Loading...
Resolution 2023-32576RESOLUTION NO. 2023-32576 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING, PURSUANT TO SECTION 2-367(D) OF THE MIAMI BEACH CODE, THE SOLE - SOURCE PURCHASE OF FOUR (4) PORTABLE 2.55 M HDPE DOWNSTREAM DEFENDER SYSTEMS AND RELATED ITEMS OR SOFTWARE BY HYDRO INTERNATIONAL FOR PURPOSES OF STORMWATER TREATMENT DURING KING TIDE EVENTS IN KEY LOCATIONS IN THE CITY IN AN AMOUNT NOT TO EXCEED $230,560. WHEREAS, during the rainy and king tide season, the Public Works Department deploys temporary diesel pumps to reduce flooding in areas throughout the City; and WHEREAS, the City has Miami -Dade County Department of Environmental Resource Management (DERM) Class V Temporary Dewatering Permits for this type of operation; and WHEREAS, in recent discussions with the regulatory agency, the implementation of additional water quality treatment systems has been requested when the temporary pumps are set up to discharge directly into the Biscayne Bay; and WHEREAS, Public Works determined that the purchase of four portable 2.55 M HDPE Downstream Defenders by Hydro International is required to meet the additional water treatment requirements; and WHEREAS, the stormwater must be treated prior to discharge, using a stormwater treatment system capable of reducing the total suspended solids and turbidity; and WHEREAS, due to the significant site constraints associated with typical locations where the temporary pumps are deployed, the portable water quality treatment system must maintain a high rate of contaminant removal while occupying a significantly limited footprint; and .WHEREAS, the portable Downstream Defender System is a well -tested product, by an established manufacturer; and WHEREAS, this product is patented, does not require power orwater and meets the required enhanced treatment performance, flow capacity, materials of construction, vac truck accessibility, flexibility, mobility, footprint and schedule; and WHEREAS, the Portable 2.55 M HDPE Downstream Defender System by Hydro International meets all of these constraints without exception, and has an estimated cost of $230,560 for four (4) devices and related items or software, including a 10% contingency; and WHEREAS, Pursuant to Section 2- 367(d)(2), the Procurement Department publicly released Intent to Sole Source No. 2023-399-NA on March 29, 2023 (the "ITS"); and WHEREAS, the ITS provided details to potential bidders on the City's needs and requested that any vendor that believed it could provide the City with the necessary items submit written notification to the City for consideration; and WHEREAS, no response to the ITS was received; and WHEREAS, as there was no response to the ITS, the Public Works Department requests approval for the sole -source purchase of four (4) portable 2.55 M HDPE Downstream Defender Systems by Hydro International and other Hydro International items or software as may be required for purposes of stormwater treatment during king tide events in key locations in the City. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby approves, pursuant to Section 2-367(d) of the Miami Beach Code, , the sole -source purchase of four (4) portable 2.55 M HDPE Downstream Defender Systems and related items or software by Hydro International for purposes of stormwater treatment during king tide events in key locations in the City in an amount not to exceed $230,560. PASSED and ADOPTED THIS cX day of 'lPrl , 2023. ATTEST: MAY 0 CITY CLERK 22023 XC2_2,��� u_ •: APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION City AttomeyDote Resolutions - C7 L MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: April 28, 2023 SUBJECT. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING, PURSUANT TO SECTION 2- 367(D) OF THE MIAMI 'BEACH CODE FOR SOLE SOURCE PURCHASES, THE PURCHASE OF FOUR (4) PORTABLE 2.55 M HDPE DOWNSTREAM DEFENDER SYSTEMS AND RELATED ITEMS OR SOFTWARE BY HYDRO INTERNATIONAL FOR PURPOSES OF STORMWATER TREATMENT DURING KING TIDE EVENTS, IN KEY LOCATIONS IN THE CITY, IN AN AMOUNT NOT TO EXCEED $230,560. RECOMMENDATION The Administration recommends approving the Resolution. During the rainy and king tide seasons, the Public Works Department deploys temporary diesel pumps to reduce flooding in areas throughout the. City. The City.has Miami -Dade County Department of Environmental Resource Management (DERM) Class V Temporary Dewatering Permits for this type of operation. In recent discussions with the regulatory agency, the implementation of additional water quality treatment systems has been requested when the temporary pumps are set up to discharge directly into Biscayne Bay. Public Works determined that the purchase of four portable 2.55 M HDPE Downstream Defenders by Hydro Intemational is required to meet the additional water treatment, requirements. The stormwater must be treated prior to discharge, using a stormwater treatment system capable of reducing the total suspended solids and turbidity. Due to the significant site constraints associated with the typical locations where the temporary pumps are deployed, the portable water quality treatment system must meet stringent requirements, including a significantly reduced footprint, while maintaining a high rate of contaminant removal. The portable Downstream Defender System is a well -tested product by an established manufacturer. This product is patented and provides the required enhanced treatment performance, flow capacity, materials of construction, no power or water required, vac truck accessibility, flexibility and mobility, footprint, and schedule. The Portable 2.55 M HDPE Downstream Defender System by Hydro International meets all of these constraints without exception and has a total estimated cost of $230,560 for four (4) devices, which includes 10% Page 308 of 991 contingency. Pursuant to Section 2-367(d)(2), the Procurement Department publicly released Intent to Sole Source (ITS) No. 2023-399-NA on March 29, 2023. The Intent to Sole Source (ITS) document provides details to , potential bidders on the Cites needs, and requests that any vendor that believes it can provide the City with ,the necessary items should submit written notification to the City for consideration. No response to the ITS was received. Therefore, based on the notification from the manufacturers and the results of the ITS, this item serves as a formal request for approval for the sole source purchase of four (4) portable 2.55 M HDPEDownstream Defender Systems by HydroIntemational, for the purpose of stormwater treatment during king tide events in key locations throughout the City of Miami Beach. SUPPORTING SURVEY DATA Results from the 2022 'Resident Survey related to the City's perception and satisfaction show an overall approval of 67.4%, and rated the City as a good place to live. FINANCIAL INFORMATION $230,560 427-0427-000674-29-422-000-00-00-00 CONCLUSION The Administration recommends approving the Resolution. Applicable Area Citywide Is this a "Residents Right Does this item utilize G.O. to Know" item, pursuant to Bond Funds? City Code Section 2-14? Yes No Strategic Connection Prosperity - Market and promote Miami Beach as a world .class arts, culture, and quality entertainment destination. Legislative Tracking Public Works ATTACHMENTS: Description ❑ Sole Source Procurement Request Temp CDS ❑ Bidsync ITS posting report ❑ 2023-399-NA ITS HDPE Downstream Defender ❑ DRAFT RESO Page 309 of 991 MIAMI BEACH Sole Source Procurement Request Description of Product/Service: Temporary 2.55 M HDPE Downstream Defender Estimated amount of this purchase: $ 209,600 (Estimate Attached) One Time Purchase 2 or Recurring 0 Department: Public Works Contact Person: Patricia L Rendon Phone: 305-673-7080 XT 6230 Due Date: a Work must be completed by: (check all that apply) f Material/Equipment/Supplies must be delivered by: June 1 st El Service must begin by: Please provide the following information in order to document the sole source request and prepare the appropriate recommendation to the City Manager and Mayor and City Commission: 1. Explain why the product/service requested is the only product/service that can satisfy your requirements and explain why alternatives are unacceptable. Be specific with regard to specifications, features, characteristics, requirements, capabilities and compatibility. Describe what steps have been undertaken to make this determination. During king tide and wet season, a total of 4 locations within the City flood with as much as two feet of water due to high ground water and rain entering the stormwater system. Some of these locations are in residential neighborhoods, and some are along major streets within the City. At each location, traffic flow is impeded and pedestrian flow is unsafe and almost impossible. In order to relieve flooding in these