Amendment NO. 2 to the Fire Station NO.1 Project20 23-32775 OCT 2 7 1013 GMP AMENDMENT AMENDMENT NO. 2 TO AGREEMENT BETWEEN CITY OF MIAMI BEACH AND CONSTRUCTION MANAGER FOR THE FIRE STATION NO.1 PROJECT Pursuant to the Agreement dated April 30 , 2020 between the City of Miami Beach, a Florida municipal corporation (the "City") and Kaufman Lynn Construction, Inc., a Florida corporation (the "Construction Manager") for the FIRE STATION NO. 1 Project ("Project"), , as amended by that certain Amendment No. 1 dated April 10, 2023 to include pre -construction services related to construction of a temporary facility for the Rainbow Intergenerational Learning Center (Daycare) at Flamingo Park and the structural and electrical infrastructure for future installation of the Apollo Mural on the fapade of Fire Station No.1 (the "Agreement"), the City and Construction Manager hereby agree to amend and modify the Agreement by this GMP Amendment (Amendment No. 2), dated and effective as of , 2023, to establish a Guaranteed Maximum Price for the Project and time for completion of the Construction Phase of the Project as set forth below: ARTICLE 1 SCOPE OF WORK Construction Manager shall be responsible for and shall perform all Work delineated in and reasonably inferable from the Contract Documents and KL GMP Proposal dated August 15. 2023, including Attachments 1 through 6 below, which are hereby incorporated into and made a part of the Amendment by this reference: Attachment Description No. 1. List of Construction Documents 2. Project Schedule 3. Schedules of Values 4. List of Itemized General Conditions 5. List of Subcontractors and Major Suppliers 6. Clarifications and Assumptions ARTICLE 2 GUARANTEED MAXIMUM PRICE Construction Manager's Guaranteed Maximum Price for the Work contemplated in the Contract Documents or reasonably inferable therefrom. including the Cost of the Project as defined in Section 8 of the Agreement, the Construction Manager's Construction Overhead and Profit Fee and General Conditions Fee as defined in Section 7 of the Agreement, and the Construction Manager's Contingency as defined in Article 6 and set forth below, is Twenty -Four Million Nine Hundred Ninety -One Thousand Eight Hundred Forty -Five dollars, ($24,991,845) (the "GMP" or "Guaranteed Maximum Price"), which includes the following: 2.1 The Subcontract Costs for Work of Subcontractors and Suppliers selected pursuant to Article 4 of the Agreement, for the entire Work contemplated in the Contract Documents or reasonably inferable therefrom, will be based on actual Subcontractor invoices to the Construction Manager up to the established amount of Nineteen Million Seven Hundred One Thousand Five Hundred Forty -Two dollars ($19,701,542), and said amount stated in this Section 2.1 is included within the GMP. 2.2 The General Conditions Fee for all general conditions items and expenses as defined in Section 7.1.2 of the Agreement, for the entire Work anticipated on this Project are hereby established as a lump sum amount of Two Million Six Hundred Twenty -Five Thousand Three Hundred Thirty -Five dollars ($2,625,335), and said lump sum amount stated in this Section 2.2 is included within the GMP. The items included as General Condition expenses are listed in the List of Itemized General Conditions attached hereto and incorporated herein as Attachment No. 5. Construction Manager acknowledges and agrees that the City shall have no liability for any General Condition costs or expenses, either listed herein or specified in Section 7.1.2 of the Agreement, beyond payment of the lump sum stated in this Section 2.2 and Construction Manager agrees that it shall not be entitled to receive any additional compensation from the City for the General Conditions beyond the lump sum amount unless expressly adjusted by a Change Order in accordance with the Contract Documents. 2.3. The Construction Overhead and Profit Fee as defined in Section 7.1.3 of the Agreement, for the entire Work anticipated on this Project, shall be 4.72% of the Cost of the Fire Station No. 1, 5_5 % of the Cost of the Daycare Relocation and 5_5 % of the Cost of the Apollo Mural (as identified in Section 2.1 above) plus the Construction Manager's General Conditions Fees (as identified in Section 2.2 above). and is included in the GMP. The Construction Overhead and Profit Fee for Change Orders shall be 55% of the net change in the GMP, associated with the Work that is the subject of the Change Order. 2.4. A Construction Manager's Contingency, which shall only be used for the limited purposes specified in Subsection 6.4.1 of the Agreement, is hereby established in the amount of _Five Hundred Fifty - Nine Thousand Nine Hundred Eighty Seven Dollars ($559,987.00), and said amount stated in this Section 2.4 is included within the GMP. In no event shall the use of the Construction Manager's Contingency cause the GMP to be exceeded. The Construction Manager shall be solely responsible for all costs that exceed the GMP (as adjusted by Change Order or Construction Change Directive), without any reimbursement from the City. Construction Manager shall use all diligent, good -faith efforts to maximize cost savings and minimize use of the Construction Manager's Contingency. Draws made against the Construction Manager's Contingency shall be made as specified in and to the limited extent permitted by the Contract Documents. 2.5. The City retains exclusive use and control of the City's Contingency ($1,249,592), and all expenditures must be approved in writing by the City Manager or Project Coordinator by Change Order or Construction Change Directive in accordance with the Contract Documents. Construction Manager shall not proceed with any portion of the Work, which it intends to charge against the City Contingency without first obtaining City's express written authorization to proceed. Any unused City Contingency remaining at the completion of the Project shall accrue solely to the City and shall not be used for purposes of calculating any Project Cost Savings. 2.6. Applications for Payment of the Cost of the Project. General Conditions Fee. the Construction Overhead and Profit Fee shall be made monthly based upon the percent completion of the Work for each particular month and in accordance with the Contract Documents. The percent completion shall be based on the updated and City -approved Construction Schedule as required by the Contract Documents, The Construction Manager will be required to furnish documentation evidencing all expenditures for which it seeks payment or reimbursement and demonstrating that the costs incurred were necessary for the Work, in accordance with the Contract Documents, including Article 11 of the Agreement. 2.7. Construction Manager recognizes that this Contract includes work for trench excavation in excess of five feet deep. Construction Manager acknowledges the requirements set forth in Section 553.63 of the Florida Statutes entitled Trench Safety Act, Construction Manager certifies that the required trench safety standards will be in effect during the period of construction of the Project and Construction Manager agrees to comply with all such required trench safety standards. The amount of Twenty -Five dollars ($25.00) has been separately identified for the cost of compliance with the required trench safety standards, said amount is included within the GMP. 2.8. The GMP may be adjusted pursuant to the terms herein for Change Order in accordance with the Contract Documents. ARTICLE 3 CONTRACT TIME 3.1. The Construction Phase Commencement Date for the Work shall be the date stipulated in the Notice to Proceed. The total period of time beginning with the Construction Phase Commencement Date (on site mobilization of Work) through the date required for Substantial Completion of the Work is Seven Hundred -Twenty (720) calendar days ("Contract Time") 3.2. Pursuant to this Agreement, the parties have established the limitations of liability and liquidated damages rates set forth in Section 5.1.3.1, which the parties acknowledge and agree apply to this GMP Amendment and Construction Manager's responsibility to complete the Work within the Contract Time and achieve the Milestones as stated therein. ARTICLE 4 ADDITIONAL PROVISIONS 4.1. Pursuant to Subsection 2.5.2.3 of the Agreement, the Construction Manager (a) hereby represents and warrants that it has taken all steps reasonably necessary to ascertain the nature and location of the Work, and that it has investigated and satisfied itself as to the general and local conditions which may affect the Project (as may be reasonably inferred), the performance of the Work and/or the Project Site and (b) hereby acknowledges and agrees that it shall not be entitled to an adjustment in the Project Schedule or the Guaranteed Maximum Price based on general or local conditions affecting the Project, the Project Site and/or the performance of the Work, unless otherwise provided for in this Agreement, and the Construction Manager waives and releases City from any and all Claims associated therewith. 4.2. Pursuant to Subsection 5.2.3 of the Agreement, except to the limited extent of reasonable acceleration costs funded from the City's Contingency pursuant to Subsection 5.2.3.b. to regain lost schedule progress directly resulting from Excusable Delays; the Construction Manager hereby acknowledges and agrees that its pricing of the Work and the determination of the Guaranteed Maximum Price is expressly based upon the Construction Manager's assuming the cost risks of taking all steps that may be necessary, including implementation of a Recovery Schedule, acceleration of the Work, or extraordinary measures, in order to achieve a Milestone or Substantial Completion. In no event shall Construction Manager be entitled to any other compensation or recovery of any damages in connection with acceleration or constructive acceleration, including consequential damages, lost efficiency, opportunity costs or similar remuneration. 4.3. Omitted without implications. 4.4. Stored Materials. Notwithstanding anything to the contrary, the City shall not be required to pay for materials, machinery or other personal property stored off the Project Site, or stored on the Project Site but not yet incorporated into the Work (the "Stored Materials"), unless the following conditions are satisfied by Contractor, at the City's sole discretion (the cost of which shall be included in the Guaranteed Maximum Price): (a) Contractor shall deliver to the City bills of sale and/or other evidence reasonably satisfactory to the City of the cost of, and, subject to the payment therefor, the City's title in and to such Stored Materials: (b) The Stored Materials are identified to the Project and the City, are segregated so as to adequately give notice to all third parties of the City's title in and to such materials, and are components in substantially final form ready for incorporation into the Work, (c) The Stored Materials are stored at the Project or other property owned by the City in the area or at such other third -party owned and operated site as the City shall reasonably approve, in writing, and are protected against theft and damage in a manner reasonably satisfactory to the City, including, if requested by the City, storage in a bonded warehouse in the county in which the Project is located, (d) The Stored Materials will be paid for in full (minus the required retainage) with the funds to be disbursed by the City to Contractor, and all lien rights or claims of the supplier will be released upon full payment, (e) The City has or will have upon payment with disbursed funds a perfected, first priority security interest, (f) The Stored Materials are insured, in the name of the City, for an amount equal to their replacement costs in accordance with this Agreement, (g) The City or City's representative shall at all times have the right of access to Stored Materials in the possession of the Contractor or a third -party that has been approved by Owner in writing, including prior to the approval of the request; (h) The Contractor shall assume total responsibility for the Stored Materials to the extent not covered by insurance. (i) Contractor shall certify that it has inspected such Stored Materials and they are in good condition and suitable for use in connection with the Project, 0) Contractor shall provide explanation for the circumstances giving rise to the request. The explanation shall include anticipated installation date of the Stored Materials, in accordance with the approved baseline schedule, The Contractor must update the inventory of any and all Stored Materials on a monthly basis and must reflect changes to all Subcontractors' and Sub -subcontractors' inventory. 4.5. Escalation Allowance. The Guaranteed Maximum Price includes a cost escalation allowance in an amount equal to $100,000 (the "Cost Escalation Allowance"). The Cost Escalation Allowance shall be documented in a separate line item on the Schedule of Values. The Cost Escalation Allowance may only be utilized for unanticipated costs incurred by Contractor directly as a result of escalations in materials costs due to market conditions that the Contractor could not have avoided through its compliance with other sections of the Agreement and specifically as stipulated below: Contractor shall use its (and shall cause its Subcontractors to use their) best efforts to limit the City's exposure to increases in the cost of materials for the Work by locking in prices for same with applicable suppliers and vendors in a timely and prudent manner and to avoid increased and unnecessary costs to the City. However, to the extent that a price has been locked in with a supplier for materials and the market for such materials later decreases prior to the time such materials are delivered and installed at the Project Site, Contractor shall use its (and shall cause its Subcontractors to use their) best efforts to reduce the price of such materials. To the extent that the Contractor fails to satisfy its obligations pursuant to this Section, Contractor shall be solely responsible to pay for any increased costs of such labor, equipment or materials resulting from such failure. Any unused portion of the Cost Escalation Allowance remaining at the completion of the project shall accrue solely to the City and shall not constitute or be used to calculate project cost savings. 