Resolution 2023-32453 (2)RESOLUTION NO: 2023-32453 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 6 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND SAVINO MILLER DESIGN STUDIO, P.A., FOR ADDITIONAL ARCHITECTURAL AND ENGINEERING SERVICES AT BAYSHORE PARK, FOR ADDITIONAL BIDDING AND CONSTRUCTION ADMINISTRATION SERVICES DUE TO INCREASED PROJECT COMPLEXITY, SCOPE AND CONSTRUCTION DURATION, IN THE AMOUNT OF $554,993.30, WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on December 9, 2015, the Mayor and City Commission adopted Resolution No. 2015-29234, authorizing the Administration to enter into negotiations and further authorizing the Mayor and City Clerk to execute a Professional Services Agreement with the firm of Savino Miller Design Studio, P.A., ("Consultant"), to provide professional services for the planning, design, bid, award and construction administration of the Bayshore Park, former Par 3 (Project); and WHEREAS, on May 19, 2016, a professional services agreement was executed in the amount of $933,465; and WHEREAS, the site of the Project was previously a golf course and is being developed as a passive community park; and WHEREAS, the project scope includes site contamination remediation, a central lake, stormwater infrastructure to capture the stormwater runoff from the adjacent neighborhpod, open meadows, informal open play field areas; site grading and drainage, pavilion, six (6) courts marked for tennis and pickleball, lighting system for" the courts, restroom facilities, children's playground, dog park, pathways, pathway lighting, vita course and a fitness cluster, butterfly garden, linear water feature, parking lot, and park identification signs; and WHEREAS, the passive park will preserve the landmark specimen trees and pastoral spaces and have extensive tree planting, landscaping, and irrigation system; and WHEREAS, the Project includes abandoning and replacing the existing water and sanitary sewer force mains with a new 20-inch water main and a 30-inch force main; and WHEREAS, on January 26, 2018, the Mayor and City Commission approved Amendment No.1, in the amount of $32,295, for design revisions reducing and reconfiguring the lake, the removal of the parking lot from the west side of the property, increased parking along Pinetree Drive, and reconfiguration of the walkway and jogging path; and WHEREAS, on May 16, 2018, the Mayor and City Commission adopted Resolution No. 2018-30291 approving Amendment No. 2, in the amount of $35,698, for additional Architectural and Engineering Design associated with the site changes which occurred due to Hurricane Irma debris storage and removal operation; and WHEREAS, on September 12, 2018, the Mayor and City Commission adopted Resolution No. 2018-30492 approving Amendment No. 3, in the amount of $126,781, for additional Architectural and Engineering Design Services associated with the incorporation of resilient and sustainable strategies, including installation of the infrastructure to retain and store a portion of the stormwater runoff from the adjacent neighborhood, into the central lake at the Bayshore Park; and WHEREAS, on April 10, 2019, the Mayor and City Commission adopted Resolution No. 2019-30764 approving Amendment No. 4 in the amount of $50,100, for additional coordination with DRER; and WHEREAS, on June 24, 2020, the Mayor and City Commission adopted Resolution No. 2020-31291 approving Amendment No. 5 in the amount of $122,041 for additional services associated with the implementation of resilient and sustainable elements and additional monitoring and reporting requirements by DRER for the project; and . WHEREAS, on December 14, 2022, the Mayor and City Commission awarded the construction contract and construction is anticipated to commence in spring of 2023; and WHEREAS, the Consultant evaluated the post design services scope in their current contract and requested to amend their contract to account for the additional post design services that is needed during construction; and WHEREAS, the additional services are due to the extended construction duration from twelve (12) to twenty-two (22) months, increased complexity in the park scope of work, DRER contamination remediation monitoring and reporting requirements during construction and the special inspections required by the City of Miami Beach Building Department for the park's structural elements; and WHEREAS, additionally, the City of Miami Beach Police Department has requested incorporating the CCTV security system infrastructure into the park; and WHEREAS, the scope of the additional work is to coordinate with the police department's consultant during the CCTV security system design, develop the infrastructure design drawings and obtain City of Miami Beach Building Department permit; and , WHEREAS, the Consultant provided a fee proposal in the amount of $554,993.30 for additional services needed during construction; and WHEREAS, City staff has reviewed the proposal and has found it to be fair and reasonable; and WHEREAS, Amendment No. 6 (Exhibit A) in the amount of $554,993.30 will revise the total contract amount, to a total of $1,855,372.95; and WHEREAS, the Administration recommends that the Mayor and City Commission approve Amendment No. 6. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute Amendment No. 6 to the Professional 2 Services Agreement between the City of .Miami Beach, Florida and Savino Miller Design Studio, P.A., for additional Architectural and Engineering Services at Bayshore Park, for additional bidding and construction administration services due to increased project complexity,_ scope and construction duration, in the amount of $554,993.30, with previously appropriated funding. PASSED and ADOPTED this. day of Ft Grua r y , 2023. ATTEST: FEB 0 0n?.� Rafael E. Gr nad ,',City Clerk Dan Gelber, Mayor APPROVED AS TO FORM & LANGUAGE :FOR EXECUTION': 23 QN, Mornay Date Resolutions - C7 B MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: February 1, 2023 SUBJECT.A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 6 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND SAVINO MILLER DESIGN STUDIO, P.A., FOR ADDITIONAL ARCHITECTURAL AND ENGINEERING SERVICES AT BAYSHORE PARK, FOR ADDITIONAL BIDDING AND CONSTRUCTION ADMINISTRATION SERVICES DUE TO INCREASED PROJECT COMPLEXITY, SCOPE, AND CONSTRUCTION DURATION, IN THE AMOUNT OF $554,993.30, WITH PREVIOUSLY APPROPRIATED FUNDING. RECOMMENDATION The Administration recommends adopting the Resolution. On December 9, 2015, the Mayor and City Commission adopted Resolution No. 2015-29234, authorizing the Administration to enter into negotiations and further authorizing the Mayor and City Clerk to execute a Professional Services Agreement with the firm of Savino Miller Design Studio, P.A., (Consultant), to provide professional services for the planning, design, bid, award and construction administration of the Bayshore Park, former Par 3 (Project). On May 19, 2016, a professional services agreement was executed in the amount of $933,465. The site of the Project was previously a golf course and is being developed as a passive community parka The project scope includes site contamination remediation, a central lake, stommwater infrastructure to capture the stormwater runoff from the adjacent neighborhood, open meadows, informal open play field areas; site grading and drainage, pavilion, six (6) courts