Project Closeout Agreement between CMB & Ric-Man Construction Florida, INC . I 6 2 CI - Z- 9 33 2 Exhibit 4 T JAN 18 2024 THIS PROJECT CLOSEOUT AGREEMENT AND RELEASE (this "Agreement') is entered into as of the day of -, 2023 by and between C. (hereinafter referred to as "RMCF"), and the 1 ereina er referred to as the"City"). The parties hereto (the Parties agree a RECITALS WHEREAS, RMCF and the City entered into that certain Contract (the "Contract") dated October 1, 2019 pursuant to ITB 2019-231-KB for the project known as "Indian Creek (SR A1A) Phase III - Roadway and Drainage Improvements from 25th to 41' Street (the "Project"), which incorporated by reference, among other Contract Documents, the General Conditions for Construction Contracts (version dated April 16, 2019) and the January 2017 edition of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (the "FDOT Specification"); and WHEREAS, prior the Parties have amended the Contract pursuant to Change Order No. 1 dated July 21, 2020 and Change Order No. 2 dated April 15, 2021; and WHEREAS, RMCF filed a Claim pursuant to Article 11 of the General Terms and Conditions (as defined in the Contract) dated July 20, 2022 in the amount of$2,799,586.02; and WHEREAS, the City disputed the vast majority of the items included in the Claim and rendered a written decision to this effect to RMCF on or around March 8, 2023; and WHEREAS, thereafter, on April 28, 2023, RMCF filed a legal action captioned Ric-Man Construction Fla., Inc. v. City of Miami Beach, Fla., Case No. 2023-016016-CA-0, in the Circuit Court of the Eleventh Judicial Circuit in and for Miami-Dade County, Florida (the "Action") to pursue the Claim through the Circuit Court, and such Action remains pending between the Parties; and WHEREAS, the Parties are desirous of closing out the Project and, except as otherwise expressly set forth herein, resolving all claims and disputes between themselves, on the terms and conditions hereinafter set forth. NOW, THEREFORE, in exchange for the good and valuable consideration more particularly set forth herein, but without admission of any liability, fault or wrongdoing, the Parties agree as follows: 1. Recitals. The above recitals are true and correct and are incorporated herein by this reference. Capitalized terms used herein and not otherwise defined shall have the meanings given to them in the Contract. 2. Representation. This Agreement is entered into voluntarily by the Parties who stipulate and agree that they are under no duress or undue influence. The Parties represent that in the execution of this Agreement, they had the opportunity to consult legal counsel of their own selection with respect to the execution this Agreement. Page 1 of 8 3. Terms. The Parties agree to close out the Project as of the Effective Date of this Agreement and. in connection therewith, the Parties agree as follows: a. The Parties acknowledge and agree that Substantial Completion was reached on June 3. 2022 and Final Completion occurred on November 10, 2023. b. Concurrently with the execution of this Agreement, the Parties will execute Contingency Draw No. 12 ("CD 12")and Change Order#3 ("Change Order No. 3")to the Contract: c. Within fifteen (15) business days of the full execution by the Parties of CD 12, Change Order No. 3 and this Agreement, as well as submission by RMCF of a final payment application along with all required associated documentation, the City shall issue Final Payment to RMCF in the amount of One Million Twenty-Five Thousand and 00/100 Dollars ($1,025,000.00)(the "Final Payment"). The documentation required with the final payment application is the Consent of Surety, Final Waiver and Release of Lien and Change Order No. 3. d. Within fifteen (15) business days of the full execution by the Parties of CD 12, Change Order No. 3 and this Agreement. RMCF shall dismiss the Action with prejudice, by submitting the Joint Stipulation and Order of Dismissal With Prejudice to the Circuit Court, in the same form as the document attached hereto and incorporated by reference as Exhibit A. e. All warranties required by the Contract Documents shall run from July 1. 2022 for the entire duration required by the FDOT Specification. except that the asphalt warranty. as governed by FDOT Specification Section 338, Value Added Asphalt Pavement. shall be 7- years and shall run from November 10. 2023. RMCF shall submit a confirmation letter addressed to the Florida Department of Transportation('`FOOT") substantially in the form attached as Exhibit B. For the avoidance of doubt, (a) RMCF is providing a 7-year warranty in lieu of the 3-year warranty stipulated in Section 338 as RMCF opted, with the FDOT's consent, to provide such longer warranty in lieu of performing APA testing and (b) RMCF is and shall be the "Responsible Party" for purposes of the asphalt warranty requirements in Section 338. A detailed schedule of warranties required by the Contract Documents. including those required by the FDOT Specification, reflecting, for each warranty, the work or equipment covered, the manufacturer of the equipment, warranty commencement date and duration. the responsible party(ies) and contact information, is attached hereto as Exhibit C and incorporated by reference. In the event an RMCF subcontractor or vendor fails to provide the warranty coverage as specified in Exhibit C, RMCF will provide the requested warranty coverage to the City. RMCF's provision of any such warranty coverage is without prejudice for RMCF to pursue a claim against its subcontractor or vendor. 4. Mutual Release. The Parties, for themselves and on behalf of their Consultants, all Subcontractors, and all material suppliers at every tier, hereby remise, release, acquit and forever discharge each other. their attorneys, representatives, officers, employees and agents from any past, present and future claims, actions. causes of action, demands, rights, damages. costs. losses. expenses, compensations and obligations which exist or which may hereafter accrue, whether known or unknown, whether foreseen or unforeseen, whether matured or not Page 2 of 8 mature, whether discovered or undiscovered, and the consequences thereof, having resulted, resulting or to result from any or all of the following: a. All matters related to the Contract and Project excepting any Excluded Claims; b. All matters or disputes which have been or could have been alleged in the Action and the Claim, including any compulsory counterclaim related to the Project, but excepting any Excluded Claims; c. Any representations made by either Party related to any and all matters or disputes at issue in the Action (except for any such representations relating to any Excluded Claims); d. Any and all claims for attorney's fees (including paralegal fees) and costs in any way related to the Action and the Claim; and e. Any claim for liquidated damages after April 21, 2022 (i.e., the date for Substantial Completion required pursuant to the Contract as amended by Change Order No. 3). Notwithstanding anything to the contrary contained herein, the City does not remise, release, acquit or discharge RMCF or otherwise waive (i)warranty claims, (ii) claims relating to or arising from latent construction defects at the Project, or (iii) third-party claims related to personal injury or third party claims related to property damage other than property damage to the Project. Notwithstanding anything to the contrary contained herein, RMCF does not release the City's Consultants for actions related to the City's reservations identified in subclauses (ii) and (iii) above. Collectively the claims reserved by the City and RMCF in this paragraph are referred to as the"Excluded Claims". 5. Warranty of No Assignment; Satisfaction of Third-Party Interests. RMCF represents, warrants, and certifies that it has not in any manner assigned, pledged or otherwise voluntarily or involuntarily disposed of or transferred to any person or entity any interest in any claim(s), actions, causes of action, suits, damages, losses, judgments, executions, demands, liabilities, obligations, responsibilities, liens, expenses, costs and attorney's fees raised in the Action and/or referenced in this Agreement (collectively, "Damages and Losses"), and if any person or entity has any interest in any such Damages and Losses, RMCF will fully satisfy and discharge such person or entity's interests from the consideration payable by the City pursuant to CD 12, Change Order No. 3 and this Agreement. RMCF will hold harmless and indemnify the City from and for any and all actions, causes of action, damages and costs, including reasonable attorneys' fees, incurred in defense of or in settlement of all actions, causes of action, suit or suits, or demands, by any third party whose interest in any Damages and Losses is not fully satisfied and discharged by RMCF. 6. No Admission of Liability. RMCF acknowledges and agrees that any payment by the City pursuant to CD 12, Change Order No. 3 and/or this Agreement, and/or any other act, representation, inaction or silence by the City is not to be construed as an admission of liability Page 3 of 8 but is made to protect the interest of the City and to avoid further litigation and the expenses thereof. 7. Effective Date. The Effective Date of this Agreement shall be the date upon which the second Party to sign has affixed the signature of its representative to the Agreement and delivered an executed copy to the other Party. 8. Entire Agreement. This Agreement constitutes the sole and entire agreement between the Parties and supersedes all prior and contemporaneous statements, promises. understandings or agreements, whether written or oral. 9 Amendments. This Agreement may be amended, modified or altered at any time upon the approval of the Parties; however, any such amendment must be in writing and signed by all Parties in order for such amendment to be of any force and effect. 10. Partial Invalidity. In the event that any provision of this Agreement is declared by any court of competent jurisdiction or any administrative judge to be void or otherwise invalid, all of the other terms. conditions and provisions of this Agreement shall remain in full force and effect to the same extent as if that part declared void or invalid had never been incorporated in the Agreement and in such form, the remainder of the Agreement shall continue to be binding upon the Parties. 11. Applicable Law. This Agreement shall be subject to and governed by the laws of the State of Florida. without regard to conflict of law rules. 12. Counterparts. This Agreement may be signed and executed in one or more counterparts. each of which shall be deemed an original and all of which together shall constitute one Agreement. Delivery of an executed counterpart of a signature page of this Agreement by facsimile or email shall be effective as delivery of an originally executed counterpart of this Agreement. 13. No Adverse Construction. The Parties acknowledge that this Agreement has been prepared by each of them. In the event any part of this Agreement is found to be ambiguous, such ambiguity shall not be construed against either of the Parties. 14. Further Acts. In addition to the acts recited in this Agreement, the Parties agree to perform, or cause to be performed on the date of this Agreement. or thereafter, any and all such further acts as may be reasonably necessary to consummate the transactions contemplated hereby. Each of the Parties agrees that it will execute and deliver all such documents and instruments as may be necessary and appropriate to effectuate the terms of this Agreement. 15. Authority. Each person(s) executing this Agreement as an agent or in a representative capacity further warrants that he or she is duly authorized to do so. The Parties have executed this Agreement as of the date set forth below. Page 4 of 8 IN WITNESS WHEREOF, the parties hereto have caused this Settlement Agreement to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST CITY OF MIAMI BEACH, FLORIDA , _74 JAN 1 R 2024 6(44_ Rafael E. Granado, . Hudak City Clerk C Manager s ATTEST: RIC-MAN CONSTRUCTION FLORIDA, INC. Secretary (i,:,4 etiN.9/e ://,.)/ President Daniel Mancini Print Name Print Name APPROVED AS TO 1*1 N\1 • 17 FORM&LANGUAGE / ` &FOR EXECUTION K, �u O i i 12,2'2023 9q - AttWer Dote 'i •. Ate/ Page 5 of 8 A t\ I ��, •\s i I B E AC F_i INDIAN CREEK ST. DRAINAGE PROJECT NAME: IMPROVEMENTS- PHASE III AlE CONSULTANT: Ribbeck Engineering, Inc. CONTRACTOR: Ric-Man Construction Florida, Inc. RPR/CEI: WSP USA, Inc. CHANGE ORDER NO. 3 DATE: 12-21-2023 You are hereby directed to make the following changes to the Contract Documents: DESCRIPTION OF CHANGE: This final project reconciliation Change Order No. 3(CO#3) is being issued to grant Ric-Man Construction Florida, Inc. (RMCF)non-compensable Contract Time Extensions associated with additional work approved as part of Requests for Contingency Draws(RCDs)and foul weather days, provide the City with a credit for all remaining unbilled items, and to compensate for costs associated with project closeout.This Change Order is a net credit to the project and is the final adjusting change oder to reconcile all the charges and close the project. 1. Non-compensable Contract Time Extensions This Change Order Number 3 will grant RMCF a total of eighty two(82)non compensable calendar days of which seventeen(17)calendar days are associated with weather days(Exhibit 1)and sixty five(65) calendar days are associated with various Request for Contingency Draws(RCD)/Contingency Draws(CD) (Exhibit 2) These additional days modify the Contractual Substantial Completion date to April 21,2022. 2. Contract Credit Credit for all the remaining unbilled line items reflected in the Balance to Finish column of the Schedule of Values in the amount of$2,464,769.10(Exhibit 3), inclusive of the remaining balance of the Owner's Contingency in the amount of$ 1,400,414 91,as shown in line items 199 and 254 of the Schedule of Values. 3. Negotiated Contract Final Payment/Closeout Amount 1 Negotiated Final Payment/Closeout Amount of$1,025,000.00, in accordance with Closeout Agreement (Exhibit 4). REASON FOR This Change Order is the final reconcilliation Change Order to reconcile the Contract Time,to make Final CHANGE: Payment to Ric-Man and to close the Project. This Change Order results in a net credit to the City in the amount of$1,439,769.10 based on the remaining Contract balance after the negotiated final closeout payment to Ric- Man Construction of Florida(RMCF), and provides a total non-compensable Contract Time extension of 82 days 1. Non-Compensable Contract Time Extension Foul Weather Days: 17 days(Exhibit 1) Time extension resulting from RCD/CD: 65 days(Exhibit 2) 2. Contract Credit:($2,464,769.10)(Exhibit 3) 3. Negotiated Final Payment Closeout Amount$1,025,000.00(Exhibit 4) Total contract change: net credit to the City in the amount of$1,439,769.10 and additional Contract time of 82 non-compensable calendar days. CLASSIFICATION: Credit,Other IF OTHER: Contract Time Extension ATTACHMENTS: 1- Exhibit 1-Foul weather day log. 2- Exhibit 2—Contingency Draw log with schedule impact. 3- Exhibit 3-Schedule of Values(pay application#31) • 4� '. tti '.+ 0d FPrOjeCt CtctseWcut S Page 1 of 2 CHANGE IN CONTRACT SUM CHANGE IN CONTRACT TIME Original Contract Sum: $13,636,984.00 Original Contract Time to Substantial Completion: 594 DAYS Net change by previously $5,884,859.00 Net change from previous Change Orders: 104 DAYS authorized Change Orders: Contract Sum prior to this Change $19,521,843.00 Contract Time to Substantial Completion prior to this 698 DAYS Order: Change Order is: Contract Sum will be increased/decreased by this ($1,439,769.10) Contract Time will be increased/decreased by the 82 DAYS Change Order in the amount of: following calendar days: New Contract Sum including this $18,082,073.90 New Contract Time to Substantial Completion is: 780 DAYS Change Order is: II NO ADJUSTMENTS IS MADE,THE CONTRACT AMOUNT REMAINS UNCHANGED. ADJUSTMENTS TO TIME FOR PERFORMANCE In connection with the change(s)noted in this document,CONTRACTOR'S TIME FOR PERFORMANCE REMAINS UNCHANGED unless specifically noted herein. This Change Order is being executed contemporaneously with Contingency Draw No.12)(CD 12)and the Project Closeout Agreement attached as Exhibit 4 hereto. Taken together, Contingency Draw No.12 and this Change Order,together with all Exhibits,constitute an amendment to the Agreement between the Contractor and City. For the sake of convenience and avoidance of any doubt,all references to"this Change Order"shall be deemed to include the terms and conditions set forth in all Exhibits.including without limitation.the Project Closeout Agreement. The negotiated Final Payment/Closeout Amount and the adjustments to the Contract Time specified in this Change Order are the maximum monetary compensation and time extension agreed to by both the City.and Contractor for this Change Order and the closeout of the Project Contractor attests that the Final Payment,Closeout Amount and adjustments to the Contract Time provided in this Change Order are reasonable and constitute compensation in full for all matters set forth herein andior otherwise pertaining to the closeout of the Project. • Accordingly,in consideration of the Final Payment and the extension of the Contact Time stipulated in this Change Order,Contractor hereby releases the City from all Claims the Contractor now has or may ever have regarding the performance of the Work or the Project and further,the City and Contractor expressly agree to the terms set forth in the Project Closeout Agreement I, attached as Exhibit 4 and executed contemporaneously herewith.This Change Order sets forth the entire agreement between the City and Contractor with respect to the subject matter herein. 