LTC 551-2023 Progress Report on the City's Local Mitigation Strategy (LMS) Projects relative to Property Owner Discounts on Flood Insurance PremiumsMIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC# 551-2023 LETTER TO COMMISSION TO: FROM: Honorable Mayor Meiner and Members of the City Commission Alina T. Hudak, City Manag� December 12, 2023 \f \ ••DATE: SUBJECT: Progress Report on the City's Local Mitigation Strategy (LMS) Projects relative to Property Owner Discounts on Flood Insurance Premiums Introduction and Background The purpose of this Letter to Commission is to provide the Mayor and Commission with a progress report on the City's Local Mitigation Strategy (LMS) projects. The LMS is one of the activities that will result in a discount of up to 25% on flood insurance premiums for residents in our city. The primary goal of the LMS is to reduce vulnerability to natural, technological, and societal hazards from all sources, but especially from floods, hurricanes, tornadoes, and other severe weather events. The City's participation in the LMS Program improves its standing and classification in the Community Rating System (CRS), making flood insurance under the National Flood Insurance Program more affordable. Program Continuity and Strategy to Inform the Public City staff members attend the Miami-Dade County Local Mitigation Strategy meetings once each calendar quarter and review the latest published version on the LMS. Meeting times, dates, and locations are posted on the Miami-Dade County LMS website at www.miamidade.gov/lms.asp. This Letter to Commission will be made available to the public on the City's website and via the City's Clerk's Office. The progress report on the projects listed below have either been completed since 2022, are active projects, or are projects that will begin in 2024. Flood Hazard Projects Private Property Adaptation (PPA) Program The Private Property Adaptation (PPA) program is a competitive grant program to incentivize flood mitigation and resilient action for private properties. The program provides funding for flood risk assessment and flood mitigation project. Status: Ongoing. The program is funded through 2025. Citywide Home Elevations Citywide home elevations are an effective tool for property-level flood mitigation. We provide information and opportunities for home elevation through the PPA program. We have 2 properties that were accepted for further consideration for the FEMA FMA program for home elevation, and they would qualify to have 90-100% of costs covered. Status: Ongoing. Sea Level Rise (SLR) Vulnerability Assessment and Adaptation Plan This study will analyze the impact of sea level rise and compound flooding on city assets. Funded by the Resilient FL grant program, the study qualifies included projects for future grant funding. Status: Planning. Dunes In addition to providing ecosystem benefits, the restoration and maintenance of our dune system provides critical robust storm surge protection for the island. Status: Ongoing W est Avenue Neighborhood Drainage Improvements Ph II Drainage improvements for West Avenue and Bay road from 14th to Collins Canal consist of a new pump station, additional drainage collection, conveyance, treatment, and disposal facilities. This drainage project will mitigate street-level flooding and reduce residential/commercial flooding concerns. Status: Design West Avenue Neighborhood Drainage Improvements Ph Ill Drainage improvements for West Avenue from 5th to 8th Street (Alton Road to West Avenue) consisting of replacement of the stormwater collection system and addition of injection wells for additional water quality treatment, to meet 10-year storm criteria. This drainage project will mitigate street-level flooding and reduce residential/commercial flooding concerns. Status: Design Page 1 of 14 72%' Street Community Com plex The on-site stormwater management system shall be designed for the 10-year 24-hour storm event (per South Florida Water Management District, SFWMD) with a safety factor of 1.25, for a total of 8.75-inches of rainfall to be retained on-site. The system will be required to meet SFWMD water quality requirements. The proposed stormwater management system shall also include an underground stormwater retention system. This type of system allows the reuse of runoff collected. Status: Design Maurice Gibb Park Construct new walking paths, additional fishing piers, a dog park and a large bay overlook; replace the current playground with a custom-made music-themed play structure; increase park resiliency with soil remediation, irrigation and natural landscaping. The existing seawall will be raised to elevation 5.7' NAVD, and the existing living shoreline shall be expanded towards the south property line, with the planting of additional mangroves and native plantings. Status: Construction. Estimated completion in 2024. Par 3/Bayshore Park Construction of a new park with children's playground for different ages, exercise station, sports courts with tennis and pickleball markings, bathroom/office building, site furnishings, lake with circulation and ozone system water treatment, drainage system, installation, and adjustments, The project also includes abandoning the existing water and sanitary sewer force mains and the installation of a new 20-inch water main and a 30-inch force main through the park. The pipeline replacement work consists of installing a 30-inch DIP force main and a 20-inch DIP water main (to replace the existing mains within the project area). Status: Complete. Completed in 2022. Indian Creek Drive Drainage Improvements Construction consists of drainage improvements, seawall construction, a pump station as well as road raising on Indian Creek, from 25 to 41" Street. The project includes construction of new catch basins and outfalls with associated piping. The stormwater will be treated using vortex structures and stormwater pump stations. Status: Drainage system and roadway improvements are complete - completed in 2022. Seawall is complete, pending final review and close-out in early 2023. Brittany Bay Park This project included the creation of a living shoreline between the existing remaining seawall and the concrete retaining seawall. The living shoreline will be hydraulically connected to Indian Creek and will have an ADA-Accessible overlook that will allow park patrons to walk from the park to the existing seawall's edge. The project enhances the surrounding riparian and inter-tidal environment by creating a new habitat for aquatic and terrestrial species and improving water quality via filtration of upland runoff. Status: Complete. Completed in 2023. Page 2 of 14 Beachwalk Draina ge - 24" Street to 46" Street Improve drainage throughout the Beachwalk, on the noted blocks. Status: Construction. Estimated completion in 2024. Beachwalk Drainage - S. Pointe to 23" Street Improve drainage throughout the Beachwalk, on the noted blocks. Status: Construction. Estimated completion in 2024. 7" Street Garage - Interior Drainage Improve drainage in facility. Status: Bidding. 7h Street Parking Garage Flood Panels Improve drainage in facility. Status: Design. 42 ° Street Garage - Interior Drainage Improve drainage in facility. Status: Complete, pending final review and close-out in early 2024. Anchor - Interior Floor Drainage Improve drainage in facility. Status: Complete. Completed in 2022. 17" Street Parking Garage Bathroom Drainage Improve drainage in facility. Status: Design 17 55 M eridian Garage Flood Drainage Improve drainage in facility. Status: Construction. Estimated completion in 2024. 12" Street Garage - Interior Floor Drainage Improve drainage in facility. Status: Complete. Completed in 2022. Page 3 of 14 12" Stree t Pa rki n g G ara ge Dr ai n Improve drainage in facility. Status: Bidding 17 S tree t G arag e - In teri or Fl oo r D rainage Improve drainage in facility. Status: Complete. Completed in 2022. Fle et/Sa n itatio n R o o f D rain Improve drainage in facility. Status: Construction. Estimated completion in 2024. 10 " Stre e t A ud it Entran ce D rainage Improve drainage in facility. Status: Planning Po lic e H ea d q u art e rs Parking G arage Flo od M itigatio n Im p rovem ents Improve drainage in facility. Status: Planning. FD O T A lto n Rd D rain age Im p rovem ents Comprehensive neighborhood project along Alton Road (Lower from Michigan to 43 St, Mid from 43 St to 48 St, and Upper from 48 St to 63 St.) to enhance quality of life and provide tidal and rainfall flood mitigation. This project includes significant stormwater drainage improvements, including installation of large conveyance and pumping systems. It also includes reconstruction of the water and sewer systems, some road raising and reconstruction, sidewalk, and streetlighting improvements. Status: Design 1" Stree t N e igh b o rh o o d Im pr o vem ent Project Comprehensive neighborhood project in South of Fifth Neighborhood, from Alton Road to Washington Avenue, to enhance quality of life and provide long-term tidal and rainfall flood mitigation. This project includes significant stormwater drainage improvements, including installation of large conveyance and pumping systems. It also included reconstruction of the water and sewer systems, and for First Street it includes road raising and reconstruction, sidewalk, streetlighting and landscaping improvements. Status: Design Page 4 of 14 To w n C e nte r (N o rt h Shor e D ) Comprehensive neighborhood project in North Shore D- North Beach Town Center to enhance quality of life and provide long-term tidal and rainfall flood mitigation. This project includes significant stormwater drainage