marked for tennis and pickleball, lighting system for the courts, restroom facilities, children's playground, dog park, pathways, pathway lighting, vita course and a fitness cluster, butterfly garden, linear water feature, parking lot, and park identification signs. The passive park will preserve the landmark specimen trees and pastoral spaces and have extensive tree planting, landscaping, and irrigation system. The Project includes abandoning and replacing the existing water and sanitary sewer force mains with a new 20-inch water main and a 30-inch force main. Page 610 of 1420 On January 26, 2018, the Mayor and City Commission approved Amendment No.1, in the amount of $32,295, for design revisions reducing and reconfiguring the lake, the removal of the parking lot from the west side of the property, increased parking along Pinetree Drive, and reconfiguration of the walkway and jogging path. On May 16, 2018, the Mayor and City Commission adopted Resolution No. 2018-30291 approving Amendment No. 2, in the amount of $35,698, for additional Architectural and Engineering Design Services associated with the site changes which occurred due to Hurricane Irma debris storage and removal operation. On September 12, 2018, the Mayor and City Commission adopted Resolution No. 2018-30492 approving Amendment No. 3, in the amount of $126,781, for additional Architectural and Engineering Design Services associated with the incorporation of resilient and sustainable strategies, including installation of the infrastructure to retain and store a portion of the storrnwater runoff from the adjacent neighborhood, into the central lake at the Bayshore Park. On April 10, 2019, the Mayor and City Commission adopted Resolution No. 2019-30764 approving Amendment No. 4 in the amount of $50,100, for additional coordination with DRIER. On June 24, 2020, the Mayor and City Commission adopted Resolution No. 2020-31291 approving Amendment No. 5 in the amount of $122,041 for additional services associated with the implementation of resilient and sustainable elements and additional monitoring and reporting requirements by DRIER for the project. On December 14, 2022, the Mayor and City Commission awarded the construction contract and construction is anticipated to commence in spring of 2023. The consultant evaluated the post design services scope in their current contract and requested to amend their contract to account for the additional post design services that is needed during construction. The additional services are due to the extended construction duration from twelve (12) to twenty-two (22) months, increased complexity in the park scope of work, DRIER contamination remediation monitoring and reporting requirements during construction and the special inspections required by the City of Miami Beach Building Department for the parWs structural elements. Additionally, the City of Miami Beach Police Department has requested incorporating the CCTV security system infrastructure into the park. The scope of the additional work is to coordinate with the police department's consultant during the CCTV security system design, develop the infrastructure design drawings and obtain City of Miami Beach Building Department permit. The consultant provided a fee proposal in the amount of $554,993.30 for additional services needed during construction. City staff has reviewed the proposal and has found it to be fair and reasonable. Amendment No. 6 (Exhibit A) in the amount of $554,993.30 will revise the total contract amount, to a total of $1,855,372.95. SUPPORTING SURVEY DATA Not applicable.. FINANCIAL INFORMATION Page 611 of 1420 Not applicable. Amount(s)/Acount(s): 388-0820-061357-00-410-546-00-00-00-26270 $554,993.30 TOTAL CONCLUSION The Administration recommends that the City Commission approve the resolution. Applicable Area Middle Beach Is this a "Residents Right to Know" item. pursuant to City Code Section 2-14? Yes Strategic Connection Non -Applicable Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description ❑ Exhibit A - Amendment No. 6 ❑ Resolution Does this item utilize G.O. Bond Funds? Yes Page 612 of 1420 Exhibit A AMENDMENT No. 6 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND SAVINO MILLER DESIGN STUDIO, P.A., DATED MAY 19, 2016, FOR ADDITIONAL ARCHITECTURAL AND ENGINEERING DESIGN SERVICES FOR THE FUTURE COMMUNITY PARK (FORMER PAR 3) PROJECT, IN AN AMOUNT NOT -TO -EXCEED OF $554,993.30; This Amendment No. to the Agreement, made and entered this day of 2023, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and SAVINO MILLER DESIGN STUDIO, P.A, a Florida Corporation, having its offices at 12345 NE 6 Avenue, Miami, Florida 33161 (hereinafter referred to as the Consultant). RECITALS WHEREAS, on December 9, 2015, the Mayor and City Commission adopted Resolution No. 2015729234, authorizing the negotiation and execution of a Professional Services Agreement with the firm of Savino Miller Design Studio, P.A., ("Consultant"), to provide professional services for the planning, design, bid, award and construction administration of the Future Community Park (former Par 3) Project (the "Project"); and WHEREAS, on May 19, 2016, a professional services agreement was executed in the amount of $933,465.; and WHEREAS, on January 26, 2018, the City approved Amendment No.1, in the amount of $32,295, for design services, to incorporate the reduction and reconfiguration of the lake; removal of the parking lot from the west side of the property; increase the parking along Pinetree Drive; and reconfigure the walkway and jogging path; and WHEREAS, on May 16, 2018 the Mayor -and City Commission adopted Resolution No. 2018-30291 approving Amendment No. 2, in the amount of $35,698, for additional Architectural and Engineering Design Services associated with the site changes due to Hurricane Irma debris removal operation; and WHEREAS, on September 12, 2018 the Mayor and City Commission adopted Resolution No.2018-30492 approving Amendment No. 3, in the amount of $126,781, for additional Architectural and Engineering Design Services associated with the resiliency and sustainability strategies; and WHEREAS, on April 10, 2019 the Mayor and City Commission adopted Resolution No. 2019-30764 approving Amendment No. 4 in the amount of $50,100, for extended coordination with Miami -Dade County Regulatory and Economic Resources (RER), installation of additional wells, groundwater sampling and preparation of groundwater flow modeling; and Page 613 of 1420 Exhibit A WHEREAS, on June 24, 2020, the Mayor and City Commission adopted Resolution No. 2020-31291 approving Amendment No. 5 in the amount of $122,040.65 for additional services associated with the resilient and sustainable elements and additional monitoring and reporting requirements by Miami -Dade County Department of Regulatory and Economic Resources (DRER) for the project; and WHEREAS, on December 14, 2022, the Mayor and City Commission awarded the construction contract and construction is anticipated to commence in spring of 2023; and WHEREAS, the consultant evaluated the post design services scope in their current contract and requested to amend their contract to account for the additional post design services that .is needed during construction, the additional services are due to the extended construction duration from twelve (12) to twenty-two (22) months, increased complexity in the park scope of work, DRER contamination remediation monitoring and reporting requirements during construction and the special inspections required by the City of Miami Beach Building Department for the park's structural elements; and WHEREAS, additionally, the City of Miami Beach Police Department has requested incorporating the CCTV security system infrastructure into the park; and WHEREAS, the scope of this additional work is to coordinate with the police department's consultant during, the CCTV security system design,development of the infrastructure design drawings and obtain City of MiamiBeach Building Department permit; and WHEREAS, the consultant provided a fee proposal in the amount of $554,993.30 for additional services needed during construction; and WHEREAS, City staff has reviewed the proposal and has found it to be fair and reasonable; and WHEREAS, Amendment No. 6 (Exhibit A) in the amount of $554,993.30 will revise the total contract amount to a total of $1,855,372.95. NOW, THEREFORE, the parties hereto, and in consideration -of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 6. 