LTC 144-2023 G.O. Bond Program - Project Implementation Update No. 26M IA M I BEACH OFFICE OF THE CITY MANAGER LT C # LETTER TO COMMISSION TO: FROM: DATE: H o n ora b le M a yo r D a n G e lbe r and M em be rs of the City Com m ission Ana T. H u d ak , c iy M an a [} warn 28, 20 2 3 (/ SUBJECT: G.O. Bond Program - Project Implementation Update No. 26 T h e pu rpo se of this Le tte r to the C om m i s sion ("L T C") is to advise you on the status of the im p le m e ntation of the 44 G e ne ral O b liga tion Bond (G .O . Bond) Pro jects appro ved by the City C o mm issio n fo r the first tran che of fund ing (Tr a nch e 1) in the am ount of $152,466,449 including iss u a n c e co sts. Re fe r to att ache d E xhib it A fo r the m eeting ag enda w hich took place w ith the G.O . Bond Oversight C o mm ittee ("th e C o mm itte e") on February 16, 2023. T he fo llow ing info rm ation includes excerpts fr o m tha t m e e tin g. F o r co m p lete m e eting agend as, handouts, m inutes, presentations, and audio re co rd ing s, visit the w e bsite www .GO M B info .co m and click on the O versight C om m ittee tab to see M e e ting R eco rds. IMPLEMENTATION STATUS Project Dashboard and Program Progress Report A s of Fe b rua ry 16 , 20 2 3, a total of 32 out of 44 Tr an ch e 1 pro jects are in some fo rm of "A ctive" sta tu s and 11 pro jects are co m p leted . Chart 1 bel o w show s the full breakdow n by C ategory . Chart 1 PROJECT ACTIVITY Tranche 1 44 Complete 11 Active 32 Pending 1 - Future 13 • 75% of all GOB Projects are Complete or Active = 43 PROJECT CATEGORY Parks Infr astr uctu re Publ ic Safety A ll PROJECT C o m pl e te 8 11 STATUS A ct ive 12 10 10 32 Pen d ing 0 0 Futu re 9 3 13 A ll 30 14 13 57 144-2023 G.O. Bond Program - Project Implementation Update No. 26 March 28, 2023 Page 2 of 5 Approximately $58 million have been expended and another $15.9 million are encumbered for a total of $73.9 million out of the $151.1 million of available Tranche 1 funds. Chart 2 below shows the full breakdown of the expenditures broken down by Category. Chart 2 Tranche 1 Progress Most of the 44 projects in Tranche 1 have different components which are considered distinct projects, or “subprojects”, that are tracked separately and have separate budgets, procurement, and implementation schedules. The Tranche 1 Subproject Activity Summary depicted in Charts 3 and 4 summarize the subproject activity into Status, Category and Funding amount. Subproject Tracking Summary by Phase The tracking summary indicates that 43 (49%) of the 88 total Tranche 1 subprojects have been completed, 5 (6%) are under construction, 29 (33%) are in a design phase, 7 (8%) are in a planning phase, and 4 (5%) are pending to become active. Chart 3 shows the status of all subprojects broken down by Phase and Category. G.O. Bond Program - Project Implementation Update No. 26 March 28, 2023 Page 3 of 5 Chart 3 The expenditures summary indicates that as of February 16, 2023, the 43 completed subprojects equate to $36 million of the budget (24%), $19 million (13%) equate to subprojects under construction, $71.8 million (48%) equate to subprojects that are in the design phase, $20 million (13%) equate to subprojects that are in the planning phase, and a total equating to $4.4 million (3%) are for subprojects which are pending to become active. The total funding expenditures for each of the sub-project categories is indicated on Chart 4 below. For a full breakdown, by project, refer to attached Exhibit B. Chart 4 G.O. Bond Program - Project Implementation Update No. 26 March 28, 2023 Page 4 of 5 Subproject Progress Chart 5 below compares the status of subprojects from previous months to the current month, going back to October 2019. Chart 5 Project Savings A total of $3.68 million in savings have been realized for 43 completed subprojects with total budgets of $38.2 million. An amount of $1.2 million has been transferred in the Parks category to GO Project #10 Maurice Gibb Park and an amount of $1.1 million has been transferred in the Public Safety category to GO Project #48 Police Headquarters Facility. These transfers leave a remaining $1.4 million in savings. For a full breakdown of all savings by project, refer to Exhibit C attached. UPDATED ORGANIZATIONAL CHARTS The Administration presented the updated Organizational Chart for the G.O. Bond Oversight Committee. Per Ordinance 2022-4524, 2 