improvements, including installation of large conveyance and pumping systems. It also included complete reconstruction of the water and sewer systems, road raising and reconstruction, sidewalk, streetlighting and landscaping improvements. Status: Design 17 th St Im p ro ve m e nts Phase 1 Comprehensive neighborhood project along 17th St. from Alton Rd to Washington Ave, to enhance quality of life and provide long-term tidal and rainfall flood mitigation. This project includes significant stormwater drainage improvements, including installation of large conveyance systems. It also includes reconstruction of the water and sewer systems, road raising and reconstruction, sidewalk, streetlighting and landscaping improvements. Status: Design N o rm an d y Isles A Comprehensive neighborhood project in Normandy Isles to enhance quality of life and provide long-term tidal and rainfall flood mitigation. This project includes significant stormwater drainage improvements, including installation of large conveyance and pumping systems. It also included complete reconstruction of the water and sewer systems, road raising and reconstruction, sidewalk, streetlighting and landscaping improvements. Status: Planning C N # 1 N autilu s F (N o rt h) Drainage improvement project at North Nautilus F to provide flood mitigation solutions to localized areas that currently experience recurring flooding. This project will be complimentary and adaptable to the future neighborhood improvement project. Status: Design C N # 2 N a u tilu s B - M u ss Park Drainage improvement project at Nautilus B (Muss Park and 44 St) to provide flood mitigation solutions to localized areas that currently experience recurring flooding. This project will be complimentary and adaptable to the future neighborhood improvement project. Status: Design Page 5 of 14 CN# 3 La Goree C- North Bay Road 1 Drainage improvement project at La Goree C (North Bay Rd. 1) to provide flood mitigation solutions to localized areas that currently experience recurring flooding. This project will be complimentary and adaptable to the future neighborhood improvement project. Status: Planning CN# 4 La Goree A Drainage improvement project at La Goree A to provide flood mitigation solutions to localized areas that currently experience recurring flooding. This project will be complimentary and adaptable to the future neighborhood improvement project. Status: Planning Nuisance Flooding Mitigation Yearly blue-green-gray improvements to assist in alleviating nuisance flooding impacting the livelihood of residents. Improvements may include swale construction, sidewalk reconstruction and rehabilitation, installation of curb and gutter, asphalt and roadway regrading, sodding, and other improvements depending on engineering analysis of the area. Status: Planning Pump Station #10 Improvements Water quality and flood mitigation improvements at stormwater pump station No. 10, to reduce recirculation of groundwater within the wet well. Status: Construction. Estimated completion in 2024. Temp. Stormwater Pump Water Quality Addition of water quality treatment devices to allow permitted deployment of temporary stormwater pumps throughout the City during high tide and rainy season. Status: Construction. Estimated completion in 2025. Stormwater Pump Station Calvert Rehabilitation of stormwater pump station 32 culvert to minimize infiltration and optimize pump station performance. Status: Planning PS 32 Water Quality Improvements Connection of injection wells, constructed at Canopy park, to stormwater pump station No. 32 effluent. Status: Construction. Estimated completion in 2024. Page 6 of 14 EPA - Sewer Pump Station No. 31 Repairs Replacement of Sanitary Pump Station No. 31 wet well hatches with waterproof hatches. Status: Complete. Completed in 2023. Pump Station No. 28 Rehabilitation Rehabilitation and hardening of Regional Sanitary Pump Station No. 28. Status: Permitting. Shane Watersport Seawall Stantec staff has previously provided preliminary design drawings for the proposed improvements at the Shane Rowing dub. The original design called for a continuous seawall with cap raised to elevation 5.70' across the entire waterfront of the property. Status: Design Seawall on Lenox Court Reconstruction of approximately 23 ft of seawall on Lennox Court. Status: Construction Procurement. Estimated completion in 2025. Seawall on Jefferson Avenue Reconstruction of approximately 80 ft of seawall on Jefferson Avenue. Status: Construction. Estimated completion in 2023. Seawall on Trouville Esplanade Reconstruction of approximately 80 ft of seawall on Trouville Esplanade. Status: Construction Procurement. Estimated completion in 2024. Seawall on 7150 Indian Creek Drive Reconstruction of approximately 70 ft of seawall on Indian Creek Drive. Status: Construction Procurement. Estimated