SUBJECT: F irst S tre e t N eig h b o rho o d Im p rov e m ent Project- Co m m u n ity Su rv ey
R es u lts
The City of Miami Beach is committed to preserving the welfare and safety of its
residents, visitors, and businesses. As part of this commitment, the City has diligently
worked to provide an improved level of service to the residents via Neighborhood
Improvement Projects. The First Street Neighborhood Improvement Project is a very
important infrastructure improvement project that will benefit the South Pointe
neighborhood.
Since the start of the project, the City continuously involved the community at every step
of the process. A testament to the extraordinary level of community engagement, are the
more than 40 stakeholder outreach meetings held during a 4-year period (2017 - 2021 ).
The stakeholder feedback led to multiple concept variations, including the evaluation of
different locations for the proposed stormwater treatment system (SWTS) and outfall. In
2021 the location of this proposed infrastructure and roadway typical section was agreed
upon and Jacobs was tasked with the detail design of the First Street Project. The
project kicked off in December 2021, and the consultant has been working on the
preliminary engineering tasks.
On June 7, 2022 a presentation was held from 6:00 PM and 7:30 PM to update the
community on the status of the First Street Neighborhood Improvements / South Pointe
Stormwater Project. The meeting was hybrid and attendees were able to participate via
Zoom or in person at the City Hall Commission Chamber. The presentation was also
televised via Miami Beach TV and was recorded.
During the meeting, the Jacobs design team presented two conceptual options for First
Street layout and streetscape based on the previously approved (Community and City
Commission) roadway typical section (Option A - Base Option). In addition, Jacobs
presented two architectural screening concepts for the above ground electrical
components associated with the proposed stormwater treatment system to be located on
the parking lot at the SW corner of Washington Ave and First Street.
As part of the process to gather feedback from the community during and after the public
meeting, the City distributed an online survey. The Survey was distributed by the City's
Communication Department using an online survey link through a third-party vendor
(www.surveymonkey.com). The Survey was opened to the public on June 7, 2022, at 6
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
PM and kept open to gather feedback through 10 PM on June 22, 2022. During
this period reminders were sent to the local community to maximize the
outreach. A ttachm ent 1 includes survey summary and results provided by Jacobs
and a copy of the presentation materials used during the meeting.
Based on the Community Survey responses received, and analysis presented
herein, the following are the results and corresponding conclusions:
• The preferred Streetscape Option by the respondents is Option A- Base Option.
Receiving 54.15% of the votes in favor
• Additional parking should be considered along Jefferson Avenue. Receiving
55.11 % of votes in favor.
• The preferred Architectural Screening Concept by the respondents is Concept A
Receiving 55. 71 % of votes in favor.
• More than 80% of the survey respondents claimed residency in the South of Fifth
Neighborhood.
• The number of respondents to the survey was 238. This is considered a typical
response rate by the City of Miami Beach Communications Department.
The pro ject Design Team plans to refine and further develop the design for the First
Street project. The community feedback received in the survey will be considered
accordingly during the design phase. Jacobs will continue to coordinate with the City and
community during the design phase by providing updates at the major milestone design
submittals (30%, 60%, 90% level of completion). The next community outreach meeting
is planned for November 2022 and the project design phase is expected to be completed
by February 2024.
6@
AH/LS/JG/ KP/ME/CO
DocuSign Envelope ID: FDFAB43C-38ED-45C8-8097-5FBD6E30805C
Technical Memorandum Jacobs
Public Meeting Feedback- Community Survey Results
Date: July 19,2022
Project name: First Street Neighborhood Improvement Project
Project no: 03585200
Project Juan F Aceituno, P.E.
Manager.
Oient: City of Miami Beach
Prepared by: Jacobs
3150 SW 38 Avenue
Suite 700
Miami, FL 33146
United States
T +1.305.441.1864
www.jacobs.com
The City of Miami Beach (City hosted a hybrid public meeting on June 7,2022, from 6:00 p.m. to 7:30 p.m.
to present the status of the First Street Improvements & South Pointe Stormwater Project . During the
meeting, Jacobs presented two conceptual options for 1° Street layouts and streetscapes based on the
previously approved ( Community and C ity Commission) roadway cross section. In addition, Jacobs
presented two architectural screening concepts for the aboveground electrical components associated with
the proposed stormwater treatment system. Appendix 1 includes a copy of the presentation made by the
City and Jacobs during the meeting.
As part of the process to gather feedback from the community during and after the public meeting, the
City distributed an online survey, this survey remained open for a period of two weeks after the
presentation took place.
Jacobs reviewed the results and comments from the survey provided by the City. The purpose of this
memorandum is to summarize and document the feedback received.
1. Community Survey Conclusions and Next Steps
Based on the Community Survey responses received, and analysis presented herein, the following are the
results and corresponding conclusions:
• The preferred Streetscape Option by the respondents is Option A- Base Option. Receiving 54.15% of
the votes in favor.
• Additional parking should be considered along Jefferson Avenue. Receiving 55.11 % of votes in favor.
• The preferred Architectural Screening Concept by the respondents is Concept A .. With some incline
from the community to consider alternatives to this option. Receiving 55.71 % of votes in favor.
• More than 80% of the survey respondents claimed residency in the South of Fifth Neighborhood.
• The number of respondents to the survey was 238, this is considered a typical response rate by the
City of Miami Beach Communications Department.
Jacobs plans to refine and further develop the conceptual design for the First Street Neighborhood
Improvement Project. The community feedback received in the survey will be considered accordingly
during the design phase. Jacobs will continue to coordinate with the City and community during the
design phase by providing updates at the major milestone design submittals (30%, 60%, 90% levels of
completion).
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
2. City of Miami Beach Community Survey Description &
Results
The City survey posed six questions to the public:
• Question 1- Please choose your preferred Streetscape option
o First Street Improvement Option A (Base Option)
o First Street Improvement Option B (Meandering Wall)
o None of the above
FIRST STREET IMPROVEMENT OPTION A
0ES«GM FATS
pporo»ed re io per jo/o pub'i erga pem rt
pro,ti$ od onori do tu¢
hid gt pat
i 9, adite ionel tee hoe ero ti o di.or
erot eei bet tet tot o h th mnt er pe t
· hated #,odno ooh dud ring, ad e
gor g er y er
fa, tree des
FIRST STR EET IMPROVEMENT OPTION B
0ES4GM HATS MATERIAL PALETTE
"ye.,4 g;a. airai #ppcd net ros ion per 2020 90
rpp u t po ind omni i dine the
#dhhs outdoor iq wa providing »al hog ip0
Md bl add.toral voes. her enoting onit na
·prono s tete rae pth th nor tee n p
ft rd hooding togood teltg ad raw or moat
y am
»tine urine ofro ante tort hoeoi« home rM»
2
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
• Question 2- Should additional parking be accommodated on Jefferson Avenue?
o Yes
o No
3
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
• Question 3- Which screening design is preferred for the above ground components of the
stormwater Treatment System?
o Architectural Screening Concept A
o Architectural Screening Concept B
o None of the Above
ARCHITECTURAL SCREENING CONCEPT A
0ESKGN FATS
re,n he ato,so 4r«
opts erg e n$e t go rd
uno te atee$ o aie go. e
· f0!»t2 otrst?re,
a«¢3 G@roa Sr
· Sonat4ihut r Meg3a
pat ft$rm
·mltna.gr gang opta.a hie
hune top ormet ot tare «op ter rt re9ouhoeeat de
gr.t to th ay and era ones
long ala#a
·Ha»te ruted errad rete
ts alt.toloo retool1a
terr e M n
·Honors peed re by »d#meet
a#ta tartarp tote brat
s od mote A t rg rt
eh ado we eoeerr
MATERIAL PALETTE SPAATONAL IMAGEY
", gpg .