voting members and 1 nonvoting member were added to the Committee. The updated Bond Program Organizational Chart was also presented, which includes the projects for the G.O. Bond for Arts & Culture. Refer to Exhibit D for further details and information. G.O. BOND FOR ARTS & CULTURE The Administration reported that at the January 27, 2023 Finance & Economy Resiliency Committee there were two presentations: 1) Request for Letters of Intent (RFLI) for the Byron Carlyle and 2) Bond Issuance Summary. Staff discussed the issued RFLI 2023-261-KB for the Byron Carlyle, in an effort to find a cultural partner to manage and operate this asset once it is redeveloped. Note: LTC #106-2023 was subsequently issued on March 3, 2023 advising the Commission of the results of the RFLI request. Staff presented an updated General Work Plan of the 21 approved projects, refer to Exhibit E attached. The Workplan chart identifies which entities would execute each of the projects, which projects could have Quick Wins, and which could have Shovel Ready projects by the time the bonds are issued. Currently, Staff is determining the specifics of the bond issuance and further evaluating the number of tranches being proposed. The revised workplan will be presented at the March 31st Finance and Resiliency Committee meeting. G.O. Bond Program - Project Implementation Update No. 26 March 28, 2023 Page 5 of 5 Collins Park Rotunda Project The Administration presented the Collins Park Rotunda Project, where $1,500,000 from the Arts & Culture Bond will be allocated to the renovation. This resolution was approved at the February 1, 2023 City Commission Meeting. TRANCHE 1 PROJECTS UPDATE The following Tranche 1 project updates were discussed at the February 16th meeting. Refer to Exhibit F for further details and information for each of the following: #01 72nd St. Community Complex #05 Flamingo Park Youth Center Facility #05 Flamingo Park Master Plan #10 Maurice Gibb Park #15 PAR 3 / Bayshore Park #23 Baywalks (with Map) #25 Waterway Restoration #40 41st St Corridor Improvements #45 Fire Station #1 #54 Marine Patrol Facility COMMUNITY INFORMATION AND OUTREACH The Administration continues to perform public information and outreach activities through various community meetings, Constant Contact emails, direct mailings, publications, social media platforms. Please see attached Exhibit G to view recent materials. The Administration held a Normandy Isle Traffic Calming Public Meeting on January 10th to discuss GO Project #42 Normandy Isle Traffic Calming. The Ad Hoc North Beach CRA meeting was held on January 10th where the Byron Carlyle Theater RFLI was discussed. On February 9th, the Administration held a 41st St Conceptual Design Hybrid Public Meeting, where an update of GO Project #40 41st St Corridor Improvements was presented. A ribbon cutting ceremony for Brittany Bay Park and a groundbreaking for Maurice Gibb Park are currently being planned. The website, www.GOMBInfo.com, continues to be updated with the latest construction advisories, press releases, project photos, implementation updates, public presentations, and more. For more information, please contact Maria Hernandez at mariahernandez@miamibeachfl.gov or via cellphone at (786) 371-3168. Attachments: Exhibit A – GOB Oversight Committee Agenda for February 16, 2023 Exhibit B – Subproject and Project List by Phase Exhibit C – Project Savings Exhibit D – Organizational Charts for Committee and Program Exhibit E – G.O. Bond for Arts & Culture Workplan Update Exhibit F – Tranche 1 Projects Update Exhibit G – Community Information and Outreach ATH / MH F:\cmgr\$ALL\GO Bond Program\LTC Program Updates\2023\G.O. Bond Program - Project Implementation Update No. 26.docx __________________________________________________________________________________________________ Legend: (P) Planning Phase, (D) Design Phase, (C) Construction Phase, (PN) Pending, (F) Future Tranche General Obligation Bond Oversight Committee City of Miami Beach Karen Rivo, Chair Maria Hernandez, Liaison AGENDA – VIRTUAL MEETING February 16, 2023 I.Roll Call and Introductions All 4:30pm •Introduction of 4 New Members & Committee Changes •New Oversight Committee ORG Chart II.Committee Business Karen Rivo 4:40pm •Adoption of Meeting Minutes from 12-01-22 •Sunshine Law Refresh (Legal Update) •Bond Program ORG Chart III.Community Outreach Staff 4:55pm •Upcoming and