4.6. Allowance for Design Modifications exclusively for the Daycare Relocation project. The Guaranteed Maximum Price includes a construction allowance exclusively for the Daycare Relocation design modifications in an amount equal to $100,000 (the "Daycare Relocation Allowance"). The Daycare Relocation Allowance shall be documented in a separate line item on the Schedule of Values. The GMP is based on design drawings and criteria developed by the Architect of Record and assumptions made by the Construction Manager. The Allowance may only be utilized for any additional cost of work associated with further development of the design plans not previously included in the GMP and subject to the Owner's approval. Any unused portion of the Daycare Relocation Allowance remaining at the completion of the project shall accrue solely to the City and shall not constitute or be used to calculate project cost savings. 4.7. All defined terms herein shall have the same meaning ascribed to them in the Agreement or other Contract Documents. Except as expressly modified herein, the terms and conditions of the Agreement remain unchanged. In the event of a conflict between the terms of this Amendment and those of the Agreement, City and Construction Manager agree that the terms of this GMP Amendment shall prevail and control. [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK] IN WITNESS WHEREOF, the Parties hereto have executed this GMP Amendment the day and year first written above. CITY OF MIAMI BEACH, FLORIDA ATTEST: By: By: City Clerk =1N(ORP�ORATED' ATTEST: Print Na e: (—Sarre . Southern; Sr. VP Print Name\ MaXo Gatica; PX MAYOR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION gyp. COMAItoft "s By: ris L. Long; Presid AMENDMENT - ATTACHMENT 1 RL Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job #: 81-1 72 City of Miami Beach - Fire Station No 1 K:11 k'N.AY I.I A.Y .oYyTlu �:TTnY 833 6th Street anlaawmaaw Miami Beach, Florida 33139 Kaufman Lynn Construction, Inc. 90%CD("/05/23) DRAWING LOG - FIRE STATION A-000 EXISTING PLANS AND ELEVATIONS 0 04/052023 05/11/2023 90%CD (04/0523) A-001 LEVEL 0 - SITE PLAN 1 04/052023 05212023 90%CD (04/05/23) A-002 HIGH SITE PLAN 1 04/052023 05/112023 90%CD (04/0523) A-003 SITE DETAILS 1 04/0S/2023 0S212023 90%CD (04/0523) A-003a SITE SECTIONS 0 04/052023 05/112023 90%CD (04/0523) A-004 SITE DETAILS 1 04/052023 05/11/2023 90%CD (04/0523) A-005 FENCE DETAILS 1 04/052023 05/112023 90%CD (04/0523) A-005 FENCE DETAILS 2 04/052023 05/!L/2023 90%CD (04/0523) A-006 SITE DETAILS 0 04p52023 05/112023 90%CD (04/0523) A-007 FENCE AND RETAINING WALL DETAILS 0 04/052023 05/112023 90%CD (04/05123) A-008 GATE DETAILS 0 04/052023 05212023 90%CD (04/0523) A-009 EXISTING PLANTER DETAILS 0 04/052023 05/112023 90%CD (04/0523) A-010 EXISTING PLANTER DETAILS 0 04/052023 OSA12023 90%CD (04/0523) A-011 PLANTER DETAILS 0 04/Cs2023 05212023 90%CD (04/0523) A-012 PLANTER DETAILS 0 04/052023 05/112023 90%CD (04/OS/23) A-013 BAY RAMP RAILING AND BOLLARD DETAIL 0 04/0S2023 05212023 90%CD 40410523) A-014 BAY RAMP RAILING AND BOLLARD DETAIL 0 041052023 05/112023 90%CD (04/0523) A-015 BAY RAMP RAILING AND BOLLARD DETAIL 0 04/052023 05/112023 90%CD 104/0523) A-101 LEVEL 1 - FLOOR PLAN 1 04/O5nO23 05/11/2023 90%CD (0410523) A-102 LEVEL 2 - FLOOR PLAN 1 04/052023 OS/112023 90%CD (04/O523) A-103 LEVEL3-FLOOR PLAN 1 04/O52023 OS/11/2023 90%CD(04/0523), A-104 ROOFPLAN 1 04/052023 05/112023 90%CD(04/05/23) A-105 ENLARGED ROOF PLAN 1 04/052023 0521/2023 90%CD (04/05231 A-110 EMS PLAN - LEVEL 1 1 04/05/2023 05212023 90%CD (04/0523) A-111 EOS PLAN - LEVEL 2 1 04/052023 05212023 90%CD (04/0523) A-112 EOS PLAN - LEVEL 3 1 04/05/2023 05/112023 90%CD (04/0523) A-113 EOS-RO0F 1 04/052023 05/112023 90%CD(04/05/23) A-114 SITE PLAN -PARTITION TYPES 0 04/052023 05/212023 90%CO (04/0523) A-115 LEVEL 1- PARTITION TYPES 1 04/052023 05/112023 90%CD (04/05723) A-116 LEVEL 2-PARTITION TYPES 1 04/052023 05/112023 90%CD(0410523) A-117 LEVEL 3-PARTITION TYPES 1 04/052023 05212023 90%CD(01 1.1 A-120 LEVEL 1 - DIMENSION PLAN 1 04I052023 O.112023 90%CD (04/05/23) A-121 LEVEL 2 - DIMENSION PLAN 1 04/052023 1 052312023 90%CD (04/05t23) K - nY4 nnln�am awn Kaufman Lynn Construction. Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20. 2023 at 08:49 pm EDT Job M: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 A-122 LEVEL 3-DIMENSION PLAN 1 04/05/2023 05/11/2023 90%CD(04105123) A-123 ROOF - DIMENSION PLAN 1 04/052023 05/112023 90%CD (04/0523) A-124 ROOF -DIMENSION PLAN 0 04/052023 05/11/2U23 9U%CD(U4/U5/23) A-130 NEW TRANSFORMER VAULT 1 04/052023 OS/112023 90%CD(0410523) A-201 LEVEL 1 - RCP 1 04/052023 05212023 90%CD (04/0523) 0.202 LEVEL 2 - RCP 1 04/05/2023 05/112023 90%CD (04105231 A-203 LEVEL 3 - RCP 1 04/052023 OS/112023 90%CD (04105123) A-204 LEVELI- RCP - STORAGE 0 041052023 05212023 90%CD(G4/0523) A-300 EXTERIOR ELEVATIONS 1 04/052023 05/112023 90%CD (04/05/23) A-301 EXTERIOR ELEVATIONS 1 04/052023 05/112023 90%CD (04/0523) A-302 EXTERIOR FINISHES AND PRODUCTS 0 04/052023 05/112023 90%CD(04/0523) A-303 EXTERIOR FINISHES AND PRODUCTS 0 04/052023 OS/11/2023 90%CD(04/D5/23) A-304 EXTERIOR FINISHES AND PRODUCTS O 04/052023 05/112023 90%CD(04/0523) A-320 BUILDING SECTIONS 1 04/052023 05/112023 90%CD(04/0523) A-311 BUILDING SECTIONS 1 04/052023 05/112023 90%CD (04105231 A-312 BUILDING SECTIONS 1 04/0S/2023 05/112023 90%CD (0410523) A-313 BUILDING SECTIONS 1 04/052023 05/112023 90%CD 104/0523) A400 ENLARGED WATER CLOSET PLANS AND ELEVATIONS 1 041052023 OS/112023 90%CD (04/0523) A401 ENLARGED WATER CLOSET PLANS AND ELEVATIONS 1 04/052023 05/112023 90%CD(04/0523) A402 ENLARGED WATER CLOSET PLANS AND ELEVATIONS 1 04/052023 05/112023 90%CD (0410523) A-410 ENLARGED FLOOR PLANS AND ELEVATIONS 1 04/052023 05/11/2023 9D%CD (04/0523) A411 ENLARGED FLOOR PLANS AND ELEVATIONS I 04/052023 05212023 90%CD(04/0523) A-412 ENLARGED FLOOR PLANS AND ELEVATIONS 1 041052023 05/112023 90%CD (04105/23) A-413 ENLARGED FLOOR PLANS AND ELEVATIONS 1 04/052023 05/112023 90%CD 104/05123) A-414 ENLARGED FLOOR PLANS AND ELEVATIONS 1 04/052023 05/112023 90%CD (04/0523) A-415 ENLARGED FLOOR PLANS AND ELEVATIONS 1 04/052023 05212023 90%CD (04105/23) A-416 ENLARGED FLOOR PLANS AND ELEVATIONS 1 041052023 05/112023 90%CD (0410523) A417 ENLARGED FLOOR PLANS AND ELEVATIONS 1 04/052023 OS/11/2023 90%CD (OII0523) A-418 ENLARGED FLOOR PLANS AND ELEVATIONS 0 041052023 05/112023 90%CD (0410523) A-420 MILLWORK SECTIONS 1 04/052023 05/112023 90%CD (04/0523) A421 MILLWORK SECTIONS 1 04/052023 051112023 90%CD(0410523) M30 ENLARGED SLIDE PLANS AND SECTION 1 04/052023 OS/11/2023 90%CO 104/0523) A-501 INTERIOR ELEVATIONS 1 04/05/2023 05/11/2023 90%CD (0410523) 0.502 INTERIOR ELEVATIONS 1 04/052023 05/112023 90%CD (04/05/23) 0.600 ENLARGED STAIR PLANS AND SECTIONS 1 04/052023 05/112023 90%CD 404/05123) 0.601 ENLARGED STAIR PLANS AND SECTIONS 1 04/052023 05/112023 90%CD (04/0523) A-601 ENLARGED STAIR PLANS AND SECTIONS 1 04/052023 05/112023 90%CD (04/0523) 0.603 ENLARGED STAIR PLANS AND SECTIONS 1 04/052023 05/112023 90%CD (0410523) �� I I va 1, rovnu criu� n urwm wall Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job ft: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 A-604 LADDER SECTIONS 1 04/052023 05/11/2023 90%CD (04/05123) A-605 LADDER SECTIONS 0 04/052023 05/112023 90%CD (04/0523) A-607 STAIR DETAILS 0 04/052023 05/112023 90%CD (04/0523) A-608 STAIR DETAILS 0 04/052023 05/112023 90%CD 404/0523) A-610 PLAN DETAILS 0 04/052023 05/11/2023 90%CD (04/0523) X620 CEILING DETAILS 1 04/052023 05/112023 90%CD (04/0523) A421 CEILING DETAILS 1 04/05/2023 05/112023 90%CD (04105123) A-700 WALL SECTIONS 1 04/052023 05/112023 90%CD(04/0523) A-701 WALL SECTIONS 1 04/052023 05/112023 90%CD (04/0523) A-702 WALL SECTIONS 1 04/05/2023 05/112023 90%CD (0410523) A-720 ENCLOSURE DETAILS 1 04/05/2023 051112023 90%CD (04/05/23) A-721 ENCLOSURE DETAILS 1 04/05/2023 05/112023 90%CD (04/0523) A-722 ENCLOSURE DETAILS 0 04/052023 05/112023 90%CD (04/05/23) A-723 ENCLOSURE DETAILS o 04/052023 05/112023 90%CD(04/0523) A-724 PERFORATED METAL SCREEN DETAILS 0 04/052023 05/112023 90%CD (04105123) X725 PERFORATED METAL SCREEN DETAILS 0 04/05/2023 05/112023 90%CD (0410523) A-727 ROOF SCREEN DETAILS 0 04/05/2023 05/11r2023 90%CD (04/0523) A-730 VERTICAL CIRCULATION 1 04/052023 05/112023 90%CD (04/0523) A-80G PARTITION TYPES 1 04/052023 05/112023 90%CD (04/0523) A-801 PARTITION TYPES I 04/052023 05/11/2023 90%CD (04/05123) xao2 PARTITION TYPES 1 04/052023 05/112023 90%CD (04/0523) X803 PARTITION TYPES I 04/052023 05/11/2023 90%CD (04/05/23) A-804 PARTITION TYPES 1 04/052023 05111/2023 90%CD (04/0523) A-805 PARTITION DETAILS 0 04/05/2023 051112023 90%CD (04/0523) A-810 DOOR SCHEDULE - LEVEL I & 2 1 04/05/2023 05/112023 90%CO (04105123) A-811 DOOR SCHEDULE - LEVEL 3 1 041052023 0521/2023 90%CD 404105123) A-812 INTERIOR DOOR DETAILS 0 04/052023 05/11/2023 90%CD (04/0523) A-813 EXrERIOR DOOR DETAILS 0 04/05/2023 05/11/2023 90%CD (04/05/23) A-830 STOREFRONT AND LOUVERS ELEVATIONS 1 041052023 05/112023 90%CD (04/0523) A-831 CURTAIN WALLS ELEVATIONS 1 04/052023 05/11/2023 90%CO (04/0523) A-832 STOREFRONT DETAILS 0 041052023 051112023 90%CD (04/(1523) A-833 CURTAIN WALL DETAILS 0 04/052023 05/112023 90%CD (04/05123) A-834 HORIZONTAL LOUVER DETAILS 0 04/052023 05111/2023 90%CD (04/0523) A-835 EXTERIOR SIGNAGE 1 D41052023 05/112023 90%CD (04/05123) A-836 LOUVERS AND FLOOD VENT DETAILS 0 04/052023 05/112023 90%CD (04/0523) A-837 EXTERIOR SIGNAGE - PERMIT 0 04/052023 05/11/2023 90%CD (041G5123) A-838 EXTERIOR SIGNAGE GI 04/052023 05/11/2023 90%CD (04/0523) AD-100 DEMO SITE PLAN 1 04/052023 05/112023 90%CD (0410523) 'u c.-rlll rrGn �eea Iwnom owm Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job *: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 CwIl C-001 ABBREVIATIONS & LEGEND 1 04/052023 05/11/2023 90%CD (04/(15123) C-002 GENERAL NOTES 1 04/052023 05/112023 90%CD (04/05/23) C-003 GENERAL NOTES 1 04/052023 05/1112023 90%CD(04105/23) C-004 SWPPP NOTES & DETAILS 1 04/052023 05/112023 90%CD (04105/23) C-101 SURFACE DEMOLITION PLAN UTILITY DEMOLITION PLAN 2 04/05/2023 05/112023 90%CD (04/05/23) C-102 2 04/052023 OS/112023 90%CD (04/05123) C-103 CIVIL SITE LAYOUT AND GEOMETRY PLAN 1 04/05/2023 05/112023 90%CD(04/05123) C-304 SITE GRADING PLAN 1 04/052023 05/112023 90%CD (04/05123) C-105 SITE DRAINAGE PLAN 1 04/05/2023 05/112023 90%CD (04/0523) C-106 SITE DRAINAGE PLAN 0 04/052023 05/112023 90%CD (04/05/23) C-107 SITE WATER AND SEWER PLAN 1 04/052023 05/112023 90%CD(04/0523) C-108 6TH STREET ROADWAY IMPROVEMENTS PLAN 1 04/05R023 05/112023 90%CD (04/05/23) C-109 MERIDIAN AVENUE ROADWAY IMPROVEMENTS PLAN 1 04/052023 05/112023 90%CD (04/0523) C-110 JEFFERSON AVENUE ROADWAY IMPROVEMENTS PLAN 1 04/052023 OS/112023 90%CD (04/(15/23) C-111 JEFFERSON AVENUE ROADWAY IMPROVEMENT PLAN 0 04/052023 05/112023 90%CD (04/0523) C-112 MISCELLANEOUS CONSTRUCTION 0 04/05/2023 05/112023 90%CD (04/0523) E-000 ELECTRICAL LEGEND ABBREVIATIONS AND GENERAL NOTES 1 04/052023 05/11/2023 90%CD(0410523) E-001 LEVEL 0-SITE PLAN - ELECTRICAL 1 04/052023 OS/112023 90%CD(04/0523) E-002 LEVEL 0-HIGH SITE PLAN - ELECTRICAL 1 04/052023 05/112023 90%CD(04/0523) E-101 LEVELI - FLOOR PLAN POWER 1 041052023 05/11/2023 90%CD(04/05123) E-102 LEVEL 2. APPARATUS BAY - FLOOR PLAN -POWER 1 04/052023 05/112023 90%CD(04/0523) E-103 LEVEL 3- FIRE STATION LIVING - FLOOR PLAN -POWER 1 04/052023 05/11/2023 90%CD(04/05/73) E404 ROOF - FLOOR PLAN - POWER 1 04/052023 05/112023 90%CD(04/0523) E-111 LEVELI - FLOOR PLAN - SYSTEMS 1 04/052023 05/112023 90%CD(04/05/23) E-112 LEVEL 2-APPARATUS BAY -FLOOR PLAN - SYSTEMS 1 04/052023 05/112023 90%CD(0410523) E-113 LEVEL 3- FIRE STATION LIVING - FLOOR PLAN -SYSTEMS 1 04/05/2023 05/112023 90%CD(04/05123) E-121 LEVEL 1- FLOOR PLAN- FIRE ALARM 1 041052023 05/112023 90%CD (94105123) E422 LEVEL 2-APPARATUS BAY -FLOOR PLAN - FIRE ALARM 1 04/052023 05/112023 90%CD(G4/05/23) E-123 LEVEL 3- FIRE STATION LIVING - FLOOR PLAN -FIRE ALARM 1 04/052023 05/112023 90%CD(04/05/23) E-202 LEVELI- LIGHTING 1 04/052023 05/112023 90%CD(04/05/23) E-202 LEVEL 2-APPARATUS BAY - LIGHTING 1 04/05/2023 OS/112023 90%CD(04/0523) E-203 LEVEL 3- FIRE STATION LIVING - LIGHTING 1 041052023 05111/2023 90%CD (04/05/23) E-300 SITE NORMAL PHOTOMETRY 1 04/052023 05/11/2023 90%CD (0410523) E-300A SITE- PHOTOMETRY CALCULATION SUMMARY 1 04/05/2023 05/11/2023 90%CD(04/05/23) E-300B ENTRY FOYER AND EXTERIOR PLAZA NORMAL PHOTOMETRY 1 04/052023 05/112023 90%CO (04/0523) E-301 LEVEL 1- NORMAL PHOTOMETRY 1 04/052023 05/112023 90%CD(04/05/23) RL 5 r,, c e.Tm nm -'0 '-14 Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job *: 81-172 City of Miami Beach - Fire Station No 1 833 fith Street Miami Beach, Florida 33139 E-302 1LEVEL 2-APPARATUS BAY- NORMAL PHOTOMETRY 1 04/052023 05/11/2023 90%CD (04/05/23) E-303 LEVEL 3- FIRE STATION LIVING- NORMAL PHOTOMETRY 0 04/052023 05/11/2023 90%CD(04/0523) E-311 LEVEL I- EMERGENCY PHOTOMETRY 1 04/052023 05/112023 90%CD(04/0523) E-312 LEVEL 2-APPARATUS BAY - EMERGENCY PHOTOMETRY 1 041052023 05/112023 90%CD (04/0523) E-313 LEVEL 3- FIRE STATION LIVING- EMERGENCY PHOTOMETRY 1 04/052023 05/112023 90%CD (04/05/23) E-401 ENLARGED PLANS 1 04/052023 05/112023 90%CD (04/05/23) E402 ENLARGED PLANS 1 04/052023 05/112023 90%CD (04/0523) E-403 GENERATOR DETAILS 0 04/052023 05/11/2023 90%CD (04/05/23) E-501 POWER RISER 1 04/052023 05/112023 90%CD(0410523) E-502 FIRE ALARM RISER 1 04/052023 05/112023 90%CD (04/0523) E-503 SYSTEMS RISERS 1 04/052023 05/11/2023 90%CD (0410523) E-504 SECURITY SYSTEMS RISERS 1 04/052023 05/112023 90%CD (04/0523) E-505 RADIO ENHANCEMENT SYSTEM -GRAL NOTES 1 04/052023 05/112023 90%C0(04/05123) E-506 RADIO ENHANCEMENT SYSTEM -RISER DIAGRAM 1 04/052023 05/112023 90%CD (0410523) E-507 LEVEL 1 -FLOOR PLAN - RADIO ENHANCEMENT 1 04/052023 05/112023 90%CD 104/0523) E-508 LEVEL 2-APPARATUS BAY - FLOOR PLAN- RADIO ENHANCEMENT 1 04/05/2023 05/112023 90%CO(04/0523) E-509 LEVEL 3- FIRE STATION LIVING - FLOOR PLAN- RADIO ENHANCEMENT 1 04/052023 05/112023 90%CD (04/05/23) E-601 ELECTRICAL DETAILS 1 04/052023 05/112023 90%CD(0410523) E-602 FPL VAULT DETAILS 1 04/052023 05/112023 90%CD (04105123) E-701 PANEL SCHEDULES 1 04/052023 051112023 90%CD(04/0S23) FP-000 FIRE PROTECTION LEGEND AND NOTES 1 04/052023 05212023 90%CD (04/05/23) FP-100 SITE PLAN FIRE PROTECTION 1 04/052023 05/112023 90%CD (04105/23) FP-101 LEVEL 1 FIRE PROTECTION OVERALL PLAN 1 04/052023 05/1L2023 90%CD (04/05/23) FP-102 LEVEL 2 FIRE PROTECTION OVERALL PLAN 1 04/052023 05/112023 90%CD (04/0523) FP-103 LEVEL 3 FIRE PROTECTION OVERALL PLAN 1 04/052023 05/112023 90%CD(04/0523) FP1300 FIRE PROTECTION DETAILS 1 04/052023 05/112023 90%CO (04/0523) FP-301 FIRE PROTECTION DETAILS 1 041052023 05/112023 90%CD (04/0523) FP-401 HYDRAULIC CALCULATIONS FIRE PROTECTION 0 04/052023 05/112023 90%CD (04/0523) G-000 COVER 0 041052023 05/112023 90%CD (0410523) G-101 DRAWING LEGEND AND BUILDING DATA 1 04/052023 05/112023 90%CD (04/05/23) G-102 SHEET INDEX 2 04/052023 OS/112023 90%CD (04105/23) G-103 CODE ANALYSIS 1 04/05/2023 05/112023 90%CD (04/05/23) G-104 MOUNTING HEIGHTS 1 04/052023 05/112023 90%CD (0410523) G-105 UL LISTINGS 1 I O4/052023 05/112023 90%CD (04/0523) G-207 FEMA FLOOD PLAIN MANAGEMENT DIAGRAMS 21 04/052023 05/11/2023 1 90%CD (04105/23) G-108 HISTORICAL PRESERVATION BOARD ORDER 0 04/052023 OS/112023 90%CD (04/O523) XL U�1Q%Itt(:it0.1 wlR�R1N/ Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job A: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 G-109 HISTORICAL PRESERVATION BOARD ORDER 0 04/052023 05AV2023 90%CD (04/0 5/2 3) G-110 SURVEY 0 04/05/2023 OS/1112023 90%CD (04105/23) G-121 SURVEY 0 04/052023 05/112023 90%CD (04/0S/23) G-112 MOUNTING HEIGHTS 0 04/052023 05111/2023 90%CD(04/0523) G-113 UL LISTINGS 0 04/052023 05/11/2023 90%CD(04/05/23) G-114 UL LISTINGS 0 04/052023 05/112023 90%CD (04/0523) 10-101 LEVEL 1 - FINISH PLAN 1 04/052023 05/112023 90%CD (04/0523) ID-102 LEVEL 2-FINISH PLAN 1 041052023 05/112023 90%CD(04105/23) I0-102.1 LEVEL 2-FINISH PLAN - ADD ALT. 0 041052023 05/112023 90%CD(0410523) I0-103 LEVEL 3-FINISH PLAN 1 041052023 05/112023 90%CD(04/0523) ID-202 LEVEL 2 - FURNITURE PLAN 1 04/052023 05/112023 90%CD (0410523) ID-203 LEVEL 3-FURNITURE PLAN 1 04/052023 05111R023 90%CD(04/0523) ID-401 INTERIOR DETAILS 0 04/052023 05/112023 90%CD (04/0523) ID-402 INTERIOR SIGNAGE O 04/052023 05/112023 90%CD (04/0S23) IR-101 IRRIGATION PLAN 0 04/052023 05/112023 90%CD (0410523) IR-102 IRRIGATION PLAN 0 04/052023 05/112023 90%CD (04/0523) IR-901 IRRIGATION DETAILS 0 04/052023 05/11/2023 90%CD (04105/23) IR-902 IRRIGATION DRIP DETAILS 0 04/052023 05/112023 90%CD (04/0523) IR-903 IRRIGATION DRIP DETAILS 0 04/052023 05/112023 90%CD (0410523) LD-001 TREE DISPOSITION NOTES 2 04/052023 05/112023 90%CD (04/0523) LD-002 TREE DISPOSITION SCHEDULE 2 04/052023 05/112023 90%CD (04/05231 LD-101 DISPOSITION PLAN 2 04M5/2023 05/112023 90%CD (04/0523) LP-001 LANDSCAPE NOTES 2 04/05/2023 OS/112023 90%CD (04/0523) LP-002 MITIGATION SCHEDULES 2 04/052023 05/112023 90%CD (04MS/23) LP-003 PLANTING SCHEDULES 2 04/052023 051112023 90%CD (04/0523) LP-201 TREE MITIGATION PLAN 2 04/052023 05/11/2023 90%CD (04/0523) LP-301 CANOPY PLANTING PLAN 2 04/052023 05/112023 90%CO (0410523) LP-302 UNDERSTORY PLANTING PLAN 2 04/052023 05/112023 90%CD (04/0523) LP-901 TYPICAL PLANTING DETAILS 2 04/052023 OS/112023 90%CD (04/0523) LP-902 TYPICAL PLANTING DETAILS 2 04/052023 05/112023 90%CD (04/05123) 8-101 LEVEL 1 - LIFE SAFETY PLAN 7 04I052023 OSl112023 90%CD (04/OS23) B-102 LEVEL2-LIFE SAFETY PLAN 1 1 04/052023 05/112023 90%CO 404105123) 8-303 LEVEL 3-LIFE SAFETY PLAN ill 4/05/1023 1 05/112023 1 90%CD(04105/23) M-001 MECHANICAL LEGEND A88REVIAnON5 AND GENERAL NOTES 1 0a/052023 OS/il/2023 90%CD (04/OS/231 RL MA�LYR MY Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job #: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 M-101 LEVELI- ENTRY FLOOR PLAN - MECHANICAL 1 04/05/2023 05/11/2023 90%CD(0410523) M-102 LEVEL 2 - APPARATUS BAY FLOOR PLAN MECHANICAL 1 04/052023 05/112023 90%CO (04AS/23) M-103 LEVEL 3 - FIRE STATION LIVING FLOOR PLAN MECHANICAL 1 04/052023 05/112023 90%CD (04/05231 M-104 ROOF PLAN MECHANICAL 1 04/052023 05/112023 90%CD (0410523) M-20D MECHANICAL SCHEDULES 1 04/052023 051112023 90%CD 104/05/231 M-201 MECHANICAL SCHEDULES 1 04/052023 05/112023 90%CO(04/0523) M-300 MECHANICAL CONTROLS 1 04/052023 05/112023 90%CD(04105/23) M-301 MECHANICAL CONTROLS 1 04/052023 OS/11/2023 90%CD (041G5123) M-400 MECHANICAL CALCULATIONS 1 04/052023 05/112023 90%CD(04/0523) M-401 MECHANICAL CALCULATIONS 1 O4/052023 05/112023 90%CD(04105/23) M-500 MECHANICAL DETAILS 1 04/052023 05/112023 90%CD (04/0523) M-501 MECHANICAL DETAILS 1 04/052023 05/112023 90%CD (04/05/2 3) M-502 MECHANICAL DETAILS 1 04/052023 05/112023 90%CD(04/0523) M-503 MECHANICAL DETAILS 1 04/052023 05/112023 90%CD (04/0523) M-SO4 MECHANICAL DETAILS 1 04/052023 05/112023 90%CD(04/05123) M-505 MECHANICAL DETAILS 1 04/052023 05/11/2023 90%CD(O4/05/23) M-506 MECHANICAL DETAILS 0 04/052023 OW112023 90%CD(D4/0523) M-507 MECHANICAL DETAILS 0 04/052023 05/112G23 90%CD (04/0523) M-508 MECHANICAL DETAILS 0 04/052023 05/11/2023 90%CD(0410523) P-000 PLUMBING LEGEND AND NOTES 1 04/052023 05/112023 90%CD (04/0523) P-100 PLUMBING SITE PLAN 1 04/052023 05/112023 90%CD (04/0523) P101 LEVEL 1- PLUMBING OVERALL PLAN 1 04/052023 05/112023 90%CD(04/0523) P-102 LEVEL 2 - PLUMBING OVERALL PLAN 1 04/052023 05/112023 90%CD 404/05123) P-303 LEVEL 3 - PLUMBING OVERALL PLAN 1 04/O5/2023 05/112023 90%CD (04/0523) P-104 ROOF - PLUMBING OVERALL PLAN 1 04/052023 05/112023 90%CD (04/05/23) P-201 PLUMBING ENLARGED PLANS 1 04/052023 05/112023 90%CD (0410523) N202 PLUMBING ENLARGED PLANS 1 04/052023 05/112023 90%CD(04105123) P-203 PLUMBING ENLARGED PUMP ROOMS 1 04/052023 051112023 90%CD (0410523) FL301 LEVEL 1 - PLUMBING ISOMETRIC 1 04I05/2023 05/112023 90%CD (04/0S23) P-302 LEVEL 2- PLUMBING SANITARY DRAINAGE ISOMETRIC 1 04/052023 05/112023 90%CD(0410523) P-303 LEVEL 2 - PLUMBING DOMESTIC WATER ISOMETRIC 1 04/052023 OS/112023 90%CD (04105123) P-304 LEVEL 3 - PLUMBING SANITARY DRAINAGE ISOMETRIC 1 04/052023 05/112023 90%CD (04/(3523) P-305 LEVEL 3- PLUMBING DOMESTIC WATER ISOMETRIC 1 04/052023 05/112023 90%CD(04/0523) P-306 PLUMBING GAS ISOMETRIC 1 04/052023 05/112023 90%CD (04/0523) P-400 PLUMBING SCHEDULES I 04/0S/2023 05/112023 90%CD (G4/0523) P-401 PLUMBING SCHEDULES 11 4IG52023 OS/112023 90%CD (04/0S/23) P-500 PLUMBING DETAILS I 04/052023 05/112023 90%CD (04/0523) I1� Tt�-TUTI'In\ ieexlmor0 acne Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT Printed on Thu Jul 20, 2023 at 08:49 pm EDT Job #: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street Miami Beach, Florida 33139 P-501 PLUMBING DETAILS 1 04/052023 1 05/11/2023 90%CD (04105123) P-600 PLUMBING FOG 1 04/052023 05/11/2023 1 901 1 P-601 PLUMBING FOG PLUMBING FOG 1 04/05/2023 05/11/2023 111 (04105/23) P-602 1 04/OS/2023 05/11/2023 9(1 (04/0523) P-603 PLUMBING FOG 1 04/052023 05/11/2023 9(1 (04/0523) 53.00 COVER SHEET 2 04/052023 03/112023 9(1 (04/0523) 51.01 STRUCTURAL NOTES 2 04/052023 05/112023 90%CD (04/0523) S1.02 STRUCTURAL NOTES 2 04/11 05/112023 90%CD (04/05/23) S1.03 STRUCTURAL O 04/052023 OS/112023 90%CD (0410523) S1.04 STRUCTURAL 0 04/052023 05/112023 90%CD (0410523) S3.05 WALL WIND DIAGRAMS 2 04/052023 05/11P023 90%CD (04/05/23) S1.06 WALL WIND DIAGRAMS 2 04/052023 05/112023 90%CD (04/0523) 51.07 ROOF WIND DIAGRAM 2 04/052023 051112023 9(1(04105173) S2.10 FOUNDATION AND GROUND FLOOR FRAMING PLANS 2 04/052023 05/112023 911(04/0523) S2.20 SECOND FLOOR FRAMING PLAN 2 04/052023 05/11/2023 911 (0410523) S2.30 THIRD FLOOR FRAMING PLAN 2 04/05/2023 05/112023 90%CD (04/0523) 52.40 ROOF FRAMING PLAN 2 04/052023 05/112023 90%CD (04/0523) S3.01 WALL SECTIONS 1 04/052023 OS/11/2023 90%CD (04105123) S3.11 I PILE CAP PLANS AND DETAILS 1 04/052023 05/112023 90%CD (04/0523) S3.12 FOUNDATION DETAILS 1 04/052023 OS/112023 91(04/0523) S3.21 SHEAR WALL PLANS 1 04/052023 05/112023 911104/0523) S3.26 SHEAR WALL DETAILS 1 04/052023 05/112023 9(1 (04/0523) S3.31 STAIR SECTIONS 1 04/052023 051112023 90%CD (0410523) S3.41 STAIR DETAILS 1 04/052023 05/112023 90%CD (04/OS/23) S3.42 STAIR DETAILS 1 04/052023 05/11/2023 90%CD (04/05/23) S4.01 TYPICAL COLUMN DIAGRAMS 2 04/052023 05/112023 90%CD (04/0523) S4.02 COLUMN SCHEDULE 2 04/052023 05/1112023 90%CO (04/0523) S4.11 BEAM SCHEDULE DIAGRAMS 2 04/052023 05/112023 90%CD W4/0523) S5.01 TYPICAL SLAB ON GRADE DETAILS 2 04/052023 05/112023 90%CD (0410523) S5.11 TYPICAL MASONRY DETAILS 2 04/052023 05/112023 90%CD(04/0S/23) S5.12 TYPICALMASONRY 0 04/052023 05/112023 90%CD(ON0523) S5.21 CONCRETE DETAILS 1 04/052023 05/112023 90%CD (04105/23) S5.22 CONCRETE DETAILS 1 04/05/2023 05/112023 90%CD (04/0523) S5.23 CONCRETE WALL 0 04/052023 05/112023 90%CD (04/0523) S6.01 TYPICAL POST TENSION DETAILS 1 04/05/2023 05/11/2023 90%CD (04105/23) S6.02 TYPICAL POST TENSION DETAILS 1 041(1 05/112023 90%CD(04/0523) S7.01 STEEL DETAILS 1 04/052023 0511141( 90%CD (04/05/23) AMENDMENT - ATTACHMENT 1 Im lob* 81-172 City of Miami Beach - Fire Station No 1 k�crwA� u.� 833 6th Street ° ° DRAWING LOG — AP O L L O MURAL Miami Beach, Florida 33139 Kaufma Kaufman Lynn Construction, Inc. D'a—, u'. S-101 Drawing Title STRUCTURAL NOTES Revision Drawing Date [ 06l30I2023 R ... ived Date Set 07/26/2023 S-200 APOLLO MURAL 1 O6I30/2023 07/26/2023 NARRATIVE ANITCIPATED DESIGN NARRATIVE OF MURAL EMAILED TO KAUFMAN LYNN FROM CIP 02/1712023 rz.uFnn:v um 1:11V�r141 1"I'IIIY Kaufman Lynn Construction, Inc. AMENDMENT - ATTACHMENT 1 Job #: 81-172 City of Miami Beach - Fire Station No 1 833 6th Street DRAWING LOG - DAYCARE Miami Beach, Florida 33139 • S-1 AREA STUDIES 0 6/13/2023 7/27/2023 HPB APPROVED DESIGN PLANS 5-2 DAYCARE REL4rATION SI IRROI INIIINr3R r.01 FXT 0 6/13/2023 7/27/2023 JFIPB APPROVED DESIGN PLANS SD-1 OVERALL SITE PLAN a 6/13/2023 7/27/2023 1 HPB APPROVED DESIGN PLANS SD-2 RENDERED SITE PLAN 0 6/1312023 7/27/2023 HPB APPROVED DESIGN PLANS SD-2.1 PARTIAL SITE PLAN 0 6/13/2023 7/27/2023 HPB APPROVED DESIGN PLANS SD-2.2 IPARTIAL SITE ROOF PLAN 0 611312023 7127/2023 HPB APPROVED DESIGN PLANS SD-3 FLOOR PLAN 0 6/13/2023 7/27/2023 HPB APPROVED DESIGN PLANS SD-3.1 ELEVATIONS 0 6/13/2023 7127/2023 HPB APPROVED DESIGN PLANS SD-3.2 ELEVATIONS 0 6/13/2023 7/27/2023 HPB APPROVED DESIGN PLANS SD-3.3 SECTIONS 0 6113/2023 7127/2023 HPB APPROVED DESIGN PLANS SE-1 SITE EQUIPMENT / PRODUCTS 0 6113/2023 7/27/2023 HPB APPROVED DESIGN PLANS SDI 3D RENDERING - VIEW I - BUTTERFLY GARDEN & DAYCARE 0 6/13/2023 7127/2023 HPB APPROVED DESIGN PLANS SD4.1 3D RENDERING - VIEW II - AERIAL BUTTERFLY GARDEN & DAYCARE 0 6/13/2023 7/2712023 HPB APPROVED DESIGN PLANS SD-4.2 3D RENDERING - VIEW III - DAYCARE & PLAYGROUND 0 6/1312023 712712023 HPB APPROVED DESIGN PLANS SD4.3 3D RENDERING - VIEW [III - AERIAL BUTTERFLY GARDEN & DAYCARE 0 6/13/2023 7/27/2023 HPB APPROVED DESIGN PLANS A000 GENERAL NOTES, ABBREVIATIONS, & CODE REFERENCES 0 71Q12Q23 7/2712023 60% DESIGN DRAWINGS AS100 OVERALL SITE PLAN 0 7/9/2023 712712023 60% DESIGN DRAWINGS AS101 ENLARGED SITE LAN SITE & BUILDING DATA 0 7/9/2023 7/27/2023 60% DESIGN DRAWINGS A100 FLOOR PLAN 0 7/9/2023 712712023 60% DESIGN DRAWINGS A101 REFLECTED CEILING PLAN 0 7/9/2023 7/27/2023 60% DESIGN DRAWINGS Al 2 ROOF PLAN 0 719/2023 7I2712023 60% DESIGN DRAWINGS A200 BUILDING ELEVATIONS 0 71912023 7127/2023 60% DESIGN DRAWINGS A300 BUILDING SECTIONS 01 /19/2023 112/12U23 60% DESIGN DRAWINGS A400 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS 0 7/912023 7/27/2023 60% DESIGN DRAWINGS A500 TYPICAL WALL TYPE & GENERAL DETAILS 0 7/9/2023 7/2712023 60% DESIGN DRAWINGS A501 TYPICAL CANOPY DETAILS 0 7/912023 7/2712023 60% DESIGN DRAWINGS A502 TYPICAL RAMP DETAILS o 7/912023 7/27/2023 60% DESIGN DRAWINGS A600 DOOR, WINDOW & FINISH SCHEDULE 0 719/2023 7/27/2023 60%DESIGN DRAWINGS NARRATIVE NARRATIVE OF DAYCARE SOPE OF WORK EMAILED TO KAUFMAN LYNN FROM CIP 7127/2023 AMFNnMFNT - ATTAr.HMFNT 7 1 Aalvny AG6rBY clan. Arkin anion sat Flr4N SIP 12 + -x F11a 6 en v 4 ++ x 1a x4 r a 1« t« A2820 Mobilitation A21301rtstall Fence A2140 S"pp A2150 Building Demdbton A2160 Utility / Site Liblity Demdmon A2170Clean /Grub Site Utility OflSI[e7Ye-Ins ty/ A21R0 Drainage Well 1 A2190 Drainage Well 2 A2200 Drairsage NMI 3 A2210 Drainage Well 4 A2220 0thite Water Tie-in 6th Street A22400n-Site Drairege Stnutures A2270 Pad Prep/Site Balance A2230 Restore 6th street A2250 SanitayTe In Meridian Ate A2260 Restore Meridian Ave Shuch" 5 z 3 15 10 5 68 1 7 7 7 15 7 10 5 15 5 166 18-P-24 241un24 2S1urv24 261un24 27-Atn24 01-1W-24 02-11k24 23-1u1.24 24111.24 06Au9-24 07-Aug-24 13-Aug-24 1 4-A!{-24 18+1au-24 14Aug-24 22-Aug 24 23-Aug-24 03 Sep-24 04-Sep24 12-Sep-24 OSep-24 23-SWI 24 Sep-Z4 14t7tt-21 24Sep-24 02-0ct-24 03-0ct-24 16Oct-24 15 Od-24 23-0:1-24 22-Od-24 11-N-24 12-Nor21 18Nw-24 : Mabllmtion .................. i i i i ...........i�-li Irntpl iejrte'-- - S* 1• BuFOkig l7amglMai + LIfi1M i5ReiRiBlYDalnoBliart 4ean�Ghib i i....... • ...:.... ....:.... ............ .. �.... � ....:.....: i :....,.. Nte VtlkN/O�AtETk•#Is . Draihage;WelFl Dr9ina8e WAY 2 :s Draim VMl3 l E'Orailtage Wel(4 ._j.....j....j..._ .........:. ... - ... ............... ....;.....: Othrt• � ' ewaka Tied&hSkrnl.... OrvSReDralpgegnt" Pad Prep/Ste Balabce 3testiae 66 street: SlnitaryTi@In1+9eri4en/Iw ....:.........:............. . .........:..........�._..:.... •..�..Res4re Meridxl Pie 5¢tRt}ae �T"�!tr BtiIYYW Falildeticn v :Pk OY* � fiortkRks -------=---i----- i j i ... _ ...Iw..Soh F" .... _ Eachsote No¢h Piles 0 Ot Back North Pllea :s Etecas3e SpRh Piles: :Wt BackSarth Piles i i E i i i �W�FmT/Aeirfarce %Pbvl2atir PY�CapR Crrle fleam;- Fqm f. Reir(orce/Poly Sajeh gkl]ipAOesde;Beada Tie LUA 1: 3orrt /RBinfo/ce/Palu bhe-i-4ar4C*i. s g;5ha6e 2ritl Flobr/Ireped ...�...:.... e.. _: i i i i :..... •....k.Fo?^.S1m Edges/PuH-QR TpdW Bdtan;Reinforcieg I Tell.-Insti151eer VLW Endi/Rekforie :1 SI"For lend /dap lieirdtjrdnls/P1-*ri ¢ :1 Pb., Slabs: ....i.... .... i..._j....i.... .... i � iy Tere0n 9qb/f�rou[Faklts/jerdgns I Strip Edges/SaTl 147 1« 1« 19 += 19 151 19 154 15/ isa 15e 1b 161 1Q 19 A221 Pile Lay— 5 17-0ct-24 23-Wt 24 A221 North Piles Is 24Oa-24 13-Nov-24 A231 Spfth Piles 15 14Nor24 05-Dec-24 A23: Escarate North Piles 10 34-Nor24 27-Nw-24 A23: CLL Back North Piles 10 29-Nar26 12-Dec-24i A23: E.—te South Piles 2 06-Dec-24 09-Dec.24 A23, Cut Back South Piles SO 16Dec-24 23-Dec24 A2.1- Farm/Reiriarce/Pour North Pile Cap:, [rode Beams g 13-Dec-24 24Dec-24 A231 Form /Reirimce/ Pax South Pik Cape, Gmde Beams 8 24-Dec-24 WJ-25 1 W 166 166 167 1q in 170 m 1T2 t7J 1. A23' Form/Reinforce/Pau Shear Its and Columns 10 07.1-2S 20.1-25 A241 Shore 2nd Floor/Inspect 4 21-1am25 24Jan-25 A24: Form Sub Edges/Pull-qrt Tendons 2 27-1an-25 28-1an-25 A24: Bottom Reinforcing 2 29bn25 30.1an-25 A24: Tendon Install Sleeves/Lire Ends/Rein6rce 2 31-Jan25 03feb25 A24 Sleeses For Tendats/ Tap Reinforcings/Accessories 2 04-FeM25 05feG25 A24! Po Slabs 2 06-Feb-25 07-Feb-2S A244 Tension Slab /Grou[Packets /Tendons 4 10-Feb-15 13-Feb•25 AlaStrip Edges/Safety Rails 1 144eb-25 14-Feb-25 176 t7r 170 t7a 1« 1a1 19 � a4L°"1 cr E"°" "`"°"° Aeiul L..aI m Et°n �p sunray Aeu•Iswn< Grul Wmannp Nbk Miami Beach Fire Station #1 8.14.23 — MBFS1-1 Data Date 14Aug-23 Run Oat,. '.6Aug-23 Page Sots 1.IQ_Layoul Cala6 AMENDMENT -ATTACHMENT 2 tl AaMty 0 Ac1Mtyllnw Wndm r Mpff�oa r v 3 ] 1 . 