4 No other agreements or modifications shall apply to this Change Order unless expressly provided herein,and all prior or contemporaneous understandings and discussions,whether written or I verbal,regarding the subject matter hereof are entirely superseded by this Change Order. If there is any conflict between the terms and conditions of the Agreement and those set forth in this i Change Order,the terms and conditions in this Change Order shall govern. I i EXCEPT AS EXPRESSLY MODIFIED HEREIN,THE TERMS AND CONDITIONS OF THE CONTRACT DOCUMENTS REMAIN UNCHANGED. ApprPvedlyy RPR/CEI: Approved by CIP Project Manager: Approved by CIP Division Director: .„ // 12/29/23' L (2 ,21, r ( r.z.3 WSP USA,Inc. Date Can Dixon Date David A,Gome �1 a•y Date Approved by Engineer of Record: Approved bySenior Project Mana er: Approved pp nj. j pe b CI Director: Digitally"' signed by Mahe, `eR 4/ s 2 4 Maher I Maatiki Dae2 /'^( DMc 2023.12191 a:3337-0500 Ribbeck Engineering,Inc. Date Mina Samadi,P E. Date David ,P. E. Da e Approved by Contractor: Ap roved uty City M nager .,.ved b . M.nager: i1 jz/13 is-Man Construction of Florida Date Eric Carpenter,P. D IV / .---- to Aline T.Hud• Date , . ' i i I ' 'i f, Page 2 of 2 Exhibit 1 miAAAIBEACH Indian Creek (SR A1A) Phase III Imprvements form 25th St to 41st ST Fould We th r D alay Log Dates # Days 1.15.2020 1 5.05.2020 1 6 4 1 08 3 1 09 1 10.19.2020 1 10.21.2020 1 12.07 1 2.24.2021 1 6.24.2021 1 06.30.2021 1 07.12.21 1 10.25.2021 1 11.02.2021 1 01.05.2022 1 01.11.2022 1 03.15.2022 1 Total Days 17 Exhibit 2 MIAMIBEACH Ci f Miami B ch, 1700 Convention Center Driv , Miami B ach, Flo ida 33139, www.miamib achfl.gov OFFICE OF CAPITAL IMPROVEMENT PROJECTS el: 305.673.7071 Indian Creek Flooding Mitigation Project Phase III- 25 to 41 Street RMCF CMB Approved Contiengency Requested Day Days Status Tot I Am un TOTAL PROJEC C N INGEN Y 2,034,987.00 Approved Contingency Draws: CD Amount($) Contingency Draw#1(RCDs 1,2,5) 0 0 CMB Approved $ 51 385. 6 Contingency Draw# (RCD#10,3 ) 1 1 CMB Approved $ 16 5. 4 Contingency Draw#3(RCDs 18 24 and 25) 0 0 CMB Approved $ 8,67 Contingency D 4(RCD#7,8,4 &4 ) 10 10 CMB Approved $ 182,51 3 Contingency raw#5(R 16 &37 0 0 CMB Approved $ 8,562 0 Contingency raw#6( 9&52 5 5 CMB Approved $ 6, 01 8 Contingency raw#7(50,51,5 ,56 6 6 CMB Approved $ 31, 87 52 Contingency raw#8(53,57,58,59&60 9 9 CMB Approved $ 68,768 50 Contingency raw#9(RC # 8,62,63&69 CMB Approved $ 3 ,5261 Contingency raw#10(RC #75,79,83,85,86,87,88,93 13 11 CMB Approved $ 3,289 57 Contingency raw#11(RC 66,72,91,95,96,99,100,and 10 11 9 CMB Approved $ 100,228.91 Contingency raw#12(RC 97,102,103 10 10 CMB Approved $ 37,967 36 Total RCDs- 69 65 $ 774,022. 4 CONTINGENCY B L ( fter CD#1 ) i 1 6 964.96 Exhibit 3 APPLICATION AND CERTIFICATE FOR PAYMENT Indian Creek(SR A1A)Phase III Application No.: 31 Distribution to: To Owner: City of Miami Beach Project. Imprvements form 25th St to 41st ST Period To: 31-Oct-22 X Owner From Contractor: Ric-Man Construction FL,Inc. Via Engineer. City of Maimi Beach Project No.: Ire 2019-231-KB X CEI-WSP 3100 SW 15th Street Purchase Order No.: TBD X Contractor Deerfield Beach, FL 33442 Contract Date: 3/2/2020 X On-Site Admin Recorc Sub Comp Date: 10/17/2021 Contract for: Indian Creek Phasee III Improvements The undersigned Contractor certifies that to the best of the Contractor's CONTRACTOR'S APPLICATION FOR PAYMENT knowledge, information and belief, the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, Application is made for payment,as shown below,in connection with the Contract. that all amounts have been paid by the Contractor for Work for which previous Continuation sheets are attached. Certificates of Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM $ 13,636,984.00 CONTRACTOR: Ric-Man Construction FL, Inc. 2. NET CHANGE BY FIELD CHANGE DIRECTIVE/CHANGE ORDER $ 5,884,859.00 3. CURRENT BID ITEM VALUE(Line 1 +/-Line 2) $ 19,521,843.00 By: 4. TOTAL EARNED COMPLETED TO DATE $ 17,057,073.91 Daniel LaCross Sr Project Manager 5. RETAINAGE: State of Florida 0%OF COMPLETED WORK $ - County of: Broward Subscribed and sworn to before me this 14th day of November 2022 6. TOTAL EARNED LESS RETAINAGE/TOTAL RETAINAGE $ 17,057,073.91 (Line 4 less Line 5) Notary Public: 7. LESS PREVIOUS CERTIFICATES OF PAYMENT $ 16,715,932.43 (Line 6 from prior Certificate) My Commission expires: 8. CURRENT PAYMENT DUE $ 341,141.48 9. BALANCE TO FINISH, INCLUDING RETAINAGE $ 2,464,769.09 CEI CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief, the Work has progressed as indicated,the quality of the Work is in accordance with the FIELD CHANGE DIRECTIVE/CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Contract Documents, and the Contractor is entitled to payment in the Total changes approved by Owner $ 5,884,859.00 $ - AMOUNT CERTIFIED. TOTALS $ 5,884,859.00 $ - AMOUNT CERTIFIED: $ - NET CHANGES by FCD/CO $5,884,859.00 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on the Application and on the Continuation Sheet that is changed to conform to the amount certified.) The following items MUST be included with the Application and Certification for CEI:WSP Payment or this Application will be held until received: By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only Updated Project Schedule attached to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under Construction photographs attached — this Contract. Project Drawings AFP-1 Indian Creek Flooding Mitigation Project phaaa III APPLICATION NO.: 31 APPLICATION OI1TE:... _........_._-11N42022 APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-Od-22 PROJECT NO.: ITO 2E19-231•ID PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THE PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE A Par Mm S C I0 E F G H I J K MATL M N 0 1 P 0 R 5 FOOTPOSTOR 46IYPOR1IO11 Ti. 1044 MS ID% Mir OEimtl1ENOPa.R QUANTITY ROT VALE I VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE QUANTITYVILLUE 1NF1 I REf0100E 7L10% f1a%A NO. .1-. 101-1 Bonds and lrwuSRUO -f._-.2-i.ri6-$i- STANDS IA 101-1 MobilQaIOn 1 ; LS S 434.056.01;S 434,056.91 1 S 434,056.91 3 - $ - S - 1.00 $ 434,0513.91 100.00% .- - -1 1.00 _. - • S 241.602.19 f 02,454.12 2 102-I Malntersnee of Treble I I LS $ 86232.001 S 03232.50 0.775 S 66,829.63 $ $ • . f - 0.76 S 6662963 77.50% - 19,4022_0F b - $ 52.595.05 1 14.234.75 3 102-14 Traffic Control Olnur 11180 I MH S 1.12E 13,305.80 3822.5 S 4,281.20 S 5 - 3 • 3822.50 I 3 4261.20 32.16% 9.02440 $ f 310.30 S 011 S0 4 10240 Work Zoca Signs 1011100 I ED 3 0.2115 22,28100 100600 f 21,12728 $ - $ - S - 100306.00 I3 21,12728 94.82% 1,153,7415 - S 18,227 15 S 4.50.11 5 /02-71-15 Temporary Barrier F6lAn/shored 192 I LF $ 2/.06S 5.366.31 0 S_. S r 0.00% ....5368325 - s -._.s 6 102-71-16 Temporary Border F&I Fme PAnang 1.878 LF S 19.00 13 35,644.00 11176 $ 35.644.00 S - 3 • $ - 1878.50 13 3564102 100.00% 5 „f - 3 20,02142 S 7,52217 7 102-71.25 Temporary Barter Relocate AMwrad 98 ' IF 3 1230 13 1,160.60 0 'S - $ $ - 3 - 0.00 1 - 0.00% I+BO..: S - S - S 6 102 71-26 Temporary Barter Reloads Free Standing 4.621 ; LF S 7.03 I$ 37,748 43 0 f $ 3 - $ - 0.50 i s - 0.00% Q 32.743.s I$ • S - S - 9 10274-1 Channelling DevEle-Type)II,DI VP60rurn 101335 , ED f 0.13 $ 13,17355 101335 $ 13,17355 • f • f 10133i.00 f 13.173.55 100.03% S $ 10,307.Sa f 2,905.07 -19 1D2acz onannelQ evw m i. ingD -Type -9 -._._---1eD1a �-s ...o:0's _.--4.B6z.m leoio... f.._._-ae62.7o._____. $.._._._.... - 3 - f - 76310.00 $ 416270 100.40% .... _. -__- 11 102-75-7 ChennelUmg Device-PedestNSn LCD(Longitudinal 532 ; LF S 5.59 5 2,973.66 156 $ 872.04 3 �.3 - f 3,NNO30 135.74 Chennef0Mg Device) S - S - 158.OD I3 672.0 29.32% f - S NO 30 S 15574 12 102-76 Arrow Bcard I Advanced Waring Mow Pend 920 ED S 5.59•$ 5.142.30 920 3 5,142.80 S - $ - $ - 920.00 I,f 5.142.80 10000% S - $ 4.00710 2 1.025.42 13 ...102-78 Temporary RahoreflAive Paverneni Morker 50 EA $ 559f _-.270.50 0 S - -"..._.-__.. .f 14 102-861 Temporary Crash Cushion,Redredbye Option 7 LOC $ 361.00 3 6657.03 0 3 - S - $ - 3 - 0.00 II'o - 0.00% 5 - 3 - f - 15 102-S9 Portable CMnges eMetaage Sign-Temporary 1570 ED 3 1230I 3 16311.50 1570 f 19,311.00 f - 3 - S - 1570.00 S 16311.00 100.00% $ - S 15,10110 f 41 O.N 16 102-104 Temporary Signalicalion and msmt08nce of 2376 ED 6 7.83 I$ 113604.08 2378 5 7660.06 $ - f - $ - 2376.03 ,$ 16,004.06 100.00% $ - f 12,641.11 $ 3.902.67 m...aQn +Eo s 7s] s 1a,eD4ae 2376 s 1e.ea.ae s s G 17 102-107-1 Temporary Traffic Detection and Maintenance of 2373 $ - 2378.00 is.._.__18.80408 .-100.00% j------ 3 1;641i1 3 �Aa.57 I16 102-911-1 Removable Tape Pavement Markings White or Beek 403 I LF $ 5.00 I S 2,330.03 0 3 - 3 - $ - S - 0.03 $ - 0.00% f - S - f Skip 19 102-911-2 RemovableTape Pavement Markings Wnlile or Black 1885 I LF f 503 13 9,425.00 1800 3 9,00.00 S - $ • f - 1800.013 '$ 9.500.00 95.49% S - f 7130.0 S 1,01709 Solid 20 102-911-3 Remorabe Tape Pavement Markings White on Black 731 SF S 10.00 1 S 7,310.00 0 $ - S - 3 - f - . 0.00 13 - 0.00% S - 3 - f Other • ' 21 102-912-2 RSmeva9l5 Tape Pavement Markings Yallow Solid 10947 LF $ 5.00 I f 54,735.00 1692 $ 6,460.00 S - $ - S - 1892.03 I f 8.480.00 15.46% 5 S 8,0311.02 f 1,801.98 22 104-103 Sediment Barrer 3327.7 LF $ 2Z0I S 7,587.18 3327.7 S 7,587.16 S - $ - S - 3327.70 f 7,587.16 100.00% S - 1 5,07103 S 1,216.07 23 104-11 Floating Turbidity Berner ...-._121 LFf 21.93 s -._ 2.853.53 121. 3 ---265353 __-..•.3 ..... • -. S • 3 - 121.10 3 2,653.59 100.0014 $ _.-.. _ 1 3.uM ai s _.-53520 24 104-18 H Pron System 77 EA 3 183.00 1 Het ecb 3 14,091.00 77 S 14091.50 $ - $ - $ - 77.00 I 3 14,091.00 100.00% $ - ! i1.010e2 $ 3,001.Ss 25 107-1 Utter Removal 53.2 AC $ 3)0.00 I$ 15,900.02 53.2 $ 15,980.0D $ - $ - 3 - 53.20 $ 15.960.00 100.00% $ - 3 12.30.32 5 3,30.4 23 107-2 Mowing - -..__-. 13.2 AC f_--_1.23.00♦y 16,539.03 __...132 f 16,539.03 -.- y-.-_-___ - $ • 3 - 13.20_..•f /6,539.OD- 100.00% 3 i.__. i3mae1 f _.S.SaO 27 108-1 Monitor Existing Strudor's Inspection and Settlement 1 LS S 39.146.00 1 3 39,148.00 0199990 $ 39.14603 5 - 3 - S 1.00 $ 36146.00 100.00% S - S MAP so f 8.131110 monitoring 25 103-2 Monitoring Existing Structures Vibration Montoring 1 LS s 286545.03 S 266545.00 1 $ 269,545.00 3 - 3 $ - 1.00 3 269.545.00 100.00% 3 - f 212,131.92 S 57.01506 29 1063 Monitoring E008ng Slrurdur0 Ground Weer 1 I LS S 67,107.00 13 67,107.00' I $ 67,107.50 $ • $ - $ - 1.00 I$ 87,107.00 100.00% 5 - S 52A13.21 f 11233.78 Monitoring 30 110-1-1 ClOmgend Grubbing 4.62 I AC S 1,447.00 I 3 6689.94 4.6242419 S 6,069.94 5 - 3 - 4.62 +$ 6.1,69.94 10D.00% f - S 5,05.e1 S 1,43330 31 110410 Removal 6 Existing Concrete 8.374 SY f 19.44 I S 162,790.56 8374 3 182.790.56 $ - 3 - 6374.00 If 1132,790.68 100.00% $ S 126140.it S 34E7439 Page 2 APPLICATION NO. 31 Indian Creek FloodingMitl _-_ _... _.. _..._. patlon Project phew III PERIOD FRODATE: MOD T APPLICATION FOR PAYMENTA:ONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-Ott-22 PROJECT NO.: ITS 201E-31-KB PURCHASE ORDER NO.: • ORIOIN4LL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE - • MAT A Peii B C 0 E • F G H I J K w L M N 0 ! P 0 R S POET FORME CITY PORTNIN MEM, ICNIOAL[D % 304 .._._...... _.__._..._.... ____ ITEM OEACRPTIONOF WORK QUANTITY;UNIT VALUE - VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE ITEM RETAWreE ]%71% 31.30% OW 32 120-1 Exwvaecn 356.1 1 CY s 34.00 i$ 12,107.40 356.1 $ 12.107.40 3 - f - $ - 366.10 I$ 12,107.40 100.O0% 5 - $ 0,52052 s 2,578.80 • 33 120E EMBANKMENT 13,825.4 I•CY $ 23.30:S 322,131.52 13825.4 $ 322,131.82 S - 3 - 3 - 13825.43 I$ 322,131.02 100.00% 3 - I 253,51774 S 60a14.08 34 100-4 Type B Slabilialion 20413 i SY f 9.00 f 3 183,717.00 20413 3 183,717.00 $ - 3 - - $ - 20413.00 S 183.717.03 100.00% S - s ,8,5859E S 30,13172 35 1671-11 Prepared Soil Layer - 3.014 SY 3 16.94 1 S 51,057.16 3014 '3 51,057.15 $ - 3 - $ - 3014.00 $ 51,057.15 100.00% $ - s atat w f 10.075.17 38 285701 Optional Bess Group 01(012.5 .................. ..-_ __-_..._ __..._.. onlq 2112 SY s b.rls iia.239.ie 772D.7 s is.427se s f $ 2nu.m is 89.427.5e 78.97% S s 70.379 51 s 1E.348o7 37 265-711 Optlonal Bar Group11 8-12.5 ,5( Only) 15839 SY 3 53.70 I f 850554.30 14842.18 S 797.011.07 $ - $ - 8 - 14642.18 s 717.025.07 93.71% 33.539.ff $ - S 627.238.73 f 160.70E.34 35 2135711 Opaon9l Base Group 11 Lknarack Only) -. -_.. ( OMy) -..15838 SY f _17.®i 25D.191.91 - 0 -f • s 3 - S 0.00 t3 - 0.0015 $_- - y- .._ y-___-.- • 39 327-70-1 Milling Existing Asphalt Pavement(1-Avg Depth) 4581 SY 3 247 I$ 11,2(6.67- 0 3 - $ - - . - - - 3 S 0 00 i f - 0.00% $ - s s - 40 327-70.4 Milling Existing Asphalt Pavement(7 Avg Depth) 14789 I 6Y-3 39+I f 57.824.99 t478B f 57,824.99 $ - $ - S - t 1173D.00 3 57.524.99 100.00% - - $ - S 45,501.27 3 12310.72 41 334-1-13 SOperpave Asphaltic Conn Traffic ' 4526.55 I Tana 3 139.811 f 632,856J6 2744.06 $ 383,735.10 $ - s - $ - ZIM.® fs 383,775.+0 50.84% 249.,21::::-.S S 301,9ss.52 f e1.731.58 42 337-743 Asph Conn FC Tref C,FC-12.5,PG 76-22 2383.4 i Tom $ 148.00 I$ 400,411.20 2343.4 $ 4[0.41120 S - $ - 2383.40 $ 400.411.20 100.00% $ 3 315,123.01 S 10,217.50 I .. _...._._... _.___43 37F1 Mllwltanoaw AaphaB PavemMll 58 3 17S.0010 1033.20 5.! f 1,038.20 f -___.___ _...._.._3 _. _...... 5.60 f 1,098.20 +00.00% f _ f e17110 s 23114 44 403-011 Concrete CIass NS Gravity Wall(For Onvlty WM 2 82.3 CY s 196.00 15 16,130.80 82.3 $ 10,130.80 3 - 3 • 3 - 8230 S 16,130.13 100.00% $ S 12.194.94 S 3 435.1e Heigh Avg 45 400-0-13 Concrete Class NS Steps 233 - CY $ 262.00!$ 0137140; 35.3 3 5,871.60 $ - $ - $ - 23.30 '$ 5.871.40' 100.0D% B - s 4022.e5 S 1253.0 ---M 40048 Cone CYsslV Bulkhead 7 1 CY S.-_.-... 162.DOS-_-.--1.761.00�_...7 3 --. 1,761.00 _.... 3 $ - 700. S 1.761.00 100.00% $ f 1x627 5 ...-373:73 47 415-14 Reinforcing Steel-Misc2lamaM 1156 LB $ 0801$ 1440.40 124.03 $ 111.63 $ - $ • 3 - 124.03 'S 111.63 10.73% f - 1 8105 S 23.78 48 415-14 Relnfordrg Steel-BWIdr3E__._____-.._._..-_720 LB 7._-_.0.6013 44100 720 3 _... 648.00 f - f - 720.00 3 040.00 100.03% 3 __y______Sau eS f 138.u2 N 425-1311 Inlets Curb Typt P-1,410 0 I EA $ JM8.00 s 20.916.00 8 $ 20,916.00 $ - $ - $ - 6.00 "$ 20,918A3 100.03% 3 S 10.400.09 S 443311 50 425-1321 Inlets,Curb Type P-2.410 7 I EA $ 3,909.00 I$ 27,343.00 7 $ 27,383.01 f - 6 - $ - - 7.00 $ 27,333.00 100.00% $ - S 31.53466 s 5.028.32 '.51 425-7351 IMHe,cum.Type PS,4117 ID ft EA s 4.E79.00 1$ 64,222.00 13 7.-..11,2a 00 g . $ • _. nl3ss Inlets.cab,type PAS,Partial EA $ 3.627.00 $ - +f.o6 $ 81222 DD 1DD.a9% s..._ - _-s_. .ee.»i:ir$ ,7.w9.a 52 s s 3JI27.00 1 $ 3,927.00 8 - s - $ - 1.00 1$ 3227.00 100.00% $ - S 3011.46 f 015.15 53 4201381 INsts,Cum,Typo P-0,410 12 EA 3 4007.00 s B9A61.00 12 $ 58.884.00 S - S - $ - 12A0 I f 56.034.03 100.00% $ - s 41,341 71 S 12,542.2E 54 42&7782 Inlets,Cum,Type P$.>10 3 EA 5 8.3M.Og�3 19.179.00 J $ 19.173.00 $ - $ - $ 3.00. i s -._19.177.00 100.00% $ - .f_.. 15.ae015 s 4.00 es' 55 425-1521 Inlets,Ditch Bottom,Type C,410 4 I EA $ 2028.00 I$ 11,304.03 4 3 11,304.00 $ - $ - $ - 4.00 '$ 11,304.00 100.00% $ - S 14025 S 24m.75 56 425.1529 Inlets,Ditch Bottom Type C Modified JP Drewry 8 EA $ 3.565.00 $ 28,760.00 8 $ 28,700.00 -$ - $ - $ - 8.00 f 28,703.03 100.00% $ - 3 22634.13 S 8.125.S I14 Single and doted.01.10 57 425-241 Mammon P-7,<10 0 I EA 3 7798.03 1 f 34,182.00 9 3 34,18200 8 - 3 - 3 • 9.00 I$ 34,182.00 100.00% $ - S 25,901.23 f 1,210.17 58 425-242 A1WM104.P-7,.10 + { EA $ 3,445.03 IS 3,445.00 1 3 3.445.00 3 - $ - $ - 1.00 I f 3.445.03 100.03% $ - S 2711.22 S 733.79 ES ..42S471 Manhole.,J-7,<117.-_-_- ---- a tEA 3 5,10600 i3763.0 __......6__ $ 30,636.00 3 - $ $..._...__- a.co +1 ._--3083600100.00% $ - s C411051 S 8,,52547 80 425-2-72 ManhaW,J-7,410 30 I EA 3 5,160.03:6 154,8(0.00 39 $ 149,640.00 f - $ - 3 - . 29.00 1 3 149,640.00 96.67% $ - f 117,766IQ s 31.673.32 61 4252-73 Manhoos.J-7 Pamal(MH Rear),410 Wino 72-Pipe 17 EA 3 3,414.00 13 58,030.00 17 $ 58,038.00 $ - -$ - $ - 17.00 S 50038.03 100.00% $ - f 46.671.00 S 12,33Q.00 Rleor 62 4255 Menholss MOsl 47 i EA 3 787.00IS 36,04).00 47 S 36.049.00 $ - f - s - 4700 $ 38.049.00 100.00% $ $ 2E70.56 S 7.678..44 Pope 3 Main Creek Floodng Milpy6 phew HI Project phe DI APPLICATION NO.: 31 AER F1ON DATE'. IOD TO: APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-0422 PROJECT NO.: ITS 2819431.K6 PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE A Peyton B C I, D E RIOT F G H I J K MAT L M N 0 P 0 R B PORTION CRY P011TAK1 DY�fr 0C11110UL® II PEI _.._.-go%. M% 1146I 835846.34 Or WORN pMNTIY I urn VALUE VALVE QUANTITY VALUE OWNTT/ VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY NALLN 9112) RRANAIS 7676% 21J5% No. 63 125-54 MankoAQ adjust Maly 85 I PA B 717.00 $ 42,185.00 55 $ 42165,00 f - 3 - 3 - 55.00 3 42.185.03 100.00% $ - 5 33181110 5 6.E65 n 64 125-0 VW.Box Adjust 270 , EA B 211.00!