Loading...
LTC 067-2004 New World Symphony Project CITY OF MIAMI BEACH Office of the City Manager Letter to Commission No. 067-2004 ~ Subject: Mayor David Dermer and Members of the City Commission Jorge M. Gonza'ezd~ ,L/' City Manager ~ NEW WORLD MPHONY PROJECT CONCEPT PLAN AND TRAFFIC STUDY Date: March 23, 2004 To: From: As reported at the City Commission meeting on March 17, 2004, in accordance with Section 2.2 of the Development Agreement dated January 5, 2004 between the City of Miami Beach and the New World Symphony (NWS), on March 9, 2004 the NWS submitted the attached Project Concept Plan and accompanying Traffic Study. The attached preferred concept plan depicts a combined building footprint of 46,000 sq. ft., encompassing the central part of surface lot and requiring the closure of Drexel Avenue at Lincoln Road. The estimated hard construction cost of the project is now estimated at $63 Million (not including garage structure) compared to the $40 million minimum contemplated in the Agreement. The total cost, including soft costs, is estimated at $90 Million. The proposed concept plan reflects the following: providing an open plaza connection between Convention Center Drive, 17th Street and Lincoln Road; creating multiple access points onto the site by separating the garage and supporUclassroom facilities from the main SoundS pace component; reorienting the parking garage frontage onto on Pennsylvania Avenue; and the proposed main exterior screen has been shifted from the south side of the building to the east side facing towards the park. At the meeting on March 9, 2004, the NWS stated the design cannot move forward until a decision is made relative to the closing of Drexel Avenue. NWS has also procured a traffic study which evaluated the closing of Drexel and finds no material adverse impacts of such. Certain alternatives were also discussed regarding enhancing Lincoln Lane North, including two-waying the street, opening it to Washington Avenue and widening the right- of-way on the south side of the Project. According to the Public Works Director, the closing of Drexel will require a public hearing process as well as coordination with and approval from the County. The review process will require an understanding of traffic patterns and pedestrian flow generated by the Project and look at current and future transit plans. The NWS indicated that the Traffic Analysis addresses many of these issues. In order to facilitate the City's review process regarding the Project Concept Plan Alternatives and pursuant to the terms of the Development Agreement, an internal meeting has been scheduled for Monday, March 29, 2004 at 2:00 PM, to include the City Manager, Planning, Public Works, RDA, NWS, Gehry's project manager, Bernard Zyschovich and possibly Miami Dade Transit Authority, prior to submitting the Project Concept Plan Alternatives to the Planning Board. March 23, 2004 NWS - Project Concept Plan and Traffic study - LTC Page 2 of 2 Since the Agreement requires NWS to submit Project Concept Plan Alternatives for the City Manager review prior to submittal to the Planning Board for their review, the NWS will resubmit the attached package to include the earlier concept plans reviewed with Frank Gehry, City staff and members of the City Commission, in October 2003. It is anticipated that the Project Concept Plan Alternatives will be presented and reviewed by the Planning Board on May 25, 2004, in accordance with the Development Agreement. After Planning Board Review, the Project Concept Plan Alternatives will be forwarded to the Mayor and City Commission for your approval. We have also asked that Frank Gehry be available for the presentation before the City Commission, when the Project Concept Plan Alternatives are presented. If you have any questions, please contact me. JMG\dJt6\rar F:\cmgr\$ALl\l TC_04\NWS_projectCOnceptPlan&TrafficStudy.CMC.rar.doc c: Christina M. Cuervo, Assistant City Manager Gehry Partners, LLP March 4, 2004 New World Symphony SoundSpace Project Concept Plan Description New World Symphony plans to develop, construct and operate a new facility on Miami Beach. The project site is on two city blocks owned by the City of Miami Beach bordered by Lincoln Lane, 17th Street, Pennsylvania Avenue, and Washington Avenue. The site is across Lincoln Lane from the Lincoln Theatre, NWS' current facility. The Project Concept Plan as described below is visually represented in the attached drawings and photographs. SoundSpace, as it is currently called, will be a new state-of-the-art facility. It will be used by NWS for educational activities, musical and related cultural events, rehearsals, Internet transmissions, television and radio broadcasts, and other uses permitted by the City of Miami Beach. The primary program feature of the project is an acoustic music space of approximately 700 seats that will be equipped as an Intemet2 classroom and transmission facility and that will also be used for music and cultural performances. NWS anticipates the new facility will contribute to the cultural life of the City of Miami Beach by creating new types of performance formats that entertain and educate the community about music. Ideas under development include attracting pedestrians from Lincoln Road for short performances, incorporating Intemet2 technology into the concert-going experience with greater frequency than has previously been done, and allowing the public to see live rehearsals and educational sessions from a viewing balcony open to walk-in traffic. In addition to the primary music space, other program elements include public lobby spaces, practice and teaching classrooms, backstage support and administrative offices for NWS. The concept design also includes a new parking structure and a park. Excluding these two items, the current building program comprises approximately 90,000 gross square feet on multiple levels, occupying a footprint of approximately 50,000 square feet. Gehry Partners' design approach connects the project to the urban street life of Lincoln Road and emphasizes the civic presence of this facility. The design goals include maximizing public parking on the site and creating a public park on the property for the City of Miami Beach by consolidating the existing surface parking. The new park will reinforce pedestrian flow from 17th Street to Lincoln Road, and create an attractive amenity for a variety of public uses. The project will respect the existing scale and architecture of the surrounding area. The current design locates SoundSpace on axis with Drexel A venue. By pushing the building to the center of the site, a forecourt is created at the main entrance on the south fayade, allowing for vehicular and/or Page I H:\private\NWS _ description.doc passenger drop off. The south facade will have a large marquee, perhaps with video enhancements, to visually connect the new building to Lincoln Road street life. The main entrance is a double height atrium space creating an attractive terminus to Drexel A venue. The lobby will wrap around three sides of the hall, offering secondary entrances on the north end of the building from 17th Street. The size and volume of SoundSpace will optimize the acoustic properties of the facility. The design goals of the music space will allow for flexible seating and acoustic configurations to serve a wide range of educational functions and performance types. As currently envisioned, SoundSpace is a separate building from the other program elements, increasing its architectural prominence on the site and optimizing public accessibility. Backstage loading will be on the north end of the building. Trucks can back up into a covered loading dock directly off 17th Street. The building massing and additional landscaping will minimize the visual impact of the loading area on the north fa~ade. The east end of the site will be a park to be developed by the City of Miami Beach, facing Washington A venue. As envisioned, the park will have a trellis structure to provide shade and opportunities for electronic sound dispersion and amplification, and an open space for public gatherings and events. Other park features include a fountain and accommodation for public art. There will be a large video screen located on the east fa~ade of SoundS pace, facing the park. While a realistic size remains to be determined, the objective is to incorporate a screen large enough for the images to be clearly seen throughout the park. The streetscape around the site will be further improved by the addition of greenery and tree planting in the park. At the west end of the site along Pennsylvania A venue is a parking structure accommodating approximately 514 spaces on four levels. Trees and landscaping will be planted along the street to screen the parking structure, and it will be set back from the street to create a wide promenade. Classrooms, practice rooms, administrative and performance support spaces will be located adjacent to the east side of the parking structure. The building massing for this portion of the school will be smaller in scale and more in keeping with the surrounding architectural context. The support spaces will face SoundSpace across an intimate outdoor area that could be used as a student gathering location. This space is also a pleasant landscaped walk across the site from 17th street, and includes pedestrian access from the parking structure to SoundSpace. There will be a covered walkway, or perhaps an underground passage, that will provide direct access from the support spaces to SoundSpace. Alternatively, the classrooms, practice rooms, administrative and performance support spaces may be located adjacent to the west fa~ade of SoundSpace, facing the east wall of the parking structure. Pedestrian access across the site will then be between the support spaces and the parking structure. This may be more desirable from a functional viewpoint, and the evolution of the design will consider each alternative in more detail. H:\privateINWS _ description. doc Page 2 Gehry Partners proposes that the city encourage the beautification of the back facades of the buildings located along Lincoln Lane across the street from the project. The proposed location of SoundS pace and the park creates an opportunity for outdoor dining facing the project. The building massing along Lincoln Lane is set back to create a wider visual corridor. This will also serve to make a more pleasant walkway for users of the garage heading to or from the eastern end of Lincoln Road. The proposal for the site is a strong urban design move, creating a prominent terminus at Drexel Avenue and linking the New World Symphony to Lincoln Road. The park significantly enhances the current site and preserves public access across the site to Lincoln Road. The new outdoor open space creates a location for future musical events, film festivals, and other presentations in a central location. This design proposal necessitates the closure of Drexel Avenue from Lincoln Lane to 17th Street. Drexel Avenue is not a major traffic thoroughfare, and the closure of this portion of the street would not adversely impact the traffic patterns in the area, as indicated in the recently completed traffic study for this project. The following provides more information for each program element: SoundSpace and public lobbies . SoundSpace seating capacity of approximately 700 . Auditorium size approximately 84' long x 68' wide x 52' high with a building footprint of 13,300 Sq. Ft. . Public spaces, ticketing, box office, reception on multiple levels . Building footprint for Entry/lobby and other public spaces is 14,300 Sq. Ft. . Stage Support - Building Footprint is 3,400 Sq. Ft. Classrooms, administrative and performance support . Administration - Programmed for 3,480 Gross Sq Ft. 1-2 Levels Building footprint is 3,120 Sq. Ft. SoundSpace operations support offices Administrative offices . Teaching and Practice Rooms - Programmed for 8,045 Gross Sq. Ft. on 1-2 Levels Building footprint is 6,650 Sq. Ft. Multi-use Rooms 7 Ensemble Rooms 15 practice rooms, and 13 individual practice rooms . Performance Support - Programmed for 5,645 Gross Sq. Ft. on 1-2 Levels Building footprint is 4,920 Sq. Ft. Principal Dressing rooms, Wardrobe, Music Library Green Room Lounge Page 3 H:\privateINWS _ description.doc Parking structure . Footprint 320' x 130' . Entry and Exit from Pennsylvania Avenue . Ground Level- 124 parking spaces . Levels 2, 3, 4 - 130 parking spaces per level Park (to be developed by the City of Miami Beach) . 