8 13 to 1. e m 21 H % 1� A281 Irstag Masonry Groural Floor A244 Farm/Reinforce/Pour Shear sysllsantl Columns A25. gwe3rd Flaar/Imect p3rd Ra /Reshae2nd Raor A25 Form Sb Edges/Pull-Cul Tendons A25, Baran Reinforcing A25! Tendon Install 9c es/Liw Ends /Reinlorce A254 Sleeves For Tendons/ Top Reidorcings/Accessories A25' Par Slabs A251 Tension Slab /Grout Pockets/Tendons A261 St."t Pour In Place A25: Strip Edges/Safety Rails A28• Load Masonry gal Flm A28! Icall Masonry 2nd Floor 6 7 4 2 2 2 2 2 4 30 1 2 7 13-May25 20Meµ25 17-Feb-25 25-Feb-25Fain/Reirtare/PpurShear 26-Feb-25 03-Mar 25 Off Man-25 05-Ma125 OFMar-25 O7�.tar-25 10.Mar-25 11-Mar-25 12-Mar-25 13-Mar-2S 14-Mar-25 17-Mar-25 18-Mar-25 21-Mar-25 18-Mar.2S 28-Apr-25 24Mar-25 24-Mar-25 25-Ma,-25 261dar-25 27-Mar-25 01-Apr-25 .....: :...: i .... :. i ...-4-...:............... :.....:.... .,.._........ I ! ! •. ..... !..... .........:....:.... : ....:....... . .-.... .-..e.._i.... ....:.... ----i---_i-...i................ i ! i i i j i i :---- i t ! i i i i i i i i i i ! J-all MasonryGrouwlflaa vallsarb Cdimrsi .�..Shue 3rd flgpr/kLQlett 3rd Flrnr/RpMte hlllFbpr ..: :I Faro Sib Edges f.FVFC1+t Tendvs 'I tldQd11(1 RlIhMd18 1 TRndoli lrLgsg 51" 1Lhf,, Er* Rglnfaa 1 1 Seines FoiTendas%TopRein{Xdrgs /.Acceaalei .Y. Pour Slap¢... g7-1 S{.b/6.4 PocFmes/.`RndaK E!mm stayti O..mr„Plate 1:%4 Ed(Ls,IWdJ 1;lnil Masonry 2nf fkel •Iti rytM Naar ; LN 3 aFaun/k.kfarfill— —willsandCdunris Sore 9polkrmldlfpalF.R.djae jrdFya ! :� F Fbrm Sub fdaesi'PtAiOa%miens g tioltarn Rynforting---� 11erd6n lrtAall5lceves/live Edda/Rekd6rce 1 SleeuesFa Terelons/Tap Relribrdngs/l6t es,- 1 IbW Slak* )�'�I a i S[r�tEdges/Safety Ras.... •...._........ Lnpd Mpsmary3rd Rcpr Now ksta115taiis2 Metal pan: IbtaN;Maspwry 3rd %loot' rT Ramp Rim :g Form Syb Edges FPugiM Terldprm 1 Bbdom RelNordig :1 T""Il Sltl.wb/ Llyb Ends I RNrnbfa i Beeves Fot%Id:n;(Top Rdnbrdngs/. 3 err Lahs 1 Terlsbn SbIb/ anctit podlets%Tddbrs I StdpEdgeis/Safety Rails'; � Ed4rbr§Idnj. ErtHar Mlsn 1u t% 1n IN to t% 191 ta3 19,3 IN 1% 1% 1% A25! Form/Reinforce/ Pour Shear vnlh and Columns 7 25-Mar-25 02-Apr-25 A26: Shore Roof /roped Roof /Reshwe 3rd Floor /Remwe2M Fktar 4 03-Apr.25 08-Ap-25 A26 Form Sb Edges/PWI-CIATendas 2 09-Apr.25 10Apr-25 A26! Bottom Reinforcing 2 11-Apr-25 14-Apr-25 A261 Tendon Install Sleeves/Live Ends/Reinforce 2 15-Apr-25 16•Apr-25 A26SleevesFa Tendons/Top Reinfercirlgs/Accessories 2 17-Apr-25 18-Apr-25 A261 Pour Slabs 2 21-Apr-25 22-Apr-25 A26! Tension Slab/Grout Pockets/Tenders 4 2}Apr-25 28-Apr.25 A26: Strip Edges/Safety Rails 1 29-AP,25 29-Apr-25 A281 load Masonry 3rd Rmr 2 30-Apr-25 01-Maµ25 A271 I call Stair 42 Metal Pan 30 30.Apr-25 11-1un-25 A28 Install Masonry 3rd Floa 7 02 May25 12-Maµ25 A27: Shore Ramps/Inspect 2 30-Apr-25 01-May25 A27. Form Sub Edges/Pull-Out Terdms 2 02 May25 O5-Maµ25 A271 Balton Reidocirg 2 OGMaµ25 07-Maµ25 A2T T—Jui, liotell Sleeves/Live Olds/Reinkxce 2 00 May 25 00 May25 A271 11— For Tendons /Top Rndnbrcins/Accessories 2 12-Maµ25 13#•1aY25 Air Pour Slats 2 14 May-25 15-May-25 A281 Tensim Slab/Grout Pockets/Tenders 1 16-May25 1SMaµ25 UT Strip Edges/Safety Rails I I4Maµ25 19-May25 Po14rbarSkin /Dry -in 33i 21-Maµ25 25-14 w25 1% all, atn 2a3 im 1a a% ia6 am 2ae am 3f0 an 3I3 313 rt 313 31. a17 318 re TA Aaua1 L°,.1 °1 Eeen �y Surmary Itl°.I H6a Di R.mai°mp veM � usalwma���r Nt,M Miami Beach Fire Station #1 8.14.23 MUS1-1 Data Dab' 14-AW23 Run Dal.: 16,11Y9-n Png.6 d 13 Ix-L.yatc l r. AMFNIMFNT - ATTAr.HMFNT 7 B Aat*y ID AQINty wm. anp ,glen I w non m 3 1 n B B 11 tz r B 19 I z0 A 73 z4 A291 Waterprad Openings -Grand Raw 3 21-MaY'a 23NIsya : : :. :. :. :Waterprod0pe ngs-Grgald Raw m A29: Waterproof Openings-2nd Boor A29: Waterproof Opervngs-3rtl Floor A29': Louser lmblation Ground Floor A29- Lower lmtalahon 2nd Flow 3 S 2 4 27-Mav2S 29-M"2S 30-Nava OS-11n25 O&J-25 03-25 10-1ur1-25 134-25 : t Waterpl fgpeni rgs-z1d Paw: 0 WaterprodApenirgsi 3rdFlooi 1 LiBrretlmalatiGn Grdndflaal 1 lauleF ksialaEibn grid Rcu =n 37• as A24 Lauverlwalation 3rd Floe A291 Wind— mtall Ground Raw 5 5 lblura IOlurLa 23-Jun-25 27-Jurn25 -....j --'.i..-..i-...i.....(....i....-i-.-- ...g..-'i'-` i----t....i.......-$-.--.....-i----i.......-..i....e.....i-_. i i j i i ....:.... .... .... . glower lltmWtlon 3rd Roar......' 4 Wir�dwl;BetaB Ground Poor; A29' Storefront /Window lrutall 2nd Floor A291 Window Install Id Floor A29 Apara[w Bay RdI UP A3( xhaffdd South Elevation A3( Stucco south Elevation AM Prime Stucco A31 Paine St —South A31 Vereer Masonry south 10 10 20 s IS 10 5 10 36Aaf25 144uF2S IS-)d-25 28-Jul-25 29-luF2S 2S-Aug-25 29-JU 25 04-Aug-25 05-Aug-2s 25-Aug-25 26Aug-25 09-Sep-25 10-5ep-25 16Sw25 17-Sep2S 30-Sepa --.. : : : : : ....:.....:....:...../....i.....1-....}....i-...1.....I....f... 1.-..5..-.- .-..i-.--4....i..-.i.-.. * !k.*prtiwiridokhwa112ndFl Wigdowl ta1131d Floor 0-: ApaixusBayRdl lip .--1--..i.--..i....i---.-i.-..�yBlaar....h. tf-T��South- SQtafftjd S*h 9-tion..,. stucco South Eevation ■ Piime3tu o g Pain;stuoio Sojrth )-...:--.. �...- ....4----F..-f---.;. Veneer Y.taautnY�+uth 229 z91 ifz 2x z>6 z72 A31 It—Schaffdding South S O3-0d-25 0-W-25 : R�mWe SdNffpltlln r----- V With :0 SfJofldd Math Elewtdn i Rucf.VNorthEWW*. t AY xhaffdd North Elevation 5 OSAug-a 11-Ag-a AM St —North Elevation 15 26-A1g-25 I65ep2!5 AN Prime Stucco AY Pairt 4uao North AY Veneer Masonry North 10 5 10 17-Sep-a 3PSepa 01-0ct-25 07-0ct-25 09-Od-25 21-W-25 .-.-i--.-.y---- ...-.L.-..i.... j--..S....F..•l-...-L..-.:...:..........i..--;----i--.-.i....i-..- j :--. --..• ..--4----1----4----:.. ....i �` Prime Slupcn - 0 P•yrt Ruo:Q North I—Masonry1,110 Z� ]It AY Remise 4haffdding North 5 22-0a-25 28-Od-25 : g' Remorse '..... 2K A3( Schaffdd West Eevton 5 12-Aug-25 1&A1g-2SWeSEleladon:.--- y..-.i-... 1... 1-...p....i... - aa7 A31 Sit— West Elevation A31 Rime west Elevation A31 Paint We4 Elevation A3] Veneer We4 Elevation A31 Remove Schaffdd West 10 w 5 10 5 17-SW25 30-SBp2S M-Od a 14-Od 25 15-0d-2S I1-Od-25 22-Ott-a 0414 -a 05-N-25 11-Nw-25 . .--.j.-.-.j-...i-............j.... 1.....-...-. i.... j-... 1....5-----1-- - ...j... iFi r kljcco West oeuytlon' iN Prime Wort Ele;.tid g �Palrt West E11e11 WjrerWeQE j-..-i.....I....i....-j.-..L....:.... 1� z31 asa i i i i p Eas : ■: xhiffdd FastE"tfm ■ StuaO East Elevatpo 0: Pddne Ebst EL —tit •.--.i..- Y Pan Fist Eleva l Veneer East El m A;; Schaffdd East Elevation 5 13Aug-25 25 Auga AK St —East Elevation 10 01 O0-25 14 Oct25 A3; Prime East El—tlon 10 ISIDd-a 2aoct-2S A3; Pairt East Elevation 5 2900-25 0444-25 k3-, Veneer East Elevation 10 05-Nw25 18Nw25 m 25. AK Remove xhaffod East S 19-N-25 2SNw-25 g: Reldox eifW Miami Beach Fire Station #1 8.14.23 Data Date 14-Aug-I3 Rawl LrW or ER°n �gsurm.iy An"'1 WeM — MBF61-1 Run Dale: 15A1,-2J 1J Page ",3 — Orin rbmanmB MbM 1,KL-LayW Calms AMENDMENT -ATTACHMENT 2 A30 Rigid Board lnstalladon At Rad 5 21-May25 28-Maµ25 - ■'' Rigid Bo?d lrlstalIMM At Roof A30-. Roof Curb Coodisadm/Install 3 23May25 02-J-25A30. py MechanicalJacks/Stands 3 03-1 25 OSA-25A33! Gene —Curb uL4aganon/ Structural support 30 03-1um25 15AU-25 Base Sheet Install 2 O6Jum25 031un25A30 :1 BaseSheetlrotatlA30-: Curb Insulation/Hahing 3 ID-Jun25 12-1un-25A30' Cap Sheet/Deta,I,Ns S 16-JU-25 22-1u1-25A301 I Capping Caps/Trim Metal 10 231ul-2S OS-Aug-25 �IX•II Call/TrYnMetal; 50 RTUStandslnsiall RofBuildut a O6-Aug-25 11-Aug-25 :1 kf *ndchs4aN-Rodlo 155 RTU's Equip lrt4all-Roof Build-oul 7 12-Ag-25 20-AW25 i i EtJslip ltrpaM RooReu15C RTU'sPlumbingTien-RodBuildw 5 21-Asg 25 27-ALS-21 ir riJ Pllimdryt Tie+rt:RPd 16C RTU's Electrical T-rs-Roof Buildat 5 21-AM-25 27-Aug-25RTl?'sE GI T�j-irK filcin =stop( 155 RTU's Mechanical Tie-im-Roof Ruild-out 5 2J-Aug-25 27-Aug-25 RTIj's Mechanical T — Fit 155 RTU'SSlart-up-Rod Bdldout 5 2&Ag-25 OC-Sep25A■i4hM/2■■YIOgp 111 -13-AAP25 t74c1-25 i ' r`�`�`7Fni41es/Ilt-0, ....:.... ....(---i...-:.....l....L...S - -- ny,ig Parlarp Wrige ill A41 Framelg l4 Floor 2 27 Maµ25 29 Maµ25 I' Framing:l4 Floor ; as AU MEPF Wa I Rough 3 29 Maµ25 02-Jun-25 M(PF y{hl Rough 11a A4: Hang Drywall 1st floor 2 03-1um25 04-J-25 i--.- Hang Drywall Jstflod 231 AC Finish Drywall 2 05-1un-25 WJut-25 -.....-.--•.................... FYish Drywall... 2X2 A42 Prlme/rouch up/Paint Drywall 3 191-11 11-1-21 1 Fr-,e Tudh up:/win Or—! 2g1 A4: MEPF O✓erhead Rough 2 12-Ain134-25 : 1 MEPf Orerhead Rough 1aa A42 Ceilings Gdd Instal 1 16Asn25 16-J-25 I [elirigsGrid h¢aX A4: MEPF 0—head Rogh/Drops 2 17-A-25 I9-J-25 i i... 1 EPh ORrihe oRwgh/Drops 2K 1 MJun-25 IN-25 ......................._-,.-..-:-.--�-. _: .i.......:.....:.. i 0 opCeiRhgs llles AC OropCeilingsTiles Polish ('pxr{te 7n 2M AC Polish Concrete A4_ Mist Floodrg 10 5 20Jun25 03-Jut 0741,05 11-JI1-25 1 1 �% - 1tl A4_ MEPTrims 2 I4JuWS ISAuF25 1 AX�TdmS '. %glp AC Finish Paint S iblul-2S 2'2-1ul-25 1 flrrifl119i1e A4E KL Punch 5 23JUF25 23JUL25 :.... Ol�lsel�l/Ids and ALcppfa(rtY 1e2 ]A AA. Owner Punch and Acceptance 5 30-1ut.25 OS-Aug-25 . V1 ORTrasriurme[NlJt rmnlHb/ 2" 30C H/KPads-VLTRMID4 3 09-J-25 11-Jurv25 ':l f♦/KPads=W PM1Q6 216 099 Prime &Paine - VLT RM104 3 12-J-25 16-Jun-25 1 Pane& P!Xt w RM701 ale 16C Elec Panels/Tx's VLTRM100 7 17-1un25 25-1un-25 .. ....:........i : : ...- :-.--: EIeE Panels/Lfs- -�i. .. KT RMld : Rervnirp Lewlul Eean ♦ ♦NU—. Miami Beach Fire Station 91 8.14.23 one Data: 14-Aug-23 ,Noel Level as Eeon r1 Summery Run Date: 16-Aug-23 atlwl wen, MBFS1-1 Page X of 13 1� Pameneq w4h 1� foul R.munnR syeh I.KL_LayW Colas AMENDMENT -ATTACHMENT 2 NTP Contracts (Daycare) Submittals (Daycare Modular) State Approval (Daycare Modular) City Permit (Daycare Modular & Site) Dermi Approval (Daycare Modular & Site) Sitework Modular Install Site Finishes / Landscaping / Inspections Daycare Relocation PERSONNEL - Construction Protect Executive 1.1 1. ; Sr. Project Manager 0.0 t Protect Manager 4.3 4.3 Awl, Protect Manager 0.0 Sr. Superintendent 0.0 Superintendent 010 Asst. Superintendent 21.7 4.3 4.3 4.3 4.3 4.3 Project Engineer 0.0 Accountant 17.3 2.2 2.2 2.2 22 2.2 2.2 2.2 22 Sr Accountant 0.0 j On site Start to finish reeks 34.6 I 4.3 13 4.3 4.3 4.3 4.3 4.3 4.3 (Additional Support Staff May Be Added Depending on Project r PROJECT SCHEDULE AMENDMENT -ATTACHMENT 2 Niami Bead Fin Statmn 11 M—, —a NTP Cormacts Early Release F,tM b,. - DemokCon I Cleanng I GMW,g Sitevaerk I Piling Strum, Ertenor Interior Land—pN I Imgation Final Compl oon PERSONNEL-con.vucden .c m NaL. Nci M...... 30.6 1.3 4.3 �.Im¢n weeks e3.a swPnn st.n n1.r ae Hance oeFenama en P,M.,..� I.- 11 13 1.3 1.3 11 1.] 4.3 5 I3 l3 l3 3.3 6.3 Sl 1] 1.] 1.3 laaanond se.3 cnmWe.wrl Mate ]nu salary s n.eule is hued .n «owning 1m1e N. g anVEnyin «servivs on Te Orycan Raoutwn waM, are na g a Y pe a„^ • v J . ano p euu�m.m o� loot' Lae Hems ac..o. g Ina m. > .rn.eii4. AMFNnMFNT - ATTArHMFNT a AtllWyD Aa yN grl0" Start FlnW OunOon v J •] 3 Jan M Y Oa > 8 Bn 9 19 tt a 6 19 3a 11 32 N m 76 30 A1710 Wnxdws/Storefront -A/E R&A 10 05-Feb-24 16-Feb24 WlrgdwSf Stooatropt A(E R&A 1M A1770 Drywall-A/E R&A A17W Stucco-A:E R&A A18DD Specialites-A/E R&A A1830 Roll -up Doan-A/E R&A A1&20 Lanrkcape -A/E R&A SO 10 10 10 10 19Feb-24 01 Mar-24 19-Feb-24 01-Mar-24 19-Feb-24 01-Mar24 13feG24 01-Mar-24 19.Fetr24 01-Mar-24 Dryv ll-A/FRBA , k:cco tA/E(1&A: r Sp4CIaIMes-aA i&A RaAup DaaY AfE R&A - � --� A taiidscape-?AR&A: 1BB "a 112 H3 A1840 Flooring -A/E R&A A1850 ACT /Ce4ing. AfE R&A bbrh%b AkDBWlr A2100 AHU F&D 10 10 240 93 13Feb24 01-Mar-24 19-Febb24 01-Mar-24 230K-23 M-D9-2F: . 29-Dec-23 08-M4y24 j i ! ....j.-.- 1-.-.i-..-.i....l.... 111 Flooring -At R&A P AL7 /Ceilirgr AA R&A �.L. ' : i Fa *.lilAe&�er i..--p.-..j.. .i....j.... >- lilillikkkmiikkii 1 -- -- -1- -- 115 118 117 A2110 Switcgear-F&D A3970 Gererdor-F&D A40DG Generetor Curb-F&D A1920 Electrical Componems(Panels) F&D 240 240 30 60 29-Dec-23 05-D.-24 29-Dec-23 OSDec-24 29-1)ec-23 09Feb24 09-Jan-24 29-Mar-24 91j8dgeK�&D; Geer#a4%D r Generetar Glrb%F8Q E3eidricdl CahparRlRs�anels)-F&D : ne HB ton 111 A1930 MechanKalF&D A2060 Elevator -F&D 1 128 09-lan-24 0&Jan24 08-Jam24 OS-Jul.24 ..._j...-.1-... j......... i..-..V ...:...:.... ... ....J....:.-..j-...p-..-1----i.---1--.--i..--j..-.-i....l.-.- �.---i.. .--.:-....1.....-...{--. :I M�KhfIYn(-f&6 : Ellvatgr -F$D to 121 A23W Laundry Equipments A2390 Food Semen Equipment 120 120 08-lan-24 244un24 08-Jan-24 241un-24 Laundry Egdlinenk ;"5"-QWpineni 1N 133 A1900 Site Work(Drywells and Sturm structures)-F&D A1910 Corcrete llhst Tension)-F&D 40 ZO Z24 -24 15-Mar-24 22-1an24 lfifeb24 .-.-j....-i....i--.- 4.-_---y.-..j....-1..-.i.-...1--.-i----t ilte Skrk lOrylidk irld Stamiaructlydl�&D .... ........ : � Concrete (Pos[YemEn)-f&D: 1s IV A2020 Masonry -F&D A2120 We Slxpdrawiigs-D 1 30 224art24 22-Jan24 22-Jan-24 01-Mar24 1;Masmary-F&D Pile 94dreimgsD 12B 1A A1950 Plumbing -F&D A1960 Roofing F&D A1970 Doors And Hardware-F&D A1980 Plumbng -F&D A1990 Rre Protection-F&D A209D Rre Pump -F&D A1940 Wnodws/Storefront -F&D A20000rywa11-F&D A2010 Stucco -F&D 1 40 85 1 1 85 107 1 1 12-Pab24 124eb24 12-Feb24 OS-Ap-24 12-Feb24 16Jun-24 12-1eb-24 12-Feb24 12-Feb24 12-Feb24 12-Feb24 141urv24 19Feb-24 18-Jul-24 04Mar-24 04Mar-24 O&Mar-24 04-Mar-24 ! •---/----.F-.--;-....i...-1.-..-i..--.i. ..-. i...--... i.....i.".-:""-.- : I Nlumbug4ll.D Rwiling _fDD -..1....:...-.'...:-.--1...-i..--3'----I....{-...�--.-1-.--3----.1.-.. d..--j-.-. j..... j.--.-.--i.... DetrsMd�lardetreF F&6 I P,k+m4ing4F&D; i I Hn Pfotec�ion+F&LS rice P"p F&D . . . . Wnddwsj R.Wpdt - F&D :1 Span; FBrD t>D 151 13i 179 t34 135 13fi In 1>t A2030 Specialities -F&D A2040 Roll -up Doors-F&D A2050 landscape -F&D g20]0 Flmring -F&D 1 85 1 1 O6Mar.24 04-Mar-24 04Mar-24 01-JuQ4 04-Mar-24 D4Mar-24 04Mar-24 04Mal-24 1 ..-. j...- �....i.... ....I.........-y-.....-_�. ? $peciallies%F&D : Rokp Pod}F&4 :1 Dandudpe-F&D; - -..-i...-j--..i..-......i..