areas, the Miami Beach Public Works Department on a seasonal basis uses a series of temporary diesel pumps to pump groundwater from a manhole at each location over the sea wall and into the Bay or at some locations, into another stormwater manhole which drains into the bay. To date, this has successfully relieved the flooding and reduced complaints of residents and visitors. However, Miami Dade County has required that the Miami Beach obtain a DERM Class V Temp dewatering permit to discharge stormwater into the Bay. As a condition of this permit, the stormwater must be treated prior to discharge using a stormwater treatment system capable of reducing the total suspended solids and turbidity. Due to the proposed location of the treatment systems and other factors, there are a number of significant constraints which must -be met by the temporary treatment system. In addition to being a well -tested product manufactured by an established manufacturer, constraints include the following: • Patent -The DownStream Defender Select is a patented device as it relates to an inlet module for a separator, a separator and a method of manufacturing a separator. It is patent approved in Great Britian with a patent number of GB 2593669 and is patent pending in the US. The patent involves the separator itself, a method of manufacturing the separator and a specific inlet design; all of which help provide the following benefits: ➢ Significantly improved separation efficiency in separating TSS from water. This provides a cleaner effluent and more solids capture within the unit itself. ➢ A reduction in the washout of captured pollutants which have already been trapped in the separator. This means more solids that have already been captured stay captured even during periods of high flows instead of w8ftac, Nj0EM contaminating the effluent. ➢ Increased ability to handle peak flows while saving space. This means that higher flows can be accomplished in a smaller space while still providing a very high level of treatment. Please reference the offached letter for additional information. Treatment Performance - The stormwater treatment system should be sized to meet the permit discharge requirements of a turbidity of no more than 29 NTU greater than the background turbidity in the bay and 40 mg/I TSS at, the pumping flow rate required. The Temporary 2.55 M HDPE Downstream Defender has the treatment capabilities mandate by permit for the small footprint needed for space constraints. Flow Capacity - Public Works has determined through experience that a pumping rate of approximately 1,500 GPM is required to prevent flooding in the areas of concern. It is therefore critical that any stormwater treatment system have a full treatment capacity with overflow of at least this flow rate or some of the stormwater will be discharged without treatment. The Temporary 2.55 M HDPE Downstream Defender can meet the treatment mandated by permit at 1,500 GPM flow rates. Materials of Construction- Since the stormwater treatment system will be used above ground and moved every year, the materials of construction of the treatment system need to be very strong, resistant to heat and sunlight and at the same time light weight to be able to deploy onsite every 6 months. Public Works has determined that the best materials of construction for this site is HDPE because it meets all these criteria. The Downstream Defender is manufactures in HDPE material for these temporary applications. • No Power Required- All sites do not have easy access to power. Bringing in temporary power or utilizing a separate generator would cause additional safety and logistic concerns and for this reason Public Works has determined that one of the constraints of the treatment system is that it cannot require power. The Temporary 2.55 M HDPE Downstream Defender requires no power or moving parts for stormwater treatment. • No Water Reauired- Most of the sites do not have easy access to either potable or reuse water. Since temporary water lines would be difficult to implement and subject to vandalism and even to potential potable water system contamination, Public Works has determined that one of the constraints of the treatment system is that it cannot require an outside water source. The Temporary 2.55 M HDPE Downstream Defender requires no water for stormwater treatment. Vac Truck Accessible- Public Works owns several vac trucks which are currently used for other purposes including pumping out manholes, pumping and maintenance of existing below ground DownStream Defenders. Additionally, Public Works hires a third party contractors to be able to clean all stormwater system per NPDES permit. Because Public Works is already set up with vac trucks, the stormwater treatment system will need to be accessible to be cleaned of solids using a vac truck. The Temporary 2.55 M HDPE Downstream Defender is easily cleaned using vac truck same as the permanent concrete Downstream Defender. Flexible and Mobile - The treatment units will need to be put in place every year prior to the wet season and removed once the wet season is over. The units will then be moved to the Public Works yard and stored until the next season. Additionally, the treatment systems will need to be re -located around the City from time to time as the need for pumping the stormwater changes within the City. They may also occasionally be used as treatment for temporary dewatering on various projects throughout the City. All of these uses require a stormwater treatment that can be loaded onto a truck with a fork truck and moved around the streets of the City by Public Works service personnel without the use of a crane or other specialized equipment. The Temporary 2.55 M HDPE Downstream Defender is light weight and easy to transport unlike other solutions available in the market. Footprint- Several of the treatment systems will need to be located in major streets essentially taking up no more than a parking space and, in some cases, partially blocking a lane of traffic. For this reason, a small footprint is absolutely critical. A treatment system that is too large or requires excess Page 311 of 991 maintenance would be a potential safety concern to motorists and to Public Works Staff. The Temporary 2.55 M HDPE Downstream Defender requires no more than half a parking spot. • Schedule - The stormwater treatment system must be in place and operational by the upcoming wet season on June 1 st to allow the City to meet the permit discharge requirements while pumping out the flooded areas. Pre -purchase of the temporary HDPE Downstream Defenders will shorten the schedule by several months and allow the City to meet the discharge requirements during the upcoming wet season. The temporary DownStream Defender is the perfect device for this application because it is made from structurally re -enforced HDPE, resistant to heat and sunlight and is light enough to be easily moved in a temporary application for use during the wet season. The temporary HDPE Downstream Defenders will be moved into position and will occupy approximately'/2 of a parking spot for the wet season, then removed and put into storage during the off season. They are flexible enough to be moved to any application in the City where treatment is required by City staff with existing city equipment and could even be mounted on a small trailer and moved around the City on a regular basis if desired. Additionally, Miami Beach already has multiple successfully installed DownStream Defenders which have been on place for years, and Public Works, is familiar with the performance and cleaning associated with them. 2. Explain why this service provider, supplier, or manufacturer is the only practicably available source from which to obtain this product or service and describe the efforts that were made to verify and confirm whether, or not, this is so. (Obtain and include a letter from the manufacturer confirming, claims made by distributors of exclusive distributorships for the product or service, if, that is cited as a reason for this Sole Source.) As indicated above, this, application is very unique because there of the significant number of constraints that must be met. The Down Stream Defender meets all of these constraints without exception. The Downstream Defender is unique in that it is a patented stormwater vortex separation device and is the only advanced vortex separator on the market without an internal bypass mechanism, meaning that 100% of the stormwater inflow entering the system is treated, ensuring maximum removal of pollutants. It is the only above ground structurally re -enforced HDPE vortex separation stormwater treatment system available that can meet the treatment within the required footprint. The DownStream Defender is also the only HDPE above ground vortex separator without a by-pass and with a large enough capacity and adequate performance to handle this project. The DownStream Defender is unique in that it provides a very high level of stormwater treatment in a very small above ground footprint of about'/2 of a car parking spot which is extremely important since some will be used on the main streets of Miami Beach during tourist season. The 2.55M HDPE Downstream Defender will remove particles down to 50 micron and will remove 95% of all particles 175 micron which should be more than adequate to meet the permit requirements. The DownStream Defender is certified and accepted in multiple states by multiple organizations for TSS removal including Florida Department of Environmental Protection (FDEP). In fact, 28 DownStream Defenders were recently purchased for the high -profile signature Miami Bridge Project. 