65,000 Sq. Ft. (West ofNWS' Facility) . Open Air Trellis of varying height 24,000 Sq. Ft. . Public Lawn for civic events, capacity to several thousand Page 4 H :\privateINWS _ description.doc Site Plan Page 5 co Q) C) C'O a.. Q) ::l c: Q) ~ Q) x ~ o E 2 '+- c: o :;J ro > Q) W .r= +-' ::l o en '" Q) 1 c: o ~ ~ Q) w +-' en ro W --- ---- - -- Page 8 North Elevation CJ) Q) C) C'O Q.. ~ It ill!!: , " 1~~I~rt Ii!!!: 11m. {io!~--'_o ~ i :r,i , "[ 'I " \ I ,',,< .,',...~) ~pr~, 3~ .'~~.' I . "~I " .li_. '" ! ~ " 'jjc'.' I . .... :;.. , I ~ HI,I.d L- lilli, :l J .. :1 :i 1 i ~ ~i !<{:.>, Wto' -l>"1~~' i ~ z o ~ ru ..J w u.i ~ z o l- e> ~ J: Cf) ~ q,..-. z o ~ Gj ..J W w 5 z ..J o () z ::i o ~\ D ~ r~ J i ( Iffi n Iii ~ :' II flf111 1imll Rllllttr' :. ~ I ","IS ,,~ ~ ::r J ~ r~ r~. f'~ r~ If _ .--- r..~ I~ ,~ rl :) I 1-:) r.'~ I:) I~ rl-- 1:1 ~ '-:) r: ~ I,~' [I': I" ~ r!,~ l~ rl~ I ' (~ r-~ ~ r.~ ":it r~ :--:. r~f '. ..; . ....,.,,_" .' NEW WORLD ~YMPHftNY TRAFFIC IMPACT ANALYSIS 'PO ..; r'~ 12/17/03 ... .. ~ r~ . -~ .- ~ ~ -~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ rJ-.". ~ ~ -. ~ ~ '~ ~ ;, ,..,. - ..; -:. .- ..; - "I - ... .; , - o:f - <J -- <J - ~ .::> ..; .- ~ ,. ~ ,- .. .- .. - ~ - . ,') - ~ 'J 1.0 EXECUnvE SUMMARY This T raffle Analysis has been developed to measure the impact on the level of Service (lOS) at major intersections surrounding the project site, as a result of the development of the New World Symphony and adjacent park. An examination of this impact Was undertaken for two altematives for the closure of Drexel Avenue. The new facility will be located on the site currently occupied by City of Miami Beach surface parking lots. This is bound by J 7'" Street to the north, lincoln lane to the south, Washington Avenue to the east and Pennsylvania Avenue to the west. Option A This option closes Drexel Avenue between lincoln lane and 17'" Street. lincoln lane, which will become a two-way thoroughfare, will be opened for access to and from Washington Avenue. No northbound left tums will be permitted onto Washington Avenue. Option B This option closes Drexel Avenue between 17'~ Street and J 6'" Street. lincoln lane will become a one-way eastbound service street with access to Washington Avenue. No northbound left tums will be permitted onto Washington Avenue. The most reliable method of measuring the impact of a street closure or additional development is to measure their impact on major signalized intersections. These intersections are what control the capacity of a roadway network. Six study intersectionswere examined: J. 17th Street / Washington Avenue 2. J 7th Street / Drexel Avenue 3. 17th Street / Convention Center Drive 4. 17th Street /Meridian Avenue 5. J 6th Street / Washington Avenue 6. J 6th Street /Meridian Avenue Performance Was measured in level of Service, Delay and Vehicle/Capacity ratio CV/C) (essentially the measure of an intersections vehicular capacity, examined as a percentoge). Analysis was done for the pm peak, as that is generally the heaviest period of the day. 1.1 &/sting PM Peak Hour Traffic Perfonnance T raffle performance was calculated at six intersections in the vicinity of the project. Results of the existing conditions analysis indicate that only two study intersections operate worse than LOS D+, the minimum service standard allowed by the City. The majority of the intersections operate at lOS C +, indicating that the traffic network surrounding the praject functions well. 1. J 7th Street / Washington Avenue operates at LOS C+ 2. 17th Street / Drexel Avenue operates at LOS C+ 3, 17th Street / Convention Center Drive operates at LOS E+ 4. 17th Street /Meridian Avenue operates at LOS E S. J 6th Street / Washington Avenue operates at LOS C+ 6. 16th Street /Meridian Avenue operates at lOC C+ C:\Documems ond Settings\SCoS1ro\local Settings\ Temporary Internet FUes\OlKA\200312Nws Report.doc .... .... .... 1.2 PM Peak Hour Traffic Performance - Option A The results of the analysis of future traffic conditions with the implementation of Option A Indicate that traffic conditions in the study area will improve. The intersection at 17th Street and Convention Center Drive will improve from LOS E+ to LOS D, which is acceptable. The intersection at 1]'1' Street and Meridian Avenue maintains LOS E. The improvement is due to the additional vehicles generated by the project being able to move through the intersection in the east /west directions on a single light phase. These vehicles are taking advantage of unused green time that exists at that signal. This lessens individual vehicle delay enough to improved the overall level of service. 1.3 PM Peak Hour T ral6c performance . Option B Option B functions the same as Option A. Table 1: InIenedIan LOS Pelfurmance Intersection Level of Service Delay V olumelCaoacitv Existini!! lOot A lOot B Existino lOot A lOot B rlee) Exlstlni!! lOot A lOot B 17"'St/Washinaton Ave C+ IC+/C+ 25 127/27 .4 7 I .481 48 1 7'" St I Drexel Ave C+ I B+ I B+ 21/14/15 .54/.47/.47 17'" St I C Center Dr E+ I DID 55/54/54 .69/.72/.72 1 7'" St IMeridian Ave E/E/E 69176176 , .721.75/.75 1 61hSt/Washinaton Ave C+/C+/C+ 22/23 123 .57 I .57 1.57 161h St IMeridion Ave C+ /C+ IC+ 27/27/27 .71/.71171 Andlngs . It has been found that the closure of Drexel Avenue will have no adverse impact to the transportation network. In fact, the removal of this street from the network will improve the performance of the intersections at 1 r Street and Convention Center Drive. Currently this intersection operates below level of service standards required by the City of Miami Beach, In respect to the preferred option of closure, A or B, either will be appropriate. There is no quantifiable difference in the performance of either option. Table 1 details the measures of effectiveness for each option as well as the existing conditions. Only the intersection at 1 7th Street and Meridian Avenue will continue to operate below the LOS D+, required by the City of Miami Beach, but it is anticipated that this can be mitigated through a signal optimization at this intersection. Level of Service is poor for the intersections northbound and southbound legs, due to the preponderance of green time assigned to the major flow of traffic in the east/west directions. It is this green time, that is utilized to improve the LOS as the project traffic is added to the network. C:\Documents ond Setlings\SCosfro\Locol Setllngs\Temporory Inlemet Files\OLKA\200312Nws Report.doc c; r;~ rJ 1 IJ J fJ j rJ ~. ~ ,...~ . ~ ~ Figure 1: Existing Conditions -) .-~ I ~ ...j ~ , ~ -~ I ~ ~ ~ ~ .... . ) ......~ ) ) r) I - ) " ) l' " ) ) [> . r: > r'~ ~ r>- I ~ . I [~ ~ ,~..., N W-<r. 200 o 200 400 Feet Existing Conditions New World Symphony THE CORRADINO GROUP s C:\Ooc:uments and Settings\SCastro\loc:a1 Settings\ Temporary Intemet Files\OLKA\200312Nws Report.doc: I 'J ., I \ r t . D >> >> Agure 2: Option A 'n ~ ~ ~ ~ '.. ~ ,- ~ ~ . . j i ~ (l . . . . ~ ~ ~ " " N w4-E 200 o 200 400 Feet Option It An s New World Symphony THE CORRADINO GROuP C:\Oocuments ond Seltings\SCostro\Locol Settings\Temporory Internet Files\OLKA\200312Nws Report.doc [~, , , ra 1. :, [(: r~ ) fJ ) Agure 3: Option B . C I 0: -) I I J . I . I . , r-o I ' " . .' I t -' t ..::, t t .-- -t \r . ,...J . . r. I >> " ~-, . f, N W-<?-E 200 o 200 400 Feat Option "S" New World Symphony THE CORRADINO GROUP s r r 1J C:\Documents and Settings\SCastro\local Settings\ Temporary Internet Files\OLKA\200312Nw5 Report.doc , , , , , ~ ~ :) ~ , :> :> ) :) ) ) ) ) ) ) ) ) ~ ~ ) ~ ) ) ) ) ) ) 11 ~ 2.0 Introduction n "n -... 1 This Traffic Analysis has been developed to measure the impact on the level of Service (lOS) at major intersections, as a result of the development of the New World Symphony and adjacent park. An examination of this impact was undertaken for the closure of Drexel Avenue, in two alternatives. The new facility will be located on the property between 17th Street to the north, Lincoln lane to the south, Washington Av~nue to the east and Pennsylvania Avenue to the west. ~ " -~ Existing Conditions The existing condition has the study parcel occupied as surface parking. Drexel Avenue is currently a north/south street carrying traffic to and from Espanola Way, through Lincoln Road, the 17*' Street parking lots and terminating at a "T" intersection at 17th Street and the Theater of the Performing Arts. The addition of the proposed development will close Drexel Avenue. Two options have been developed to handle this closure. 1 \] ~ J 1 .' ..I Option A . This option closes Drexel Avenue between Lincoln lane and 17th Street. Lincoln Lane, which will become a two-way thoroughfare, will be opened for access to and from Washington Avenue. No northbound left turns will be permitted onto Washington Avenue. Option B This option closes Drexel Avenue between 17*' Street and 16th Street. Lincoln lane will become a one-way eastbound service street with access to Washing'ton Avenue. No northbound left turns will be permitted onto Washington Avenue. ~ 3.0 Traffic Impact Analysis Methodolagy In order to review the impact this project has on traffic in the study area, an analysis was performed, which examines the signalized intersections surrounding the site. Due to the nature of traffic flow dnd distribution, these intersections will be most dramatically affected by the addition of the theater and the change in the network configuration. Intersections outside of this area will be affected to a lesser and almost imperceptible degree. ~ f · Definition of Study Parameters Examination of the goal of the examination, and definition of the study area ] j !l J ] The most reliable method of measuring the impact of a street closure or additional development is to measure the impact on major signalized intersections. These intersections . are what control the capacity of a roadway nemork. Their performance is measured by level of Service. The following issues were undertaken in the development of this study. · Data Development · Traffic counts (six in total) · Turning movements peaks, (adjusted seasonally as required) · Inventory Intersection Geometry C:\Oocuments ond Settings\SCastro\Local Settings\ Temporary Internet flles\OLKA\200312Nws Report.doc n {] c; f:' 1 " , r\~ r~ ~ r' '~, , r' ., , r,~ , ) r~ ) [) y) f) ) f.: r: ~ r: r"~ ... . [~ . ri: . Collect Signal Timing Data . Calculate Trip Generation for applicable land uses using the PM peak hour . Distribute trips via Cardinal Trip Distribution obtained from the Miami Dade County FSUTMS model . Assign trips to transportation network . Analysis . Intersection Analysis. Signal 2000 analysis is performed on each intersection. Intersection levels of service we~ calculated with this software, which strictly follows the procedures outlined in the 2000 Highway Capacity Manual (HCM). . Required input for Signal analyses includes: . roadway geometry, tuming movement volumes, traffic signal timing (cycle lengths and phasing) . Performance was measured in terms of Level of Service, Delay and the Vehicle/Capacity rI/c) ratio. Analysis was done for the pm peak 4.0 Datu Development T rafflc impact qnalyses strive to quantify the existing conditions of a study area prior to the development of. a particular site. The specific development is then measured in terms of its , impact on,the project area. 4.1 TrafRc Counb Traffic performance was calculated for the PM Peak hour, as generally acceptable for a traffic impact analysis. These were performed on Tuesday December 2nd, 2003. Traffic counts (appendix A) were taken at six intersections: 1. 17th Street / Washington Avenue 2. 17th Street / Drexel Avenue 3. 1 7th Street / Convention Center Drive 4. 17th Street /Meridian Avenue 5. .16th Street / Washington Avenue 6. 16th Street /Meridian Avenue Geometric conditions were developed from onsite observation. Volumes were adjusted for , peak season factors as suggested by FOOT's Transportation Statistics Office. (See Appendix B) [I: n C:\Documents and Settlngs\SCastro\locol Settings\ Temporary Internet Files\OlKA\200312Nws Report.doc G f"W I I, , J , L I , . ,f . ~ Rgure 4: Study Intersections "r . ! '-"- . ". !-'" . . . . ..,." . .... ~ . . . . ~ ~ ~ ~ . . ~ . . . ...... . . - N w-<?-e Study Intersections New World Symphony THE CORRADINO GROUP 200 o 200 400 Feet s C:\Documenls and Settings\SCaslro\Locol Settings\ T emporory Internet FiJes\OlKA \20D312Nws Report.doc -- -' ..., I ,il J , J n ~~ ..... 1 ,.;:.. .....1 ~ ~~ ~.