Resolution 2023-32454 (2)RESOLUTION NO. 2023-32454 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OFJTHE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE SETTLEMENT AGREEMENT AND RELEASE BETWEEN THE CITY OF MIAMI BEACH , FLORIDA (CITY) AND RIC-MAN INTERNATIONAL, INC. (RMI) IN THE AMOUNT OF $950,000, WHICH SETTLEMENT SUMS ARE AVAILABLE IN THE PROJECT BUDGET, TO SETTLE ALL OUTSTANDING CLAIMS PERTAINING TO THE DESIGN/BUILD SERVICES ASSOCIATED WITH NEIGHBORHOOD NO. 8: CENTRAL BAYSHORE SOUTH RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS PROJECT AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE SETTLEMENT AGREEMENT. WHEREAS, on April 13, 2016, the Mayor and City Commission adopted Resolution No. 2016-29363, pursuant to Request for Proposals No. 2015-133-YG, awarding design/build services to Ric -Man International, Inc. ("RMI" or the "Contractor") for the Neighborhood No. 8: Central Bayshore South Right -of -Way (ROW) Infrastructure Improvements project; and WHEREAS, on June 10, 2016, a design -build contract (the "Design -Build Contract") was executed in the amount of $18,061,646 plus $1,300,000 owner's contingency for a total of $19,361,645.95; and WHEREAS, the Central Bayshore South Neighborhood project limits include the public rights -of -way bounded on the north by the south right-of-way line of 34th Street; on the east by the west right- of way line of Pine Tree Drive; on the south by Dade Boulevard; and on the west by the Miami Beach Golf Course; and WHEREAS, the scope of this Design -Build project consisted of the design and construction of new water mains, road raising/reconstruction, storm drainage, installation of stormwater pump station, stormwater outfalls, and concrete sidewalk repairs; and WHEREAS, on July 14, 2016, Notice to Proceed (NTP) No. 1 was issued directing RMI to start the pre -construction work including engineering design and permitting; and WHEREAS, on December 8, 2016, a Community meeting was held to kick-off the start of construction for water main installation and to present the 60% stormwater design including information about the road raising strategy; and WHEREAS, following the meeting, the City received significant opposition from the Bayshore Neighborhood community regarding the proposed road elevation improvements; WHEREAS, in February 2017, RMI began construction activities related to the water main scope of work, including sidewalk repairs, and road reconstruction from Dade Boulevard to 34th Street and milling, resurfacing and striping from Dade Boulevard to 28th Street; and WHEREAS, the 60% level stormwater design encountered challenges in meeting the specified design criteria, as well as obtaining consensus from the community on the road raising strategy; and WHEREAS, for several months the Administration and Design/Builder attempted to finalize the stormwater design, but these efforts proved unsuccessful; and WHEREAS, on June 2, 2017 a stop work letter was issued to RMI for all design work related to the drainage and right-of-way infrastructure scope of work, until further direction by the City; and WHEREAS, the City's Stormwater Management strategy was reviewed by the Urban Land Institute (ULI) and by the Columbia University Resilience Accelerator in 2018 and based on recommendations made by ULI, the Resilience Accelerator and other agencies, the Administration was to determine next steps in the stormwater program to better implement the projects; and WHEREAS, on December 18, 2020 a Notice of Termination for Convenience for the Design -Build Contract for the Central Bayshore South Right -of -Way (ROW) Infrastructure Improvements project was sent to the Contractor, and as required by contract terms, the City requested a final termination payment proposal with substantiating documentation as a final settlement for all work performed on the project; and WHEREAS, RMI submitted a claim letter on January 15, 2021 with a final termination payment proposal in the amount of $3,898,305.25; and WHEREAS, the Contractor claimed that the final termination payment proposal included the opportunity costs of maintaining the payment and performance bond active for an amount equal to the contract amount for a lengthy period of idle time, compromising their bonding capacity, and the overhead costs associated with management and accounting services to monitor the project and continuously assess the availability of resources to be prepared to proceed with the work upon notification by the City; and WHEREAS, after numerous written communications and negotiation meetings, the City and the contractor agreed to a final termination payment in the amount of $950,000 in full settlement of all claims pursuant to a settlement agreement, a copy of which is attached to the Memorandum accompanying this Resolution as Attachment A (the "Proposed Settlement Agreement"), said termination payment to account for the reduced bonding capacity and unabsorbed office overhead costs and expenses allegedly incurred by RMI, subject to City Commission approval of the Proposed Settlement Agreement; and WHEREAS, the City will also be releasing the remaining retainage held for work previously completed in the amount of $10,000; and WHEREAS, the Administration recommends that the Mayor and City Commission approve the resolution. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA approving the settlement agreement and mutual release between the City of Miami Beach, Florida (city) and Ric -Man International, Inc. (RMI) in the amount of $950,000, to settle all outstanding claims pertaining to the design/build services associated with Neighborhood No. 8 Central Bayshore South Right-of-way Infrastructure Improvements project and authorizing the City Manager and City Clerk to execute the settlement agreement, which settlement sums are available in the project budget. PASSED and ADOPTED this f day of Febri-ee. 2023. Dan Gelber, Mayor AT -TEST: FEB 0 8 Ra6ael E. Granado, City Clerk APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION '7 - z-3 Obj Atforftay rca :Date e 1 e MIAMIBEACH COMMISSION MEMORANDUM TO; Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: February 1, 2023 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE SETTLEMENT AGREEMENT AND RELEASE BETWEEN THE CITY OF MIAMI BEACH, FLORIDA (CITY) AND RIC-MAN INTERNATIONAL, INC_ (RMI) IN THE AMOUNT OF $950,000, WHICH SETTLEMENT SUMS ARE AVAILABLE IN THE PROJECT BUDGET, TO SETTLE ALL OUTSTANDING CLAIMS PERTAINING TO THE DESIGN/BUILD SERVICES ASSOCIATED WITH NEIGHBORHOOD NO. 8: CENTRAL BAYSHORE SOUTH RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS PROJECT AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE SETTLEMENT AGREEMENT. RECOMMENDATION. The Administration recommends that the City Commission approve the Resolution. On April 13, 2016, the Mayor and City Commission adopted Resolution No. 2016-29363, pursuant to Request for Proposals No. 2015-133-YG, awarding design/build services to Ric - Man Intemational, Inc. ("RMI" or the "Contractor") for the Neighborhood No. 8: Central Bayshore South Right -of -Way (ROW) Infrastructure Improvements project. On June 10, 2016, a design -build contract (the "Design -Build Contract') was executed in the amount of $18,061,646 plus $1,300,000 owner's contingency for a total of $19,361,645.95. The Central Bayshore South Neighborhood project limits include the public rights -of -way bounded on the north by the south right-of-way line of 34th Street; on the east by the west right - of way line of Pine Tree Drive; on the south by Dade Boulevard; and on the west by the Miami Beach Golf Course. The scope of this Design -Build project consisted of the design and construction of new water mains, road raising/reconstruction, storm drainage, installation of stormwater pump station, stormwater outfalls, and concrete sidewalk repairs. On July 14, 2016, Notice to Proceed (NTP) No. 1 was issued directing RMI to start the pre - construction work including engineering design and permitting: Page 649 of 1420 On December 8, 2016 a community meeting was held to kick-off the start of construction for water main installation and to present the 60% stormwater design including information about the road raising strategy. Following the meeting, the City received significant opposition from the Bayshore Neighborhood community regarding the proposed road elevation improvements. In February 2017, RMI began construction activities related to the water main scope of work, including sidewalk repairs, and road reconstruction from Dade Boulevard to 34th Street and milling, resurfacing and striping from Dade Boulevard to 28th Street. ANALYSIS The 60% level stormwater design encountered challenges in meeting the specified design criteria, as well as obtaining consensus from the community on the road raising strategy. For several months, the Administration and RMI attempted to finalize the stormwater design, but these efforts proved unsuccessful.. On June 2, 2017 a stop work letter was issued to RMI for all design work related to the drainage and right-of-way infrastructure scope of work, until further direction by the City. The City's Stormwater Management strategy was reviewed by the Urban Land Institute (ULI') and by the Columbia University Resilience Accelerator in 2018. Based on recommendations made by ULI, the Resilience Accelerator and other agencies, the Administration was to determine next steps in the stormwater program to better implement the projects. On December 18, 2020 a Notice of Termination for Convenience for the Design -Build Contract for the Central Bayshore South Right -of -Way (ROW) Infrastructure Improvements project was sent to RMI, and as required by contract terms, the City requested a final termination payment proposal with substantiating documentation as a final settlement for all work performed on the project. RMI submitted a claim letter on January 15, 2021 (Attachment A) with a final termination payment proposal in the amount of $3;898,305.25.The Contractor claimed