Jacobs
A'/ MCH
ARCHITECTURAL SCREENING CONCEPT B Jacobs
VA'8AC
DESIGN FATS
Soren the els« tui.at onsets iring he
penp tat booted n '#bgtoer he
t #t V ut, 2 onrt ut,
d3 6aver@to St
pen not no«tune lot urare operation to
tuune repten o Le qu pen
Setie es hough alloy and tee ovole
pures long Who e.
·fade router.iai could io dude pr tor@td
tat anoels gt to ad L.an ted olid metal
yen at hare
Supet ur jegr h tg meta
tortu#tes, the hgrqo aity oh the stretu
ad oresponds to th oto teet o he
totingar wall eresented in option 8f 0
first trot Lad ao/hard ape
iront nt
MATERLAL PALETTE
■I. 0..
.
~ - lit:i
INSPIRATIONAL IMAGERY
4
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
Question 4- Please share with us any additional comments you may have
• Question 5-If you would like to receive project updates please provide us with an email
address.
• Question 6- Mark the answer that best describes you:
o llive in Miami Beach South of First Neighborhood
o I live in Miami beach, but not in the South of Fifth Neighborhood
o I am visiting Miami Beach
The survey was distributed by the City's Communication Department using an online survey link through a
third-party vendor (www.surveymonkey.com). The survey was opened to the public on June 7, 2022, at
6:00 p.m. and kept open to gather feedback through June 22, 2022, at 10 :00 p.m. During this time frame
reminders were sent to the local community to maximize the outreach, reminders were sent as follows:
• June 7-the date of the public meeting the meeting was held at the Commission Chambers for in-
person attended, it was televised, and participants were also allowed to join via Zoom)
• June 9-Recap of Public Meeting was mailed out with links to website, survey and recording of the
June 7" meeting
• June 15-A rsninder to take the survey was emailed with a direct link to survey and webpage.
June 21-One day left reminder for survey email reminder to South of Fifth mailing list. Note the
strong deviation in responses both in terms of quantity and direction.
The following sections present the Community Survey results for each question based on the results
summary received from SurveyMonkey.
Appendix 2 provides a copy of the survey results. Appendix 3 provides a copy of the City reminder for the
Community Survey.
5
DocuSign Envelope ID: FDFAB43C-38ED-4 5C8-B097-5FBD 6E 30B05C
Technical Memorandum
Q ues tion 1.--Please choo se your prefe rred Streetsca pe option
T he re w ere 229 total respo nses to Q ue stion 1.Figure 2 illustrates the surv ey results.
Answered. 229 Skipped . 9
Noneofthe I
above
First Street Improvement
Option A (Base Option)
First Street Improvement
Option B (Meanderinq Wall)
0%6 10% 20% 3%% 4 0% 50% 60% 70% 80% 90%% 100%
ANSWER CHOICES
None t the above
First Street 'rproveremt Option A (Base Opti on)
First Stree Improvement Opicon B (Meanderirg Wal l)
RESPONSES
9.17%6
54.15%6
36.68%
22
124
84
TOTAL 229
Figure 1: Summary Results for Question 1
6
DocuSign Envelope ID: FD FAB4 3C-38ED-4 5C8-B 097-5FBD6E 30B05C
Technical Memorandum
Q u es tion 2 - Sho u ld additi onal parki ng be acco m m odated on Jeffers on Avenue?
There were 225 responses to Question 2. Figure 3 illustrates the survey results.
Answered. 225 Skipped: 13
es
No
0% 10% 20% 30% 40% 50%% 60% 70% 80% 90% 100%
ANS WER CHOICES
Yes
No
TOTAL
RESPONSES
55.11%
44.69%
124
101
225
Fig u re 1: Sum m ary R es u lts fo r Q uestio n 2
7
D o c u S ig n E n v e lo p e ID : F D F A B 4 3 C -3 8 E D -4 5 C 8 -B 0 9 7 -5 F B D 6 E 3 0 8 0 5 C
Technical Memorandum
Question 3-Which screening design is preferred for the aboveground components of the Stormwater
Treatment System?
There were 219 responses to Question 3. Figure4 illustrates the results.
None of the
above
Architectural Screening
Concept A
Architectural Screening
Concept B
0% 10%, 20% 3% 40% 50 60% 70% 80% 90% 100%
ANSWER CHOICES
More of the above
Architectural Screening Concept A
Architectural Screering Con cept
RESPONSES
12.79%
55.71%
31.51%
28
122
69
TOTAL
Figure 1: Summary Results for Question 3
219
Question 4 -Please share with us any additional comments you may have .
Refer to Appendix 2 for a tabular summary of the public responses to this question.
Question 5 - If you would like to receive project updates , please provide us with an email address.
A total of 107 individuals have requested to be registered to receive future project related correspondents.
These individuals will be added to the project mailing lists to ensure they are notified of project updates
moving forward.
8
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
Question 6 - Mark the answer that best describes you:
o I live in Miami Beach South ofFifth Neighborhood.
o I live in Miami beach, but not in the South of Fifth Neighborhood
o I am visiting Miami Beach
There were 219 responses to Question 6. Figure 5llustrates the results.
Answered. 219 Skipped: i9
I live in Miami Beach South
of Fifth Neighbo rh ood
I live in M iam i Beach South , but
not in the of Fifth Neighborhood
I am visiting
Miami Beach
ANSWER CHOICES
I live in Miami B each S out h at Fifth Nei gbortc od
I live in Miami Beach, but not in the South of Fifth Neighborhood
I am visiting Miami Beach
TOTAL
RESPONSES
86.76%
3.65%
190
21
8
219
Figure 1: Summary Results for Question 6
9
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C
Technical Memorandum
3. Appendices
Appendix 1 - Public Meeting Presentation Slides
Appendix 2-Survey Monkey Results
Appendix 3-City Reminder for the Community Survey
10
D o cuS ign E nvelo pe ID : FD F AB 43C -38E D -4 5 C 8-B 09 7-5FB D 6E 3 0 0 5C
Technical Memorandum
Appendix 1 -
Public Meeting Presentation Slides
t !
I
'
di I rt ,pt
q/] 4i l
'/
41
+ O u
O
0 o
&%
O o
?±n u I
à Ó i2= 3 ui 3O ¿3
k <í- L o ;=o< o
~ e
uI
I
##
)
I
I
1
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C
Meeting Agenda
e
e
o
0 '11°7'"· ~
o
Introduction
Flood Mitigation Project
First Street Improvements and
Conceptual Layout
Stormwater Management and
Treatment System - Architectural
Screening Concepts
Questions and Feedback
£22 ±s, #à.#.%Ne.EGIp ,$g 2 Z±±22238%2747E48£1577e%55
Ml ! {"
'i '
'
:I¡¡ >/
i« » $%7
<$ «pg2 Agua l, pi}lljI„,so , 'l.. , '""'' : ,:\·I (' ~,,, \ i:- . ,', ... ;:.:
-'> ' !il a=, ' ' <' ' ~ ¡'); ,. \1' . í t· / . ·, ,,;,: '.
-:-i.....1o1_., ,_ . ~ :r,,,,,., .. 4-' •,· I' d \~·' ) .i;t:• · .... ,_ ··,. 5 is;l! #%jib}}k:4%ff%5
-ii si@sè$ 1 hlil#il/%i%f%
iiijj ' '#if%$""li t+e ,g íjj i ti k#fili$#%}1$£ 2 f $6 Rl "ks ff%"kl.$hi$,fi%%$ 1 3! #,
° %
'±±,'&à
a#@?
jgt hi$»
'~-i,,
~
I • ,\\• •
$: ¿' } 3j$4£ 421
we $4] 1
$ "
i# l' } hi ¡te]
O
O
O
0 o
)
I
O o
0 u.
?