$ 85,500.03 250 $ 48.500.00 $ - ,$ - i - 250.00 f 4,500.00 103.00% $ - $ 5233650 f 1414.50 65 42510 Peril Dram _.._-_. 62 S EA 3 1,427.00•f 66.474.00 62 $ 86474.00 3__--_.- -_.-.' B :..__ 62.00 3 6E47460 790.00%% B-___.__-.. io9as.04 S.-.WHIM M 430-175-112 PIG CINert Opt MET Round IT SICD 2,131 I LF B 46.39 3 36.657.08 2131 $ 4,857.09 $ - $ - $ - 2131.00 f 910.857.09 100.00% $ - f 7r,4353 5 7t.368.64 67 430 175.115 Pp Culvert Optl Materiel Round IS 51CO 32 I If f 100.72 3 3223.04 32 $ 3.223.01 $ - f - I - 3200 f 3,223.04 100.00% f . S 2531163 S e 61 66 430-175-111Pp Divert Opt Material Round 78.5/CD 9w I IF 3 57.52 3 57,117.38 903 $ 57,117.36 $ $ - $ • 500.00 $ 57.117.36 100.00% $ - f I2E134 B 12,10.00 M 130.1 75-124 Pp Culvert Opt Material Round 24 SlCD 1.317 I LF B 73.03 I f 96141.03 1317 f 96141.00 $ - $ $ 131700 'B *741.00 100.03% f f MOD E7 3 20.415.03 70 430-171730 Pp Culvert Opt Metedal Round RICO -..181 T.LF. s._-161.40tB._....___.16957.80 161 �.....--W,OS7.M i _.-_. B _..__._.....f . 761.60 ii lf -O.S67.60 100.0011 p B '3 iiSau ;s7i i9 71 431171138Plp Culvert Opt Material Routs 38 8/CO 74 I EA B 11646 1 3 13947.52 74 3 13.647,52 3 $ - 3 - ' 74.00 1 3 13,947.52 100.20% s - 5 10.W6.70 S 2.010 l2 I br 72 430-171172 PIPE Culvert Opt MeI!Round 77& 2CD 080 LF f 545.72 f 1,135.097.60 2060 f 1.124,183.20 B - 3 s 2060p0 I B 1,124,183.20 0.04% f - 0 .47321e $ 230.6102 j 73 ♦31.1-1 Pp rl Unn 04er MM.ras 624• 65 ' EA 3 130.61 B 8,507.06 0 f - 0 - $ - $ - 0.00 1 s - 0.00% 3 - $ - 0 - i 74 131-1-2 PipeUn.r alonalM 4r4125-3r 67 ' EA f tani i1,240.59 67 3 11.240.58 B - 3 - 3 - 67.00 --ti- 11240.81 i5 oo. B - ..-T- A8Ni f .1-i2 4.]e' 75 436-1.1 Trench drain Standard 763 LF 3 IMAM I$ 144,077,29 763 3 144,077.29 S - $ - $ - 763.30 ':B 144,077.29 100.00% T--_ f - 5 113,34.as 5 30.e19.45 76 I475-I Deep uw-Plugging of ENe6ng Welk 3 I EA f 1578.00I$ 5.034.00 3 3 5A04-00 $ - s - f - 3.00 I$ 5034m 103.00% B - 3 22111 7e 5 1.072 24 I 77 44673 Pump Station(Drainage Use OM') 1 I LB B 1,546J103.00 1.5460IG.00 0.35 3 545.453.40 1 - 0.616734396 $ 1,003,409.5/- $ - 10C '3 1.546H4.33 103.00% f - S 1,T17..1 t5 f 52a.ITe2 78 45534-2 Prestressed Concrete PRng 141 SO 280 ' LF B 175.80t$ 49,080.00 280 $ 46003.03 B - $ - 250.00 3 49.030.00 103.00% f - S 311.6IG.00 S loam. �. n 51112 Pip.wnaa4-o.anal aluminum 371 f--1.-F...'3 121.00+3 117.49100 923.8 $ 1i1.773A0 s - s $ azT.eD ts--_..117.779.e3- 95.14% $__._.. s..__._a476m s aiw to 50 520.7-70 Cure and Gutter Type..F• 6.405 I LF B 30.31 1$ 194.135.55 8405 s 194.135.55 $ - B - 3 - 04 a0 $ 194135.55 100.00% f S 162.7I00 6 41,1®07 61 520-2.4 Curb End Gutter Typo-•D• 503 I LF B 438 Is 14,770.14 503 s 14770.14 S • B - $ - 503.00 3 14,770.14 100.20% $ - S 11.53040 S 5.14274 82 5203 Conc.1.Valley Gutter 332 , LF $ X.76 T 8,864.32 332 3 8184.32 3 - $ - 3 - 332.00 f 8.884.32 100.00% 3 - 5 somas 5 ,H02.. 37..-521-72.4 Skid,Concrete Barrier Wall Rigid R.teiN ry 1,963 tLP $ moots 771,509.00 1907A B 167,835.20 ..-_.._.__. B. __-__ ...1307.30 $ 167835.10 -3311%� .a: ''3 -..i 132.1]3.6]f 33.71,!! 84 522-1 Concrete SldRelk and Dr0lv.ly.,4 TNdr 4745 ! w SY B 91.26 13 263.953.70 4745 S 286,953.70 3 B - B - 1745.03 $ 261.953.70 103.00% _ - 3 f 210.42.Se 5 ...,14 75 522-2 Concr.le Driveways and 5ld.w.lk,S TNek 2341 I SY $ 78.85 3 179,905.65' 2341 3 179,605.64 B - $ - B - 2341.00 I$ 171,935.14 103.00% B - B 141,6116 W 5 2e.51sM 80 523.73 Patterned Paverne T V.010ular Arse*Green Berke 223 I ST B 16.78 I$ 3,74194 0 3 - S - B - 3 - 0.00 3 - 0.83% 5 5 - S - LOT. 87 526-1-1 Pavers Artld.durel,Roadway 227 I SY B 138.96 I$ 28,79722 0 r---- $ - B - B - 0.IID 13 - 0.00% $ - S - S - 1 s9.-526-1.2 Pesos Architectural Sawa* 46 1 2 0 rs .in S 133s szn.iy $ -._.-- $ .- --- -$ $ - o.00 rts 0.00% s _ s 5 70 527-2 D.lsd30le Warning Surface 591 • SF 3 28.84 3 1580244 591 $ 15862.44 5 - B - $ • 591.00 3 15.86 44 100.001E f . 5 124.74 1 3.376.70 90 530-33 RlpRep Rubble Bank end Store 30.5 Tone B 2051121$ 6277.51 0 $ - $ - S - $ - 0.03 B - 0.00% - S - $ - Pape 4 ., Indian Crook Flooding Mltlpa% III Project phase APPLICATION NO 21 APPLICATION DATE PERIOD FOR PAYMENT/CONTINUATION SHEET PERIOD FROM PERIOD TO: 31 Od-22 PROJECT NO.: ITS 2618231.1 M PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE • MAT A Pa en. 6 C ! 0 E F G H I J K L M N 0 P 0 R S SOOT PORTION CITYPRRTON 92M113r SGnOULIS PSI ow Om .......... 60 DESGARTDN Of WORN pMNTIY UNIT VALUE VAL QUANTITY VALUE QUANTITY VALUE QUANTITYVALUE QUANTITY VALUE QUANTITYVALUE Per ROAMS. TIM% 21231E NO. ' 91 536-1.0 Ownnil-Roadway General T1-2 277 1 LF S 75.00 5 20,775.00 222 S 16650,00 $ - S - 5 - 222.00 1 S 16650.00 80.14% S - $ 13553.55 S 3.5,11.43 92 536.7-2 Gun/droll Spatial Pod(Special Sleet Pod pie 36 1 EA $ 159.00-S 16,521.00 22 S 10.W 6.00 S - S $ - 22.00 -S 10.066.00 61.11% S - S ],9B.t3 S 2.150.37 CondrAS Mount) - 93 536-73 Gwrdnll Removal 1064 LF $ 224 I S 3,772.16 1664 $ 3.772.16 $ - f - $ - 1664.00 $ 3,772.16 100.00% S - f 2,12611.811 S 603.47 94 5968524 Guard RWI End hsebnent PanIW ApploeoN TermNRl 2 1 EA $ 7AN.00 $ 6.096.00 2 S 6.098.00 S S - S - 2.00 f 6,066.00 100.0016 S - 6 419755 3 1,20.45 536-85-25 Gwroml End Treatment Tn rclt i3rg Aoreps Type 11 2 EA f 1.175.001 3 2.750.00__--.-.2 s 2.350.00 f _... >i - S 2.00. f 2.350.00 700.00% $... f tam -i 9ou.35 96 536-85-28.Owrorall End Traalm5nl Type CRT 1 ' EA $ 1,175.00 IS 1.175.00 1 j 1,175.00 S - $ - $ - 1.00 5 1.175.00 100.00% $ - f 524.23 f 23026 97 544-75-1 CINA Cushion 1 EA $ 20,132.00J$ 20.132.00 1 -S 20.132.00 $ - f - $ - 1.00 -f 20.132.00 100.00% S - S 0.1143 NI 3 4,205.12 96 550-602-37 FenceGate Type ElSlidrig Cantilever Greeter Thn 2 1, EA S 22.366.00 S 44736.00 1 f 22,789.00 - f - S - 1.00 $ 22,3®.00 50.00% U,a '. 5 _ f 11604.40 3 4e1] .60 30 Opening 99 570-1-2 Perbrmena Tort Sad 9511 ; 8Y S 2.42 i f 7.293.58 3014 $ 7393.88 f - S - - 3074.00 $ 263.68 100.00% - $ - - - S 5,740.26 3 1,56360 100 560-230 LANDSCAPE Rent Existing Tres in Place WM _.. .-._3596.00 $ $ S O.OD $ O. % r5 5 Staking and Guying . - ..__ • 101 630.2.12 Conduit 106 LF $ 28.00 S 2.640.00 105 $ 2,940.00 $ - $ - 3 - 105.00 $ 2940.00 103.00% •S - s 2313./3 f 62622 102 635-2.11 Pull 8 Spite Box F 8I 13"x 24 Cover SW - 1 1 EA $ 416.00•S 416.00 1 $ 41603 f - S - S - 1.00 1 I 41600 100.03% $ - $ 32697 f w 03 109...88-2-12 Pull 6Splice Ike F6124"x38'covey See 8 E11 S 80000`3 4.800.00 6 S 1.800.00 S • S _.... __. y.- .__6.00!f 4.600.00 100.00% j • ! m Seb f .0nib__-..- . 101 6951-1 TMS Vehicle Axle Sensor,Non Weight F 81 2 1 EA S 2018.00 IS 4,096.00 2 $ 4,006.00 $ - 3 - S - 2.00 I f 4,096.00 100.00% S - f 3,2I3.55 S e7245 106 8958.12 TMSInd.SEEa Loop Assembly 2 I EA f 1p62.00 S 3.92400 2 f 3,92400 3 - 3 - S 2.00 5 3.924.00 100.00% $ - S ].aes.19'$ 63521 106 695-7-132 TMS GOinl FUITYN and IrNle2 Type 3 PsdMW / 1 EA $ 6.739.00 i f 6.739.00 1 $ 6,799.00 $ - 3 - f - 1.00 f 6.739.00 100.00% i f 5,301.59 f TAM Mount 107 700-1.11 Single Post Sign F 8I Ground Mount,up b 12 SF 72 I AS S 216.001 f 20,502.02 72 $ 20,592.02 -S - $ - $ 72.00 •$ 20.5512.02 100.00% $ - S 132069O S 4,366.10 -106 7005-12 Single Pod Sign F&!Ground Mount 12&to 20 SF 13 AS $ 6150075 7.995.00 13 ;____7.905.00 5....-- 3 - $ - 17.00 1-8 i,NS.OD 100.00% $ - i'----u6zm s ti7od:a 109 700.1-21 Single Pod Sign F 8I Bawler Mount Index 11671 up 21 AS $ 319.001 S 8699.03 21 S 6,899.00 S - U - $ - 21.0D I$ 6,699.00 100.00% S - f 5,272.11 3 1,426.59 to12 SF 1110 700-1-50 Single pod Sign Rebate 47 I AS S 76.00 S 13,395.00 47 f 13,395.00 $ - S - $ - 47.00 I$ 13.205.00 101.07% S - e 10.54127 S 235314 f 11.__700-1-00 "Single Pod Sign Remove 125 AS $ -.._. 56.00S 7,000.00 123 f 7,000.00 j S _...._-_..._ f - 125.00-4f._____7.000130 100.00% _- __f S.SW.aS 0 t�iT9u 112 7003-101 Sign Penal F 81 Grouts Mount up l012 3F 1 EA f 10600 $ 188.00 1 $ 188.00 -3 - S - S - 1.00 f 166.00 100.00% f - $ 132.21 S SS>e 1 113 700.350-1 Sign Panel Rebate up to 12 SF 3 EA S 134.00 5 252.00 3 S 252.00 f - , S - f - 3.120 'S 252.00 100.00% $ - f 19632 S S3.SS 114 700-3B0.1 Sign Panty Remove up to 12 SF 7 EA f 26.00 S /96.00 7 -3 iN.UE S - f - $ - 7.00 S 198.00 100.001E 5 - t 154.M 8 41 15 115 7083 Rdro relNo6ve Pavement Marlon 518 : EA f 5.56:3 2,665.62 516 3 2.695.62 $ - $ - $ - 516.00 1$ 2,895.62 100.00% $ - $ 221866 f ogees ..._ .. ._. -T.____.... __._ 716 710-00 Palnbd Prvsmsnt Markings Surha -.__.._-..._..1 LS f 16.167.00f 18,463.00 1 $ 16.183.00... ___._._. !._.. $ 1.OD f 16,48300 100.00% s-......_._...-.�__.._1464li2 3 3,816N ',117 • Painted PM Markings WN6s Solid 6" 2.371 GM $ 2,707.00 1S 4,983.70 2.371 S 4.995.70 f - U $ - 2a7 $ 4,995.70 100.00% $ - i S.p1 R Ma f t,O 118 • Painted PM M8rle Whi ngs le Solid e' 0.324 094 S 2,825.80 I S 650.50 0.324 S 850.50 S 3 - $ - 0.32 j S 650.50 192.W% $ - S 86834 f Ile 15 Page 5 APPLICATION NO.: Si Indian Creek Flooding MRIpEtlon Project phew IR APPUCATION DATE:_..._-__...-..iini2o2Y'.. APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-00422 PROJECT NO.: FM nil#31-RI PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE A PM O B C 0 E F O H I J K MAT M N 0 - P 0 R S MOTP0IGRN m'eP0R110N. DYIIIIw WONEe0LaD II91 Ai IS% 0E000Pl10N W IM T•OP WOOS QUANTITY UNIT YAWS VALUE QUANTITY YAWS QUANTITY YAL QUANT VALUE QUANTITY VALUE QUAM VALVE TNY RIP) aegl0 0 _.. >011 NO. 119 • P0101 past Markings Vyh0e solid 10• SW LF $ 1.17 3 611.13 694 -$ 611.96 3 - $ - 3 - 89400 $ 811.98 100.00% $ - 1 630.03 S 17295 120 • PNnW Past Markings Waite Solid 23 1,401 1 If $ 1.57 1 3 2293.77 1461 $ 2293.77 3 • 3 - 3 - 1461.00 !f 2293.77 10040% 1 - 1 1,00520 I 4M37 121 • Painted Paul Markings White Me34493 or Symbol 20 I BA f 07.11 S 1,744.00 20 3 1,744.00 -3 - - $ - 3 - 2600 i 5 1,744.66 100.00% f - f 1,373.20 3 371 oa 122 • P6dNd Paul Marlengs Whits Arrow 27 I• EA $ 33.55;$ 905.65 27 $ 005.65 '$ - S - $ - 27.00 i s 905.115 100.00% S - t 71290 S 1E2.95 123 • Pointed%H Markings While Skip 6•(10/30) 0.750 OM $ 2072.03 I$ 1,570.56 0.755 3 1,570.55 $ - I • I - 0.70 !$ 1,570.50 100.00% 3 N 1,23e.oa 3 334.33 124 %irtad pAvt Markings White Skip 3(2/4)Dotted 0.229 GM $ 241713001$ 475.40 0.229 $ 475.40 $ - $ - $ - 023 1$ 475.40 100.O0% f 3 37414-3 10125 OUOakne 6-10 Dotted EHersion - 125 • Pained Past MvtlrosF00.Solid 13/orCmwa& 1502-..•_Li $ 028 ri- 1,17136 1302 $ 1.171.56 $ - f - f - 1902.00E 1,171.56 10000% $ --- f_---- 32202 1 23854 126 W M PMn Past OIUro w s Yelb SNi06• 0.717 : OM f 2070.00I$ 1.488.40 0.717 f 1,400.49 3 - I - ' I - 0.72 $ 1,460.41 100.W% 3 - 1 117144 t 317 05 127 • Painted PM Markings Yellow Solid 0• 0.10 GM 3 2658.00'$ 470.44 0.10 -s 470.44 3 - $ - $ - 0.16 'S 478.44 100.03% s - 1 375.53 3 101.01 12B • Painted Pain Markings Yellow Sold IS 097 ' IF i 1.17 I$ 1,04049" Ski $ 1040.40 $ - $ - S 897.00 S 1,04149 100.03% S - 3 525.95 I 223.04 129 • Painted Past Markings i --- Yellow laiand Nose 1094 ' SF 3 0.67 13 - 732.96 1084 S 732.96 S - f ...- - f 1094.00 f 732.96 100.00% { 1 520.06 f 11.11 130 710-11-160 Painted Pavement Markings 10 EA f 87131 S 1371.100 10 s 071.10 3 . $ -_-- 3 10.00 S 071.10 100.40% $ - t 520.10 S 142.01 •131 711-11-124 Thermoplastic STD White Solid 18• 694 LF $ 2.01 13 1,059.02 074 s 1,650.02 $ - $ - S - 094.00 $ 1,059.92 100.00% $ - s 1.45075 s Sae 1e 132 711-11-125 TkxngRMeSe STD 101Oa Solid 24'for Stop Bx 1 295 LF f 3.56 i f 1,056.10 210 $ 1.056.10 $ - $ - $ - 295.00 $ 1,05010 100.00% 3 - 3 33115 3 22495 133 711-11-141 TkxncpIa015c 5TD White Skip 6•(24)D011.d 0229 ' OM 3 4.745.001$ 1,000.61 0.16 f 054.10 f • '$ - 3 - 0.16 f 954.10 7580% $ 1 07216 3 on 92 O9Mlne I610 Dotted Extension We Symbol--- $ f 7,469A9 16 $ 2.H57B 3.-.- _._-_-__..__._.$ _..-. .$ _...__-13.00 �5 2,415.76.--0Y2111 {_.- --_: f i,9dil3 3 314:5e 1>/ 711-11-190 Thermoplastic Standard White Message o15 oak m FA 134.21 --_ -- _._............._._._--._ 133 711.11-170 thermoplastic Standard White Arrow -_-. 27_...._r.EA S 01.51{f 1,660.77 ZI S 166D 77 S - i - $ - 27.03 3 1:E1077 100.00% $ - 1. 1.30703.3 _..... 3074 130 711-11-224 Thermoplastic STD YNbw Solid 16 207 1. LF 1 2.00 i f 2,403.96 697 S 240396 s - $ - f • 097.00 3 2,403.96 100.00% f - $ teat 92 3 51204 137 711.14123 ThenmoptaNc Preowned 1611111a Sold 17 tali 1502 1 LF $ 1342 IS 20.150 04 1502 1 20.154.84 $ 3 - $ - 1502.00 $ 28158.84 100.00% S $ 15.003.0 3 420 41 Crosswalk 130 711-16125 Th rmoplestis Preformed Wide So5d 24"For 1100 LF $ 19.00 1$ 22154.00 1100 $ 22154.00 $ - 3 - $ - 1191.00 5 71.154.00 100.00% ---_- f 0 17.425 20 3 4.716 90 Crosswalk 131 711-14-100-Thermoplastic Preformed Whle Message - 16 EA 3 -._.223AY3--_-_- 337904 10 I 2,236.90 -_ 3_.._.__._ $ -_-__ .._ 5 1000 $ 2235.10 52.5133 ' 1.3121_..3 ..._.____---C_ .1.711044 S 47545 '140 711-16101 Thermoplastic qMr Sutaooa Whoa Solid 3 2.371 GM $ 5.33.00 12,697.12 1.1 $ 5,044 30 5 - 3 - $ - 1.10 S 5,844.30 40.39% 6,'752 $ - 1 4.50946 3 1944 e4 141 711-16102 Thermoplastic other Surfaces White Sold If 0.324 OM 3 0,00.0015 2,267,66 0.2 $ 1,380.90 3 - $ - $ - 0.20 $ 1.369.00 61.73% ®6T.,.. 3 - $ 1101 M 3 20016 142 711-16131 Thermoplastc Weer Surf.On Wain Skip 6.1630 0.750 OM 5.329.03 4,031.38 0.75B 4,039.36 • $ - $ - 0.76 f 4,039.33 10000% -_ 0; 3 3 1.17033 t NM 39 SW 143 711-16201 TMmoplaNk ONx Suncca Yellow Solid 0' 0.717 ' OM f 5.377.03t5 3.61667 0.717 $ 3.62e.67 -3.--_._-.---_.... 5 • i - 070 f 7.621.13 70000% - (0 I` S "----'i- 3o11 se i e15 07 144 711.16202 Thennopleetic Othe roaortao0e Yellow Solid 0• ale OM I 7,00344,$ 1275.58 0.10 0 1,275.58 I - f - I - 016 $ 1275.58 100.00% • {0. $ - 1 1,00147 S 271 TN ,145 1362-12 Conduit Fxrllh and Install D redlonal Bon MO ' LF 'I 2500 15 130.400.00 6798 y 113.344.03 I - - $ - $ - 6798.03 3 130.344.00 100.00% - -- 3 - 3 too a Ts s 40543 27 146 035-2.11 Pull$Sptioe Boo F 6 l Directional 13 e 24 Coax 73 EA 3 47534 / 3430.82 73 -$ 34.8312 3 - $ - 3 - 7300 S 34000.82 100.00% S - 3 27.300.1e 3 7,39105 SW 147 641-2.12 Pnbe0wd Concrete Pole F&I Type P-II Sella 1 EA f 1,342.13 $ 1,342.15 1 $ 1,542.15 $ - $ - f - 100 $ 1,342.13 100.00% $ '1 1056..20 I 205.07 Pole'1tl 7761-02 LlyhOro Corl6iporaFillowland No11-6 -._--1e390 LFy._.----t.4D 1 31.757.20 23347 f 32.685.10 f--...__. $-_.-__. -_ 330.00 3._- 32,053.10 1221ti $ -__..- -2--_..---2e.Trini 0.902.08 149 715-1-13 LkhtIn1 Condo tot F e 0 klslaetad No 4 to NO 2 340 ' LF S 2.04'$ 709.02 340 -3 700.92 3 - '$ - $ - 39103 I s 700.92 100.00% $ - I 33871 I 1M.31 150 715160 LIghI Pole Compose Relocate 11 EA S 2611.00'$ 31,251.40 11 -3 31351.00 $ I - $ - 11.00 $ 31251.00 100.00% f 1 240454 3 tea 151 715170 I.gO Pole Compose Remove Pole and Foundation 15 EA 3 1359.00'3 29.835.40 14 $ 27,846.00 3 - 3 - $ - 14.00 +$ 27.04000 9323% f - 1 213000 3 5,93120 152 715-741 Load Cana F 315scxtlary Voltage _ 2 FA $ 75M 1.00.f - -31,630.00 : $ 718]0.00 f -- ------f-- - - $ •----Z:OO.._. S-----31,630.00 100.DD% $ - 1 Anna,`s e73719 153 715-7-21 Load Cider Rework Secondary Voltage 1 EA $ 4,32.00 $ 4.262.40 1 -I 4,262.03 s - $ - $ - 1.00 I s 431200 100.00% $ - 1 3,361.13 $ 307 H POP 6 _, Indian Creek Flooding Mitigation Prefect phase 15 APPLICATTIO APPLICAION N DATE: _._ 11/14/2022 APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO'. 31-05122 PROJECT NO.: nu 2019431-KS PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE A Pay9w 0 C 1 D E F G H I J K "AT L M N 0 P 0 R 8 MOTPa1T5111 art PORTION WNW SCHEDULED IEOO _.- _-. Ra DEECRWOON OF ROAR WARTY WIT VALVE VALUE QUANTITY VALUE O1MMb1V VALVE QUANTITY VALUE QUARTO, VALUE QUANTITY YALYE owl Ammo, MA% 31.30% 110. 154 715-7-41 Lad Corder Remwe Secondary VeSeq 1 I EA f 1,343.00 $ 1.34300 1 f 1,343.OD $ - f - f - 1.00 $ 1,343.00 100.00% $ - f toss g4 5 twa' 155 715.500-1 Poe Cable Disbibdlgn System Conventional 47 EA $ 1.854.03 f 87.138.03 47 S 87131300 $ - f - $ - 47.00 $ 87,138.00 100.00% $ f 9557761 S ,E,aW% 156 715-511-130 UpM Pole Can Spacial Dsapn F 81 Sinds Arm 47 EA f 1GQ2.00}f N9,d.00 73.2e f 2I8.369,58 3 0.54 $ 2pM, EA2 f - 2280 f tl9.d.00 100.00% f f ]e6,i9.s f 1u1,x.i s, SndW1ler MountAle Numinum 30 I 157 630-2.12 Conduit Furnleb 5nd Install Directional Bora 3326 I LF $ 26.00 I f 42.064.09 2942 S 82,378.00 $ - 3 - $ • 2942.00 $ 82,370.00 69.46% $ - f E4I9.91 f 17,540.05 158- 632-7-1 Signal Cable New or Reconstructed Inbaeann F 8I 3 I PL $ 6.152.00 I$ 18,456.00 3 S 10.456.00 $ - $ - $ - 3.00 $ 16656.03 100.90% $ - S 14,924.07 3 3,93113 159 632-74 Signal Cable Remove AMn.Nen 3 I PL 3 510.001 3 1,690.03 3 $ 1,060.00 3 - 3 - $ - 3.03 f 1600.00 100.0016 $ - f 1322.14 S 33704 1110 6392-11 PIA 6 Splice Bee FumiN 6ImW11T s 24 Car y2. +.-E_.s___-415.th 3 43,792.00 ._-02--.-f .4T,79200 S- f.._ gM p,79200 tOOAD% $ - 9 344.3 f e,sT.iO 161 0391-122 Electric Power SErvia F a I Underground Metar 4 AS $ 4010.CO 8 19,240.03 4 $ 19,240.00 $ - $ - $ - 403 •f 10.240.00 10000% $ - f 15,141.111 S 4,010,2 PurcIMad By COmrador ' 162 839-2-1 EIWrk Service Wire F 6I 303 ' LF $ 7.51 S 6,687.05 040 -$ 6912.40 f - $ - $ • 840,00 13 6,39240 92,82% f . f S,030.E2 S t,s191 163 63-340 Electric Service DNcennsd Remove 3 I EA 3 951.00 3 2.65300 3 S 2.053.00 8 • $ - 8 • 3.00 $ 2663.00 100.00% f - S 2,245.31 S 00750 194 611 d-13 PUEbeaad Type SI 11 EA $ 1,23100 7 7692.a . •4 3 7f1200 3 i lW $ 7,6>Z.OD 100.00% f - 1 41l3.n 5 I,Ea.Tl ype P-II Service 4 I EA 8 1,fa.00 _ S Pole '195 e49-1-11 AlNmnuns 22.156.02 10 $..__a2.15s:oo t----_-_ f f - 1600 i 2z:13s.00_..100.00% $ �- - --......