2. MODIFICATIONS a. The Agreement is amended to include and incorporate the additional Services, as set forth in Schedule "A attached hereto. b. In consideration for the performance of the additional Services, as set forth in Schedule "B", City shall pay the Consultant the total amount of $554,993.30. Page 614 of 1420 Exhibit A 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 6. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 6 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: Rafael E. Granado, City Clerk ATTEST: Secretary Print Name SCOPE OF SERVICES Dan Gelber, Mayor CONSULTANT: SAVINO MILLER DESIGN STUDIO, P.A President Print Name SCHEDULE "A" Schedule "A" entitled, "Scope of Services", is amended as follows: Add the following under Task 4 — CONSTRUCITON ADMINISTRATION ADDITIONAL SERVICES Task 4: CONSTRUCTION ADMINISTRATION ADDITIONAL SERVICES Page 615 of 1420 Exhibit A 4.0 Site Security Camera System Coordination and Permitting: Additional fees for coordination with the Police Department consultant, CIP and the project MEP for site security camera design, electrical drawings and permitting. 4.1 Pre -construction Meeting: No additional fees. 4.2 Pre -construction Kick-off Meeting with Residents: No additional fees. 4.3 Bi-weekly Construction Meetings: Additional fees for conducting biweekly meetings and follow up coordination, meeting minutes and site reports, due to extended construction schedule and increased project complexity. 4.3.1 General Construction Project Administration: Additional tasks as Prime Consultant, including: coordination with City, Contractors and Subconsultants. Review of subconsultants site reports, submittals, etc. Meeting coordination and minutes. Review of entire payment application packages for completeness. 4.4 RFI's / CDC's: Additional fees for RFI's / CDC's due to increased scope of work from original contract including, but not limited to: • path and tennis lighting • street light relocation • monument signage • docks & bridge • elevated metal walkway • concrete seat walls • oolite steps • custom metal railing & fencing • increased playground size and complexity • lake maintenance equipment & pump house • solar panels on tennis building • civil drainage complexity to conform with DERM requirements & future connection to neighborhood stormwater • contamination remediation & coordination with DERM (soil capping, tree relocation & preservation, etc.) • coordination with the water main / force main replacement project 4.5 Request for Changes to Construction Cost / or Schedules: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.6 Processing of Shop Drawings: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.7 Mandatory Specialty Site Visits: Page 616 of 1420 Exhibit A Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.8 Project Closeouts: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.9 Warranty Administration / Post Project Services: Task was included in original contract, but no fees were assigned in the original fee table. 4.10 Environmental Oversight New scope of work for Gallagher Bassett Technical Services to provide bid evaluation services, environmental oversight of construction and coordinate with DERM for the City, as detailed in the proposal. Hours are included for Savino Miller Design Studio as prime consultant to oversee and coordinate with GBTS, the City of Miami Beach, DERM and the Contractor. Page 617 of 1420 EXHIBIT A SCHEDULE "B" Task 4: CONSTRUCTION ADMINISTRATION ADDITIONAL SERVICES (SAVINO MILLER PROPOSAL DATED 01109/2023) • Savino Miller Design Studio (Prime - Landscape Architecture) $ 205,040.00 • William Lane Architecture $ 52,860.00 • Coastal Systems International (Civil Engineer) $ 20,205.00 • JALRW Engineering Group (MEP Engineer) $ 56,165.00 • Edgewater Exhibits (Lake Consultant) $ 13,200.00 • Aquadynamics Design Group (Aquatic Engineer) $ 5,000.00 • Douglas Wood Associates (Structural Engineer) $ 32,478.30 • Gallagher Bassett Tech Services, formerly EEG (Environmental Engineer) $170,045.00 TOTAL ADDITIONAL SERVICES $ 554,993.30 Page 618 of 1420 Schedule "6" miller 12345 NE 6TH AVENUE A NORTH MIAMI, FLORIDA 33161 T 305.995.9082 305.895.9083 AAaJ,,'..63 _ c::r.2oa July 25, 2022 REVISION 1 October 25, 2022 REVISION 2 November 18, 2022 REVISION 3 November 21, 2022 REVISION 4 December 8, 2022 REVISION 5 January 9, 2023 VIA ELECTRONIC MAIL: MinaSamadiamiamibeachfl.gov, Daniel CevallosCa-miamibeachfl.Qov City of Miami Beach CIP Office 1701 Meridian Avenue, Suite 300 Miami Beach, Florida 33139 Attention: Mina Samadi, Senior Capital Projects Coordinator Daniel Cevallos, Capital Projects Coordinator Reference: ADDITIONAL SERVICES #9 BIDDING AND CONSTRUCTION ADMINISTRATION City of Miami Beach Bayshore Park (Former PAR 3) Project No. 2015-29234 Request for additional Bidding and Construction Administration Services due to increased project complexity, scope and construction timeline. The summaries attached include additional time and cost for the Construction Administration of the Bayshore Park project. Since the original contract was written, the complexity and scope of the project has grown, contamination remediation was added and the estimated timeline for construction extended from twelve (12) to twenty-two months (22) and sixty (60) days to final completion. The proposals from the Design Team reflect these changes along with anything additional that specifically applies to their scope of work. In addition, fees were not included in the original contract for the Environmental Consultant for the Bidding and Construction Administration phases, the Structural Engineer for Special Inspections required by the City of Miami Beach Building Department and for the Prime Consultant for the Warranty Administration/Post Project Services Task. The full descriptions and deliverables of the tasks below can be found in the original contract. Items summarized here under each task are in addition to the original scope of work. Related fees can be found on each consultant's corresponding fee table. Pad�1P�f4420 Schedule "B" Task 4: CONSTRUCTION ADMINISTRATION ADDITIONAL SERVICES 4.0 Site Security Camera System Coordination and Permitting: Additional fees for coordination with the Police Department. consultant, CIP and the project MEP for site security camera design, electrical drawings and permitting. 