Loading...
Amendment No.2 to Construction Manager at Risk Agreement with Burkhardt Construction , Inc. 2_ ole - 2-9 1 DocuSign Envelope ID:1 CCB5B39-68E8-4071-A62C-26D837B571 A9 AMENDMENT NO. 2 TO CONSTRUCTION MANAGER AT RISK AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND BURKHARDT CONSTRUCTION, INC. DATED JANUARY 17, 2017 FOR THE ADDITION AND REMOVAL OF PRECONSTRUCTION PHASE SERVICES RELATED TO REVISED DESIGN FOR THE LINCOLN ROAD IMPROVEMENTS PROJECT RESULTING IN A NET INCREASE OF $358,145.00 TO THE CONTRACT SUM - • ; -.42 THIS AMENDMENT NO. 2 TO CONSTRUCTION MANAGER AT RISK AGREEMENT (this "Amendment No. 2") is made and entered this day of , 2022, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (the "City"), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and BURKHARDT CONSTRUCTION, INC. having its principal office at 1400 Alabama Avenue, Suite 20, West Palm Beach, Florida 33401 (the "Construction Manager"). RECITALS WHEREAS, on January 17, 2017, pursuant to Request for Qualifications (RFQ) No. 2016-073-KB, the Mayor and City Commission adopted Resolution No. 2016- 29447, approving and authorizing the Mayor and City Clerk to execute an Construction Manager at Risk Agreement with Burkhardt Construction, Inc. (the "Agreement"), for Construction Manager at Risk Services associated with the contemplated construction of improvements and related infrastructure in the Lincoln Road district (the "Project"); and WHEREAS, the Agreement provides for the Construction Manager to act as Construction Manager At Risk to the City in connection with the construction of the Project based on the Contract Documents being prepared by James Corner Field Operations (the "Consultant") and includes preconstruction phase services and construction phase services with a Guaranteed Maximum Price (GMP) for the Project; and WHEREAS, the initial lump sum fee for Burkhardt's services during preconstruction phase was $250,190; and WHEREAS, on January 2, 2018, the City Commission approved Amendment No. 1 to the Agreement, increasing the fee by $49,220.00 to include additional preconstruction phase services associated with the extension of the geographic area of Page 1 of 3 Burkhardt Construction,Inc.,Amendment No.2 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 the Project to include the area Lincoln Road from Washington Avenue to Collins Avenue (200-300 Block); and WHEREAS, during the period between January 2018 and December 2021, a variety of external factors, including the COVID-19 pandemic and unprecedented price escalations in the construction industry, have adversely impacted the anticipated cost of the Project; and WHEREAS,on December 8, 2021, the City Commission discussed the project and directed the Administration (a) to include $5.2M of RDA funding, previously set aside, allowing the project to utilize the full, available budget of $57.6M, and (b) to pursue an amendment to the architectural and engineering design services agreement with the Consultant (the "JCFO Agreement") to revise the design to reflect the project budget constraints; and WHEREAS, on June 22, 2022, the City Commission adopted Resolution 2022- 32181 approving Amendment No. 3 to the JCFO Agreement for the revision of design for the Project; and WHEREAS, the revised design requires that the Construction Manager provide additional pre-construction services for cost estimates at various stages, project scheduling, preparation of bid packages, constructability reviews, and the preparation of a GMP; and WHEREAS, the City and Construction Manager have agreed on the terms outlined in the attached additional preconstruction services proposal which reflects an increase in fees of$399,520.00 for the additional services specified in the proposal, and a decrease in fees of $41,375.00 for the elimination of certain services, for a net increase of $358,145.00 in the fees payable to Construction Manager; WHEREAS, based on the net increase of $358,145.00 contemplated by this Amendment No. 2, the total contract sum under the CMR Agreement shall be increased to the not-to-exceed total amount of$657,555.00. NOW, THEREFORE, in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, the parties hereby agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS The Agreement is amended, as provided herein and in the additional preconstruction services proposal attached hereto and incorporated herein. Page 2 of 3 Burkhardt Construction,Inc.,Amendment No.2 t-\V DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 3. OTHER PROVISIONS. All other provisions of the Agreement are unchanged and shall remain in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: EP 9 ZQz�CITY OF MIAMI BEACH, FLORIDA Rafael E. Granado, City Clerk Dan Gelber, Mayor f o,�,""ehRea, _. ItiCORP1CRATED 5,s'•, .4.t +may ATTEST: CONSULTANT: Burkhardt Construction, Inc. •`.LT. By: t to r 14.:4,1\ rint N :$r;tta,�y'�grvi C. Print Name: Marc Kleisley ,.