS Pursuant to the Committee 's direction , the Facilities and Fleet Management Departmen t worked in conjuncti on w ith the operators and tenants of various cultural institutions within the City to ga t her an inven tory of capital needs and requests . The proposed enhancements conte m pla te capita l, acousti cs/sound system, techno logy, and act ivating public spaces . The Department also collaborated with other departments to identify opportunities . Moreover, the Department identified and compiled capital needs from multiple facility conditions assessments (FCAs) which provided the data on defe rred maintenance, deficiencies, and future capital needs , including the buildings ' envelope , mechanical, electrical , and plumbing systems . Collectively, th is provided the framework fo r the inventory of proposed capital improvements projects. On February 25 , 2022 , the Committee rev iewed the item , and directed the Administ ration to brief mem bers of th e C ity Comm ission w ith the proposed requests . Inpu t from seve ral members was gathered wh ich cont ri buted to furthe r refining the inven tory list. On March 30 , 2022 , the Committee reviewed the revised project list. After deliberation , the Committee made a motio n to have the item discussed at the May 4, 2022 , City Commission for further discussion and direction. The Facilities and Fleet Management Department continued to meet with stakeholders to address costs previously undetermined in the original request to further refine the project list. Attached for the Mayor and City Commission's review is a draft inventory (Attachment A). proposing enhancements totaling over $115M. This is a preliminary iteration and provides opportunities to continue the discussion of addressing the capital needs of our facilities and how to further augment the cultural venues and anchors in the community . Should a General Obligation Bond be considered, it is important to note the potential fiscal impact to homeowners. The estimated annual cost to an average homeowner (based on a property with $596K taxable value) is depicted below for a bond at $100M, $150M, $200M, and $250M : Bond Program Amount Annual Debt Service Equivalent Millage Annual Cost to Rate Average Homeowner $100M 6,000,000 0.1732 $108 $150M 9,000,000 0.2598 $163 $200M 12,000,000 0.3464 $217 $2SOM 15,000,000 0.4330 $271 CONCLUSION The Administration recommends the Committee consider the capital enhancements detailed herein for a proposed G.O. Bond for arts and culture. The bond would allow the City to address capital needs that are currently unfunded . Should the Commission move forward with a favorable consideration of issuing a G.O . Bond, this item will be subject to voter referendum . Attachments A -Proposed G.O. Bond for Enhancement of CMB Cultural Facilities Attachment A 1 Proposed GO Bond for Enhancement of CMB Cultural Facilities Bass Museum of Art Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program New projector and screen for Museum Courtyard $45,000.00 Automatic shade system for Museum Courtyard $75,000.00 Audio Induction Loop for Museum Courtyard $28,000.00 Lumitrix event lighting system for Museum Courtyard $45,000.00 Commercial grade overhead door for Museum Café $40,000.00 Enhanced A/V equipment for Museum Creativity Center $65,000.00 Programmable automatic shades for Museum Creativity Center $75,000.00 Adjustable gallery tack lighting for Museum Creativity Center $15,000.00 Audio Induction Loop for Museum Creativity Center $40,000.00 Replace transformer for LED lighting at Museum Lobby $10,000.00 Museum wide beacon- based wayfinding system $40,000.00 Enhanced exterior lighting for Museum façade and Museum Courtyard $75,000.00 WiFi access points throughout Collins Park for enhanced patronage reporting $175,000.00 Lumitrix display lighting for exterior art installations $45,000.00 Wall mounted ladder replacement $11,000.00 Exhaust System renewal $12,000.00 Condenser Pump renewal $33,000.00 Rooftop Package Unit renewal $84,000.00 Clean Steam Humidifier renewal $93,000.00 Emergency lighting replacement $47,000.00 Fire Alarm system replacement $1,500,000.00 Subtotal $784,000.00 $1,769,000.00 Permitting (2%) $15,680.00 $35,380.00 Contractor General Conditions, Overhead and Profit (22%) $172,480.00 $389,180.00 