0 o q
0O
O
uO q o
I
0O
e9
O
)
t
0
~ o
LL.
i
Q)
a. o s e
uI
e
O» o
3 o o
e o
•
a
-1- u ::,
O o • -I- e
• Com m unicate status of the First Street Im p rovem ents and South Po inte
Stormw ater Project
• Present conceptual layouts for First Street
• Present the screening concepts for the ab ove ground co m ponents
• Receive and gather feedback from the pub lic
• Conduct a poll on conceptual alternatives includ ing:
• Conceptual layouts for First Street
• Screening concepts for above ground com p o ne nts
• Jeff ers on A ve Parking possibilities
ggggg3o.u."ge-g,-ge€ge,gg.,Z ,'g o."" g
<<<>> EFT
ila..sete.luci.ha.ld2sala.al.lla.lume.iinia.aalza..leil .toa.Ah..
1±g3il i35 3£ç@@sg@ 522iE5g,53j %g@e.i$ #$
A
7
O
V
V
I\
A
O
V
V
~---------·-----·--•-·- .. •·----------
200
g1so
1 O
• (v
; E16o
8 = >-- 140
Q z % • » g 120
= % OJ V)
gs100
0
2 8o
al 4is
@
8 6o
a
2 5 4o
a) d c: O e 20
i Unified Sea Level Rise Projection
(Southeast Florida Reginal Climate Change Compact, 2019) ---·-••- --· r··-·--.. -~--· ..
' PcCc ' NOAA '
' Media Intermediate , NOAA High rear ; mean, High l (ch« ;)
(I h ·1 ¡ ,g i mc es ncnes) i (inches) /
---.i e!e "..i P ·
! 2040 ! 10 [ 17
too
i
2070 ¡ 21 40
I
2120 I 40 ! 92
21
54
136
¢
Observed
5-Year Average
Mean Sea Level
50 Year Planning Horizon
175 NOAA Extreme e
' ,.,,,.,'
' +' ,,,," ,,.,,,•
' ,• • ' ° " ,,.• .· 64, .
$ • 4o ,, .. -
b
- . ]9 "„ „ „u„ „k s s s » o s so Y »
Where we are now
/
136 NOAA High •• /
./ ,,,,
9 2 NOAA
Intermediate High
/
40 ¡pCC Median
2 0so 2090 2100 2110 ?"" go
8!MU
<<7>> 9e7717% 4 g.a
T%.TC##.%¥051G%#.%±7 ü:t.Zs!iA LE5list ä ht gal
%
Award to
Jacobs
Engineering
Public Meeting
No. 2 Public Meeting
No.4
Present 30%
design to the
community
Procure
Construction
Services
Present 90% design
to the community
Construction
Commencement
Fall of 2016-
Summ er 2021
i' Jc_• March 2023-- îº_ February - a 2024
@ @ @ @ t
Novernber l July 2023 7
2022
6/07/22 °
12/13/21
September
2024
!
~
~~,--'.- ' ay 9) te) g9
June 2024
Approval of
PS Location
and Road
Design by
Commission
Present
Conceptual
Layout to the
Community
Present 60% design
to the community
Finalize design and
start permitting process
Public Meeting
No. 1
Public Meeting
No.3
Final Plans
Development
October
2024
Pre-Construction
Community Meeting
Public Meeting
No. 5
Public Hearing During the duration of the project updates will be provided
to the community. Once construction commences, the
community will be notified of any neighborhood impacts.
This Schedule is subject to change.
<<8>> ~r;~-- '_,,_,_ -_- £7-1%2il
-n on.ass oc .St a. tart it.
1
TT
II
1t ¿s. ,
g
[I i ,.., j
o
Flood Mitigation
Project
Flood Mitigation Project includes:
• Stormwater Treatment /
Pumping Facility
• Roadway improvements
include raising First Street,
road restoration along Alton
Rd and Washington Ave
• Utility relocations, Water and
Sewer Improvements
<< 10 >>
ak .l a.il .sou«aluni lai««iolali iouler«lolo.lai illetalsalol lllui-oil«lue lia.volas.lat..lllia.lie
DocuSign Envelop e ID: FDFAB 43C-38ED-45C8-B097-5FBD 6 E30B05C 181BEACH
RISING
ABOVE
mn
<< 11 >>
dee. a.a..t.geo.alea aio.tille.etc. .ollwllldllei.aeliliali«rolla.~ella.llelsa.a.aut.wnel.. te lgal.landa+
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C
MIAMIBEACH
RISING
ABOVE
First Street
Improvements and
Conceptual Layouts
@3Zeü?4@@@fEs EIA3ASRe} 2f.E%#%37EIEEEE3e3.
a.sai ont
• Preserve the look and feel of First Street
• Facilitate Harmonization
• Prevent future flooding
• Improve water and sewer service
<<13 >>
2rah.tidal aloe.mah „tulaaiaiii«lel.ill.ii J
<<]4>> SETTA EGEEESEIEES3el5
aahat.aakaaioa dz»l i ar.dllo all.la«r.slaiaa all-.till.lira ital..lit.lo«ilillei.ii.a.llull.~ ii oiii wiolollilliii«we..ti«iea..ls.h. ..
+« 'l!L..A, ¡; ;; l I[· ]\ [[ Lua] g'
l±le!' 'j tl_if!/'±"±„a_±,/h}y #i_ .l!l± '},#f hie--w=-iii.sü sis.s.a--as.-a-t"--!5
L......L J...~_b . ~-----"'------~-~-----------jl_ 1í,""'\ n?-=---'L=L_.J _..). __ L _L ~"-, ~ ;¡;~"'=s-~ • ·• : I I ' * " ~ " ·• .¥ ~ i .. ~ • ' I ,, ' • • • • . • • ' 1ï 11 ~
Ex~fi ng~~~r
64 Parking Spaces
Future First Street - Option A
36 Parking Spaces o
NORTH
<<15 >> E
okttnstI.
¥
±i. .sl_Al ti
'-•'· ».S. • - _, ~ ~--'" " -· .. -~
t r
-«. ass sac »do: »
<<16>>
aia«no
IMO»MMAE1IE9tag#j j ppg2gggz3a2Egg.±
.1 Le #; [ il, } 3 ¥ E.1 LI {t- "= z ,f %.L!_!id!d„,zll/±= 4==Ys . ,, _ ~ , 1.i. ~-=,. -~ . = ~-~'liFFi • .• , •'--LJ.,_L+--'7\ _ , ¡-r \[ [E. ·, e.i=cd-"riT' _]] r a!·. .-.--=» J!
~-~l -. .. . . ~----;~--:---;--;---:-,_ -:,--: T~=-:-=~-=-j ¡ ltt ½-"..:-~-~--"..---=----------,,_-~' -~~~:¡;-[-:;¡._;..
, - - -1 - 1--L-I;') ~ J > ~ ------,-~--~---- - 7 I - - __ ;_·-~=-~¡¡==.=.;z:=e7~,~ . "I¡;; , ~ \ ~= ~· ~r=,----r•:s:t,·_¡ ~L -:----=-- ~ - - ~ ¡ k_-.: - . ~~"~ ..... ~u~=;-"--¡_---~~- - 'I "r~1 : - -1:J i'Í-\\
'-~- -T9 , ~---•L .. ~J;~_l..,.k ..-;,_,,,_:t:=::.'1èirti. , - - - - - - T;.:¡ ~ I . t~ Il:.,__}
- g Er"TM .-. .'T, 7;} le ' .!,..-=~, "~ - - -- ~ . ' jj , ' ----
n g f .r hl s {\1· • - ,1f /
" « \ ' iil
Existing Conditions
64 Active Parking Spaces
Future First Street - Option B
36 Parking Spaces
o
NORTH
<<21>> EST7a f #3,99A915155.g 91 A"SEA:A'ALBEE LEG L PAI
l
f I
I\
I\
O
4
V
V
I\
7
O y
V
V
7%,E
Existing Street
Trees 89
Existing on-street seating
areas (currently set on travel lanes)
Option A
Proposed Trees 183
+94 Trees
(No sidewalk or on-street seating)
O ption B
Proposed Trees 150
+1 Trees
Options for sidewalk seating
<<26>>
Lggg.g..g,oggi .gag.g3gaso.o?g o1gag,go.g.g. g.ge .g ..'tao .ç¢g.,.gggLz gr..g ,1,323g g ga g.J ".''g.,g ç"e.. gr-o.gg.g.a
TEE3 26
\ ~--· -- I ·- ~- ·--·\ - - ... • F'- e9e ,€
s -R. leedlhll.denle
e..@@@.@$ s' " g k "so:o$&$"_ "o"os& os°- '
7 %
,;¡,,1'ó
\
Í~ 1íl'(.• I :1
f v%. ~.-"' ..,..,,·· .. · ,11_ I? " g;a 'e!