Recent Past Public Meetings Kevin Pulido •Updated GO Bond Website Maria Hernandez G.O. Bonds for Arts & Culture IV.G.O. Bond for Arts & Culture Update Staff 5:00pm •1/27/23 Finance & Economic Resiliency Committee Re-Cap o Byron Carlyle (RFLI)Adrian Morales o Bond Issuance Summary Kathie Brooks •General Work Plan Status Update Maria Hernandez •Collins Park Rotunda Project Approval and Presentation David Martinez V.Public Comment Public 5:50pm 2018 G.O. Bonds VI.Program General Status Update Maria Hernandez 6:00pm VII.2018 Bonds Projects Update CIP / ENV 6:10pm •72nd St. Complex (P), Bayshore Park (D), FS#1 (D), Flamingo Park (D), FP Youth Center/PAL (P), Baywalk (D), 41st Street Revitilization (D), Maurice Gibb (D), Marine Patrol Facility (D), Waterway Restoration (D) VIII.Public Comment Public 6:50pm IX.Adjournment 7:00pm Committee Charge The purpose of the General Obligation Bond Oversight Committee is to make advisory recommendations to the City Manager and City Commission from a macro perspective regarding the timely progress, overall goals, costs, including financial efficiencies, and the timely completion of General Obligation Bond Program projects approved by the voters in the City of Miami Beach. The Committee shall have the following powers & duties: 1.Receive input from the public, the City Administration, City consultants, and the City’s Inspector General, as needed, to make recommendations relative to the overall timing, cost efficiencies, and prioritization of the G.O. Bond Program projects. 2.Provide general oversight to ensure that G.O. Bond Program project timelines, budgets (including cost e fficiencies) are prioritized and achieved, and that the projects are completed in accordance with the scope of work approved by the voters. 3.Review City staff and G.O. Bond Program project manager’s progress reports and provide monthly reports to the City Commission. EXHIBIT A Active Phase Project Name Category Department Tranche Anticipated End Count % Count $ Budget $ Encumbered $ Spent % Spent $ Available Closed #53 PORTABLE BOLLARDS Public Safety Police 1 07-31-2019 1 1%599,916 - 599,915 1.03%- Closed #17 POLO PARK Parks Parks & Recreation 1 08-11-2019 1 1%493,673 - 493,673 0.85%- Closed #19 SOUNDSCAPE 4K TECHNOLOGY Parks Tourism & Culture 1 09-30-2019 1 1%3,799,999 - 3,748,495 6.46%51,503 Closed #13 NORTH SHORE LIGHTS & PAINT Parks Property Management 1 10-14-2019 1 1%130,300 - 130,210 0.22%89 Closed #52 TATUM PARK LED LIGHTING Public Safety Parks & Recreation 1 10-14-2019 1 1%52,758 - 52,758 0.09%- Closed #52 CRESPI PARK LED LIGHTING Public Safety Parks & Recreation 1 10-21-2019 1 1%41,780 - 41,780 0.07%- Closed #52 STILLWATER PARK LED LIGHTING Public Safety Parks & Recreation 1 10-21-2019 1 1%41,780 - 41,780 0.07%- Closed #26 COLONY THEATRE ROOF Parks Property Management 1 10-24-2019 1 1%299,650 - 299,650 0.52%- Closed #21 STILLWATER PARK Parks Parks & Recreation 1 11-08-2019 1 1%142,440 - 142,440 0.25%- Closed #3 CRESPI PARK Parks Parks & Recreation 1 11-09-2019 1 1%184,920 - 184,919 0.32%1 Closed #18 SCOTT RAKOW PAINT Parks Property Management 1 11-12-2019 1 1%116,776 - 116,776 0.20%- Closed #47 MACARTHUR CSWY READERS Public Safety Police 1 11-28-2019 1 1%64,904 - 64,904 0.11%- Closed #52 NORMANDY ISLE PARK LED LIGHTING Public Safety Parks & Recreation 1 12-02-2019 1 1%212,599 - 212,593 0.37%5 Closed #18 SCOTT RAKOW HVAC Parks Property Management 1 12-06-2019 1 1%137,303 - 137,302 0.24%- Closed #13 NORTH SHORE ROOF Parks Property Management 1 12-16-2019 1 1%375,000 - 374,722 0.65%276 Closed #18 SCOTT RAKOW ROOF Parks Property Management 1 01-05-2020 1 1%127,218 - 127,217 0.22%- Closed #26 MIAMI CITY BALLET ROOF Parks Property Management 1 01-15-2020 1 1%758,825 - 758,824 1.31%- Closed #13 NORTH SHORE CAMERAS Parks Property Management 1 02-04-2020 1 1%205,699 - 60,858 0.10%144,841 Closed #18 SCOTT RAKOW CAMERAS Parks Property Management 1 02-05-2020 1 1%250,000 - 110,659 0.19%139,340 Closed #32 PALM & HIBISCUS LANDSCAPING Infrastructure Capital Improvement Projects 1 03-25-2020 1 1%1,000,000 - 1,000,000 1.72%- Closed #18 SCOTT RAKOW WINDOWS Parks Property Management 1 04-16-2020 1 1%699,999 - 198,887 0.34%501,110 Closed #26 FILLMORE ROOF Parks Property Management 1 05-15-2020 1 1%1,874,156 - 1,874,154 3.23%- Closed #4 FAIRWAY PARK PAVILION Parks Parks & Recreation 1 05-15-2020 1 1%50,000 - 35,044 0.06%14,955 Closed #2 COLLINS PARK Parks