that the final termination payment proposal included the opportunity cost of maintaining the payment and performance bond active for an amount equal to the contract amount for a lengthy period of idle time, compromising their bonding capacity, and the overhead costs associated with management and accounting services to monitor the project and continuously assess the availability of resources to be prepared to proceed with the work upon notification by the City. After numerous written communications and negotiation meetings, the City and the Contractor agreed to a final termination payment in the amount of $950,000 in full settlement of all claims pursuant to a settlement agreement and release (Attachment B), said termination payment to account for the reduced bonding capacity and unabsorbed office overhead costs and expenses allegedly incurred by RMI, subject to City Commission approval of the settlement agreement. Additionally, the City, will be releasing the remaining retainage held in the contract, for work previously completed, in the amount of $10,000. SUPPORTING SURVEY DATA Not applicable. FINANCIAL INFORMATION Not applicable. Page 650 of 1420 Amount(s)/Account(s): $950,000 432-0820-069357-26-418-000-00-00-00-28940 CONCLUSION The Administration recommends that the City Commission approve the resolution. Applicable Area Middle Beach Is this a "Residents Right to Know" 'item. pursuant to CitiLCode Section 2-14? 9M1 7 Strategic Connection Non -Applicable Legislative Tracking Capital Improvement Projects P 77 - • :. . _ �. No ATTACHMENTS: Description o Attachment A- RMI Claim's Letter Dated January 15, 2021 o Attachment B - Settlement Agreement o Resolution Page 651 of 1420 ATTACHMENT A d1oRIC-MAN INTERNATIONAL, INC. r GENERAL CONTRACTOR 49* 1545 NW 27TH Ave • Pompano Beach, Florida 33069 Phone: (954) 426-1042 • Fax: (954) 426-0717 Raul J. Aguila 1/15/2021 Interim City Manager City of Miami Beach 1700 Convention Center Drive Miami Beach, FI 33139 Re: Notice of Termination for Convenience Project: Design/Build Services for Neighborhood No. 8: Central Bayshore South Right -Of -Way Infrastructure Improvements. Dear Mr. Aguila, This letter is in response to the December 10, 2020 Notice of Termination for Convenience ("Notice Letter") issued by the City of Miami Beach (City) concerning the referenced Contract between the City and Ric -Man International, Inc. (RMI). As you presumably are aware, the Contract was awarded to RMI on June 10t', 2016. On June 2, 2017, RMI was instructed to stop its Contract work; no date was provided as to when the resumption of the work was expected to occur. To our dismay, three and a half years passed before the City notified us that the Contract was being terminated for the City's convenience, effective December 18, 2020. During the extraordinary 1,295-day period between June 2, 2017 notice to stop work and the December 18, 2020 termination for convenience, RMI was required to maintain its Performance and Payment Bond issued to the City at the outset of the project, which meant over $18 million in bonding capacity was unavailable for our use; RMI was required to have its management and accounting departments continue to oversee and monitor the project, and RMI was required to continuously assess the availability of resources so that it would be prepared to proceed with the work when the City notified it that the work would be resuming. According to the Notice Letter, RMI has calculated a final termination payment proposal for your review and consideration. Our original contract sum was $18,061,645.95, and according to our records, the retainage still owed to us is $548,343.00. In addition, to determine our unreimbursed costs due to the three -and -a -half -year suspension of the project, we have utilized the formula accepted by the Florida Department of Transportation. Enclosed, you will find the calculations, which totals $3,898,305.25. Pursuant to the above calculations, the total final payment pursuant to the Agreement and the termination for convenience is $4,446,648.25. Please find enclosed, latest payment application and letters received. Should you have any questions, please feel free to contact us. Best Regards,. Anh i CGC General Manager Cc: Michael Jankowski Alina Hudak, CIP Asst. City Manager David Martinez, P.E. CIP Director David Gomez, CIP Division Director Sabrina Baglieri, Senior Capital Projects Coordinator Enclosed: Letter to Stop Work Notice of Termination Latest Pay-App#21 FDOT Calculation Page 652 of 1420 I I P a 9 e ATTACHMENT A JUN 0 5 20Y ^fr' ?