- 4.2 SllInal DaIa Signal data was collected from the computerized Miami-Dade Coun1y Traffic Control System. This data is located in Appendix 8, . . -, " . . The signal at 17'h Street and Washington Avenue is coun1y asset number 2808, , which has a 90 second cycle length in the PM Peak. . The signal at 16th Street and Washington Avenue is coun1y asset number 2806, which has a 90 second cycle length in the PM Peak. . The signal at 17'h Street and Meridian Avenue is coun1y asset number 3395, which has a 95 second cycle length in the PM Peak. . The signal at 1-rn Street and Convention Center Drive is coun1y asset number 4275, which has a 95 second cycle length in the PM Peak, . The signal at 17tto Street and Drexel Avenue is coun1y asset number 6023, which has a 95 second cycle length in the PM Peak. . The signal at 16th Street and Meridian Avenue is coun1y asset number 2746, which has a 53 second cycle length in the PM Peak, ~, . . . - . . -, . . 4.3 Trip GIllIraIIon An essential aspect of development of a quali1y traffic impact analysis is to measure the future impact of the planned development on the existing conditions. Trip generation rates were obtained from the Institute of Transportation Engineers, Trip Generation Handbook, and 6th Edition, . ' . ...... - . The New World Symphony,. as it will be developed will consist of a 700 seat theater. A peripheral use will be a municipal park of approximately three acres, The theater is ITE Land Use Code 441 and the park is Land Use Code 411. Due to low numbers of generated trips these figures were adjusted by a factor of ten ta assure a conservative estimate. This development will generate 180 total peak hour trips. -. -~ \ Table 2: Site Project Trip Generation Analysis ... , PM PEAK HOUR TRIPS Land ITE ITE TRIP IN OUT Use LU GENERATION TOTAL (Lu) Units CODE RATE % Trios % TriDs TRIPS Live , , Theater 700 Seats 441 0.2 50% 70 50% 70 140 City Park 3 Acres 411 15.9 50% 20 50% 20 40 Gross Vehicle Trips " 50% 90 50% 90 180 _I - NOTES: Due to small trip generation production during tile PM peak hour for both land uses. Trip generaUon rates were adjusted up by a factor of 10 (equivalent to 1000% Incraase) to obtain a conservaUve analysis. ,... C:\Documents and Seltlngs\SComo\Locol Selllngs\Temporory ln1emot Files\OU<A\200312Nws Report.doc r r ) ) ) ) ) ) ) ) ) >> ) ) ) ) J J t t t t ~ ~ ~ ~ . . . . . . I Trips were then distributed using the cardinal trip distribution for TAl number 626. This distribution is based on the MUATS & year 2025 lRTP Update from the Miami Dade MPO. This has been done for incoming and outgoing trips. Trip generation data can be found in APPENDIX D Agura 5: Option A - Traffic Distribution 17th $t. ........,. i I " .. .. .. N .-</-, OptIcon"A" New Worlcl Symphony s CHFfRADINO GROUP - - C:\Documents and Settlngs\sCastro\local Sellings\Tempornry Internet Fnes\OLKA\200312Nws Report.doc - , ~ '"'"', , ...." , , - , , ...., , ..-, , ) ..... t ) Figure 6: Option B . T raffle Distribution 17th St. ..-? i a: c ! i' c ; I ..... - >> -' >> , ,....., , -", ,- , , , , -, , ...... . . , , N w~, s Opllan "a" New Wand Symphony THE CORRAOINO GRO...P -, , .....' ,..... , C:\OocumenlS and Settings\SCastra\Lacal Settings\Temparary Internet Files\OLKA\200312Nws Report.dac -, ~ , , , , , , , , , , , , . . . . . . . . . . . . ~ . . . ~ ~ ~ ~ .... -. .... 5.0 AnalysIs The data collected in the categories specified above have been utilized in the methodology arrived at by the project team. The analysis takes into account LOS at key signalized intersections in the study area. Traffic counts were adjusted for a peak season and a background growth rate of 3.6% was provided for three years. This was developed by measuring the average annual daily traffic (MDT) for the MacArthur Causeway and Collins Avenue and taking the average. All analysis outputs are in Appendix E. 5.1 I.MI at Senb Level of Service (LOS) is the traffic performance measure generally accepted in traffic analysis. Levels of service range from LOS A (free flow with negligible delays) to LOS F (heavily congested with long delays). LOS B, LOS C, LOS 0 and LOS E indicate intermediate conditions. Applicable levels of service were developed from FOOT's 2002 Q/los Tables for each roadway classification. Agure 7: level of Service ... QUALITV AND LEVEL 0... Sl!RVlCE ~. _!-7""':::-:::~~~~~=:.~- A B, c 0 E F 1 "j , ) 1 , J .J i ~ ~ 5;2 &IsIIng eo.1IIons LOS Analpls Traffic performance was calculated at six intersections in the vicinity of the project. Results of the existing conditions analysis indicate that only two study intersections operate worse than LOS 0+, the minimum service standard allowed by the City. The majority of the intersections operate at LOS C+, indicating that the traffic network surrounding the project functions well. The intersection at 17'" Street and Convention Center Drive has a failing northbound approach. This approach handles traffic out of the 1 7'" Street parking garage. It is assumed that the signal phasing can be adjusted to mitigate this problem. All other legs operate at LOS C+ or better. In addition the northbound approach to the intersection at 17'h Street and Meridian Avenue fails. As does the left turn movement at the southbound approach. Again, it is assumed that signal optimization can mitigate these issues. It is apparent that deference has been provided to the majortraffic flows of east and westbound traffic. As such there. is more green time than needed for these movements. ~ Study Intersections: 1. 17th Street /Washington Avenue operates at LOS C+ 2. 17th Street / Drexel Avenue operates at LOS C+ 3. 17th Street / Convention Center Drive operates at LOS E+ 4. 17th Street /Meridian Avenue operates at LOS E 5. 16th Street / Washington Avenue operates at LOS C+ 6. 16th Street /Meridian Avenue operates at LOC C+ C:\Documenls and Seltlngs\SCostro\Locol Senlngs\Temporory Internet Files\OLKA\200312Nws Report.doc I [; 1[' I . . r.. . f' -- , r: r: t ft t '^'t r~ r: ~ r~ ~ r: . 1. l . .....~ l ~ r; G' I r: - r '. - Figure 8: Level of Servo - Existing Conditions N W-c?-E s 200 400 Feet Existing Conditions New World Symphony THE CORRAOrNO GROUP o 200 .. . C:\Documents and Seltings\SCostro\local Settlngs\Temparary Intemet Files\OlKA\2003I 2Nws Report.doc i J . 'J I n t I . Rgure 9: Level of Service - Option A ,'~ . . ~ . t -" . . . t . ;... . . r - t t t ;.. ~ , - , t I ~ , ... " N W~E 200 o 200 400 Feet Option "A" New World Symphony THe: CORRADINO GROwP . , s C:\Documenls and Seltings\SCastro\Local Settings\T emporo'ry Intemet Files\OlKA\200312Nws Report.doc G'~ ~ '" r~ V" ~ [') . ) ~ r, , r~ r' ~ , , f, ) I) , J ) ) f) ) r) l . r: t". ~ . k . r: r: / I r: , r. If p Ie FigU1810: Level of SelVice - Option B -:: " N w-<rE 200 o 200 400 Feet s C:\Documents and Settings\SCastro\locol Seltings\ T emporory Intemet Files\OlKA\200312Nws Report.doc rralfic Olreclion LoVlll Dr Service SIrMI Acce<ls Cl\lIflged Option "B" New World Symphony TI-iE CORRADINO GROUP t >> t >> >> t t . J ~ J . . . . t . ~ J t J t , . 5.4 PM Peak Hour T raffle Performance. Option A The resulls of the analysis of future traffic conditions with the implementation of Option A indicate that traffic conditions will improve. The intersection J 7'" Street and Convention Center Drive will improve from LOS E+ to LOS D, which is acceptable. The intersection at J 7th Street and Meridian maintains LOS E. The apparent extra green time at the J 7'h Street and Convention Center Drive intersection is use to move the additional trips produced by the development, through the intersection in the east/west directions in the same light phase. This makes less the individual vehicle delay and improves the overall intersection LOS. 55 PM Peak Hour Traffic Performance. Option B Option B functions the same as Option A. Tallle3: Inllrsecllan LOS Pedarmma - Intersection Level of Service , Delav V olume/Canacitv ExbtiulllOot A lOot B ExistlulllOoi A lOot B (lIeCl ' ExistlulllOot A lOot B 1 7"'StlWashinatonAve C+/C+/C+ 25/27/27 .47/.48/48 1 .,... St 1 Drexel Ave C+/B+/B+ 21/14/15 .54/.47/.47 1 .,... St 1 C Center Dr E+ 10/0 55/54/54 .69 1 .72 / .72 17'" St IMeridian Ave E/E/E 69/76/76 .72/.751.75 16111StIWashinatonAve C+ /C+ IC+ 22/23/23 .57/ .57 1.57 16111 St /Meridian Ave C+ IC+ /C+ 27/27/27 .71/.71 171 "'- Andings It has been found that the closure of Drexel Avenue will hove no adverse impact to the transportation network, In fact, the removal of this street from the network will improve the performance of the intersection at 1 7'" Stfllet and Convention Center Drive. Currently this intersection operates below level of service standards required by the City of Miami Beach. ~;..... In respect to the pfllferred option of closure, A or B, either will be appropriate. Thefll is no quantifiable difference in the performance in either. Table 3, shown above details the measures of effectiveness for each option as well as the existing conditions. Only the intersection at J 7'" Street and Meridian Avenue will continue to operate below the LOS D+, required by the City of Miami Beach, Again, this can be mitigated through an optimization of the signals. - .... - C:\Documenl$ and Seltlngs\SCastro\locol Seltinas\Temparory Intemet FiJes\OLKA\200312Nws Report.doc .... '""'\ ..... p ~ ;>t t .....t t . . t APPENDIX A - - t _l . . . . TRAFFIC COUNTS / INTERSECTION APPROACH VOLUMES -t -, ....1 I .... I .....1 -- .... .- - .- , - C:\Documenls ond Selllngs\SCastro\Locol Settings\Tempomry Internet Files\OLKA\200312Nws Repott.doc ,- , t , t , t , , t t ) t >> >> >> >> >> . >> . t >> t . ~ ~ . . . . . . ~ I - - .,.......... ..,.,.p. 199-49 NW 62 A_ File Name : Washington Avenue & 17 St MI8m~ FL JJ01S S' Cd' 00000 0 Tel: 786-661-2135 Fax: JOS-62HJ640 ite 0 e . 00 Start Date : 12/02/2003 Page : 1 - - 46 0 49 0 1fT 0 214 0 17:00 18 74 50 0 140 I 10 0 821 43 92 9 0 1441 75 53 85 0 1931 559 17:15 5 88 47 0 120 10 0 911 44 95 9 0 148 83 81 48 0 192 ' 551 17:30 10 89 33 0 112 7 0 851 47 121 12 0 180 ee 41 50 0 157 534 17:45 8 83 34 0 103 4 0 53 44 98 13 0 155 88 1fT 44 0 197 508 0IaI 37 274 184 0 475 1 0 311 17 408 43 0 8271 310 222 207 0 739 215 Grwld TOlIII 76 579 328 0 9831123 441 61 0 625 I 355 634 82 0 12711 541 474 421 0 14361 4315 Approh % 7.7 58.9 33.4 0.0 19.7 70.6 9.8 0.0 127.9 85.6 6.5 0.0 37.7 33.0 29.3 0.0 Total % 1.8 13.4 7.6 0.0 22.8 2.9 10.2 1.4 0.0 14.5 8.2 19.3 1.9 0.0 29.5 12.5 11.0 9.8 0.0 33.3, 291 190 0 522 61 237 :fl 0 335 173 405 38 0 614 290 249 229 0 758 2229 55.7 38.4 0.0 18.2 70.7 11.0 0.0 29.2 88.0 5.9 0.0 38.9 32.8 30.2 0.0 81 62 0 155 16 eo 9 0 85 43 109 10 0 162 57 76 49 0 162 584 0.954 Peek Hell' From 16:00 10 17:45. Peek 1 d 1 116:30 7581 ~ 16:15 16:00 16:30 Volume 47 310 190 0 547 61 237 37 0 335 177 428 39 0 644 280 249 229 0 Percent 8.6 56.7 34.7 0.0 18.2 70.7 11.0 0.0 27.5 86.5 6.1 0.0 38.9 32.8 30.2 0.0 I Hgh In\. 16:30 17:15 16:00 17:00 Volume 12 81 62 0 155 13 88 10 0 91 45 113 13 0 1711 75 53 85 0 1931 Poek FlIClor 0.882 0.920 , 0.942 0.9821 ..... ill , -, , ....., , , , , --, , -) ) ) - ) ) -) ) ....) ) >> ) . -) ) -) ~ . -~ - ) r-) ) ) - . . ,-. . _I ,..., , , Ir,,_r..DI'p. J99-49 NW 62 A_ Ml8m~ FL 33015 Tel: 786-663-2135 Fax: 305-62HJ640 File Name : Drexel Ave &17 St Site Code : 00000000 Start Date : 12/02/2003 Page : 1 17:00 17:15 17:30 17:45 Tctal Gnind Tctal /lWd1 % Tctal % o o o o o o 0.0 0.0 1 23 17 14 70 0' 19 01 18 o ~ 13 o 12 o 62 01132 10.3 0.0 4.3 146 135 153 123 557 1144 89.7 37.4 o 185 I 25 o 153 2B o 186 20 o 135 10 o 619 83 o o o o o o 22 o 14 o 20 o 31 o IS7 o 162 0.0 62.3 0.0 5.3 o o o o o o o o o o 162 I 394 194 I 389 1921 3llI\ 198. 3n 794! 1553 14751 3081 4&2 o o o o o o o o o o o 0.0 0.0 o o o o o o 0.0 0.0 47 42 40 41 170 3101 10.11 o 174 8 o 181 13 o 182 10 o 183 13 o no 44 1276 I 148 /47.7 41.7 4.8 o 0.0 0.0 o 0.0 0.0 o 0.0 0.0 o 13711 0.0 93.5 0.0 45,1 98 6.5 3.1 o 0.0 0.0 o 0.0 0.0 Left 0 0 0 0 Il4 592 0 0 6561 89 0 70 0 159 0 726 47 0 773 1588 0.0 0.0 0.0 9.8 90.2 0.0 0.0 .56.0 0.0 44-0 0.0 0.0 93.9 8.1 0.0 0 0 0 0 14 156 0 0 Inl 18 0 14 0 30 0 189 18 0 :!OS: 4I1T 0.975' Peek HclII' Fran 16:00 to 17:45. Peak 1 011 116:00 117:00 118:45 ~ 16:00 857 I 83 I Volume . 0 0 0 0 0' 70 561 0 0 0 87 0 170 I 0 726 47 0 7731 P&rcert 110.7 89.3 0.0 0.0 148.8 0.0 51.2 0.0 0.0 93.9 6.1 o,p I I-Igh lot. 18:45 118:00 117:00 18:45 I Volume 0 0 0 0 o 16 160 0 0 176 25 0 22 0 47' 0 189 18 0 0.~1 Peak Factor 0.9331 0.9041 . . . t . . . . . . . ~ . . ~ . . t t t t t t t t t t t ~ ~ "U : SII8tTrme: ~-FadOr ~ 16:00 111:15 111:30 18:45 --, TaIaI 17:00 29 17:18 40 17:30 3l! 17:48' 2ll TQllII 128 GIlIld TtUI 229 Appn:h " 44.6 Tot.. " 8.2 ea-.uan CenIM Dr ~~Pc' h l at '"1~-- 1, \5' l.g~ 3l! 0 4& 0 29 8 33 0 28 3 31 (I 11l3-'~ 1:1ll 0 3 30 (I 82 5 34 0 79, 3 3e 0 1'1 3 33 0 61 14 133" - 0 u 273 , 'ZT 2118 (I 5.3 6CI.2 0.0 0.7 6.9 (1.0 5 34 II"MfraIIfft.U, I.DqA J!J!J-49 NW 6Z A_us MIamI, FL 33OJ5 Td: 786,66:].2J.35 Far. 305002100640 ... - FIle Name : Convention Center &17 St Site Code : 00000000 Start Date: 12/0212003 Page : 1 GnlwoP_V~, Tnldco I 17 SI I eor-.tIcn Cell.... Dr , W_ . N_ Afip: ~"-"'hIo' R1gh 1 Pea I APp.r- ~ 1 TtUI . ~,h" ,_ tl " Total! I uah ! 