3. Will this purchase obligate us to a particular vendor for future purchases? (Either in terms of maintenance that only this vendor will be able to perform and/or N we purchase this item, will we need more 'like" items in the future to match this one?) No, this is a simple capital sale, and there will be no obligation to any vendor due to this purchase. Although this vendor is the only vendor found which can meet all the specific constraints for this particular application, this is a standalone purchase without obligations or ties to other purchases. Specially regarding maintenance, there are no moving parts with this product, there are no sacrificial wear parts with this product, and there is pgootKgo6yigotenance of specialized labor associated with that is required to be supplied by the manufacturer. Operation of the units essentially consists of opening a hatch and utilizing a vac truck to vac out the accumulated solids from the unit. Miami Beach Public Works Department owns several vac trucks and also works with several third -party stormwater maintenance companies with vac trucks which are unaffiliated with this particular manufacture to clean out various existing sanitary sewer and stormwater manholes. Thus, Miami Beach has multiple post capital sale operational options, none of which involve this particular manufacturer and with no ongoing financial relationship with this company is anticipated post capital sale. 4 4. Explain why the price for this product or service is considered to be fair and reasonable. Miami Beach has standardized on two vendors for stormwater treatment solutions and has purchased multiple units through competitive bids in the past and has a good understanding of the relative cost of these products. In this case, none of the vendors provides a HDPE treatment system suitable for above ground use which meets the previously identified restraints thus the request for a sole source. As a further verification of a fair and reasonable pricing, at the request of the Public Works Department the vendor has supplied several past Purchase Orders for the same or similar product for comparison purposes. Based on an evaluation of these Purchase Orders, Public Works has cdncluded that the pricing is fair and reasonable. Price Verification Throuah Previous Purchase Orders In order to verify pricing is fair and reasonable, see attached Purchase Orders for both the "permanent below ground" concrete DownStream Defenders as well as the "temporary above ground" HDPE DownStream Defenders. An explanation of pricing for each of these two is as follows: a. S' Concrete DownStream Defender (Permanent/ Concrete) Attached are the Purchase Orders for three 8' diameter concrete defenders. The scope is essentially same as would be purchased by Miami Beach for this project so the only adjust made to the price was for inflation as follows: Summary of Comparison Purchase Orders - 8' Concrete DD Adjusted to Adjusted to 2023 2021 Pricing Purchase Order Estimated 2023 Pricing Pricing Delvered ITo Delivered To No. No. Customer PO Scope PO Value Date of PO Inflation Rate Delivered to Site Ste Site 1 HQU-097534 Penine Plumbing inc 8'ODConcrete $44.753.00 2f16/2022 5,00% $46,990.65 S46,990.65 $46.990.65 i Superior Drainage Z HQU-110552 i Products. Inc 8' DD Concrete $34.326.00 8/15/2022 5.00% 535.196.20 $35.196.20 $35,1136.20 Superior Drainage ' 3 HQU-114862 Products.:nc 8' DD Concrete $36,588.00 10/17, 2022 5.00% $37,136.82 $37,136.82 537,136.82 This indicates that the proposed price to Miami Beach of $34,800 is in line with previous purchase order pricing from other customers for similar scope for permanent solution. A below ground 8' Concrete permanent DownStream Defender will have additional cost for design, permitting and installation which would surpass the cost of a temporary solution seen below and may take up to an additional year to implement. b. 2.55 M HDPE DownStream Defender As previously indicated, the Metric 2.55M HDPE is a standard product offered by Hydro International in the UK for years for use in buried systems. Attached is a Purchase Orders for several 2.55 M diameter HDPE DownStream Defenders for comparison purposes. Since the price of the PO is in Pound Sterling, the price of the Purchase Order has been adjusted to reflect the exchange rate at the time of purchase as well as for inflation. Additionally, the Purchase Order price has been added to reflect the cost of additional structural bands around the tanks to allow for above ground use and freight to Miami Beach, all of which has been included in the previous proposal to Miami Beach for the 2,55M HDPE DownStream Defenders. The adjusted price for these previous PO's is as follows: Summary of Comparison Purchase Orders - LSS M HOPE DID Additional Structural Adjusted Eahange Rate AddMonsfor Overseas 2023 Pricing Purchase Order Purchase 2023 Pridng (LBS) Pound Stering 2023 Pridng- Above Freight 6 Landed and PO No. No. Customer Order Scope PO Value (LBS) Date of PO (Inflation @ S%) to US Dollar USD Ground MIvery Delivered 1 PO01275578371 Clrat/ni:ks 2.5 M DD 525.275.0C 5'3,•'2C21 S27.17:.63 1.3848 537.625.88 55.50:.X, 59.53C.00 552.625.88 Page 313 of 991 This indicates that the proposed price to Miami Beach of $52,400 is in line with previous purchase order pricing from other customers for similar scope. The temporary 2.55M HDPE DownStream Defenders does not require additional cost for design, permitting and construction /installation. Additionally, the temporary 2.55M HDPE DownStream Defenders can be onsite ready to use within 8-12 weeks of approved submittals. 5. Describe the negotiation efforts, N any, that have been made with the supplier to obtain the best possible price. Public works initially requested that the unit price of each unit be reduced which was agreed to. Additionally, this vendor, at the request of Public Works, has provided a total of nine different proposals with various scopes, unit sizes, materials of construction and stormwater treatment solutions in an attempt to not only find the best solution, but to get as much scope added to the price as possible. As an example, Public Works requested that the vendor provide a specific type of non-standard pipe connection which the vendor agreed to provide at no charge. Additionally, Public Works requested the vendor also provide additional service time to help with setup once the units are on -site at no extra cost which was also agreed to by the vendor. 6. Explain the consequence(s) to the City or Public, including a dollar estimate of the financial impact N this Sole Source is not approved. Ultimately, the County will not allow the deployment of the temporary pump stations without having cleaning devise prior to discharge to the bay. Without the deployment of the temporary pump station the City streets will flood causing disruption to vehicle and pedestrian passage through main streets or into residences and /or commercial properties. The impact to the public of not having the temporary devises and pumps would mean this 4 locations would remain under as much as two feet of water during wet season and they would be unable to get to their parked cars, houses and in some cases shops and stores without walking through water. This could obviously lead to other safety concerns and potential lawsuits involving significant amount of money. Additionally, flooding could enter private property causing damage beyond the ROW. 7. Industry Independent Standard Review. Hydro International hydrodynamic vortex separators have several third -party certifications and verifications. Below is a list of the certifications and verifications: • New Jersey Corporation for Advanced Technology (NJCAT) • New Jersey Department of Environmental Protection (NJDEP) • Environmental Technology Verification (ETV) Canada • Washington State Technology Assessment Protocol - Ecology _(TAPE) for Pretreatment Virginia Department of Ecology BMP Clearinghouse • Ohio Department