-f----±i.aew s T,iiaa 193 016-140 Aluminum Signal Poles Remove 9 EA f 56.00 S 504.00 9 $ 504.00 -0 - $ - 8 • 9.00 -:3 934.00 100.00% S - S 3a a5 S 10735 167 640-214 Steel Mast Arm Mambly F{I Double Alm 40.317 1 EA $ 35.507.00'S 35,567.03 0.75 3 26.875.25 8 - 3 0.25 3 8,891.75 8 - 1.00 .8 35567.03 10000% f • I 7710123 s 7.575 77 196 049214 Steel Mad Arm Mambo F&I Single Arm 50 1 I EA $ 3333000 3 33,330.03 0.51 8 18,848.50 3 - 3 0.49 S 16.481.50 '$ 100 3 33.330.03 100.02% 3 - S 29230 71'S 7,003.20 ._..-._641 ._.__ h----_ - - _. - ...._._.__._169 6N-21.7 Steal Mad Wm Aaembly F 610ouMe Arm 50 b]0 1 EA f 36,922.00�f 79,971.00 O.J2 $ 12./2517 f f -..- ass s Z6,498.17 � 1.00 1 8 39,922.00 100.00% f.._--._.._.. 7 _30131.61 3 6.29U35 170 019-21-10 Steel Mat um Assembly F 8I Single Arm 80 3 I EA S 35,902.00 f 107,706.00 2.43 f 40.626.34 3 - i 0.57 $ 00.879.60 f - 360 8 107.706.00 100.03% $ - f 50,7a E2 f 22941 3e 171 649.26-3 Steel Mast Arm Aseembly Remove Shalbw 5 EA $ 3132.00 f 15,063.00 43 f 15.000.00' $ - $ - 3 - 43.00 $ 15,930.00 100.00% 3 - f 12324.42 S 3.335 Se Foundation Bolt on altacemm e 172 650-1.14-Traffic Signal F 8!Aluminum 3 S 1 Way 18 AS $ 1.0113.00 S 19,13400 18 8 19,134.00 s - s - ' $ - 16.D0 I f 10,13400 100.00% $ - S 15A071.40 S 4.07554 173 6511-11 Padaselan Signal F{I lFD Countdown 1 Way 18 AS i 951.00 f 152I6ID 16 3 18.21e.00 - i_--- - 3 - $ 16.00--1-- 13216.00 100A0% f --- - i nml.i 3.37 Ot- 174 053-1-12 PeMstrbn Signal FurrM 8 lneaS LED Countdown 2 2 AS $ 1916.001$ 3.132.03 2 .3._..._3,132.03 ._.... 8 ... • i - 3 - um f-.-_3.13201 /0007% $ •-1- 24114.M f Mr 12 Wry 175 853-1430 Paatlrlan Signal Remove PM&gal Poe Pedestal 1 AS 3 87.11 I i 67.11 1 $ 67.11 $ • S to Remain F - 3 - 1.00 1$ 67.11 100.00% $ - `f szex S u.s 176 8t10411 wit,*Deletion Sydem VIdae F 81 CWYrt 3 I EA 8 9,707.00 3 29,36100 3 $ 29,361.00 f f - f - 3.00 I$ 29361.00 100.00% $ - f 3310711 f 6,233 e9 Equipmml 177 11eg412 VMI00Deta5an ground S EA f 464200 3 37,13300 8 $ 37,136.00 3 $ • - f - $ 'if 37,136.OD 100.00% $ - S sa76a S i.Ea 97 170 605-1-00 PaaNten Defector F 61 Pol.6Pe0estal b 20 EA f 560g r 5,60300' 20 ---f 3600.00 3 f 1,107 e0 - - _ _-_•_ 1 _- - - f - 7000 i f 5,00D.00 100.00% f --'i - ;4m.2b f R•m nman 8 50.00 1 -3 56.00 $ - 3 • $ - 1.00 1 B %a 10o.W% s - f 44.07 1 ,,0* 163 6765-140-Tra11k CormoNr ASambly F a 1 MOAN 2070 3 '. AS $ 20,520.W $ 05,590.00 3 f 05,560.00 3 - f - $ - 3AO 18 85.500.00 100.03% i - s 07,335 n S 10224 s 181 670-5QI Traffic Controller AAembly Modify 1 ' AS $ 271600',3 2.798.00 1 3 2,730.00 $ - f - $ - 1.03 $ 2796330 100.00% 3 - S 0.213.4 f sass 102...070a300 Tnllk ControllerAMmbly Remove CeblrelW HIM 3 , AS 3 559.0214 - -1,1377.03 3 T---..-.1,6n.00 --_.-_ $ • 3 - -'-__.---- Cabinet - 8 - 3m 8 1,677.00 100.001 {----- f ,a,9eo i .310 1313 700-3-201 Sign Paal F&I OvedNad MoHA up be 12 SF 8 EA S 559031$ 4.472.03 6 8 4,472.00 -$ - $ - 3 - 800 13 4,472.00 100.00% S - 3 351548 S 952.94 164 700.3.205 Sign Panel FuniiM 6 AIQE Overhead Man151-100 1 EA 3 4.116.00 i$ 4116.30 1 -3 4,118.0C f - f - 8 • 1.00 I f 4,116.03 100.00% S • 3 3.239.29 1 576 71 SF •105 700-3401 Sign Panel Remove W to 12 SF 1 EA $ 67.00 t$ 67.00 1 $ 6703 - S - f - 1.00 1 f 6703 10000% 3 - S 52.73 f ,4.27 'IRE-7004.112 OvuMad Static Spn Structure F{I CMIllMdw21-30 t I EA $ 61.7Mt0WI -..._...62206 i.00 0.77 --03.1N 8_ ]S _ -_-7--_. . - $ o.23 i--i9067� 3 •-_- 1.Oot---a.20e.ao 100.a0► s •T-- �4,e9_ S.,2 s- ,�.Suw sT PICA? • • APPLICATION NO.: 71 k1G16n Crook Flooding MItlyEDon Pro}M pIMM■ APPLICATION DATE: -.__ 11%1 APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-031-22 PROJECT NO.: RD 2011-231-KS PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PER100 THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS TO DATE A Fry mo 9 C ; D E I F G H I J K MAT I M N O P 0 R S POOTPOwer 0115gITON rIbmk 16 O7%1 lfl r10e oifcolDON Oa woos O NW/I OAT NUM 1MLM OIMMIR IM WARMS VALMRMS NUM MANNY PALM QUANTIN VALUE GYAMIIIY R11i/PALM PM RRA 1E/1S MANI MD. 187 700521 Intermit/Illuminated Sign F 8 I Overhead Mount up b 0 1 FA $ 3,915.00 I$ 31.320.00- / 3 31,320.00- 8 1 S • S.00 i 3 31,320.03 100.00% f - f 24648.MI f 1,671.18 12 SF 180 70612-32-Sqn Bannon F 91 Overhead Mount Two Seasons ] AS 3 72700 $ 2,11.00 3 $ 2.161.00 $ $ f - 7.00 I f 2,161.00 100.00% f - f 1,716 o s 43486 i I J111s1Wa tans tar ale Shoat Drainage $ 1 .S - $ Option A r $ S $ - 1M 415-2.1/ Manholes.P-7,410 3 t. EA S 48,910.00 3 14,430.00 3 3 //A30.00 $ -} - y,// $ 1{•8f1,M 100.00% $ - 11,]6iM f 3.073.59 190 /25-2J2 ManhoPipe S -7,a10 1 1F $ l47I.0043 5.m.00 1 S 9.a7700 $ _1N _ SA70JM_ 100.00% f sotto f tam80 •i1A30.17S716 Pip C W Opt Matt Hound 15'SA:D _-. 1 �_lF $ e31.25J 3 7.57500_.. S 3.525.00 -.. y_ - -_-.-._�_ .__-_--_ _ - 192AS30.17S711Pipe Col.Opt Mall Round li S/CD i I IF 3 104.00'$ 29,598.W i-_"$ 29.5000 _. r -__- /�__.100.W% T 1 3212053 i60.95 MM } M,M1.11 100.00% $ 23]em 9 7077 is 190 tl0.1-I-I Pipe Cuts,Opt Mall,Round,21'S/CD 1921 i IF f M.00 3 175,10100 1324 f 173,101.00 $ 1W.M i 17S,NOM 100.00% y - 1M,M6.M f ]7,25716 j 194 •31-1-1 Pipe Liner.Optional Material,0-21' 11M IF $ 140.00 $ 182,120.00 M2 3 91,060.00 SILO $ M,/M.M 59,71% $ - 712eaM 9 20,53S.M 195 Q1-1-2 PI• Liner O•tonal Material 2p I IF $ 168.0013 41,832.00 241 $ 41,832.00 $ 318.01 /1-.M 100.00% 4.111.11111111116 $ - 32A21.78 f 1.10.22 p /M S 191 Albwanoe br Trench Safely Ad 1 LS 3 25.00;3 25.00 1 3 25.00 $ 1J1 ;$ UM 100.00% - S . 18M f 5.33 197 Permit Allowance 1 LS $ 50,020.00'.$ 50,00200 1 $ 50.000.00 0 1JM •1 M,N1JM 100.00% f - 93.360.63 f 10.000.60 1M City Indemnification 1 LS $ 25.00•3 25.00 1 f 25.00 f __._1JM ! _....-7S.N 100.00% _f - 19M f 6]] 1M Owmr'a Contingency ._.. 9ency .._ ._.__. 1 L6 11,8M,1M.01 1 N942821 0 II 134373.09 f LW t 7332% , 666,425 f.. wO02 f 'MONO] Request for Contingency D 01(CD No.1) 1 LS 2148426t1 ...-#,1M.21 1 1 -29114.21 5... _._ M8�73.M ... _.._. ___ ... ..___ Request for Contingency Draw 02(CD N.1) 1 LS 3,92357(1 352697 1 S 352347 1 I Request for Contingency Draw 06(CD No.) 1 . Li 122,29433 22,223 1 Request for Contingency Draw 11(CD No.2 1 LS 112,7MM!S 112,71431 1 $ 112,]N.01 i Request for Contingency Draw 10(CD Not 0 LS11JPpJ2 { 11,{1].12 1 11.893 92__--- - Request for Contingency Draw 03(CD No.2 1 I LS M,2M.N i M,2M.0 1 76,]M.N 3 ---- Request for Contingency Draw 18(CD No.3) --_ 1 LS 1,919.13 9 1,099,13 1 1,019.13 7 ------' - - - Request for Contingency Draw 21(CD No.3) 1 LS 1,166.03 $ /,011103 1 L $Of1.o3 S i _-- Regue f I Contingency Draw 25(CO o.4) 1 LS 0223.10•{ 021311 1 3,620.00 $ 3 - Request for Contingency Draw 7(CD No.A) 1 LS 20,363.1 1 20,313.1 1 20,M3.91 3 _- ""- ---- - Request for Contingency Draw 8(CD No.4) 1 ! LS 17,962.00 $ 17,242.00 1 $ 17,162.00 $ Request for Contingency Draw AO(CD NoA) 1 ' LS 47,153/3 1 47,163.43 1 $ 47,183.41 $ - - _ -• Request for Contingency Draw Al(CD NoA) 1 I LS 96,1/6.00 t 86,182.32 0J1172 1 05,61.32 y Request for Contingency Draw 18(CD No.6) 1 I L9 6212.60 $ 6,/12.60 1 -4- ,/02.80 3 - _ Request for Contingency Draw 37(CD No.6) 1 I L9 3,079.90 $ 3,073.90 1 I 3,071.eo Request for Contingency Draw 23(CO Nos) 1 l LS 2,211.78 f 2,21.74 1 $ 2,211.78 '3 - - - - -._ Request for Contingency DrawN.6 --_ _- goes gen y (CD ) 1 _ LI 2,M/.61 f 2,664.61 1 1 3.6f1.67 3 - _ ------ RequestContingency Draw K(CO N 1) _-.-- � T L1 20101.17 f 28,30I27 1 21,301./7 •$ Request for Contingency Draw 62(CD No.8) 1 LS 14241.10 f 16,241.10 1 16,241.10 $ _-- - - Reguest for Contingency Draw 80(CD No.7) 1 LS 1262.46 f 1,162A/ 1 1,11231 f Request for Contingency Draw 61(CD No.7) 1 LS 4,11.00 1 4,116.00 1 /,1M.1 S Request for Contingency Draw 61(CO No.7) 1 - LE 1,312.18 f 1,76228 1 431291 f -- Request for Contingency Draw 66(CD No.7) 1 LS 14318.05 8 11,17109 1 185 _ -3 . Request for Contingency Draw 63(CD No.8) 1 ! LS 7,437.04 $ 7237.04 1 7,177.04 3 r_ Request f Contingency Draw 6](CD Noll) _,... 1 L5 _ 27,N1.23 8 22,161.M 7 i_-.__...._ - Requeif C g 1 ncy Draw 81(CD No.6) 1 LS 11,166.01 f 21,196.61 1 1_ .1 1 Request for Contingency Draw 68(CD No.f) ----- 1 r LS 8,932.30.8 11,832.30 1 0,132.70• Request for Contingency Draw 60(CD No.8) 1 LS 1,639.30 8 1,530.30 1 123920 ---- - - ----- 1 Request for Contingency Draw 48(CD No.9) 1 LS 1,122J0-t 2,622.N 1 2122.11 Request for Contingency Draw$2(CD No.9) 1 LS Lt$010 I 1 21,934211 1 15,93426 Request for Contingency Draw 83(CD No.9) 1 : LS 9,238.12 L I 0,334.12 1 1,334.12 Request for Contingency Draw 69(CD No.9) 1 LS 2,734.90 1 2,734.90 1 2,734.99 --- Request for Contingency Draw 76(CD No.10) 1 LS 8,163.39'6 8,113.39 1 8,14321 ,____,, ._ Request for Contingency Draw 79(CO No.11)_.-_..._1 LS 11,028.32 f 14,026.32 1 14,028.32 ti _ Request f Contingency inDraw 83(CD N.101 - 1 LS_ 13,923.42.f 13,97342 1 13.07342 _ -___. __ Request f Contingency Draw 96(CD N-.10) 1 .LS (/6,801.12)1 - 14628182) .-.7. - -.. - -.-.__. ..... ._..-_ .. _ _-_-. _ PSALM f Request for Contingency Draw 96(CD N.10) 1 1 L9 IOA7826 f M 131 M MAMJf Request for Contingency Draw (CD No.10) 1 Li 72,MSJi2)$ p,M3.f2) 1 (2,013./2) Re•uest for Conlin.nc Draw 0088 CD No.10 1 I LS 6 $ 2,603.76 1 2011,74 Request for Contingency Draw 93(C•No.101 1 L3 1 .17 1201.17, 1 12311.17 I 3 CO $ __ _. 1 01110INAL CONTRACT SUM 1 13,1f1,/NJ1 1 11.391,80.1f { - 1 1,311.13122 1 - 1 11.714,13137 MAI% 1 - 6 1,M1,M_l 9 SA/2,11A7 Pi1E a ir APPLICATOR NO 31 kN4n Crook Flooding MIBsogon PTDJSet prim III APPLICATION DATE: -_ --_.11/14/2022 APPLICATION FOR PAYMENT/CONTINUATION SHEET PERIOD FROM: PERIOD TO: 31-044-22 PROJECT NO.: ITB 2019431-S0 PURCHASE ORDER NO.: ORIGINAL CONTRACT PREVIOUS PERIOD THIS PERIOD PREVIOUS PERIOD STORED STORED MATERIALS ' TO DATE A NylonB C 0 E F G H I J - K 6/AT L M N 0 ' P O R S FOOT PORTION CITY 908716N OEM 5C11097LEO % 1661 00% - w% _ Ile DYCRIICNCP WORK QUANTITY UNIT VALUE I VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALUE QUANTITY VALIE1 QUANTITY WILY. P9P) ItRAMAGE 78.70% 2130% N0. APPROVED CHANGE ORDERS S _ Changed de 0001 _ _... S - _ -" ' 700 t02-2 Camero I Material for Tempary OrNwa aya 21 CV S Q7S f 665.7E 21 885.78 4 -- 21.00 $ BBS TB f 00 00% �-- M]it-S 158-87 201 1604 Type B Slabilu•t.An 7 ' SY 900 $ 63.00 7 63.00 7.00 5 63.00 100.00% 4958 S 13.42 202 162-1-11 Prepared Soil Layer 73 SY 15.94 3 1,236.62 73 1236.62 73.00 5 1.238-62 100.00% 973.22 S 20110 203 285701 Optional Base Group 01(8-12.5 Only) 6 SY 4027 $ 241.62 6 241.62 6,00 I 5 241.62 100.00% 190.15 1 5147 204 265-711 Optional Base Group 11(B 12.5 Only) 4 SY 5370'3 21180 4 214.80 7.1000 3 214,80 100.00% 18005 s 45.75 4.q 205 265711 Optional Base Group 11 LlrtprOck - 43 P P ( ) 27 SY 1700j$ (41,3951 27 17652 1,731.608) (sts52)S (t0.25141 206 4060.11 C 6Ym' ( ) 2743.q 5 (13.5751 100.00% Concrete Class NS Gravity Wall 7.1 CY 1%.qiS 1,3W 80 7.1 1,g780iS 1,30160 100.00% oM.ts f 2s.n 207 403-0.13 Concrete Class Ns Steps 133 I CY 25200i3 (3,47769 13_6 (547780) -1380 5 (047780__..,,100,q% R.A6.87)S (740,73) zce 4q-411 Coquet CI IV,Retaining Wan 288 OY_ 652.6I s 25,4794E 26.5 _25,41948 ._.4 _ __--i_ ...-- _- .___ _ _ 2380 4f 25,N948 f00.00% 2q H51J Rainfor n9 Steel-Retaining Wall ----f300 ��LS- � 1.59 I S 1{,787.q Y305 71,767.00 �� -- - - -- -"- 9304.00 .S 14,7 4.50)100.0% tt,991,5E f (113.04 '210 415-1-6 Nets,Curbs. Steel-P43.<10- -4 LB 0.51 (Ot4.B01 (RI4.00) -1.03 :$ .907.00) Iq.CO% (4MSe)i n4519) 211 Q51381 Nets,Curb-,Type P-8.<10' -1 EA 4,907,00 (7,907.00) .1 (4.907.00) -I C0 $ (49D7,o0) 100.00% (5,s151)f 1.615.1W -212'�24/ Manhole,P-7<10 _ 2 EA 3,7q.q 7,566.q 2 7,5q.q -213 4252-71 Manhole,J-7<10 -t EA 5,108.00 (5,1q. -1 2.-1. $ 5,Sq.00 100.q% 4018.45 f 1,0t195 61 214 42-2-72 Manhole,J-7 910 2 EA 5,160.03 10,320.00 2 10,320.00 2.03 I f (0,Iq.00 100A0% 6,121641 S (2.115).16 215 4255-1 Manhole Adi M,Utlky -9 EA 767,q 0 5 (6,903.00 116AO% 5432 6664 f 1,ti.34 (7.62a00) -0 (7,822 (7.6q,0D) 100.00% (4.452.911 f (t,176.on 2176 425-0 Valve rainSok Adjust 44 FA 227.C° (15.70860 -47 ft 5_702000 __. _.. _-__-__...._ _ _-6.00 5 (17_70600L Iq:00% n4E22.20$ 1.2115.80 '217 430-IO •w.Or ... ._-3 LF 1,46.39 5,2q 65 4 620200 4.q .5 6.262 85 100.00% _-.._._ �__ 928.71 f t 33e.94 216 100-1Fr11gPpe Culvert,Opt MNl.RwglS SrCD... 1J, LF tl.3P e,282.q 1a6 8,26J.q 136.q S 6,38285 1q.00% -...___ .djE_i1 ! 1363.94 219 130-131 t3 Pipe Culvert.Opt Ma6.Round 1E9 S/CD -15 IF 57.52 (862.80) -15 (662.60) -15.00 1 S (982.80) 100.00% (67902) (105.78) 220 420.175724 PM.Culvert.Opt Mee,Round 24 S/CD -11 LF 73.00 j603.00) -11 (900.00) -11.00 !$ (803.00) 100.0096 531991 (17104) 221 430-1313[PM*Culvert.Opt MET,Round 309&CO 25 ! IF 103.40 1 2585.00 25 2,595.00 - 25.00 '5 2,585.00 100.00% 2,034.40 550.61 222 430-17513[Plpe Culvert,Opt Matl,Round 36"S/CD 22 LF 186.48 I 4,148.56 22 4146.56 22.00 $ 4,146.56 100.00% 3,285.54 ME 22 223 430-175-172 Pipe Culvert.Opt Matt,Round 72 S/CD -20 LF 545.72 (10,914.40) 40 (10,914.40) -20.00 U (10,914.401 100.00% 79MLP 1161663) (2,321.77) 224 4311-2 Pipe liner,Optional Material.25'-36" 3 LF t67.77. 50331 3 50331 _ 300 S 5033/ 100.00% 8R.10 107.21 225 436-1-1 Trench Drain,Standard -47 LF 186:C1'II (5,075.01) 47_ (0_67501L q - 47 _ 3 (6.67501)._.100.00% __.._.6,�8 11 51 89¢39) 226 455-34 a5 2 Prestr• •0 Concrete Rkrg,14'SO 35 LF 175.8T 6,12500 35 6.125.00 227 51-1-2 Pipe Hard Rail-Gundr•)Aluminum � LF 121,00 (6,349.00) -0 q2 4B9 (6.349 _... __. 35q $ 0125q 10000% -_ -.. 4E30.]5 d- 7O/N . 2 3._.. (8.3452 C0 4) 1 .00% -........ _-----'p.56E� n 6 7202j �,228 5261-10 Curb and Gutter Type 4 LF 30.714.00 121.24 4 121.24 3 121.24 100.00% 6.p 25.662 222 520-2-4 Curb and Gutter Type D 4 LF 3.38 I (117.52) -4 (117.52) 4.03 $ (117.52) 100.03% I92.4R (23.03) 230 522-1 Concrete SIANwelk and• 4 Thick A SY 5528, Z758.74 40 2758.74 231 522-2 Concrete Sidewalk and O1tow•NN,8'Thick 84 SY 76.98 1 94.00 3 2755.4074 100.00% 5500.45 311.t0 6,435.40 8{ 6,455.40 769 $ 6,455.40 /q.00% S,187.88 100.00% 14110 tOlss 232 M7 2 Oelatlahle Warning Surface 7 SF 26.64 18768 7 187.88 .02 233 570-1-2 Perform Turf.Sod 73 i SY.... 242 17696 73 17688 _..... 73C0 13 17606 100.00% - 138.03.86 3763 !234 635-2-12 Pull SpliceBoo F8.124'a 36'Cover Ns _._i_ -4_EA 6q.00 (2,40000) -3 ._._{240000) _ _ -3 0 S J11gq) Iqq% -1 n.5Me0) (tin 20) 235 Markup N 8 ms 1 IB 4,Iq.22 1,1q.72 1 4,iq 2? --- f 00 $ 4,10022 103.00% 3.23396 8752E 238 Bond and Insurance 1 LS 447.25 447.25 1 447.25 1.00 1$ 447.25 103.00% 35199 95.26 237 425241 Manholes.P-7,<10 5 FA 4,610.00 24.050.00 5 24,050.00 5.00 I 5 24.050.00 100.00% 16,927.35 5.122.65 1 238 425-2-42 Manholes,P-7,<10 -8 EA 8,477.00 (13,477.03) -1 (8,477.00) -1,q !$ (6,477.00) 1C0.00% (667143) (19(5.60) 23S 430-175-I19/Pipe Culvert.Opt U.S.Round 15'S/CD 20 LF 881.25 I 17.625,q 20 17,625.00 20.00 !5 17.625q 100.00% 1y570.66 3.754.13 240 430-175118 Pipe GUNert.Opt Molt Round 18'S/CD J9 LF 604.00 (23,556.00) -30 (23.556.00) -39.03 'f (21,240.00) 100.00% nB.539.5s) (aGas07) 241 43D17512a Pipe Culvert.Opt Ms.Routs 2P S/CD -13 LF 95.1p I (1,248.00) -13 (1,243.00) -13.00 f 1 IN. 1q.00%(. 0O .492.241 [H7.72) 242 431 1 I Pipe Liner.Options!Material,2 34" S _L8 IIO.00! 9(20.00 -5 9(520 q q.q 3 9,52000 Ig00% 7.402.6E 2,027.1E 243 401 1 2 Pipe Liner.Oplwml Material.25--3e"... _..__.......-'3 LF tee 00 f5W 00? ...J (50400)-__----.-..__....---_' ----..__.-. _.._.__ Jq {s ...S53600) 700.00% -..-- l%8_e6j (t0].DS) 244 Bona and Insurance 1 LS 536321 536.32 -- 1 -----538.32 ...__. _._. __.. ! _- t.q 13 536 32 HMA0% S 422.0E 111.24' CN _._ _._-__. ___...- _____... _..-.-_ 246 Ganef to.ernersn ad Pump PoleSlafl Control Panel 1 $1101,810.003 6ST,310.00 09182N/q 1 N41011s f .� __- __.. 09862Mi02 3 101364 9 9552% 3 51470972 N 300s.17 Modification _-- -_- TTT 245 Modified Berner Wall Light Pole Foundation 1 LB $ 6638f000 S 1,101,3B9.q O.B9999g9%1 7,N7,3s.00 0.9999g997$ 110t,3q.q Iq.00% 3 sa,l92.M S 234.593.64 41. $ M Sheet Pile Walls and Caps 27,263 SF 5 95.05 $ 2.565267.00 27E68.543B 3,571,075.05 3 - 27056.840B S 2,571,975.96 99,37% f 2024.147 44 54703152 240 Skeet U9hen9 System II LS $ (4484.,,I (4,464. 1 - (4,484.00) 1C0.00% 3 P,ua.01) NMMOH 249 Maintenance of Traffic Plan 11 LS 5 390,000.00 $ 390.000 0000 1.00 390.000.00 $ - 1 f 390,030.00 100.00% • y 3069]0.00 83 07000 250 General Items I�LS 3 166,07600 5 188,076E0 0.99 198,010.71 3 - -0.823 63 61 3 7.f 196,916.71 153.38% S 147,105.02 39,51369 251 General Conditions 1, LS 3 363.119.00 5 363,119.00 1.00 343,118.1 3 - 0.989999941 S 383,116.96 1C0.00% -- 3 245,774.64 77,344.34 252 Fire Flaw Improvements 1! LS 3 35220.00 5 35.220.00 0 - 3 - 0 '!,S 0.00% - t - 257.._ 4 0<in . -- • R 1261h Sheet end CollinsCOIHrn 1 LS f N.473 q i 5 24,473C0 o 0 q%S SJ/,9q q 0 - - 0 4 f _-__ 0.001E 5 - � 25{ owners c6Nkg npy 1 Ls s 53/96Bq • • SUB TOTAL Co I 8 5594,059.00 I 5,2537335.54 $ - t - 5 5,262S35,114 90.43% t 414163027 1 0103027 • TOTAL ADJUSTED CONTRACT PRICE $ 19,521,543.00 I /5,541A4399 $ - I 1v395130.22 It I5 17,057,073.91 07.37% 5 N 18,413,91117 f 3.