-- 4 Flaortrig-FBtD ', : : 139 148 1h 1u A2080 ACT/Ceiling -F&D 30 04-Mar-24 12-Apr-24 ACr/Celly* F&D p srru[lIOI; 10 Mobillnoon arld Site Clearing 40 38-Jun-24 13-Aug-24 rl klobil6s0marami a(Mg; nam.nnp L�KI m Frtnn ♦ ♦ wwwne Miami Beach Fire Station #1 8.14.23 Data Date: 14-Aug _ 2 Run Date: 3 aay.I Nek Remaining Non MBFS1-1 p4of Page 4 d 13 0 Gral Ramaninp Non 1.� Ley4d Cd9rs AMENDMENT -ATTACHMENT 2 9 Atl"ID —WyNana Odglnr pyrylar gam fllllalr - OU un Ju °� V °f n 0ti ° v1 �i d •1 1V 2 3 4 fi a 9 10 11 a 1 8 to 19 ]9 4 3 29 A1260 Medaracal- Submittal Package A1390 Eleiata Submittal Package A1640 AHU- Submittal Package A1650 Swit Submittal Package A3950 Generata-Sbmmal Package A1220 Site Work(Drywells and Stam#ructures) -Submittal Package A1230 Concrete(Pw Tereion)9ws/ Corks- Submittal Package A1350 Masonarv-Submittal Package A1660 Pile Strcpdra mgs- Submittal Package A1270 Wiradws/Storeha9-Submittal Parkage A1280 Pluming -Submittal Padoge A1290 Roofing- Submittal Package A1300 Doors And HaMvere-Sbrnittal Package A1320 Fi Aotectim- Ssbm ittal Package A1630 Fine Pump - Sulmmal Package A1330 Drywall - Sbmittal Padage A1340 Stucco-Sbnittal Package A1360 5pecalmes Sbmittal Package A1370 Roll -up Dc - Submittal Package A1380 Landscape Submittal Package A1400 Flowing- Submittal Package A1410 AR/@fling-Submittal Package A/E Milli &ApprowSubanlAtift A1690 Ekc(riral -qrE R&A Al700 Mecancal -A/E R&A A1970 AHU-A/ER&A A1880 Switdgear-AA' R&A A3960 Generates-A/F R&A A1830 Elevates-A/E R&A A167058e WaklOrywell5 and 5tam #ructuresl-A/E R&A A3790 Ma—, A/E R&A A11fA`1mile ShoPdrawrgs Ail, b&A A1680 Cmcrete(Pm# Tensim)- A/E R&A A1720 Plumbing -A/E R&A A1730 R—*%-A/E R&A A1740 Doas And Hardmre -A/E R&A A1760 Fire Prdecdm A/E R&A A1860 Fire Pump-A/E R&A 1s 20 1s is is 1S 30 15 1S 10 Is 15 ]s is is 15 1s is 1s is IS 15 55 15 is 10 10 10 10 10 10 10 15 10 10 10 10 10 22-Nw23 130K-23 22-N-23 26DK-23lio 22-No 23 13-OK-23 22-Nw23 13-Dec-23 22-Nw-23 134)K-23 14Dec-23 05-1an24 14-Dec-23 26Am24 14Dec-23 061am24 14-Dec-23 U5.1an24 0114rF24 02-Feb24 06Jan-24 26An24 0&)an24 26dam24 0&An-24 26Jan-20 06Ar'24 26-1an24 08-Jan24 261am24 294rv24 16-Feb24 29-Jam-24 16Feb-24 29An24 16feb2A 29.An•24 16f9b24 2948n24 I6f4A24 29Arv24 16Feb-24 291arr24 16Feb24 14-Dea23 01-Mar-24 14DK-23 05-lam24 14Dec-23 05-Jan24 14Dec-23 284)ec-23 14Dec-23 28,Dec-23 14DK-23 28.DK-23 21-Dec23 05.1n24 084rf24 191arf24 08-Ar~24 19Jan24 06Jaie24 1SJa24 29An-24 16Feb-24 29-Jarv24 09-Feb24 291n24 09 Feb24 29Arf24 09Feb24 29-1m24 09Feb24 29An-Jan09Feb21 III folechamiral- Submfttal Package Elev4ta Subih'ttal, Padpge i i .. •. ANU-.Submittal Package :... ft —d!g-a S b!mlltal Package; Ge ata-5ihrtiltal Pacl¢ge '�Oil11?WYaklt%rywllls add Xhm 3UtJdtMit�-6dgYA8tMH ! ;Corile`i(N7$TerWati.9-W Oakcs-5)brt6tal lYdo&e i ......;..... � : � AAsaarY-$uhmBhlDadage : .... A PIk StMPdr?wirMs SWmMal PsclagC :00 WiripdWs/StaefkontiSbnittal Package: : Plluenbmg. Sul- Pa loge ��;R94Rrg:SAknbbl Paclage qg-i....-j....j...-...... .....:.....:....{..._.....�....ry....j.....j....j : ��Dodrs And Nadwere-Subrrittal Pac ' 9 �... :MRra Proticti9n-S6niRdl Piclage : Pre Pump- Submittal paclolge i brNwllAubmiltalhadage r6tutCo-SVbrni(tal PgcAa:e ....:...........................j.... ....... - ... .... j....:....j... Te ?Peclalitia-=t✓bnn�lai P �dgRe -i. -- .. Rdl-V Did.-.Mubriilhl Pac. ` la .,N: -Submittal Pa'cla#* 11110 kopring- Subnmal Package : .. f-I4i6 -$tbmittal7acgge A/E Revlew8Ap19tMe5uhmilb& i Elbctreal -A/E R&A M<:ranical:A/ERBte S SiikchgeanAyi A ............................. - ....&A..<. Generatp'A? R .... 10 ElNitp-AIE R&A $ite V✓ark(Drywelkand $[am #niltWes(-R/E R♦OA lulaie�nary -AliRA* i i i i i oil. Owdnw?ge• A'2 R&A: ' i ` CorKIKe(Po#Serelm(•A/EAM!--- Plurritift"AA R&A: - !11—V-Ol RBA D,PorsArrd NaM(wrc=A/5R&q j . F(re RLbectlm-q/E Q&A ....:....:....:....:.....:.......... ...............-....i ....G....:........:. M We P�mP:A/E li&A; ... 7� 73 74 7s n 7/ 70 91 82 ® a Y a9 a2 a6 % W 93 IN [m taa 1m tW t� to 'N""°"° IA°.I Lear a Eire" r18umr.n g;t♦ Aa°.INak t! Rn.r nxN Nee � OaiW lbrrwnkN NAe Miami Beach Fire Station #1 8.14.23 — MBFS1-1 DNaDi0il14Aog-2' Wn Desk 1&Alip23 Pp3d/3 IXLL9wAcdn ._.. AMFNnMFNT-ATrAC'.HUFNT �) 0 1 A.-Y Ounlbn earn Rniish Oct T Min i I!, OaW i toi -71 i Ausil �pOG I 1 11. 1 IM1. 1 r1 1 as I N I z 1 261 v 1 28 1 A4170 Rau, Approral - DayWre Mdulzir A40M KL- Ste-1, A4230 CAV P—it - Daycare Modular & Site A4250 Denni App—I - Daycare Modislar & Site A4090 Vendor, Modular Irstallabon 44100 Bukig Ir.Wn— A4110 KIL - Site Finishes "120 Site Iropecoaris A4130 Kl-Turrgwer Pro, — A4040 Da-ire Rel—tion Pmcurenient 22 42 21 22 42 3 17 I'D I 22 28o 01-14ov23 01-Dec-21 04-D-23 01-Feb 24 04-D-23 03-Jar,24 o4-)an-24 02-Feb-24 02-Feb-24 01-Apr-24 02-Apr-24 04-*-24 05-Apr-24 24API-24 30Apr-24 134L,y74 14-Ma,,,24 14-Ma04 14 ,�Iu,,' 4. � 2 state Ap proal Q."r M.6,"r KL-. Sit EW Gty Peernit i Dekarehilo&Aar & Site Dqn,iiA cproiel -.bym,e kilodular &i9te: lendor: Msidul.e Insta:Utli. In""I" KLISPte;R" *e YispecNas no',e, ft,�. . . . . . . mom : . �' R vaere OOCW� . . . . . . . . . . . f Suli.iofflod A-,d ELvjriciF Stub�.�d *—ij WM-dnanil:plkS"Il Award 4 - - —I — ... ........ WE 47 tienuilificii-a6coni aAward I" she Work (-Il$ Carsi—Wt Sjbwie 4 Aid 10 Ma44iW- isibcintrath ftard v-..w r412 Vill-s11/fit—jirritSulalontroctAln plsnbap-$iLtamx2 Award 4 ...... . . . : : i : iii;., : : N* D24 fln: liro�Aftoi&.aAlsiiud I ' T'e' alla; DriiiisslFiSutisisintrict Aivand Ib .......... 24— r.0 As" ..-T I T .......... r . . . . . Splialft�es- jiloitm� Award15 Roll(up liarp..p- SQboositrsc( Ajlsd Fl.&Iq: sul�oni .......... ;- . I I red Award q IN: Prepare Sit-rhal P". 35 Je 3) 40 Sudiconatral Ativaid w 01-N-23 261an-24 AID Fleamalk Subcont,ad Award 15 01-No,23 21 -N-11 A10 Mechanical -subcontract Award is 01 N-23 21-N-23 Alit Elevate- Suixontraa Award is 01 N-23 21444m,23 45 48 A101 D—olihon - kilcontract Award is 22-Ni-23 13-13-23 All Sne Work (wells Gontrai:tsirf Subconitiact Award Is 22-N-23 1343--23 Siulo�— Award All. Concrete(lost Tension is 22-Nw-23 13-D-23 A10, Pile- Subcpd,act Award is 22-N-23 134D-23 All, Masonry- SubCon4:raa Award is 22-14-23 13-D-23 So e, M AUN W,nDdws / Stonefrorn- Subcor,vaa Award 15 14-D-23 05-Jan-24 All plumbing -Subcontract Award is 14-Dec-23 05-Jan-24 AlOj Roofing- subcontraa Award 15 14-Dec-23 OS-1-24 AIO'. D=s And Hardware- kbconvaa Award 15 I�D-23 OS4— All Fire Protection, wbcordract Award 15 I4-Dec 23 OS-Jari 51 55 All. Drywall- Subcont,sa Award is ORI-24 264-24 AIL St. —Subcontract Award 15 OR-24 26-1-24 AlV Sp—libes Subcortma Award 08-bri-24 26-1-24 All( RolIkup Doon Subcointract Award 15 O&Jan-24 264a,24 All Lard—pe Stibconsra. Award is 08 lan-24 261-24 All! Flooring subcontract Award 15 011-lan-24 26Jan-24 A121 ACr/Geili S.IxorA— Award 15 08 lan-24 26Jan-24 PirepiareSubmi [Package 60 22-Noii,21 16feb-24 A1250 El --I S .fta]pa,kag, 15 22 N-23 13-D, 23 N 0 03 66 011110111111 1110000 Miami Beach Fire Station #1 8.14.23 MBFSI-1 11,18 11,11 IIAU9,23 Run Date 16-ALT23 Page 2 of 13 lq�-Layout colon, AMENUMLN I A I I AUMMLP41 z AdMry filai,­ AcWhir aViiuil 1&. 1 N.1 I . [ �.. j I N.� I b— — WIAwIIfiwlJurIj,I F�j III I — 1-` s 1'.1 is 3 A3580 ProjectlDurabor,NTP SCO (CO) C' -0 'CC ,rq� A3590 Prq�DuraboriNTIP-MO (CD) ot Duration F- , issaw C. sco Lubstamalcampkitus, la, rco F-1 Completion - FCO C. ra, om.,� F u. 'CO 5(39 539 0 469 1I.-M 077 N — n�� 17-J-24 07-N-25 o' o_ 17-Jur-24 07-Dec-25 n7.-75 _,5 16 Aug 22 -------------- 1 . . . . . . )rai'IOW: t Reii— .... . ........... I .......... .......... . .... -V*- 1 "ilej, Rej, I it ReNSIaA2 .... . ......... :90% Perilift Rlr� W 2 0! Peron sladed; : # EQ* R*as4 tar LaILLeWlterris j . . ................ ............... EM Csy(OsinisdMAWriviii oft N ReglMed I mp Noticie To Proceed (STP) Date Of Commie —inert: Voddlar likodirl; Proc 1.1 ................... ................. com-esion Awiiiiw =:DaVj'are 6 WO-Dit . . . . tia . , "re N"r T Prpje,,t Mile P[ojed Duriboi "I.W"Dw d .......... .... .... . 4 4 I 6 6 7 Prewn.Amiction A3630 �, Re,,ew/[)e)—,bI, A3820 Penrod Re,rew / Gtv Re —of 60% Dra,ings A3850 DERM / E—m errial Per— R— A38M 90PA Permit Drawings A3840 90% Permit D..ngs Review A3860 90% Permit Revision 1 A3870 901% Permit Re— R- 1 A38W 90% Permft RN.- 2 43&90 9D%PermftR.,ie.R-2 A3900 Permit Ismaed M160 Early Release far Long Lead Items A3910 GMP True UP A4150 Commence GMP True UP A3920 GMP Negolhatio, A3930 Gtv Gormssior, Appma] of GMP - If Required A35W Notice To P—d (NTPI A3S7 Date Of C—mercermerit Modular Building Protiuminelit A4070 Wrdor Fabr,cat,or, (Siadard Etch RooO A4290 Comm-orApproal-Daycare A4050 NTP-Daycare A4060 Contracts -Daycare A4140 Submittals - Daware Modular v 60 90 30 28 14 211 14 28 0 0 35 0 10 15 1 145 1 0 22 22 1&,22 A 77-S�22 A 16-Aug.22 A (I A 16-Aug- 47ec-22 A Dq_N�:: A 21 A 210-22 A 22-Dec-22 A 01*eb-23 A 02-Feb-23 A 21-Feh,23 A 22-Feb-2:A 31-Mar-23 A 03-Apr-2 A 20-Apr.23A 18)ul-23A 24-Aug-23 24-Avg-23 01 N-23 11W-24 26-Apr-24 11 Mar 24 29-Apr-24 10-M.�,24 13-Ma,,24 03-Jur,24 11-1-14 17-Ju,,24 17-J-24 1-14 I&Aug-22 A 10 Ma, 23 29-5w23' 29-Sep-23 02-Oa-23- 02-Oct-23 31-W-23 02-Oct-23 31-W-23 10 12 ,a 14 I is 1. 17 is 19 M 25 I 30 4, ACwI I. —I E— V--W U—q Axv.l veer Miami Beach Fire Station #18.14.23 MRF131-1 a Date 14-Aug-23 Data Run Date: lrAg-23 page I d 13 I KILL.youll Color, AMFNF)MFNT - ATTAC.HMFNT 2 0 AtllMlyI0 jfttlOtyl/ 6lpnal gal S" J.,jFbIMwIAWld�jJiu. 7 jiMaj, 1, 14 11 1 16 1 11 1 1. 1 19 1 . w 16C ElectrIcal Wire Pull] /Terminate VLTRM1D4 16C T—pForTeongirpectnon VLTRM104 16C Electrical System Start-up-VURIM104 5 2 5 26A�25 03-Jul-25 0 X045 02-Jul-25 07.JL4-25 14-1LA-25 11 al Wire I 1111.1c "I .1 Tomp F m stutlnspiscbop VLTRM To 0 Oectrical*stern Stan up-VL1. RMI 4A2: .... . .... .... . .... .......... NVAC QM tact W* V12 ■ 1j. SO& O?H P4h,.- LVL2 -------- - ---- ■ OW Flumb (5/141ilghwin-LA2 T* V411 h4"to/ Fufting IL ln�pecwrn I ElecW.all,11ghdn-tyL2 ■ ifVA1dCM,.AHU'SIrd2a1I-sVL2: LL ........... L 1 L 1 L L i N: Frarne Gailings/CeillngsGrid iLVLt. ElecW�g Rgh4n -IL U; Plua.,brg Wall Rgl�in -WL2: ........... ........... . . ..... ........... .... ; A Perimeter EII InklecOw- JA2: I HVA4 Ron lrRpecllcn ME :7 1 ?-roeteF W.A FnsMnng: -4 - 001 1 . . ■irig : Mein. rxal dwirWn - �Vu ■ SP* GegIng Rfi" - LIA2 ............... .41 Gel re Rgh,-6 - LVL2 E* Rglein InaLpecti 1: PIrInbinj RglNrr lrspecp- i:LVL{ Ii: Wall Frainirq Inspe'd. - viLi I mi.ct-lical ;.iling W."clill. - Lw ............... '4r; spar Ceiling Electncal Ceiling *Me*- LVL# Firristi. Ncl"-LVP ................ ......... . .... ..... .... 4N Stack upi- Wij ■ H.pgl)6—OC.Ilngs/.Inspect-� FlnishbrjvallW.Ils&Cdlinpi M 90C Layout F..,rg/MEPO/H -LVL2 3 30-May-25 03-Jun,25 155 HVACO/H Duct RgImn -LVL2 6 02-1-25 094-25 152 F- SpW 0111 Rgh4n - LVL2 7 024-25 10-J-25 901 Frame Walls-LVL2 8 02-J-25 11-J-25 16C El. OM Rgh- - LVI-2 7 04-J-25 12-1-25 15C PI—bujil OMRgin LVL2 7 04-J-25 12-J-25 72C Tilt Z11 h2liate / Furnng & IrtspectIon - LVL2 4 04-J-25 09-1-25 16C Perimeter E le c Wall Rgh- - LVL2 5 10-J-25 16-J-25 155 HVACOMAHU'sinstall-LVL2-2 6 10-jun,25 17-Jur,25 152 Fire Spldr Rghn Inspectim - LVI.2 2 -X-25 12-J-2S 904 RarneCelings/CeIlings Grid LVL2 a -kn,25 234-25 902 Hang Drywall Rippers/Inspect-LVL2 3 12-P-25 16-J-25 16C Elec Walt Rgl— - LVL2 a 1-1,A-25 244-25 15C Plumbing Mil R& in -LVL2 9 13-J-25 24-J-25 16C Perimeter Elec RgMn Inq—tion LVL2 2 17-Jur,25 19Jun,25 155 HVAC Ril IrrspectIon - LVI.2 2 184-2S 19-J-25 90C Perimeter Wall Framing Inspection - LVI.2 I L111121 10-J-21 23C M.cKanrc.l Ceiling Rgh- - LVL2 20-bun,25 30-jur-25 21C Fire SO*CkRgh-i. LVL2 1 201-21 30-1-21 16C Electrical Ceding Rgk,,n - LVI.2 7 23-k-25 01-4.1-25 16C Elec R,I I p-- - LVI.2 2 2---k-2S 26-J-25 15C Plumbing RgK,, (ndpectim - LVL2 2 25-J-15 26-Jun-25 901 Mll Framing Inspectim LVL2 2 27-Jum25 30-Jun-25 23C Mechanical aflhng Inspection-LVL2 2 01-Jul-25 02-J.1�25 21C Fir, SpIdr Ceiling Inspectim - LVL2 01-Jul-25 02-1ul-25 2 16C Electrical Ceiling 11 LVL2 2 02 Jul-25 03-Jul-25 905 Ceding Framing Inspection LVL2 2 07 Jul-25 08 Jul 25 303 As 307 316 3" 313 314 315 3% 317 311 311 321 72C Insulation/trspectim LVI-2 903 Hail �11 / Inspect � LVI-2 10 155 HVACStartup LVI.2 90E Hang Drywall Ceilings/Inspect-LVL2 933 Finish Drywall WalIs&CeNings-LVL2 3 1 , 7 8 09 Jul-25 14-lul-5 15 Jul-25 22-Jul-25 31-JUI-25 11-1LA-25 23"Iul-21 21-Jul-25 30-J.1-25 11-Aug-25 M1 I E— T—T Liu—, Miami Beach Fire Station #18.14.23 MBFSI-i Data Dft: 14-AL.9-23 Run Date 16-Aug-23 Page 9 of 13 1.01-LayoutCalm AMENDMENT -ATTACHMENT 2 Aanyo AeMty wm. onpnr se.n -2 " 9 10 1 1 1 6 a t9 20 21 N 26 28 EIX Daars/Trim-LVL2 5 12-Aug-25 18-Aug-25 p q I Do01s/Tnm -WI-2 '. 336 rc 99C Prime Paint 5 19 Aug-25 25-Aug-25 :... ..... : �;Prinle Palrc tVU -. .. 3n 93C Bathrxm We-LVL2 8 26-Au9-25 OS-Sep-25 Bitho'wn Tile-Liit2 1x 94C Casewnk-LVL2 d 26Ag-25 29-Aug-25 Ca� . ?bw?k-LVU ; YX ACTG.1 LVL2 7 2GAy-25 DFiep_ZS i i i . f AGTGrid L29141 i 96C Rooting -LVI2 8 26-Aug-25 OS-SeP25 ! f Fl600ng-LV12 34t 941 Cntntertcps-LVL2 5 02-Sep-25 08-Sep-25 ........................_...._ _ _ _ _....y-tert_L.... _ ]4x 16C Electrical Grid Fiztures-LVL2 8 0S-Sep-25 I&Sep-25 � flectnolGrMEKLuies- 23C Melva rical Grid Figtures-LVL2 8 05-Sep-25 165ep-11 :� MecllaniUl Grill FiMureS 991 Finish Paint - LVLZ 8 09-Sep-25 17-Sep25 i Flriisll PairL - 11�2 942 9ackspash-LVL2 5 09.Sep-25 15-Sep-25 i :.... : � j d jAaOl -LVl2 � "I %umhirg Fi#ores-Lull s 11-Sep-25 17-Sep-25 .. -. .... .... --: -.--•. :.---.-.: _ iVl.t' t6C Electrical Tnm-0ut-LVL2 8 16-SM25 25-Se1r25 i Eier§kal Trtrri4uE-L 4 951 AR Tiles -LVl2 s 17-Sep-25 23-Sep25 ■:ACTTIe.-LW; 155 NVAC Tnm-Out -LVL2 s 18-$ep-25 245eP25 : HVAY Tnjn-"-LW 3so 114 AppliaKes-LVI1 8 1&Sep•25 235eP2s : ■ AWliances-LM2: A..:........:........ Ice Morns-LVL2 3 zasep-25 x65ay25 ..................t - - t i t i i i i i i i - .IN! . hir(ors'lVl.a >•= IOC Div 10-LVL2 d 24-5ep-ZS 29-SM25 ; D6t10-ivL2 ab 157 Fire Spkk Trim -Out -LVL2 ; 24-Sep-75 265ep25 L: Frg50dt7rirn-0ui-L KLP KL P—*-ut - LVL2 7 30-Sep-25 08-Ott-25 i• K(R-h--IVL2 FOr Final 0eanirg-LVL2 7 099OG-25 17-Ott-25 :E kroldear, Lvd :`-'- - - ..-.�"•r.'•lipinv$10...... 357 095 Prime&Pain-Ub"210 3 04-An25 06)n25 t trait-L!bk#210 16C Elec Panels/Svnchgears-Ubkyg210 7 09-Jun-25 17-1un25 Elec 6anekJ Swichggars: LJtilti."210 16C Electrical Wire PJl/Termiivte-LJdlit#210 5 19-11-11 Z4-1-25 q -':Eledric4 Wit, PullI lerjnMjte -Lhllit 16C Temp For Testing ectl lmpm-LJARW210 2 265ep-2S 24SeP25 : f Temp For Testing. 16C Electrical System $tart-tq�Uliklyp210 5 3PSe 25 WOct-ZS - ---- - - - -...:.