Loading...
R9E Baylink PresentationBAYLINK – IMPLEMENTATION PLAN Baylink Implementation Plan PRESENTED BY COMMISSIONER EILEEN HIGGINS MIAMI-DADE COUNTY, DISTRICT 5 BAYLINK – IMPLEMENTATION PLAN •The SMART Program is advancing six rapid transit corridors •Implement expanded mass transit infrastructure in Miami-Dade County. •Beach Corridor •East-West Corridor •North Corridor •Northeast Corridor •South Corridor •Kendall Corridor* SMART Program *on hold BAYLINK – IMPLEMENTATION PLAN Beach Corridor - Baylink MetroMover Connection October 3, 2022BAYLINK – IMPLEMENTATION PLAN Baylink Extension Scope •Extend Metromover from Museum Park Station towards Miami Beach •Creation of new “Beach Loop” •Elimination of transfer and additional main-land stations •Preserve alignment south of I-395 •Alignment consistent with PD&E study Contiguity with Metro Mover System October 3, 2022BAYLINK – IMPLEMENTATION PLAN •One-seat ride •Minimize project costs •Saves $2 billion over 30 years •Operational benefits •Accelerated procurement Baylink Extension Benefits October 3, 2022BAYLINK – IMPLEMENTATION PLAN Museum Park Metro Mover Station Beach Metro Mover Extension (Beach Loop) October 3, 2022BAYLINK – IMPLEMENTATION PLAN •One-seat ride to Miami-Beach via “Beach Loop” •Compatible with planned extension of existing Metromover to Design District •Improved connectivity to other modes of transit (MetroRail, Brightline, Tri-Rail) Community Benefits BAYLINK – IMPLEMENTATION PLAN Beach Corridor – Baylink Current Next Steps Next Steps: •Advertise RFP Solicitation for the Project •Work with FDOT on approval and funding •Community outreach and involvement OUR METRO MOVER TODAY METROMOVER Reimagined Museum Park Metro Mover Station OUR METRO MOVER TODAY METROMOVER Reimagined Museum Park Metro Mover Station A TRIP FROM DOWNTOWN TO MIAMI BEACH… METROMOVER Reimagined Beach Metro Mover Extension (Beach Loop) Museum Park Metro Mover Station A TRIP FROM MIAMI BEACH BACK TO DOWNTOWN… METROMOVER Reimagined Beach Metro Mover Extension (Beach Loop) Museum Park Metro Mover Station BAYLINK – IMPLEMENTATION PLAN THANK YOU