$33,151174 PROP 9 EXHIBIT A FORM OF JOINT STIPULATION AND ORDER OF DISMISSAL WITH PREJUDICE Page 6 of 8 IN THE CIRCUIT COURT OF THE ELEVENTH JUDICIAL CIRCUIT IN AND FOR MIAMI-DADE COUNTY, FLORIDA R1C-MAN CONSTRUCTION FLORIDA, Case No.: 23-16016 CA 01 INC., Plaintiff, v. CITY OF MIAMI BEACH, FLORIDA, Defendant. JOINT STIPULATION OF VOLUNTARY DISMISSAL WITH PREJUDICE Plaintiff, Ric-Man Construction Florida, Inc., and Defendant, City of Miami Beach, Florida (collectively,the"Parties"), by and through its undersigned attorneys, and pursuant to Fla. R. Civ. P. 1.420(a)(1)(B), hereby file this Joint Stipulation of Voluntary Dismissal with Prejudice and [Proposed] Order for the same. The Parties acknowledge and agree that the Court retains jurisdiction with respect to the interpretation and enforcement of the terms and conditions of a project closeout agreement entered into by the Parties. DATED: December 12, 2023 Respectfully submitted, Frank J. Hild, Esq. Henry J. Hunnefeld, First Assistant City Attorney Florida Bar No.: 169810 Florida Bar No.: 343811 Christopher D. Mellado, Esq. Freddi Mack, Senior Assistant City Attorney Florida Bar No.: 1018915 Florida Bar No.: 111623 Martin I Hild,P.A. Rafael A. Paz, City Attorney, City of Miami Beach 555 Winderley Place, Suite 415 1700 Convention Center Drive, 4`h Floor Legal Dept. Maitland, FL 32751 Miami Beach, FL 33139 Telephone: (407) 660-4488 Telephone(305) 673-7470 Email: fjh(a,martinhild.com Email: henryhunnefeld@miamibeachfl.gov cdm@martinhild.com freddimack@miamibeachfl.gov Attorneys for Plaintiff, Ric-Man Attorneys for Defendant, City of Miami Beach Construction Florida, Inc. CERTIFICATE OF SERVICE I HEREBY CERTIFY that, on December 12, 2023, a true and correct copy of the foregoing was electronically filed via the Florida Courts e-Portal system and served on all registered parties via electronic service generated by the e-Portal system. Frank J. Hild, Esq. Florida Bar No.: 169810 Attorney for Ric-Man Construction Florida, Inc. 2 IN THE CIRCUIT COURT OF THE ELEVENTH JUDICIAL CIRCUIT IN AND FOR MIAMI-DADE COUNTY, FLORIDA RIC-MAN CONSTRUCTION FLORIDA, Case No.: 23-16016 CA 01 INC., Plaintiff, v. CITY OF MIAMI BEACH, FLORIDA, Defendant. / [PROPOSED] ORDER DISMISSING ACTION WITH PREJUDICE THIS CAUSE, having come before the Court upon Plaintiff, Ric-Man Construction Florida, Inc., and Defendant's, City of Miami Beach, Florida (collectively, the "Parties") Joint Stipulation of Voluntary Dismissal with Prejudice pursuant to Fla. R. Civ. P. 1.420(a)(1)(B), and after due consideration, it is ORDERED and ADJUDGED as follows: 1. The Parties' Joint Stipulation of Voluntary Dismissal with Prejudice is hereby GRANTED. 2. This Action shall be dismissed with prejudice. 3. Each party shall bear its own fees and costs. 4. The Court reserves jurisdiction to interpret and enforce the terms and conditions of the Parties' settlement agreement in the event the interpretation and enforcement of the same shall be necessary. DONE AND ORDERED in Chambers of Miami Dade County, Florida, on this day of December 2023. Honorable Barbara Areces Circuit Court Judge 3 lare111444, i 3100 SW 15th Street CON8T. FL,INC.I Deerfield Beach, Florida 33442 'DEE�TFIELD BEACH,FLORIDA Office:(954)426-1221 Fax:(954)426-1226 EXHIBIT B FDOT WARRANTY LETTER December 22, 2023 Cohn W.Johnson, P.E. Senior Construction Project Manager FDOT-D6 North Dade Construction 1773 NE 205th Street, N Miami Beach, FL 33179 Re: ITB-2019-231-KB I NDIAN CREEK (SR AlA) PHASE III IMPROVEMENTS FROM 25TH TO 41ST STR FIN # 439228-2-58-01 Sub: Value Added Asphalt Warranty Dear Mr.Johnson: In accordance with Section 338 of the January 2017 edition of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (the "FDOT Specification"), Ric-Man Construction Florida, Inc. agrees to warrant the asphalt placed within the limits of the above-referenced project for a period of seven (7)years from the date of Final Acceptance by the Department (i.e. from November 10, 2023). Should you have any questions or require additional information regarding this matter, please contact our office. Respectfully submitted, RIC-MAN CONSTRUCTION FLORIDA, INC. By: Daniel Mancini - President Ric-Man Construction Florida Cc: David Martinez, P.E., LEED®AP, Director, Office of Capital Improvement Projects, City of Miami Beach David Gomez, P.E., LEED®AP, Division Director, Office of Capital Improvement Projects, City of Miami Beach Mina Samadi, P.E., LEED®AP, Senior Project Manager, Office of Capital Improvement Projects, City of Miami Beach R I C - M A N RI c r i p N F i OR 1 1) 1 I N EXHIBIT C SCHEDULE OF WARRANTIES Page 8 of 8 Exhibit C g ITB-2019-231-KB �ON ! G°"y INDIAN CREEK(SR 414)PHASE III a' tt IMPROVEMENTS FROM 25TH TO 41ST STR CflN9�,-Fi x�:, CONalkFL,INC. y; FIN#43922B-2-58-01 H4' L. MIA M1 FoRIOX _ Project Warranties ii NUMBER WORK/ WARRANTY Indian Creek EQUIPMENT COMMENCEME DURATIO FOOT SPECIFICATION/ Closeout COVERED COMPANY PROVIDING WARRANTY MANUFACTURER NT DATE N PRODUCT SPECIFICATION CONTACT INFORMATION Package Comments 1 Indian Creek Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 5 Years PL7040.090-2030001;PL7040.090- Ric-Man Construction Florida,Inc. Xylem Letter, Repaired Pumps USA,LLC Non- 2030002; 3100 SW 15th Street 6/15/2022 Prorated PL7040.090-2030003 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1226 2 Axial Flow/Mixed Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 5 Years 3000 Series(CP,NP,DP,CT,NT,CZ,LL) Ric-Man Construction Florida,Inc. Xylem Letter, Centrifugal Pumps USA,LLC 4000 Series(SR,PP) 3100 SW 15th Street 6/15/2022 &Mixers 7000 Series(PL) Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1227 3 Electrical Control Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year/ Xylem Manufactured Control Panels Ric-Man Construction Florida,Inc. Xylem Letter, Panels USA,LLC 100% 3100 SW 15th Street 6/15/2022 (permanently 2 Years/ Deerfield Beach,Florida 33442 installed) Limited Tel 954.426.1221 Fax 954.426.1228 4 Abrasion/Corrosio Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 18 Months 3000 Series(MP,MF,MH,FS,FP,HP, Ric-Man Construction Florida,Inc. Xylem Letter, n Resistant& USA,LLC HS)5000 Series(HP,HS) 3100 SW 15th Street 6/15/2022 Chopper/Grinder 8000.280 Series(DP,DZ,DT,DS,DF) Deerfield Beach,Florida 33442 Pumps Tel 954.426.1221 Fax 954.426.1229 5 Dewatering Pumps Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 18 Months 2000 Series(BS,KS) Ric-Man Construction Florida,Inc. Xylem Letter, USA,LLC 3000 Series(CS,NS,D5) 3100 SW 15th Street 6/15/2022 8000.280 Series(OS,OF) Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1230 6 TOPS&PSS Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 18 Months Fiberglass Pump Station Ric-Man Construction Florida,Inc. Xylem Letter, USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1231 7 Accessories Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year Permanent/Portable Ric-Man Construction Florida,Inc. Xylem Letter, USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 8 Hydro ejectors/ Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year HE,JA Ric-Man Construction Florida,Inc. Xylem Letter, Aerators USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1233 9 Portable Pump Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year Control Boxes(Nolta,MSHA etc.) Ric-Man Construction Florida,Inc. Xylem Letter, Controls USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1234 Exhibit C NUMBER WORK/ WARRANTY Indian Creek EQUIPMENT COMMENCEME DURATIO FOOT SPECIFICATION/ Closeout COVERED COMPANY PROVIDING WARRANTY MANUFACTURER NT DATE N PRODUCT SPECIFICATION CONTACT INFORMATION Package Comments 1D Small Pumps Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year 3045,3057,SX Ric-Man Construction Florida,Inc. Xylem Letter, USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1235 11 Parts* Xylem Water Solutions USA,LLC Xylem Water Solutions 7/1/2022 1 Year All New Spare Parts Ric-Man Construction Florida,Inc. Xylem Letter, USA,LLC 3100 SW 15th Street 6/15/2022 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1236 12 Galavanized Steel South Florida Electrical Consultant and Millerbernd 7/1/2022 5 Years FDOT Spec 649-4.3.2 requires warranty for Ric-Man Construction Florida,Inc. 48-49 Poles/ Millerbernd Manufacturing Company Manufacturing coating system adhesion and color 3100 SW 15th Street Master Arms "MMC" Company"MMC" retention for 5-years from Final.Warranty Deerfield Beach,Florida 33442 information must be provided to FDOT prior Tel 954.426.1221 to material first delivery to jobsite.Absent Fax 954.426.1226 designation of the responsible party per this timeline,Contractor becomes the warranty holder. 13 Vehicular Traffic South Florida Electrical Consultant and Dialight 7/1/2022 3 Years FOOT Spec 650-4 requires warranty for Ric-Man Construction Florida,Inc. 53 Signal Assemblies Dialight Vehicular Traffic Signal Assembles=3-years 3100 SW 15th Street as per Section 650 from Final. Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1226 14 Vehicular Traffic South Florida Electrical Consultant and Leotek Electronics 7/1/2022 3 Years FOOT Spec 650-4 requires warranty for Ric-Man Construction Florida,Inc. 61 Signal Assemblies Leotek Electronics USA,LLC USA,LLC Vehicular Traffic Signal Assembles=3-years 3100 SW 15th Street as per Section 650 from Final. Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1226 15 Vehicle Detection South Florida Electrical Consultant and FLIR Intelligent 7/1/2022 2 Years FDOT Spec 660-4 is 2-years from Final Ric-Man Construction Florida,Inc. 59 System FLIR Intelligent Transportaion Systems Transportaion Systems Product Specification Below: 3100 SW 15th Street TrafiSense•series Deerfield Beach,Florida 33442 TrafiCam x-stream series Tel 954.426.1221 TrafiRadar series Fax 954.426.1226 SafeWalk series TI x-stream EDGE TrafiCam series 4Tl ETH EDGE FC-Traffic'series VIP3D.Xs series Viewcom/Es MAX+ 4/05 xp.output expansion boards VuX series VuCom Keypad VIP-T VIP-IP VIP-HD 16 Vehicle Detection South Florida Electrical Consultant and FLIR Intelligent 7/1/2022 2 Years FDOT Spec 660-4 is 2-years from Final Ric-Man Construction Florida,Inc. 59 System FLIR Intelligent Transportaion Systems Transportaion Systems Product Specification Below: 3100 SW 15th Street D-ITS"series(dome) Deerfield Beach,Florida 33442 PT-ITS•series(pan tilt) Tel 954.426.1221 •The uncooled sensor itself has a 10-year Fax 954.426.1227 warranty Exhibit C x i NUMBER • WORE/ WARRANTY Indian Creek EQUIPMENT COMMENCEME DURATIO FOOT SPECIFICATION/ Closeout COVERED COMPANY PROVIDING WARRANTY MANUFACTURER NT DATE N PRODUCT SPECIFICATION CONTACT INFORMATION Package Comments 17 Pedestrian South Florida Electrical Consultant and PELCO Products Inc. 7/1/2022 5 Years FDOT Spec 665-3=5-years from Final. Ric-Man Construction Florida,Inc. 54 Detection System PELCO Products Inc. Sec 650-Product Specification Below: 3100 SW 15th Street Vehicular Traffic Signal Assys, Deerfield Beach,Florida 33442 Backplates,Visors. Tel 954.426.1221 Sec 659-Mast Arm,Span Wire,Pole Fax 954.426.1228 Mountings. Sec 665-Pedestrian Detection System, Push Buttons. 1187 Internally South Florida Electrical Consultant and Southern 7/1/2022 5 Years FDOT Spec 3.3.5.2 Internally Illuminated Ric-Man Construction Florida,Inc. 58-59 Illuminated Signs Southern Manufacturing Manufacturing Signs=5-years from Final. 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fan 954 476 177R 19 Flashing Beacons South Florida Electrical Consultant and Temple,Inc. 7/1/2022 5 Years FOOT Spec 700-6.4=5 years from Final. Ric-Man Construction Florida,Inc. 55-56 Temple,Inc. 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1229 20 Highway Lighting South Florida Electrical Consultant and Holophane 7/1/2022 5 Years FDOT Spec 992-1.2=5 year warranty Ric-Man Construction Florida,Inc. 3-5 Materials Acuity Brand Lighting,Inc. from Final. 31005W 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1230 21 Traffic Controller South Florida Electrical Consultant and McCain,Inc. 7/1/2022 2 Years FDOT Section 676 Ric-Man Construction Florida,Inc. 60 and Cabinet McCain,Inc. Traffic Cabinet 3100 SW 15th Street Warranty 760-727-8100 Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1231 22 Control Panel South Florida Electrical Consultant and Custom Controls 7/1/2022 1 Year FOOT Section 992 Ric-Man Construction Florida,Inc. 50 (Lighting Controls) Custom Controls Technology,Inc. Technology,Inc. Highway lighting 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1231 23 Traffic Products South Florida Electrical Consultant and Brown Traffic 7/1/2022 1 Year FOOT Section 700 Ric-Man Construction Florida,Inc. 52 Brown Traffic Products,Inc. Products,Inc. Highway Signing 3100 SW 15th Street FOOT Section 992 Deerfield Beach,Florida 33442 Highway lighting Tel 954.426.1221 Fax 954.426.1232 governed by January 2017 24 Asphalt General Asphalt 11/10/2023 Warranty 7 Years FDOT Road and Bridge Specification Section 338 25 Mounting PELCO Products,Inc. PELCO Products Inc. 7/1/2022 FDOT Section 659 Ric-Man Construction Florida,Inc. 54 Assemblies 405-340-3434 3 Years Hardware,cables,connectors 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 Exhibit C NUMBER WORK/ WARRANTY Indian Creek EQUIPMENT COMMENCEME DURATIO FDOT SPECIFICATION/ Closeout ;.:. COVERED COMPANY PROVIDING WARRANTY MANUFACTURER NT DATE N PRODUCT SPECIFICATION CONTACT INFORMATION Package Comments 26 Internally Southern Manufacturing Southern Manufacturing 7/112C?? FOOT Section 700 Ric-Man Construction Florida,Inc. 57 Illuminated Signs 800-866-5699 7 years Highway Signing 3100 SW 15th Street Internally Illuminated Signs Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 27 Flashing Beacons Temple,Inc. Temple,Inc. 7/1/2022 FOOT Section 700 Ric-Man Construction Florida,Inc. 51&55 Highway Signing 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 28 Highway Lighting Custom Controls Technology Custom Controls 7/1/2022 1 Year FOOT Section 992 Ric-Man Construction Florida,Inc. 50 Materials 305-805-3700 Technology Highway lighting 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 29 Grounding and ASCO Power Technologies ASCO Power 7/1/2022 FDOT Section 620 Ric-Man Construction Florida,Inc. Attached Lighting Protection 712-212-4460 Technologies 10 years Surge Protection Devices 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 30 Pull,Splice and J- Hubbell Quazite 7/1/2022 FDOT Section 635 Ric-Man Construction Florida,Inc. Attached Boxes 865-635-2134 1 year Pull,Splice and 1-Boxes 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 31 Network Devices 7/1/2022 FDOT Section 684 Ric-Man Construction Florida,Inc. 5 years MFES 3100 SW 15th Street 5 years Device Server Deerfield Beach,Florida 33442 2 years Video Digital Encoder Tel 954.426.1221 5 years Media Converter Fax 954.426.1232 32 Traffic Monitoring Transportation Control Systems Transportation Control 7/1/2022 1 year TMS System,Sensors,poer unit,cables Ric-Man Construction Florida,Inc. Attached 800-886-2735 Systems 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 33 Highway Lighting Acuity Brands Halophane 7/1/2022 5 years See prior sections above Ric-Man Construction Florida,Inc. 3&4 System 866-465-6742 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 34 Traffic Control Acuity Brands Halophane 7/1/2022 FDOT Section 603&608 Ric-Man Construction Florida,Inc. Signals and Devices 866-465-6743 See items above 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fan 954.426.1232 35 Cabinet Equipment Flir Intelligent Transportation System Flir Intelligent Ric-Man Construction Florida,Inc. 59 32(0)56 37 22 00 Transportation System 3100 SW 15th Street 660-4-11 Deerfield Beach,Florida 33442 Vehicle Detection System-Cabinet Tel 954.426.1221 Equipment Fax 954.426.1232 36 Video Above Ground Flir Intelligent Transportation System Flir Intelligent Ric-Man Construction Florida,Inc. 59 32(0)56 37 22 01 Transportation System 3100 SW 15th Street 660-4-12 Deerfield Beach,Florida 33442 Vehicle Detection System-Video Above Tel 954.426.1221 Ground Fax 954.426.1233 Exhibit C NUMBER WORK/ WARRANTY Indian Creek EQUIPMENT COMMENCFME DURATIO FDOT SPECIFICATION/ Closeout COVERED COMPANY PROVIDING WARRANTY MANUFACTURER NT DATE N PRODUCT SPECIFICATION CONTACT INFORMATION Package Comments 37 Stationary Standby Kohler Kohler 7/1/2022 5 years or Kohler Co. Generator& 3,000 Service Department Accessories hours M5072 (whicheye Kohler,WI 53044 r occurs Tel 920-457-4441 first) 800-544-2444 Fax 920-459-1646 Kohlerpawer.com BELOW ITEMS NOT INSTALLED BY RIC-MAN and SUBCONTRACTORS(NOT WITHIN RIC-MAN SCOPE) 38 Communication 7/1/2022 FOOT Section 633 Ric-Man Construction Florida,Inc. No comm or fiber on this project Cable 2 years Fiber Optic cable,splice encl.,terminations 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 39 Mid-Block 7/1/2022 FOOT Section 654 Ric-Man Construction Florida,Inc. N/A ,Crosswalk 2 years Rapid Flashing Beacons 3100 SW 15th Street Assemblies Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 40 Signal&Preemtion 7/1/2022 FOOT Section 663 Ric-Man Construction Florida,Inc. N/A System 5 years Signal Priority and Preemtion Systems 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 41 Equipment Shelter 7/1/202 FDOT Section 677 Ric-Man Construction Florida,Inc. N/A 1 year Shelter Assembly 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 42 System Control 7/1/2022 FOOT Section 680 Ric-Man Construction Florida,Inc. N/A Equipment 3 Years Adaptive Signal Equipment 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 43 Video Equipment 7/1/2022 FOOT Section 682 Ric-Man Construction Florida,Inc. N/A 3 Years CCTV Cameras 3100 SW 15th Street Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 44 Traffic Control 7/1/2022 FOOT Section 695 Ric-Man Construction Florida,Inc. N/A 5 years UPS External Batteries 3100 SW 15th Street 3 years UPS Unit Deerfield Beach,Florida 33442 Tel 954.426.1221 Fax 954.426.1232 MIAMI BEACH Office of Capital Improvement Projects