Owner Contingency (10%) $78,400.00 $176,900.00 Total by Category $1,050,560.00 $2,370,460.00 TOTAL $3,500,000.00 City-owned Assets Attachment A 2 Miami City Ballet Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Facility-wide Variable Air Volume (VAV) Box Replacements $52,500.00 Electronic HVAC Filtration - UV-C Lights in rooftops units $35,000.00 Dry Wall Repairs and Paint at Studios 1-5, 7, 8 and Common Areas $145,000.00 Harlequin "Marley" Floors - Studios 4,5,6,8, Hallway 1 & 2 $200,000.00 Wolfson Theater A/V Upgrades $552,000.00 Elevator Modernization $370,000.00 Wardrobe Utility Renovation $145,000.00 LED Lamp Replacement (Facility-wide, including balconies) $171,500.00 Bottled Water Filling Stations (3) $10,000.00 Hands Free Faucets and Toilet Flushometers Upgrade $150,000.00 Restroom Exhaust System renewal $25,000.00 Acoustical Ceiling Panel renewal $75,000.00 HVAC Ductwork renewal $522,000.00 Systems Furniture $345,000.00 Lobby Security Enhancements $80,000.00 Stair Finish Renewal (rubber treading) $48,000.00 Loading Dock Flooding Repair $250,000.00 Studio Black Out Shades $120,000.00 3rd Floor Wood Floors Replacement $130,000.00 Project Management Fees (Balance Commercial Real Estate) $69,899.00 Defensive Architectural Enhancements to Collins Park Boardwalk $15,000 Subtotal $1,371,899.00 $2,139,000.00 Permitting (2%) $27,437.98 $42,780.00 Contractor General Conditions, Overhead and Profit (22%) $301,817.78 $470,580.00 Owner Contingency (10%) $137,189.90 $213,900.00 Total by Category $1,838,344.66 $2,866,260.00 TOTAL $4,800,000.00 Attachment A 3 Fillmore Miami Beach Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Auditorium furniture and finishes replacement $1,183,400.00 First Floor Lighting and Finish Upgrades (FOH) $1,856,070.00 Second Floor Lighting and Finish Upgrades (FOH) $922,920.00 Third Floor Lighting and Finish Upgrades (FOH) $659,300.00 Fourth Floor Exit Corridor- Painting and Carpet Replacement (FOH) $41,220.00 Repairs to Existing Catwalk $33,500.00 Structural Panels at Stage Roof Penthouse + Lapeyre Stair $52,500.00 Exterior Window and Door Replacement $266,880.00 Exterior Structural Repairs $329,500.00 Driveway Redesign and enhanced pedestrian area $329,000.00 Basement Lighting and Finish Upgrades $972,820.00 First Floor Lighting and Finish Upgrades (BOH) $496,560.00 Second Floor Lighting and Finish Upgrades (BOH) $270,760.00 New Second Floor VIP Area $1,200,000.00 New Commercial Kitchen $600,000.00 Acoustical Improvements at Dressing Rooms/ Corridors $50,000.00 Asbestos, Lead Paint, IAQ Abatement Allowance $200,000.00 Freight Elevator renewal $493,000.00 Exhaust System renewal $350,000.00 Chilled Water Piping renewal $1,625,000.00 HVAC Replacements $841,800.00 Electrical Enhancements (including FA allowance) $1,227,000.00 Plumbing Enhancements (facility-wide) $36,500.00 Upgrades to Existing Fire Protection System $202,285.00 Emergency Lighting renewal $319,000.00 Theatrical Systems Upgrade $2,882,000.00 New LED Marquee Sign $1,200,000.00 Subtotal $12,163,030.00 $5,294,585.00 Permitting (2%) $243,260.60 $105,891.70 Contractor General Conditions, Overhead and Profit (22%) $2,675,866.60 $1,164,808.70 Owner Contingency (10%) $1,216,303.00 $529,458.50 Total by Category $16,298,460.20 $7,094,743.90 TOTAL $23,400,000.00 Attachment A 4 Colony Theater Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Lighting & Projection System $772,000.00 Sound System Redesign & Replacement $812,250.00 Replace Acoustical Drapes, Main Drape, & Soft Goods $180,000.00 Stage rigging and mechanics $175,000.00 New JLG driveable vertical mast lift $20,000.00 Loading Dock doors and liftgate $50,000.00 Facility-wide expansion & storage $340,000.00 Facility-wide Security, Access & Communication Systems Upgrade $186,000.00 Emergency Lighting renewal $11,000.00 Domestic Water Pump renewal $52,000.00 Accessibility Enhancements $160,000.00 Lobby & front entry renovations $470,000.00 Restroom renovation & expansion $375,000.00 New Carpeting & Theater Seating $490,000.00 Entry door/storefront replacement $220,000.00 Roof hatch replacement $30,000.00 Subtotal $4,030,250.00 $313,000.00 Permitting (2%) $80,605.00 $6,260.00 Contractor General Conditions, Overhead and Profit (22%) $886,655.00 $68,860.00 Owner Contingency (10%) $403,025.00 $31,300.00 Total by Category $5,400,535.00 $419,420.00 TOTAL $5,900,000.00 Attachment A 5 Miami Beach Botanical Garden Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Resiliency & Sustainability Initiatives $2,459,000.00 Pond pump replacements $15,000.00 Irrigation upgrades $30,000.00 New pathways for high traffic areas $50,000.00 New accessible routes to Native Garden and Gazebo $150,000.00 Dedicated electrical panel for Short Term Events $5,000.00 New safety and landscape lighting $40,000.00 Security cameras and alarm system $35,000.00 Exit Sign renewal $11,000.00 Catering kitchen expansion $30,000.00 Expanded event storage areas $250,000.00 HVAC replacement $120,000.00 New ceiling fans $20,000.00 New A/V equipment for Banyan and Butterfly Rooms $65,000.00 New sliding glass doors at Banyan Room $75,000.00 Expansion of outdoor event area $50,000.00 Enhanced technology infrastructure $100,000.00 New Japanese Garden $500,000.00 Subtotal $3,839,000.00 $166,000.00 Permitting (2%) $76,780.00 $3,320.00 Contractor General Conditions, Overhead and Profit (22%) $844,580.00 $36,520.00 Owner Contingency (10%) $383,900.00 $16,600.00 Total by Category $5,144,260.00 $222,440.00 TOTAL $5,400,000.00 Attachment A 6 Welcome Center - Miami Design Preservation League Proposed Enhancement Projected Cost for proposed GO Bond Additional Funding for Art Deco Museum Expansion $800,000.00 Enhanced Exterior and Interior Lighting $100,000.00 Subtotal $900,000.00 Permitting (2%) $18,000.00 Contractor General Conditions, Overhead and Profit (22%) $198,000.00 Owner Contingency (10%) $90,000.00 Total $1,300,000.00 New World Symphony Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Upgraded Theatrical Lighting $1,400,000.00 Elevator Modernization $750,000.00 New LED Marquee Sign for East Façade $750,000.00 Facility-wide Surge Protection $150,000.00 New Pergola for Roof Garden $750,000.00 Exterior Paint and Stucco Repairs $250,000.00 Flood Barriers $650,000.00 Acoustical Resurfacing of Performance Hall "Sails" $500,000.00 Replace Acoustic Panels Throughout NWC $150,000.00 Replace Fire Alarm System $255,000.00 Subtotal $4,350,000.00 $1,255,000.00 Permitting (2%) $87,000.00 $25,100.00 Contractor General Conditions, Overhead and Profit (22%) $957,000.00 $276,100.00 Owner Contingency (10%) $435,000.00 $125,500.00 Total by Category $5,829,000.00 $1,681,700.00 TOTAL $7,600,000.00 Attachment A 7 Holocaust Memorial Miami Beach Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Interior repair and replacement of center arm structure $250,000.00 Repatina of center arm structure including surface sculptures $300,000.00 Replacement of broken Jerusalem stones $400,000.00 Regrouting of all walkway stones $200,000.00 Renovate center water feature and seal leaks (including filters) $500,000.00 Install new bicycle rack $500.00 Tech for State of the Art walking tour for visitors $150,000.00 State of the Art Security bollards at west side frontage $175,000.00 State of the Art telephone system for visitor info $75,000.00 Remodel security booth for 24-hour security staff $50,000.00 Renovations to Visitor Welcome Center $100,000.00 Renovations to Public Restrooms $150,000.00 Wayfinding and Directional Signage $5,000.00 Technology upgrade for Visitor Center $100,000.00 New outdoor walkway to classroom $125,000.00 Replacement of pond lamps $500,000.00 New lilies for pond feature $10,000.00 Security Gate for rear entrance $150,000.00 New CBS wall at rear of Memorial/West side of MBBG $375,000.00 Roof replacement for Classroom, Admin. Office, Security Booth and Visitor’s Center $250,000.00 New flooring for Classroom, Admin. Office, Security Booth and Visitor’s Center $30,000.00 New Security System and Surveillance Cameras $750,000.00 Subtotal $2,745,500.00 $1,900,000.00 Permitting (2%) $54,910.00 $38,000.00 Contractor General Conditions, Overhead and Profit (22%) $604,010.00 $418,000.00 Owner Contingency (10%) $274,550.00 $190,000.00 Total by Category $3,678,970.00 $2,546,000.00 TOTAL $6,300,000.00 Attachment A 8 Unidad- North Beach Senior Center Proposed Enhancement Projected Cost for proposed GO Bond New sound system and acoustical controls at Community Room $200,000.00 New tables and seating for Community Room $50,000.00 Catering Kitchen Expansion for Senior Meal Program 