� i Title: vice President - • V r )10 APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION City Attorney Date Page 3 of 3 Burkhardt Construction,inc.,Amendment No.2 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 EXHIBIT A BURKHARDT CONSTRUCTION,INC. Vincent G.Burkhardt President 4k, July 26,2022 City of Miami Beach 1755 Meridian Avenue,3'Floor Miami Beach,FL 33139 Attn: CIP Department RE: Scope and fee proposal for pre-construction services RFQ No.2016-073-KB Construction Manager at Risk(CMR)for construction of Lincoln Road District Improvements To whom it may concern: Burkhardt Construction,Inc.,acting as Construction Manager at Risk(CMR),is pleased to provide the attached scope and fee proposal to the City of Miami Beach(Owner)for pre- construction services necessary to implement the Lincoln Road District Improvements outlined by the City of Miami Beach Commission and outlined by City staff on an email dated January 14, 2022. Burkhardt Construction,Inc.preconstruction services are composed of the following: 1. TASK I $ 199,560.00 2. TASK II $ 85,800.00 3. TASK III $ 56,000.00 4. TASK IV $ 58,160.00 Total $399,520.00 Please feel free to contact me directly should you have any questions regarding any of the information included in this letter or the attached schedule of pre-construction fees and services. Respectfully, Burkhardt Construction,Inc. Marc R.Kleisley Vice President Ol 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 / EXHIBIT A I BURKHARDT CONSTRUCTION, INC. .. PRECONSTRUCTION PHASE SCOPE OF SERVICES TASK I—$ 199,560.00 I. This task includes coordination with the design team. The CMR will participate in bi- weekly team progress meetings. These meetings will be attended by CMR,Design professionals, Owner and others as requested. A. Design Meetings: HOSTED BY JAMES CORNER FIELD OPERATIONS • The CMR anticipates meeting up to award of GMP contract,with the total estimated meetings being thirty(30). B. Permit Tracking and Coordination:BY JAMES CORNER FIELD OPERATIONS C. Issue Tracking and Resolution:BY JAMES CORNER FIELD OPERATIONS D. Participate in Community Meetings and Presentations • The CMR anticipates four(4)-2 day meetings. E. Schematic Design and Design Development Site Visits • The CMR anticipates four(4)-2 day site visits • The Electrical subcontractor will perform a detail review of existing electrical infrastructure including electrical rooms,panels,conduit paths and service connections in order to assess current spare capacity and available conduit paths. They anticipate 7 weeks(32 hrs/wk) • The fountain subcontractor will propose what existing fountain mechanical equipment repairs are feasible based on existing site findings. They anticipate 5 weeks(16 hrs/wk) TASK II—$85,800.00 IL This scope includes the preparation and presentation of cost estimates at various stages of design. The following activities will take place,but will not be limited to: A. Cost Estimating:The CMR will conduct quantity surveys at Schematic Design (Order of Magnitude cost estimate)and Design Development at 50%construction document stages.At the Design Development stage of the plans,we obtain numbers like square footage of concrete,number of trees proposed on site,and other quantities that will be used. Upon completion of the quantity surveys,the CMR will use their extensive in-house cost history to produce the Order of Magnitude cost estimate.The estimate will be on an Excel worksheet and will be broken out into different categories that are specific to the work that is going to be performed under each category.At the 50%construction document stage this scope will include an update/refinement of the Order of Magnitude cost estimate.The CMR will examine the 50%and 100%construction documents and conduct quantity surveys again to determine if there are any substantive changes that may materially 01/41 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 EXHIBIT A IBURKHARDT CONSTRUCTION,INC. TASK II(cont.) affect budget or time.The CMR will conduct these cost estimates based on the quantity surveys established at these design stages.These estimates will include all materials and information that has been discussed and outlined in the design meetings up to that point.