--.: : : : : : : : fltct i{al Syfemstart >Q i� Gereratcr Room 3m 301 E. Gen H/K Pads- EmGen 3 04-1un-25 %-1un25 :E Elh Gen H/K Pads - ErhGen 162 Em Genfietall EmGen 3 0l-u 25 11-1-21 L Fm GCnM$a11 ;EmGen 365 161 Elertrical Panels/Wire Thin-EmGen 5 12-J-25 18-Jur.25 0 EletOital Panels/Wire lirin:-EmGen'. Ma 162 Em Gen Start-up EmGen 5 19-Jun-25 25 J-25 : : : : '. : @:Em en5tart;up-fmGtn 36/ — uA 3 rA Riaghim l� 9IX LayWFramirg/MEPO/H-LVL3 3 Oa lum25 W-Iurv25 Laiput:Franiing /,MEV0Z/L-LVf3 Ito 155 HVAC O/H Dutt Rghin-LVL3 6 OS-lurrv25 12-Jum25 :� HVAC0/H Outt Agh*-LNL3 m 152 Flee Sp4r 01H Rgin h-LVL3 2 05-Jonas 13-1raF25 : i : : i i i �.-.. - - - ...�9re SjHr o/N Rghi(-lV(i-- T72 901 Frame Walk-LVL3 8 05 J-25 Sblun.25 - Frame Walk-LVL3 i Miami Beach Fir. Station #1 8.14.23 Data Date: 14-Aug-23 Mual Lml M Elron �� Bunn�rs' — Run Date". 16-Au¢23 Llllllll� Ae°r ureM MBF61-1 page 10 of 13 Wm°nie Vbh 1.10_L.PACis � Otid w.maniiq YbM AMFNnMFNT - A TTAC'HMFNT 7 0 AdIN1y AGivity Xing 0d4na1 9art Final tlurallm I Nov 3� W � n Ju Ortviv J -] 3 8 a 9 10 11 2 8 °n to I4 ID 4 a5 .r3 16C Elec O/H Rgl.in LV-3 7 09-K-25 17-J-25 - EIec OM ?BSin-LVL3 : 574 15C Plumbing OM Rgh-in LVL3 72C Tilt Wall Insulate / Furring &Inspection-LVL3 11iC PerimeterEkcwaN RgMn-LVL3 155 HVAC OM AHU's Install -LVL3 7 4 5 6 03A»25 17Juri 09-)u25 12-J-25 13-lur]5 141urv25 13-h-25 20-J-25 __ ....:.... :....:.....:..............._. .• :...c .........�. i ����: Plumbing O/H Rgh-ih-LV13 : '1 Tik Wallniulate/Fuiri &I rapectbn � r PermeteR EkiWall ReM,In-u..... 0 HVACOMAHu'simull:LVL3 375 37B m 152 Fire Spldr RgMn btspectlm-LVL3 1 16-Fn25 17-1un25 1 FireIdr AgMn kispectl>I-Liu 904 Frame Ceiling s-LVL3 Inspect-LV13 902 Hang Drywall Rippers/'.. 16C Elec Wall Rgh-in -LVU a 3 8 17-1um25 26-J-25 t7-A-25 MJ-25 1&Jurv15 27-1urv25 .i....i.....t....i..... �... �; FraRle Ctilir�A-LV}3 1 eS/Mpau1-LV33 Mar Drywall IV Ekc Wall RglnWn-1VL3:... I5C Plumbing Wall RgMn-LVL3 8 18-J-25 17-J-25 Pl-birq Wall Rgtin-WL3i 3a3 l6C Perimeter Elec RgMn lry:action-LVL3 155 HVAC RgMn kupectim-LVL3 2 2 20.1urv25 23-J-25 21-1-75 24-1-21 tl: Perimeter Ekc Rgh-ln,;, lm-ivd 1: HVAL RgMn IRSpe4tim=LVL$ ]B4 90C Perimeter Wall Framing Irlspecti0n -LVL3 16[ Electrical Ceiling Pgh-in-LVL3 23( Mechanical Ceiling R,i in-LVL3 21( Fire Spktr Ceiling Rgh-in-LVL3 2 7 7 7 244urv75 2541n25 251urv25 03-1uF25 254,rv25 03-Ju1-25 25-1urv25 03-Jul15 ..........................:.....!"-.. i...: :....i.... _ _ i i i i � L: Periinely Wall Frdmir* kepeclim-L ... - �--ENc[n<31 Gelling RgMh-LV13 •' + hkchamical Ceiling Rgh+n-�LVL3� 11 Rre 5pldr Ceding Rgh-ie-LVL3 Y! Ya 16C Elec Rgt.in Inspectim-LVL3 15C %umbirg RgMn lmpectim-LVL3 90C Wall framing lmpecnm-LVL3 2 2 2 30JUrv25 01-1ul-25 30-1urv25 01-1ul-25 02-1u1-25 03-1uF25 : •........C....; i i i 1 Ek# Rgti-m Inspect-;LVLJ 1 %unbira RgMn lirspeclipni LVL3 1 —71 W�tl Framing lrtµle ti0n-LV13 �. m 16C Electrical Ceiling lmpectim-LVL3 23C Mechanical Ceiling lmpectim-LVL3 21C Fire,Spldr Cedkg lmpecnm-LVL3 905 4ilirg Framing lrtspectim-LVL3 2 2 2 2 07-Jul-25 08-lul-25 07-Jul-25 08-Jul-25 07-JuW.5 08-JLL25 09-025 So-lullS . : :1 EFectriJ,al CSilirg;lmp(ctldi-LVI3 :1 NAMw.C.L Ceiling lnspectim-LVL3: '1 FIYe5p Jr CGNing�c -LVj3 :1 CeilingFramirg ksspa'etl0ri-unI 29, 094 3.6 155 HVAC Stan -up -LVL3 5 2S1un25 x-AAa ....._. _. _:. ' . H R H D7 398 SIDE Hang Drywall Ceilings/btspect-LVL3 72C mulatim/Inspectlm-LVL3 902 Harg Oryvall/lmpect-LV13 7 3 8 02-1u1-25-11-1uF25 ll Jul-25 15-Jul-25 1-Jul-25 25-Jul-25 i..__e....i 1tlbrywll Cellkgi/hyeetYL 6 yulaglm i mpleddi -L1j13 ■Ha O w%krWect�LVl� bee 903 RnisnOnWntlwatl:&caIngs-Lvu 80C Doors/Trim-LVL3 99C Prime Paint -LVL3 93C Bathr—Tile-LVL3 a 5 5 8 n-Jw-ss 3aiu1-25 31-JUF25 06-Aug-25 07-Aug-25 13-Aug-25 14-Aug-25 25-Aug 25 i i i i i i i Y Opus %Trinj-LVj3 Prime Paint -LVLL3 aatpr—r T4-043 402 40.I 4a 405 94C Gsewmk LV13 95C ACT Grid -LVL3 96C Floormg-LVL3 941 C rtert ys- LVt3 4 7 8 5 14-Aug-25 19-Aug-25 14 Aug-25 12-Aug-25 IbAull 2SAug-25 20Aug -25 26-Avg-25 ... ....:....:....� _ I C ►wrk:- Lva " ra&W�LVIf -• A :ROR4g=LVL3 �; Caugermpe LVL3 4p7 4a 409 16[ Electrical Grid Ratures-LVL3 23C Mechanical Grid Natures-LVL3 8 8 21 Aug-21 14-SeD25 25-Aug-25 04-Sep-25 10 El;ct11 1GM F.jtLrej-LV 11 MechanralGrid FMures- 410 "—" Miami Beach Fire Station #1 8.14.23 Data Data %Ausi Aea.l LrMIa Ev°n rl8unmr/ — Run DMa: 1&AW23 MBF81-11 Page 11 of 73 � Wrrannp VIbM 1.� Laput OOkra � Old Mmannp VbN AMENDMENT -ATTACHMENT 2 tl AGhey ID I AtlMly Ran Ounelan v .I.a m stop a -1 2 a 4 6 e p n u va u 1 is 1� 20 21 a 21 me 4" 991 Finish Paint LVL3 942 Backsplash-LVI3 15C plumbing Fed--LVL3 16C Electrical Trim-Out-LVl3 951 ACTTiles-LVL3 1S5 HVALInm-(M-LVLS 114 Appliances-LVL3 1U Mirrors-LVL3 1a Div 10 LVL3 157 Fire Spill TrimOut-LVL3 KIP KL Pui hb -lVL3 fCb Rnal Oeaning-LVL3 RIM T� 8 5 S 8 5 5 8 3 4 3 7 7 2(-Aug-25 OS-SW25 27-Aug-25 03-Sep-25 29-Aug-25 05-Sep25 04-Sep25 15-Sep-25 OSSep25 11-Sep25 uWf1625 u-51p25 08-Sep25 17-Sep�25 12-Sep25 16-Sep25 12-Sp17-Sep 12-Sep-2.5 16-Sep25 18-Se,25 26Sep25 29-SeP25 07-Od-25 ....:.....:....i.....L....i.....i....a....j....^..... r.... 4....r....i-.... ` ` ` ....1.....................a-...j.... .. _j.... i.... �....-....y............ : ....J.....1....j.....1....i....-i....y....j....j.....j....{.....j....j-....I....}....1-....j....j.... s I 1 1 ..........�..........._.. .......j....... -i.....:....: i ....i.....1....i.....:....:.....:.... ...:....:. i----:-- -- ....i..........1.....y....1..-..t....y....i....i.....j....i-.._i....;.....i-. I j ....1.....:....1.....y....i.....i.... �....j....;.....y....i.... I.... FMsh Pairt:LVl3 Ba;ckspl�sh-LVL3, Plumbing Fidrei-LIA3 '� tlectrk.lTrim-Out LVL} _: i........-.i... .....i--..-y....y....;....i.. ..... i...�..}....t ..i....i....i....iy.. ... Srim;Q0.; lVli Mlnars-LLL3 Piv 10-LJL3 g fire Spldr Trim-Dut- LVLA - ...1 r Filial Clearog-LG73' 'rV Electrical Rama 3121 g Primt&P9iH=EkcitM �....i.... j....:y....;.. i �:Eki Panels/4witchgeais-EkeRM- i Elpcmgl Wl.Pytl/Tamrihate=Ek Tempfim Testhghspec0dtt-ElecR 9lectr6l9ytem Yaray-EIet RM ......_id el Roden 310 .�lepc I ....-............:.............g._M/KF.a.d..t ...j....i : L Prlmk&Painr Meth RM ■ AMUE R"P I-11 j Medh RN r AMU System CnrerdY Meth RM ' AHU EIettriOl TK-kty -MeO RM .....j....j.... j....j....p....j....3. i - Uh�echanKa�Tie-e6-INech�RM� r ANU PIurnhing Tie-irsl-M6ch RiA '0 AMU 91i5si ":RM h Igt<11en/kung@ SeryNjes EQuipRxKi t - �Ekrvitawlall - pexajl theft BeimiPr:d Roo ileama I :OrltiRe0ew Elination51wft rtFr!d'/0aint?h#1 ..:..j... _j....j. _ ��ni 1 i-....y... -- --...j... j.... i.... 1... i 1Zai19tack5haft r cDllntep WelghtsJGilles : BURO GLK 412 413 ne na ^10 417 n8 11e 420 4a 4Z1 �^ 30C H/KPads -Eltt RM 312 3 09-lury25 11-Jun25AadIs:Elec;RM;12' 095 Prime&Palrt-EkcRM 3 12-1un25 16-1urv25 16C Elec Panels/Swixhgean Elm RM 7 17-An-25 2S.X -25 16C E[WncallMre PWI/Terminate-EIec RM 5 26AnZ5 02-Ju425 16C Temp For Testing lmpectim-Elec RM 2 0}Ar425 07-JU-25 16C Electrical System Startap-EItt RM 5 O8-Jul-25 14-JuF25 ^� ^� 4a axe tlp /KPad-MethRM310 3 12-1un25 16-lun-25 403 Prime&Pain-Meth RM 3 17-Jun25 19-Jun25 155 AHU Eg1eD III -Meth RM 7 20-kin75 364un25 LSS AMU System Controls - Mech RM 5 Ol-Jig-ZS OB-Juk25 165 AHU Electrcal Tee-inet s-Mh RM 5 Ol-Jul-2S OB-1uL25 235 AHU Mtthartical Tiedm-Mech RM 5 O1-Jul-2S 08-Jul-25 225 AHUplunbing Te4ns Mech RM 5 01-Jul-25 OR-JuL25 I55 MU S}4Start -up-Mech RM 5 041u1-25 151u125 ^+ ^� 43t3 434 ^� ^� Ln ^30 I39 A45 food Services Equipments install A311 I,I,RHrust Prams Ars•IRrnl Rrams A311 OTIS Review Elevabw Shaft A321 Punch/Point Shaft A32: Set Platforms A321 Rail Stack Shaft A32: Canter Weights Cables A32': Budd Cabs 10 5 2 3 2 15 10 15 31 Jul-25 13-Aug-25 13-MaQ5 14M.Q5 20-1,Aay25 214V y25 22-May,25 27-Wy'25 28-May.25 24May.25 34May.25 14Jun25 24Jun-25 03-Jul-25 07du1-25 25-Ju1-25 440 M1 ni ^^3 ^^^ ^03 N0 ^^7 ^^0 Rnvnaq L..el.I Eeo4 ♦ ♦ rAa.mn. AtlwlNbM Pnrainns VWM � UOI R.manep VWM Miami Beach Fire Station #1_8.14.23 MBFS1-1 ORLR Ode: 1st 23 - � 1Pega12"uq3 t Ru�A C� 1.1113 - J AMENDMENT -ATTACHMENT 2 ! AGhiry AOOA, Nana Qiglnd 4erf Fin4h WnNm OC r "� ! fe 11 13 tiv 17 15 tb t8 19 ID 21 22 N 16 MB A32, Final Wiring 5 28)u1-25 01-Aug 25 Final W'aing �` A32' Elevates Testings/Certification is 04Aug-25 22 Aug 25 �;Eievytur TeAirig5/(ertilkn" o 451 FltnlfoapeNon 15 20act45 o7-Nw45._.,.-...:....y....y..................... _..FrolM6aLNmi � A39a0 Fnal lnspernnns is 2DOd-25 07-N—Z5 i flNl k{ CII- 1 A3990 TCO 0 o7-N -25 Tm Miami Beach Fire Station #1 8.14.23 Dah Date: l4Aug-Aug AGual Level ar Eean �I Summery — R. Date: 16-Aug-23 MueI V1bM M BFS 1-1 Page 13 of 13 Wmeinina Nbnr � fieiul lirrvn°q Nbh i.IQ Low"cdwa AMENDMENT - ATTACHMENT 3 Project Data Project Name Miami Beach Firestation #1 Updated sm Location Gross Project Area (Square Feet) null 833, 6th Street, 33139 Miami Bea& 23136 w %it F-0 Vn r' NN -NN '[ 111 r TI-. , Gross AC Area (Square Feet) 31,100 Estimate Deliverable 90% IGMP Update Parking Garage Efficiency (SF/Space) 0 Date August 15th, 2023 Building Height (Stories) 0 Owner City of Miami Beach Gross Site Area (Acres) 0 Architect Wannemacher Jensen Architects Schedule Duration (Months) 181 Document Level Permit Set April 5th, 2023 Div Description Total Cost $ I GSF % / Total 1.1 GENERAL REQUIREMENTS $ 381,820 $ 12,28 1.67 % 2 SITEWORK $ 3,790,223 $ 121.87 16,58 % 3 CONCRETE $ 4,120,000 $ 132.48 18.02% 4 MASONRY $ 289,460 $ 9.31 1.27 % 5 METALS $ 494,815 $ 15.91 2.16% 6 wnnnS. PI ASTICS AND COMPOSITFS $ 501,754 S 16.13 2.19°% 7 THERMAL AND MOISTURE PROTECTION $ 523,397 $ 16.83 2.29% 8 DOORS AND WINDOWS $ 1,579,156 $ 50.78 6.91°% 9 FINISHES $ 1,134,822 $ 36.49 4.96°% 10 SPECIALTIES $ 250,770 $ 8.06 1.10 % 11 EQUIPMENT $ 326,099 $ 10.49 1.43% 12 FURNISHINGS $ 25,667 $ 0.83 0,11 % 13 SPECIAL CONSTRUCTION $ - $ - 0.00% 14 CONVEYING SYSTEMS $ 176,954 $ 5.69 0.77 % 15 MECHANICAL $ 1,652,046 $ 53.12 7.23% 16 ELECTRICAL $ 2,701,714 $ 86.87 11.82% SUBTOTAL $ 17,948,697 $ 577.13 78.50 % 1 GENERAL CONDITIONS $ 2.297,091 $ 73.86 10,05 % 50 INSURANCE, TAXES & BONDS Yes KLInsurance 1A5% $ 331,549 $ 14.33 1.45% Builder's Risk Insurance - Quote 0.00% $ 352,200 $ 15.22 1.54°% Excludes Builders Risk Insurance Deductible - By 0% $ - $ - 0, 00% Contractor's Payment and Performance Bond 0.95 % $ 217,222 $ 9.39 0.95 % Subcontractor Default Ins. (P&P Inc in above 5) 0.00% S - $ - 0.00% Excludes Owner's Contingency (NIC . Carried by 0.00% $ - $ - 0.00% Contractor's Construction Contingency 3.00% $ 538,461 $ 23.27 2.35% Escalation Allowance 0.00% $ 100,000 $ 4.32 0,44 % Excludes Permit Fees - By Owner 0.00% $ - $ - 0, 00°% SUBTOTAL $ 1,539,432 $ 66.54 6,73% Contractor Overhead and Profit (Div 1 thru 50) Reflects Jar'23 OH/P Yes $ 1,080,233 $ 46.69 4.72% Kaufman Lynn Construction AMENDMENT - ATTACHMENT Miami Beach Day Care - Allowance Estimate 08/15/2023 Item COST General Requirements 87,597 Modular Building 788,928 Sitework 156,550 Clear and Grub (13000 sf) Raise Site 24" (750 cy) 6" Sidewalk (200 If) Truck Parking Spot (200 sf) 6' x 6' x6" Condensor Pad 4" Sanitary Line 180 If 1" Water Line 240 If with Tap Fire Line 240 If with Tap, FDC, and DDCV Storm Line 200 If Parking Signs ( 6 ea) Landscaping & Irrigation 10,500 New Sod New Landscaping Relocate Irrigation Fencing 6,500 Provide Site Fence Playground Equipment 75,592 Provide "Cub" Playground Equipment Provide "Shady Days" Playground Equipment Provide Wood Fiber Mulch and Weed Barrier Provide Landscaping Tibers Site Furnishings 8,022 Provide Bike Rack (1 ea) Provide Cast Aluminum Bench(1 ea) Provide Trash Receptacle (lea) Provide Recycling Receptacle (lea) Foundations 47,250 70 ea 3" Pin Piles @ 30' Concrete 15,000 Pile Caps Grade Beams Metals 140,649 Provide Canopy, Walkways, and Roof Plumbing 10,000 Connect Sanitary under Trailers Connect Water Piping Under Trailers Fire Protection 5,000 Connect To New Fire Service HVAC 15,000 Pipe, Charge, and Start One 3T Mini -Split Electrical 67,500 Provide 600 Amp Service AMENDMENT - ATTACHMENT 3 Provide Two 3" power conduit (100' max) Power Trailers Provide Grounding For Trailers Provide one Light Pole Provide 2" Conduit for Tele/Data (100' Max) Provide Power For Mini Split Condensor Pathway Lights (2 ea) Signage 1,000 Trailer Signage 1,435,088 General Conditions Subcontractor Bonds KL Insurance Builders Risk Insurance: Final amount to be determined Cunirdctur's Peer Bums Owner's Contingency Contractor's Construction Contingecny 328,244 29,000 29,000 30,800 19,000 - 21,526 Subtotal 1,892,658 Contractor Overhead and Profit 104,096 Grand Total Allowance 1,996,754 Design Allowance inclusive of KL Mark-ups 100,000 Credit Deposit Payment Under Amendment #1 (325,000) Revised Grand Total Allowance 1,771,754 Kaufman Lynn Construction Apollo Mural - Allowance Estiamte City of Miami Beach Fire Station #1 AMENDMENT - ATTACHMENT 3 8/15/2023 ADDITIONAL SCOPE OF WORK / ALTERNATES ITEM NO. #1 Apollo Mural - Provide aluminum screen substrate for historical "artwork" S-101 & S-200 dated 5-30-2023 A = Add D = Deduct ADOIDEDUCT Description Qty Unit Unit Cost Cost A = Add NOA- engineering / shop drawing coordination 1 Isum $ 1,500.00 $ 1,500 A = Add Surveying / Layout 1 Isum $ 500.00 $ 500 A = Add "Components' aluminum screen panels 1583 sqft $ 75.00 $ 118,725 A = Add Brackets / Misc Connections 1 Isum Inc in $ Inc in $ A = Add Equipment / Scaffolding 1 Isum Inc in $ Inc in $ A = Add Installations 1 Isum Inc in $ Inc in $ A = Add Install Bimetallic Inserts for Steel / Aluminum Connection 225 each $ 20.00 $ 4,500 A = Add Increase Steel Reinforcing & embeds at existing structure 1583 sqft $ 7.50 $ 11,873 A = Add 2x8 Galvanized Steel columns 414 Inft $ 95.00 $ 39,330 A = Add Welded Base Plates at Column Connections 50 each $ 175.00 $ 8,750 A = Add Welded Transition Inserts 225 each $ 150.00 $ 33,750 A = Add 2x8 Galvanized Steel bracing 125 each $ 525.00 $ 65,625 A = Add Bolted Wall Plates Connection 125 each $ 125.00 $ 15,625 A = Add Paint Misc Steel Components 1583 sqft, $ 5.35 $ 8,469 A = Add Clean-up / Debris Removal 1 Isum $ 1,800.00 $ 1,800 A = Add Lighting & Electrical Allowance 1 Isum $ 20,000.00 $ 20,000 D = Deduct Aluminum Fins at West Elevation 1 Isum $ (21,690.00) $ (21,690) A = Add Provide Roof Top Anchors (for Davits) = 6 each 1 Isum $ 9,000.00 $ 9,000 Installation of the "Art Work" provided by the City is not included in $ NIC Total Cost $317,757 General Conditions 0.00% In Fire Station GCs General Rerequirement 0.00% In Fire Station GRs Date Generated 17-Aug-23 Subcontractors Bonds 1,38% $4,385.04 Approval