COVER SHEET FROM: Office of Capital Improvements Projects Luigi Molina Ext. 26424 To: City Clerk's Office DROP OFF DATE: 01/18/2024 DOCUMENT(S): Indian Creek Drainage Improvements Phase III — Project Closeout Agreement Otteleek%Signature Needed As part of the final project reconciliation Change Order No. 3 for the Indian Creek Drainage Improvements Phase III project, Exhibit 4— Negotiated Project Closeout Agreement between the City and Ric-Man Construction Florida, requires signatures from the City Manager and City Clerk. Two copies of the Project Closeout Agreement and one copy of the corresponding exhibits are included. Thank you. RESOLUTION NO. 2016-29332 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE SUBSTANTIVE BUSINESS TERMS OF A PROPOSED AGREEMENT BETWEEN THE CITY AND FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) FOR THE COST SHARING OF A CONSTRUCTION PROJECT ON INDIAN CREEK DRIVE, BETWEEN 26TH AND 41ST STREETS, FOR THE CONSTRUCTION OF A SEAWALL BARRIER WALL, IMPROVED STREET DRAINAGE, AND RAISING THE ROAD ELEVATION; AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY'S OFFICE TO NEGOTIATE A FINAL AGREEMENT WITH FDOT BASED UPON THE APPROVED TERMS; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE FINAL AGREEMENT; PROVIDED THAT, SHOULD ANY OF THE SUBSTANTIVE TERMS BE MODIFIED, THEN REQUIRING THE AGREEMENT TO COME BACK TO THE CITY COMMISSION FOR FURTHER APPROVAL. WHEREAS, Indian Creek Drive is a State-owned and maintained road, but is considered one of the City's main transportation corridors, establishing a southbound artery between North Beach and South Beach; and WHEREAS, Indian Creek Drive is a major commuter road that runs through residential districts of the City, and is critical for providing emergency services to residents and visitors (including its use as a hurricane evacuation route); and WHEREAS. the City experiences extreme high tide events in the Spring and Fall, which cause intensive and paralyzing flooding on Indian Creek Drive (which consistently flood between 26th and 34'h Streets); and WHEREAS, the City has empirical evidence that these flooding events have increasingly worsened due to these high tide events, which are expected to continue to escalate with sea level rise; and WHEREAS, the City has no alternative but to prohibit access to Indian Creek Drive, for the health, safety and welfare of its residents and visitors multiple times each year, which occurs two (2)times daily consistent with these higher tidal events; and WHEREAS, the City, at its own significant cost, has taken exceptional measures to mitigate this flooding, by installing a temporary flood barrier and the placement of several mobile pumps; and WHEREAS, the City has determined that more permanent, corrective actions in response to these flooding events would require major infrastructure construction for Indian Creek Drive, between 26`h and 34th Streets, including the construction of a crash barrier seawall that will maintain street drainage during high tides, and increasing the road elevation, and WHEREAS, in 2015, Mayor Levine and members of the City Administration traveled to Tallahassee to meet with the Secretary of Transportation for the purpose of discussing these life safety concerns surrounding Indian Creek Drive, and to present him with a video documenting such flooding; and WHEREAS, at the conclusion of the presentation, there were potential solutions offered to the Secretary, which included: • building a seawall from 26th to 41st Street, approximately 4,000 feet in length, at a 5.7 NAVD elevation (City standard). The proposed seawall would be constructed over a 20 feet deep sheet pile wall that would eliminate water from flowing underground and from flowing over the wall and flooding the street; and • installation of a 72 inch drainage line, beginning south of 26th Street, and continuing all the way to 415'Street, connecting at the drainage system on 41s`Street; and • construction of a pump station on the 32nd Street street end, that would have the capacity to pump the 72 inch drainage line and maintain the proper capacity in the system; and WHEREAS, since Indian Creek Drive is a State owned and maintained road that is under Florida Department of Transportation's (FDOT's)jurisdiction, the City Administration also met with FOOT District Six staff to discuss the sharing of the costs for these identified improvements; and WHEREAS, City staff and FDOT have agreed that FDOT would be responsible for the base cost (estimated to be $15 million) of draining its roadway, and the City would be responsible for those costs (estimated to be $3.4 million) necessary to accommodate the additional capacity in the drainage system for the City streets abutting the affected areas of Indian Creek Drive; and WHEREAS, the City further recognizes that it owns approximately 30% of the land and seawalls that border the eastern portion of Indian Creek Drive, and as such, the City acknowledges that an equitable distribution of those construction costs associated with the seawall would be appropriate with FDOT responsible for $4.9 Million and the City responsible for$2.1 million; and WHEREAS, the total monetary cost for all aspects of this project is estimated to be $25 million, and includes the City's equitable share (based upon those anticipated benefits to its land, seawall and increased capacity flows to those surrounding City streets)that is estimated to be $5.5 million; and WHEREAS, City staff seeks to reduce the time necessary for the development of drawings for the project, and commence construction by Summer of 2016, thereby enabling enough of the system to be implemented in order to stem the high tides this Fall; and WHEREAS, the City would be responsible for completing the project over the next year by finalizing the elevations and any additional work necessary; and WHEREAS, FDOT has currently developed a draft agreement that memorializes the parties respective obligations, which draft agreement is attached as Exhibit "A" to this Resolution; and WHEREAS, City staff would recommend that the Mayor and City Commission hereby approve the substantive business terms for the proposed project, as contained in this Resolution and the draft agreement; and that City Staff and the City Attorney's Office be further authorized to negotiate the final agreement (based upon the approved business terms); and, if successful, that the Mayor and City Clerk be authorized to execute the final Agreement; and WHEREAS, in the event that any of the proposed business terms change, then the City Manager will bring those changes back to the City Commission for further approval NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve the substantive business terms of a proposed agreement between the City and Florida Department of transportation (FDOT) for the cost sharing of a construction project on Indian Creek Drive, between 26`" and 4151 streets, for the construction of a seawall barrier wall, improved street drainage, and raising the road elevation, authorizing the City Manager and City Attorney's Office to negotiate a final agreement with FDOT based upon the approved terms, and further authorizing the Mayor and City Clerk to execute the final agreement; provided that, should any of the substantive terms be modified, then requiring the agreement to come back to the City Commission for further approval. PASSED AND ADOPTED this 9 day of March, 2016, Philip�•ev' Or ATTEST: dil Ki' 3 e ---- j/ I� B G. �4 / Ra ael E. Granado, City Clerk \P,. y 1° w%. : T \AGENDA\20161March\Public i 01 SO ocx - I APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION "g___L___e"L. '1 el ( ((9 City Attorney Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach,Florida,Accepting An Agreement Between The City Of Miami Beach And The Florida Department Of Transportation(FDOT)For The Cost Sharing Of A Construction Project On Indian Creek Drive, Between 26th And 4151 Streets, For The Construction Of A Seawall, Improving Street Drainage And Road Elevation, In The Amount Of$5.5 Million Dollars (Of A$25 Million Dollar Project) Key Intended Outcome Supported: Item Summary/Recommendation: Indian Creek Drive is considered one of the City's main corridors,forming a southbound artery between North/Mid Beach and South Beach. Indian Creek as a major commuter road which runs through residential areas where the City provides emergency services and is also a hurricane evacuation route. During the extreme high tide events in the spring and fall,Indian Creek Drive consistently floods between 26'h and 34'h Streets. Over the years,these flooding events have worsened due to higher tides which are expected to escalate with sea level rise. This leaves City staff with no choice but to close the roads multiple times each year,two times each day coincident with high tides. The majority of flooding has been controlled by the extraordinary installation of a temporary flood barrier and several pumps at significant cost. Correcting this flooding would entail major construction at this location,including building a crash barrier wall to serve as a seawall in order to maintain street drainage during high tides,as well as increase the road elevation. Last year, Mayor Levine along with City Administration traveled to Tallahassee to meet with the Secretary of Transportation to discuss these concerns,and to present him with a video documenting such flooding. At the end of the presentation,potential solutions were offered to Secretary Boxold including: • Concepts of building a seawall from 26 to 4151 Street,approximately 4,000 feet in length,at a 5.7 NAVD elevation (City standard). The proposed seawall would be constructed over a 20 feet deep sheet pile wall that would eliminate water from flowing underground and from flowing over the wall and flooding the street; • The installation of a 72 inch drainage line beginning south of 261h Street and continuing all the way to 4151 Street, connecting at the drainage system on 4151 Street; • The construction of a pump station on the 32nd Street end, that would have the capacity to pump the 72 inch drainage line and maintain the proper capacity in the system: • As part of the project,the City recommended raising the roads to a 3.7 NAVD elevation. However,prior to doing so,the City would conduct field surveys of the project area to ensure businesses would not be adversely impacted and be able to establish a transition. Since Indian Creek falls within the Florida Department of Transportation(FDOT)jurisdiction,City Administration met with FDOT District Six staff to discuss the sharing of the costs for this proposed project. At this meeting, it was agreed upon that FDOT would be responsible for the base cost of draining their roadways and the City would be responsible for the costs necessary to accommodate the additional capacity in the system for City streets. The approximate base cost for this project is$22 million,and the approximate cost for additional flows due to the City streets is $3.4 million. Since the City owns approximately 30% of land along Indian Creek Drive and adding accommodations of street ends and City parking lots, the City agreed to accept part of the cost of the barrier wall itself,plus the difference between capacity. The construction cost of the wall is estimated at$7 million. The City's share will be$2.1 million,which totals$5.5 million of the total$25 million project. Should FDOT take the lead,they anticipated it would take them a year before they could prepare a set of documents, followed by a project bid process. Should the City take the lead,a design build and a fast track system would be utilized,following a procurement process.However,the City would propose to reduce the time necessary to develop the drawings and start construction as early as summer 2016,enabling enough of the system to help during the high tides this fall. The City would then complete the project over next year by finalizing the elevations and any additional work necessary.FDOT is currently developing a draft agreement to this project. THE ADMINISTRATION RECOMMENDS APPROVING THE RESOLUTION. Advisory Board Recommendation: Financial Information: Funds: 1 Amount 1 Account Approved I I 1 ()BPI Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Eric Carpenter, Public Works X6012 Sign-Offs: Department Director Assistant Manager City M a r JJF ETC JLM T WGENDA12016Uanuary\Pubs c Works\TECO.Sum.doc Agenda Item R i S MIAMIBEACH Date 3-?-IL, MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach,Florida 33139,www.miomibeochH.gov COMMISSION MEMORANDUM TO. Mayor Philip Levine and Members the City C4/ mission FROM: Jimmy L. Morales, City Manager :ram DATE: March 9, 2016 SUBJECT A RESOLUTION OF THE MAYOR D CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,ENTERING INTO AN AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND THE FLORIDA DEPARTMENT OF TRANSPORTATION(FOOT)FOR THE COST SHARING OF A CONSTRUCTION PROJECT ON INDIAN CREEK DRIVE, BETWEEN 26TH AND 41ST STREETS, FOR THE CONSTRUCTION OF A SEAWALL BARRIER WALL, IMPROVING STREET DRAINAGE AND RAISING THE ROAD ELEVATION, IN THE AMOUNT OF $5.5 MILLION DOLLARS (OF A TOTAL $25 MILLION DOLLAR PROJECT). BACKGROUND Indian Creek Drive is considered one of the City's main corridors, forming a southbound artery between North/Mid Beach and South Beach. Indian Creek as a major commuter road which runs through residential areas where the City provides emergency services and is also a hurricane evacuation route. During the extreme high tide events in the spring and fall, Indian Creek Drive consistently floods between 26th and 34'' Streets. Over the years, these flooding events have worsened due to higher tides which are expected to escalate with sea level rise. This leaves City staff with no choice but to close the roads multiple times each year, two times each day coincident with high tides. The majority of flooding has been controlled by the extraordinary installation of a temporary flood barrier and several pumps at significant cost Correcting this flooding would entail major construction at this location. including building a crash barrier wall to serve as a seawall in order to maintain street drainage during high tides, as well as increase the road elevation. Last year, Mayor Levine along with City Administration traveled to Tallahassee to meet with the Secretary of Transportation to discuss these concerns,and to present him with a video documenting such flooding. At the end of the presentation, potential solutions were offered to Secretary Boxold including • Concepts of building a seawall from 26 to 4151 Street, approximately 4,000 feet in length,at a 5.7 NAVD elevation (City standard). The proposed seawall would be constructed over a 20 feet deep sheet pile wall that would eliminate water from flowing underground and from flowing over the wall and flooding the street; • The installation of a 72 inch drainage line beginning south of 26`" Street and continuing all the way to 41 s' Street, connecting at the drainage system on 415' Street: FDOT Agreement March 9. 2016 Page 2 of 2 • The construction of a pump station on the 32r0 Street end, that would have the capacity to pump the 72 inch drainage line and maintain the proper capacity in the system; • As part of the project, the City recommended raising the roads to a 3.7 NAVD elevation However. prior to doing so,the City would conduct field surveys of the project area to ensure businesses would not be adversely impacted and be able to establish a transition. Since Indian Creek falls within the Florida Department of Transportation (FDOT)jurisdiction. City Administration met with FDOT District Six staff to discuss the sharing of the costs for this proposed project. At this meeting, it was agreed upon that FDOT would be responsible for the base cost of draining their roadways and the City would be responsible for the costs necessary to accommodate the additional capacity in the system for City streets The approximate base cost for this project is $22 million, and the approximate cost for additional flows due to the City streets is$3.4 million. Since the City owns approximately 30% of land along Indian Creek Drive and adding accommodations of street ends and City parking lots,the City agreed to accept part of the cost of the barrier wall itself, plus the difference between capacity. The construction cost of the wall is estimated at $7 million. The City's share will be $2.1 million, which totals $5.5 million of the total $25 million project. Should FDOT take the lead, they anticipated it would take them a year before they could prepare a set of documents, followed by a project bid process. Should the City take the lead, a design build and a fast track system would be utilized,following a procurement process. However,the City would propose to reduce the time necessary to develop the drawings and start construction as early as summer 2016. enabling enough of the system to help during the high tides this fall. The City would then complete the project over next year by finalizing the elevations and any additional work necessary. FDOT is currently developing a draft agreement to this project. CONCLUSION The administration recommends approving the Resolution. Attachment. Draft Agreement JLM/ETC/JJF/FRS T WGENDA\2016\MARCH\PUBLIC WORKS\INDIAN CREEK.MEMO.DOC Contract Number: CSFA/CFDA Number: DEPARTMENT FUNDED AGREEMENT BETWEEN STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION AND I L CITY OF MIAMI BEACH THIS AGREEMENT is made and entered into this Ist day o rktly, 2016, between the State of Florida Department of Transportation, a component agarf4the State of Florida, hereinafter referred to as the `DEPARTMENT', and the City o Miami Beach, a municipal corporation of the State of Florida, existing under the Laws t t to of Florida, hereinafter referred to as the `CITY OF MIAMI BEACH'. 