4.1 Pre -construction Meeting: No additional fees. 4.2 Pre -construction Kick-off Meeting with Residents: No additional fees. 4.3 Bi-weekly Construction Meetings: Additional fees for conducting biweekly meetings and follow up coordination, meeting minutes and site reports, due to extended construction schedule and increased project complexity. 4.3.1 General Construction Project Administration: Additional tasks as Prime Consultant, including: coordination with City, Contractors and Subconsultants. Review of subconsultants site reports, submittals, etc. Meeting coordination and minutes. Review of entire payment application packages for completeness. 4.4 RFI's / CDC's: Additional fees for RFI's / CDC's due to increased scope of work from original contract including, but not limited to: - path and tennis lighting - street light relocation monument signage docks & bridge elevated metal walkway concrete seat walls - oolite steps - custom metal railing & fencing - increased playground size and complexity - lake maintenance equipment & pump house - solar panels on tennis building - civil drainage complexity to conform with DERM requirements & future connection to neighborhood stormwater - contamination remediation & coordination with DERM (soil capping, tree relocation & preservation, etc) - coordination with the water main / force main replacement project 4.5 Request for Changes to Construction Cost / or Schedules: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.6 Processing of Shop Drawings: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.7 Mandatory Specialty Site Visits: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. 4.8 Project Closeouts: Additional fees due to increased project complexity and additional scope noted above in Task 4.4. Papj6f31420 Schedule "B 4.9 Warranty Administration I Post Project Services: Task was included in original contract, but no fees were assigned in the original fee table. 4.10 Environmental Oversight New scope of work for Gallagher Bassett Technical Services to provide bid evaluation services, environmental oversight of construction and coordinate with DERM for the City, as detailed in the proposal. Hours are included for Savino Miller Design Studio as prime consultant to oversee and coordinate with GBTS, the City of Miami Beach, DERM and the Contractor. The following summarizes time and costs associated with the additional Construction Administration Scope of Work as described above. See accompanying subconsultant narratives and fee schedules for more detail: Task 4: CONSTRUCTION ADMINISTRATION ADDITIONAL SERVICES - Savino Miller Design Studio (Prime - Landscape Architecture) $ 205,040.00 - William Lane Architecture $ 52,860.00 - Coastal Systems International (Civil Engineer) $ 20,205.00 - JALRW Engineering Group (MEP Engineer) $ 56,165.00 - Edgewater Exhibits (Lake Consultant) $ 13,200.00 - Aquadynamics Design Group (Aquatic Engineer) $ 5,000.00 - Douglas Wood Associates (Structural Engineer) $ 32,478.30 - Gallagher Bassett Tech Services, formerly EEG (Environmental Engineer) $ 170,045.00 Sincerely, Barry Miller, PLA, ASLA, Principal in Charge Savino Miller Design Studio TOTAL ADDITIONAL SERVICES $ 554,993.30 Pad1 6f 31420 4.0 54writ7 Grtnn S—M (PKma ronfultant Parmlttlr18j 4.1 Pn!-COnrommon Maeu 1 m 4.2 Pn Gn UvMn gckV11MOCUM with Kaldama (1 m 4.3 , General Cgnstructlan 1r0(act AdMI.Is mW n (Pdme Ilan Schedule "Brr 1 1 1 12 1 1 1 1 L 13 $ 1,980 �—® 16 121 56 656 0 0 0 -0 554 0 0 0 88 21.780 10,080 98.700 - - - - 70,080 - - - - 4,400 10.62% 4.92% 48.14% 0.00% 0,00% 0.0096 0.00% 34.18% 0.00% O.OD% 0.00% 0.00% 2.15% MIAMI BEACN COMMUNITY PARK PAR 3 SAVINO MILLER DESIGN STUDIO 1 Page 622 of 1420 5 260 5 22,650 416 5 54,960 158 5 21,020 69 S 8,800 192 $ 36,460 112 $ 16,560 1507 $ 205,040 100% william lane architect inc Schedule "B" July 25, 2022 (REVISED November 18, 2022) VIA ELECTRONIC MAIL: MinaSamadi0miamibeachfl.gov, DanielCevallos(&-miamibeachfl.aov City of Miami Beach CIP Office 1701 Meridian Avenue, Suite 300 Miami Beach, Florida 33139 Attention: Mina Samadi, Senior Capital Projects Coordinator Daniel Cevallos, Capital Projects Coordinator Reference: ADDITIONAL SERVICES #9 BIDDING AND CONSTRUCTION ADMINISTRATION City of Miami Beach Bayshore Park (Former PAR 3) Project No. 2015-29234 The summary provided below includes additional time and cost necessary for the Construction Administration of the Bayshore Park project. Since the original contract was written, the complexity and scope of the project has increased and the estimated timeline for construction extended from twelve (12) to an estimated eighteen months (18) to final completion of the tennis pavilion and associated canopies and shade structures. Task 4: CONSTRUCTION ADMINISTRATION ADDITIONAL SERVICES 4.1 Pre -construction Meeting: No Additional Fees 4.2 Bi-weekly Construction Meetings: Additional fees for biweekly meetings and follow up coordination and site reports, due to extended construction schedule and increased project complexity. 4.3 RFI's / CDC's: Additional fees for RFI's / CDC's due to increased scope of work from original contract. The number of anticipated RFI's for this project is based on our firm's previous experience with comparable Municipal and County projects. The construction document drawings provided by the Architect includes information necessary to describe the design of the buildings as well as to satisfy compliance with State and City code requirements. However, requests for information that are specific to the complexities of each project are expected. Additional time and effort will be required by the Architect to ensure that the built work will meet acceptable standard levels of quality. For this project we forecast approximately forty (40) Requests for Information. 4.4 Request for Changes to Construction Cost / or Schedules: Additional fees due to increased project complexity and additional scope. 4.5 Processing of Shop Drawings/ Submittals: Additional fees due to increased project complexity and additional scope. 1480 Marseille Drive, Miami Beach, Florida 33141 tel: 305 865 7830 wlane@williamlane.com FL. LIC. # AR00014247 Page 623 of 1420 william lane architect inc Schedule "B" The contractor is required to provide submittals and shop drawings for the many components that comprise the project. These are reviewed and approved and often commented upon and resubmitted until they satisfactorily conform to the project's design intent. Listed below are example items that will require shop drawings/submittals from the contractor and reviews by the Architect. This list will vary per project: 1. Overhead Door 2. Aluminum Louvers 3. Door hardware 4. Hollow metal doors 5. Aluminum frame glass panel doors 6. Aluminum frame glass windows 7. TPO Roofing Membrane 8. Metal Flashing 9. Plumbing Fixtures 10. Epoxy floor 11. Ceramic the samples 12. Equipment Screen color chart 13. Millwork 14. Light Fixtures 15. Electrical Accessories (Sensors, Switching, Wiring) 16. Interior Paint 17. Exterior Concrete Protective Coating 18. Toilet Partitions 19. Bathroom Accessories 20. Trough Sink 21. Tankless Water Heater 22. Bathroom Signage 23. Aluminum Handrails 24. Solar Panels 25. Exhaust fans 26. Skylights 27. Drinking Fountain 28. CIP Ribbed Architectural Concrete 29. CIP Ribbed Concrete Formwork 30. CIP Exposed Architectural Concrete (Lake Shade Structure) 31. Concrete formwork 32. HVAC Equipment 33. Gypsum Board 34. Cement Stucco 35. Powder Coat Finishes (Shade Structures) 36. Ceiling & Wall Insulation 37. Miscellaneous Metals (Aluminum Reveals) 38. Exterior Deck, Stairs, and Ramp Finishes 39. Overflow Scupper 40. Flood Vents 41.:Roof Drains 42. Waterproofing Products 43. Fire Safety Components 44. Shade Structure Metal Fabrication Components 45. Tile Setting Material 46. Shade Structures 1480 Marseille Drive, Miami Beach, Florida 33141 tel: 305 865 7830 wlane@williamlane.com FL. LIC. # AR00014247 Page 624 of 1420 william lane architect inc Schedule "B" 47. HVAC Equipment Screen 48. Ozone Equipment Room Metal Enclosure 4.6 . Mandatory Specialty Site Visits: 4.7 Project. Closeouts: Additional fees due to increased project complexity and additional scope. 