completion in 2024. Seawall on Garden Avenue Reconstruction of approximately 65 ft of seawall on Garden Avenue. Status: Construction. Estimated completion in Dec. 2023. Page 7 of 14 S e a w a ll o n B o n it a D r iv e Status: Reconstruction of approximately 60 ft of seawall on Bonita Drive. Status: Construction procurement. Estimated completion in 2024. Seawall on Rue Notre Dame Reconstruction of approximately 70 ft of seawall on Rue Notre Dame. Status: Construction procurement. Estimated completion in 2024. Seawall on 48" and Bay Road Reconstruction of approximately 60 ft of seawall on 48" and Bay Road. Status: Construction. Estimated completion in 2024. Seawall on Flamingo Drive Pedestrian Bridge Reconstruction of approximately 40 ft of seawall on 29 Street. Status: Design Seawall on Dade Boulevard - Washington Avenue To 23" Street Reconstruction of approximately 689 ft of seawall on Washington Ave to 23"° Street. Status: Design Seawall on Dade Boulevard - N Meridian Avenue To Washington Ave Reconstruction of approximately 993 ft of seawall on N Meridian Avenue to Washington Avenue. Status: Design Seawall on Collins Avenue (Indian Beach Park Living Shoreline) Reconstruction of approximately 607 ft of seawall on Indian Beach Park. Status: Design Seawall on Flamingo Drive Pedestrian Bridge Reconstruction of approximately 45 ft of seawall on Flamingo Drive Pedestrian Bridge. Status: Design Seawall on Collins Avenue Reconstruction of approximately 280 ft of seawall on 2380 Collins Avenue. Status: Design Page 8 of 14 Seawall on Collins Avenue Reconstruction of approximately 144 ft of seawall on 2457 Collins Avenue. Status: Design Seawall on Collins Avenue Reconstruction of approximately 60 ft of seawall on 44" street End. Status: Planning Seawall on Chase Avenue (Living Shoreline) Reconstruction of approximately 240 ft of seawall on 4016 Chase Avenue. Seawall on Collins Avenue (Living Shoreline) Reconstruction of approximately 297 ft of seawall on 5301 Collins Avenue South. Status: Design Seawall on Pine Tree Drive North (3D Pilot) Reconstruction of approximately 46 ft of seawall on W 60"" Street End. Status: Design Seawall on Tatum Waterw ay Pedestrian Bridge Reconstruction of approximately 18 ft of seawall on Tatum Waterway Pedestrian Bridge. Status: Planning Seawall on Palm Island Reconstruction of approximately 299 ft of seawall on Palm Island Park. Status: Planning Seawall on Indian Creek Drive Reconstruction of approximately 53 ft of seawall on 43rd St Street End. Status: Planning Seawall on Indian Creek Drive Reconstruction of approximately 49 ft of seawall on W 42nd St Street End Status: Planning Seawall on Tatum Waterw ay Reconstruction of approximately 440 ft of seawall on Bayside Ln. Status: Planning Page 9 of 14 Seaw all on Tatum W aterw ay Reconstruction of approximately 78 ft of seawall on Bayside Ln Street End Status: Planning Seaw all on N o rm andy Shores South Reconstruction of approximately 49 ft of seawall on Ray St Street End Status: Planning Seaw all on Dickens Avenue South Reconstruction of approximately 535 ft of seawall on 7251 Collins Avenue. Status: Planning Seaw all on Bo nita D rive Street End South Reconstruction of approximately 61 ft of seawall on Bonita Dr Street End South. Status: Planning W ind Hazard Projects M iam i City Ballet W indow s Replace windows, installing impact windows for wind mitigation. Status: Complete, pending final review and close-out in early 2024. Bass M useum W indow s Replace windows, installing impact windows for wind mitigation. Status: Construction. Estimated completion in 2024. No rt h Shore Com m unity Center W indow s Replace windows, installing impact windows for wind mitigation. Status: Permitting. No rm andy Isle Park and Pool W indow s and Doors Replace windows and doors, installing impact windows and doors for wind mitigation. Status: Planning 77" Street Bridge (876719) over Tatum W aterw ay Bridge structural rehabilitation at 77 Street Bridge (876719) over Tatum Waterway. Status: Construction. Estimated completion in 2024. Page 10 of 14 H e n e d o n A v e n u e B ri d g e (8 7 6 7 2 1 ) o v er B isca y n e P o in t C a n a l Bridge structural rehabilitation at Henedon Avenue Bridge (876721) over Biscayne Point Canal. Status: Construction. Estimated completion in 2024. 