Parks & Recreation 1 05-28-2020 1 1%557,287 - 557,287 0.96%- Closed #13 NORTH SHORE GENERATOR Parks Property Management 1 06-30-2020 1 1%524,999 - 503,861 0.87%21,138 Closed #18 SCOTT RAKOW GENERATOR Parks Property Management 1 06-30-2020 1 1%803,748 - 729,717 1.26%74,029 Closed #18 SCOTT RAKOW POOL Parks Parks & Recreation 1 07-06-2020 1 1%977,998 - 977,104 1.68%893 Closed #47 71 ST. ENTRANCE READERS Public Safety Police 1 07-12-2020 1 1%31,582 - 31,582 0.05%- Closed #47 JULIA TUTTLE CSWY READERS Public Safety Police 1 09-21-2020 1 1%89,186 - 89,185 0.15%1 Closed #57 LUMMUS PARK/OCEAN DRIVE CAMERAS Public Safety Police 1 02-28-2021 1 1%824,845 - 824,845 1.42%- Closed #4 FAIRWAY PARK FENCE Parks Parks & Recreation 1 03-10-2021 1 1%209,999 - 205,917 0.35%4,082 Closed #40 41 STREET LIGHTING UPGRADES Infrastructure Public Works Department 1 03-13-2021 1 1%102,999 - 99,173 0.17%3,825 Closed #56 CAMERAS- BEACHWALK Public Safety Police 1 04-02-2021 1 1%693,219 - 693,218 1.19%- Closed #24 MIDDLE BEACH BEACHWALK PH3 Parks Capital Improvement Projects 1 12-27-2021 1 1%4,500,000 - 4,214,178 7.26%285,821 Closed #18 SCOTT RAKOW GYM FLOORS Parks Parks & Recreation 1 01-21-2022 1 1%322,561 - 322,451 0.56%110 Closed #9 MSD PLAYGROUND AND SIDEWALKS Parks Parks & Recreation 1 08-05-2022 1 1%553,999 - 524,410 0.90%29,588 Closed #52 FLAMINGO PARK LED LIGHTING Public Safety Parks & Recreation 1 11-14-2022 1 1%1,044,143 - 1,044,143 1.80%- Closed #18 SCOTT RAKOW OTHER FLOORS Parks Parks & Recreation 1 08-30-2023 1 1%203,798 - 203,798 0.35%- Closed Sum 38 43%23,100,058 - 21,828,429 38%1,271,607 Closed Count 38 43%38 38 38 0.00%38 CITY OF MIAMI BEACH Page 1 of 3 2/13/2023 EXHIBIT B G.O. BOND PROJECT LIST BY PHASE G.O. BOND PROJECT LIST BY PHASE Active Phase Project Name Category Department Tranche Anticipated End Count % Count $ Budget $ Encumbered $ Spent % Spent $ Available Complete #42 NAUTILUS TRAFFIC CALMING Infrastructure Transportation 1 01-14-2022 1 1%739,499 22,500 712,627 1.23%4,371 Complete #49 PUBLIC SAFETY RADIO SYSTEM Public Safety Fire 1 04-30-2022 1 1%9,700,000 1,190,426 8,502,920 14.64%6,653 Complete #12 N. BEACH OCEANSIDE BEACHWALK Parks Capital Improvement Projects 1 06-06-2022 1 1%1,999,999 64,831 1,934,573 3.33%593 Complete #50 DADE BLVD. CORRIDOR CAMERAS Public Safety Police 1 08-03-2022 1 1%165,674 - 127,436 0.22%38,238 Complete #50 71 STREET CORRIDOR CAMERAS Public Safety Police 1 12-22-2022 1 1%211,999 1,634 83,673 0.14%126,692 Complete Sum 10 11%12,817,171 1,279,391 11,361,229 20%176,547 Complete Count 5 6%5 5 5 0.00%5 Construction #33 TREE PLANTING - TRANCHE 1 Infrastructure Environmental 1 04-30-2023 1 1%2,620,000 366,945 2,294,053 3.95%(40,999) Construction #38 STREETS - TRANCHE 1 Infrastructure Public Works Department 1 07-30-2023 1 1%5,800,000 754,831 4,907,555 8.45%137,612 Construction #37 SIDEWALKS - TRANCHE 1 Infrastructure Public Works Department 1 12-29-2023 1 1%4,110,066 119,652 3,509,791 6.04%480,621 Construction #47 OTHER READERS CITYWIDE Public Safety Police 1 12-30-2023 1 1%1,390,000 50,866 429,209 0.74%909,924 Construction #39 SEAWALLS/SHORELINES - TRANCHE 1 Infrastructure Public Works Department 1 02-29-2024 1 1%4,999,998 729,307 1,810,060 3.12%2,460,629 Construction Sum 20 23%$18,920,064 $2,021,601 $12,950,668 22%$3,947,787 Construction Count 5 6%5 5 5 0.00%5 Design #57 COLLINS AVE/WASH AVE CAMERAS Public Safety Police 1 06-30-2023 1 1%665,154 42,438 246,561 0.42%376,154 Design #48 POLICE HQ FACILITY - TRANCHE 1 Public Safety Property Management 1,2 06-30-2023 b 1 1%6,573,271 35,215 1,496,070 2.58%5,041,985 Design #55 STREET LIGHTING - TRANCHE 1 Public Safety Public Works Department 1 07-17-2023 b 1 1%3,500,000 253,687 154,361 0.27%3,091,951 Design #53 CONVENTION CENTER BOLLARDS Public Safety Public Works Department 1 08-28-2023 1 1%783,130 271 55,804 0.10%727,053 Design #53 SOUNDSCAPE PARK BOLLARDS Public Safety Public Works Department 1 08-28-2023 1 1%225,199 271 50,729 0.09%174,198 Design #53 SOUTH POINTE PARK BOLLARDS Public Safety Public Works Department 1 08-28-2023 1 1%391,669 271 49,206 0.08%342,191 Design #50 ALTON RD. CORRIDOR CAMERAS Public Safety Police 1 09-30-2023 1 1%211,999 19,598 92,621 0.16%99,779 Design #42 PALM VIEW TRAFFIC CALMING Infrastructure Transportation 1 10-26-2023 1 1%86,349 4,040 42,387 0.07%39,922 Design #19 SOUNDSCAPE RESTROOMS/STORAGE Parks Parks & Recreation 1 03-31-2024 1 1%699,999 31,501 