1,0' 1.0 f.OT 1.0 I 1-' 1.0 1,0 , 31",'-0" 81 31 0 11200" 2' 0 78 1 139 50 0 190 ,,8 0 70 0 150 49 (I 199 '16 0 6a 0 1511 35 0 1113 I 16 0 241 , 1 !l2B' jee- 00 . 0 6114 72 0 a 130 40 o 147 48 1 1211 46 3 129 44 6 !!3!1 177 514 I 7 1063 :l4.2 , 0.5 75.3 24.2 13.61 o,a 26.6 9.2 o o o o o o 0,0 0.0 172 25 195 28 175: 19 176! 10 7rar-~ o o (I o (I o 161 0.0 5(1,9 0.0 4.3 'inf--- EIIl_ ' I.eII Thto I'illglil Peel: API>. ~ h ' , i "I I<>!!'i__ TtUI' 1.0 .1!!J 1.0, 1.0, 0-00167' fr-ooo 179 I :16T o 32 , 0 172 11 0 183 i 483 o 40 ' I 131 la 0 144 . 453 o 30 0 189 18 0 20ll ! 41lD 1 ,- :i4F- 001 659 51 0 71" 1'i93 22 14 20 31 67 o 41: o 421 O 39' o 41 I o "1611'1 o 174 o 181 1 182 o 183 I 720 14121'54 48.7 38.0 4.1 1 0.3 0.0 3161 2 1379 0.1 83.5 8.5 0.1 37.1 6 12 10 13 43 94 6.4 2.5 .- - (I (I o o (I o 0.0 0.0 182; 463 1113, 509 1113. 478 198 I 474 764 I 1924 1475, 3717 , - 39.7 ' '--17 Sl ! cQi;;oi>if...iceiiiirOr WMI_ ' NorIhIlound Thto ~TPed, ',00 " Afip:'~- i ~-Rf,jli'[Pea, ua h t, ~__~ I . TctaI Left h t .-.!.l App. Total o 274 i i I I 79' o 147 CaMInIlcn Ci'iiii1iI_oooo,-,-", ' So.dI1bOJnd ' I Sterlnme :L;T~[~l ~ = I left _HCU' F",," .6:00 10 17:48. ".... I or 1 1_18:45 Wume 129 14 131 0 P....... 47,1 5.1 47.6 0.0 Hgh 101. 17:,15 _ 40 _FlICIcr 3 564 168 0.4 76.7 22.9 _ Hour FftlI11 16:00 10 17:0\5. 1'_, 011 ~16:48 Vol..... 129 14 131 0 Pereenl 47.1 5.1 47.6 0.0 Hal> Int. 17:1S VoIYme 40 5 34 0 P"",,FacIO' c 18:30 274 2 , 0.3 . 16:30 79 0 0.867 : S8S 172 77. I 22.7 HID 49 48 o 0.0 o 735 1116' 28 o 0.0 o 759 188 0._ 68 ~7 17:00 112 48.5 17:00 2!l o 70 0,0 44.3 o o 67 0.0 51.5 o 22 o 0.0 156 . 1 728 0.1 113.9 o 181 14 42~ o o 0.0 o i 16:45 169 1 728 0.1 93.9 16:45 47 0 169 o.M '"' 6.0 12 48 6.0 16 o 0,0 773 i 1940 o I 19310.= - -, (I 0,0 o m 20S 0.943 - - ... r-' r ,.... - .- ,., t ~ t ~ , ~ , , , , ) , , ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) . . . t t - - .._~ "'-/h 199-49 NW 62 A_ File Name : Washington Avenue & 1651 MWni, R. 33015 , S't Cod : 00000000 Tel: 786-663-2135 F6x: 3D5-621-<J64tJ lee Start Date : 12/0312003 Page : 1 1--~ashIl'Cllcn AVtttIii ,n.. , - ---~- - ,J.,~_"-" =~ ---: StlO1llrne LeII ,~iR1gr 0 App. I App., LeII' TI1ro I R1gh; Peel' App. I ~ ,~ ... .' !JILh , t . ' Total, TCI8I' ;~ . TC181 Total , Fact<r. 1.(ltl, ; 1. i 1. ' I l.oi 1.0 1.0.. '1,0.::- I 11l:1lO fir 1>>'" 211 0 175: 203' 17 25 24 0 861 50e 16:15 6 118 33 0 38 l111i 833Z7 086471 16:30 9 131 31 0 24 113' 13 26 Z7 0 86 48ll 11l:411 13 141 35 0 Z7 1751 B 16 22 0 48 , 475 TalaI 47 517 128 0 119 ,142 , 46 100 100" '0 248: 11119 17:00 15 146 32 0 193 i 2 32 23 0 57' 23 127 5 0 155 ! 15 22 14 0 51 ' 460 17:15 7 135 31 0 173 . 3 31 18 0 $2' 19 147 17 o -ij 18 'ZI' 23 0 86 I 478 17:30 18 112 37 0 187 3 44 23 0 70 32 152 1\ o 193 14 23 31-+-Jhi 17:45 12 146 38 0 194 ' 4 24 19 0 47 24 159 12 o 1~ 2li 17 33 0 70 506 TC181 52 !l3O" l:l6 0 7271 12 131 'M'" 0 98"588 ' 43 0- ,-87-89 101" 0 7., 1 ~Talal 59 1056 264 0 141111 24 275 186 0 4651 217 1130 121 0 14681 113 1811 201 0 5031 J855 Appn:h " 7.0 74.04 18.8 0,0 5.2 59.1 35.7 0.0 14.8 77.0 8.2 0.0 . 22.5 37.6 40,0 0.0 TcIIII'Ho 2.8 27,4 6.8 0.0 38.8 0.6 7.1 4.3 0.0 12.1 5.8 211.3 3.1 0.0 38.1 : 2,1\ 4.9 5,2 0.0 13.0 ! r 18_ - App, ! Thro rRlOh~. LlIlljIJ(l.h,,-...._' .: =1 12 131 83 0 2261 98 585 43 0 726 ff7 811 101 0 2571 1936 5.3 58.0 38.7 0.0 13.5 BO.6 5.9 0.0 28.1 34.6 39.3 0.0 , 471 146 38 0 194' 4 24 19 0 24 ' 159 12 0 195 20 17 33 0 70' 50e o.~ PeIk lieu Fl'am 16:00 to 17:46. Polk 1 r:J 1 118:46 , By 18:00 ApproIch 17:00 .17:00 Volume 52 i538 138 0 727 10 14& 85 0 244 119 546 78 0 742 ff7 89 101 0 257 Perc8nt 7.2 74.1 18.7 0.0 4.1 81.1 34,8 0.0 16.0 73.5 10.5 0.0 26.1 34.6 39.3 0.0 HIgh In!. 17:46 17:30 18.:00 . 17:45 v...... 12 148 38 0 194 3 44 23 0 70 30 153 20 D 203 ' 20 17 33 0 70 _Faot... 0,937 0.871.. 0.914 ; 0.918 . - - - ... ,10, ..... , -') ~ " ..... 3 3 .....~ ) -) ~ -~ ~ ~ ,....~ ~ -~ ~ -~ :) ~ ,'# ~ ~ -~ ~ . - ~ t '-j _I - - - I~ c.'DrfI. 199-49 NW 62 A_ Mf8mI, FL 33015 7W: 786-663-2135 FIJX: 305-62HJ640 File Name: Meridian Ave &16 St Site Code : 00000000 Start Date : 12/04/2003 Page : 1 'fir."" ~ TollII 3W 72 340 104 109 "Wi 17:00 4 34 II 0 411 5 86 14 0 105 14 84 8 0 105 315 11,18 7 040 11 0 58 13 72 24 0 109 10 79 1 0 96 3118 11:30 9 53 i 0 71 15 7lI 2D 0 113; 14 81 1 0 102 410 11:45 10 eo 13 o 73 III 73 13 0 11)1' 11 73 i 0 93 3lIO TOI8I 30 171 41 "o"--z,(8 51 31i9 "'7f 0 431' 49 317 31 0 3971 1583 ~ T.... 62 3G9 74 0 495\ 92 lI92 6ll 0 6112 llll ese 180 0 832i 98 ll63 83 0 744 \ 2923 """"'" ,. 12.5 72.& 14.9 0.0 10.8 81.2 8.0 0.0 10.3 71.8 18.0 0,0 ' 13,2 76.7 11.2 0.0 T....,. 2.1 12.3 2.5 0.0 18.9 3.1 23.7 2.3 0.0 29.1 2.9 20.4 5.1 0.0 28.5 : 3.4 19.3 2.8 0.0 25.5 , _el.. A_ue ~ "SIaI1 T;;;" I.8Il R1gh , i Ajlp. LeII h t, ..~J TaIllI Peek HllurFnlln 1\1:00 10 17:46 ,Peok 1 ofl 1_11:00 4117\ 51 VcIurne 30 171 41 0 ZC8 43 398 411 0 309 71 0 431 49 317 31 0 397 ' 1583 - 12.1 71.4 18.5 0.0 8.8 81.7 9.4 0.0 11.8 71.7 16.5 0.0 12.3 79.8 7.8 0.0 High lot. 17:30 124 ! v_ a 53 9 0 71 13 101 10 0 15 7lI 20 0 113 14 81 1 0 102 i 410 Polk FllClO' i 0.953 ~ Hour t"": 1\1:00 tllI7:45 - Pelle 1 d 1 17:00 117:00 .1111:46 Apprc8I:II 17:00 431! 48 V_. 30 171 41 0 248 43 398 48 0 <1371 51 309 71 0 3;!0 33 0 399. - 12.1 71.4 18.5 0.0 8,8 81.7 1f.4 0.0 111.8 71.7 16.5 0.0 111.5 80.2 8.3 0.0 tilgh Int. 17:45 17:15 17:30 ' 17:00 Vdume 10 50 13 0 73 12 112 11 0 135 15 78 20 0 1131 14 84 8 0 108 ' PeekFlICtor 0.849 0.9021 0.954. O'll'!1 : - ., ) :> :> :> :> :> :> ~ ~ j j j :) :) :> :> J J J ) ) ) ) ) ;) ;) ) ) ) ) >> . . . . h. ~ i- &! ~ !! ~!i: ~i; ~a: !0I1!' ~ j!< ~ II ill II ~h 5 ;a ;;! a!..! ~ ' ,~ ~- ~II ~ ii ~ - -- . ,. Hi - ~ ! ~ ~ h ;! . .. .. ... tr , . .'O v ! ~ ~ ;! . .. . ~ J 0 ~ h .. .. . ~ I - - ~ pI; 1I! !L ~ ! Ii II i !llll,. '" - :: l; II "ill.. iil - II !!i.:<~ :: i @e ~ !h ~Il i II ... ;at; ,. ~II- - - J i ~ - ;a q II!! .... ...... II ~ ~ U o. N 1- h_". - ~5 'o-.s .. - -. M .. I, .. I ~ ~ j!;,,:t ;j -' .;if"" " ~ . j!; ;/ ,,:t~ ;/~j!; " e e I " " " !i a l! !i! ~ ! ! ~ i I ~ ~ I " i ~ g , ~ ~ :;; I 10 ... ~ Q e ~ ~ ~ I, - .. !!I - ili - ~ ~: II! II ilt; ~t; " r I I -,!!'Fj .. .. . I 13 :Ii! ::I g :z: ~ ~ z Q I- (J W ~ ~ I C:\Documents and Settfngs\SCastra\LocoI SeIIlngs\Temporary Intemet Files\OlKA\200312Nws Report.doc - - - - -, II ~, ';lil ,.~ ~1 lill! e" r il r dl! hi) t~~Jl {;!III ~i!Ui nUb ... ~lJbJ -.......""~~ ... ..... - - - - ... :) -) :) .-' , , -, , ......) ) -, ) ) -, ) -) ~ -~ ~ ~ en w -) :i ::) ) .... 0 -) > :c ) ~ ) i - D. ) ~ ~ z -~ 0 ~ ~ -I ~ ~ z - -, - - ,- f<.. .. ~o~~o~~;~~~!X~*!II~~ls~~I~;fi ..!~ ~ ~~s~~J~f~~~~~!~oooa~~o~ ~ li~ ~ .. !o~~ol~;~~~!x~~!S~~I~~I~;~ ~i8~~J~~~~fi~RI~oooo~~o~ ! IIi .... ~ ~~ ~ca~fC).1: alii ail !1llS me: a ill 8 0 lil 8@ Hi .... ~ l'!~ ....ca~IO.. o iii alii lIllS &li~ .. II 18 .. i i~ .. ~J ~ ... ~oi~o~'5~~~!x~ial~~ ~~1~5~ .. ~ Iftls ~ UNU~"""02 oll H ~ .. ... iii ~1~~f~~!~al~"o"02aol ~ol'lh"!x~in ~lll ~ ~ II~ I ~ I; ~ Ul8 Slo ... ~n ~~n ~~~~a~R~~~"OO"~~OU 10i~..~~~I~~!~o~~ Ill~ ~~IS ~l .. .. ~~ "'ilGfll!l~~I!~~&$! ~E~aooalOl~oiJi O2~0~;~i~~!GGg~ES~ ~~ ~~! "'() _ C");tT" (II') Go" ... ... >: I ~ "l~F"~ F " ~I~ F " ~ ~F"g~F"~ -"F"~ Fa:a ~F"~~F"~ F"g~Fa:g g g .. g 12 to to ~ .. i c .. i i !l .. i i .. ~ i i z I i i ::> i i I ~ I ~ I ~ l i 12 z 12 ~ ~ E II ~ ~ I!: is !~ ~t; lit; I ffi: ~ lI' NOU.03S~~ ~ .. '" ~I ~~ Iii H Ii ~. z! Uti glIB . i~ -I t . f~I!i1 ii!Uj Will ~IH~I ._N(11').... OaJ i of": " ~ , ~ , , , ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) >> t . I I I APPENDIX B PEAK SEASON ADJUSTMENTS - - - - -- C:\Documenls and Settlngs\SCastro\Locol Settings\Tempomry Intemet Files\OlKA\200J12Nws Report.doc - ., , ..) ) -) ) Prnlt Date: Dec/l0J2D03 Florida Department of Transportation Tronsportation Slntistillsollice ) 2002 Peak season Factor Category Report ~) MIAMI-DADE NORTH MOCF = 0;97 Category: 8700 Week .l!!!!!. ..!!. PSCF ) ---- 1 01/0112002 - 01/0512002 1.01 1.04 ,...) 2 01/0612002 - 01/12/2002 1.01 1.04 ) 3 0111312002 - 01/19/2002 1.00 1.03 4 01120/2002 - 0 1/26/2002 0.99 1.02 ) 5 01/27/2002 - 02/02/2002 0.99 1.02 ) 6 02/03/2002 . 02/09/2002 0.98 1.01 . 7 02110/2002 - 02116/2002 0.97 1.00 ) . 8 0211712002 - 02n312002 0.97 l.00 -) . 9 02/24/2002 - 03/02/2002 0.97 1.00 . 10 03/0312002 - 03109/2002 0.96 0.99 ) . 11 03/10/2002 - 03/16/2002 0.96 0.99 ....) * 12 03/17/2002 - 03/2312002 0.97 1.00 . 13 03/2412002 - 03/30/2002 0.97 1.00 ) * 14 03/31/2002 - 04106/2002 0.97 1.00 ) . 15 04/0712002 - 0411312002 0.97 '1.00 . 16 04/14/2002 - 04/20/2002 0.98 1.01 ) * 17 04/2112002 - 04/2712002 0.98 1.01 ) . 18 04/28/2002 - 05/0412002 0.98 1.01 . 19 05/0512002 - 05/1112002 0.98 ' 1.01 .....) 20 05/12/2002 - 0511812002 0.98 1.01 ) 21 05/1912002 - 05/25/2002 0.99 1.02 22 OS/2612002 - 06/0112002 U)O 1.03 .....) 23 06102/2002 . 06/08/2002 1.01 1.04 ) 24 06/09/2002 - 06115/2002 1.01 l.04 25 0611612002 - 06/22/2002 1.02 1.05 ) 26 0612312002 - 0612912002 1.02 1.05 ) 27 06130/2002 - 07/0612002 1.02 1.05 28 07/07/2002 - 07/13/2002 1.02 1.05 ) 29 07/1412002.07/2012002 1.03 1.06 -) 30 '07121/2002 - 07/27/2002 1.02 1.05 31 07/2812002 - 0810312002 1.02 1.05 ) 32 08/04/2002 - 08/1012002 1.02 1.05 -' 33 08/1112002 - 08/17/2002 1.01 1.04 34 08/18/2002 - 08/2412002 LOt 1.04 , 35 08/2512002 - 08/3112002 1.01 1.Q4 , 36 09/0112002 - 09/0712002 1.02 1.05 - 37 09/08/2002 - 0911412002 1.02 1.05 ) 38 09/15/2002 - 09121/2002 1.02 1.05 ) 39 09/22/2002 - 0912812002 1.01 1.04 40 0912912002 - 10/0512002 1.01 1.04 -) 41 10/06/2002. 10/12/2002 1.00 1.03 ) 42 10/13/2002 - 10/1912002 1.00 1.03 43 10/2012002 - 10/2612002 1.00 1.03 ~ 44 1012712002 - 1110212002 1.01 l.04 -, 45 11/03/2002 - 11/0912002 1.01 1.04 46 11110/2002 - 1111612002 1.02 1.05 47 1lI17/2002.11/23/2002 1.02 1.05 -I 48 11/24/2002 - 1113012002 1.01 1.04 49 12101/2002 - 12107/2002 1.01 1.04 50 12/0812002 - 12/14/2002 1.01 1.04 -' 51 1211512002 - 12/21/2002 1.01 1.04 52 1212212002 - 1212812002 1.01 1.04 -....... .- .'- ..... ) ) ) ) APPENDIX ( ) ;> ) ) SIGNAL DATA ) ) ) - ;) ) ;) - ) ~ - ~ if - ;j ~ .. .... !/o - - ~ ~ ~ ~ . - . . . . - . . . - . ~ I ~ -. C:\Documents and SOltings\SCaslra\LocoI Seltings\Tempolllry Internet Files\OlKA\200312Nws Report.doc - TIMING DATA FOR 2806 WASHINGTON AVE & PAT OF NSW F Y R EWW F G Y R SL 1 T 26 11 10 4 2 7 21 1 4 2 5 2 T 42 28 11 4 2 7 21 1 4 2 7 3 M 47 18 11 4 2 7 21 1 4 2 7 4 T'18 28 11 4 2 7 21 1 4 2 7 5 T 16 28 11 4 2 7 21 1 4 2 7 6 T 15 28 11 4 2 7 21 1 4 2 7 7 M 29 30 11 4 2 7 21 1 4 2 5 8 T 34 18 11 4 2 7 21 1 4 2 7 9 M 34 20 11 4 2 7 21 1 4 2 5 10 T 13 20 11 4 2 7 21 1 4 2 5 11 T 44 28 11 4 2 7 21 1 4 2 7 12 T 80 28 11 4 2 7 21 1 4 2 7 13 M 15 20 11 4 2 7 21 1 4 2 5 14 M 15 26 11 4 2 7 21 1 4 2 7 15 M 25 50 11 4 2 7 21 1 4 2 5 16 M 13 90 11 4 2 7 21 1 4 2 5 17 M 0 11 10 4 2 7 21 1 4 2 5 18 M 18 28 11 4 2 7 21 1 4 2 7 22 T 0 11 10 4 2 7 21 1 4 2 5 23 T 0 20 11 4 2 7 21 1 4 2 5 24 T 0 11 10 4 2 7 21 1 4 2 5 MIN: 7 11 21 1 5 ,... ... , , r) ) .-) ) ) r", , .....) ) .-) ) ) -) ) ~) ) ) ) ) t'"") ) 2608 TIMING DATA FOR 2808 PAT OF NSW F Y EL 1 T 4 4 16 4 5 2 T 16 20 16 4 7 3 M 21 11 16 4 7 4 T 82 20 16 4 8 5 T 32 20 16 4 8 6 T 37 19 16 4 8 7 M 23 19 16 4 8 8 T 56 11 16 4 7 9 M 56 11 16 4 7 10 T 59 11 16 4 7 11 T 62 20 16 4 7 12 T 80 20 16 4 8 13 M 5 11 16 4 1 14 M 37 19 16 4 8 15 M 45 40 16 4 8 16 M135 80 16 4 B 17 M 25 4 16 4 5 18 M 82 20 16 4 8 22 T 25 4 16 4 5 23 T 25 4 16 4 5 24 T 25 8 16 4 5 MIN: 4 16 5 .....) ) ) ,..... . ) . 2806 ..-. . -. ,...... I - ..... I - , ,-' WASHINGTON AVE & Y EWW F G Y NL 3 6 15 3 4 7 3 6 17 1 4 9 3 6 17 1 4 8 3 6 17 1 4 8 3 6 17 1 4 8 3 6 11 1 4 9 3 6 17 1 4 9 3 6 17 1 4 8 3 6 17 1 4 8 3 6 17 1 4 8 3 6 17 1 4 9 3 6 17 1 4 8 3 6 17 1 4 8 3 6 17 1 4 9 3617148 3 6 17 1 4 8 3617147 3 6 17 1 4 8 3617147 3 6 17 1 4 7 3617147 17 1 5 16 ST Y 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 17 ST (SEC: y 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 (SEC: 9 TYPE: SA) S Y M CYC 70PRE lIM PEAK 90AM PEAK 80MID MORNING 90AVERAGE 90AFTERNOON 90PM PEAK 90PM PEAK 80EARLY EVENIN 80EVENING 80LATE EVE 90llM PEAK-FLAB 90AFTERNOON-FL aOTEST - BW 90PRE PM PEAK- 11 OTEST - BW 150Y2K INBOUND/ 7 70MEMORIAL WKE 90MID-MORNING 7 70NIGHT 20/0 7 70NIGHT 20/0 7 74RECALL TEST 9 TYPE: SA) S 'f. M CYC 70PRE lIM PEAK 90AM PEAK 80MID MORNING 90AVERAGE 90AFTERNOON 90PM PEAK 90PM PEAK 80EARLY EVENIN 6 o EVEN ING 80LATE EVE 90AM PEAK-FLAS 90AFTERNOON-FL 60TEST - BW 90PRE PM PEAK- 11 OTEST - BW 150Y2K INBOUND/ 6 70MEMORIAL WKE 90MID-MORNING 70NIGHT 20/0 7 BONIGHT 20/0 70RECALL TEST '" ) ) ) ) ) ) :) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ~ ~ l I ... ..... 