¥
1
9 i i
\
±
1 <d ! z
.# O 3i
)N T "&g
7 }: ±
}. +/./
\ß%
A d d itio n a l P g rk i n g S pa c e s_-J e ff e rso n S tre e t
à
• E xi sti n g P ar king 9 +2 M o tor c y c le
• P ro v id e d 15 +2 M o tor c y cl e
this would require using some portion of the park to accommodate
<< 27>>
ggeo..up'gag,
eEE
aka....a.a.ni.o«luto »«oasas2taladra. loa.lata.atal.llalll a.b. l.e.... l.la
< z o ¡:: • o
A
7
co
N
V
V
OPTION A OPTION B
• Both options provide for enhanced green space over existing conditions (more trees).
• Reduced Flooding through Road Raising
• Option B adds Outdoor seating opportunities while providing walking space
<<29>> Éftnf$g #Re,eegg2. 1gpegggE,
Jg4EZ2ZE D I EGL L.LU!
~-- "-·----~~-----~~=,~=-~~-~-~~--=--~-"--~~--=-"--~~~"-----'-'---~~-==-~""-~-~~-~~-~-------~~---~-~=-~=~-=~---'--=--'--"'""
DocuSign Envelope ID: FDFA B43C-38ED-4 5C8-B097-5FBD6E30B05C
MI AM/BEA CH
RISING
ABOVE
••
.
'
Stormwater
Management and
Treatment System -
Architectural Screening
Concepts
DocuSign Envelope ID: FDFAB43C-38ED-45C8-8097-5FBD6E30805C +14401BEACH
RISING
ABO VE
m ]
r -e "-"-. "" "
<< 31 >>
i. .. -i gs±: ±±.g .a: gs g Anh."E ·g14.<Gog.g,-ggç.go,ggggu..g.2$.,ego,gig,g.1egg.og° gig gg go.-gig g.LL.çggggo,egg7egg2S. gee.gutta.gt
@ff.#f 4.23%/±2
Sc re e n th e a b o ve g ro un d
e le c tric a l co m p o ne n ts se rving
th e un d e rg ro u nd p um p sta tio n
1.FPL V a ul t
2. Ele c tric a l Pla tf o rm
3. G e n e ra to r Se t
En cl o su re a p p rox. A re a: 5,085 SF
O p e n ro o f stru c ture fo r cra n e
o p e ra tio n fo r re p la c e m e nt of
lar g e e q u ip m e nt
Se rvic e ac c e ss th ro ug h
o v e rh e a d do o r a nd re m o va b le
p a n e ls alo ng W as hing to n A ve .
<< 32 >>
-
. . ·-:~ .. -
N
N
2
V
V
A
I\
t
0O
V
V
I\
A
O
)
V
V
A
A
O
)
V
V
O
uO o
0o o
G
3
0 u.
49
I
0 o
0
ob
O
~ o
I
00
e?
O
?
? o
Lu.
rc o ;
o o
I\
A
N
0O
V
V
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
MIAMI BEACH
R ISING
ABOVE
o
Community
Feedback
sgg gçg .go.ge ggg ggg.ggg g g g.g ggg.o]
TT OE3SEESE3ESE9LL.Eng 5'3'.%é¿2s??k a sp,g9$g;2y
4El
If you have further questions or comments,
please reach out our Public Information Team:
Lauren Firtel
LaurenFi mig mi begchfl_gov
E
HEE ...
±55n ' Jeanette Gorgas . mrami i.com
Scan this QR Code to participate in our Survey
<< 39 >> [NEEEIEI3Te3
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
Technical Memorandum
Appendix 2 -
Monkey Survey Results
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD 6E30B05C g th p . t St t · t
ri ueeprwveter Ou 'ointe ormwa.er pro]eCc
Q1 Please choose your preferred Streetscape option
Answered: 229 Skipped: 9
None of the
above
First Street
Improvement...
First Street
Improvement...
none of the
above
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES
None of the above
First Street Improvement Option A (Base Option)
First Street Improvement Option B (Meandering Wall)
none of the above
TOTAL
RESPONSES
9.17%
54.15%
36.68%
0.00%
21
124
84
o
229
1 / 16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C & S th p , t St t · t rus ueenroverrer> Oul 'Ointe .orm w a .er pro ]e C
Q2 Should additional parking be accommodated on Jefferson Ave?
Answered: 225 Skipped: 13
Yes
No
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES
Yes
No
TOTAL
RESPONSES
55.11%
44.89%
124
101
225
2/16
DocuSign Envelope ID: FDFABA43C-38ED-4 5C8-B097-5FBD6E 30B05C , S th p . t St t · t rus ueeuuproverrent> Ou! 'Olne ormwa.er pro]eC
Q3 which screening design is preferred for the above ground components
of the Stormwater Treatment System?
Answered: 219 Skipped: 19
None of the ,
above
Architectural
Screening...
Architectural
Screening...
none of the
above
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES
None of the above
Architectural Screening Concept A
Architectural Screening Concept B
none of the above
TOTAL
RESPONSES
12.79%
55.71%
31.51%
0.00%
28
122
69
o
219
3/16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-8097-5FBD6E30B05C & S th p . t St t · t rrueeuuproverret> Ou' 'OIe ormwa".er prO]eC
Q4 Please share with us any additional comments you may have.
Answered: 50 Skipped 188
#
1
RESPONSES DATE
I think that more thought still needs to be given to the street design, esp with regard to parking. 6/22/2022 5:36 PM
The survey upon which the current designs are based was a very small sample, heavily
lobbied. Parking is one huge issue, the other is pedestrian safety. The idea of "greenspace"
also needs to be thought through more carefully. I do not think either proposed screen designs
relate to the neighborhood. A green screen of some kind would seem much more relevant and
compatible.
2
3
4
5
6
7
8
Movable seating for the restaurants and cates along the South side will add wonderful energy
to the street.
Please keep more residential and less commercial.
My preference for 1st street would be to keep the green area between the 2 lanes, that could
potentially have trees branches covering the whole street, providing lots of shade and good
atmosphere. Same impact as Meridian Ave.
Huge proponent of saving outdoor seating for the restaurants as it adds to the community feel,
openness and creates community cohesion as one is able to see people they know sitting
outside. Whatever it takes to save this, we are 100% supportive of. Creating and keeping the
vibrancy of outdoor seating brings the neighborhood to life and makes people feel less alone
even with a short walk down the block.
Hopefully noise and light pollution ..as well as contruction and maintence..disruptions can be
kept 2 an MINNI MUM OVER THE INSTALLATION & Life of this plan
Looks beautiful - we need more outdoor seating in that area and space to walk.
6/22/2022 4:42 PM
6/22/2022 2: 38 PM
6/22/2022 2:25 PM
6/22/2022 2: 19 PM
6/22/2022 1:46 PM
9
10
11
12
13
14
I want a quiet family neighborhood with, residential quality of life. The party should go to other
places, no outdoor dining, and drinking. DO NOT CONVERT FIRST STREET INTO A MIXED-
USED OUTDOOR COMMERCIAL SPACE.
The Decorative wall panels could be more decorative and artistic. The two designs are quite
boring and dated.
I agree that residents nearby should have the main decision on the design of the above ground
components that need to be screened. A green, live plant-like covering would be best.
Insist the Robotic parking garage on 1st Street becomes operational
Thank you. I hope this can be implemented asap.
Extremely concerned with the resulting LOSS of on-street parking on First Street.
6/22/2022 7: 53 AM
6/22/2022 7:26 AM
6/21/2022 9:37 PM
6/21/2022 8:46 PM
6/21/2022 7: 17 PM
6/21/2022 6:05 PM
6/21/2022 5:41 PM
15
16
The removal of the medían and making first Street into only two lanes seems like it will be very 6/21/2022 5:39 PM
backed up. I have lived in south of fifth for many years and traffic is always backed up from
Washington to Alton on first. Neither design seems to address that issue.
Row of Psalm Trees along either A of B....Thank you for all your work and consideration!! 6/21/2022 5:16 PM
17
18
19
Wall in option b protects diners, but makes it harder for dog walkers to get dogs to grass...
could mean more poop to clean up on sidewalk. Harder to safely get out of passenger side of
cars, too.
The neighborhood would have less parking problems if parking garage in residential building
owned by Mr Galbut was resolved. Unused from beginning, right?
where is the bike path?
I assume the time and budget are approximately the same. Quicker is better.
6/21/2022 5.01 PM
6/21/2022 4:59 PM
6/21/2022 4:48 PM
6/21/2022 4:42 PM
4 / 16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C & S th p.'t St t · t ri> ue n p ruverer io OUI 'Olne ormwa'.er pro]eC
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Use more green and natural screen to reduce heat caused by metal screens.
Thank you for the improvements. I am owner and resident full time at the Cosmopolitan. 110
Washington Ave. We do not need more cars, more valets, more noise, more crowded
sidewalks with tables and loud speakers. There 2 restaurants already occupying the northwest
corner of Washington and First Street with too many tables, loud speakers and horrible smell
of old fried oil ( Vegan one ).
Trying to slip in more outdoor seating at restaurants that are already loud to residents is really
crappy! Sneaky and not talked about before.
Quality of life for the residents is the most important to consider for any improvement
Those two screens are not attractive IMO. It would e nice to see something else.
Please do not have seating for eating. Big problem for our residents
Outdoor dining on first is excellent opportunity to improve the residents experience! Thanks!
please no more commercial outdoor spacing on First St
keep more parking spaces, losing 26 spaces is not acceptable
Why rain gardens have not been used in the landscape ??
Wasn't Alton Road (from South Pointe to Fifth Street) recently improved and how much
reconstruction (destruction) of that roadway will this project require? How long will this project
take?
Nice work.
Strong preference for LESS parking and MORE trees in the street design. There is not enough
shade in Miami Beach. Please use leaf, not palm trees!
I do not like either, but I listed my preferences of the two options I was given. I prefer keeping
the median - it keeps the neighborhood feel. Without the median, it becomes a commercial
street. Also the wide parkways are ditches and difficult for pedestrians and those going to and
from cars. How much did we pay these amateurs to do this?
34 i have been living in this immediate area for 20+ years. only for about 2-3 hours does alton and 6/10/2022 10.01 AM
1st and washington and 1st flood enough to only "not walk" Any car can safely drive through.
My biggest concern is the design is only showing first street draining improvement. What
happens with the pitch pushing water toward 2nd street. On 2nd street and meridian avenue.
That is the highest elevation point south of fifth. You can see withthe human eye. That is why
my building was there in 1926. So far, this higher elevation of first street makes the water run
toward other areas. So, how is the drainage gonna work between 1st street and 2nd street on
meridian? This looks like a lake will be created. Also, no more parking, more swale for
drainage is the answer. Make the parking lot your proposing for power, generator etc. Into a
huge swale, naturally.
35
36
37
38
39
40
41
No seating on first street sidewalks! It's already too loud and seating leads to large groups and
loitering. Also, valet area should not be used for parking valeted cars (Milo's The valet lane is
for loading and unloading only. Causes unessecary traffic and lots of horns!
It works now, leave it alone
Option B is a sham giveaway to adjoining commercial property owners and paves the way for
noisy sidewalk cafes. also, alters character of neighborhood. OUTRAGEOUSLY BAD!
Should minimize as much as possible the look of pumping station...samples are way too
intrusive, emphasizing the pump to detriment of existing buildings
Hello, we live at The Courts facing 1st Street. My concern is the noise increase from outdoor
dining.
What happened to the bike lanes? Narrowing the street to one lane in each direction will make
it more dangerous for biking.
Preferred screening is a third option of vegetation, bevined panels could hinge down with
minimal impact on flexible vegetation to permit access and would offset sadly-apparently
neccessary-added parking caused loss of greenspace at Jeff The curved wall will prevent
6/21/2022 3: 17 PM
6/21/2022 1:34 PM
6/21/2022 12:45 PM
6/21/2022 12.33 PM
6/21/2022 12:01 PM
6/21/2022 11:29 AM
6/21/2022 11:16 AM
6/20/2022 6:13 PM
6/20/2022 2:33 PM
6/20/2022 7: 19 AM
6/16/2022 2:04 PM
6/15/2022 6:26 PM
6/15/2022 4:24 PM
6/13/2022 5: 54 PM
6/10/2022 7:19 AM
6/9/2022 11:30 PM
6/9/2022 6:21 PM
6/9/2022 6:10 PM
6/9/2022 4:28 PM
6/9/2022 3:21 PM
6/9/2022 2:42 PM
5/16
DocuSign Envelope ID: FDFAB4 3C-38ED-45C8-B097-5FBD6E 30B0 5C S th p . t St t · t ri>ueennproverrer Oul 'omne .ormwa.er proyeC
42
43
44
45
persons entering wet swale and eroding grass, it also sets a tone, very congruent with the
neighbourhood vibe but may invite interest in sidewalk cafes for better or worse. A final
concern remains the de-facto offloading to property owners of previously municipally provided
drainage over unraised sidewalks which if raised above unharmonised properties will obstruct
the accustomed shedding of stormwater
I live on 1st street with four windows facing the street. Very concerned about the noise that
would come with add'l outdoor restaurant seating.
Outside seating could be a noise issue for neighbors.
Thank you for an excellent presentation- the best I've seen
Not sure oaks will survive, given increased salt content in groundwater. More diversity in plant
palette will also enhance the area ecosystem, be more resistent to pests, etc. Will there be
any consideration to bike lanes? There's a city bike rack at the corner, but I dont see bike
lanes in the renderings.
6/9/2022 11:40 AM
6/7/2022 7:21 PM
6/7/2022 7:18 PM
6/7/2022 6:47 PM
46 Option B offers some protection from the street to restaurant diners and walkers .. we don't want 6/7/2022 6:.43 PM
a repeat of the recent accident at Call Me Gaby restaurant.
47
48
49
50
Need to allow two lanes from west to east.
Interested in what the street lighting would be
I would try to hide the equipment rather than make an architectural statement.
test test test
6/7/2022 6:42 PM
6/7/2022 6:40 PM
6/7/2022 6.40 PM
6/6/2022 9:32 PM
6/16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30805C & S th p . t St · t rrueeproverieni i0ut 'ointe .ormwater projeC
QS If you would like to receive project updates please provide us with an
email address.
Answered: 106 Skipp ed: 132
ANSWER CHOICES RESPONSES
Name
Company
Address
Address 2
City/Town
State/Province
ZIP/Postal Code
Country
Email
Phone Number
91.51%
0.00%
93.40%
0.00%
0.00%
0.00%
0.00%
97
o
99
o
o
o
o
0.00% O
100.00% 106
0.00% o
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
NAME
Baris Litvak
Paul Dedrick
Alexis Bidermann
Caroline Bidermann
harry martin
pilar R
Paulo R Souza
Tiere Hessert
Christopher Lucy
elite kedan
Stanley G Hoch
Rosy Cancela
Manuel Gutierrez
steve gillon
Beth Kais
Silvia
RODGER Dean WASSERMAN
greg A mohr
Maurice Le Blanc
DATE
6/22/2022 6:17 PM
6/22/2022 5:37 PM
6/22/2022 5: 11 PM
6/22/2022 5:09 PM
6/22/2022 3:28 PM
6/22/2022 2:38 PM
6/22/2022 2:25 PM
6/22/2022 2:19 PM
6/22/2022 1:46 PM
6/22/2022 12:44 PM
6/22/2022 12:31 PM
6/22/2022 12:27 PM
6/22/2022 12:18 PM
6/22/2022 9:08 AM
6/22/2022 7:53 AM
6/22/2022 7: 26 AM
6/22/2022 7:25 AM
6/22/2022 7.04 AM
6/22/2022 1:37 AM
7 / 16
DocuSign Envelope ID: FDFAB4 3C-38ED-4 5C8-B097-5FBD6 E30B 05C S th p , t St t · t ru>ueenuproverrer> O ui 'O ln e ormwa.er pr o ]e C
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
David Fremont-Smith
Elsa Lavin
Frank Lavin
Tim Carr
Roger Van Dyke
Sue Grayson
Richard Shon
Tony Giulino
Zenaida
Howard Stark
Grace c Dillon
Nicholas Tannura
Virginia LopezRey
Steve Burgay
Robert Zweben
Oscar Vazquez
Rachel schremp
John Dobson
Barbara Martinez
John Latella
Marcia
Jessica Rice
Cristi Stiers
liana bernot
Nassir habboubi
Alyson
Richard White
Alice Morrison
Ion Pancu
Carmel Dubuque
Roberto Carneiro
patricia
Arnaldo "HARLEY" Mancebo
Debbie Wulffhart
valeria quagliata
karen willoughby
Donald V. Vines
Najwa Fayoumi
6/21/2022 9:45 PM
6/21/2022 9:39 PM
6/21/2022 9:37 PM
6/21/2022 9.34 PM
6/21/2022 9.32 PM
6/21/2022 8:46 PM
6/21/2022 7:29 PM
6/21/2022 7:17 PM
6/21/2022 6:55 PM
6/21/2022 6:41 PM
6/21/2022 6:26 PM
6/21/2022 6:13 PM
6/21/2022 6.05 PM
6/21/2022 5:59 PM
6/21/2022 5:55 PM
6/21/2022 5:50 PM
6/21/2022 5:39 PM
6/21/2022 5. 16 PM
6/21/2022 5.01 PM
6/21/2022 4:59 PM
6/21/2022 4:59 PM
6/21/2022 4:51 PM
6/21/2022 4:43 PM
6/21/2022 4:33 PM
6/21/2022 4:.05 PM
6/21/2022 3:48 PM
6/21/2022 3.36 PM
6/21/2022 3:17 PM
6/21/2022 2:56 PM
6/21/2022 2:36 PM
6/21/2022 1:34 PM
6/21/2022 1:32 PM
6/21/2022 1:29 PM
6/21/2022 1:.04 PM
6/21/2022 12:55 PM
6/21/2022 12:45 PM
6/21/2022 12:38 PM
6/21/2022 12:33 PM
8/16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C g th p · t St t · t rs ueenprovere Ou 'oIne .ormwa.er pro]eCc
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
Mary Wertheim
Maria
George Willoughby
Robert DeBurro
Kizzy Parks
Marc Gellman
Mark J. Connor
Duval Yeager
Harry Rosenzweig
ltzhak Tabak
Eddy
Trisha Posner
gerald Posner
Toby Mannheimer
Andrew Stranovsky
Jody Konstand
Bruce Altman
Eda Dogru
Charles Douglas Wingate
Erica Wyche
Rudolph Guglieri
Saul Dolgin
Dale Schacherer
Keith Hamill
Meryl Buchwald
Valentine
Gregory Sica
robert lansburgh
Elaine Litvak
Aline Belarmino
Jo Karabell
Steve oison
Joaquin Cortizo
William Winkowski
Matt Rice
brett koshel
Valdine Zakzanis
Nancy
6/21/2022 12.01 PM
6/21/2022 12:00 PM
6/21/2022 11:29 AM
6/21/2022 11: 16 AM
6/21/2022 11.07 AM
6/21/2022 10.50 AM
6/21/2022 10:47 AM
6/21/2022 10:47 AM
6/21/2022 10:46 AM
6/21/2022 10:46 AM
6/20/2022 6: 18 PM
6/20/2022 6: 17 PM
6/20/2022 6:13 PM
6/19/2022 4.12 PM
6/17/2022 5.09 PM
6/16/2022 2.04 PM
6/16/2022 8.28 AM
6/16/2022 12.32 AM
6/15/2022 9: 11 PM
6/15/2022 5: 16 PM
6/15/2022 4:43 PM
6/15/2022 3:27 PM
6/15/2022 3:23 PM
6/15/2022 2:54 PM
6/13/2022 7.09 PM
6/13/2022 5:.54 PM
6/13/2022 8:19 AM
6/12/2022 5:01 PM
6/11/2022 9.01 PM
6/10/2022 4:31 PM
6/10/2022 3:17 PM
6/10/2022 11:12 AM
6/10/2022 10:01 AM
6/10/2022 8:20 AM
6/10/2022 7:19 AM
6/9/2022 9:.53 PM
6/9/2022 6:37 PM
6/9/2022 6:10 PM
9/16
DocuSign Envelope ID: FDFAB4 3C-38ED-45C8-B097-5FBD6E30B05C & S th p . t St t · t rus u e e proveen iOu! 'OInte ormwaer pro]eC
96
97
#
Andrea Wood
Johann Moore
COMPANY
There are no responses.
ADDRESS
1000 South Pointe Drive
1000 South Pointe Dr, Apt 2801, Miami Beach 33139
1000 south pointe dr, unit 1804
1000 South pointe dr, unit 1804
1000 South Pointe Drive #2302
110 Washington avenue APT 1502
1000 South Pointe Dr, Apt 805, Miami Beach
1000 S Pointe Dr
1000 South Pointe Dr.
450 ALTON RD, APT 1403,
151 Michigan Ave #512
145 Jefferson Avenue, #442
716 Michigan Avenue# 303
110 Washington Avenue #1724
520 West Ave
Merino
450 alton road, #1407
465 OCEAN DRIVE
1000 South Pointe Dr.
400 S Pointe Dr Apt 1508
110 Washington Ave. 1303
110 Washington Ave. #1303
540 West Ave #2214
90 Alton Road
110 Washington Avenue (Cosmopolitan)
1000 Southpointe Dr MB, FL 33139
1000 S. Pointe Dr
90 Alton Rd Apt TH7
120 Jefferson Ave #12003
300 South Pointe Drive
140 Jefferson Ave
400 Alton Rd. #1403
2555 Collins Ave
6/9/2022 4:28 PM
6/9/2022 2:42 PM
DATE
#t
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
DATE
6/22/2022 6:17 PM
6/22/2022 5:37 PM
6/22/2022 5: 11 PM
6/22/2022 5:09 PM
6/22/2022 3:28 PM
6/22/2022 2:38 PM
6/22/2022 2:25 PM
6/22/2022 2:19 PM
6/22/2022 1:46 PM
6/22/2022 12:44 PM
6/22/2022 12:31 PM
6/22/2022 12:27 PM
6/22/2022 12:18 PM
6/22/2022 9.08 AM
6/22/2022 7.53 AM
6/22/2022 7:26 AM
6/22/2022 7:25 AM
6/22/2022 7: 04 AM
6/22/2022 1: 37 AM
6/21/2022 9.45 PM
6/21/2022 9.39 PM
6/21/2022 9.37 PM
6/21/2022 9.34 PM
6/21/2022 9:32 PM
6/21/2022 8:46 PM
6/21/2022 7: 29 PM
6/21/2022 7: 17 PM
6/21/2022 6:41 PM
6/21/2022 6:26 PM
6/21/2022 6:13 PM
6/21/2022 6:05 PM
6/21/2022 5:55 PM
6/21/2022 5:50 PM
10 / 16
DocuSign Envelope ID: FDFABA43C-38ED-45C8-B097-5FBD 6E30BO5C g th p . t St t · t ris ueeuupruverient> OU 'Oint e .orm w a .e r pro]eC
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
1000 s pointe dr 2603
110 Washington Ave 1309
400 S Pointe Dr, Unit 705
110 Washington Ave Apt 2416, MB FL 33139
Cunningham
110 Washington Ave, APt 1213 Miami Beach FL
110 Washington Ave, Unit 1521
110 Washington Ave
400 So Pointe Dr
110 Washington Ave 1823
400 S. pointe Dr. #1810 Miami Beach, FL 33139
110 Washington Ave
110 Washington Ave #2616 Miami Beach FL 33139
110 washington ave
110 washington ave, unit 1713
Cosmopolitan
110 washington ave
110 Washington Avenue Unit 1317
141 Kings Creek Circle
110 Washington ave, Miami Beach
110 Washington Ave Apt 1319
110 Washington ave
110 Washington Ave #1317
110 Washington Ave, unit 1608
110 Washington Ave 1415, Miami Beach FL 33139
110 Washington Avenue
110 Washington Avenue, Unit 2307
110 Washington Ave, Apt 1604
65 Washington Ave #25
1161101st St, Bay Harbor Islands 33154 FL
61 Collins Ave
110 Washington Ave, #2401
110 Washington Ave #2401
151 Michigan Ave Apt 532
1508 Bay Road
90 Alton Road; Unit 802
300 South Pointe Dr 1103
1200 West Avenue
6/21/2022 5:39 PM
6/21/2022 5:16 PM
6/21/2022 5:01 PM
6/21/2022 4:59 PM
6/21/2022 4:59 PM
6/21/2022 4:51 PM
6/21/2022 4:43 PM
6/21/2022 4.05 PM
6/21/2022 3:48 PM
6/21/2022 3:36 PM
6/21/2022 3:17 PM
6/21/2022 2:36 PM
6/21/2022 1:34 PM
6/21/2022 1:32 PM
6/21/2022 1:29 PM
6/21/2022 1:04 PM
6/21/2022 12:55 PM
6/21/2022 12:45 PM
6/21/2022 12:38 PM
6/21/2022 12:33 PM
6/21/2022 12:01 PM
6/21/2022 12:00 PM
6/21/2022 11:29 AM
6/21/2022 11:16 AM
6/21/2022 11:07 AM
6/21/2022 10:50 AM
6/21/2022 10:47 AM
6/21/2022 10:.47 AM
6/21/2022 10:46 AM
6/21/2022 10:46 AM
6/20/2022 6:18 PM
6/20/2022 6:17 PM
6/20/2022 6:13 PM
6/19/2022 4:12 PM
6/17/2022 5:09 PM
6/16/2022 2:04 PM
6/16/2022 8:28 AM
6/16/2022 12:32 AM
11 / 16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30805C & S th p t St t · t rus ueeupruveeni> Ou! 'ointe .ormwarer pro]eC
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
#
#
250 Meridian Ave
125 Jefferson Avenue #132
350 Collins Ave
208 Jefferson Ave
140 Jefferson Avenue
Murano Grande , Alton road
800 and 1000 S Pointe Dr
90 Alton Rd #2507
50 S Pointe Dr. Apt 1406
90 alton road th4
1000 South Pointe Drive
120Jefferson Ave unit 12018
90 Alton Rd
400 South Pointe Drive
739 2nd street
110 Washington Ave 2504
110 Washington Ave, Apt 1213
300 south pointe drive
300 South Pointe Dr. Unit 709 Miami Beach 33139
90 Alton Rd
100 Meridian Ave
717 Jefferson Ave apt 8 Miami Beach 33139
100 Meridian Ave., 236, Miami Beach, FL 33139
151 Michigan Ave #511
800 First Street
1000 south pointe dr
90 Alton rd
90 Alton Road
ADDRESS 2
There are no responses.
CITY/TOWN
There are no responses.
STATE/PROVINCE
There are no responses.
ZIP/POSTAL CODE
There are no responses.
COUNTRY
There are no responses.
EMAIL
6/15/2022 9:11 PM
6/15/2022 5: 16 PM
6/15/2022 4.43 PM
6/15/2022 3:27 PM
6/15/2022 3:23 PM
6/15/2022 2:54 PM
6/13/2022 7:09 PM
6/13/2022 5.54 PM
6/13/2022 8:19 AM
6/12/2022 5:01 PM
6/11/2022 9.01 PM
6/10/2022 4:31 PM
6/10/2022 3:17 PM
6/10/2022 11:12 AM
6/10/2022 10.01 AM
6/10/2022 8:20 AM
6/10/2022 7:19 AM
6/9/2022 9:53 PM
6/9/2022 6:37 PM
6/9/2022 6:10 PM
6/9/2022 4:28 PM
6/9/2022 2:42 PM
6/9/2022 11:40 AM
6/7/2022 6:43 PM
6/7/2022 6:42 PM
6/7/2022 6:40 PM
6/7/2022 6:40 PM
6/7/2022 6.39 PM
DATE
DATE
# DATE
# DATE
# DATE
# DATE
12 / 16
DocuSign Envelope ID : FD FAB4 3C-38ED-4 5C 8-B097-5FBD6E30B05C & S th p . t St t · t ruez proverer Ou' 'oInre .ormwater pro]eC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
chadcjb@yahoo.com
e1itvak273@aol.com
dedrickpaulOO@gmail.com
123alb@gmail.com
123cbs@gmail.com
hdmconsulting@yahoo.com
pilarblue3000@gmail. corn
opaulo@the-beach.net
tieremarie@gmail.com
chrisbuell1998@gmail.com
ekedan@gmail.com
Rcampmsnrn@aol.com
rcancela@aol.com
michigan303@hotmail.com
smgillon@aol.com
kaisx3@gmail.com
silviamerino@me.com
rodwasserman@hotmail.com
lessmohr@gmail.com
mrlb1214@gmail.com
ddavidfs2@gmail.com
elsalavin@icloud.com
FrankA.Lavin@gmail.com
timpcarr@aol.com
rtv2006@sbcglobal.net
spgrayson127@gmail.com
dick@whittallandshon.com
tony.giulino@elliman.com
arrieta1969@yahoo.com
howard@howardstarkmd.com
graciedillon@gmail.com
ndtannura@gmail.com
virginia.lopezrey@gmail.com
burgay@bu.edu
robertzweben@gmail.com
omvhome@gmail.com
rschrernp@litstrat.com
dobber140@hotrnail.com
6/22/2022 7:.07 PM
6/22/2022 6:17 PM
6/22/2022 5.37 PM
6/22/2022 5: 11 PM
6/22/2022 5:09 PM
6/22/2022 3:28 PM
6/22/2022 2:38 PM
6/22/2022 2:25 PM
6/22/2022 2:19 PM
6/22/2022 1:46 PM
6/22/2022 12:44 PM
6/22/2022 12.31 PM
6/22/2022 12:27 PM
6/22/2022 12:18 PM
6/22/2022 9:08 AM
6/22/2022 7: 53 AM
6/22/2022 7: 26 AM
6/22/2022 7:25 AM
6/22/2022 7.04 AM
6/22/2022 1:37 AM
6/21/2022 9:45 PM
6/21/2022 9.39 PM
6/21/2022 9:37 PM
6/21/2022 9:34 PM
6/21/2022 9:32 PM
6/21/2022 8:46 PM
6/21/2022 7: 29 PM
6/21/2022 7: 17 PM
6/21/2022 6.55 PM
6/21/2022 6:41 PM
6/21/2022 6:26 PM
6/21/2022 6:13 PM
6/21/2022 6.05 PM
6/21/2022 5:59 PM
6/21/2022 5.55 PM
6/21/2022 5.50 PM
6/21/2022 5.39 PM
6/21/2022 5:16 PM
13 / 16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C S th p , t St t · t rs u n p rovere ro OU 'OIie orm water prO]eC
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
barbmart@mindspring.com
johnlatellajr@gmail.com
marciacunninghaml@gmail.com
jessrice@me.com
stiersc @icloud.com
pira129@hotmail.com
nassirhabboubi@yahoo.com
a lysherman@aol.com
richardmichaelwhite@hotmail.com
radulski.morrison@gmail.com
iovipa@aol.com
carmel_dubuque@yahoo.com
robmcarneiro@gmail.com
trisha@posner.com
gaucho12@bellsouth.net
debbiewulffhart@gmail.com
miamivale@gmail.com
Karen_Willoughby@comcast.net
donvinews@hotmail.com
najforwork@gmail.com
herbieboo@aol.com
mariaauxsilva@icloud.com
gwillough1@gmail.com
rdeburro@lazparking.com
kizzyparks@gmail.com
marcg013@gmail.com
markjconnor@verizon.net
duvalyeager@hotmail.com
hrosenzweig@yahoo.com
ztabak13@gmail.com
eddy61ca@gmail.com
miamiwarrior@gmail.com
gerald@posner.com
tmannheimer@gmail.com
andrew.stranovsky@gmail.com
jmkmedia@msn.com
brucealtman@gmail.com
eda_dogru@hotmail.com
6/21/2022 5.01 PM
6/21/2022 4:59 PM
6/21/2022 4:59 PM
6/21/2022 4:51 PM
6/21/2022 4:43 PM
6/21/2022 4.33 PM
6/21/2022 4:05 PM
6/21/2022 3:48 PM
6/21/2022 3:36 PM
6/21/2022 3:17 PM
6/21/2022 2:56 PM
6/21/2022 2:36 PM
6/21/2022 1:34 PM
6/21/2022 1:32 PM
6/21/2022 1:29 PM
6/21/2022 1:04 PM
6/21/2022 12:.55 PM
6/21/2022 12:45 PM
6/21/2022 12:38 PM
6/21/2022 12:33 PM
6/21/2022 12:01 PM
6/21/2022 12:00 PM
6/21/2022 11:29 AM
6/21/2022 11:16 AM
6/21/2022 11:07 AM
6/21/2022 10:50 AM
6/21/2022 10:47 AM
6/21/2022 10:47 AM
6/21/2022 10:46 AM
6/21/2022 10:46 AM
6/20/2022 6:18 PM
6/20/2022 6:17 PM
6/20/2022 6:13 PM
6/19/2022 4:12 PM
6/17/2022 5:09 PM
6/16/2022 2:04 PM
6/16/2022 8:28 AM
6/16/2022 12:32 AM
14 / 16
OocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30BO5C S th p . t S . t ru uee proveren> i0ut 'ointe itorm water projeC
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
10 1
10 2
103
104
105
10 6
#
dwingate108@gmail.com
eawyche@gmail.com
rudygoog07@gmail.com
sdolgin@gmail.com
dshocker@aol.com
keithhamill@hamillone.co. uk
Porterrobin@ymail.com
YCP@Valentine.US
gsica@sprynet.com
rclmgt@gmail.com
eitvak273@aol.com
alinebrasilus.yahoo.com
jokarabell@gmail.com
solson@ekoklaw.com
joey@permitdoctor.com
williamdwinkowski@gmail.com
6/15/2022 9:11 PM
6/15/2022 5:16 PM
6/15/2022 4:43 PM
6/15/2022 3:27 PM
6/15/2022 3:23 PM
6/15/2022 2:54 PM
6/13/2022 7.09 PM
6/13/2022 5:54 PM
6/13/2022 8:19 AM
6/12/2022 5:01 PM
6/11/2022 9.01 PM
6/10/2022 4:31 PM
6/10/2022 3:17 PM
6/10/2022 11:12 AM
6/10/2022 10:01 AM
6/10/2022 8.20 AM
ricemg@me.com
brett@brettworld.com
valdineborg@hotmail.com
nandvs@mac.com
adcwood@gmail.com
johannmoore859@gmail.com
caseytwood@gmail.com
elke.soskolne@gmail.com
marlew36@aol.com
rgalbut@crescentheights.com
johnmcaprio@yahoo.com
rselsam@gmail.com
s.soskolne@gmail.com
pauljturcotte@gmail.com
PHONE NUMBER
There are no responses.
6/10/2022 7:19 AM
6/9/2022 9:53 PM
6/9/2022 6:37 PM
6/9/2022 6:10 PM
6/9/2022 4:28 PM
6/9/2022 2:42 PM
6/9/2022 11:40 AM
6/7/2022 7.21 PM
6/7/2022 6:43 PM
6/7/2022 6:42 PM
6/7/2022 6:40 PM
6/7/2022 6:40 PM
6/7/2022 6:39 PM
6/7/2022 6:39 PM
DATE
15 /16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-097-5FBD6E30B05C S th p · t St t · t ri oueenuroverien> OU' 'Ointe .orm w a.e r pro ]e C
Q 6 M ark the answ er that best describes you
Answered: 219 Skipped: 19
I live in
M iam i Beach ...
I live in
M iam i Beach ,...
I am visiting
M iam i Beach
I
~
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
ANSWER CHOICES
I live in Miami Beach South of Fifth Neighborhood
I live in Miami Beach, but not in the South of Fifth Neighborhood
I am visiting Miami Beach
TOTAL
RESPONSES
86.76%
9.59%
3.65%
190
21
8
219
16 / 16
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD 6E 30B O5C
Technical Memorandum
Appendix 3-
City Reminder for the Community Survey
DocuSign Envelope ID: FDFAB43C-38ED-45C8-B097-5FBD6E30B05C
We encourage everyone to participate in our
community poll - it will be open for feedback
until June 22. Click here to take the survey.
Thanks for your interest in the First Street and
South Pointe Storwater project. These
comm unity improvem ents will significantly up date
the road design , drainage capa city an d below-
ground infrastructure in your neighborhood. At the
June T public meeting, the project team shared
some conceptual road layouts, possible
configurations and screening options with the
community.
Click _here to visit the project web page for more background information. On the page,
you ca n view the full recording of the public meeting, complete the commun ity poll and
download the presentation if you wish. Thanks for caring about community improvements
in your neighborhood. Please be in touch if you have questions or comments.
For more information, please contact Lauren Firtel, South Beach Neighborhood Affairs
Coordinator via email. laurenfi rtel@mn iamibgach fI,gov
Ta earn mnor atout the cry's rnavative nut!sties, visit yo_MB8Fig+ngAtoygcom.
Ta recucst :nu materal. alterrnte i-mat, sr Izçuaae ntepretr ;ttys-day natie requlrcc), irtrmator cn accs; fr 3r;arr with
canihiti:, angor ars ccmnmodr or ta rcvew any document a partoute Ir ars oty-;Ear:ore EraciIng, all 35.5£74.243 2rd
srlect I tr Engrh ar 2 tr 5parish, teen apron ; TY users my call a 7LI /FIc.«dn Belay Sruc).
o0@
,,A, The City of Miami Beach fights for your -
- human rights, let us fight for you!