15,907 0.03%652,590 Design #43 CHASE AVE/34 ST SHARED USE PATH Infrastructure Capital Improvement Projects 1 04-02-2024 1 1%830,000 51,525 244,860 0.42%533,614 Design #42 BAYSHORE SOUTH TRAFFIC CALMING Infrastructure Transportation 1 05-14-2024 1 1%380,148 109,600 182,939 0.32%87,608 Design #5 FLAMINGO PARK MASTER PLAN Parks Capital Improvement Projects 1 05-28-2024 1 1%15,150,000 453,415 534,544 0.92%14,162,039 Design #23 PEDESTRIAN BRIDGE Parks Capital Improvement Projects 1 07-12-2024 1 1%8,999,999 7,310,437 1,638,954 2.82%50,606 Design #43 23 ST. STREETSCAPE IMPROVEMENTS Infrastructure Capital Improvement Projects 1 08-17-2024 1 1%1,500,000 57,977 586,292 1.01%855,729 Design #9 MSD PARK LIGHTING Parks Parks & Recreation 1 10-01-2024 1 1%127,999 38,429 - 0.00%89,570 Design #25 WATERWAY RESTORATION Parks Capital Improvement Projects 1 10-17-2024 1 1%100,000 - 27,111 0.05%72,888 Design #43 ALTON ROAD SHARED USE PATH Infrastructure Transportation 1 10-30-2024 b 1 1%50,000 - - 0.00%50,000 Design #42 NORMANDY ISLE TRAFFIC CALMING Infrastructure Transportation 1 10-31-2024 1 1%293,999 82,390 144,240 0.25%67,368 Design #10 MAURICE GIBB PARK Parks Capital Improvement Projects 1 11-11-2024 1 1%4,500,000 - 211,392 0.36%4,288,606 Design #15 PAR 3 / BAYSHORE PARK Parks Capital Improvement Projects 1 05-12-2025 1 1%15,699,999 14,620 857,647 1.48%14,827,731 Design #45 FIRE STATION #1 Public Safety Capital Improvement Projects 1,2 07-17-2025 1 1%4,000,000 960,340 1,170,987 2.02%1,868,670 Design #54 MARINE PATROL FACILITY Public Safety Capital Improvement Projects 1,2 10-17-2025 1 1%1,999,999 351,898 207,714 0.36%1,440,386 Design #30 SKATE PARK Parks Parks & Recreation 1 10-30-2025 1 1%749,999 49,708 39,726 0.07%660,565 Design #23 BAYVIEW TERRACE LINK Parks Capital Improvement Projects 1,2 01-22-2026 1 1%169,999 - 75,131 0.13%94,868 Design #23 SOUTH BAY CLUB LINK Parks Capital Improvement Projects 1,2 01-22-2026 1 1%559,999 - 176,551 0.30%383,448 Design #23 BAY GARDEN MANOR LINK Parks Capital Improvement Projects 1,2 02-03-2026 1 1%269,999 - 79,101 0.14%190,898 Design #50 41 ST. CORRIDOR CAMERAS Public Safety Capital Improvement Projects 1 07-21-2026 1 1%235,324 - 17,999 0.03%217,324 Design #40 41 ST CORRIDOR IMPROVEMENTS Infrastructure Capital Improvement Projects 1,2 07-21-2026 1 1%1,977,318 1,323,764 575,863 0.99%77,691 Design #34 A.G.IMPROVEMENTS - INDIAN CREEK Infrastructure Public Works Department 1 (blank)1 1%1,112,000 - - 0.00%1,112,000 Design Sum 145 165%$71,843,551 $11,191,395 $8,974,697 15%$51,677,432 Design Count 29 33%29 29 29 0.00%29 CITY OF MIAMI BEACH Page 2 of 3 2/13/2023 G.O. BOND PROJECT LIST BY PHASE Active Phase Project Name Category Department Tranche Anticipated End Count % Count $ Budget $ Encumbered $ Spent % Spent $ Available Planning #5 FLAMINGO YOUTH CENTER FACILITY Parks Capital Improvement Projects 1,2 06-29-2023 b 1 1%250,000 172,486 25,296 0.04%52,218 Planning #13 N.S. PLAYGROUND & REFORESTATION Parks Parks & Recreation 1 01-30-2024 1 1%795,000 - - 0.00%795,000 Planning #36 WASHINGTON AVE. CORRIDOR Infrastructure Economic Development 1,2 07-01-2024 b 1 1%397,616 - 213,740 0.37%183,876 Planning #8 LUMMUS PARK Parks Capital Improvement Projects 1 12-05-2025 b 1 1%4,736,999 784,968 25,761 0.04%3,926,269 Planning #1 72 ST. COMMUNITY COMPLEX Parks Capital Improvement Projects 1,2 07-29-2026 1 1%10,800,000 413,534 2,266,841 3.90%8,119,624 Planning #46 OCEAN RESCUE NOBE FACILITY Public Safety Capital Improvement Projects 1,2 01-27-2028 1 1%1,000,000 - 15,658 0.03%984,342 Planning #31 OCEAN DRIVE CORRIDOR Infrastructure Capital Improvement Projects 1,2 09-20-2028 1 1%2,000,000 - 406,500 0.70%1,593,500 Planning Sum 42 48%$19,979,615 $1,370,988 $2,953,796 5%$15,654,829 Planning Count 7 8%7 7 7 0.00%7 Pending #13 NORTH SHORE PATH & FIELDS Parks Capital Improvement Projects 1,2 09-30-2027 b 1 1%1,409,000 - - 0.00%1,408,999 Pending #29 WEST LOTS - TRANCHE 1 Parks Economic Development 1 (blank)1 1%1,000,000 - - 0.00%1,000,000 Pending #18 SCOTT RAKOW ICE RINK FLOORS Parks Parks & Recreation 1 (blank)1 1%413,640 - - 0.00%413,640 Pending #52 FLA. PARK LED LIGHTING - FIELDS Public Safety CIP 1 (blank)1 1%1,655,856 - - 0.00%1,655,856 Pending Sum 28 32%$4,478,496 $0 $0 0%$4,478,495 Pending Count 4 5%4 4 4 0.00%4 88 100%$151,138,955 $15,863,375 $58,068,819 100%$77,206,697 CITY OF MIAMI BEACH Page 3 of 3 2/13/2023 www.GOMBInfo.com REPLACE PROJECT