(Two(2)total cost estimates are included). B. Review of Construction DocumentationNalue Engineering: The CMR will examine the construction documents,specifications,and site conditions at each plan stage to evaluate and proactively determine any conflicts,errors,misrepresentations,or potential difficulties designed or present in the site conditions.The items discovered in this process will be included in the next meeting agenda which will act as a clearinghouse for discussion and resolution.After the quantity surveys and project estimating are complete,the CMR will then look at the designed and specified construction materials,methods,and systems being used and use Burkhardt Construction Inc.'s established"lessons learned"to develop a potential value engineering list of alternatives to be made available for a decision by the team.The CMR will not suggest any products that will reduce quality and does not view this exercise as a cost cutting measure.Value Engineering will continue to take place throughout the design process.The CMR will inspect the construction documents to make sure that all prior constructability comments and recommendations have been incorporated into them.The review process will continue until all comments and best practices have been incorporated. TASK III—$56,000.00 III. The CMR will produce a pre-construction project schedule that includes deliverables to the Owner in conjunction with the Owner and the Designer.Long lead items and potential early start items may be identified as well and included in this schedule.The City will not be participating in any Owner Direct Purchasing of materials.The CMR will review the construction documents and come up with construction phasing and schedule based on the design.The schedule will be in a bar chart format and will point out specific milestones in construction for the project as well as anticipated project duration. TASK IV—$58,160.00 IV. This scope consists of the CMR preparing the Guaranteed Maximum Price and the final construction budget based on the 100%construction documents provided by the Owner/Design Team.The GMP shall consist of detailed line items for all major work to be performed. The GMP will follow the same format as the cost estimates.The following activities will take place,but will not be limited to: A. Public Advertisement:The CMR will place an ad in a south Florida newspaper.Each ad will run for ten days over two consecutive weekends as a public notice to AS/ 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 EXHIBIT A IBURKHARDT CONSTRUCTION, INC. TASK IV(cont.) subcontractors to pre-qualify with the CMR.Ads can be run in additional newspapers at the Owner's request as well. B. Subcontractor Pre-Qualification:The CMR will use a pre-qualification questionnaire to qualify subcontractors who wish to bid on the projects.The questionnaire has subcontractors address items like bonding capacity,insurance requirements,current schedule of work on hand,how many full time employees the firm has working for it, and other items that the CMR feels are necessary to have a good subcontracting pool with which to issue bid packages.The CMR will also respond to any questions the subcontractors have about prequalifying.The CMR will then create a list of prequalified bidders and review them with the team to determine if a larger pool is required. C. Bid Package Preparation: The CMR will conduct quantity surveys on the 90% construction plans using the same procedures used in the IOPCC and the 60%Cost Estimate to form scopes of work for each trade.These quantities are an in-house product used as an independent verification for use in analyzing subcontractor bids. These quantities will be put in an Excel spreadsheet and distributed to the qualified subcontractors as the bid form with the Invitation to Bid,and Instructions to Bidders. The bid packages that will be developed will be tailored to the market of prospective bidders. D. Issuance of Bid Packages:The CMR will conduct pre-bid meetings with prequalified subcontractors and conduct pre-bid tours of the project site.The CMR will then issue bid packages to all qualified subcontractors that will include the Invitation to Bid, Instructions to Bidders,and the bid form.Any questions that arise during the bidding phase will be answered in an addendum that will be sent to all bidding