73rd Street Bridge (876732) over Tatum Waterway Bridge structural rehabilitation at 73rd Street Bridge (876732) over Tatum Waterway Status: Construction. Estimated completion in 2024. Liberty Avenue Pedestrian Bridge (Ped. Bridge No. 1) Pedestrian bridge structural rehabilitation at Liberty Avenue Pedestrian Bridge (Ped. Bridge No. 1). Status: Complete. Completed in 2023. Lincoln Court Pedestrian Bridge (No. 6) over Collins Canal Pedestrian bridge structural rehabilitation at Lincoln Court Pedestrian Bridge (No. 6) over Collins Canal. Status: Design 81" Street Pedestrian Bridge (No. 4) over Tatum Waterway Pedestrian bridge structural rehabilitation at 81st Street Pedestrian Bridge (No. 4) over Tatum Waterway. Status: Permitting 24" Street Pedestrian Bridge (No. 2) over Collins Canal Pedestrian C63bridge structural rehabilitation at 24 Street Pedestrian Bridge (No. 2) over Collins Canal. Status: Design 28th Street Pedestrian Bridge (No. 3) over Collins Canal Pedestrian bridge structural rehabilitation at 28th Street Pedestrian Bridge (No. 3) over Collins Canal Status: Design Wayne Avenue Pedestrian Bridge (No. 5) over Tatum Waterway Pedestrian bridge structural rehabilitation at Wayne Avenue Pedestrian Bridge (No. 5) over Tatum Waterway. Status: Design Page 11 of 14 Pine Tree D rive Bridge (876736) over La Goree Canal Bridge structural rehabilitation at Pine Tree Drive Bridge (876736) over La Goree Canal Status: Design 17th Street (87672 7) over Colli ns Canal Bridge structural rehabilitation at 17 Street (876727) over Collins Canal. Status: Design Fountain Street Bridge (876733) over Biscayne Bay Bridge structural rehabilitation at Fountain Street Bridge (876733) over Biscayne Bay. Status: Design Palm W ay (Fountain Street) Bridge (876734) over Biscayne Bay Bridge structural rehabilitation at Palm Way (Fountain Street) Bridge (876734) over Biscayne Bay. Status: Planning Ho locaust M em orial Bridge (876740) Bridge structural rehabilitation at Holocaust Memorial Bridge (876740) Status: Planning Conventio n Center D rive (876726) over Collins Canal Bridge structural rehabilitation at Convention Center Drive (876726) over Collins Canal. Status: Planning Flood & W ind Hazard Projects Fire Statio n #1 The project provides for the design and construction of a new Category 5 storm resilient Fire Station Number 1, inclusive of a 911 emergency call dispatch center and ancillary uses, in a 17,000 to 20,000 square feet facility. The existing FEMA flood elevations also indicate that under severe storm events, the Fire Station would become inaccessible and would prevent emergency assistance to the surrounding Miami Beach community. The designed structure will be significantly elevated and it includes 5 drainage wells and 9 drainage structures. Status: Design Page 12 of 14 Pum p Statio n N o . 1 Rehabilitatio n Rehabilitation and hardening of Sanitary Pump Station No. 1. Status: Permitting H ardening San. Sew er PS N o. 29 Rehabilitation and hardening of Regional Sanitary Pump Station No. 29. Status: Design Belle Isle Booster Statio n Rehabilitatio n Rehabilitation and hardening of potable distribution system Belle Isle Booster Pump Station. Status: Design Norm andy Isle Booster Hardening Rehabilitation and hardening of potable distribution system Normandy Isle Booster Pump Station. Status: Design 25 S treet / Public W orks Yard - Booster Pum p Station Harden ing Rehabilitation and hardening of potable distribution system 25th St. Booster Pump Station. Status: Design 41" Street Booster Hardeni ng Rehabilitation and hardening of potable distribution system 41st St. Booster Pump Station. Status: Design Term inal Isle Booster PS/PS 30 G enerator Rehabilitation and hardening of potable distribution system Terminal Isle Booster Pump Station. Status: Design W -2 75 Stre et Booster Station Rehabilitati on Rehabilitation and hardening of potable distribution system 75th St. Booster Pump Station. Status: Permitting Page 13 of 14 Other Hazard Projects Refo restation G.O. Bond funded reforestation efforts benefit the city in numerous ways, protecting the City from urban heat impacts. One way is by providing shade - the shade provided lowers heat absorption by hard surfaces. These lower temperatures help mitigate the effects of the Urban Heat Island Effect and mitigates flooding. This effect, mainly felt in dense urban environments, will only become worse as the climate continues to change. Status: Ongoing. Police Station Generator Install a generator to ensure continued operation of facility during storms. Status: Completed, pending final review in early 2024. City Hall Generator Install a generator to ensure continued operation of facility during storms. Status: Planning 42' Street Garage Generator Install a generator to ensure continued operation of facility during storms. Status: Construction. Estimated completion in 2024. 17 Street Garage Gen erator Install a generator to ensure continued operation of facility during storms. Status: Completed, pending final review and close-out in early 2024. Fleet Management Generator Transfer Switch Install a generator switch to ensure continued operation of facility during storms. Status: Construction. Estimated completion in 2024. Pennsylvania Avenue Garage Generator Renewal Renew a generator switch to ensure continued operation of facility during storms. Status: Planning Page 14 of 14