Code Insurances 3.00% $10,639.14 Comments Fee 5.50% $18,488.24 See Project Contingenj 0.00% $0.00 Contractor's P&P Bond 0.95% $3,369.06 $ 354, 638 RL AMENDMENT - ATTACHMENT 4 Miami Beach Fire Station #1 Miami Beach SUMMARY OF GENERAL CONDITIONS 16.7 Month Duration Item Line Item Cost Category Total I. Management Personnel $2,002,982 A. Salaried Payroll $1,936,337 B. Scheduling $66,645 C. Vehicles $0 D. Parking/MileagefTravel $0 II. Field Office Set-up and Maintenance III. Administrative, Communications & IT A. Job Site Phone/Radios B. Software Licensing & Connectivity C. Job Site Office Supplies D. Job Site Office Equipment E. Postage & Shipping F. Drawing Reproduction G. Fuel H. Project Photography IV. Survey/Field Engineering A. Field Engineering Staff B. Survey Equipment and Materials C. Professional Engineering Services V. Field Operations Support A. Field Labor/Carpenter B. Storage & Warehouse C. Contractor Equipment D. Hoisting E. Tools & Hardware F. Temporary Protection G. Jobsite Cleanup / Final Cleaning H. Misc. Ops Support VI. Jobsite Conditions A. Site Security (Guard Service) B. Temporary Roads, Laydown C. Temporary Toilets D. Project Signs E. Misc. Site Support VII. Project Safety A. Safety Inspect/Maint. B. Safety Equipment & Supplies C. Ladders, Barricades and Safety Rails VIII. Energy/ Environmental Controls A. Temporary Utilities B. Temporary Heating and Cooling C. Temporary Enclosures/Partitions D. Temporary Fire Protection IX. Consulting Services $105,356 $4,592 $6,329 $9,164 $19,993 $833 $5, 980 $0 $u $0 $0 $105,356 $46,891 $0 $108,805 $5,000 $28,058 $0 $0 $0 X. Miscellaneous General Conditions $0 A. Punch Crew B. Record Retention TOTAL GENERAL CONDITIONS $2,297,091 SUMMARY OF GENERAL REQUIREMENTS AMENDMENT - ATTACHMENT 4 Miami Beach Fire Station #1 Miami Beach 16.7 Month Duration Item Line Item Cost Category Total I. Management Personnel $0 A. Salaried Payroll B. Scheduling C. Vehicles D. Parking/Mileage/Travel II. Field Office Set-up and Maintenance $0 III. Administrative, Communications & IT S5 416 A. Job Site Phone/Radios $0 B. Computer Equipment $0 C. Job Site Office Supplies $J D. Job Site Office Equipment $0 E. Postage & Shipping $0 IL416 F. Drawing Reproduction $0 G. Fuel $0 H. Project Photography IV. Survey/Field Engineering S35 000 A. Field Engineering Staff B. Survey Equipment and Materials C. Professional Engineering Services $35.0'70 V. Field Operations Support 5184 978 A. Field Labor $0 B. On Site Storage $4,165 C. Contractor Equipment $() D. Hoisting $0 E. Tools & Hardware $8,331 F. Temporary Protection (Vibration Monitoring Allowance) $100,00q; G. Trash Chute / Trash Hauling $72,441112 H. Misc. Ops Support VI. Jobsite Conditions $29,733 A. Site Security (Fence) B. Temporary Roads, Laydown C. Temporary Toilets $10,58 D. Project Signs $0 E. Misc. Site Support $0 VII. Project Safety S25 A. Safety Inspector (3rd Party) B. Safety Equipment & Supplies $0 C. Ladders, Barricades and Safety Rails $0 D. Trench Safety Act $25 Vlll. Energy/ Environmental Controls $54,787 A. Temporary Utilities $5 B. Temporary Heating and Cooling $0 C. Temporary Enclosures/Partitions $0 D. Temporary Fire Protection $755 IX. Consulting Services $71,883 X. Miscellaneous General Conditions $0 A. Punch Crew B. Record Retention TOTAL GENERAL REQUIREMENTS $381,820 Ra AMENDMENT - ATTACHMENT 4 Miami Beach Fire Station #1 Daycare & FS1 Early Release Miami Beach SUMMARY OF GENERAL CONDITIONS 9 Month Duration Item Line Item Cost Category Total I. Management Personnel $228,747 A. Salaried Payroll $201,726 B. Scheduling $27,021 C. Vehicles $0 D. Parking/Mileage/Travel $0 II. Field Office Set-up and Maintenance 68 $28,868 III. Administrative, Communications & IT $12,986 A. Job Site Phone/Radios 2 B. Software Licensing & Connectivity $0 C. Job Site Office Supplies $4,954 D. Job Site Office Equipment $1,000 E. Postage & Shippinq $450 F. Drawing Reproduction $3,980 G. Fuel $0 H. Project Photography $0 IV. Survey/Field Engineering $0 A. Field Engineering Staff $% B. Survey Equipment and Materials $0 C. Professional Engineering Services $0 V. Field Operations Support S24,1140 A. Field Labor/Carpenter $19.840 B. Storage & Warehouse $0 C. Contractor Equipment $0 D. Hoisting $0 E. Tools & Hardware $0 F. Temporary Protection $0 G. Jobsite Cleanup / Final Cleaning $4,200 H. Misc. Ops Support $0 VI. Jobsite Conditions S2 500 A. Site Security (Guard Service) $0 B. Temporary Roads, Laydown $0 C. Temporary Toilets $0 D. Project Signs $2,500 E. Misc. Site Support $0 VII. Project Safety S15 086 A. Safety Inspect/Maint. $13,060 B. Safety Equipment & Supplies $2,026 C. Ladders, Barricades and Safety Rails $0 D. Trench Safety Act $25 Vill. Energy/ Environmental Controls SO A. Temporary Utilities $0 B. Temporary Heating and Cooling $0 C. Temporary Enclosures/Partitions $0 D. Temporary Fire Protection $0 IX. Consulting Services $16,018 S16 018 X. Miscellaneous General Conditions $0 S0 A. Punch Crew B. Record Retention TOTAL GENERAL CONDITIONS $328,244 AMENDMENT - ATTACHMENT 4 Miami Beach Fire Station #1 Daycare & FS1 Early Release Miami Beach SUMMARY OF GENERAL REQUIREMENT; 9 Month Duration Item Line Item Cost Category Total I. Management Personnel $0 A. Salaried Payroll B. Scheduling C. Vehicles D. Parking/Mileage/Travel II. Field Office Set-up and Maintenance III. Administrative, Communications & IT A. Job Site Phone/Radios B. Computer Equipment C. Job Site Office Supplies D. Job Site Office Equipment E. Postage & Shipping F. Drawing Reproduction G. Fuel H. Project Photography IV. Survey/Field Engineering A. Field Engineering Staff B. Survey Equipment and Materials C. Professional Engineering Services V. Field Operations Support A. Field Labor B. On Site Storage C. Contractor Equipment D. Hoisting E. Tools & Hardware F. Temporary Protection (Vibration Monitoring) G. Trash Hauling H. Misc. Ops Support VI. Jobsite Conditions A. Site Security (Fence) B. Temporary Roads, Laydown C. Temporary Toilets D. Project Signs E. Misc. Site Support VII. Project Safety A. Safety Inspector (3rd Party) B. Safety Equipment & Supplies C. Ladders, Barricades and Safety Rails Vill. Energy/ Environmental Controls A. Temporary Utilities B. Temporary Heating and Cooling C. Temporary Enclosures/Partitions D. Temporary Fire Protection IX. Consulting Services $+_i 2, 252 $0 $0 $4,503 $0 k- $9,8.70 $0 $14,040 $v $3,152 $0 $o $0 $0 $3, 076 $35,000 $16,625 S171,g2 SO S1 5 703 so X. Miscellaneous General Conditions $0 s0 A. Punch Crew B. Record Retention TOTAL GENERAL REQUIREMENTS $87,597 AMENDMENT - ATTACHMENT 5 Project: Miami Beach Fire Station #1 Update Location 833 6th Street, 33139, Miami Beach Date: 8/15/2023 LIST OF PROPOSED SUBCONTRACTORS AND VENDORS SCOPE OF WORK TITLE COMPANY NAME* 01 - GCs / GRs General Conditions KL Estimate General Requirements KL Estimate 02 - Sitework Demolition DEMCON Group Drainage Wells Jaffer Well Drilling Earthwork EMS Site Devlopment Surveying Right o Way Consultants Paving/Surfacing/Curbs/Sidewalks EMS Site Devlopment Pavement Specialties, Markings, Site Signage Pavement Marking & Signs Piling /Caissons/ Deep Foundations Keller Site Utilities EMS Site Devlopment Brick Pdvers Peiie'-i Pdvera Irrigation Arazoza Brothers Fence & Gates Fence Masters Plantings / Irrigation /Exterior Improvements - 32 Arazoza Brothers Site Furnishing White Cap 03 - Concrete Cast in Place Concrete - Building Titan Structural 04 - Masonry Masonry/CMU Titan Structural Veneer/Stone Masonry Liberty Casting Stone 05 - Metals Metal Fabrications/Pipe/Tube Railings East Coast Metals 06 - Carpentry Rough Carpentry/Wood Framing KL Estimate Finish Carpentry/Millwork/Trim Advanced Woodworking 07 - Thermal and Moisture F Dampproofing/Waterproofing General Caulking Thermal Insulation Southern Foam Insulation Roofing /Flashing/Roof Specialties Wolverine Roofing Fireproofing/Firestopping Tropic Fire Protection 08 - Doors and windows Joint Sealants/Expansion Control Doors/Frames/Hardware KL QTY Survey Dash Door & Glass OH Coiling/Sectional Doors Coast To Coast Door Storefronts/Curtainwall/Entrances Dash Door & Glass Architectural Louvers & Vents R.D. Souza Cement Plastering/Stucco R.D. Souza 09 - Finishes Gypsum Board Assemblies Atlantic Interior Contracting Acoustic Wall & Ceiling Panels Atlantic Interior Contracting Flooring Package TSI Commercial Finished Concrete Floors Bay to Bay Specialty Flooring - Wood/Epoxy/Athletic Bay to Bay Painting/Wallcovering Lenny's Cleaning, Painting, WP 10 -Specialities Signage[Visual Display Allowance Specialties/Toilet Partitions/Toilet Accessories SDI - Mardale Fire Protection Specialties Pye Barker Lockers GearGrid Wire Shelving Eagle Group Flagpoles US Flag Vehicle/Parking Control Equipment Parking control equipment Excludes Relocate Public Parking Provisions - Note #5 (NI Allowance Food Service Equipment AMENDMENT - ATTACHMENT 5 Food service equipment Lace Food Service Hoods and ventilation Hood Depot Appliances WS-1 -Washer GE #GFW850SSN/SPN GE WE Washer / Extractor DOMUS #DLU-60 TOUCH II DOMUS DR Dryer GE #GFD65GSSN/GSPN GE Delivery / Uncrating / Clean-up KL Estimate Athletic Equipment KL Estimate Fleet Equipment Window Treatment James Blinds 14 - Elevator Elevators/Escalators/Lifts Schindler 15 - Mechanical Fire Supression - 21 Arfran Inc Plumbing - 22 DAB Mechanical Heating Ventilating and Air Conditioning - 23 AA Advanced Air 16 - Electrical Electrical - 26 Pomeroy Electric `List of proposed Subcontractors and Vendors carried in our Estimate shall remain confidential as it has the potential of prejudicing later negotiations. AMENDMENT - ATTACHMENT 5 Project: Miami Beach Fire Station #1 Update: Day Care Allowance Location 833 6th Street, 33139, Miami Beach Date: 8/1S/2023 LIST OF PROPOSED SUBCONTRACTORS AND VENDORS SCOPE OF WORK TITLE "-AsTitt cr►o COMPANY NAME* 01 - GCs / GRs General Conditions KL General Requirements KL 02 - Sitework Sitework Allowance Landscaping & Irrigation Allowance Fencing Allowance Site Furnishings Rep Services 03 - Concrete Foundations Allowance Concrete Allowance 05 - Metals Provide Canopy, Walkways, and Roof Advaced Modular 10 - speuieiiies Sigr"dge Aliuwa(IU2 13 - Special Construction Modular Building Advanced Modular Playground Equipment Rep services 15 - Mechanical Plumbing (Connection to Modular Building) Allowance HVAC Allowance Fire Protection Allowance 16 - Electrical Electrical Allowance *List of proposed Subcontractors and Vendors carried in our Estiamte shall remain confidential as it has the potential of prejudicing pending negotiations. AMENDMENT - ATTACHMENT 5 Project: Miami Beach Fire Station #1 : Mural Substrate Allowance Location 833 6th Street, 33139, Miami Beach Im Date: 8/15/2023 KAt FN:1N LYNN LIST OF PROPOSED SUBCONTRACTORS AND VENDORS oNSTat r ri+�� SCOPE OF WORK TITLE COMPANY NAME* 01 - GCs / GRs General Conditions In Fire Station General Requirements In Fire Station 03 - Concrete Supplemental reinforcing of Fire Station structure Allowance 05 - Metals Mural Substrate Allowance Hoisting davits at Roof Allowance 16 - Electrical Lighting and Electrical Allowance *List of proposed Subcontractors and Vendors carried in our Estiamte shall remain confidential as it has the potential of prejudicing pending negotiations. AMENDMENT - ATTACHMENT 6 RL 3185 South Congress Avenue Delray Beach, FL 33445 0 561.361.67001 f 561.361.6979 KAUFMAN LYrN www.kaufmanlynn.com CO NST R UCTI O'N MIAMI BEACH FIRESTATION #1 Permit Set Construction Document Estimate July 21st, 2023 DIVISION 01- GENERAL ITEMS: This scope is intended to expand and/or clarify plan interpretation in instances where the plans are in conflict or silent. Should the plans conflict with other contract documents, this proposal is based on the plans being the default. The following descriptions provide further Clarification to the Permit Set Construction Document Estimate and take precedence over all Contract Documents. 1. The following insurance requirements are included as part of this estimate: a. Builder's risk insurance is included as required b. Payment and Performance Bond is included as required. c. General Liability insurance is included as required. 2. The following Contingencies are included as part of this estimate: a. 2% Permit Allowance (For sub -permits) b. 3% Owner's Contingency c. 3% Construction's Contingency 3. Standard work hours are anticipated during normal business days (7:00 AM to 5:00 PM) including Saturdays if required. Off -Hour work will be identified in the final Estimate related to any activities that require a second or night shift. 4. Pricing is based on current market conditions. No escalation has been accounted for. This proposal is valid for 60 days. Beyond that Kaufman Lynn will need to perform a GMP "true -up" for any trades not under contract. Since it is anticipated that the Work will not be released until the Spring or Summer of 2024, KL recommends that the City include an escalation allowance in their budget to account for future escalation. 5. Temporary or 'Construction Power' will be the responsibility of KL in its entirety. Once the permanent meter(s) have been installed by FPL, Owner becomes responsible for power. 6. Plan/Drawing Revit Model and CAD Files shall be provided by the Owner as required for use by KL subcontractors in their preparation of Shop Drawings for the project. 