subcontractors.A date will be set to receive bids from all subs. This date will be firm and any subcontractor who submits after this date will be disqualified. E. Analyzing of Subcontractor Bids:After the CMR receives all qualified bids(i.e.The bidding subcontractor responds on time with a complete bid)they will then begin analyzing and comparing the subcontractor bids.The CMR will first be sure that all bids received are complete and that they acknowledge any and all addenda.Then the CMR will set up a bid comparison spreadsheet to compare which subcontractors are low in their scope of work.The CMR will conduct post bid meetings with individual subcontractors to confirm scope coverage and where necessary,create a scope coordination matrix to avoid any overlap of scope.After preparing and analyzing the comparison spreadsheets,the CMR will prepare a recommendation for the apparent low bidder in each scope of work. F. Preparation of the Guaranteed Maximum Price(GMP):After going through all these steps,the CMR will compile the GMP for the Owner. Included in this GMP will be the CMR's general conditions,construction phase fee,profit and contingency.The GMP will be presented to the owner in a book and will include all of the information listed above. sOj 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 EXHIBIT A IBURKHARDT CONSTRUCTION, INC. City of Miami Beach Scope and fee proposal for pre-construction services RFQ No.2016-073-KB Construction Manager at Risk(CMR) for Construction of Lincoln Road District Improvements Submitted:July 26,2022 Burkha• t Construction.jnc. Marc R.Klei• y Title:Vice President Accepted by: City of Miami Beach By: Printed Name Title: Date: Upon your acceptance of this letter of agreement,Burkhardt Construction,Inc.shall begin work immediately. Please return one original for our files. �,v 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID:1CCB5B39-68EB-4071-A62C-26D837B571A9 / EXHIBIT A IBURKHARDT CONSTRUCTION, INC. City of Miami Beach Scope and fee proposal for pre-construction services RFQ No. 2016-073-KB Construction Manager at Risk(CMR) for Construction of Lincoln Road District Improvements Hourly Rates for Additional Requested Pre-Construction Services Name Position Rate Vincent G.Burkhardt President $300.00 Sharon H.Burkhardt Secretary/C.P.A. $200.00 Marc R.Kleisley Vice President/Lead PM $200.00 Anthony Sabatino Senior Project Manager $150.00 Bill Zammit Snr.Vertical Project Manager $150.00 Adam Rossmell Project Manager $120.00 CJ Rhody Project Manager $120.00 Brandon Rhodes Project Manager $120.00 Kevin Brennen Asst.Project Manager $ 90.00 Nicholas Fasulo Asst.Project Manager $ 90.00 Ruben Almazan Const.Field Mgr. $100.00 Mike Vazquez Const.Field Mgr. $100.00 Karl T.Kaminski Utilities Const.Field Mgr. $100.00 Michael Parsons Utilities Const.Field Mgr. $100.00 Hemant Tank Estimator/Cost Engineer $ 75.00 Resident/Merchant Outreach $ 75.00 Sarah B.Hoadley Accounting Manager/M.B.A. $ 90.00 Katy Pantaleon Accounting $ 75.00 Brittany Darville Admin.Ass't/Clerical $ 50.00 Crystal Caldwell Admin.Ass't/Clerical $ 50.00 01 1400 Alabama Avenue•West Palm Beach,Florida 33401 •(561)659-1400•Fax(561)659-1402 DocuSign Envelope ID: 1CCB5B39-68EB-4071-A62C-26D837B571A9 EXHIBIT A Guitian, Ariel From: Marc Kleisley <marc@burkhardtconstruction.com> Sent: Tuesday,August 23, 2022 9:37 AM To: Guitian,Ariel Cc: Vega, Paola;Adam Rossmell; Gomez, David Subject: Re: Lincoln Rd - proposal [THIS MESSAGE COMES FROM AN EXTERNAL EMAIL-USE CAUTION WHEN REPLYING AND OPENING LINKS OR ATTACHMENTS] Ariel, We confirm and acknowledge that the balance remaining in the original agreement and Amendment 1 totaling $41,375.00 associated with project phasing,scheduling and the 200-300 block is work that will not be performed and shall show as a credit in Amendment 2. Our proposal dated July 26, 2022 in the amount of$399,520.00 will not be credited for work not performed. Marc On Tue, Aug 23,2022 at 9:14 AM Guitian,Ariel<ArielGuitian@miamibeachfl.gov>wrote: Marc—As discussed,Amendment 2 will include a language stating that this amendment credits for work not performed in the original agreement and Amendment 1 in the amount of$41,375.00 associated with project phasing,scheduling and the 200-300 block. Burkhardt's proposal that was received on July, 26, 2022 in the amount of$399,520.00 will not be credited for work not performed. Please confirm? Thanks MIAMIBEACH Ariel Guifian, Senior Capital Projects Coordinator OFFICE of CAPITAL IMPROVEMENT PROJECTS(CIP) AsV