4.8 Warranty Administration / Post Project Services: Task was included in original contract, but no fees were assigned in the original fee table and are included now. The following fee schedule summarizes time and costs associated with the additional Construction Administration Scope of Work as described above. 1480 Marseille Drive, Miami Beach, Florida 33141 tel: 305 865 7830 wiane@williamiane.com FL. LIC. # AR00014247 Page 625 of 1420 Schedule "B" CMB Bayshore Park Community - Additional Services TASK 4 - CONSTRUCTION ADMINISTRATION SERVICES Architect PM Designer Total Bi-Weekly Construction Meetings (22 meetings) 44 44 $14,520 RFls /CDC's (40 rfi's) 20 30 25 $11,100 Request for Changes to Construction Cost / or Schedules 6 8 4 $2,760 Processing of Shop Drawings/Submittals (47 submittals) 24 40 20 $12,720 Mandatory Specialty Site Visits (20 visits) 16 18 $5,580 Project Closeouts 8 14 22 $6,180 Total Hours 118 154 71 Hourly Rate 1 $180 $150 $120 Total Cost including Time to Date 1 $21,2401 $23,1001 $8,5201 $52,860 Page 626 of 1420 COASTALSYSTEMS COASTAL SYSTEMS INTERNATIONAL, INC. 464 South Dixie Highway • Coral Gables, Florida 33146 Tel: 305-661-3655 • Fax: 305-661-1914 www.coastalsystemsint.com November 18, 2022 Mr. Barry Miller SAVINO & MILLER DESIGN STUDIO 12345 NE 6th Avenue North Miami, FL 33161 Via E-mail: baru,ct ravinomillet-.com Schedule "B" 291402-R7 RE: REVISED CONSTRUCTION ADMINISTRATION SERVICES FOR THE PROPOSED. MIAMI BEACH PAR 3 GOLF COURSE, CITY OF MIAMI BEACH, MIAMI-DADS COUNTY, FLORIDA Dear Mr. Miller: This is to submit a proposal addendum for construction administration services relative to the Miami Beach Par 3 Golf Course Project (Project), located in the City of Miami Beach, Miami -Dade County, Florida. The existing contract, dated May 19t`, 2016, anticipated a construction period of 12-16 months. This has since been updated to a 24-month construction period. Concurrently, fees associated with the existing Construction Administration Services will increase to match the extended construction timeline. This proposal addendum maintains all general conditions and assumptions as outlined in the existing contract. The following work tasks, numbered sequentially from our existing contract, outlines the scope of services to be provided by Coastal Systems International, Inc. (Coastal Systems) for Savino & Miller Design Studio (Client): PART 4 — CONSTRUCTION ADMINISTRATION SERVICES Coastal Systems will provide construction administration services for the site civil work within the Project Area, as outlined in the following paragraphs, to assist the Client during the construction phase. The services will be provided to supplement full time construction management services provided by the Client. i. Additional Bi-Weekly Construction Meetings: A Coastal Systems engineer and/or program manager will attend bi-weekly construction meetings for a twenty-four (24) month period. The purpose of these meetings shall be to review the status of construction progress, shop drawing submittals, and contract document clarifications and interpretations. The engineer or program manager will also respond to emails with the Client and/or contractor with appropriate representatives to discuss Project construction status and to discuss details for Project implementation and/or permit compliance. Should the construction period extend beyond twenty- four (24) months, a separate addendum scope will be submitted. Deliverables: - Meeting minutes to document construction activities. - Non-compliance notices to the Contractor. - Archiving of all relevant documents, transmittals, and correspondence. Page 627 of 1420 291402-R7 Mr. Barry Miller November 18, 2022 Page 2 Schedule "B" j. Additional Processing of Shop Drawings: Coastal Systems will provide construction administration services to review shop drawings related to the civil works design outlined in this Project's existing contract. k. Additional Mandatory Specialty Site Visits: Site visits by Coastal Systems will be conducted throughout the construction period, and observation reports will be prepared summarizing construction progress. During the site visits, Coastal Systems will observe construction to ensure that it is being performed in accordance with the civil regulatory permits, design plans, and specifications. Fees for this scope of services includes site visits and reporting, to verify that the Project construction is consistent with the plans and specifications, for a twenty-four (24) month construction period. Should the construction period extend beyond twenty-four (24) months, a separate addendum scope will be submitted. GENERAL This contract is subject to the original agreement "General Agreement Terms and Conditions" and "General Conditions/Assumptions" and is valid to be executed for sixty (60) days. Coastal Systems will invoice the Client each month on a percent complete basis for lump sum tasks and on an hourly basis for hourly tasks pursuant to the approved "Rate Schedule". Expenses will be invoiced separately pursuant to the approved "Rate Schedule". We look forward to continuing to work with you through successful implementation of this Project. If you wish us to perform the services described above, please sign this agreement and return a signed copy to us, which will serve as our Authorization to Proceed. Should you have any questions or require additional information, please feel free to contact me at (305) 669-6236 or rhsasso cc; coastalsystemsint.com, or Mr. Orestes Betancourt at (305) 669-6258 or obetancourt(wcoastalsystemsint.com. SIGNED: PRINT: AZ:ts Enclosure Sincerely, O AL SYSTEMS ATTONAL, INC. 40 R. Hary Sasso, E. President SAVING & MILLER DESIGN STUDIO DATE NAME TITLE File, AZ, TS, OB RHS,.Conoad Book, Accounting F:1Data-2\Project\2914021Pmposal\20221(22-11-18) PRO Barry Miller re Civil Services - R7.docx �: fJdp4&YS TEMS 291402-R7 Mr. Barry Miller November 18, 2022 Page 3 Schedule "B" TABLE 1 SUMMARY -OF REVISED COSTS FOR CIVIL ENGINEERING SERVICES MIAMI BEACH PAR 3 GOLF COURSE PROJECT, MIAMI BEACH, FLORIDA DESCRIPTION TYPE FEES Part4. Construction Administration Services i. Additional.Bi-Weekly Construction Meetings j. Additional Processing of Shop Drawings k. Additional Mandatory Specialty Site Visits Lump Sum Lump Sum Hourly, est. at . $6,830 $825 $12,550 Subtotal: $20 205 SUBTOTAL: $20 205 GRAND TOTAL: $20 05 4�'eTap�a5ors rEN1 s Schedule "B" OHIO MIAMI BEACH COMMUNITY PARK PAR 3 SAVING MILLER DESIGN STUDIO Page 630 of 1420 2 Schedule T" JOHNSON, AVEDANO, LOPEZ, RODRIGUEZ & WALEWSKI ENGINEERING GROUP, INC. t...,-22 osteber 24 , 2022 November- 15,2022 January 10, 2023 VIA Email Mr. Barry R. Miller Savino & Miller Design Studio, P.A. 12345 N.E. 6th Avenue, Suite A North Miami, Florida 33161 Re: Community Park (Former Par 3) Project Add Services #4 Extended CA Dear Barry: Per your request our fee proposal is for the lump sum amount of $56,165.00 for adjusted construction phase services and extended 12 months construction phase services due to increased scope of work from original contract. including, but not limited to path and tennis lighting; street light relocation; monument signage; lake maintenance equipment & pump house; solar panels on tennis building. Fee includes scope related security camera system designed by others. Security camera scope includes coordinating with the security camera consultant, preparing infrastructure drawings for permit based on the security camera system from the consultant's drawings and construction phase services related to the security camera system. Add Services #4 Extended CA: $56,165.00 If you have any questions or comments, do not hesitate to contact our office. Sincerely, Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group, Inc. 041—)� Richard Walewski Principal 2510 Northwest 971 Avenue, Suite 220 — Miami, Florida 33172 Phone (305) 594-0660 - Fax (305) 594-0907 Pl4Vla'644%Fg420 TASKSTHAT INCLUDE MEETINGS/ M m IAdatp3. mpeaf~bW MIAMI BEACH COMMUNITY PARK PAR 3 SAMNO MILLER DESIGN STUDIO Page 632 of 1420 Schedule "B" Schedule "B" cu��, ,� 4.i.l E % H I B I T S 21900 SW 169th Ave Miami FI.33170 Kelly Hitzig Savino & Miller Design Studio 12345 NE 6th Avenue, Suite A Miami, FL 33161 RE: BAYSHORE PARK ADDITIONAL SERVICES PROPOSAL - CITY OF MIAMI BEACH. REV 1. Dear Kelly, Per your request for a closer look at our Additional Services proposal as the City prepares to impliment the "Lagoon Clean -Up project" Here is our reconsidered response. As the Designers of the Lagoons Life Support System (LSS) we have budgeted for 10 site visits and a wide range of construction/technical questions and assistance from the selected General Contractor, whoever that may be. Edgewater Exhibits is the only realistic qualified company to build and impliment this innovative Life Support System, however we have no control over who will be awarded this contract to do so. With that in mind, we have been informed that we do not qualify for the construction company as we are the system designers. For this reason we realize that we will most likely be needed as a consultant to the GC. Our new Additional Services Fee Estimate of $13,200.00 (See BAYSHORE PARK CA add services Excel Spred sheet)for consulting with the Contractor/s chosen to perform the construction of this project. We are aware this is scheduled as a two year project and would require our engagement throughout the entire project - including Start-up and Commissioning. This is a very important aspect. Respectfully, ,.,—A Matthew J. Rothan Director of Exhibitions Edgewater Exhibits 305 8010596 Edgewater Exhibits - Savino Miller - Additional Sevices Proposal - Bay Shore Park Lagoon Life Support System Submitted 06-14-22 - Updated 10-24-22 as REV1 Page 633 of 1420 mtgWWAI.II TASKSTNAT INCWOE MEETWO / xv- IsdkYo menbgr of htaeggs 40 20 0 15 0 0 0 0 0 0 0 0 7,I00 3,600 - I,4110 5455% 27.27% 0.00% I8.18% 0.00% 0.0096 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% These revbbm are to considered additional fees based on the 2 year field Installation schedule The 40 hours of Site VUit/Meetings represents 10 site vMs hours for design development is for airy unfwwen site cordllem or additional drawings for contractor clarificatlons The 20 hours for start-up and commissioning is for getting the Lagoon system up and running and owner training about system. Page 634 of 1420 MM1 AI SEACN COMMUNITY PARK PAR 3 SAVING MILLER DESIGN STUDIO 1 Schedule "B" @ � o $ - $ 23,200 100 $ 7,200 $ - 2.400 $ 3,600 75 $ 13.200 100 100% 4 tDS Nc. AQUATIC ENGINEERING CONSULTANTS 5000 SW 751h Suite 103 Avenue Miami, Florida 33155 Phone (305) 667-8975 Fax (305) 662-1002 Website: AQUADYNAMICS.BIZ e-mail: INFO@AQUADYNAMICS.BIZ Water Park & Family Aquatic Center Design Resort, Hotel, & Condominium Pool Design Forensics, Evaluations, & Analysis DOH Violations, Variances, Permitting John J. Wahler, Principal Elisa Love Wahler, R.A. Ofelia Taboada, P.E. Z[bbitional xegign 6erbice!9 Vroyoal November 3, 2022 updated from original BARRY MILLER SAVINO & MILLER 12345 NE 6TH STREET, SUITE A NORTH MIAMI, FL 33161 BARRY: barry(asavinomiller.com Schedule "B" Re: CONSTRUCTION ADMINISTRATION PHASE FEE FOR PAR 3 LINEAR WATERFEATURE EQUIPMENT Request for Proposal for Additional Services. The following proposal is being sent at your request, and includes fees for the construction administration phase of this project for the scope of the linear water feature equipment. The fee outlined below includes additional services beyond the post plan and permitting phase that will include: • REVIEW OF SHOP DRAWINGS AND EQUIPMENT SUBMITTALS. • REVIEW OF RFI'S • ATTENDANCE AT 2 COORDINATION MEETINGS DURING CONSTRUCTION. • RESPONSES TO QUESTIONS SENT VIA EMAIL • UP TO 6 SPECIALTY SITE VISITS INCLUDED IN THIS PROPOSED AMOUNT THAT WOULD INCLUDE ROUGH PIPING EVALUATION, FINAL PIPING EVALUATION, PLACEMENT AND HOOK UP OF EQUIPMENT VAULT, START UP OF EQUIPMENT VAULT WITH POOL BUILDER, FINAL INSPECTION WITH COMB AND 1 CINTINGENCY INSPECTION. The proposed allowance for this work is: $5000.00 Article 2.0- FEE PROPOSAL 2.0.1 BREAKDOWN OF FEES additional fees for the new work: 2.0.2 PROPOSED ALLOWANCE FOR CA PHASE $5,000.00 PAYMENT SCHEDULE INVOICES WILL BE SENT AS WORK OCCURS. OF THE $5,000 FEE WE HAVE ALLOWED $850 PER FIELD INSPECTION, WITH THE REMAINING AMOUNT SPLIT AMONG OTHER SERVICES. Page 1 of 2 IF FOR SOME REASON THE CA PHASE GOES BEYOND THE $5,000 LIMIT PROPOSED, WE WILL NOT MOVE FORWARD WITH ANY WORK WITHOUT ADDITIONAL APPROVAL FROM YOUR OFFICE. Schedule "B" Article 3.0- IMPLEMENTATION 3.0.1 ACCEPTANCE- To signify acceptance of this proposal, please sign and return a PDF copy of this proposal to our office by email to start work. Work will begin upon receipt of signed agreement and receipt of additional information for new work from other consultants. Respectfully, Aquadynamics Design Group, Inc. C*V��- By: John J. Wahler, Principal ACCEPTED BY: BARRY MILLER AUTHORIZED AGENT BY: NAME: TITLE: DATE: S:IOFFICEIPROPOSALSV1dd Services Proposals120221PAR 3 _ASA FOR CA PHASE ADD SERVICE_BARRY MILLER_SAVINO AND MILLER_updated 11-3-22.doc Page 2 of 2 Pa a 636 of 1420 bWOOO / ID'OONNELL " NACCARATO S T R O C T U R A i E N G I N E E R S REQUEST FOR FEES FOR ADDITIONAL SERVICES June 21, 2022 (Revised 11/02/2022) To: Ms. Kelly Hitzing, ASLA, PLA Savino & Miller Design Studio 12345 NE 61h Avenue, Suite A North Miami, Florida 33161 Via E-Mail: Kelly@savinomiller.com Project: City of Miami Beach BayshorePark (Former Par 3) Miami Beach, Florida Schedule T" .,,_, _> Anthony Naccarato. PE. SE, r ,l ^.> Mark Lunden. PE. SE, .'. Dennis Mordan. PE. SE..'. Paul Panzarino, PE. BE Rod McComas. PE. SE v ce ce• , Scott Bauer. PE. SE. LEED AP James Behler. PE. SE Michael Hermann. PE. SE Alan Miller, PE, SE Mark Orsini. PE. SE Brian Rawlings. PE. SE Douglas Wood. PE William O'Donnell. PE Peter Naccarato. PE In accordance with our agreement of December 23, 2015 we hereby request authorization of fees for Additional Services as described below. DESCRIPTION OF ITEM(S) REQUIRING ADDITIONAL SERVICES: Construction administration and special inspections for aluminum structures and reinforced masonry. Scope of construction administration services was increased due to additions to the project and extension to the anticipated construction schedule. The additions to the scope include the ozone equipment building, additions/modifications to the lake structures, water features and _bridge, and signs and foundations. The anticipated construction schedule was extended from 12 months to 24 months. ADDITIONAL SERVICES REQUIRED TO ACCOMPLISH: Consultation, coordination, special inspections, review of structural submittals (shop drawings) and responses to questions from the contractor during construction (RFI's). FEES FOR ADDITIONAL SERVICES: Our additional construction administration fees will be a lump sum of $14,580.85. Therefore, the total fee for construction administration will be increased from $10,425.00 to $25,005.85. For informational purposes, see below estimate of man-hours and fees for the additional Construction Administration fees: Hours Rate Amount Principal 4 $172.50 $690.00 Senior Structural Engineer 22 $138.00 $3,036.00 Structural Engineer 84 $116.15 $9,756.60 Senior CAD Technician 8 $69.00 $552.00 CAD Technician 8 $63.25 $506.00 Clerical 1 $40.25 $40.25 Subtotal $14 580.85 P@A"20 5040 N.W. 7th ST, SUITE 820, MIAMI, FLORIDA 33126, T: (305) 461 — 3450 Ms. Kelly Hitzing, ASLA, PLA Schedule °B" (Revised 11/02/2022) Date: 06/21/2022 Bayshore Park Page 2 of 2 Our fees for Special Inspections will be a lump sum of $17,897.45. For informational purposes, see below estimate of man-hours and fees for the Special Inspection fees: Hours Rate Amount Principal 5 $172.50 $862.50 Senior Structural Engineer 44 $138.00 $6,072.00 Structural Engineer 93 $116.15 $10,801.95 Clerical 4 S40.25 $161.0 Subtotal $17 897.45 Therefore, the total fees for the additional construction administration and special inspection are as follows: Additional Construction Administration $14,580.85 Special Inson $17,897.45 Total $32,478.30 All other aspects of our agreement remain unchanged. We thank you for the opportunity to continue our services to you. Please indicate your authorization to proceed with these additional services by signing in the space provided below and returning a copy to us. We will begin these Additional Services upon receipt of a signed copy of this memorandum. Sincerely, Wood/O'Donnell & Naccarato Douglas Wood, P.E., SECB Principal Accepted: For: Savino & Miller Design Studio Date Printed Name Title PVWRAI4Qfp1420 5040 N.W. 7th ST, SUITE 820, MIAMI, FLORIDA 33126, T: (305) 461 - 3450 Schedule "B" MIAMI BEACH COMMUNITY PARK PAR DOUGLAS WOOD ASSOCIATES. INC. Page 639 of 1420 Schedule "B" GALLAGHER TECHNICAL SERVICES WSETT December 6, 2022 Project No. 2020-3005 Mr. Barry Miller Savino Miller Design Studio, P.A. 12345 NE 6 Avenue, Suite A North Miami, FL 33161 barry@savinomiller.com Subject: Environmental Consulting Proposal — Construction Administration (Revised 12/06/2022) Future Bayshore Park Project Miami Beach, Miami -Dade County, Florida Dear Mr. Miller: Gallagher Bassett Technical Services (GBTS), a division of Gallagher Bassett Service, Inc. (GBSI), has prepared this proposal to provide environmental consulting during the park construction project. A support table has been provided to detail the anticipated GBTS personnel categories and hours, drilling, laboratory, and field costs to complete these services. The primary GBTS personnel categories referenced in the proposal include: • Professional Geologist (Craig Clevenger, P.G.) • Professional Engineer (Sean Nemster, P.E.) • Certified Industrial Hygienist (Alex Mavrelis, CIH) • Field Geologist (to be determined) • CADD Draftsperson (to be determined) • Administrative Support (to be determined) Task 1— Plannina Meetines GBTS will conduct a kick-off meeting with City of Miami Beach (the City), and a second meeting with the City and the General Contractor to review the environmental requirements for the project. GBTS will provide notification to DERM of the timing for implementation of the field work. Additionally, GBTS has included time to review materials as needed, and if required one meeting with DERM. GBTS also has included a budget for additional meetings, conference calls, or review -of technical information as requested by the City of Miami Beach. Budget was based on 60 hours of the Professional Geologist, 8 hours of the CIH, 6 hours of the Professional Engineer, 10 hours of the Field Geologist, 5 hours of Administrative Support, and field vehicle (2 days). Task 1 Budget = $11,970.00 Page 640 of 1420 Savino Miller Design Studio, P.A. December 6, 2022 Page 2 Task 2 — Baseline Groundwater Monitoring Schedule "B" GBTS will conduct a pre -construction baseline groundwater monitoring event, during which up to 20 existing monitoring wells will be sampled. Sampling will be conducted in accordance with the Florida Department of Environmental Protection (FDEP) Standard Operating Procedures (SOPs), per Chapter 62- 160, Florida Administrative Code (FAC). Groundwater samples will be transported to an environmental laboratory and analyzed for Total Arsenic by EPA Method 6010. GBTS proposed that the monitoring plan include the following 14 existing monitoring wells: • Boundary Wells: GW-1, GW-2, GW-3, MW-6, MW-16, MW-17, MW-19 & MW-21 • Interior Wells (outside the rim of stormwater system): MW-3, MW-5, MW-20, MW-8 & MW-14 • Deep Well: MW-15D However, DERM indicated that the final monitoring plan would be subject to review and evaluation. Therefore, the budget has included sampling/analysis of up to 20 existing monitoring wells. GETS' Professional Geologist will contact DERM and verify the required monitoring wells prior to implementation of the baseline sampling. Upon completion of the sampling event, GBTS will prepare a Baseline Groundwater Sampling Report including maps, tables and backup documentation within 30 days, which will be signed/sealed by the Professional Geologist. Budget was based a 3-day sampling event and a day of forms/tables by the Field Geologist (50 hours), project management and report preparation by the Professional Geologist (20 hours), drafting and administrative support (4 hours each), field vehicle (3 days), sampling equipment/PPE (3 days), and laboratory costs (20 groundwater samples). Task 2 Budget = $8,105.00 Task 3 — SMP Oversight & QOR Reporting Review GBTS will inspect the site twice -per -month to evaluate compliance with the Soil Management Plan (SMP), Dust Control Plan (DCP), Air Monitoring Plan (AMP), and installation of the Engineering Control cap. GBTS also will provide periodic inspections of the soil management handling during the water and sewer line installation. GBTS will review the weekly air/dust monitoring data and draft Quarterly Operating Reports (QORs) to be provided by the General Contractor. GBTS will memorialize the inspections with inspection logs that will be submitted to the City on a quarterly basis. Budget was based on an average of three times per month inspections by the Field Geologist (12 hours per month — estimated 264 hours over 22 months), weekly review of dust sampling data and general Page 641 of 1420 Savino Miller Design Studio, P.A. December 6, 2022 Page 3 Schedule "B" environmental consulting issues by Professional Geologist (2 hours per week) and CIH (1 hour per week) for a duration of 22 months of work, and quarterly review by the CIH and Professional Geologist (4 hour each quarterly for 22 months), including field vehicle and PPE (66 days), and administrative support (2 hour per month for 22 months). Task 3 Budget = $80,570.00 Task 4 — Monitoring Well Replacement In the event that the General Contractor does not preserve or replace the monitoring wells, or if DERM requires additional post -construction monitoring, GBTS has included a budget to install up to eight (8) shallow monitoring wells by a Florida -licensed well drilling contractor. The 1.5-inch diameter wells will be installed to a depth of 12-feet BLS, including 10-feet of pre -packed, slotted well screen, and sufficient riser to reach the surface. The wells will be completed within a protective, flush -mounted, steel manhole with cover. Budget was based a 1-day field installation event, 10 hours of a Field Geologist, 12 hours of a Professional Geologist for coordination with DERM and Client, project management, and report preparation, 1 hour of administrative support, 1 day of field vehicle, 1 day of field supplies/PPE, and up to eight (8) monitoring wells. Task 4 Budget = $11,825.00 Task 5 — Post -Lake Construction Groundwater Monitoring Only Plan (MOP) In the event that the General Contractor does not conduct the MOP, GETS has included this budget to conduct a 1-year post -lake construction groundwater MOP. The MOP will include quarterly sampling of up to 20 existing monitoring wells. Sampling will be conducted in accordance with the FDEP SOPs, per Chapter 62-160, FAC. Groundwater samples will be transported to an environmental laboratory and analyzed for Total Arsenic by EPA Method 6010. DERM indicated that the final monitoring plan would be subject to review and evaluation. Therefore, the budget has included sampling/analysis of up to 20 existing monitoring wells. GETS' Professional Geologist will contact DERM and verify the required monitoring wells prior to implementation of the 15t quarterly sampling event. GBTS will prepare Quarterly Groundwater MOP Reports, including maps, tables and backup documentation within 30 days of each sampling event, which will be signed/sealed by the Professional Geologist. Budget was based a per -quarter estimate of: 3-day sampling event and a day of forms/tables by the Field Geologist (50 hours/quarter), project management and report preparation by the Professional Geologist (13 hours/quarter), drafting and administrative support (4 hours each/quarter), field vehicle (3 days/quarter), sampling equipment/PPE (3 days/quarter), and laboratory costs (20 groundwater samples/quarter). Task 5 Budget = $29,020.00 Page 642 of 1420 Savino Miller Design Studio, P.A. Schedule "B" December 6, 2022 Page 4 Task 6 — Engineering Control Certification (ECC) Report GBTS will prepared the Engineering Control Certification (ECC) Report utilizing the documentation provided by the General Contractor. This will include verification of the backup documentation, approximately 10 field inspections during cap installation, and discussions with the General Contractor concerning the details of the ECC. Budget was based on inspections by the Field Geologist (60 hours), preparation of ECC by Professional Geologist and Professional Engineer (35 hours each), field vehicle (11 days), and administrative support (10 hours). Task 6 Budget = $15,635.00 Task 7 — Supplemental Environmental Testing, Interpretation and Reporting GBTS has included this budget in the event that additional testing is needed during the excavation of the lake and relocation of soils. In the event that leachate water requires arsenic testing or soils require total and/or Synthetic Precipitate Leaching Procedure (SPLP) arsenic, GBTS can collect the samples and have the laboratory complete the analysis. GETS can provide interpretation and reporting of the results. Budget was based on sample collection by the Field Geologist (40 hours), project management, data interpretation, and reporting by the Professional Geologist (25 hours), field vehicle and sampling equipment (10 days), administrative support (5 hours), and up to 20 water samples for total arsenic and up to 20 soil samples for SPLP arsenic: Task 7 Budget = $14,300.00 BUDGET SUMMARY GETS has budgeted $170,045.00 to complete the scope of services, and the City of Miami Beach will only be charged for the actual services rendered, which will be invoiced on a Time and Materials basis, and will include the following anticipated staff and equipment unit rates: • Professional Geologist @ $150/hour • Professional Engineer @ $130/hour • Certified Industrial Hygienist @ $130/hour • Field Geologist @ $75/hour • CADD Draftsperson @ $60/hour • Administrative Support @ $40/hour • Field Vehicle @ $85/day • Sampling Equipment/Field Supplies/Disposables/Personal Protective Equipment @ $100/day • Subcontracted Laboratory —Total Arsenic Analyses @ $20/sample • Subcontracted Laboratory — SPLP Arsenic Analyses @ $150/sample . • Subcontracted Driller— Install Shallow Monitoring Wells @ $1,150/well The proposal assumed that the work will be completed within a maximum 3 year period. Page 643 of 1420 Savino Miller Design Studio, P.A. December 6, 2022 Page 5 Please do not hesitate to contact us if you have any questions concerning this proposal. Sincerely, ca c c �_ Craig C. Clevenger, P.G. Managing Director, Environmental Services Gallagher Bassett Technical Services Attached: • Fee Estimate Detail Spreadsheet Schedule "B" Page 644 of 1420 Schedule "B11 TABLE 1 - FEE ESTIMATE DETAIL CONSTRUCTION ADMINISTRATION - ENVIRONMENTAL OVERSIGHTISUPPORT Proposed Sayshore Park (Former Per 3), Miami Beach, FL EE&G Project No. 2020-3005 Task 1 Task Task 3 Task 4 Task 5 Task 6 Task 7 Planning/Mast Baseline GW Sampling SMPOve*M Well Replakemera 1-Year GIN MOP ECC Review Suplem. Sampling LAWR Rate Unit Hours per Task Total Hours Subtotal Principal, Professional Geologist (P.G.) $150.00 Hour 90 20 206 10 62 35 30 415 $62,250.0 Professional Engineer (P.E.) _ $130.00 Hour 8 0 0 0 0 35 0 41 $5,330.DO Certified Industrial Hygenist (CIH) $130.00 Hour a 0 120 0 0 0 0 128 $10,640.0 Field Geologist $75.00 Hour 10 60 264 /2 200 60 40 636 $47.700.0 _ D Draftsperson $60.00 Hour 0 4 0 0 16 0 0 20 $1,200.0 Administrative Assistant $40.00 Hour 5 4 44 1 16 10 5 85 $3,400.0 Subtotal - Labor Bllli : $11.770.00 $7,150.00 $88.360.00 $2440.00 $24,400.00 $14,700.00 $7,700.00 $136.520.0 EXPENSES Rate Unit Costs per Task ($) Costs per Task ($) Subtotal b Analysis (groundwater- Total Arsenic) $20.00 Sample $O.DO $400.00 $0.00 $0.00 $2,400.00 -$0.00 $400.00 $3.200.00 Lab Analysis (groundwater- SPIP Arsenic) $150.00 Sample $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,000.00 $3.000.00 Driller to Install Monkorin9 Wells $1.150.00 Well $0.00 $0.00 $0.00 $9,200.DO $0.00 $0.00 $0.00 $9,200.00 Truck Rental/Mileage $85.DO Day $170.00 $265.00 $5,010.00 $85.00 $1.020.00 $935.W $850.00 $8,925.00 Field Supplies (sampling equipment, disposable,. PPE, etc) '$100.00 Day 0.00 300.00 6.600.00 100.00 $1,200.00 0.00 1,000.00 $9,200.0 ubtotal-Expenses $170.00 $955.00 $12,210.00 $9,385.00 $4,620.00 $635.00 $5.260.00 $33,525.0 Total Pro'act Per Task: $11,940.00 $8105.00 $80 570.00 $11.825.00 $29,020.00 $16.635.00 $12.950.00 Task 1 - Pm sct Bud et: $170,045.00 Re iw 2Cets I-�TW- Caetru,Ylm P6rd,ob,ticn Page 645 of 1420