COMPLETION –TRANCHE 1 SUMMARY Category Sub Projects Budget Savings % Transfers Pledged Available Infrastructure 3 1,842,499 8,196 0%- 8,196 Parks 26 21,500,346 2,468,368 11% (1,200,000) 1 - 1,268,368 Public Safety 14 14,847,658 1,206,617 8% (1,073,272) 2 - 133,345 TOTAL 43 38,190,503 3,683,181 10% (2,273,272) - 1,409,909 1 Transfer to #10 - Maurice Gibb Park 2 Transfer to #48 - Police Headquarters Facility EXHIBIT C G.O. BOND PROJECT LIST ‐ SAVINGS Active Phase Category Project Name Count  Budget    Encumbered  Spent  Savings  Transferred   Revised  Budget  Available  Closed Infrastructure #32 PALM & HIBISCUS LANDSCAPING    1           1,000,000       ‐  1,000,000     ‐                ‐  1,000,000     ‐                 Closed Infrastructure #40 41 STREET LIGHTING UPGRADES 103,000          ‐  99,173           3,825           ‐  103,000         3,825            Complete Infrastructure #42 NAUTILUS TRAFFIC CALMING 739,499          22,500                  712,627         4,371           4,371            Infrastructure Sum 3           1,842,499      22,500                 1,811,800     8,196           ‐  1,842,499     8,196            Closed Parks #17 POLO PARK 1           499,998          ‐  493,673         6,325           (6,325)             493,673         ‐                 Closed Parks #19 SOUNDSCAPE 4K TECHNOLOGY       1           3,799,999       ‐  3,748,495     51,503         ‐  3,799,999     51,503          Closed Parks #13 NORTH SHORE LIGHTS & PAINT     1           130,300          ‐  130,210         89                 ‐  130,300         89                  Closed Parks #26 COLONY THEATRE ROOF            1           300,000          ‐  299,650         350              (350) 299,650 ‐                 Closed Parks #21 STILLWATER PARK                1           144,999          ‐  142,440         2,559           (2,559)             142,440         ‐                 Closed Parks #3 CRESPI PARK 1           210,998          ‐  184,919         26,079         (26,079)           184,919         ‐                 Closed Parks #18 SCOTT RAKOW PAINT              1           130,000          ‐  116,776         13,224         (13,224)           116,776         ‐                 Closed Parks #18 SCOTT RAKOW HVAC               1           150,000          ‐  137,302         12,697         (12,697)           137,303         ‐                 Closed Parks #13 NORTH SHORE ROOF               1           375,000          ‐  374,722         276              ‐  375,000         276               Closed Parks #18 SCOTT RAKOW ROOF               1           1,124,000       ‐  127,217         996,782      (996,782)         127,218         ‐                 Closed Parks #13 NORTH SHORE CAMERAS            1           205,699          ‐  60,858           144,841      ‐  205,699         144,841       Closed Parks #18 SCOTT RAKOW CAMERAS            250,000          ‐  110,659         139,340      ‐  250,000         139,340       Closed Parks #26 MIAMI CITY BALLET ROOF         760,000          758,825         1,175           (1,175)             758,825         ‐                 Closed Parks #18 SCOTT RAKOW WINDOWS            700,000          198,887         501,110      ‐  700,000         501,110       Closed Parks #26 FILLMORE ROOF 1,920,000       1,874,154     45,844         (45,844)           1,874,156     ‐                 Closed Parks #4 FAIRWAY PARK PAVILION           50,000            ‐  35,044           14,955         ‐  50,000           14,955          Closed Parks #2 COLLINS PARK 640,000          ‐  557,287         82,713         (82,713)           557,287         ‐                 Closed Parks #13 NORTH SHORE GENERATOR          524,999          ‐  503,861         21,138         ‐  524,999         21,138          Closed Parks #18 SCOTT RAKOW GENERATOR          816,000          ‐  729,717         86,281         (12,252)           803,748         74,029          Closed Parks #18 SCOTT RAKOW POOL               977,998          ‐  977,104         893              ‐  977,998         893               Closed Parks #4 FAIRWAY PARK FENCE 209,999          ‐  205,917         4,082           ‐ 209,999         4,082            Closed Parks #18 SCOTT RAKOW GYM FLOORS 322,561          ‐  322,451         110              ‐  322,561         110               Closed Parks #24 MIDDLE BEACH BEACHWALK 4,500,000       ‐  4,214,178     285,821      ‐  4,500,000     285,821       