of Transportation • St. Louis Metropolitan Sewer District • California Water Boards Full Trash Capture • Florida Department of Environmental Protection (Accepted) The New Jersey Corporation for Advance Technology and Washington State Technology Assessment Protocol are the most widely accepted and known third party certifiers in the industry here in the United States. A link to these certifications can be foundpoone f �ativebsite as follows: https://hydro- int.com/en/products/downstream-defender I hereby affirm that, pursuant to Section 2-367(d) of the City Code, the goods or services describe above are only available from the stated source. Department Director Name: Industry Expert': Department Director Signature: i Inliustry Expert Signature: �a.1 F1.1.Sim l rIlWl Eel a L-7,UR MMOII 1• a tK•] H n• L-74c=iM 'Section 2-367(d) requires the using department to "obtain the written determination from an industry expert or consultant that the item or service is the only one available to fulfill the city's need." Page 315 of 991 ATTACHMENT 1 ESTIMATE Page 316 of 991 SALES QUOTE Quote No: HQU-130316 Quote Date: 03-09-2023 Account: Contact: Patricia L Rendon Hydro Ref: 22_12 4063 Hydro�R. International Project Name: Miami Beach Grit King Project Project Location: Miami Beach, FL Hydro Contact: Gary Lohse Hydro Phone: Email glohse@hydro-int.com Description Quantity Unit Price Amount 2.55 M HDPE Downstream Defender System 4.00 52,400.00 209,600.00 Each DownStream Defender System Includes Downstream Defender Internals installed in a 2.55 M Diameter HDPE Manhole reinforced for above ground use. 2.55 M HPDE DD estimated to remove 95 % of particles down to 175 microns.at 1500 gpm Please allow 8-12 weeks from approved submittal dwgs for delivery Price Includes delivery to site but not loading Total 209,600.00 Price is quoted in US Dollars and is FOB Jobsite All treatment systems include precast concrete manhole/vault, preassembled internal components, manhole frame & cover/grate (unless otherwise noted). Standard Exclusions: 1. Outlet pipe coupling. 2. Grade rings, concrete block, and mortar if needed to extend manhole frame and cover from manhole top slab to final grade. 3. Diversion structure and associated piping. 4. Inlet and outlet pipe boots. 5. Manhole frame and cover other than Hydro International standard. 6. Unloading, storage, final assembly, and installation of any equipment on site. 7. Taxes or duties of any kind. 8. Site design and construction: 9. Hydro International representative during installation, though one may be provided at additional cost. 10. State and/or local taxes will be charged unless Hydro International receives a valid resale/exemption certificate. Agreement to purchase equipment as quoted above is contingent upon approval of submittal drawings. This document constitutes a binding contract that may only be cancelled by the agreement of both parties or by the rejection of product submittals without recourse for resubmitta►. All order canceNations in whole or in part that have been approved and released to production will be billed a rate of 50% of the product unit price. Terms: 100% net 30 days after delivery or notification that unit is ready for delivery (subject to credit approval). Payment in accordance with Hydro International standard Terms and Conditions. By executing this contract you are verifying that you read and agree to the Terms and Conditions listed on our website. Please review them at https://www.hydro-int.com/ASW.pdf Due to market volatility, proposal is based on receipt of a signed quotation or purchase order within 15 days of the quotation date. As you are aware, due to the volatility in the energy market cost of fuel has risen significantly over the last several months. As such, we will be initiating a fuel surcharge on all deliveries from this point forward, or until we see fuel prices stabilize and we can change our freight charges back to the standard rates. Below is the surcharge calculation. Fuel Surcharge: A fuel surcharge of $ .10 per mile, round trip will be charged on all deliveries when the average fuel price is exceeded by 2% in your region of the country. Please refer to (https://www.smc3.com/weekly-fuel-prices.jsp). An additional $ .10 per mile, round trip will be charged for each additional $ .10 per gallon increase in fuel cost thereafter. Signed: Date: 2 t Name: Company: Site Contact for Delivery Coordination Name: Phone: Email: Requested Delivery Date: Page 318 of 991 (A1 (D O_ CD CD IN IN IN INLET OUTLET -ET, TYP N VIEW OUTLET .ET, TYP J VIFW PIPEWORK SHOWN FOR ILLUSTRATION PURPOSES y INLET INLET OUTLET ILET, TYP IN VIEW A A PARTS LIST DESCRIPTION Single Skin Upper Chamber Single Skin Lower Chamber Benching Skirt Chamber Inlet Chute Outlet Hood DN5001600/675/750 Pius Connection Note: 1. Angles can be adjusted to suit. Minimum angle between inlets and outlet is 90% 2. Maximum number of inlets is 3. 3. Cover slab, cover and frame by others. 4: Max. lift weight 950kg. awo V 2IRB. 2410 VAS 2:. B JN CG RNA 1SJ0 WAS IEW, 17AIYJW 0000 NK52Y50, a ONA 44M, 1 N0V 1470, PROJECTION IF IN DOUBT ASK AASK wTE scuE 17/06/2022 1:55 DRAWN BY CHECKED BY APPItOVEO BY JM CG RWB Tb XXXXProject Downstream Defender Select 2400 Single Skin, Advanced Vortex µ Hydro International hydro-int.cvm C2022 HYDRO INTERNATIONAL Wf IGHT NATERULL N/A STOCK NUMBER: DRAWING NO.: XXXXPROJECT-2400SAV SHEEr SVE' SHEET: R, A3 1 OF 1 8 0 0■ 0■ M. ■ Mat'I Specification Black PE 80/100 DIN EN ISO 17855-1 Standards PE QUACH, 45 T A 0031006 DIN4102 B2 Extrusion welding (hot Method stringer bead torch separate from filler) EN 13705:2004 Welding Standards EN 12943:2000 EN 1306:2003 1 2 1 3 CHAMBER DIAMETER 1800 ID A AA A A 4 5 6 PARTS LIST ITEM CITY DESCRIPTION MATERIAL MASS 1 1 Inlet Chute Polyethylene, High Density 238.4 kg 2 1 Outlet Hood Polyethylene, High Density 15.6 kg 3 1 Single Skin Upper Chamber HDPE Plastic 192.2 kg 4 1 Single Skin Lower Chamber Polyethylene, High Density 114.7 kg 5 1 Benching Skirt HDPE Plastic 117.3 kg 6 2 Pipe size options DN375-600, pipe Noe TBC by client Potethylene, High Density 8.4 kg 1 ■0 PROJECTION {{�} IF IN DOUBT/ASK DATE SCALE 15/03/2022 1:40 DRAM BY: CHECKED BY APPROVED BY B RJT TDe DOWNSTREAM DEFENDER SELECT ADVANCED VORTEX DDC18-600-F SINGLE WALL PLASTIC Hydro International hydro-int.com 02021 HYDRO INTERNATIONAL A WEIGHTMAIERIAL N/A STOCK NUMBER DRAWING NO -DDC18-F SHE' TSUE SHEET p�v A3 1 OF 3 A 6 1 2 3 1 4 5 6 UPPER CHAMBER FABRICATION aw. ..fit.. 75 IMPORTANTI THIS IQ �50 -y /0x 45'CHAMFER DRAWING SHOULD BE 1 I READ IN CONJUNCTION D D 1>f20,7 7 WITH THE RELEVANT GENERAL ARRANGEMENT ---- 01801A i- TOPOSITIONTHE A �` I ^r INLET70UTLETHOLESAND STRENGTHENING RIBS TO �C I SUIT THE PIPE TYPE AND 1 140 X 45' CHAMFER SIZE. ,10r Apo, *k-41 DETAIL D 4 POSITIONS V ' ` C 02017AA F C 25 VEIW ON B R / D 1 T o o I L T _e fl% MOLE SIZE DEPENDENT I I !J7 (D R ON PIPE TYPE AND SIZE. t00 N I DETAIL E pa Q I L 4 POSITIONS �S a 12 TYP —T 12 12 � TYP � I 20 12 TYP I 12 B t'llE B / yP 12 12 o TYP 12 80 �2017 Q 72 1 050 PROJECTION 50 X 45' CHAMFER IF IN DOUBT ASK r _ i6/03/1022 1iO TYP 12 I At J ^�n 1z r Q2x 09THRu _ 1 i • ... •�� p I p DOWNSTREAM DEFENDER SELECT Q01B95 PCD AI ADVANCED VORTEX \ 1009 120 DOCIPLASTIM00-F SINGLE WALL DETAIL F A i I SECTION C•C 4 POSITIONS Hydro? A / International 'I."- -Mg .= A. . DDC18•F 9 : Ala rra 2 OF 3 A 1 2 3 4 5 6 1 o= 0m om Al TYP 0 I A 12X 09THR Q01895 250 Q350 75 40 X 45° CHAMFER Lo N TYP 1 ` 110 DETAIL J 4 POSITIONS 2 3 I LOWER CHAMBER FABRICATION TYP TYI 6 DO NOT SOALE DIGWINO LASERS WATER JET 011TTINe TOLERANCES ONIESIONS ME IN ILLNElED, 0@IENSIONS ME IN MIllS1ETER3. L— JvquNl 0001000 • 10 — 00e1000 • S 10' 1000-N -.0.15 1000-1000 • t 0 6 •2000. E02— -2000 •>: 0.25' IMPORTANTI THIS DRAWING SHOULD BE D READ IN CONJUNCTION WITH THE RELEVANT GENERALARRANGEMENT TO POSITION THE HOLES AND STRENGTHENING RIBS TO SUIT THE PIPE TYPE AND SIZE. mM =11=1 050 50 X 45° CHAMFER 6 X 45° CHAMFER Hyqro�k International o co hydro-intourn IT m r 02021 HYDRO INTERNATIONAL A MIGHT NATERNI 115 k9 Polyethylene, Hph Density S7OCA NUMBER DETAIL K DETAIL L DRAINING NO 4 POSITIONS-DDC18-F SHEET SUE I SHEET: Rw. A3 3OF3 A 3 4 5 6 1 2 3 4 5 6 _ -tr D D r I voi I i "�• i I r-----1 TYPICAL PIPE INSERT I I C 1� I DETAIL D C WELD IN BENCHING SKIRT ALIGN INVERT AND PRIOR TO ASSEMBLING LOWER CHAMBER TO TRIM CHUTE TO PIPE O/D i / N UPPER CHAMBER. CD - W N W 12 TYP O 12 CO t0 PROJECTION �JJ IF IN DOUBT ASK _ F _ DATE 22/03/2022 LE 20 B E E E E I I I I DRANM BY RJT I CHECKED BY APPflOVEO BY B I I TBe DOWNSTREAM DEFENDER I O SELECT E I E ADVANCED VORTEX i i 1.8m SINGLE SKIN A A •— --- —• o DETAIL C N ALIGN INVERT MARKS Hydro - International hydro-int.mm A o 0 02021 HYDRO INTERNATIONAL A � ' WEK:NT NIA MAIERuI STOCK NUMBER SECTION B-B SECTION A -A DIUWNG NO -DDC18-1 SHEET SIZE A3 SHEET 1 OF 2 R. 1 2 3 4 5 6 17■ o■ cDrYP 17■ 0■ 112 1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT GENERAL ARRANGEMENT & DETAIL DRAWINGS. 2. ALL COMPONENTS SHALL BE MANUFACTURED IN ACCORDANCE WITH THE PRODUCTION SPECIFICATION HRD-FM09/15. D 3. ANY CUT OR WORKED EDGES TO BE MADE SMOOTH. PROJECTION {{ 7 E3 IF IN DOUBT ASK DATE SCALE 22/03/2022 1:30 B DRAWN BY. CHECKED BY AfHilOVEO BY RJT TIM DOWNSTREAM DEFENDER SELECT ADVANCED VORTEX 1.8m SINGLE SKIN SPECIFICATION Mat'I Description High Density Polyethlene Mat'I Hydro Specification Black PE 80/100 1ntimational DIN EN ISO 17855-1 0 Standards PE QUACH 45 T hydro-int.com F SECTION F-F SECTION E-E Welding Standards 003/006 DIN4102 B2 02021 HYDRO INTERNATIONAL A xtrusion welding (hot WEIGHT N/A MAZER Al stringer bead torch STOCK NUMBER: separate from filler) EN 13705:2004 DRAWING NO: -DDC18-I EN 12943:2000 SHEETSUE IS.EET p.. EN 1306:2003 A3 12 OF 2 A ATTACHMENT 2 PATENT LETTER Page 325 of 991 Hydro International 3/17/23 Patricia L Rendon, P.E City of Miami Beach Regulatory Compliance Manager PUBLIC WORKS DEPARTMENT, Engineering` Division 1700 Convention Center Drive, Miami Beach, FL 33139 Dear Patricia: The DownStream Defender Select is a patented device as it relates to an inlet module for a separator, a separator and a method of manufacturing a separator. It is patent approved in Great Britian with a patent number of GB 2593669 and is patent.pending in the US. The first page of the GB patent has been attached for reference. The patent involves the separator itself, a method of manufacturing the separator and a specific inlet design; all of which help provide the following benefits: Significantly improved separation effeciency in separating TSS from water. This provides a cleaner effluent and more solids cature within the unit itself. • A reduction in the washout of captured pollutants which have alreaady been trapped in the separator. This means more solids that have already been captured stay captured even during periods of high flows instead of washing out and contaminating the effluent. • Increased ability to handle peak flows while saving space. This means that higher flows can be accomplished in a smaller space while still providing a very high level of treatment. Please do nto hesitate to contact me with any questions or colmments regarding this poatent or if your require additional information regarding the patent. Bet Regards G M. Lohse Industrial Sales Manager i Page 326 of 991 (12) UK Patent Application (,,)GB (11)2593669 (13)A (43)Date of A Publication 06.1 i (21) Application No: 2002320.6 (22) Date of Filing: 19.02.2020 (71) Applicant(s): Hydro International Limited (Incorporated in the United Kingdom) Shearwater House, Clevedon Hall Estate, CLEVEDON, Avon, BS21 7RD, United Kingdom (72) Inventor(s): Mark Richard Bowditch Philip Walsh Daniel Stuart Jarman (74) Agent and/or Address for Service: Hasettine Lake Kempner LLP Redcliff Quay, 120 Redcliff Street, Bristol, BS1 6HU, United Kingdom (51) INTCL: E03F 5104 (2006.01) (56) Documents Cited: GB 2459896 A US 20150048014 Al KR20120052493 (58) Field of Search: INT CL E01F, E03F Other: WPI, EPODOC E03F 5114 (2006.01) KR 102037006 B1 US 20070012608 Al (54) Title of the Invention: An inlet module for a separator, a separator and a method of manufacturing a separator Abstract Title: An inlet module for a separator, a separator and a method of manufacturing a separator (57) An inlet module for a separator 2, the separator comprising a chamber 4 defined by a chamber wall having a chamber wall opening. The inlet module 6 comprises an attachment portion 27 and a projecting portion 29 extending from the attachment portion. The attachment portion is coupled to the chamber wall and comprises an inlet (36 fig 6) for receiving liquid passing through the chamber wall opening. The projecting portion comprises an outlet (46 fig 6) directed such that the liquid exits the inlet module and creates a circulating flow within the chamber about a central axis (15 fig 12) of the chamber. The projecting portion is offset from the attachment portion such that a gap (76 fig 5) is formed between the projecting portion and the chamber wall through which the circulating flow can pass. There is also described a method of manufacturing a separator comprising obtaining an inlet module from a range of inlet modules; obtaining a further inlet module from a range of inlet modules; removing a distal end of the projecting portion of the further inlet module so as to form an outlet module; and coupling the inlet module and the outlet module to the chamber wall so as to form a separator. !` IV cyl Q0 W C� a Page 327 of 991 ATTACHMENT 3 PO COMPARISON Page 328 of 991 Purchase Order Pennine Plumbing, Inc. 1139 S. Placentia Avenue Fullerton, Ca. 92831 Tel: 714-888-0040. Fax: 714-888-0043 Cont' Lic # 844663 Bill To: PENNINE PLUMBING, INC. 1139 S. PLACENTIA AVE FULLERTON, CA 92831 714-888-0040 Description of Work The attached submittal has been approved by TABC, Inc. Please move forward as per your attached submittal and sales quote.. Any questions please call Dave Linton directly-562-755-2749. 2/16/2022 Summary: PO (PUR ORDER) Reference #: 2251-9333 P.O. #: HQU-097534 Job Name: TABC, Inc. 6375 N Paramount Blvd Long Beach, CA 90806 Subtotal Total 89506.00 $89, 506.00 All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection, including attorneys fees. Signature jZ2,?of 991 Date SALES QUOTE Hyqro International m Quote No: HQU-097534 Quote Date: 02-09-2022 Project Name: TABC Inc Facility - Long Beach Account: Project Location: Long Beach, CA Pennine Plumbing 1139 S. Plancetia Ave, Fullerton CA 92831 Hydro Contact: Phil O'Neill Contact: Dave Linton Hydro Phone: +1 805-350-8163 Hydro Ref: 21_12 4350 Email poneill@hydro-int.com Description Quantity Unit Price Amount 8' Downstream Defender System 2.00 44,753.00 89,506.00 Total 89, 506.00 Price is quoted in US Dollars and is FOB Jobsite All treatment systems include precast concrete manhole/vault, preassembled internal components, manhole frame & cover/grate (unless otherwise noted). Standard Exclusions: 1. Outlet pipe coupling. 2. Grade rings, concrete block, and mortar if needed to extend manhole frame and cover from manhole top slab to final grade. 3. Diversion structure and associated piping. 4. Inlet and outlet pipe boots. 5. NFanhole frame and cover other than Hydro Intemational standard. 6. Unloading, storage, final assembly, and installation of any equipment on site. 7. Taxes or duties of any kind. 8. Site design and construction. 9. Hydro International representative during installation, though one may be provided at additional cost. 10. State and/or local taxes will be charged unless Hydro International receives a valid resale/exemption certificate. Agreement to purchase equipment as quoted above is contingent upon approval of submittal drawings. This document constitutes a binding contract that may only be cancelled by the agreement of both parties or by the rejection of product submittals without recourse for resubmittal. All order cancellations in whole or in part that have been approved and released to production will be billed a rate of 50% of the product unit price. Terms: 100% net 30 days after delivery or notification that unit is ready for delivery (subject to credit approval). Payment in accordance with Hydro International standard Terms and Conditions. By executing this contract you are verifying that you read and agree to the Terms and Conditions listed on our website. Please review them at https://www.hydro-int.com/ASW.pdf Due to market volatility, proposal is based on receipt of a signed quotation or purchase order within 15 days of the quotation date. et Signed: f'� -4 Date: 2- /6 - Name: DVIA L,n il1 Company: 4je ` 1ur#&A DSA A I IN I. SALES QUOTE Quote No: HQU-110552 Quote Date: 08-15-2022 Account: Superior Drainage Products, Inc. 3131 E. Governor John Sevier Hwy, Knoxville TN 37914 Hydro International Project Name: The Bowen House at Knollmere Place Project Location: Nashville, TN Hydro Contact: WIII Hall Contact: Brent Burnette Hydro Phone: +1 770-380-7749� u' Hydro Ref: 22_12_1966 Email whall@hydro-int.com (� Description Quantity Unit Price Amount 8' Downstream Defender System Price is quoted in US Dollars and is FOB Jobsite 1.00 34,328.00 34,328.00 Total 34,328.00 All treatment systems include precast concrete manhole/vault, preassembled internal components, manhole frame & cover/grate (unless otherwise rioted). Standard Exclusions: 1.Outlet pipe coupling. 2. Grade rings, concrete block, and mortar if needed to extend manhole frame and cover from manhole top slab to final grade. 3. Diversion structure and associated piping. 4. Inlet and outlet pipe boots. 5. Manhole frame and cover other than Hydro International standard. 6. Unloading, storage, final assembly, and installation of any equipment on site. 7. Taxes or duties of any kind. B. Site design and construction. 9. Hydro International representative during installation, though one may be provided at additional cost. 10. State and/or local taxes will be charged unless Hydro International receives a valid resalelexemption certificate. Agreement to purchase equipment as quoted above is contingent upon approval of submittal drawings. This document constitutes a binding contract that may only be cancelled by the agreement of both parties or by the rejection of product submittals without recourse for resubmittal. All order cancellations In whole or in part that have been approved and released to production will be billed a rate of 50% of the product unit price. Terms: Net 30 Days (subject to credit approval). Payment in accordance with Hydro International standard Terms and Conditions. By executing this contract you are verifying that you read and agree to the Terms and Conditions listed on our website. Please review them at https:/twww.hydro-int.com/ASW.pdf Due to market volatility, proposal Is based on receipt of a signed quotation or purchase order within 15 days of the quotation date. As you are aware, due to the volatility in the energy market cost of fuel has risen significantly over the last several months. As such, we will be initiating a fuel surcharge on all deliveries from this point forward, or until we see fuel prices stabilize and we can change our freight charges back to the standard rates, Below is the surcharge calculation. Fuel Surcharge: A fuel surcharge of $ .10 per mile, round trip will be charged on all deliveries when the average fuel price is exceeded by 2% in your region of the country. Please refer to (https://www.smc3.comtweekly-fuel-prices.jsp). An additional $ .10 per mile, round trip will be charged for each additional $ .10 per gallon increase In fuel cost thereafter. Signed: Date:61�J�� Name: Company: Site Contact for Delivery Coordination Name: Phone: Email: Requested Delivery Date: 0 Page 332 of 991 SALES QUOTE Hydrointernational m Quote No: HQU-114862 Quote Date: 10-17-2022 Project Name: Dal -Tile Quartz Plant - Phase II Account: Project Location: Dickson, TN Superior Drainage Products, Inc. 3131 E. Governor John Sevier Hwy, Knoxville TN 37914 FO Hydro Contact: Will Hall Contact: Brent Burnette Hydro Phone: +1 770-380-7749 Hydro Ralf. 22_12_2827 Emall whal@hydro-lnt.com Description Quantity Unit Prke Amount 8' Downstream Defender System 1.00 36,588.00 36,588.00 This unit has 2' of extra vertical footage. Total 36,588.00 N ((DD Price Is quoted in US Dollars and Is FOB Jobske WAll treatment systems Include precast concrete manholelvault. preassembled Internal components, manhole frame 8 coverigrate (� (unless otherwise noted). Standard Exclusions: , 1. Outlet pipe coupling. Co 2. Grade rings, concrete block and mortar If neaded to extend manhole frame and cover from manhole lop slab to final grade. lip J. Diversion structure and associated piping. 4. Inlet and outlet pipe boots. 5. Manhole frame and cover otter than Hydro International standard. 6. Unloading, storage, final assembly, and installation of any equipment on site. 7. Taxes or duties of any kind. I. Site design and construction. 9. Hydro international representative during Installation, though one may be provided at additional cost. 10. State and/or local taxes will be charged unless Hydro hlernational receives a valid resalelexemption carillicate. Agreement to purchase equipment as quoted above Is contingent upon approval of submittal drawings. This document constitutes a binding contract that may only be cancelled by the agreement of both parties or by the rejection of product submittals without recourse for resubmlttal. All order cancellations In whole or in pan that have been approved and released to production will be billed a rate of 50 % of the product unit price. Terms: Immediate Payment (subject to credit approval). Payment in accordance with Hydro International standard Terms and Conditions. By executing this contract you are verifying that you read and agree to the Terms and Conditions Isted on our webslle.. Please review them at htipslMww.hydro-inl.com/ASW.pdf Due to market volatility, proposal Is based on receipt of a signed quotation or purchase order within 15 days of the quotation data. As you are aware, due to the volatility in the energy market cost of fuel has risen significantly over the last several months. As such, we will be initiating a fuel surcharge on all deliveries from this point forward, or until we see fuel prices stabilize and we can change our freight charges back to the standard rates. Below Is the surcharge calculation. Fuel Surcharge: A fuel surcharge of $ .10 per mile, round trip will be charged on all deliveries when the average fuel price is exceeded by 21/6 In your region of the country. Please refer to(https:/hvww.smc3.com/weeklydual-p(ces.Jsp). M additional $ .10 par mib, rood ttlp wul he charged f additional $ .10 per galkxk Increase In fuel cost thereaft/err..� sgne jl !Date., 1���7 Name: of / . _ ComPenY Site Contact for Delivery Coordination Name: --- .. ---.-.- -- Phone: Email: Requested Delivery Date: T 0) (D W W O t0 CtJ ..a I�ICE .. CHAD LET'S GET IT DONE kitchens appliances HEITON BUCKLEY Robinhood Road Off Longg Mile Road DUBLIN 22 D22V5T3 Phone 4089500 a -Mail : credifteam32@heitons.ie PURCHASE ORDER RH55693 Supplier Details Prepared By : SEAN MCDERMOTT HYDRO INTERNATIONAL UK LTD SHEARWATER HOUSE Date : 8/9/21 VICTORIA ROAD CLEVEDON "CONFIRMATION ORDER" Phone:01275878371 Comment: AR PER QUOTE FROM PHIL COLLINS Unit Total Item Description Unit Qty. Price Price 916092 2.55M DOWNSTREAM DEFENDER Ill - SINGLE WALL HDPE EA 1 23275.00 23275.00 PQL 1320.1081 Suppliers Item Code - N/A 916093 FLEXSEAL COUPLING EA 2 0.01 0.02 411000 Suppliers Item Code - N/A 916094 TRANSPORT DELIVERY TO SITE VIA FLAT BED VEHICLE EA 1 2500.00 2500.00 TRA 1010.3000 Suppliers Item Code - N/A 916095 1.8M DOWNSTREAM DEFENDER III - SINGLE WALL HDPE EA 1 13912.75 13912.75 PQL 1320.1051 Suppliers Item Code - N/A 916111 FLEXSEAL COUPLING EA 2 0.01 0.02 411000 Suppliers Item Code - N/A 916112 TRANSPORT DELIVERY TO SITE VIA FLAT BED VEHICLE EA 1 500.00 500.00 TRA 1010.3000 Suppliers Item Code - N/A 916113 1.8M DOWNSTREAM DEFENDER 111 - SINGLE WALL HDPE EA 1 13912.75 13912.75 PQL 1320.1051 Suppliers Item Code - N/A 916114 FLEXSEAL COUPLING EA 2 0.01 0.02 411000 Suppliers Item Code - N/A 916115 TRANSPORT DELIVERY TO SITE VIA FLAT BED VEHICLE EA 1 500.00 500.00 TRA 1010.3000 Suppliers Item Code - N/A 916116 2.55M DOWNSTREAM DEFENDER III - SINGLE WALL HDPE EA 1 23275.00 23275.00 PQLI 320.1081 Suppliers Item Code - N/A 916117 FLEXSEAL COUPLING EA 2 0.01 0.02 411000 Suppliers Item Code - N/A 916118 TRANSPORT DELIVERY TO SITE VIA FLAT BED VEHICLE EA 1 2500.00 2500.00 TRA 1010.3000 Suppliers Item Code - N/A THIS IS A DIRECT DELIVERY TO OUR CUSTOMER. USE DELIVERY ADDRESS BELOW. DO NOT deliver to branch. Total In EUR Excl. Vat: 80375.58 Direct Order Deliver To: CLONMEL ENT LTD ADAMSTOWN NSEW LINK RD. MILO 0866043057 OR COLIN ** CONFIRMATION ORDER ** ** CONFIRMATION ORDER ** 0860201076.NEAREST EIRCOD K78EF64 PLEASE REFERENCE OUR ORDER NUMBER RH55693 ON ALL CORRESPONDENCE ALL INVOICES & DELIVERY NOTES SHOULD BE CAREFULLY MARKED HEITON BUCKLEY Robinhood Road Regi.tered Me.: e.'o Grafton G,o.p plc, Heron Hoax•. C'otrig Road, Sandyford Ind E%t., Dublin 18. Reg. No. 35111. VAT Reg. No. I 9QS3151111 W EEE No. 2572W Page 335 of 991 a 46M. 9:46 AM Cityaf Miani Beach, CATS-2023399-NA- High-DentsityPoly"ene (HDPE) 2.5 M Dowrstraem Defefder 6)etsm PeriscopeWelcome NESTORABARCA@MIAMIBEACHFLGOV JsgQ Need assistance' O Source Contact us Time Lek dosed Bid Started Mar29, 2023 8:18:17 PM EDT Bid Ended This bid closed on Apr 5, 2023 3:00:00 PM EDT Agency Information City of Miami Beach, FL vi w grW bids) Department Procurement (view deoartment'sbids) Bid Classifications Classification Codes Bid Regions ftgions Bid Contact see contact information Delivery Location One or more of the following locations City of Miami Beach PUBLIC WORKS DEPARTMENT 1700 CONVENTION CENTER DRIVE 4TH FLOOR MIAMI BEACH FL 33139 Qty 1 Expected Expenditure n/a View Rules Click here to change the rules for this bid. Best and Final Offer. Create # of offers 0 Notifications Report (%091 ActiW # of suppliers viewed 17 (View) Q & A Questions & Answers it Schedule ED Task [) Note Chat I Description I Attachments Bid Number ITS-2023-399-NA Page 336 of 991 hops:ftmw.bidWc.omMPX7ac=%ioMLaw--211438D&rebxr iemac%3DaagrauplisM2Garc%3D2114360&suparch-- 114 40M, 9:46 AM City of Miami Beach, IATS2023-399•NA - Hig h.-Density Pdyathytam (H DPE) 25 M Downstream Defender System Title Please refer to the document attachment Quantity 1 each Contract Duration 1 year Contract Renewal 1 annual renewal Prices Good for 1 year Budgeted Amount $209,600.00 (t;bgngg) Estimated Amount $2O9,600.00 Estimated Amount $2O9,600.00 (This price is estimated - riot guaranteed) Bid Comments IntenttoAward Pursuantto Sole Source Exemption ITS-2023-399-NAfora High -Density Polyethylene ('HOPE') Downstream Defender System needed to capture and retain sediments, oil, trash, and floatable debris during the IOng Tide occurrences from surface water runoffatfour locations within the Cityof Mami Beach. This notice is released pursuant tD Section 2-367 (d) ofthe Mami Beach CityCode. The purpose of this notes is to notifyinterested parties that pursuantio Section 2-367 (d), ofthe Mami Beach City Code, thatthe Cityintends lo make a noncompetitive award forthe goods or services, as stated below, available onlyfrom a single source. Goods or services required: Currently( the Public Works Department is seeking to obtain four 2.55 M HDPE Downstream Defender System. Each Downstream Defender System shall include intemals installed in a 2.55 M Diameter HOPE manhole reinforced for aboveground use. The 2.55 M HPDE DO is estimated to remove 95% of particles down to 175 microns at 1500 GPM. The HOPE Downstream DefenderSystems will be installed atfourlocations within the CityofMami Beach ('City') flooding with as much as two feet ofwatar due to high groundwaterand rain entering the stonnwatersystem. Some ofthese locations are in residential neighborhoods, and some are along major streets within the CityAt each location, traffic flow is impeded, and pedestrian flow is unsafe and almost impossible. Treatment Performance. The stonnwatertreatment system should be sized to meetthe permit discharge requirements ofa trubidiyof no more than 29 NTU greater than the background turbidityin the bayand 40 mgfl TSS atthe pumping flow rate required. The 2.55 M HOPE Downstream Defender has the treatment capabilities mandate bypernitforthe small footprint needed for space constraints. Flow Capacity Public Works has determined through wperienoe that a pumping rate of appro)dmaley 1,500 GPM is required to preventflooding in the areas ofconoem. his therefore critical that anystonnwatertreahnentsystem have a full treatmentcapaaywith overflow ofat leastthis flow rate or some ofthe slormwaterwill be discharged withouttreat ment The 2.55 M HOPE Downstream Defender can meet the treatment mandated bypermit at 1,500 GPMflow rates. Materials of Construction. Since the stormwatertreatment system will be used above ground and moved everyyear, the materials ofconstruction ofthe treatmentsystam need to be verystrong, resistanttD heat and sunlighland atthe same time lightweightto be able to deployonsite every6 months. The Public Works Department has determined that the best material ofoonstruction for this site is HOPE because it meets all these criteria. The Downstream Defender is manufactures in HOPE material for these applications. No Power Required.All sites do not have easyaccess to power. Bringing in temporarypower or utilizing a separate generetorwould cause additional safety and logistic concerns and forthis reason Public Works has determined that one ofthe constraints ofthe treatment system is thatitcannot require power. The 2.55 M HOPE Downstream Defender requires no power or moving parts forsiornwatertreatment No Water Required. Mostofthe sites do not have easysocess lo either potable or reuse water. Since temporarywater lines would be dificultto implement and subject to vandalism and even to potential potable water system contamination, Public Works has determined thatone ofthe constraints ofthe treatment system is that it cannot require an outside water source. The 2.55 M HOPE Downstream Defender requires no waterfor stormwalartreatment 1bc TrucicAcoessible. The Public Works Department owns several we trucks which are currenttyused forother purposes including pumping out manholes, pumping, and maintenance ofe)asting below -ground Downstream Defenders. ReAble and hbbile. The treatment units will need te be put in place everyyear priorb the wetseason and removed once the wetseason is over. The units will Page 337 of 991 hMxYMwwbidW c.convDPX?eGvToth6a)c=21143606rehrmievFec%3Davgrouplist%26eLc%3D21143606supsrch= 2/4 4XM. 9:46 AM Description Cityof Miami Beach, fATS2023-399-NA- High-DersityPdyal Vane (HOPE) 2.5 M Dorrstream Defender System then be moved to the Public Works Yard and stored until the next season. Additionally the treatmentsystams will need to be relocated around the Cityfrom time to time as the need for pumping the st rmwater changes within the City They mayalso occasionally be used as a treatmentfor tamporarydewatering on various projects throughout the City All ofthese uses require a slonnwatertreatment that can be loaded onto a truck with a fork truck and moved around the streets ofthe City by Public Works service personnel without the use ofa sane or other specialized equipment The 2.55 M HDPE Downstream Defender is lightweight and easyto transport unlike other solutions available in the market Footprint Several ofthe treatmentsystems will need to be located in major streets essentiallylaking up no more than a parking space and, in some cases, partiallyblocdteto ng a lane oftrafic. For this reason, a small footprint is absofulycridcal.AtreatmentsWtem that is o large or requires excess maintenance would be a potential safetyconcem to motorists and to Public Works Staff The 2.55 M HDPE Downstream Defender requires no more than half a parking spot The DownStream Defender is the perfeddevioe forthis application because it is made from structurally re -enforced HOPE, resistantto heatand sunlight and is lightenough to be easifymoved in a tamporaryapplication for use during the wet season. The HOPE Downstream Defenders will be moved into position and will occupyapproximatelyY: of a parking spotforthe wet season, then removed and put into storage during the offseason. Theyare flexible enough to be moved to anyapplication in the Citywheretreahnentis required byCftyslaffwith existing city equipment and could even be mounted on a small trailer and moved around the Cityon a regular basis if desired.Additionaliy Mami Beach alreadyhas multiple suocessfullyinstalled Downstream Defenders which have been on place foryears, and Public Works is familiarwith the performance and cleaning associated with them. Supplier to be awarded: Hydro International Reason for Sole Source: Hydro International has provided a sole source letterto the Cityof Mami Beach to cartifythat in the State of Florida, the 2.55 M HDPE Downstream Defender System is onfyoffered direclythrough Hydro Inlemational and notthrough mahufakdurerrepresentatives or distributors.Therefore, Hydro International is the onlyvendor that is able to provide the Citywith the 2.55 M HDPE Downstream Defender System. The Downstream Defender System offers the stDrmwaterwrtaxseparation device and is the onlyadvanced wrtaxseparatoron the marketwithoutan internal bypass mechanism, meaning that 100% of the stonnwater inflow entering the system is treated, ensuring maximum removal of pollut3nts. @ is the onlyaboveground strucbirallyreinforced HOPE wrtaxseparation stormwatertreatmentsystem available that can meetthe treatmentwithin the required footprint The DownStream Defender is also the only HDPE aboveground vortex separator without a by-pass and with a large enough capactyand adequate performance tD handle this project The DownStream Defender is unique in that it provides a veryhigh level of stonnwabartreatment in a verysmall above -ground footprint of about half ofa car parking spot which is extremelyimportantsinoe some will be used on the main streets during touristseason. Estimated value ofaward: $209,600.00 (one-time purchase), butsubjectln budget appropriations bythe CityCommission. THIS NOTICE IS NOTAREQUEST FOR COIVPETT1I VE OFFERS. However, anyfirm that believes it can meet the requirements stated herein maygiw written notification to the contracting analyst stated above within 7 calendar days from the date ofthis notice. Supporting evidence must be furnished insufficient detail to demonstrate the abilityfo complywith the requirements) listed. Responses are due on or before WednesdaytAphi 5, 2023, at 3:00PM ET.Adelamnination bythe Ciyof Mami Beach notto compete this proposed contract based on responses to this notice is soletywithin the discretion ofthe Cttyof Mami Beach. —Please refer to the document attachment — Documents Select All I Select None I Download Selected h4slMwwdcls)mo.conrDPX7ac=%iovA xr21143a06rehrrnivA-ac%3DavgroupisMZSauc%3D2114300fakpsrch-- 34 4MM. 9:46 AM Cityal'Miard Bearh,#ITS-2023-399-NA- High-DertsityPdW"en9(HDPE) 25M DoAmtreamDefender System There are no advertisements on this solicitadon. Home I Bid Search I Bids I Orders I Tools I Support I Privacy I Logout In u glib Page 339 of 991 WlpsJMw.bidsym.cwMPX?ac--,AeAaLjc=2114380&rekuMvh-ac%MaRgrouplist%25am%3D2114380&supsrdF 414 City of Miami Beach, 1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DEPARTMENT Tel: 305-673--7490, Fax 786-394-4075 Date: March 29, 2023 To: ALL INTERESTED PARTIES FROM: Nestor Abarca Procurement Contracting Analyst III NestorAbarcaCaD-miamibeachfl.gov Density Polyethylene ("HDPE") Downstream Defender System needed to capture and retain sediments, oil, trash, and floatable debris during thesediments, oil, trash, and floatable debris during the King occurrences from surface water occurrences from surface water runoff at four locations within the at four locations within the Ci�of Miami Beach. Beach. This notice is released pursuant to Section 2-367 (d) of the Miami Beach City Code. The purpose of this notice is to notify interested parties that pursuant to Section 2-367 (d), of the Miami Beach City Code, that the City intends to make a non-competitive award for the goods or services, as stated below, available only from a single source. Goods or services required: 1. Currently, the Public Works Department is seeking to obtain four 2.55 M HDPE Downstream Defender System. Each DownStream Defender System shall include internals installed in a 2.55 M Diameter HDPE manhole reinforced for above -ground use. The 2.55 M HPDE DD is estimated to remove 95% of particles down to 175 microns at 1500 GPM. 2. The HDPE Downstream Defender Systems will be installed at four locations within the City of Miami Beach ("City") flooding with as much as two feet of water due to high groundwater and rain entering the stormwater system. Some of these locations are in residential neighborhoods, and some are along major streets within the City. At each location, traffic flow is impeded, and pedestrian flow is unsafe and almost impossible. 3. Treatment Performance. The stormwater treatment system should be sized to meet the permit discharge requirements of a turbidity of no more than 29 NTU greater than the background turbidity in the bay and 40 mg/I TSS at the pumping flow rate required. The 2.55 M HDPE Downstream Defender has the treatment capabilities mandate by permit for the small footprint needed for space constraints. 4. Flow Capacity. Public Works has determined through experience that a pumping rate of approximately 1,500 GPM is required to prevent flooding in the areas of concern. It is therefore critical that any stormwater treatment system have a full treatment capacity with overflow of at least this flow rate or some of the stormwater will be discharged without treatment. The 2.55 M HDPE Downstream Defender can meet the treatment mandated by permit at 1,500 GPM flow rates. 5. Materials of Construction. Since the stormwater treatment system will be used above ground and moved every year, the materials of construction of the treatment system need to be very strong, resistant to heat and sunlight and at the same time light weight to be able to deploy onsite every 6 months. The Public Works Department has determined that the best material of construction for this site is HDPE because it meets all these criteria. The Downstream Defender is manufactures in HDPE material for these applications. 6. No Power Required. All sites do not have easy access to power. Bringing in temporary power or utilizing a separate generator would cause additional safety and logistic concerns and for this reason Public Works has determined that one of the constraints of the treatment system Paget of 3 Page 340 of 991 is that it cannot require power. The 2.55 M HDPE Downstream Defender requires no power or moving parts for stormwater treatment. 7. No Water Required. Most of the sites do not have easy access to either potable or reuse water. Since temporary water lines would be difficult to implement and subject to vandalism and even to potential potable water system contamination, Public Works has determined that one of the constraints of the treatment system is that it cannot require an outside water source. The 2.55 M HDPE Downstream Defender requires no water for stormwater treatment. 8. Vac Truck Accessible. The Public Works Department owns several vac trucks which are currently used for other purposes including pumping out manholes, pumping, and maintenance of existing below -ground DownStream Defenders. 9. Flexible and Mobile. The treatment units will need to be put in place every year prior to the wet season and removed once the wet season is over. The units will then be moved to the Public Works Yard and stored until the next season. Additionally, the treatment systems will need to be relocated around the City from time to time as the need for pumping the stormwater changes within the City. They may also occasionally be used as a treatment for temporary dewatering on various projects throughout the City. All of these uses require a stormwater treatment that can be loaded onto a truck with a fork truck and moved around the streets of the City by Public Works service personnel without the use of a crane or other specialized equipment. The 2.55 M HDPE Downstream Defender is lightweight and easy to transport unlike other solutions available in the market. 10. Footprint. Several of the treatment systems will need to be located in major streets essentially taking up no more than a parking space and, in some cases, partially blocking a lane of traffic. For this reason, a small footprint is absolutely critical. A treatment system that is too large or requires excess maintenance would be a potential safety concern to motorists and to Public Works Staff. The 2.55 M HDPE Downstream Defender requires no more than half a parking spot. The DownStream Defender is the perfect device for this application because it is made from structurally re -enforced HDPE, resistant to heat and sunlight and is light enough to be easily moved in a temporary application for use during the wet season. The HDPE Downstream Defenders will be moved into position and will occupy approximately '/Z of a parking spot for the wet season, then removed and put into storage during the off season. They are flexible enough to be moved to any application in the City where treatment is required by City staff with existing city equipment and could even be mounted on a small trailer and moved around the City on a regular basis if desired. Additionally, Miami Beach already has multiple successfully installed DownStream Defenders which have been on place for years, and Public Works is familiar with the performance and cleaning associated with them. Supplier to be awarded: Hydro International Reason for Sole Source: Hydro International has provided a sole source letter to the City of Miami Beach to certify that in the State of Florida, the 2.55 M HDPE Downstream Defender System is only offered directly through Hydro International and not through manufacturer representatives or distributors. Therefore, Hydro International is the only vendor that is able to provide the City with the 2.55 M HDPE Downstream Defender System. The Downstream Defender System offers the stormwater vortex separation device and is the only advanced vortex separator on the market without an internal bypass mechanism, meaning that 100% of the stormwater inflow entering the system is treated, ensuring maximum removal of pollutants. It is the only above -ground structurally re -enforced HDPE vortex separation stormwater treatment system available that can meet the treatment within the required footprint. The DownStream Defender is also the only HDPE above -ground vortex separator without a by-pass and with a large enough capacity and adequate performance to handle this project. The DownStream Defender is unique in that it provides a very high level of stormwater treatment in a very small above -ground footprint of about half of a car parking spot which is extremely important since some will be used on the main streets during tourist season. Page 2 of 3 Page 341 of 991 Estimated value of award: $209,600.00 (one-time purchase), but subject to budget appropriations by the City Commission. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE OFFERS: However, any firm that believes it can meet the requirements stated herein may give written notification to the contracting analyst stated above within 7 calendar days from the date of this notice. Supporting evidence must be furnished in sufficient detail to demonstrate the ability to comply with the requirement(s) listed. Responses are due on or before Wednesday, April 5, 2023, at 3:OOPM ET. A determination by the City of Miami Beach not to compete this proposed contract based on responses to this notice is solely within the discretion of the City of Miami Beach. THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK. Page 3 of 3 Page 342 of 991