4. N RECITALS: a WHEREAS, the DEPARTMENT has ytirrsdipn ove Nand maintains State Road (S.R.)AlA/Indian Creek Drive corridor in the CITY dFMMIAMvI BEACH;and ' Pr WHEREAS,the DEPARTMENT has dra ed concept plans construction of roadway and drainage improvements on S.R.AlA/Indu :reek Drive from 4�j `:Street to 26th Street(M.P. 1.034 to M.P. 0.232),hereinafter referred tkas t1 OJECT',th.`:fit:i idual elements of which are outlined in the attached Exhibit"A", `Sc i'pe of se ' which is herein incorporated by reference;and Ir- WHEREAS, t4;�DEP NT has ogrammed funding for the PROJECT under Financial Project Nt r b443922 Y 52-01, and h agreed to reimburse the CITY OF MIAMI BEACH for eligible PIZIO a sts pg to a mtmum limiting amount, as outlined in the attached Exhia' Finan i ,. herein incorporated by reference;and REAS, t' = LLTY IAMI BEACH has agreed to design, construct, supervise and ins s S t all aspects o " '`®JECT ruction and administration; and c' W , AS, the p.; °-s hereto mutually recognize the need for entering into an Agreement dent ling and setting forth the responsibilities of each party; and 44, WHEREA , • 'arties are authorized to enter into this Agreement pursuant to Section 339.08(e)and 339.12,yFFlorida Statutes (F.S.); Page 1 of 25 Department Funded Agreement benreen the Florida Department of Transportation and the CITY OF MIAMI BEA EXHIBIT Financial Project Number 439228-1-52-01 # A;; NOW,THEREFORE, in consideration of the premises, the mutual covenants and other valuable considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: 1. INCORPORATION OF RECITALS The foregoing recitals are true and correct and are incorporated into the body of this Agreement, as if fully set forth herein. 2. GENERAL REQUIREMENTS a. The CITY OF MIAMI BEACH shall be raespotist le for assuring that the PROJECT complies with all applicable Federal, State and Local laws, rules, regulations, guidelines and standards. ,, ° • y= b. The CITY OF MIAMI BEACH s411 submit this Agreementto its CITY OF ,K MIAMI BEACH CommissionikiWficatrOn or approval _r es"olution. A copy of said resolution is attache %h reto as"Exhibit C , ity of Miami Beach Resolution',and is herein inco 4di d by reference. c. The CITY OF MIAMh BEACH shall a vksertise and let a Design-Build contract, administer, sup4rvise,implement, evalt ate>and inspect all aspects of PROJECT construction until e'641etion, and, ;as further defined in Exhibit "A", `Scope of Services' The CITY t/f4.IAMI BEACH shall complete the PROJECTpn;or before June 3.0t, 2021. A aspects of PROJECT construction and adn i i .iion are subject DEPARTMENT standards and specifications andiiust be in'eampliance with all governing laws and ordinances as stated in Exhibit E' '� d ;:the CITYQ.F MIAMIEACH shall submit the Project Design Plans (TM). for tzreview by the DEPARTMENT via Electronic Reviewer Comt etits ("Ef') and the DEPARTMENT shall submit its comment, if any, vialERC. TheIDEPARTMENT shall have a period of 14 days from the 1` ,; date that the!,CITY4OF MIAMI BEACH notifies the DEPARTMENT that the ass plans haveeen placed in the ERC for review and comment ("Comment Due 'spate"). The CITY OF MIAMI BEACH shall respond to the DEPARTMENT's comments, if any, within 14 days from the date of the DEONIENT places its comments on the ERC ("Response Due Date"). If the.DEPARTMENT does not timely submit its comments, the PDP shall be deemed to have been approved by the DEPARTMENT. The review process for the Project Design Plans will be deemed concluded when the CITY OF MIAMI BEACH has submitted the Final Project Design Plans to the ERC, and the Comment Due Date and Response Due Date for the Final Project Design Plans have passed, and the CITY OF MIAMI BEACH has addressed all of the DEPARTMENT's comments that were submitted through the ERC. Page 2 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 4392284-52-01 e. The CITY OF MIAMI BEACH shall not execute any contract or obligate itself in any manner requiring the disbursement of DEPARTMENT funds, including consulting or construction contracts or amendments thereto, with any third party with respect to the PROJECT without the prior written approval of the DEPARTMENT. The DEPARTMENT specifically reserves 1 the right to review qualifications of any consultant or contractor and to approve or disapprove CITY OF MIAMI BEACH employment of same. f. The CITY OF MIAMI BEACH's attorney shall certify to the DEPARTMENT that the consultant selection process by the CIkY'OF, MIAMI BEACH in procuring any consultant contract for engineering, architecture or surveying services entered into by the CITY OF MFA1yBEACH for purposes of performing its duties under this Agreement hai een accomplished in compliance with Section 287.55, Flor k Statutes, Cdhsultants' Competitive Negotiation Act. ° g. The CITY OF MIAMI BEACH'S-..attorney shall certify to the D.E ARTMENT that the purchase of commodities-or :contractttial services bythe CITY OF MIAMI BEACH exceeding the Thre l 1" Amount for CATEGORY TWO per Section 287.017 F.S. for purposes"&gerforming its duties under this Agreement has been accomplished in full e$tnpliance with the provisions of Section 287.057 F.S. • h. This Agreement and any interestyferetansshall-riot be assigned, transferred or otherwise encumbered bythe' CITY ''(F MIAMI BEACH under any circumstances nwithout prior, written consent of the DEPARTMENT. Hopi ever,this Agreement shall`run to the DEPARTMENT and its successors. i. The CITY OF,IvlAM1 BEACH shall comply with all federal, state, and local . awspand ordinances app*ble' with work or payment of work thereof, and ss Will ot discriminate on the grounds of race, color, religion, sex, national originOge or disabilityin the performance of work under this Agreement. ;j. The CIT 'OF MI•AMI BEACH agrees to comply with Section 20.055(5), "Ae% F.S., and 'fo incorporate in all subcontracts the obligation to comply with Section 20055(5), F.S. k. TliZO Y OF MIAMI BEACH shall require its construction contractor to maitiain, at all times during the construction to carry Commercial General Liability insurance providing continuous coverage for all work or operations performed under the construction contract. Such insurance shall be no more restrictive than that provided by the latest occurrence form edition of the standard Commercial General Liability Coverage Form (ISO FormCG 00 01) as filed for use in the State of Florida. The limits of coverage shall not be less than$1,000,000 for each occurrence and not less than a$5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy,or such other minimum insurance coverage that may be required by Page 3 of 25 Department Funded,4greement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 the DEPARTMENT's Standards and Specifications for Road and Bridge Construction,as amended from time to time. The CITY OF MIAMI BEACH shall further cause its contractor to name the DEPARTMENT as additional insured party on the afore-stated policies,and to provide evidence of Workers' Compensation Insurance in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation law for all employees. I. To the extent provided by law, the CITY OF MIAMIBEACH shall indemnify, defend and hold harmless the DEPARP'fENT against any actions, claims, or damages arising out of, relating to, or esulting from negligent or wrongful act(s)of,or any of its officers,agejts oremployees,acting within the scope of their office or employment, in connection ith the rights granted to or exercised by the CITY OF MIA , IcBEACH hereunder,to the extent and within the limitations of Section 71.8 Florida Statutes The,foregoing indemnification shall not constitute a waiverof sovereign irntxi pity beyond the limits set forth in Florida Stat it§,SectiorQ68.28, nor shall e'same be construed to constitute agreement bnh Cf;TtY OF MIAMI BEKCH to indemnify the DEPARTMENT for theegl3gent acts or omissions of the DEPARTMENT, its officers,agents or ei '7xa yees.Nothing herein shall be construed as consent bylie CITY OF MIAMLBEACH to be sued by third parties in any manner ariinttitto this agreement: '/Y yjV.�.v,N 3. FINANCIAL PROVISIONS K It H>a <1 i a. Eligible PROJECT costs may\not exceed NINETEEN MILLION NINE HUNDRD FIY SIX THOLSAND FOUR HUNDRED AND EIGHTY AND 00,10, Dio L 1I S ($19,956,480.00). b. 1�lie I PARTI NT agrees to compensate the CITY OF MIAMI BEACH for the sercets described in Exhibit"A"— Scope of Services, up to the maximum ,,,,t . $ Ate; a limitmg?a ount described in the Method of Compensation attached hereto as -` ,z. Exhibit"W' 1 4v c. ,..he CITY, OF MIAMI BEACH shall furnish the services with which to 6nstruct the PROJECT as further detailed in Exhibit"A"of this Agreement. d. Payr iient shall be made only after receipt and approval of goods and services unless advance payments are authorized by the Department's Comptroller under Section 334.044(29), F.S., or by the Department of Financial Services under Section 215.422(14), F.S. e. The CITY OF MIAMI BEACH shall provide quantifiable, measurable and verifiable units of deliverables. Each deliverable must specify the required minimum level of service to be performed and the criteria for evaluating successful completion. The PROJECT, identified as Project Number 439228- Page 4 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 1-52-01, and the quantifiable, measurable and verifiable units of deliverables are described more fully in Exhibit"A". f. Invoices shall be submitted by the CITY OF MIAMI BEACH in detail sufficient for a proper pre-audit and post audit thereof, based on quantifiable, measureable and verifiable units of deliverables as established in Exhibit"A"— Scope of Services. Deliverables must be received and accepted in writing by the DEPARTMENT's Project Manager prior to payments. i g. Supporting documentation must establish that th , ee1iverables were received and accepted in writing by the CITY OF MIAMI BEACH and must also 2L' establish that the required minimum level of sei ice,to be performed based on the criteria for evaluating successful corripletion°a"s specified herein and in Exhibit"A"—Scope of Services was met, h. There shall be no reimbursement for travel expenses undertl is.Agreement. i. The CITY OF MIAMI BEACHc, shall have the sole responsibility for resolving claims and requests for aitioiial work for the PROJECT. The CITY OF MIAMI BEACH shall further6olely responsible for the funding of any additional work for.the PROJECT,nbluding but not limited to, work related to unforeseen circumstances related toil e PROJECT. Prior to making decisions in this regard, the d11'Y$F MIAMI BEACH shall consult with the DEPARTMENT which';,impact :ROJECT improvements on the DEPARTMENT's right of way.: t" j. The CITY OFMAMI BEACHshould be aware of the following time frames: (i.)` "ispectI'ntand approval bf goods or services shall take no longer than ,five (5) wo ila" s�less`the bid specifications,purchase order, or contract . 4�0' 'specifies othe�se. (Any Feviations should be referenced in the Agreement or airladdenddiu4mip accordance with Section 21.) The Department 44'44: twenty (20) days toidelver a request for payment (voucher)to the Department ` of Financial,,Services. The twenty (20) days are measured from the latter of k, the date the invoice is received or the goods or services are received, inspected,and approved. (Section 215.422(1), F.S.). ,, (ii,) 1f payment is not available within forty (40) days, a separate interest penalty at a rate as established pursuant to Section 55.03(1), F.S., will be due and'payable, in addition to the invoice amount, to the CITY OF MIAMI BEACH. Interest penalties of less than one (1) dollar will not be enforced unless the CITY OF MIAMI BEACH requests payment. Invoices that have to be returned to the CITY OF MIAMI BEACH because of CITY OF MIAMI BEACH preparation errors will result in a delay in the payment. The invoice payment requirements do not start until a properly completed invoice is provided to the DEPARTMENT. Page 5 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Reach Financial Project Number 439228-I S2-DI k. A Vendor Ombudsman has been established within the Department of Financial Services. The duties of this individual include acting as an advocate for the CITY OF MIAMI BEACH who may be experiencing problems in obtaining timely payment(s) from a state agency. The Vendor Ombudsman may be contacted at (850) 413-5516 or by calling the Division of Consumer Services at 1-877-693-5236. (Section 215.422(5) and (7),F.S.) 1. Records of costs incurred under the terms of this Agreement shall be maintained and made available upon request to the.DEPARTMENT at all times during the period of this Agreement and forfi e (5) years after final payment is made. Copies of these documents;arid records shall be furnished to the DEPARTMENT upon request. Records dYf costs incurred include the CITY OF MIAMI BEACH's general aecounting� cords and the project records, together with supporting doctmerits and recoXdsl of the contractor and all subcontractors performing work on the project, andaaj1 other records of the Contractor and subcontractors considered necessary ti by the DEPARTMENT for a proper audttof costs. (Section 287 058(4);F.S.) m. In the event this contract is for servicesintexcess of$25,000.00 and a term for a period of more than;one (1) year, the provisions of Section 339.135(6)(a), F.S., are hereby incorpc meted • The DEPARTMENT, during anyxfiscal year, shall not expend money, incur any liability, or enter in any,cor tract?;wbich, by its terms, involves the expenditure of money in excess of the''.mounts budgeted as available for expenditure'di ing such fiscal year. Any"contract, verbal or written, made in violation of thisrsubsection is null and void, and no money may be paid on such"contract. The DEPARTMENT shall require a statement from the Comptrdtter,Q `�fhe Departgment,that such funds are available prior to entering z into any sucf�contract ot'otler binding commitment of funds. Nothing herein contained shall,prevent the making of contracts for periods exceeding one (1) year,b%t ny con`act so made shall be executory only for the value of the t<. services t 1?e rendeled or agreed to be paid for in succeeding fiscal years; and this parag aph shall be incorporated verbatim in all contracts of the DEPARTMENT which are for an amount in excess of TWENTY FIVE >q>THOUSAI ^D DOLLARS ($25,000.00) and which have a term for a period of more-,than'1 year." TheDEPARTMENT's obligation to pay is contingent upon an annual appropriation by the Florida Legislature. (Section 216.311, F.S.) n. E-Verify: The CITY OF MIAMI BEACH shall: Page 6 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228.1-52.01 i.' Utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the Vendor/Contractor during the term of the contract;and ii. Expressly require any contractors and subcontractors performing work or providing services pursuant to the state contract to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term. The CITY OF MIAMI BEACH shall insert the above clause into any contract entered into by the CITY OF MIAMI BEACH with vendors or contractors hired by the CITY OF MIAMI BEACH for purposes of performing its duties under this Agreement. 4. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of Florida. 5. AMENDMENT This Agreement may be amended'by mutual agreement of the DEPARTMENT and the CITY OF MIAMI BEACH expressed in writing, executed and delivered by each party. 6. INVALIDITY. If any part of this Agreement shall be determined to be invalid or unenforceable, the remainder of this Agreement shall not be affected thereby, if such remainder continues to conform to the terms and requirements of applicable law. 7. COMMUNICATIONS a. All notices, requests, demands, consents, approvals and other communications which are required to be served or given hereunder, shall be in writing and hand-delivered or sent by either registered or certified U.S. mail, return receipt requested, postage prepaid, addressed to the party to receive such notices as follows: To DEPARTMENT: Florida Department of Transportation 1000 Northwest 111 Avenue, Room 6202B Miami, Florida 33172-5800 Attn: Fabiana Gonzalez, Project Manager Page 7 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52.01 Ph: (305)470-5183 With copy to: Alonzo Joseph,Contract Analyst Ph: (305)470-5428 Fax: (305) 640-7556, or their designees. To CITY OF MIAMI BEACH: City of Miami•Beach Public Works kepartment x 1700 Co %enta Center Drive • Miami, Florida:3439 AttriErie T. Carp er 111: (305)673-7080 ', y b. Notices shall be deemed to hate be receivid by the end of A ,eY(5)business days from the proper sending they iuriles proof of prior actual receipt is provided. 