Closed Parks #9 MSD PLAYGROUND AND SIDEWALKS 553,999          ‐  524,410         29,588         553,999         29,588          Closed Parks #18 SCOTT RAKOW OTHER FLOORS 203,798          203,798         ‐                203,798         ‐                 Complete Parks #12 N. BEACH OCEANSIDE BEACHWALK 1,999,999       64,831                  1,934,573     593              ‐  1,999,999     593               Parks Sum 26         21,500,346    64,831                 18,967,127   2,468,368   (1,200,000)     *20,300,346   1,268,368    Closed Public Safety #53 PORTABLE BOLLARDS              1           600,000          ‐  599,916         84                 (84) 599,915 ‐                 Closed Public Safety #52 TATUM PARK LED LIGHTING        1           151,999          ‐  52,758           99,240         (99,240)           52,758 ‐                 Closed Public Safety #52 CRESPI PARK LED LIGHTING       1           86,999            ‐  41,780           45,218         (45,218)           41,780 ‐                 Closed Public Safety #52 STILLWATER PARK LED LIGHTING   1           86,999            ‐  41,780           45,218         (45,218)           41,780 ‐                 Closed Public Safety #47 MACARTHUR CSWY  READERS        1           120,000          ‐  64,904           55,095         (55,095)           64,904 ‐                 Closed Public Safety #52 NORMANDY ISLE PARK LED LIGHTING 1           715,000          ‐  212,599         502,405      (502,405)         212,599 ‐                 Closed Public Safety #47  71 ST. ENTRANCE READERS       240,000          ‐  31,582           208,417      (208,417)         31,582 ‐                 Closed Public Safety #47 JULIA TUTTLE CSWY READERS 200,000          ‐  89,185           110,814      (110,814)         89,186 ‐                 Closed Public Safety #56 BEACHWALK CAMERAS 700,000          ‐  693,218         6,781           (6,781)             693,219 ‐                 Closed Public Safety #57 LUMMUS PARK/OCEAN DRIVE CAMERAS 824,845          ‐  824,845         ‐                ‐  824,845 ‐                 Closed Public Safety #52 FLAMINGO PARK LED LIGHTING 1,044,143       1,044,143     ‐                ‐  1,044,143 ‐                 Complete Public Safety #49 PUBLIC SAFETY RADIO SYSTEM 9,700,000       1,190,426            8,502,920     6,653           ‐  9,700,000 6,653            Complete Public Safety #50 DADE BLVD. CORRIDOR CAMERAS 165,674          ‐  127,436         ‐                ‐  165,674 ‐                 Complete Public Safety #50 71 STREET CORRIDOR CAMERAS 211,999          1,634 83,673           126,692      ‐  211,999 126,692       Public Safety Sum          14 14,847,658    1,192,060            12,410,739   1,206,617   (1,073,272)     ** 13,774,384   133,345       Total Sum          43 38,190,503    1,279,391            33,189,666   3,683,181   (2,273,272)     35,917,229   1,409,909    Note:  Red figures are projected project savings from Completed projects. *$1.2M Transfer to GOB #10 ‐ Maurice Gibb Park **$1M Transfer to GOB #48 ‐ Police Hq *Newly appointed members Mayor &Commission Karen Rivo Chair GO Bond Oversight Committee Voting Members Non-Voting Members *Susan Askew Arts & Culture *Dennis Scholl Arts & Culture Scott Needelman South Beach Jack Glottmann Middle Beach Jason Greene Vice-Chair South Beach Laura Veitia North Beach *Jason Koslowe Middle Beach 2023 Vacancy North Beach Carolina Jones Parks & Recreation Committee *Michael DeFilippi Sustainability Committee Adam Kravitz Audit Committee *Bruce Carter Cultural Arts Council David Grieser Budget Committee EXHIBIT D Project Strikethrough Indicates Completed Project Project Red Indicates Project in Progress Project Bold Black indicates Projects which have NOT Commenced Mayor &Commission GO Bond Oversight Committee City Manager Alina T. Hudak GO Bond Working Group GO Bond Program Team Maria Hernandez Thais Vieira Devin Ramirez Neighborhood Affairs Finance / Budget Resiliency Procurement CIP Environment & Sustainability ParksFacilities Police / FirePublic WorksEconomic Development Transportation -Marine Patrol Facility -PAR3/Bayshore Park -Art Deco Museum Expansion -Ocean Rescue North Beach -Baywalk -72nd St Community Complex -Flamingo Park & Youth Center -Maurice Gibb Park -Fire Station #1 -Fire Station #3 -Middle Beach Beachwalk -North Beach Oceanside Park Beachwalk -Lummus Park -Palm & Hibiscus Landscaping -La Gorce Neighborhood -Flamingo Park Neighborhood -North Shore Neighborhood -Neighborhood Above Ground Improvements -41st St Corridor -Ocean Drive Corridor -Washington Ave Corridor -Waterway Restoration - Street Tree Master Plan -LED Lighting In Parks -Collins Park -Crespi Park -Fairway Park -Fisher Park -La Gorce Park -Marjorie Stoneman Douglas Park -Muss Park -Palm Island Park -Pinetree Park -Polo Park -Stillwater Park -Tatum Park -Skate Park -South Pointe Park -Soundscape Park -Scott Rakow Youth Center -North Shore Park & Youth Center -Police HQ Renovations -Roofs For Cultural Facilities -Log Cabin -Cameras on Beachwalk -Cameras- Business District -Cameras- Entertainment District -License Plate Readers -Public Radio System -Street Lighting Improvements -Security For Public Spaces -Street Pavement Program -Sidewalk Improvement Program -Seawalls & Living Shorelines -West Lots Redevelopment -Neighborhood Traffic Calming & Pedestrian Friendly Streets -Protected Bike Lanes & Shared Bike / Pedestrian Paths GO Bond Program Inspector General Residents Eric Carpenter Kathie Brooks Maria Hernandez Adrian Morales Rickelle Williams David Martinez Alex Denis Deputy City Manager Eric Carpenter -Bass Museum of Art Expansion -Miami City Ballet -Fillmore --Botanical Garden -Art Deco Welcome Center -Collins Park Cultural Center -Collins Park Rotunda -Byron Carlyle Theater -Miami Beach Bandshell -Aquatic Sculpture Park 2018 G.O. Bond2022A&C Bond -Bass Museum of Art Renovations -Miami City Ballet -Colony Theater -Botanical Garden -Art Deco Welcome Center -NB Senior Center -Artistic Playgrounds 2022 A&C Bond2022A&C Bond -Workforce Housing 2018 G.O. Bond2018G.O. Bond2022A&C Bond 2018 G.O. Bond Grants -New World Symphony -Holocaust Memorial -Hispanic Community Center -Wolfsonian -FIU -Jewish Museum - FIU -Miami City Ballet Workforce Housing 2018 G.O. Bond 2018 G.O. Bond 2018 G.O. Bond 2018 G.O. Bond www.GOMBInfo.com GENERAL OBLIGATION BONDS FOR ARTS & CULTURE General Work Plan Status Update February 16, 2023 EXHIBIT E www.GOMBInfo.com 64.8% VOTER APPROVAL TOTAL OF $159 MILLION IN APPROVED FUNDING www.GOMBInfo.com DETERMINING THE BOND ISSUE 1. Quick Wins –Tranche 1 •Smaller projects that are faster and easier to implement 2. Shovel Ready –Tranche 1 •Projects that have a contract, completed design and/or permits, and do not require community engagement 3. Complex Projects –Tranche 2 •Projects with extended implementation schedules •May include design & pre-construction costs in Tranche 1 EVALUATING NUMBER OF TRANCHES www.GOMBInfo.com DETERMINING THE BOND ISSUE •Two tranches instead of one •Evaluates issuance based on anticipated cash flow needs •Higher issuance costs (cost for each bond) •Lower initial taxes paid by property owners –tax increases phased in over time EVALUATING NUMBER OF TRANCHES (CONTINUED) www.GOMBInfo.com FEBRUARY 1 AGENDA ITEM USE OF MISCELLANEOUS CATEGORY •Up to $1.5 Million Recommended as Additional Funding for the Collins Park Performing Arts Venue Rotunda Project •Provides small organizations with a performance venue •Renovation of rotunda as well as addition of restrooms and covered walkway •May be reduced pending possible $445,000 Department of State Cultural Facilities grant •Balance of $1.5 Million in the Miscellaneous Category To be Determined www.GOMBInfo.com COMMENTS / QUESTIONS EXHIBIT F The Waverly1330 West Ave270 FeetMonad Terrace1300 West Ave160 Feet Bayview Terrace 1228 West Ave 130 Feet Mirador1200 West Ave270 Feet Mirador1000 West Ave355 Feet The Floridian650 West Ave470 Feet Bentley Bay 540 West Ave 615 Feet Lincoln Bay Towers/Lincoln Road 1450 Lincoln225 FeetCapri1445 16th St485 Feet Flamingo1504 Bay Rd1410 Feet Bay Garden Manor1250 West Ave210 Feet South Bay Club 800 West Ave 425 Feet Mondrian1100 West Ave310 Feet 10th St70 Feet 14th St85 Feet Southgate Towers 910 West Ave650 Feet E U C L I D A V E M E R I D I A N A V E 17TH ST 15TH ST 8TH ST 10TH ST 11TH ST 7TH ST 6TH ST T WA S H I N G T O N A V E P E N N S Y L V A N I A A V E 2ND ST 3RD STM I C H I G A N A V E A L T O N R D CO L L I N S A V E 13TH ST LINCOLN LN S T A R I S L A N D D R 9TH ST BR I D G E R D N LINCOLN LN 1ST ST DR E X E L A V E JE F F E R S O N A V E BA Y R D ISLAND AVE 16TH ST COMMERCE ST 9TH ST WA S H I N G T O N A V E Baywalk Properties Ü The Floridian650 West Ave470 Feet Pedestrian Bridge Built Not Built (Other) Not Built (GOB) NEWS ANNOUCEMENTS EXHIBIT G MEETINGS Past: Upcoming: