Loading...
LTC 288-2023 COMMISSION CHAMBERS RENOVATION PROJECT UPDATEM IA M I BEACH OFFICE OF THE CITY MANAGER rc# LETTER TO COMM ISSION TO : H onora b le M a yor D a n G elbe r and M em bers of the C ity C om m ission FROM: A lina T. H ud a k, C ity M anag ~ DA TE: June 26, 202 3 SUBJECT: COMMISSION CHAMBERS RENOVATION PROJECT UPDATE T he pu rpo se of this L TC is to upda te the M a yor and C ity C om m ission on the status of the C o mm ission C ha m b e rs rem o deling pro je ct, as previously advised via L TC# 004-2023. T he F a cilitie s M anage m e nt D ivision is currently w orking to execute the Contract fo r C on struction w ith Le e C on struction ("th e C on tra ctor ") to com m ence the Com m ission C ham be rs ren o vatio n pro je ct. T he C o ntractor w ill m obilize and begin the dem olition phase of the pro je ct im m e d ia te ly fo llow ing the July 28, 2023, Finan c e and Econom ic R esiliency C o m m itt ee m ee tin g . T he C o m m ission Cha m be rs renovation pro je ct is on a 120-day schedule, tentatively slated fr om July 28 , 20 2 3 th ro ugh N o vemb er 28, 2023. Th e rem odel wi ll affect both th e 3"° an d 4 floor po rti on s of th e C om mi s sion Ch am bers at Ci ty Hal l, ren ovating a comb ine d total area of a pp ro ximat el y 4,02 5 squ ar e feet. T he F a cilitie s M a nag e m e nt D ivision is collabo rating w ith m ultiple City departm ents in cl u din g E co n om ic D e velo pm ent, M arketing and C om m un ic ations, IT., Parking , Pla nn in g, an d P o lice to relo cate and host scheduled Com m ission and Com m ittee m e e ting s at th e M ia m i Be a ch C o nve ntion C en ter ("M B C C") dur ing the construction phase of the pro je ct. A ll ne ce ssa ry step s are being taken to ensure that the tem porary arran g em e nts at the M B C C em ulate the environm ent of our existing C om m ission C ha m b er as close ly as po ssib le. S hou ld yo u ha ve an y add itiona l que stions, ple ase contact Elizabeth M iro at 305.673.7000 ex t. 2292 5 . ri6e»rec 288-2023