3395 TIMING DATA FOR 3395 17 ST/MERID. AVE & CT. (SEC: 191 TYPB: SA) PAT OF EWG G Y R XW F S yo M CYC .-. 1 T 8 57 1. 4 1 8 24 95J\M PEAK 0/6 2 T 8 57 1 4 1 B 24 95MID-DAY AVG 3 T 5 57 1 4 1 a 24 95PM PEAK 0/6 4 T 8 42 1 4 1 8 24 '7 80NIGHT & PRE- S T 8 42 1 4 1 8 24 6 80NIGHT 14/0 6 M 7 62 1 4 1 8 24 100CONV CTR IN '7 M 7 62 1 4 1 8 24 100CONV CTR OUT 8 T 8 42 1 4 1 a 24 6 80NIGHT 9/0 15 M 84 82 1 4 1 8 24 120EVACUATION 9 24 T a 42 1 4 1 a 24 7 80RECALL TEST MIN: 16 24 4275 TIMING DATA FOR 4275 CONVENTION CTR & J.'1 ST (SEC: 191 TYPE: SA) PAT OF EWW F yo R SG G Y RNW F G Y R EL Y S yo M cye 1 T 10 19 20 4 1 7 1 4 1 '7 16 2 4 1 5 3 95J\M PEAK 0/6 2 T 3 9 20 4 1 7 11 4 1 7 16 2 4 1 5 3 95MID-DAY AVG 3 T o 19 20 4 1 '7 1 4 1 '7 16 2 4 1 5 3 7 95PM PEAK 0/6 4 T o 19 20 4 1 7 1 4 1 7 16 1 4 1 5 3 7 94NIGHT & PRE- S T o 19 20 4 1 7 1 4 1 '7 16 1 4 1 5 3 6 94NIGHT 14/0 6 M 16 25 20 4 1 7 1 4 1 7 16 1 4 1 5 3 100eONV eTR IN 7 M 37 25 20 4 1 '7 1 4 1 '7 16 1 4 1 5 3 100eONV CTR OUT a T o 19 20 4 1 7 1 4 1 7 16 1 4 1 5 3 '7 94NIGHT 9/0 15 M 73 45 20 4 1 7 1 4 1 '7 16 1 4 1 5 3 120EVAeUATION 9 24 T o 19 20 4 1 '7 1 4 1 7 16 1 4 1 5 3 '7 94RECALL TEST MIN: 7 20 1 16 1 5 ,... " , r' , .-' , , ~, , -, , -~ , ~ --, , -, , ~ ~ ~ --~ ~ 6023 TIMING DATA FOR 6023 DREXEL AV << 17 STREET (SEC: 191 TYPE: SA) PAT OF EWG G Y R XW F NG G 'f R S Y M CYC 1 T 8 45 1 4 1 7 15 7 10 4. 1 95AM PEAK 0/6 2 T B 45 1 4 1 7 15 7 10 4 1 95MID-DAY AVG 3 T B 45 1 4 1 7 15 7 10 4 1 95PM PEAK 0/6 4 T B 30 1 4 1 7 15 7 10 4 1 7 BONIGHT << PRE- S T 0 30 1 4 1 7 15 7 10 4 1 BONIGHT 14./0 6 M 11 50 1 4 1 7 15 7 10 4 1 100CONV CTR IN 7 M 11 50 1 4. 1 ,7 15 7 10 4. 1 100CONV CTR OUT 8 T 8 30 1 4 1 7 15 7 10 4 1 BONIGHT 9/0 15 M 84 70 1 4 1 7 15 7 10 4 1 120EVACUATION 9 24 T 0 30 1 4. 1 7 15 7 10 4 1 80RECALL TEST MIN: 20 15 1 .- .-~ ~ ) ..... ~ ) ,-.) ~ -~ . ~ . ,.....~ . - -. _I ., , , , ) , " ) ) ) ) ) ) ) ) ) ) ) ) ) ) > > ) ) ) . . . . . . - -- ..... 12/10/2003 WED 14:31 FAX 30$ 477 6422 ~"'. l...,L..-..... _.._.....__'..---...--'...:-.--....-'..!>.~!.<!!.lY.!!!I.'J'M.... 1ZI002 ",1 .,-:.;:_ 111.ITl '1 .I,i' ~D"10Il1:' ,'If; IllS I I " I I ,..IC IVllCtI"S I 1 II". I I I I I I ' ImllL fUlmOllS III.. " I PI: ID: , I I , $ , T I I I .. 'II . PRISl InnolL I --. n:P .Iii- ...... iib- ...n ..... ..... ....e -- I 111 1111~1At - ..:.-.. . - - Z4 . . IU IlIITt"I' . I =@=Milifll -- . 1111: mE 25 FIlII IICTlot. llSI C 1 , ,- -- 1-' ....:::c. ~.ttn' a-". ..... 81. .,sa'll J;'d." ...... n=a n UABU " .na 'PlU -- I I I' 1II1IIL --:r-n - -- ...-.' n IIEJI 111 ACT, VL ~'_ I. '1 .02'. ,JlIUIE - -- :-:-:-- . U 'N. Ami fLAIl ,,0 I , '.i 'lELlOli tLlll ='~'=f1-' ... .~I BlAll' PIlAU ..0 I --- - <l.g I. I tI III CLm _o_ft:. ..-:.0.:- - $\ PI. .'EFIlIE rlAlllI I as 'lUX &lEEIl I . .. - 12 PI. UF. n. Plt -- I - --- - ,....- I at . ,III 11m z - - n u. PEt 'I - ~=1i - - - - -o- ar IAU - - ........ - ..1 DEFEAT un mElT' \ .\ W .)n uW - _..- ..-':..~ on. till Jlclllll T1i1~ . I \ I H III UCIlL -1-:..-, ---~- 'n IU .~ SU AT TIll 0 I 1 \I m "eAU - --:. - - - U \IEf USl VIR PAU .. 1 I 11 PEa Hcm . --'" - - - - n '''lUll m .. I I 12 lET 'OR.LItI - - - - - II SED INIl I PA9' T I I 'II Ull , -'- -' 17 v~F DUElt lilt COlltl ..J!... I ......--.:- ......... 00;-- I " ClI 1 - - - - -- II DU IlatU m 'I I I '. 11 FL~SlI/.tllALI "U II.' 0 I -- - - - -- I \I '1/151 OIIT - - --- --- -- I I 11 PU 11\1 - -'- -- I ,I " SOFT "ULL -- - I : IASlt t1E iMn flKt.TlOIS 1'1 II , . 0 'l E ~ : ~ ..". . r ..' .," ... ..;:....:.: :..' . '.' .. .. 1:- L'T ;C:,C, kat IWtilnt UI.. IFFSU 0\ CttLi \iN&TH' , ' , :f' t, COiTRDUtR 1& TAUt IU. 11lUE IlK. . ': 3. nm I, .ITUtAl ...0 IlEAl' lIUE Mil, I I. 'LAI'S, 'X'S' 01 ....... IEAR 1110 Vl .,. I 5. UUUIO lun at ~lfT 'OfF' I' I' .. \ IlK IREII :.' ", U. 11 ~llll 81 . . n Tl CLEU &~:! ' U IlK DYlIL I. ' Tl tlElR m 1 06 Tl tlPI ALl DED I 07 11 CLEAR tEl 1 01 TI cLIAI All lEU 2 Dr m CLEAR iff P.i ID AU CLEAR AfT p.[ n &prel H DIl CIEAI II. spmAi m ClEAR 41 Win II . PEP mn 43 lED All m CI II DEl IErOU I.E it I Of CI.C TO i011 ue S1 I 01 tlC T~ f1D 'IT B< - 1. I -' I I I - '. --' --- UR~ srlll~6! ' prseflNNBTE/) :: ~:~ :--~~- ---;;:- i. :-i~d'-ii6"~:; :i/itfiT :. __.___n-_ ~.;-; -~.-.o .o.~-~.~:-~':' ~.. -- ..- -.-: ,.__...__....~.._....--_.......--...--J-~.-: p , ~ . I, ~ (. ; \ 1 ! : :-:: ::~ ,f_. ..t!~~f.~: .~_.o ~~:~l~,?. : __._n" ,--. ~_:- ~-: .:-:-~ -~-~. :... --,..- -..: C'~\t .p.;n. , .....- t[ol";: i' .=... . - .. 'f:' ~~ : 'i: -. ~ . -" ..1 !.rT iu.tl I.tifluber. (f ~......... ....--........ -.......-..-. ......... .....-..! - n ~:::~ ~ . - MEIfJ"prA-,J AVS.;,,, ~r, ,'i. .'5 t '" ~h h, :. - .-....-...-..................... ................-....-........... .- .'. ";.' :1. .::; .". , ~z.~ . .. __.....-..-....... .__. .......__.. .__..--.--~-......,--_...-..-~.. .n_.___..' __' .__' .no'-- ..- -":' . ,... # , r' , ,...' , , -, ) ,-) , -> ) ) .-) ) .-) ) -) ) ) ......) 111101100S WED 14,'1 PAX ,oa 477 8422 ,'... . y" ..... "1/0'- DADE COONTl{ TIS liIIoos TRAme ....HA \IlTIIlVM. OlAIRAIIlI ..[ -.' "~; ~ : -~"" t" · ~ ,~tNINHt W.,IrU( ~ ~~ .Dt1N~r 1VAU'. ) --) ) >> >> ) . tR.1S j ,J.AtflllliJ*i WAa I PJA$NlI./<t; ,p"v'r ~J..c. ,~ -- ~~ ~ -. : It . 1 ." )(.I.)C +_____.....r~_____ ,--_.....' ..-.._~ ......._""_J----.. , ... '1 "4 . 11 .1 . .. ~~.. no ~6. PiIW'1"WAUI, :J' " , I. " ~~hc + ~N';J=~ ~ , 'lICj Yl' \I +1 . . : ' ~IJ ~~1fN& 7>> ,sA. 1P1iAI'T WA-~, . -N L_ 4 'A I.... _...... o. ..... 11Id118f...'. I .".,,"_." A __.IIIIIe. ...... ,t... .. ..- ..dl..t.... _--- ...._.. .. lI.n.. ...1..11"", ifllNlT~" M'1II14 ~ ClOUNn DEMIITMEIlT'Ol" TRA""'C AltD ,TRA",f'l)RTATION -I -' ..."ed ooedlllOll OIl r" Indl04'lo..' .1_'_' .PlIII..trt.. ......."t _ ~..tr"""I."'.IIO. .~ . MlRl'NAIoI ;.v,,;It/; ~_'r :~_.*-= .. ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ~ . . > . . ) - - -. - Traffic Signals , i i 1 SftII'lQllb ,_.___ -'-"+"-"-" "--. . . ---1- , I I _.._..1.. _._.1 Y \... .,./ !O '____1\/<~,_._: ___-J~ ...../"" I 1 !~ ./' I; \~ .-;'. ,- -r-" -\' - , E~_~._ I : l::ll \ I ~.. 4~75 \ , ' _ _' _ _.' ...JJtiCO.\.!L , . . I ___ \..__+-U~~, \' 2 I 1_._, _'" ....-,.+'-.'-.., , i I ' '.+'- !_-... ,___._i_ I --- ,-I i ..... ..... ...:~. T-.1..._"-t ~ i i ~ i " ~ ' . ~ -- i i \ i i , 2 08 ' 1 \ (;; --,' ---,. 1mL..-.-~ . , fJl ) N ..... - ..... - ,/ " ..__.1_--..- - ....- , I I ! - I .L I ../ . "'/-- . j --!. ..! . . . , L L L L i ' ; i , I . ; - '" , , - , , --. , , - , , Miami-Dade 1999 validation Distribution Report - , DIRECTIONAL DISTRIBUTION SUMMARY , ORIGIN \------------- CARDINAL DIRECTIONS -------------[ TOTAL I ) ZONE NNE ENE ESE SSE SSW WSW WNW NNW ) 616 TRIPS 526 0 0 0 1554 1481 1020 852 5433 ) PERCENT 9.68 0.00 0.00 0.00 28.60 27.26 18.77 15.68 - ) 617 TRIPS 942 79 91 516 911 1648 958 960 6105 PERCENT 15.43 1.29 1.49 8.45 14.92 26.99 15.69 15.72 ) ) 618 TRIPS 568 0 0 0 1171 1468 837 1009 5053 - PERCENT 11.24 0.00 0.00 0,00 23.17 29.05 16.56 19.97 ) 619 TRIPS 927 0 0 422 1124 2164 916 920 6473 ) PERCENT ,14.32 0.00 0.00 6.52 17.36 33.43 14,15 14.21 ) 620 TRIPS 2188 349 628 715 391 2070 1211 830 8382 PERCENT 26.10 4.16 7.49 8.53 4.66 24.70 14.45 9.90 ) 621 TRIPS 174 23 77 116 46 266 150 99 951 - ) PERCENT 18.30 2.42 8.10 12.20 4.84 27.97 15.77 10.41 ) 622 TRIPS 1168 433 426 1052 79 1682 947 598 6385 jl PERCENT 18,29 6.78 6.67 16.48 1.24 26.34 14.83 9.37 ' .- 623 TRIPS 303 278 321 186 27 618 350 185 2268 -. PERCENT 13,36 12.26 14.15 8,20 1.19 27.25 15.43 8.16 I 624 TRIPS 907 613 103 550 55 1254 826 455 4763 ) PERCENT 19.04 12,87 2.16 11.55 1.15 26.33 17.34 9.55 I 625 TRIPS 1038 667 65 451 202 1503 925 629 5480 PERCENT 18.94 12.17 1.19 8.23 3.69 27.43 16,88 11,48 I 626 TRIPS 1148 296 0 476 285 1676 961 1070 5912 PERCENT 19.42 5.01 0.00 8.05 4.82 28.35 16.26 18.10 627 TRIPS 1531 0 0 0 1959 3589 2557 1891 11527 PERCENT 13 .28 0.00 0.00 0.00 16.99 31.14 22.18 16.40 628 TRIPS 658 0 0 0 550 1062 982 960 4212 PERCENT 15.62 0.00 0.00 0.00 13 .06 25.21 23.31 22.79 629 TRIPS 621 0 59 298 115 928 772 732 3525 PERCENT 17.62 0.00 1. 67 8.45 3.26 26.33 21.90 20.77 630 TRIPS 536 96 75 137 90 671 578 336 2519 PERCENT 21. 28 3.81 2.98 5.44 3.57 26.64 22,95 13.34 -44- \ 1/3 \/01 ,- .. . , ~, , -, , , , , ,..., , ....., , ) ,-) ) -) ) -) ) ) -) ) -) ) -) ) ) .-) ~ -~ -I ..... I .... APPENDIX D TRIP GENERATION and DISTRIBUTION . C:\Dacumenls and Settings\SCostro\Local SeIIlngs\ Temporary Internet Files\OLKA\200312Nws Report.doc ,- ~ , -~ ) ,...~ ) > -- > ~ ,.-~ ) r) ) ) ,..... ~ ) -) ) " -) ) ) ,.-) ) Miami-Dade County MUATS TAl N' -~ \620 I '---'-''l-- 1....- I i i i .-....., ! .___.L_..__..I - I : \ J : ! ) ~ ~ ~ ,.-) ) -) ! , ! \ ~i '.--+-_. \f .. _.i_--......- 6~7 I I +--- I -) , I ' i i -....+'-..'-, ,_ _l.?~O , I I ' , \ _..._.1.__ ____.f .-- ,--,,'-'~ - , , ! ! -. .- ,. 'I -, .. I .., y , , , , , , , , , , , , , , , ~ ) ) , , , , , , , ) ) ) ) ~ . . ~ . Summary of Trip Generation Calculation For 700 Seats of Live Theatre December 05, 2003 4D,7t..{STIED 77<tf1 GEr-J " Average Standard Adjustment Rate Deviation Factor - Driveway Volume Avg. Weekday 2-way Volume 7-9 AM Peak Hour Enter 7-9 AM Peak Hour Exit 7-9 AM Peak Hour Total 4-6 PM Peak Hour Enter 4-6 PM Peak Hour Exit 4-6 PM Peak Hour Total AM Pk Hr, Generator, Enter AM Pk Hr, Generator, Exit AM Pk Hr, Generator, Total PM Pk Hr, Generator, Enter PM Pk Hr, Generator, Exit PM Pk Hr, Generator, Total Saturday 2-Way Volume Saturday Peak Hour Enter Saturday Peak Hour Exit Saturday Peak Hour Total Sunday 2-Way Volume Sunday Peak Hour Enter Sunday Peak Hour Exit Sunday Peak Hour Total 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 6th Edition, 1997. TRIP GENERATION BY MICROTRANS o o o o 70' 70 140 o o o o o o o o o o o o o 0, -- - - - - - - - - - Summary of Trip Generation Calculation For 700 Seats of Live Theatre December 05, 2003 AC:Ti../AL.. TR../I' &~, r- . ,~ ,.., ,... '. .. ....- .. .. ""- . .. .. ,. ,........ Average Standard Rate Deviation Adjustment Factor . .. Driveway Volume . .. Avg. Weekday 2-Way Volume 7-9 AM Peak Hour Enter 7-9 AM Peak Hour Exit 7-9 AM Peak Hour Total 4-6 PM Peak Hour Enter 4-6 PM Peak Hour Exit 4-6 PM Peak Hour Total AM Pk Hr, Generator, Enter AM Pk Hr, Generator, Exit AM Pk Hr, Generator, Total PM Pk Hr, Generator, Enter PM Pk Hr, Generator, Exit PM Pk Hr, Generator, Total Saturday 2-Way Volume Saturday Peak Hour Enter Saturday Peak Hour Exit Saturday Peak Hour Total Sunday 2-Way Volume SUnday Peak Hour Enter Sunday Peak Hour Exit . Sunday Peak HOur Total r- . .. . .. - . ...; ... ~ ... ,....YI ... 'fi ... -i -~ ~ ,....~ :il -~ ~ ~ -~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 6th Edition, 1997. TRIP GENERATION BY MICROTRANS ~ ~ o o o o 7 7 14 o o o o o o o o o o o o o o , -- , , , , , , , , , , , , , ) ) ) ) ) ) ) ) , , ) ) ) . . . . ..... - summary of Trip Generation Calculation For 2.5 Acres of city Park December 05, 2003 ADJUSTiZD "n<rP Gt=/'-I ..... Average standard Rate Deviation Adjustment Factor Driveway Volume Avg. Weekday 2-way Volume 1.59 1. 79 10.00 40 7-9 AM Peak Hour Enter 0.00 0.00 10.00 0 7-9 AM peak Hour Exit 0.00 0.00 10.00 0 ..... 7-9 AM peak Hour Total 0.00 0.00 10.00 0 4-6 PM peak Hour Enter 0.00 0.00 10.00 0 4~6 PM Peak Hour Exit 0.00 0.00 10.00 0 4-6 PM Peak Hour Total 0.00 0.00 10.00 0 AM Pk Hr, Generator, Enter 0.00 0.00 10.00 0 AM I?k Hr, Generator, Exit 0.00 0.00 10.00 0 AM Pk Hr, Generator, Total 0.00 0.00 10.00 0 PM Pk Hr, Generator, Enter 0.00 0.00 10.00 0 PM I?k Hr, Generator, Exit 0.00 0.00 10.00 0 PM Pk Hr, Generator, Total 0.00 0.00 10.00 0 saturday 2-Way Volume 0.00 0.00 1.00 0 saturday peak Hour Enter 0.00 0.00 1.00 0 saturday Peak Hour Exit 0.00 0.00 1.00 0 Saturday peak Hour Total 0.00 0.00 1.00 0 sunday 2-Way Volume 16.00 0.00 1.00 40 Sunday Peak Hour Enter 0.00 0.00 1.00 0 Sunday Peak Hour Exit 0.00 0.00 1.00 0 Sunday Peak Hour Total 0.00 0.00 1.00 0 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 6th Edition, 1997. TRIP GENERATION BY MICROTRANS . . . -' , r, , ,.., , , r-, , .-, , r-' , , ,...., , -, , -' , , -, th , '~ - -t m c t < C t 0 :t= t ! t Q) c: -. Q) C> . a. 'C: ,...... l- . "0 Q) . ,~ 2 . a. . S -) Ci5 - . ..I f ~ 0 0 i if v v 0 ..... ... l- I- (I) a. :e 0 ~ 'C N l- I- re ;:) 0 ! <f!. ~ ~ ~ 0 0 Ii a:: It) It) ::) 0 :z: ! Ii :e 0 i 'C N Do I- :IE z Do - <f!. ~ ~ ~ ~ ~ Ii , z Q,Q -I-w Cl ~~i N ci Lri ww ..... I-Z -w C) w W;:)Q .... ..... 1-..10 ~ ..... - CJ . S rn ~ ! 0 en <( ! 8 ('t) c ;:) ,... 5 Ii d 'C I- eD eD III ::) '... 'is 't7 i :c c i!: ~ III ~ ..I 1\1 , a. ~ ~ ::i (3 C) ~ go J i I I ~ I 01 ~ ~ . ~1 - III ~ i ~f .8 ! t~ S';.5 G> ~ =,g ~i ~ ~ :6.5 ~~ o.~ S .9 :g C :u J/ c 1 8. g t~ ='" E ~ .. '" '6 ~,g~ o ~ J! ZOm I l - I I -- I I ...... I , I .... I I ~ 0 <0 00~00 0 ON ~ ('t) ..... .... LO ('t)('t) GO .... -. ~ ~ ~ ~ 00 LOLO<O 0 .... LOOr--~ N......... en . - - . CD N CD . ~ . - . C 00 LOOr-- ~LOLO<O CI 0 ..... N........ en . ;:; :I . .Q 'iI: . ... In ,- . C - . as c C\I ....OLONLOLOO .... .- 0 . 'E ~ OOOooC"'.!C'!~ 0 0) . . . '00<000 .... . as ..... LOOoo~C\I"""" (.) . . . ... :I . 0 ::I: . .lll: . as CI) Q. . :IE . Q. - . . ..... . , . . - . ,... , r' , -' , , .--, , -, , , r- ; , , ,...., , APPENDIX E SIGNAL 2000 ANALYSIS ,...., , ) ,..... , ) -) ) ...., , , , ) .-, , -' t -I ,.... - , C:\Documents ond Soltlngs\SCaslra\l.ocol SeIllngs\T omporary Intomet Fdes\OLKA\200312Nws Roport.doc ....' .- , , , , , , ~ ) ) ) ~ ~ ~ ) ) ) ~ ~ . . ~ . . . ~ . . . Existing Conditions - - - - - - C:\Documents and Se1llngs\SCastro\locol Se1llngs\Temporary Intemet Files\OLKA\200312Nws Report.doc ~ ". , r) ) .....) ) ) ~) ) -) ) ,....) ) ) ,.... , , -) ) -' ) ) , , -, , , , , -, . - , 111- Wo"ld SympbOAY l'If PeaJt Zzj,.Ung COAd1tiOA 12/11/03 U,U:18 SIGIrAl:.2000/'l'BAPAC IV.." 1. 01. 001 - c..p...,:Lt::y llDaJ.yeb S_ary Inter..ction -"._ f!o" rDt, 1 - """1U.ngt:oJ> A..... & 17th St, D.llJ:.... of! Sat:w:at:Lon (v/o) 0.47 Veh:Lele Delay 25.0 Lev..l of! Serv:L"" C+ ------------------------------------------------- Sq 33 I Ph... 1 Phase 2 Ph... 3 _.a 4 **/** ------------------------------------------------- 1 I + + + 1 1 J I I + + + I I ++++1 11\ I 1<;+ + +> I I <++++1 1 I I ... I I ++++1 1 1 I 1++++ 1++++ ... 1 lIIo"tb 1 <+ + +>1 <+ + +>1++++> 1++++> I I I + + + I + + + 1++++ 1++++ I I . + + 1 + + + 1 v I ... I ------------------------------------------------- G/e-0.l00 I G/e-0.389 1 G/CooO.089 I G/C-0.267 I 1 (Joo 9_0" 1 Goo 3!5.0" I B- 8_0.' I Goo 24.0" J I y+a- 3.0" I Y+a.- 4.0'" 1 Y+-a- 3.0" I Y+a- 1.0" I 1 01'''' O. o' I 0.....13.3. I 0JT0056.7' 1 0.....68.9. 1 ------------------------------------------------- c_ 90 ..0 g. 76.0 eeo a 84.4t %-14.0 see _ 15.6' Peel- 0.0 .., =- 0.0' ------------------------------------------------------------------------------- ILene IWidthll 'lIe 1 Serv:L"" bbll Adj I I HCIlI ILl au..... 1 Group I Lan_I Reqd 11_ 1 SC lvph) &11 IVoJ.......' vIe I Dela,y I S 1_ 11 ------------------------------------------------------------------------------- ir llIiIn:oacb IRr+~H I 24/2 10.246 10.389 I 1148 I 1292 I 546 10.423 I 21.1 C+I 250 ~tl 1 L~ I 12/1 10.163 10.389 I 245 I 318 I 47 10.148 J 18.0 II I 37 ~tl 20,9 C+ ------------------------------------------------------------------------------- S llpproach 1Rr+12 I 24/2 10.242 10.522 I 1748 I 1811 1 560 10.309 I 12.7 8+1 204 ~tl I ~ I 12/1 10.017 10.100 I 388 1 439 I 222 10.506 I 13.0 8+1 174 ~tl 12.8 8+ ------------------------------------------------------------------------------- II Approach 26. 9 C+ IRr+2E I 24/2 10.171 10.267 I 721 1 921 I 315 10.342 I 26.9 C+l 159 ~tl I ~ I 12/1 10.185 10.261 I 143 I 214 I 73 10.326 I 27.4 C+I 72 ttl ------------------------------------------------------------------------------- " llpp"oach IR'l+U I L~ I 24/2 10.231 10,389 I 1145 I 1269 I 535 10.422 I 20.3 C+I 243 ~tl I 12/1 10.119 10.089 J 328 I 402 I 387 10.963 1 60.5 11+1 531 ttl 37.2 0+ ------------------------------------------------------------------------------- . , C:\Oocurnents and Semngs\SCostro\local Settlngs\Ternporary Internet Files\OI.J(A\200312Nws Repolt.doc . , , , , , ) , ) ~ ~ ) ) ) ) ) ) ) ) ) ) ) ) ) ) . - """\ New World symphony PM Peak Existing Condition With 22 second Exclusive Pedestrian Phase 12/11/03 16:52:50 SIGNAL2000/Tl!llU'AC rVer 1. 01. 00] - capaoi ty Analysis SUllllll8rY Intersection Averages for Int t 2 - Drexel Ave & 17th st Degree of Saturation (v/o) 0.54 Vehicle Delay 21.3 Level of Service C+ ------------------------- sq 11 **/** Phase 1 Phsse2 ------------------------- , I <++++1 ++++1 v 1 1 I I 11\ 1 I North I 1 , , I I , +>1++++> + 1++++ + I v .... <+ + + ------------------------- I G/C-O,179 I G/c-0.484 I f 0- 17.0'" 0- 46.0" 1 I Y+a- 5.0" , Y+a- 5.0" I I OFF- 0.0' , OrJa23.2' 1 ------------------------- c- 95 .ec g. 63.0 seo z 66.3' Yzl0.0 see z 10.5' Ped-22.0 ..eo = 23.2' ------------------------------------------------------------------------------- 1 ~ IW:l.dth/1 'lIe I sanrioe Ratel Adj 1 I 1104 I L I QueUe 1 Group I Lan...f Reqd used 1 @c ("Ph) @l!l IVolWll8I vIe I Delay 1 S IModel. 11 ------------------------------------------------------------~------------------ s J!pproach 45.2 D .-- ----- 110 1 290 1 218 10.724' 45.2 I D I 269 ftl 1~+Ta+LTI 12/1 10.224 10.179 ------------------------------------------------------------------------------- l!l Approach 16.6 8 --- --- orB Lor I 24/2 10.280 10.484 1 1605 1 1704 1 696 '0.408' 16.5 8 I 292 ftl I 12/1 10.329 10.484 I 141 I 183 1 78 10.415 I 17.3 B I 68 ftl ------------------------------------------------------------------------------- W Approach 19.7 B --==== ---- -- - 19.7 I 8 I 457 ftl IRor+'1'B I 24/2 10.356 10.484 1 1463 I 1563 953 10.610 ------------------------------------------------------------------------------- C;\Documents and Settings\SCostro\Locol Settings\Temporory Intemet Fdes\OLICA\200312Nws Reporl.doc ,... : , ,..." i .. , ,...' , , ~, , -, , , ....... , , -, , ......., ~ ) ) , -) ) -, , , ) ) -) ) ) -I . - .- I ..- New WOJ:14 symphony PK Peak Bxi.~ing cond1~ion 12/11/03 17:14:34 SXGINAL2000/~AC[Ver 1.01.00] - Capaoi~y Analysis s~y Xn~.J:..cUon Averages fOJ: Xn\: # 3 - Convention ct>: & 17th St. DeqJ:ee of SatuJ:ation (vIe) 0.69 Vehicle Delay 55.0 Level of Service B+ ------------------------------------------------- Sq 73 i'hase 1 phase 2 Phase 3 Phaslll 4 ""I"" ------------------------------------------------- , ' I + + + 1 I I ^ I I + + + ! I I ++++1 11\ 1<+ + +> I I f <++++1 I I v I 1 ^ I ^ ++++1 I I 1 .. 1++++ 1++++ v I North I I <+ + +>1++++> 1++++> I I I I + + + 1++++ 1++++ I 1 I + + + I v I 'v I ------------------------------------------------- G/C-O.084 1 G/c-O.263 I G/c-0.053 I G/C-O.411 I G= e.o" ! G= 25.0" I G= 5.0" I G= 39.0'" 1 I 1t+R>o 5.0" I Y+a- 5.0" I Y+:a.= 3.0" I 1'+R= 5.0" 1 I 01l'J'm O.Ot I 0"",,13 . 7'lI I' 01!T=45.31l I 0J'J!'la53.7% I ------------------------------------------------- C= 95 see G= 77.0 ..e .. 81.:l.t 11=:1.8 . 0 sea ;;II 18.9% Ped>- 0.0 .eo - 0.0' ------------------------------------------------------------------------------- 1 Lane I Width I I g/C I sQXViee Ratel Adj I 1 HCM I L I Queue I GJ:OUP 1 Lan..' 1l8qd. 11sed I @C (vph) @D I Volume I vIe I Delay I S lModel 11 ___________________________________________________________________~___M_______ N AppJ:O&ch 251.6 I' 1 I 96' 184 11.600 1 350.2 F I 561 f~l :I. I 128 I 158 11.068 1 136.6 J' I 299 ftl - I 12/1 10.233 10.084 I I 12/:1. 10.193 10.084 I IR'1'+TB I LT ------------------------------------------------------------------------------- 28.5 c S~ch 1\'J! I 12/1 'fH I 12/1 L'J! I 12/:1. - - - - 109 10.263 I :I. 10.002 1 :1.02 10.220 I 211.3 25.8 27.6 C I 115 ftl C+I 1 ftl C I :1.00, ftl 10.206 10.263 10.142 10.263 10.:1.75 10.263 223 I 329 1 310 1 414 1 487 1 463 I ------------------------------------------------------------------------------- 25.8 c+ B AppJ:oach =----- -- - I RT+TH+LT 1 24/2 10.344 10.4:1.1 I :1.:1.66 I :1.3:1.5 I 897 10.682 I 25.8 I C+I 488 ftl ----------------------------------------------------------~-------------------- 17.9 B W Approach I~+TH I LT I 24/2 10.336 10.495 I 1634 I 1726 I 952 10_552 1 18.0 B 1 427 ft! 1 12/1 10.000 10.053 I 195 1 242 I 1 10.004 1 :1.3.2 B+I 1 ftl --- -- ------------------------------------------------------------------------------- C:\Docurnen1s and Sottings\SCastro\Local Setllngs\Ternporary Internet Files\OLKA\200312Nws Report.doc "" , ~ ~ ~ , , , , ~ , , , , , , ~ , ~ ~ ~ ~ ~ , ~ ) ) , I I N_ WorJ.d Symphony PM peak Bxill1:inq Condi 1:ion SX~OOO/TBAPAC(Ver 1.01.00l - Capacity AnaJ.ysis Summary -. 12/11/03 17:23:55 '.... Interseotion Averagee for In'!: # 4 - Meri.dian Ave' 17th St. Degree of Saturati.on (vIa) 0.72 VehicJ.e Delay 69.1 LeveJ. of Serviae E -. Sq 11 **1*'" 11\ I I North , Phase 1 Phase 2 -. c- 95 .eo G- 90.0 .ea = 94.7' Y= 5.0 see = 5.3' Ped- 0.0 Ilea = O.Ot I + + + I A I 1 + + + I ++++1 1<+ + +> I <++++1 I v I A ++++1 t A 1++++ v I I <+ + +>1++++> I I + + + 1++++ I I + + + I v I G/c-O.337 I G/C-o.611 I I Goo 32.0" I Goo 58.0" I I r+a= 0.0" I Y+R= 5.0" I I orr= O.Ot I OFr-33.7' I 1 Lane IWidth/1 g/C I Sez:vi<:e Rate' Adj I 1 HCN ILl Queue 1 Group I Lanes, RAqd Used I @C (vph) eK I VolUllle I v I 0 , Delay IS, IHodel 11 - N Approaoh - - 522 11.135 117.8 210 11.B26 437.1 Ii' , 937 nl Ii' I 708 ft I IR1'+1'H ) 1.1' I 12/1 10.402 10.295 I 328 I 460 I 12/1 10.642 10.295 I 66 1 101 s Approach 11l1'+'1'H 1 loT .. -- 342 I 477 1 423 10.B87 1 50.0 D 1 540 ftl 42 I 65 I 101 11.295 I 233.4 Ii' I 263 ftl - I 12/1 10.338 10.295 I 12/1 10.524 10.295 - B Approach --- 11l1'+'1'H I loT 1 24/2 10.303 10.611 I 2073 I 209. I 788 10.375 I 1 12/1 10.281 10,611 I 316 1 363 I 99 10.273 I 209.4 Ii' -. 85.3 Ii' 9.8 A -- 9.9 A 1 267 ftl 9.1 A 1 61 ftl ------------------------------------------------------------------------------- 13.3 B+ If Approach IR1'+TH I loT I 24/2 10.301 10.611 I 2078 I 2104 1 778 10.370 I 12/1 10.557 10.611 I 311 I 358 I 274 10.765 C:\Documonts and Sellings\SCaslro\Local Seltlngs\T emporary Intemet Files\OLKA\200312Nws Report.doc ---- 9.8 1 A I 262 f1:1 23.1 I C+I 275 ftl .... ..., - r- , , r' , , ,..... . ..- , , , , -, , , , , Hew "od4 SJ/lDphony PM hak llx.isUng CotI4ition 12/11/03 17:30:40 SIGHAL2000/~EAPAcrver 1.01.00] - Capacity Analysis Summary Interseotion Averages ~or Int # 5 - Waahinqton Ave & 16~ St. Degr.. of Saturation (vIe) 0,57 Vehicle Delay 22.6 L&vel o~ Service C+ ------------------------------------- Sq 21 wI.... Phase 1 Phaae 2 Phase 3 ------------------------------------- , 11\ I I North I 1++ + 1++ I ^ I I + + + I + + I ++++1 1<+ + +> 1<+ + I <++++1 I v 1 v I ^ ++++1 I I" 1++++ v I I 1 <+ + +>1++++> 1 I 1 + + + 1++++ I I I + + + I v I ------------------------------------- I G/c=o,056 G/o.O.456 G/C=O.322 I Ga 5.0" I G=o 41.0" 1 Ga 29,0. I I y+1t'= 3.0" I Y+R- 6.0" I Y+R= 6.0" I I orr- O.Ot I Orr- S.9' I orr-61.1' I -, ..-, , - C= 90 see e- 75.0 see = 83.3' Y-15.0 see = 16.7' ~ 0.0 see _ 0.0' ------------------------------------------------------------------------------- -, I LaDe I "i4thlI g/C I Service Rate 1 Aclj I I BCM ILl Queue I Group I Lanes I aeqli t1secl I lie (vph) liB /Vol_1 vIe 1 Delay I S INcdtal 11 ------------------------------------------------------------------------------- If Approach 16.7 B _1 - - - IR'l:+U I Lor I 24/2 10.327 10.544 I 1663 I 1718 I 942 10.490 I 12/1 10.141 10.056 I 1 1 SO 1 64 10.653 13.7 8+1 329 ftl 56.2 1+1 84 ftl ----------------------------------------------------------------------~-------- -- S .Approaoh 18.8 B I R'l+'lll I L!r I 24/2 10.307 10.456 I 1366 I 1468 I 783 10.533 I 19.0 B I 350 ftl I 12/1 10.302 10.456 1 224 I 283 I 122 10.431 I 17.7 B I 103 ~tl -- ------------------------------------------------------------------------------- -, B Jlpproach .. 27.6 C 361 1 470 I 280 (0.596 I 27.6 C I 279 ft) I RT+'lIl+LT I 12/1 10,273 10.322 ------------------------------------------------------------------------------- ..- " Approach - - 45.3 D 45,3 I 0 I 397 ftl I R'l:+TH+LT [ 12/1 10.353 10.322 1 280 1 376 [ 320 10,851 ------------------------------------------------------------------------------- ,..... , ..... r- C:\Documenls and Sellings\SCastra\Local Sellings\Temporary Internet Flles\OLKA\200312Nws Reporl.doc .... , ~ ~ , , . . . >> >> >> ~ ~ . ~ t I I I I I N_ World Symphony PM Peak Existing Condition 12/11/03 17:39:17 SXGNAL2000/TEAPAC[ver 1.01.001 - Capaaity Analysis Summary Xnt:erseotLan Averag.. for Xnt f 6 - Meridian Ave" 16t:h St:. Degree of Sat:uratLon (vI 0) 0.71 Vehiole Delay 26.9 Level. of Service C+ ------------------------- 8q 11 LD/** Pltase 1 Phase 2 ------------------------- 11\ I 1 North I I + + + I ^ I I + + + 1 ++++1 1<+ + +> I <++++ t I v I ^ ++++1 I ^ 1++++ V 1 I <+ + +>1++++> 1 I + + + 1++++ I I + + +1 v I ...... .... ------------------------- 1 G{0a0.367 I G/0a0.522 I 1 G= 33.0" I a- &7,0" I 1 Y+R= 5.0" I Y+R= 5.0" I 1 orr- 0.0' I OFr-42.2' I Oa 90 8eo G- 90.0 seo = 88.9' Y=10.0 sea = 11.1' Ped- 0.0 see - 0.0' ------------------------- ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- I Lana (Widt:h/l <;I{C I Service Rat:el Adj 1 I HeM I L I Queue 1 Group I Lanes I :Reqd Used I @C (vph) @E I Volume I vIa I De1.ay I S IMoclel 11 N Approach 24.4 C+ -- _.&:ll I 12/1 10.282 10.367 I 433 I 561 I 272 10.485 I 24.9 I C+I 249 ftt I 12/1 10.191 10.367 I 123 I 169 I 38 10.213 1 20.2 I C+I 33 ft:1 -" ---- ""'" .. - ------------------------------------------------------------------------------- I R'1'+'rH I L'f S Approach 38.3 D+ ----- --- -~ ------------------------------------------------------------------------------- I R'1'+'rH I L'f I 12/1 10.399 10.367 I 433 I 561 I 475 10.847 I 12/1 10.169 10.367 I 259 I 339 I 63 10.186 40.8 D+I 549 ftl 19.6 B I 52 ft:1 E Approach 24.5 C+ -- --- ..._-=------ - ------------------------------------------------------------------------------- IR'f~H+L'f1 12/1 10.477 10.522 ( 684 I 750 I 608 10.811 24.5 C+I 598 ftl W Approach 18.9 B -----------------------------------------------------------------------~------- IRT+TH+LTI 12/1 10,424 10.522 1 652 I 717 1 496 10.692 I 18.9 1 B 436 ftl - -- ----- - .... , ...., , , Option A .... , , -, , ....' , , .... , , ,.....~ , ,....' , ) ) ) ....) ) ) ) ) .... . . ..... . . .... t t ....t t ....~ .... r-~ C:\Documents and Setlings\SCastro\Locol Setlings\Temporary Internet F~..\OLKA\200312Nws Report.doc . .... , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , N_ World Symphony PM' Peak Option 'A' Condition 12/11/03 17:43:33 SIGNAL2000/TEAPAC[Ver 1.01.00] - Capaoity Analysis Summary Interseotion Averag.s ~or Int 4# 1 - Washington Ave & 17th St. Degree o~ Saturation (v/a) 0.48 Vehiole Delay 26.9 Level of Servioe C+ Sq 33 **/** /1\ 1 I North 1 ------------------------------------------------- Phase 1 Phase 2 Phase 3 Phase' 4 ------------------------------------------------- I + + + I I ^ I 1 + + + 1 I ++++1 1<+ + +> 1 1 <++++1 I v 1 ^ I ^ ++++1 ^ I ^ 1++++ 1++++ v 1 <+ + +>1 <+ + +>1++++> 1++++> I + + + I + + + 1++++ 1++++ I + + + J + + + I v I v I ------------------------------------------------- G/C=0.100 I G/C-0.389 1 G/C=0.089 I G/C=0.267 I I a- g.O" I Goo 35.0" I Goo 8.0" I Go: 24.0" I I Y+R=o 3.0" I Y+R=o 4.0" 1 Y+R= 3.0" I Y+R= 4.0" I 1 orr- 0.0% I OFr-13.3% I OFF-56.7% I Orr-68.9% I ------------------------------------------------- -----------------------.-------------------------------------------------------- C= 90 see G= 76.0 seo = 84.4% Y-14.0 see = 15.6% Ped= 0.0 sea = 0.0% I Lane IWidth/1 glC I Service Rate I Adj I I HOd ILl Queue I Group I Lanes I Reqd Used I @C (vph) @I!: I Volume , vIa I Delay I S IModel 11 N Approach -----~---------------'---------------------------------------------------------- C+ IRT+TH I LT 21.0 --- ===--= _=======as:= -- I 24/2 10.248 10.389 1 1146 I 1290 I 12/1 10.163 10.38g I 245 1 318 555 10.430 I 21.2 C+I 255 ~tf 47 10.148 I 18.0 B I 37 ftl S Approach ------------------------------------------------------------------------------- 12.g B+ ..... IRT+TH 1 L'l' -==-= ===- - -- -- 1 24/2 10.242 10.522 I 1748 I 1811 I 560 10.309 I 12/1 10.023 10.100 I 385 I 435 I 230 10.529 12.7 B+I 204 ~tl 13.4 B+I 184 ftl I!: Approach ------------------------------------------------------------------------------- 27.1 C+ .........:t..._ I RT+TH 1 L'l' ~ __ ...l::===_ I 24/2 10.174 10.267 I 722 1 12/1 10.187 10.267 I 139 ======= ---==~ 922 I 331 10.359 I 27.0 C+I 168 ~tl 209 I 73 10.333 I 27.5 C+I 72 ftl W Approach ------------------------------------------------------------------------------- 42.2 D+ - IRT+'l'H I L'l' -=====--= - ...-. -============ -= .....==== I 24/2 10.236 10.389 I 1147 I 12/1 10.128 10.089 I 321 1271 I 556 10.437 394 I 396 11.005 20.5 I C+I 254 ftl 72.6 I E I 585 ~tl ... ------------------------------------------------------------------------------- ... ... - " , -, , ....' , , .-, , -) , -' , , -, , -, N_ World Symphony E'M Peak Option ' A I Condition 12/11/03 17:45:52 SIGNAL2000/DAPAC[Ver 1.01.00] - Capacity Analysis Summary Intersection Averages ror Int * 2 - Drexel Ave & 17~ St Degree or Saturation (vIe) 0.47 Vehicle Delay 14.1 Level of Service B+ ------------------------- Sq 11 **1** Phase 1 Phase 2 ------------------------- . 11\ 1 1 North I <+ + + I I I I 1 +>1++++> + 1 ++++ + 1 ,v I I <++++1 ++++1 v I I I I ,... ) ) ) ) -) >> -, , , t . -. I ------------------------- 1 G/C-0.2001 G/C=0.682 I 1 c;.. 17.0" 1 c;.. 58.0" I 1 Y+R= 5.0" 1 Y+R= 5.0" I I orr- 0.0% I OFT=25.9% I e- 85 see c;.. 75.0 see - 88.2% Y-10.0 see - 11.8% Pad= 0.0 see = 0.0% ------------------------- ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- I Lane I Width I I g/C I Service Rate I Adj 1 I HCM 1 L I QUeue I Group I Lanes I Reqd Used I @C (vph) @B (Volume I vIe I Delay 1 S IMode1 11 S J\pproach 511.9 B+ - --- ====== 215 1 335 1 306 10.905 I 59.9 B+I 387 ftl ------------------------------------------------------------------------------- IRT+~H+LTI 12/1 10.251 10.200 !l Approach 5.7 A ------------------------------------------------------------------------------- 1,24/2 10.260 10.682 I 2401 I 2401 I 696 10.290 I 12/1 10.350 10.682 I 279 I 315 I 111 10.352 ___ -_ ~r- - - --- ~H LT 5.7 1 A I 176 rtl 6.3 I A I 58 ftl - - _I W Approach 7.0 A ------------------------------------------------------------------------------- I 24/2 10.363 10.682 2181 I 2181 1020 10.468 I ____~ 7""_ .- -.......... -a-========= == IR~+TH 7.0 I A 295 ftl ====---=-- r""1 ,- - - ; , '" , , , , , , II , , , " . , , , , , , , , , , , , N_ World SyIIIphony PH I?e.~ Option 'A' Concli.ti.on - 12/11/03 17:53:17 SIGNAL2000/~[VElr 1.01.001 - Capaei.ty lonalysis SUIIlDIaJ:y Intersection Average. ~o:r In1; # 3 - conventi.on C'tr & 17th St, Degree of Saturati.on (v/e) 0.72 Vehi.e1e Delay 54.1 Level of Service D Sq 73 **1** PIlas. 2 Phase 3 Phase 4 1'hase 1 I + + + I I " I I + + + I I ++++1 11\ 1<+ + +> I I <++++1 I 1 v 1 " I " ++++1 I I " 1++++ 1++++ V I North I <+ + +>1++++> 1++++> I I I + + + 1 ++++ 1++++ J 1 + + + I v I v I G/e-0.084 I Q/C-o.2~3 I G/C=0.OS3 1 G/C=O.411 I 1 Goo 8.0" I Goo 25.0" I Goo 5.0" I Goo 39.0" I 1 1'+R= 5.0" 1 1'+1\== 5.0" I 1'+1\== 3.0" I 1'+1\== 5.0" I I OWF= 0.0' I OWF=l3.7' I orra45.3' I OFF-53.7' I --------------------~---------------------------- -- - C= 95 sea Goo 77:0 ..eel .. 81.1' 1'-18.0 8eo = 18.9' Ped- 0.0 see," 0..0\ -------------------------------------------------------~----_._---------------- I Lane 1 Width/l q/C I Service Rate' Adj I I ReM I L I Queue I Gr~ I Lanes' Reqc1 Used I Ie (vph) 811 IVolwDel vIe I Delay'S IHodel 11 N lopproach - -1""'-"-- ..... IRT+TH .1 LT I 12/1 10.233 10.084 I 12/1 10.193 10,084 1 I 96 I 184 11.600 1 I 128 I 158 11.068 ------------------------------------------------------------------------------- 28.5 C S,lIpp.l:oach - RT 'fH L'l I 12/1 10.206 10.263 I I 12/1 10.142 10.263 1 I 12/1 10.175 IO.2~3 1 109 10.263 I 1 10.002 1 102 10.220 I 223 I 329 I 310 I 414 1 487 I 463 I 2S!. 6 i' 350.2 r I 567 ~tl 136.6 r 1 299 ftl - 29.3 25.8 27.6 c I 115 ftl C+I 1 ~tl c I 100 nl II: Approach --------------~-----------------------------------------.---------------------- C+ - -- - -- IR!+'1'R+LTI 24/2 10.359 10.411 I 1169 I 1318 I 959 10.728 I 27.1 1 C+I S44 ftl ~-"l.'I!'- - 27.1 ------------------------------------------------------------------------------- W Approach 18.6 :e - ~--- I 24/2 10.3!i1 10.495 1 1635 1 1727 I 1019 10.590 I 18.6 B I 471 itl I 12/1 10.000 10.053 I 118 t 221 I 1 10.005 I 13.7 B+I 1 ftl IR'1'+TR I LT ------------------------------------------------------------------------------- C:\Oo<;umenls and Settings\SCastro\Lacal Settings\Temporary Internet Files\OLKA\200312Nws Report.doc ,.... " , ~ ,...., :) ,....) , ) ~) , -, , ., --- , ., ,...., , .ew World SYlllPhony PM Peak Option 'A' ConcU.tion 12/11/03 17:57:24 SIGNAL2000/~PAC[V.r 1.01,00] - Capacity Analysis Summary IntersscUon Averagell 1!or rnt It 4 - Meri.dian Ave , 17th St. Deqree of Saturation (v/c) 0,75 V.hiQl. Delay 76.4 Level of: Se=ice B Sq 11 *",/*." Phaae 1 Phase 2 11\ I 1 North 1 1 + + + 1 ^ I 1 + + + I ++++1 1<+ + +> I <++++ I 1 v I ^ ++++1 I " 1++++ v I 1 <+ ... +>1++++> I 1 + + + 1++++ 1 I + + + I v I ---) , ) ) ) -) ) -. , , --- , G/C-0.337 I G/C=O.611 I I Goo 32.0" 1 Goo 58.0" I I r+~ o. 0" I r+1\=!5. 0" I I 0...... 0.0' 1 01'J'oe33. n 1 c- 95 see G- 90.0 .se = 94.7'Y= 5.0 see = 5,3' Psd- 0,0 see _ O.Ot ------------------------------------------------------------------------------- I Lane 1 Width/ I g/C I Se~oe Ra~ 1 Adj I Group I Lanes I Reqd Used 1 @C ("Ph) liB IVolU11e 1 1 HeM IL 1 Queue I vIe I Delay I S IMOdel 11 ------------------------------------------------------------------------------- N Approach 242.9 r - - -- ------ IRT+TH 1 LT I 12/1 10.402 10.295 I 328 I 460 I 522 (1.135 I 117.8 I 12/1 10.698 10.295 I 64 I 98 I 228 12.036 I 529.3 I' 1 937 ftl I!' I 817 ftl ------------------------------------------------------------------------------- S Approach 86.1 &' -I Ia:r+'rH I LT I 12/1 10.340 10.295 1 342 1 417 I 421 10.895 1 51.3 D 550 ftl , 12/1 10.524 10.295 1 42 1 6S I 101 11.295 I 233.4 r 263 ftl - - ------------------------------------------------------------------------------- B Approaoh 10.1 B+ -- IR~ I IoT I 24/2 10.317 10.611 1 2070 I 2096 1 850 10.406 I 10.2 B+I 293 ftl I 12/1 10.293 10.611 I 295 I 341 1 99 10.290 I 9.2 A I 63 ftl ------------------------------------------------------------------------------- W Approach 15.3 B 11\T+TB I L'l' 1 24/2 /0.310 10.611 1 2081 I 2107 I 823 10.391 I 10.0 1 12/1 10.597 10.611 1 283 I 329 1 274 10.833 I 31.2 - - B+I 281 1:tl c I 308 ftl ------------------------------------------------------------------------------- ,..... r C:\Docurnenlo ond Settln9s\SCastro\Local Settings\Temporary Internet files\OLKA\200312Nws Report.doc - ~ ) > ) '1 ;, , , , ) , ., ) ., ) ) ) ) ) ) ) ) ) ~ . ~ c Ne. WOJ:lc1 8:ymphony PM Peale Opt:ion r A' ConcU t:;l.on 12/11/03 18:01:26 SIGNAL2000/TBAPAC[Ver 1.01.00] - Capacity Analysis Summary Int:.rsaot:1on Averages for :tnt:' 5 - Washing1:.on Ave , 16t:h St:. Degree of Sat:urat1on (vIol 0.57 Vehiole Delay 22.6 Level of SeJ:v1ce C+ Sq 21 LD/"'''' Pbase .2 Elha... 3 Phase 1 . 11\ I I North I 1+++ 1++ I ^ 1 1 + ++ I + + I ++++1 1<+ + +> 1<+ + I <++++1 1 v I v I ^ ++++1 I (^ 1++++ v I I 1 <+ + +>1++++> I J I +' + + 1 ++++ I 1 1 + + + 1 v , ------------------------------------- I G/C=O.056 a1C=O.456 alc-O.322 I G= !S.O" 1 G= 41.0" 1 Goo 29.0" I I Y+1lI- 3.0" I Y+R= 6.0" I Y+R- 6.0" ( f orr.- 0.0' I Orr.- 8.9' I OFT-51.1' ( C= 90 sea G= 75.0 seo = 83.3' Y-15.0 see = 16.7' Ped- 0.0 seo - 0.0' I Lane IWidt:h/ I qle I Sarvice Ra1:.el Adj ( I HCM 1 L I Queue I Gl>:oup I Lanes' Reqd Usee.'! I ee {vphl ell: (Volwae I v/c ( Delay I S IModel. 11 N Approach 16.8 B ( R!1'+TB I' LT I 24/2 10.329 10.544 I 1664 I 1719 I 850 10.494 ( 13.8 B+l 333 ftl I 12/1 10.14110.056 I 1 I 80 I 64 10.653 1 56.2 B+' 84 ft:1 S Approach 18.9 B - 1R!1'+TB , L1' ( 24/2 10.309 10.456 1 1366 I 1468 I 791 10.539 I 19.1 B 355 ftl I 12/1 10.304 10.456 1 223 I 281 J 122 10.434 I 17.7 B 103 ftl ------------------------------------------------------------------------------- B Approach 27.6 e jRT+!B+LTI 12/1 10.273 10.322 1 361 I 470 I 280 10.596 I 27.6 C 1 279 ft:1 ------------------------------------------------------------------------------- W AppJ:oach 45.3 D --------- -- tRT+TB+LTI 12/1 10.353 10.322 I 280 376' 320 (0.851 I 45.3 I D I 387 ft:1 ------------------------------------------------------------------------------- ..., """! ... .-. ') r7 ) ., ., ') --1 ') ....1 , , -- , , ,..., , ,... ,......, , > .... ) ) -) ) ....) ) ) -) >> -) ) ) -- I I , ,...l I .- r i c r New Worl.d Symphony Ji'H Peak Opt:ion 'A' Condit:ion l.2{J.J./03 18:03:41 $IGNAL2000/!/IZAPAC rVer 1.01.00] - Capaoity Analysis Summary Intereeotion AVtIlraqall :for Int" 6 - Meridian Ave " 16th st:. Deg%e. of Saturation (vIe) 0.71 VehieJ... Delay 27.1 Level. of Servioe C+ Sq 11 WI** 11\ I 1 North 1 ------------------------- Ph..e1 Phase 2 ------------------------- I + + + I A 1 I + + + r ++++1 1<+ + +> I <++++1 I v I ^ ++++, I ^ 1++++ v I I <+ +' +>1++++> I I + + + 1++++ I I + + +1 v 1 ------------------------- I G/C-0.367 I G/c-O.522 1 Goo 33.0" I Goo 47.0" I I y+a= 5.0" I Y+R- 5.0" I 1 OFF- O.Ot I OFF-42.2' 1 ------------------------- ------------------------------------------------------------------------------- c= gO see Goo 80.0 see = 88.9' Y=10.0 see = 11.1' Ped= 0.0 .eo = O.Ot 1 Lane (Width/l <;IIC I Servioe Rat:el Adj I 1 HeM 1 L I Queue 1 Group I Lanes I Reqd Used I @C (vph) @B IVo1_1 vie I Delay I S IModeJ. 11 ------------------------------------------------------------------------------- N Approach 24.5 c+ I R'f+TH ). L'l 433 I 561 1 277 10.494 I 25.1 C+I 255 ftl 121 I 166 I 38 10.217 I 20.2 C+) 33 ftl .-.- ---- J 12/1 10.285 10.367 I 12/1 10.192 10.367 ------------------------------------------------------------------------------- S App~O&ch 39.0 D+ IR'1'+TH I L'l 561 I 479 10.854' 41.5 D+' SSg ftl 335 1 63 10.188 I 19.7 B I 52 ftl -~.... - I 12/1 10.391 10.367 1 433 I 12/1 /0.170 10.367 I 256 ------------------------------------------------------------------------------- - l!l Approach 60B 10.811 I 24.5 C+I 598 ftl 24,S c+ - ...- ---- - IR'l+TH+LTI 12/1 10.477 10.522 I 6B4 1 750 ------------------------------------------------------------------------------- 11' Approach 18.9 B - - -""!' _.---a-~=--::II I RT+'1'H+L'1' I 12/1 10.424 10.522] 652 I 717 I 496 10.692 I l.8.9 I B I 436 ftl ------------------------------------------------------------------------------- t , ) t >> >> t , j , , J , , , , , . , , . , t , t , , t . . I I I " Option B ..... - .... C:\Documents ond Settings\SCostro\Locol Setlings\Temporory Intemet Files\OLKA\200312Nws Report.doc .... , , :' ;7 ~ .... :J ~ -, ., -~ ., ., ., ., ......, '1 New World S:ymphony PM Peak Option . B' Condition 12ill/03 18:06:52 SIGNAL2000/TBAPAC[Ver 1.01.00] - Capacity Analysis Summary In1:erseetion Averages for Int # 1 - Wash.ington Ave & 17th 8't. Degree of Sa'turation (v/e) 0.48 Vehicle Delay 26.9 Level of Service e+ Sq 33 **/** Phase 1 Phase 2 Phase 3 Phase 4 , , , , -, ~ -~ ~ 11\ I I North I I 1 + + + I I ^ 1 I I + + + I 1 ++++1 I 1<+ + +> I I <++++1 1 I v I ^ I ^ ++++1 I ^ 1 ^ 1++++ 1++++ v 1 I <+ + +>1 <+ + +>1++++> 1++++> I I + + + I + + + 1++++ 1++++ I I + + + I + + + I v I v I ------------------~------------------------------ I G/e-O.l00 G/C-0.389 G/e-0.089 G/e-O.267 I G= 9.0" I G= 35.0" I Go- 8.0" I G= 24.0" I I Y+R= 3.0" I Y+a= 4.0" 1 Y+R= 3.0" f Y+a- 4.0" I I 0JlT= 0.0% I 0FF-13.3% I 011'11'=56.7% I 01!'ll'=68.9% I --7 -' C= 90 see G= 76.0 see - 84.4% Y=14.0 seo = 15.6% ped- 0.0 8eo = 0.0% 1 Lane IWidth/1 'lIe I Servioe Ra1:e1 Adj I I ROil ILl Queue I Group I Lanes I Reqd Used I @C (vph) @B IVol1.U1lel vIe I Delay I S INodel 11 ~ ~ ~ -~ ~ . N Approach 21.0 e+ -==:==-- ----- ==-...... - -~ - ~ IRT+TB I LT I 24/2 10.248 10.389 I 1146 I 1290 I 12/1 10.163 10.389 I 245 I 318 555 10.430 47 10.148 21.2 I C+I 255 ftl 18.0 I B I 37 ftl ------------------------------------------------------------------------------- S Approach 12.9 B+ ====--== ---- .. ...........=-- - - --====== - >> IRT+TH I LT I 24/2 10.242 10.522 I 1748 I 1811 I 560 10.309 I 12.7 I B+I 204 ftl I 12/1 10.023 10.100 I 385 I 435 I 230 10.529 I 13.4 I B+I 184 ftl ------------------------------------------------------------------------------- . >> >> E Approach 27.1 C+ == ----==--- -=-====-=-----==---~ -===================== IRT+TB J L'l' I 24/2 10.174 10.267 I 722 I 922 I 331 10.359 1 12/1 10.187 10.267 I 139 I 209 I 73 10.333 27.0 I C+I 168 ftl 27.5 I C+I 72 ftl -. ------------------------------------------------------------------------------- W Approach 42.2 D+ ====- ======= --===========-===--====- - -.-- IRT+TH I LT I 24/2 10.236 10.389 I 1147 I 1271 I 556 10.437 I 20.5 C+1254 ftl I 12/1 10.128 10.089 I 321 I 394 I 396 11.005 I 72.6 E I 585 f'tl ------------------------------------------------------------------------------- r. , . r' I · "" J '" :J ~.. j :J :J :J :J :J :J ':1 ':1 ., , , , , , '1 '1 , , , , , , , , , , , , , , , , , , N_ World Symphony PM Peak Option 'B' Condition 12/11/03 18:08:45 srGNAL2000/TZAPAC[Ver 1.01.00] - Capacity Analysis Summary rnteraection Average. for rnt # 2 - Drexel Ave & 17th St Degree of Saturation (v/c) 0.47 Vehicle Delay 14.5 Level of Service B+ Sq 11 **/** Pha.e 1 Phase 2 /1\ I I North I <+ + + 1 1 1 I I +>1++++> + 1++++ + I v I I <++++1 ++++1 v I I 1 I - G/C-0.200 I G/C=0.682 I G= 17.0" I G= 58.0" 1 Y+a= 5.0" I y+Et- 5.0" I OFF- 0.0% , OFF=25.9% I C- 85 seo ,G= 75.0 seo" 88.2% Y=lO.O see a 11.8% Pad- 0.0 see" 0.0% ------------------------------------------------------------------------------- I Lane IWidth/1 'l/C 1 Service Rate 1 Adj 1 1 BeM ILl Queue I Group I Lanes I Reqd Used 1 @C (vph) @Ill (Volumel v/c I Delay I S IModel 11 ------------------------------------------------------------------------------- S, Approach --- -- 61.6 B+ -=-=== --- .......... -- - 1 RT+TB+LT I 12/1 10.253 10.200 215 1 336 310 10.914 1 61.6 B+I 396 ftl ------------------------------------------------------------------------------- I!l Approach 5.7 A ---- - --= -.. - TB LT I 24/2 10.260 10.682 1 2401 I 2401 I 696 10.290 1 I 12/1 10.350 10.682 1 279 1 315 I 111 10.352 1 5.7 A 176 ftl 6.3 A 58 ftl ------------------------------------------------------------------------------- W Approach ===- - -----= -- ===- 7.0 A 7.0 A I 295 ftl IRT+TH I 24/2 10.363 10.682 I 2181 1 2181 I 1020 10.468 ------------------------------------------------------------------------------- ~ .~ ~~ 7 ....7 ., 7 7 .-' , 7 7 ....~ ~ .-~ ~ , ...., , New Wo~ld Symphony PM Peak Option I B' Concii 1:ion 12/11/03 18:10:22 S7GNAL2000/TEAPAC[Ve~ 1.01.001 - Capaci1:y Analysis Summary 7nterseat3.on Averages for 7n1: I 3 - Convention C'b: Ii 17th St. Degree of Saturation (vIa) 0.72 Vehicle Delay 54.1 Level of Service D Sq 73 **1** Pbase 1 ------------------------------------------------- Phase 2 Phase 3 Pbase 4 ------------------------------------------------- 11\ I I North I 1 + + + I + + + 1<+ + +> I v I I 1 I ...-, , . , , I G/C-0.OB4 I Go= B.O" I Y+R= 5.0" I OIl'F- 0.0% 1 1 ^ I I 1 ++++1 I 1 <++++1 I ^ I ^ ++++1 ^ 1++++ 1++++ V I <+ + +>1++++> 1++++> I + + + 1++++ 1++++ I +++1 v I v I ------------------------------------ G/C-0.263 G/C-0.053 1 G/C=0.411 I G= 25.0" I G- 5.0" 1 G- 39.0" I' Y+R= 5.0" I Y+R= 3.0" I Y+R- 5.0" I OFr-13.7% I Orr-45.3% 1 OFr=53.7% I ------------------------------------------------- -, c- 95 sea G= 77.~ sea = 81.1% Y=18.0 sea = 18.9% Ped-, 0.0 sea - 0.0% ------------------------------------------------------------------------------- 1 Lane IWidth/1 qlC I Serviae Ra1:e1 Adj 1 I HeM I L I Queue I Group I Lanes' aeqd Used I @C (vph) @B 1 Volume I vIa I Delay I S (Model 11 . .-. , , , , -, N Approach ------------------------------------------------------------------------------- 251. 6 I' --- - - laT+'l'B I LT I 12/1 10.233 10.084 I 12/1 10.193 10,084 1 I 96 I 184 11.600 I 350.2 I' 567 ftl 1 I 128 1 158 11.068 I 136.6 I' 299 ftl ------------------------------------------------------------------------------- S Approach 28.5 C ==== ....... -- .Ll._ aT I 12/1 10.206 10.263 I 223 I 414 I lOll 10.263 29.3 C 1 115 ftl 'l'B I 12/1 10.142 10.263 I 329 I 487 I 1 )0.002 25.8 C+I 1 f1:1 LT I 12/1 10.175 10.263 t 310 I 463 1 102 10.220 27.6 C 1 100 ftl ------------------------------------------------------------------------------- . B Approach - 27.1 C+ .--======== - -- -- 1~+'l'B+LTI 24/2 10.359 10.411 I 1169 I 1318 959 10.728 I 27.1 I C+I 544 ftl W App~oach ------------------------------------------------------------------------------- 18.6 2 .-1 .. I 24/2 10.351 10.495 I 1635 I 1727 I 1019 10.590 1 12/1 10.000 10.053 I 178 I 221 I 1 10.005 18.6 13.7 2 1 471 f1:1 2+1 1 ftl I R1'+'l'B I LT -- ---- JIIlC~~ - - -----------------------------------------------------------------------------~- -- .- - , ) ) ) ) ) ) ) , , '..~ , , , ., ., , ., , , , ., , , , , J J , , , , , , , , , , , , , >> . I I Ne.. Wor1d S~hony 11M Peak Option 'B' Condition 12/11/03 18:12:05 SIGNAL2000/~EAPAC[Ver 1.01.00] - Capaoity Analysis Summary Interseotion Averaqes for Int' 4 - Mltr.idian Ave & 17th St. Degree of Saturation (vie) 0.75 vehio1e De1ay 76.3 L.va1 of Servioe B ------------------------- Sq 11 **1** Phase 1 Phase 2 ------------------------- 11\ 1 1 North I 1 + + + 1 ^ I I + + + 1 ++++1 1<+ + +> I <++++1 I v I ^ ++++1 I ^ 1++++ V I 1 <+ + +>1++++> I I + + + 1++++ I 1 + + + 1 v I ------------------------- 1 G/c-fJ.337 1 G/C=0.611 I G- 32.0" I G- 58.0" I I Y+R- 0.0" 1 Y+R= 5.0" I I orr= 0.0' I OFF-33.7% I c- 95 see G- 90.0 see = 94.7\ y= 5.0 see s 5.3\ Pad- 0,0 .ec = 0.0\ ------------------------- ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 1 10ane IWidth/1 q/C 1 8ervi_ Rate' Adj I I HeM I 10 ] Queue I Group I Lanes I Reqd Used I @C (vph) @:&: Ivo1umel v/o I De1ay I S lModel 11 N Approaoh --=--- -- 242.9 .. 460 I 522 11.135 I 117.8 . 1 937 ftl 98 I 228 12.036 1 529.3 F I 817 ftl ------------------------------------------------------------------------------- IH+'rR I L~ 1 12/1 10.402 10.295 I 328 I 12/1 10.698 10.295 1 64 S Approaoh 86.1 I' ==- I 12/1 10.340 10.295 I 342 I 477 I 427 10.895 1 51.3 D I 550 ftl I 12/1 10.524 10.295 I 42 I 65 I 101 11.295 1 233.4 F I 263 ftl - _ ===-_J:lI ------------------------------------------------------------------------------- IR'r+'l!B 1 L'r E Jlpproach 10.1 B+ - 1 24/2 10,317 10.611 I 2070 1 2096 I 850 10.406 1 10.2 8+1 293 ftl I 12/1 10.300 10,611 1 295 I 341 1 103 10.302 I 9.3 A I 66 ftl .0:: - ------------------------------------------------------------------------------- 1RT+'rH I L'r W Approach ---- - --- ==- 15.3 8 823 10.391 1 10.0 8+1 281 ftl 274 10.833 1 31.2 C I 308 ftl -- ------------------------------------------------------------------------------- IR'r+'rH 1 L'l! I 24/2 10.310 10.611 I 2081 I 2107 I 12/1 10.597 10.611 I 283 I 329 .- .. . :1 .-~ '" ~ -" -~ ~ 1 , ...... - , , -, , ......' , , ......, ., New World Symphony PM Peak Option I B' Condition 12/11/03 18:13:38 SIGNAL2000/TBAPAC[Ver 1.01.00] - Capacity Analysis SUmmary Intersection Averages for Int # 5 - Washington Ave & 16th St. Degree of Saturation (vIe) 0.57 Vehicle Delay 22.6 Level of Service C+ ------------------------------------- Sq 21 liD/" Phase 1 Phase 2 Phase 3 ------------------------------------- ......, ., , , , -, . -, , , , , -, , -' , , , >> -, >> >> ..... ) ) r. . ,.... . 1 + + + 1++ I ^ I I + + + 1++ I ++++1 11\ 1<+ + +> 1<+ + I <++++ I I I v I v I ^ ++++1 I I I ^ 1++++ V I North I I <+ + +>1++++> I 1 I I + + + 1++++ 1 I I + + + I v I ------------------------------------- G/C=0.056 I G/C-0.456 I G/c-O.322 I I G= 5.0" I G= 41.0" I G= 29.0" I I Y+R= 3.0" I Y+R= 6.0" I Y+R= 6.0" I I orr= 0.0% I orr= 8.9% I Orr.=61.1% I ------------------------------------- C= 90 see G= 75.0 see = 83.3% Y=15.0 see'" 16.7% ~ 0.0 seo - 0.0% ------------------------------------------------------------------------------- I Lane IWidth/1 qlC I Service Rate I Adj I I HeM I I. I Queue 1 Group I Lanes I Reqd Used I @C (vph) @E IVolWllel vIe I Delay I S IMode1 11 ------------------------------------------------------------------------------- N Approach T"'" -..~- 16.8 B --- ........, ---- ~ IRT+TH t LT I 24/2 10.329 10.544 I 1664 I 1719 I 850 10.494 I 13.8 I B+I 333 ftl I 12/1 10.141 10.056 I 1 I 80 I 64 10.653 I 56.2 I B+I 84 ftl ------------------------------------------------------------------------------- S Approach -=:aaaa:====--a-- 18.9 B - -= --= - - IRT+TH I LT I 24/2 10.309 10.456 I 1366 I 1468 I 12/1 10.304 10.456 I 223 I 281 791 10.539 122 10.434 19.1 I B I 355 itl 17.7 I B I 103 ftl ------------------------------------------------------------------------------- B Approach 27.6 C - - -- ..... == -- - ------------------------------------------------------------------------------- I RT+TH+LT I 12/1 10.273 10.322 361 I 470 I 280 10.596 27.6 I C I 279 ftl W Approach 45.3 D -- -........... -_..........-===------- -:==c-:cr= ===----- ------------------------------------------------------------------------------- IRT+TH+LTI 12/1 10.353 10.322 I 280 I 376 320 10.851 45.3 1 D t 387 ftl II. ~ . t t . t t t . . . . . . . . . . . . . . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ t t . . . . . N_ Worl.d Symphony PM Peak Option 'B' Co~tion 12/11/03 18,15:18 SIGNAL2000/TZAPAC[Ver 1.01.00] - capaoity Analysis Summary Interseotion Averages ~or Iot' 6 - Meridian Ava & 16th St. Degree of Saturation (v/o) 0.71 Vehiole DeJ.ay 27.1 Level of Service c+ Sq 11 LD/** Phas.. 1 Phase 2 11\ I I Noreh I I + + + 1 A I 1 + + + 1 ++++1 1<+ + +> 1 <++++1 1 v 1 A ++++1 1 ^ 1++++ v I 1 <+ + +>1++++> 1 1 + + + 1++++ 1 1 + + + 1 v 1 ------------------------- 1 G/C=0.367 I Q/c-O.S22 1 1 ~ 33.0" I G= 47.0" 1 1 Y+R- 5.0" I y+a- 5.0" 1 1 orr- 0.0' I OrP=42.2' 1 ca 90 seo Sa 80.0 ..0 = 88.9' Y=10.0 sea ~ 11.1% ped= 0.0 seo = 0.0% I Lane IWidth/1 g/C 1 Service Rate I Adj I 1 ReM I L I Queue I Group I Lanes I Raqd Used 1 @C (vph) @B Ivol.WllQI vIa I Del.ay I S IModel. 11 N Approach 24 . 5 C+ - IR~+Ta I 12/1 ID.285 10.367 1 433 1 561 I 277 10.494 I 25.1 C+I 255 ftl 1 LT I 12/1 10.192 10.367 I 121 I 166 I 39 10.217 I 20.2 C+I 33 ftl ------------------------------------------------------------------------------- S Approach 39.0 D+ - - -.......... .. - Ill.'!!+H I LT I 12/1 10.391 10.367 I 433 I 12/1 10,170 10.367 1 256 41.5 1 D+I 559 ftl 19.7 1 B I S2 ftl .561 335 479 10.954 63 10.lB9 ------------------------------------------------------------------------------- 81 Approach " - -- 24.5 C+ -- 1 RT+TB+LT 1 12/1 10.477 10.522 684 1 750 I 608 10.811 I 24.5 C+I 598 ~tl ------------------------------------------------------------------------------- W Jlpproach 18,9 B ---- ----------------- IRT+ra+LTJ 12/1 10.424 10.522 1 652 I 717 I 496 10.692 1 18.9 B 1 436 ftl ------------------------------------------------------------------------------- .... .... C:\Documents ond Settings\SCostro\local SetlIngs\Tempomry Intemel Files\OLKA\200312Nws Report.doc