7. This proposal is based Attachment #1 Drawing and Specification logs 8. The following Items are Excluded or Considered "By Owner": a. Master Building Permit fees, Occupancy Permit fees, Impact fees, Connection fees and Assessments. b. Cost of utility usage and services to the site after meter installation. c. Owner Direct Purchase (ODP) administration and tax savings, all sales tax is included. d. FPL transformers, Primary Conduits and wire, and Deposits. e. All work relating to the relocation of existing FPL vault (To be demolished) temporarily to service apartments to the North of the project site. KL can assist with coordination but is AMENDMENT - ATTACHMENT 6 carrying no value in the Permit Set estimate for the temporary relocation or reconnection within the new Vault of any utility. This estimate does include the value for the new feeder conduits (Supplied by FPL) run encased in concrete from the existing hand -hole to the new Vault location (E-602).. f. Thermal break or insulation of elevated decks from conditioned spaces to non - conditioned spaces (i.e. Ground floor parking to 2nd Floor Offices, Apparatus Bay to 3rd Floor dormitories). This is assumed to have been considered by the Designer and included with the thickness of the slab. g. Fire Alarm Monitoring Service Cost. h. Permanent Water Meters, Fees, and Deposits. i. Cost relating to Radon Mitigation. j. Provisions for Owner/Architect offices. k. Advanced Commissioning and/or special testing engineer services. Included in this Permit Set Estimate is normal commissioning requirements outlined on the contract drawings for Mechanical and Electrical (i.e. Start-up, Lighting Controls, etc.) I. As -Built survey, vibration damage to adjacent properties because of construction. Site monitoring for auger cast pile operation is included as an allowance of $30,000. m. Removal, relocations, and main line installations to building(s) point, including fiber optics, natural gas (including meter), phone, cable, etc. These shall be provided by the appropriate service provider. n. Mock-ups rooms/units/structure not incorporated into the finish product. o. FF&E is included as per Equipment Schedules indicated on the "Enlarged Floor Plans". Allowance of $300,000 is carried by the for Owner supplied furniture. This value is not included in the Estimate. p. Material Testing Cost, Threshold and/or Special Inspectors and Inspection/Sequencing Costs. q. Removal, disposal, remediation, and premiums associated with unforeseen or unsuitable soil conditions, hazardous materials, or other materials requiring a controlled removal/disposal. r. Any special labor rates that may be required by project location, funding, municipality governance, etc. such as Davis Bacon Act. s. All art and artwork, including artwork. t. Video Surveillance AMENDMENT - ATTACHMENT 6 CONTRACTOR LABOR RATES: LABOR RATE EXHIBIT Miami Beach FS #1 Labor Rates to Dec. 2023 Kaufman Lynn Stated Rates POSITION RATE Project Executive $ 213.68 Project Manager $ 173.26 Superintendent $ 175.88 Asst. Project Manager* $ 127.53 Asst. Superintendent* $ 127.53 Project Engineer $ 90.40 Accountant $ 95.83 This document supersedes the Contract Agreement and is considered a part of the General Conditions Cost Breakdown. The above stated rates are part of this agreement and shall be used for Change Order invoicing, and time related changes. No annual increases on Kaufman Lynn Personnel through December of 2023. AMENDMENT - ATTACHMENT 6 ALLOWANCES 1. The Alternates listed in the Key Notes on A-101: a. Alt — 5" SOG is not included. The Structural plan include 10" structural slab on grade for the Covered Parking Area. b. Alt — Fire protection and lighting. These items are shown on the fire protection and electrical plans. Therefore, these values are included in the Base Bid. c. Alt - Chain Link Fence is included in the Base Bid. 2. Addendum #1 dated 6-30-23 is not included in the Estimate. ALLOWNACES 1. Augercast installation — Monitoring $30,000 2. Existing Tree Relocations $265,000 3. Exterior Signage: "Granite LEED" Sign $15,000 4. Interior Vinyl Logo $10,000 5. Exterior Signage: Stainless Steel Historical Plaque $20,000 6. Exterior Digital Display Unit $25,000 7. Relocation Public Parking Provision $20,000 DIVISION 02 - SITE WORK 1. There is no work included outside of the designate property area other than work associated with existing service tie-ins. This includes MOT associated with existing services. 2. The existing site below surface materials are assumed to be suitable and ready for new work. There are no provisions for unforeseen conditions or unsuitable materials. 3. There is no work included for modifications or alterations to existing civil services for storm drainage, domestic water and sanitary. 4. The Permit Set Estimate includes the four (S each) deep wells as located on C-105. The depth of the 24" diameter wells is one hundred (100 If) lineal feet. Additional depth greater than 100 If will added to the project cost. 5. The Brick Pavers shown on C-103 are included in the Permit Set Estimate. The pavers are set in compacted sand. There is no mud set or concrete subbase. 6. There are no street or parking area modifications included other than what is shown on C-107, C- 108 & C-109. 7. The Permit Set Estimate does not include modifications to the existing street signalization. 8. The Permit Set Estimate does not include any asbestos abatement or mold removal. If discovered this material must be tested and removed immediately. The owner will be notified immediately if this occurs during construction. There are no provisions in the proposal to remove or abate these items. 9. The augered-cast pilings are included in accordance a with the Geotechnical recommendations by Terracon dated 7-10-21. AMENDMENT - ATTACHMENT 6 10. The existing concrete canopy shown on AD-100 will be removed. The Permit Set Estimate includes a new concrete canopy to replicate the existing structure. 11. The existing "metered parking" and equipment will be removed by the City. This work is not included in the Permit Set Estimate. 12. The Permit Set Estimate includes "Root Pruning" for existing trees indicated on LD-101. This work is required for tree/ root protection which is impacted by new sitework such as building foundations, concrete paving and new under utilities. There are trees which are excessively impacted by the amount of root pruning and canopy thinning. The mature trees may not survive the new proposed sitework and building foundations. 13. Tree to be "relocated" as shown on the Tree Disposition Plan "LD-101 are included in the Permit Set Estimate. An Allowance for $265,000 is included. The maintenance of the relocated tree off - site is not included in the Permit Set Estimate. DIVISION 03 — CONCRETE 1. Alternate for S" slab on grade is not included. 10" structural SOG is included as shown on S2.10. DIVISION 04 — MASONRY 1. The ground face veneer see item #Al2 on Building Elevations (see A-300 & A-301) is included. The outside corners are premanufactured outside corner units instead of field mitered corners. DIVISION 05 — METALS DIVISION 06 — MILLWORK 1. The plastic Laminate casework includes the interior elevations (A-400 thru A-419) and millwork sections A-421. 2. The Kitchen Casework is included in the Food Service Equipment. 3. Watch Office locks: Allowance $15 each. 4. Dorms Locks: allowance $25 each and lock type based on location. Number plates not included. S. Officer Suite and ADA Officer Suite: Lock allowance $2S each. 6. Wardrobe lift (3 per dorm) included for ADA Dorm 319 & ADA Officer Suite 329A. 7. Pantry cabinets will be 48" wide (4' ILO 4'- 2-3/8"). DIVISION 07-THERMAL AND MOISTURE 1. Waterproofing and Joints Sealants for various existing exterior opening / components are included. DIVISION 08 - DOORS & WINDOWS 1. The exterior glazing is 1-5/16" insulated / laminated clear glass with "Low-E" Coating. 2. The exterior aluminum vertical fins shown on the East & West Elevation) see A-300 7 A-301 are not a part of the window system. These are included in the Permit Set Estimate as ACP (aluminum composite panels) features. AMENDMENT - ATTACHMENT 6 DIVISION 09 — FINISHES EXTERIOR FINISHES 1. The exterior" Split faced CMU" Walls do not include sealer. INTERIOR FINISHES 1. The Interior Wall Assemblies are included as indicated on Levels 1,2, &3 (see A-115 thru A-117) and Wall Types shown on A-800 thru A-804. 2. Interior Ceiling Finishes are included as per Reflected Ceiling Plans (A200 thru A203) 3. The Interior Finishes (Floors & Walls) are included as indicated on ID-101 thru ID-103. 4. Minor Floor Prep is included. The is no "floor leveling" included in the 90% CD Permit Set Estimate. 5. Wall protection showed on Sheet G-112 not included. 6. ID-101, Note 8 says to provide corner guards at Gypsum Board Corner locations but they aren't shown on plans and therefore excluded from price. 7. 1-1/2" Hunter XCI board in lieu of Thermax. 8. Denshield at walls to receive tile included. 9. No Integral Stucco included. Project will have regular stucco, painted. 10. Sheet ID-101, Tag PT-6 EPDXY PAINT not included (not founded on plans)- by Beatriz. 11. Tag CB-1 Clear Sealed Concrete at Storages 105 & 106 & Ramps is excluded. 12. Mats Inc. Grate Mats will be Tx 9'. 13. Painting: Warranty 1year from substantial completion, Sherwin Williams warranty 1 year. DIVISION 10 —SPECIALTIES 1. The interior signage is included for room identification only. 2. The exterior building signage is included as an indicated on exterior building elevations and A-837. 3. The interior "Miami Beach Fire Department" insignia shown on the elevation #7 / A417 is included as an allowance. DIVISION 11 —EQUIPMENT —Commercial Kitchen DIVSION 12 — FURNISHING 1. The Contractor does not include any Artwork and/or Artwork allowance. 2. Office Furniture / Fixtures are not included by the Contractor. 3. The gym / training equipment indicated on the floor plan A-414 ins not included in the Permit Set Estimate. DIVISION 14 — CONVEYANCE 1. The elevator included in the Permit Set Estimate is based on Schindler #3300 MRL / 3500 lb capacity / 150 fpm with three stops. The interior finishes included the manufacturer's standard cab finishes with heavy duty rubber flooring. AMENDMENT - ATTACHMENT 6 DIVISION 15 — MECHANICAL Fire Protection 1. There are no modifications to existing water pressure or fire pump requirements. 2. There IS no "galvanized" steel sprinkler pipe in exposed areas. Plumbing The "Trench Drain" detail shown on P-501 is not included in the Plumbing Scope of Work. This structure is included in the Civil Package. HVAC DIVISION 16 — ELECTRICAL The Estimate includes empty underground conduit from the Southwest corner of the property to the 2" Floor Traffic Signal Box. There is no signalization modifications or new traffic signals included. END OF OUTLINE CLARIFICATIONS AMENDMENT - ATTACHMENT 6 RL 3185 South Congress Avenue Delray Beach, FL 33445 0 561.361.67001 f 561.361.6979 KAUFMAN LYNN www.kaufmanlynn corn CONSTRUCTION ;. n2i7a2 MIAMI BEACH FIRESTATION #1 DAYCARE ALLOWANCE - BASIS OF ESTIMATE August 15th, 2023 BASIS OF DESIGN The Daycare Allowance is based on Chisholm Architects Fire Station #1 / Daycare Relocation Permit drawings dated June 9, 2023 (June 19, 2023 and June 21, 2023 print date); July 26, 2023 Project Narrative; and, the following qualifications and assumptions. QUALIFIATIONS AND ASSUMPTIONS: Due to the Programmatic -level of information contained in the above referenced documents, the Daycare portion of the Fire Station project was included as an Allowance. With this understanding, we offer the following supplemental qualifications and assumptions to the Miami Beach Firestation #1 project to help guide the reconciliation of allowance included in the Daycare Estimate. 1. Time is of the essence. Fire Station #1 project schedule (which includes the Day Care) is based on the following NTP dates: a. NTP#1 September 1", 2023: City of Miami Beach shall release modular building for fabrication based on approved shop drawings ahead of State approval. b. NTP#2 October 2"1, 2023: City of Miami Beach shall release Contractor for subcontracting and procurement. It is the intent of our Agreement that Contractor, City of Miami Beach, and Design Team shall collaborate in development of complete State Permit Documents by October 2nd, 2023 that reconciles budget allowances provided in attached Miami Beach Daycare — Allowance Estimate dated August 15, 2023. c. NTP43 December 4th, 2023: City of Miami Beach shall release Contractor to commence sitework with ability to obtain all required inspections. This will require an early release permit package for sitework (exclusive of Day Care modular building installation). It is understood that the Fire Station Construction Schedule is predicated on relocating the existing daycare to the proposed Flamingo Park site by May 14, 2024. Accordingly, all required permits for the Daycare modular building installation must be approved before January 3, 2024 for work to be complete in time to avoid schedule impact and potential exposure to claim for delay on the Fire Station project. 2. We have assumed import of 750cy to raise site in address of Project Narrative 6.a. 3. We have assumed the existing site has a minimum of 2500 psf soil bearing capacity. 4. We have included PVC skirting under trailer in lieu of aluminum requested in Project Narrative 5.m. AMENDMENT - ATTACHMENT 6 S. We assume plastic laminate furniture satisfies request for changing table (Project Narrative Building 2 and 3). 6. We have included 20 empty j-boxes stubbed through the floor for future Low -Voltage. City of Miami / Consultants shall notate on modular building shop drawings the desired location and special mounting heights (i.e. TV) for incorporation into Subcontractor's sub -Permit Drawings. Wiring, trim, and devices are assumed by others. 7. We exclude appliances. 8. We exclude lockers. 9. We exclude all permitting costs associated with this work as they are not known at this time. END OF DAY CARE QUALIFICATIONS www.kaufmanlynn.com cGc oz�zaz AMENDMENT - ATTACHMENT 6 3185 South Congress Avenue Delray Beach, FL 33445 RL 0 561.361.67001 f 561,361.6979 KAUFMAN LYNN www.kaufman(ynn corn CONSTRUCTION cc;c021732 MIAMI BEACH FIRE STATION #1 MURAL SUBSTRATE ALLOWANCE - BASIS OF ESTIMATE August 15th 2023 BASIS OF DESIGN The Miami Beach Fire Station #1 - Mural Substrate Allowance is based on Bliss & Nyitray Apollo Mural S-200 drawing and Structural Notes S-101 with Revision date of May 20', 2023 titled Permit Set; Anticipated Design Narrative for Apollo Mural dated February 171h, 2023; and as further qualified below. QUALIFIATIONS AND ASSUMPTIONS: 1. The workscope of this Allowance includes mural substrate (perforated screen panel); subframing for mural panel substrate; means of attachment to Structure; and, associated delegated Engineering. The design criteria of the Apollo mural (assumed applied load of the art onto perforated panel) to be provided by others. 2. We exclude the Apollo Artwork itself (understood to be in storage); the design/Engineering of or means and method for attachment of artwork to perforated sheet aluminum substrate (assumed by Artist); or, installation of the Artwork (including crating, transportation, or installation). 3. We assume Mural Substrate work will be performed within the scheduled duration of the Fire Station project. 4. We assume Apollo Mural will be installed after TCO of the Fire Station. 5. We exclude "fins" (Keynote A09/A-300) illustrated in West Elevation. END OF MURAL QUALIFICATIONS