�A111,tit f�T71 City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www,miamibeachfl.gov OFFICE OF CAPITAL IMPROVEMENT PROJECTS Tel: 305,673.7071 Fox: 305.673.7073 June 2, 2017 Sent Via Email and CertiFed US Mail Rene L. Castillo, Sr. Tracking # 7014 1200 0000 2403 8826 President Ric —Man International, Inc., 1545 NW 27 Avenue Pompano Beach, FL 33069 Re: NEIGHBORHOOD NO. 8: CENTRAL BAYSHORE SOUTH RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS — Notice to Cease & Desist ROW Design Dear Mr. Castillo, You are hereby given notice to cease & desist all design work related to the drainage and ROW infrastructure improvements for the subject -project, until further direction from City of Miami Beach Administration is provided, Please continue with all construction activities for the water main scope of work for this project, as originally scheduled. Should you have any questions and/or need additional information pertaining to this matter, please contact me at your convenience. Z epital Projects Coordinator cc: David Martinez, P.E., LEED AP, CIP Director Humberto Cabanas, CIP Division Director Eric Arencibia, P.E., CIP Capital Projects Coordinator Page 653 of 1420 VVe are c:cmrni!tad to providing a<cel!en! Public servrc:e and safen,: ry oil %%-ho live, ::vrf;. and ploy in cur vibrun!, !ropico! his!onc comrrruni!y. ATTACHMENT A City of Miami Beach 17,110 Convention Center Drive Miami Beach. FI 331.39 Tel 305-673.7010 Fax- 305-673-7782 OFFICE OF THE CITY MANAGER Tel. 305-673-7010. Fax: 305-673-7782 December 10, 2020 Via: E-Mail & Certified Mail Return Receipt 9214 8901 9403 8300 0027 3669 04 Andres Garcia, P.E./ General Manager Ric -Man International, Inc. 1545 NW 27th Avenue Pompano Beach, FL 33069 Re: Notice of Termination for Convenience ("Notice of Termination") Project: Design/Build services for Neighborhood No. 8: Central Bayshore South Right -of -Way Infrastructure Improvements ("Project"). Dear Mr. Garcia Please allow this correspondence to serve as written notice that, pursuant to Article 16.1 of the agreement between the City of Miami Beach, Florida (the "City") and Ric -Man International, Inc. ("RMI"), (the "Agreement"), pertaining to the above referenced Project, the City hereby terminates the Agreement for convenience, which termination shall become effective on December 18, 2020. In accordance with article 16.1 of the Agreement; RMI shall be compensated for all Work satisfactorily performed up to the time of receipt of this Notice of Termination, and for the assembly and submittal to the City of documents for the services performed, as set forth in Article 16.1 of the Contract. The City shall have no further liability for compensation, expenses or fees to RMI, except as set forth in Article 16.1, but only to the extent such provisions therein are applicable to this Notice of Termination. Upon receipt of this Notice of Termination for convenience, RMI is hereby directed to immediately: (1) Stop the Work specified as terminated in the Notice of Termination for Convenience; (2) Promptly notify all Subcontractors of such termination, cancel all contracts and purchase orders to the extent they relate to the Work terminated to the fullest extent possible and take such other actions as are necessary to minimize demobilization and termination costs for such cancellations; (3) Immediately deliver to the City all Design Materials as defined in Section 22.1 of the Agreement, in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased. The Design/Builder acknowledges and agrees that all amounts previously paid to the Design/Builder with respect to the creation and preparation of Design Materials in approved Applications for Payment, along with the final payment for the Design Materials, to be based on the percent completion of the Design Materials, shall include the consideration to Design/Builder for City's ownership and receipt of Design Materials, with final payment for Design Materials shall be provided after receipt of Design Materials; (4) If specifically directed by the City in writing, assign to the City all right, title and interest of Design/Builder under any contract, subcontract and/or purchase Page 654 of 1420 ATTACHMENT A order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; (5) Place no further subcontracts or purchase orders for materials, services, or facilities, except as necessary to complete the portion of the Work not terminated (if any) under the Notice of Termination for Convenience; (6) As directed by the City, transfer title and deliver to the City (a) the fabricated and non -fabricated parts, Work in progress, -completed Work, supplies and other material produced or required for the Work terminated; and (b) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; (7) Settle all outstanding liabilities and termination settlement proposals from the termination of any subcontracts or purchase orders, with the prior approval or ratification to the extent required by the City; and (8) Take any action that may be necessary, or that the City may direct, for the protection and preservation of the Project, including life safety and any property related to this Agreement that is in the Design/Builders possession and in which the City has or may acquire an interest. Additionally, RMI shall submit, for the City's review and consideration, a final termination payment proposal with substantiating documentation, including an updated Schedule of Values, within thirty days of the effective date of this termination. Such final payment shall be in full and final settlement for all work performed on the Project pursuant to the Agreement. Thank you or your prompt attention to this matter. Should you have any is, pleasentact Sabrina Baglieri at (305) 673-7071. M Cc�Alina Hudak, CMB-CIP Assistant City Manager David Martinez, P.E., CMB-CIP Director David Gomez, CMB-CIP Division Director Sabrina Baglieri, CMB-CIP Senior Capital Projects Coordinator Page 655 of 1420 ATTACHMENT A APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 TO OWNER: City of Miami Beach PROJECT: D/B Services for Neighb. 8 - Central Bayshore South ROW Infrastructure Improvements Office of Capital Improvements Projects 1701 Meridian Avenue, Suite 300, Miami Beach, FL 33139 APPLICATION NO.: 21 Distribution to: FROM: Ric -Man Intemational, Inc. 1545 NW 27th Ave Pompano Beach, FL 33069 CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. ,CONTRACT SUM TO DATE (Line 1 + 2) $18,061,645.95 $1,300,000.00 $19,361,645.95 4. TOTAL COMPLETED & STORED TO DATE $5,483,430.00 (Column L on G703) 5. RETAINAGE: a. 10% of Completed Work $548,343.00 (Columns J + K on G703) b. 0% of Stored Material 0 (Column F on G703) Total Retainage (Line 5a + 5b or Total in Column N of G703) $548,343.00 6. TOTAL EARNED LESS RETAINAGE: $4,935,087.00 ..................................... (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 4,815,611.95 S. CURRENT PAYMENT DUE $119,475.05 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $14,426,558.95 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner $1,300,000.00 Total approved this Month TOTALS $ 1,300,000.00 $0.00 NET CHANGES by Change Order $1,300,000.00 PERIOD FROM: 05/01/18 OWNER PERIOD TO: 07/31118 ENGINEER PROJECT NO.: ROW BAY080 C.E.I. CONTRACT DATE: 06/10/16 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. Contractor: Ric -Man International, Inc. By: Andres G. Diaz, PE State of: Florida County of: Miami -Dade Subscribed and sworn to before me this Notary Public: My Commission expires: ENGINEER CERTIFICATE FOR PAYMENT Date: In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Contractor certifies to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents and the Contractor Is entitled to payment of the AMOUNT CERTIFIED. Additionally, the FOR certifies to the Owner that the design and permitting associated with the Work has progressed as indicated and has been undertaken, and the quality of work is in accordance with the Contract Documents, and the Contractor is entitled to the respective portion of the payment of the AMOUNT CERTIFIED. ' AMOUNT CERTIFIED $119,475.05 (Attach explanation if amount ceAified differs from the amount applied for. Initial all figures on this Application and on Continuation Engineer Of Record: Chen Moore & Assoc. - Gregory Mendez, P.E. By: Date: This Certificate is not negotiable. THE AMOUNT CERTIFIED is payable only to the Contractor named herein. 1puance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract, G702-1992 Page 656 of 1420 of H Z W 2 2 LU r Q = O O iyry�y♦8 m � p8p8p888NpSS_pp8jwR N N A m p A 88p28988Cp8S8p8 n o SM8S8S8S8888 9 A 8888H 8888888C84 N N W M N N Cbl 0 4") 1� O^ O N,6 t0 m' O N Y 0 of N 0 0 N g O O N O g fO O M 3 ¢ M ». � o m N C NN S f� pp M pp Cp N O CO yy� pp N N by Gp pp N S� pp 19 pp pp N N po pp N w pp pp M M pp pp N N ^ O N N p S O p O N m� ( N N m M fffVVV N ♦Y N O N �An YI N M Q b N• IY • No i o'o Da Uo 8 gig R Y,^ o to 6 o 0 of 8 S 8 8 N Ql O O O O O ON, 0 8 8 R 8 8 8 8 0 SS 8 8 8 8 8 8 8 8 8 H 0 0 8 8 8 Q t. 0 88X'i,�oSvi_.$,i"a ASi�BRA� $9$�$Sl$ $St• %8i��� 211 w w Y o C8O8cpG8O� o88G8pp8pc8eG8ppp8p8p8 C8C5pp8pc8p8pG8p8 oo8G8Oop8C8pG8pG8pC8p� 8Cpo8p� c8po8pC8po8po8p8 p � a LL N N • ®W 5385 8888$8883 O N p8O88p68p88 p8p88pp8p8Fpi,pB$ p88H 88888q pO yQ� N p� O O O N 8 t �8yy �Oy �t�ppi lag lag `YdAwN « d n O N M r M • • C 0 8ss8SSS G C C G O 8g8ssss ss ss8sg B O r O C G O O p O C C o o O C C G C G 0 =o �a 8S8 C C SS888g88 S888S8� 888So88 8S ggSgB V W G O O C C C O p 0 0 G O O C G O 6 666 O 666 O C p O G 0 0 Y C m lqD Y y� 6 �Op pp OO YY�� C O pp m 0 0 O G o YYff OO D C G 0 O G O O O O O O O W S op e O 8 Sg o OQ 8 O q 4 88 mm C N O D 8 S S 6m S S O C S 8 8 8 S G ee O q V Q 2588 p$4 QQS 52O5 Q $gS Q 25�$� 25$S2S $ $ $ 252$ gSg 25�ggg2525 .6 QQO $$8 QOQ Z$ga s$s NS_S Q g t,Q66 �1 LL F 7 mgm 0 M i • r S .2Nn535 W t t8mO Y V w s�j N p°�� +mS N N A fry t0�1 cQt CNi 9 A t0 1. M y� o r M tEr$2m5 Yf q m 888 88888888 85588888 8 88888. 88 88888 888 qo QQ 2 Si3 z85� i3oSoai5 88QQ 8g8QQQQ55��55�� ro25S38 8m85� 555��55�� Sck 88 0o ngo8QQ S S _ V H M N t� N r S�( M! c Oi Yy p 7 d N N N N G 2 d J J 9 2!2 ul, J 9 J S S J N J z C LL � a m = p 2 u S 8 0 V uj zg � 8 5 N N c v n OS�,oao`S,00 000Eo�S,o~o'S�,oaO�B^o Iq b % " U N w LL b m� LL $t �{�I o oS�o 'oo 'o�oe�S', O N IT O n LO m m m a r Z M r1. S Rw isI $.P ws. mN�wN....o8r8 ov uRRusP ; ~.e a �i a mG�Sc �'r6'�m Cal o $T 8 Om 60�or I mm IF a m � O 8 y 4,Oyi a 2 y r Qi v i. 5 O e z y� Y o C s < g O r fR !r/1 r r N N r N N y rr N N N N 6 10 N in W, a N N y y N� m r%OpO$immNdb' ffiOY� �S8 �OS 0 0 �M. fOSI � �8pO' �M84qN� �b8tvf8�N m yp�O$� pp�O pYpOop',S`8 8�O pO S0 001; mpO� Np�O 8pp8O 888888 99889998 98999999 88 88 m p V W8o NH ON !92 NW N a+ 1u mr °j S H H + m 0 PH 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0�0 0 0 0 0 m U m8 8888 88g888 190191919 88888888 8888HH88 0� A x O 2Q5 ? 0 N8 0 0 88oH 0 0 0 0 888888 0 0 0 0 0 0 Hoo8H88o8 0 0 0 0 0 0 0 0888808s 0 0 0 0 0 0 o m 8I O m n s= o 88 8888 MOM 0 0 0M 88888888 88888888 �> o _ r r > 9 T _ N pV� y� O O y� « O O y� O O ` O �q N O O O O O O gg O O O O O O O O O O O O O O m ZN �1 N 88 HHHB $888$$8 $88988888 88888888 �. y n M 7S� a �C lS�82S oo ub's n aars?S!S!Sffiffi2S 8��lSlSoffiZS $8 BE?YHH88 888888 $88888888 88888888 $� o ; > M w 188 O O H O O O O O O O O O s s s ai iS s s s �q O y� y� O O N y� O O q H O M O WO ° N 88888 9888888 88888888 88888888 8° r N y� � 4400 jQO� QO COS O pqO O ,q00 O 2��21• QO O O qpO W yQ1 i�T O 4qO d�2t qpO pqO pqO O OA'd�X pqO oqP F, O pqO pqO cO� QO qO pq� 3 XI2�dt,; wi N N M = �d a� 8888 7S7Sv1$N1S $FirP!4S sb 19 8!SffiigM m $$8888 $$888$$ 588888888 88888888 = �' Y+ N+ � Ramp 8 r+rfS oH—m m Owyf.� NNJ� O S m N8HH8 88888 6 88888888 0 = a ATTACHMENT A AIADacunwrd0703-APPUCATIONANOCERTIFIGTEFORPAYMENT NUMBERr� Daft 07131110 A B C D E F O I H I 1 I ir 117 Lr M I NI N Central Bayehom South -Neighborhood No.8 WORK COMPLETED PROJECTNO.: 2016.133-YO (S)AMOUNT (S)AMOUNT (3)AMOUNT BALANCE LAST THIS TOTAL ITEM UNIT TOTAL PREhOUB COMPLETED COMPLETED % RETAINAGE TO FINISH APPLICATIONS NO. DESCRIPTION OF WORK CITY UNITE PRICE VALUE C X E PERIOD PERIOD TO DATE FOR PAYMENT THIS PERIOD TO DATE Complete 101h 1- Nr of Or 11.01 lConsideraWn for IndemnKcation of Cq 1 LS $25.00 $2500 0.00 0.00 0.00 $0.00 $0.00 S0.0o 0.00% $0.00 $25.00 Suhtatal kvmwnasum 1112M .00 114.111011 $0.06 OAW% $OA0 I SSS.00 S-CW Mfa/Mw1t ditft- S111SDNn1aat*DTMA% Ass ' 12.01 Cost for compliance tong Federal and State requirements of the Trench Safety Act 1 LS $25.00 525,D0 0.00 0.00 0.00 $0.00 $0.00 $0.00 0.0(r1 $0.00 $25.00 fubbw Tmtch Sam $0.110 $0.01) 1110.01) 0.00% $0.00 S" CoftetTew A1if1 'SOUL9S.SS S13.2mia1.17 13 - Change Orders Charge Order I RFCD #1 - Additional Watimmain W 23rd St. RFCO N2 - Additional 13.01 Filings (Replacement of 16' BV win GV, Fire Hydrants in front of school moved to 16- WM. 1 LS S219,755.99 $219,765.99 1.00 0.00 1.00 $219,755.99 $0.00 $219.755.99 100.00% $21.975.60 $O.W Change of cope sizes at Tie-in al Dade Blvd.) 13.03 Change Order 2. Charge Order to move Owners Contingency funds into Project. 1 LS S1.080,244.01 $1,080,244.01 $657,376.37 14 - Contingency Drava Contingency Draw 01 - Design and pennititng of drainage pipe on Prune Ave to carry stormwater to the existing Dade Blvd. pump station (S44.000.00). 14.01 -Design, permitting. and installation of approximately 4,700 LF of (2).2 inch PVC conduit I LS $283,447.19 $283.447.19 0.1225 0.0000 0.1225 $34,727.78 $0.00 $34.727.78 12.25% $3,472.78 and 18 pull boxes for low-voftage conduit ($168,075.82). $248,719.41 -Additional drainage system analysis outside of original contract scope and DCP $71.371.37 14.02 Contingency Draw #2- RFCO e6 Field ordered installation of connecting to existing 6" 1 LS $23.830.40 $23,830.40 1,0000 0.00W 1.0000 $23.830.40 $0.00 523,830.40 100.00% $2,383.04 $0.00 fireline and 4- domestic line In front of Miami Beach Senior Highwhool Contingency Draw N3 - RFCD 03 - Public Works requested the relocation of (15) fifteen existing water service meter boxes from driveways into adjacent sidewalks. Along Prairie Avenue from Dade Blvd. to W 341h Street S37,510.08 RFCD #4 - The Public Works water atlas were not accurme aid showed a 8 inch watermain supptiyrg water to the Goff Course. However during excavation RMI found that the walennain described as 8 inch was 12 inch. CIP by directive from Pubic Works instructed RMI to correct the newly installed iG watermain at 29th St. to an existing 12" watermain to supply water to the goff course (Approximate STA 43+85. 10' Left Offset of Prairie Avenue Base Lim). $29.215.97. RFCD N5 - CIPIPW directed RMI to connect several additional unforeseen fire hydrants in 1403 font of the high school to the new, 16" 1 LS $115,590.05 $116,590.05 00000 1.000D 1.0000 $0.00 $116,590.05 $115.590.05 100.00% $11,60.01 $0.00 watenmain. Right offset of Prairie Avenue Base Line approxmnate STA 18+21 and STA 22+88. $26,608.92. RFCD 06 - RMI was directed by pubic works to connect the existing 4- domestic ire acid 6" fire lime off of the 8" main located at STA 21+25 for the High school, these connections were Prot part of our scope of work and were issued via a field order. This resulted in additional materials. labor and equipment costs. $17.685.35: RFCD 07 - CIP at the request of Public Works directed RMI to relocate the existing meter located at 3191 Prairie Ave. from private properly into the publd ROW: these connection were not pan of our scope of work and wete issued via a field order. The meters were _ originally located on the owners property. $4.569.73. TItOd O1dNe i1,iN0S6N ilTSS1417 i11/MOM {SRSfOi!! 5030% SSS.750A3 iS/ST1SA/ fTWAL!REM• TO DATA NS,SMMSM 8.70SAmu $Iva SOS I $44p.4KM I SS.SS11 I wits A INSfTSt1SN Page 659 of 1420 ATTACHMENT A RIGMMAN INTERNATIONAL, INC. dcoor GENERAL CONTRACTOR 464h 1545 NW 27TH Ave • Pompano Beach, Florida 33069 Phone: (954) 426-1042 • Fax: (954) 426-0717 Florida Department of Transportation Formula Original Contract x 8% Average Overhead/Day = Original Contract Time mm mn new n"= NTP 1 DESIGN l;< PERMITTING 7/14/2016 7/1412016 SUBSTANTIAL COMPLETION 420 9/7/2017 FINAL BA 60 1 11/6/2017 # of Days 480 REVISED NTP & ADDENDUM 12 OF CONTRACT STATES THESE $18,061,645.95 x 8% Average Overhead/Day = 480 Days Average Overhead/Day = $3,010.27 Day of Stop 6/2/2017 Tenn Date 12/18/2020 # of Days 1295 Total Overhead = Days of Suspension x Average Overhead/Day Total Overhead = 1,295 x 3,010.27 Total Overhead = $3, 898, 305.25 11 P a g e Page 660 of 1420 ATTACHMENT B SETTLEMENT AGREEMENT AND RELEASE THIS SETTLEMENT AGREEMENT AND RELEASE (this "Agreement") is entered into as of the day of , 2023 by and between RIC-MAN INTERNATIONAL, INC. (hereinafter referred to as "RMI"), and the CITY OF MIAMI BEACH, FLORIDA (hereinafter referred to as the "City"). The parties hereto (the "Parties") agree as follows: RECITALS WHEREAS, RMI and the City entered into that certain Design/Build Agreement pursuant to Request for Proposals No. 2015-133-YG, dated June 10, 2016 (the "DB Agreement") in the amount of $18,061,646 plus $1,300,000 owner's contingency for a total of $19,361,645.95, pursuant to which RMI would provide design -build services for the project known as the "Neighborhood No. 8 Central Bayshore South Right -of -Way Infrastructure Improvement" (the "Project"); and WHEREAS, on July 14, 2016, Notice to Proceed (NTP) No. 1 was issued directing RMI to start the pre -construction work including engineering design and permitting. WHEREAS, In February 2017, RMI began construction activities related to water main scope of work, including sidewalk replacement, and road reconstruction from Dade Boulevard to 34t' Street and milling and resurfacing and striping from Dade Boulevard to 28' Street; and. WHEREAS, the stormwater design reached a 60% level and encountered challenges in meeting the specified design criteria and consensus from the community on road raising; and WHEREAS, on June 2, 2017, the City advised RMI that design work related to stormwater and right-of-way infrastructure scope of work of the Project should be suspended; and WHEREAS, RMI was to proceed with all construction activities associated with the water main scope of work; and WHEREAS, on December 10, 2020, the City exercised its right to terminate the Agreement for convenience pursuant to its terms; and WHEREAS, RMI has made claims against the City for reduced bonding capacity and unabsorbed office overhead costs and expenses allegedly incurred by RMI during the period between the date of the suspension notice and the effective date of the termination for convenience; and WHEREAS, the City has denied any liability to RMI for the alleged damages; and WHEREAS, to avoid the costs and uncertainties of litigation, the Parties are desirous of resolving all claims and disputes between themselves, on the terms and conditions hereinafter set forth. NOW, THEREFORE, in exchange for the good and valuable consideration more particularly set forth herein, but without admission of any liability, fault or wrongdoing, the Parties agree as follows: Page 1 of 4 Page 661 of 1420 ATTACHMENT B 1. Recitals. The above recitals are true and correct and are incorporated herein by this reference. Capitalized terms used herein and not otherwise defined shall have the meanings given to them in the DB Agreement. 2. Representation. This Agreement is entered into voluntarily by the Parties who stipulate and agree that they are under no duress or undue influence. The Parties represent that in the execution of this Agreement, they had the opportunity to consult legal counsel of their own selection with respect to the execution this Agreement. 3. Settlement Payment. Within thirty (30) days of the Effective Date of this Agreement, the City agrees to pay, and RMI agrees to accept, the total sum of Nine Hundred Fifty Thousand Dollars and Zero Cents ($950,000.00) (the "Settlement Proceeds"), as a full and final settlement between the Parties of all claims raised, or that could have been raised, by RMI pursuant or in relation to the DB Agreement. 4. Release. RMI, for itself and on behalf of its Consultants, all Subcontractors, all Design Subconsultants and all material suppliers at every tier, hereby remise, release, acquit and forever discharges the City, its attorneys, representatives, officers, employees and agents from any past, present and future claims, actions, causes of action, demands, rights, damages, costs, losses, expenses, compensations and obligations which exist or which may hereafter accrue, whether known or unknown, whether foreseen or unforeseen, whether matured or not mature, whether discovered or undiscovered, and the consequences thereof, having resulted, resulting or to result from any or all of the following: a. RMI's performance of any work pursuant to the DB Agreement; b. the City's suspension of work pursuant to the DB Agreement; C. the City's termination of the DB Agreement; and d. any and all claims for attorney's fees (including paralegal fees) and costs in any way related to any of the foregoing. 5. Warranty of No Assignment; Satisfaction of Third -Party Interests. RMI represents, warrants, and certifies that it has not in any manner assigned, pledged or otherwise voluntarily or involuntarily disposed of or transferred to any person or entity any interest in any claim(s), actions, causes of action, suits, damages, losses, judgments, executions, demands, liabilities, obligations, responsibilities, liens, expenses, costs and attorney's fees raised by RMI and/or referenced in this Agreement (collectively, "Claims"), and if any person or entity has any interest in any such Claim, RMI will fully satisfy and discharge such person or entity's interests from the Settlement Proceeds payable by the City pursuant to this Agreement. RMI will hold harmless and indemnify the City from and for any and all actions, causes of action, damages and costs, including reasonable attorneys' fees, incurred in defense of or in settlement of all actions, causes of action, suit or suits, or demands, by any third party whose interest in any Claim is not fully satisfied and discharged by RMI. 6. No Admission of Liability. RMI acknowledges and agrees that any payment by the City pursuant to this Agreement, and/or any other act, representation, inaction or silence by Page 2 of 4 Page 662 of 1420 ATTACHMENT B the City is not to be construed as an admission of liability but is made to protect the interest of the City and to avoid litigation and the expense thereof. 7. Effective Date. The Effective Date of this Agreement shall be the date upon which the second Party to sign has affixed the signature of its representative to the Agreement and delivered an executed copy to the other Party. 8. Entire Agreement. This Agreement constitutes the sole and entire agreement between the Parties and supersedes all prior and contemporaneous statements, promises, understandings or agreements, whether written or oral. 9. Amendments. This Agreement may be amended, modified or altered at any time upon the approval of the Parties; however, any such amendment must be in writing and signed by all Parties in order for such amendment to be of any force and effect. 10. Partial Invalidity. In the event that any provision of this Agreement is declared by any court of competent jurisdiction or any administrative judge to be void or otherwise invalid, all of the other terms, conditions and provisions of this Agreement shall remain in full force and effect to the same extent as if that part declared void or invalid had never been incorporated in the Agreement and in such form, the remainder of the Agreement shall continue to be binding upon the Parties. 11. Applicable Law. This Agreement shall be subject to and governed by the laws of the State of Florida, without regard to conflict of law rules. 12. Counterparts. This Agreement may be signed and executed in one or more counterparts, each of which shall be deemed an original and all of which together shall constitute one Agreement. Delivery of an executed counterpart of a signature page of this Agreement by facsimile or email shall be effective as delivery of an originally executed counterpart of this Agreement. 13, No Adverse Construction. The Parties acknowledge that this Agreement has been prepared by each of them. In the event any part of this Agreement is found to be ambiguous, such ambiguity shall not be construed against either of the Parties. 14. Further Acts. In addition to the acts recited in this Agreement, the Parties agree to perform, or cause to be performed on the date of this Agreement, or thereafter, any and all such further acts as may be reasonably necessary to consummate the transactions contemplated hereby. Each of the Parties agrees that it will execute and deliver all such documents and instruments as may be necessary and appropriate to effectuate the terms of this Agreement. [BALANCE OF PAGE IS INTENTIONALLY BLANK.] Page 3 of 4 Page 663 of 1420 ATTACHMENT B 15. Authority. Each person(s) executing this Agreement as an agent or in a representative capacity further warrants that he or she is duly authorized to do so. The Parties have executed this Agreement as of the date set forth below. IN WITNESS WHEREOF, the parties hereto have caused this Settlement Agreement to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: Rafael E. Granado, City Clerk ATTEST: Secretary Print Name CITY OF MIAMI BEACH, FLORIDA Dan Gelber Mayor RIC-MAN INTERNATIONAL, INC. President Print Name Page 4 of 4 Page 664 of 1420