250,000.00 Restoration of Historic Coral Rock House (Home of Miami Beach Hispanic Community Center) $500,000.00 Subtotal $1,000,000.00 Permitting (2%) $20,000.00 Contractor General Conditions, Overhead and Profit (22%) $220,000.00 Owner Contingency (10%) $100,000.00 TOTAL $1,400,000.00 CMB Tourism and Culture Department Proposed Enhancement Projected Cost for Proposed GO Bond Buildout for Miami New Drama at Collins Park Garage $5,000,000.00 Subtotal $5,000,000.00 Permitting (2%) $100,000.00 Contractor General Conditions, Overhead and Profit (22%) $1,100,000.00 Owner Contingency (10%) $500,000.00 TOTAL $6,700,000.00 Rhythm Foundation at North Beach Bandshell Proposed Enhancement Projected Cost for proposed GO Bond Projected Cost for City’s CR&R Program Back of House Improvements $1,500,000.00 Canopy Phase 3 $200,000.00 Restroom Upgrades $150,000.00 Rear Platform Upgrade $200,000.00 Canopy Projection Mapping $100,000.00 Park Entrance Upgrade $150,000.00 Park Performance, Architectural and Landscape Lighting $150,000.00 By ron Carlyle Theate r Re novatio n Proposed En ha nc ement Pro j ec t ed Cost Comp lete r enovation of By ron Car ly le Theater (including spaces $19 ,921 ,788 .00 fo r enh anc ed programm in g ) Owner Co nti nge ncy (10%) $1,992,1 78.80 Total $21,913,966.80 * Pe r Condit ions Assessment & Recommendat ions Re port prepared by MC Harry Assoc iates (05/11/21 ) Attachment A 9 Subtotal $600,000.00 $150,000.00 Permitting (2%) $12,000.00 $3,000.00 Contractor General Conditions, Overhead and Profit (22%) $132,000.00 $33,000.00 Owner Contingency (10%) $60,000.00 $15,000.00 Total by Category $804,000.00 $201,000.00 TOTAL $1,100,000.00 Playground Upgrades Proposed Enhancement Projected Cost for proposed GO Bond Artistic upgrades / playground activation $5,000,000.00 Subtotal $5,000,000.00 Permitting (2%) $100,000.00 Contractor General Conditions, Overhead and Profit (22%) $1,100,000.00 Owner Contingency (10%) $500,000.00 TOTAL $6,700,000.00 Proposed Reef line Project Proposed Enhancement Projected Cost for proposed GO Bond Multi-phase 9-mile Artificial Reef Project Total $11,800,000.00 Proposed Mangrove Restoration Effort Proposed Enhancement Projected Cost for proposed GO Bond Scope of Work to be developed by CMB Environment & Sustainability Dept. Total $3,000,000.00 Attachment A 10 The Wolfsonian- FIU Proposed Enhancement Projected Cost for proposed GO Bond Proposed Expansion and New Washington Ave. Entrance Total $10,000,000.00 The Jewish Museum of Florida Proposed Enhancement Projected Cost for proposed GO Bond Facility-wide Enhancements Total $750,000.00 POTENTIAL CR&R ASK: $17,500,000.00 TOTAL (Includes CR&R) GOB REQUEST $115,000,000.00 Other Culture / Arts Institutions (Not City-owned) Commission Memorandum Date: February 25, 2022 Subject: A discussion of the possible issuance of a G.O. Bond for Arts and Culture R A City of Miarn i Beach, 1700 Convenllon Center Drive. M1am1 Beach. Flonda 33139. www.m1am1beachfl .gov TO: FROM: DATE: SUBJECT: COM,MITTEE MEMORANDUM Honorable Cha ir and Members of the Finance and Economic Resiliency Committee tfK Alina T . Hudak , City Mana February 25 , 2022 A DISCUSSION OF THE POSSIBLE ISSUANCE OF A G.O . BOND FOR ARTS AND CULTURE BACKGROUND The City of Miami Beach has a plethora of cultural assets and organizations benefiting its commun ity. Many of these assets requ ire capital improvements wh ich are limited by the City's annual capital budget. On October 13, 2021 , at the request of Commissioner Ricky Arriola , the Mayor and City Commission approved the referral of item C4-N to the Finance and Econom ic Resiliency Committee (the Comm ittee), to discuss the possible: issuance of a General Obligation Bond (G .O. Bond) to fund for arts and culture . Consequently , at its October 22 , 2021 meeting , the Comm ittee ,discussed funding arts and culture capital projects within the City. Following the discussion , the Committee issued direction to staff to work on an inventory of needs for the City's arts and cultural assets , as well as a recommendation to cont inue the discussion . ANALYSIS Pursuant to the Committee's direction , the Facilities and Fleet Management Department worked in conjunction with the operators and tenants of various cultiural institu tions within the City to compile an inventory of capital needs and requests . The proposed requests contemp late enhancements to venues that address capital, acoustics/sound system , technology and recreation upgrades. The Department also collaborated wi1th other departments, including Tourism and Culture and Office of Capital Improvement Projects to identify opportunities . Furthermore , the Department identified and compiled capital needs from multiple facility conditions assessments (FCA) which provided the data on the deferred maintenance and future capital needs, including the buildings' envelope, mechanical, 1alectrical , and plumb ing systems. Collectively, this provided the framework for the inventory 01' proposed capital improvements projects . Attached for the Committee's review is a draft inventory (Attachment A), proposing the enhancements totaling over $338M . The inventory can further serve as a tool for overall cap ital planning needs and proj ect prioritization . CONCLUSION The Administration recommends the Committee consider the capital enhancements detailed herein for a proposed G .O . Bond for arts and culture. The bo nid would nurture the arts and culture and further catapult the City as a cultural destination . Should the Committee move forward with a favorable recommendation , this item will be presented before the Mayor and Commission for consideration of issuing a General Obligation Bond , subject to voter referendum . Attachments A -Proposed GO Bond for Enhancement of CMB Cultura l Facilities Commission Memorandum Date: October 22, 2021 Subject: Referral to the October 22, 2021 Finance and Resiliency Committee to discuss the possible issuance of a G.O. Bond for Arts and Culture Committee Assignments - C4 N COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Vice-Mayor Ricky Arriola DATE: October 13, 2021 SUBJECT:REFERRAL TO THE OCTOBER 22, 2021 FINANCE AND RESILIENCY COMMITTEE TO DISCUSS THE POSSIBLE ISSUANCE OF A G.O. BOND FOR ARTS AND CULTURE. ANALYSIS Miami Beach is fortunate to have many cultural assets and organizations benefiting its community. Many of these assets require capital funding to take our cultural organizations and community to the next level, but unfortunately, our annual capital budget is limited to make this happen. As Miami Beach aims further to define itself as a serious art and culture destination, I ask the Finance and Economic Resiliency Committee to consider issuing a general obligation bond to nurture our arts and culture community and drive quality tourism. SUPPORTING SURVEY DATA N/A Applicable Area Citywide Is this a "Residents Right to Know" item, pursuant to City Code Section 2-14? Does this item utilize G.O. Bond Funds? Yes No Strategic Connection Prosperity - Market and promote Miami Beach as a world class arts, culture, and quality entertainment destination. Legislative Tracking Vice-Mayor Ricky Arriola MIAM I BEACH Commission Memorandum Date: October 13, 2021 Subject: Referral to the October 22, 2021 Finance and Resiliency Committee to discuss the possible issuance of a G.O. Bond for Arts and Culture Committee Assignments - C4 N COMMISSION MEMORANDUM TO:Honorable Mayor and Members of the City Commission FROM:Vice-Mayor Ricky Arriola DATE:October 13, 2021 SUBJECT:REFERRAL TO THE OCTOBER 22, 2021 FINANCE AND RESILIENCY COMMITTEE TO DISCUSS THE POSSIBLE ISSUANCE OF A G.O. BOND FOR ARTS AND CULTURE. ANALYSIS Miami Beach is fortunate to have many cultural assets and organizations benefiting its community. Many of these assets require capital funding to take our cultural organizations and community to the next level, but unfortunately, our annual capital budget is limited to make this happen. As Miami Beach aims further to define itself as a serious art and culture destination, I ask the Finance and Economic Resiliency Committee to consider issuing a general obligation bond to nurture our arts and culture community and drive quality tourism. SUPPORTING SURVEY DATA N/A Applicable Area Citywide Is this a "Residents Right to Know" item, pursuant to City Code Section 2-14? Does this item utilize G.O. Bond Funds? Yes No Strategic Connection Prosperity - Market and promote Miami Beach as a world class arts, culture, and quality entertainment destination. Legislative Tracking Vice-Mayor Ricky Arriola MIAM I BEACH