8. EXPIRATION OF AGREEMEN rr The CITY OF MIAMI BEACH agree�to;complete the PROJECT on or before June 301h, 2021. If the CITY 41~'`~MTA tBEACH does not complete the PROJECT;,witSinethis time perio9;ithis Agreement will expire unless an extension of the tore period `requested by 4he CITY OF MIAMI BEACH and granted in writing %the DE RTMENT's bistrict Six Secretary or Designee. Expiration of this Agreement�Jv U bedc�ronsidered termination of the PROJECT. uS:y. Alto "l t** 9. INV IC11 D Pk' ] SS RE O tTS q In order to obtai aft payments,,tl e CITY OF MIAMI BEACH shall: i 1. "i Submit monthly progress reports that: 1) describe the work performed; 2) Ifk,adequatelyOnstify and support the payment requested; and 3) are in a format "4at is acceptable to the DEPARTMENT;and ii. Subrliit to the DEPARTMENT quarterly invoices on CITY OF MIAMI BEACH forms and such other data pertaining to the PROJECT in support of the invoice total;and iii. Comply with all applicable provisions of this Agreement. The CITY OF MIAMI BEACH will invoice the DEPARTMENT on a monthly basis for completed work. The CITY OF MIAMI BEACH must submit the final Page 8 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52.01 invoice on this PROJECT to the DEPARTMENT within one hundred twenty (120)days after the expiration of this Agreement. 10. FINANCIAL CONSEQUENCES Payment shall be made only after receipt and approval of goods and services unless advance payments are authorized by the Chief Financial Officer of the State of Florida under Chapters 215 and 216, F.S. . Deliverable(s) must be received and accepted in writing by the Contract Manager on the DEPARTMENT's invoice transmittal forms prior to payment. If the DEPARTMENT determines that the performance of the CITY OF MIAMI BEACH is unsatisfactory, the DEPARTMENT shall notify the CITY OF MIAMI BEACH of the deficiency to be corrected,which correction shall be made within a time-frame to be specified by the DEPARTMENT. The CITY OF MIAMI BEACH shall, within five(5)days after notice from the DEPARTMENT, provide the DEPARTMENT with a corrective action plan describing how the CITY OF MIAMI BEACH will address all issues of .contract non-performance, unacceptable performance, failure to meet the minimum performance levels, deliverable deficiencies, or contract non-compliance. If the corrective action plan is unacceptable to the DEPARTMENT,the DEPARTMENT, at its option may: (a) Assess a non-performance retainage equivalent to 10% of the total invoice amount. In such an event, the retainage shall be applied to the invoice for the then-current billing period.'-The-retainage shall'be withheld until the CITY OF MIAMI BEACH resolves the deficiency. If the deficiency is subsequently resolved, the CITY OF MIAMI BEACH may bill the DEPARTMENT for the retained amount during the next billing,period. If the CITY OF MIAMI BEACH is unable to resolve the deficiency, the funds retained may be forfeited at the end of the Agreement period; or • (b) Terminate the agreement and pursue all remedies available to the DEPARTMENT under the law, including but not limited to seeking reimbursement for damages and costs for the CITY OF MIAMI BEACH's failure to cure such deficiency 11. AUDITS State of Florida Single Audit Act requirements as outlined in the attached Exhibit "D", `Audit Reports',are incorporated herein by reference. 12. ENTIRE AGREEMENT This Department Funded Agreement is the entire Agreement between the parties hereto, and it may be modified or amended only by mutual consent of the parties in writing. 13. PUBLIC RECORDS Page 9 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 The CITY OF MIAMI BEACH shall allow public access to all documents, papers, letters, or other material subject to the provisions of Chapter 119, Florida Statutes, and made or received by the CITY OF MIAMI BEACH in conjunction with this Agreement. Specifically, if the CITY OF MIAMI BEACH is acting on behalf of a public agency the CITY OF MIAMI BEACH shall: (a) Keep and maintain public records that ordinarily and necessarily would be required by the DEPARTMENT in order to perform the services being performed by the CITY OF MIAMI BEACH. (b) Provide the public with access to public records on,;the,same terms and conditions that the DEPARTMENT would provide the reeord's and at a cost that does not exceed the cost provided in Chapter 119, Florida `Statutes, or as otherwise provided by law. (c) Ensure that public records that are exempt or confidential ands'"empt from public q exceptby records disclosure requirements are not disclosed as autho zed law. (d) Meet all requirements for retainin blic record:§;and transfer, auto cost, to the DEPARTMENT all public records it e'; ssess on'-of the CITY OF MIAMI BEACH upon termination of the contract" and destroy any duplicate public records that are exempt o&:confidential and a empt from public records disclosure requirements. All recorst;ored electronical1tmust be provided to the DEPARTMENT in a format Cha is c, mpatible witififie information technology systems of the DEPARTMENT Failure by the CITY OF MIAMI BEACIl:tolgrant such public access shall be grounds for ;iimediate unilateral cancell,E o-t n of this Agreement by the 444. DEPARTMENT The CITY OF;.MIAMI BEACH shall promptly provide the DEPAR ',; ENT with a copy of any,request to inspect or copy public records in possessiontof the Cl<TY OF MIAMI'BEACH and shall promptly provide the DEPARTMEN TAAjOiflthe�CJTY OF MIAMI BEACH's response to each such request rt f Ag,„ fang&r i.=-REMAINDER OF PAGE INTENTIONALLY LEFT BLANK-- Page 10 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 IN WITNESS WHEREOF, the parties hereto have executed this Agreement,on the day and year above written. CITY OF MIAMI BEACH: STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION: BY: BY: CITY OF MIAMI BEACH MAYOR DISTRICT SECRETARY ATTEST: ATTEST: (SEAL) CITY OF MIAMI BEACH CLERK (SEAL) EXECUTIVE SECRETARY LEGAL REVIEW: • CITY OF MIAMI BEACH ATTORNEY r DISTRICT CHIEF COUNSEL yt e rrq.A Page I I of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 EXHIBIT"A" SCOPE OF SERVICES Under this Agreement, the CITY OF MIAMI BEACH will provide the following services from Begin Milepost 1.034 to End Milepost 0.232 as detailed in the concept plans and typical section in Exhibit"Al": o Reconstruct roadway along S.R. ALAI Indian Creek Drive from 41m Street to south of 26th Street o Install signing and pavement marking o Construct sheet pile wall along west side of roadway o Construct special rigid concrete barrier wall o Construct a pump station at 32"d Street. All incidentals to pump station construction such as pollution control box,outfall-energy dissipator,unit, structural, electrical and mechanical pump station components as well as incidental seawall replacement shall be included. o Construct 72"RCP pipe trunk-line(water-tight system) o Construct incidental roadway"drainage including inlets,manholes,trench drains, inlets lateral-pipes and manhole=stub connections to side-street drainage systems. o Lining of side-street's storm drain systems within project limits o Protect seawall within project limits:- o Install new roadway lighting system along the west side of roadway o Replace traffic signal at 29th Street;,. o Modify traffic signals at 26th Street and 41st Street o Modify mid-block crossing north of 39'h Street o „Relocate existing 6" gas main o Adjust utilities including but not limited to valves,meters&manholes PROJECT Limits: SR AlA/ Indian Creek Drive from 41st Street to 26th Street(M.P. 1.034 to M.P. 0.232) FDOT Financial Project Number: 439228-1-52-01 County: Miami-Dade ,..;.7 FDOT Project Manager: Fabiana Gonzalez, P.E. CITY OF MIAMI BEACH Project Manager: Eric T. Carpenter, P.E. Page 12 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-0! EXHIBIT "Al" CONCEPT PLANS AND TYPICAL SECTION i 1 :F b lA5 -,..,,,, ,.. ,...,*, , ,...,.„,.., 4 ,,,,, tr14. ,.'4'6, p 4 'V Page 13 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 EXHIBIT "B" FINANCIAL SUMMARY Estimated PROJECT costs and deliverables for reimbursement are below-listed, for 439228-1-52- 01: Item Amount Fund Type SEDIMENT BARRIER ''01 `2. 7,950 State Funds et Rk FLOATING TURBIDITY BARRIER 125,000 State Funds INLET PROTECTION SYSTEM 's $2, , �: State Funds CLEARING&GRUBBING « ', $59,000 State Funds ROADWAY REGULAR EXCAVATION 4 `'., $79,605 "State Funds TYPE B STABILIZATION $31,575 State Funds OPTIONAL BASE,BASE GROUP 09(TYPE 12.5) 4'' k $286,750 State Funds SUPERPAVE ASPHALTIC CONC,TRAFFIC C(ASSUMEO`;,3"TH CK)�°` w $322,019 State Funds l Y N:l 'yr SAY,"cam,:: ASPH CONC FC,TRAF B,FC-9.5,PG 76-22,ARB ' :,, $112,802 State Funds IrkINLETS,CURB,TYPE P-4 <10: t` $69,960 State Funds INLETS,CURB,TYPE P-5; 1Q' ' $27,700 State Funds INLETS,CURB,TYPE P 6 <10' r .. �,,�" $9,239 State Funds h PIPE CULV,Opt ATL^ RGUN.D,18"S/rr`,9 '4, $18,984 State Funds . i PIPE CUL, ,kOPT MATL,ROUND'36"S/CD $55,513 State Funds PIPE CULV,OPT MAIL, ROUND,481S/CD x. $1,731 State Funds PIPE CULV,OPT r0,5,ROUND,72 S/CD(INCLUDES AVERAGE 13'-DEEP TRENCH EXCAVATION,MUCKTFtAJLING&DISPOSAL,DEWATERING,TRENCH SHORING& $5,210,400 State Funds TRENCH FILL MATERIAU.. <;,r PIPE LINER,OPTIONAL MATERIAL,0-24" $229,940 State Funds PIPE LINER,OPTIONAL MATERIAL,25-36" $ 158,370 State Funds TRENCH DRAIN(SPECIAL) $243,000 State Funds PUMP STATION(TRASH RAKE,WET WELL,VALVE BOX,SLUICE GATE,ENERGY DISSIPATOR,POLLUTION CONTROL BOX,INCIDENTAL STRUCTURAL,MECHANICAL F $2,000,000 State Funds ELECTRICAL) Page 14 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52.01 I I SHEET PILING STEEL,F&I PERMANENT(CONTINUOUS FROM BEGIN TO END PROJEC $3,585,143 State Funds CONCRETE CURB&GUTTER,TYPE F $217,350 State Funds SHLDR CONC BARRIER WALL,RIGID SHLDR 54" $1,178,667 State Funds CONCRETE SIDEWALK AND DRIVEWAYS,4" $253,299 State Funds CONCRETE SIDEWALK AND DRIVEWAYS,6" $19,438 State Funds PERFORMANCE TURF,SOD $3,625 State Funds UTILITY PIPE,F&I,DI/CI,WATER/SEW,20-49.9 $68 056 State Funds PAVEMENT MARKING . ' J,.- c SINGLE POST SIGN,F&I GROUND MOUNT,UP TO 12 SF .,; 00 State Funds THERMOPLASTIC,STANDARD-OPEN GRADED ASPHALT SURFACES ifNHITE,SOLID,6" $2,125 °,., State Funds a.t..� . , THERMOPLASTIC,STANDARD-OPEN GRADED ASPHALT SURER•; y,WHITE,SKIP,6', ?`. uy 30 SKIP OR 3 9 LANE DROP _ ,„ .k,�„ $1,530 `.estate Funds LIGHTING I` "''' LIGHTING CONDUCTORS,F&I,INSULATED,NO 4 TONO��� r'$31,000 State Funds p. POLE CABLE DISTRIBUTION SYSTEM,CONVENTIONAL p ,�g z. $10,022 State Funds �r; le5 a +. a' LIGHT POLE COMPLETE-SPECIAL DESIGN.F&I,SINGLE ARM SHOULDER IViOUNT, ALUMINUM,40' ,41* $166,371 State Funds y' -% u.. H ,: SIGNALIZATION 0 ar ELECTRICAL SERVICE`WIR t "`s' .„if, �•, iA $325 State Funds ELECTRICAL'POWER SERVICEF,�&I UND RGROUND,METER PURCHASED BY CONT.RAt?OR "^ $2,909 State Funds 9, • PRESTRESSED�CONCRETE POLE,F :1;3TYPE P-II SERVICE POLE $2,274 State Funds MAST ARM,REMOVE'SHALLOW FOUNDATION,BOLT ON ATTACHMENT $4,549 State Funds MAST ARM,F&I,WIND SPEED-150SINGLE ARM-36 $24,463 State Funds MAST ARM,F&I,WIND SPEED-150,SINGLE ARM-60 $33,644 State Funds TRAFFIC SIGNAL,3 SECT., 1 WAY,ALUMINUM $3,790 State Funds SIGNAL PEDESTRIAN(F&I)(LED)(1 WAY) $2,412 State Funds LOOP DETECTOR INDUCTIVE,F&I,TYPE 9 $460 State Funds LOOP ASSEMBLY,F&I,TYPE A • $1,629 State Funds PEDESTRIAN DETECTOR,F&I $416 State Funds Page 15 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 TRAFFIC CONTROLLER ASSEMBLY, 170,F&I $25,297 State Funds TRAFFIC CONTROLLER ASSEMBLY,REMOVE CONTROLLER CABINET $1,819 State Funds INTERNALLY ILLUMINATED SIGN,RELOCATE $1,889 State Funds 20%CONTINGENCIES $3,504,620 State Funds MOBILIZATION(5%OF CONSTRUCTION COST) $876,155 State Funds MAINTENANCE OF TRAFFIC(5%OF CONSTRUCTION COST) $,876,155 State Funds <zsis DEPARTMENT Responsibility \}yv , `'a• s s.� $19,956,480 (Maximum Limiting Amount) s ;, v a , MANHOLES,SPECIAL,BMP STRUCTURE,SLUICE GATE STRUCTURE,JUNCTION -^ City of Miami $255;000 Beach Funds STRUCTURE>10' F JUNCTION BOXES,J-7,<10' a°;' s"�'���. City of Miami : .a *�� $142,915 rS ,r Beach Funds :r JUNCTION BOXES,J-7,>10' M Cityof Miami "1r $384,000 Beach Funds i SHEET PILING STEEL,F&I PERMANENT(CONTINUOU-S FROM BEGIN TO EN�PRQJEC Cityof Miami ` ^ $ $1,536,490 f„ r , ,5' Beach Funds SHLDR CONC BARRIER WALL,RIGID SHLDR 54" b lY City of Miami x � $505,143 ,�,v �;- tip: Beach Funds DESIGN FEE-CONSTRUCTION5SUPERVISION FEE City of Miami $2,576,452 .40Qk f lt#q�i� /k Iv ¢.. 't CITY OF 1V(IAMI BEACH Responsibility $5,400,000 : Ss tlf' • q t't ttor Page 16 of 25 Department Funded Agreement between the Florida Department oJ Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 EXHIBIT "C" CITY OF MIAMI BEACH RESOLUTION To be herein incorporated once approved by the CITY OF MIAMI BEACH Commission. i 4�J �a s_ .. . q r.' b ya >,>,`y .. % 4 . ♦.> iL R $ Y xi 4M1. ,'Tvtom p1. C fir dp 9�yy `Ft.�h� t sss .c R V it,. 2ti., j Y%,•. C \ ',, y a' Page 17 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 4392284-52-01 EXHIBIT "D" AUDIT REPORTS The administration of resources awarded by the Department to CITY OF MIAMI BEACH be subject to audits and/or monitoring by the Department, as described in this section. For further guidance, see the Executive Office of the Governor website,which can be found at: www.fssa.state.fl.us. MONITORING In addition to reviews of audits conducted in accordance with OMB Circular A-133"and Section 215.97,F.S.,as revised (see "AUDITS" below), monitoring procedures may include, but•not be lined to, on-site visits by Department staff, limited scope audits as defined by OMB Circular A-133,'as revised,and/or other procedures. By entering into this agreement, the recipient agrees to comply and cooperate fully with any monitoring procedures/processes deemed appropriate by the Department. In the event the Department determines that a limited scope audit of the recipient is appropriate, the recipient agrees to comply with any,,additional instructions provided by the Department staff to CITY OF MIAMI BEACH regarding such audit:i;CITY OF MIAMI BEACH further agrees to comply and cooperate with any inspections, reviews, investigations, or audits deemed necessary by the Department's Office of Inspector General(OIG)and Florida's Chief Financial Officer(CFO)or Auditor General. AUDITS PART I: FEDERALLY FUNDED Recipients of federal funds(i.e.state,local government,or nonprofit organizations as defined in OMB Circular A-133,as revised)are to have audits done annually usingthefollowing criteria: 1. In the event that the recipient'expends $500,000•,or more in Federal awards in its fiscal year, the recipient must have'a„single or program-specific audit conducted in accordance with the provisions of OMB Circular A-133;as revised ,EXHIBIT Ito this;agreement indicates Federal resources awarded through the Department by this agreement: .In determining the Federal awards expended in its fiscal year, the recipient„shall consider all sources'of Federal awards, including Federal resources received from the Department. The determination of amounts of Federal awards expended should be in accordance with the guidelines established by OMB Circular A-133, as revised. An audit of the 'recipient conducted by'thtAuditor General in accordance with the provisions OMB Circular A-133,as revised,:will meet the requirements of this part. 2. In connection with the audit requirements addressed in Part I,paragraph I.,the recipient shall fulfill the requirements';relative to auditee responsibilities as provided in Subpart C of OMB Circular A-133, as revised. x, 3. If the recipient expends less than $500,000 in Federal awards in its fiscal year, an audit conducted in accordance with the provisions of OMB Circular A-133, as revised, is not required. However, if the recipient elects to have an audit conducted in accordance with the provisions of OMB Circular A-133, as revised,the cost of the audit must be paid from non-Federal resources(i.e.,the cost of such an audit must be paid from recipient resources obtained from other than Federal entities). j 4. Federal awards are to be identified using the Catalog of Federal Domestic Assistance(CFDA)title and number,award number and year,and name of the awarding federal agency. Page 18 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-/-52-0/ PART II:STATE FUNDED Recipients of state funds(i.e. a nonstate entity as defined by Section 215.97(2)(1), Florida Statutes)are to have audits done annually using the following criteria: I. In the event that the recipient expends a total amount of state financial assistance equal to or in excess of $500,000 in any fiscal year, the recipient must have a State single or project-specific audit for such fiscal year in accordance with Section 215.97, Florida Statutes; applicable rules of the Department of Financial Services and the CFO; and Chapters 10.550 (Local GovernmentallEntity Audits) or 10.650 (Florida Single Audit Act: Audits Nonprofit and For-profit Organizations),Rules of the Auditor General. EXHIBIT I to this Agreement indicates state financial,`' sistance awarded through the Department by this Agreement. In determining the state financial as sistanee.expended in its fiscal year, the recipient shall consider all sources of state financial assistane4 includitt .state financial assistance received from the Department, other state agencies, and .other non-state gi tti s. State financial assistance does not include Federal direct or pass-through.aw'atds'and resources c ived by a non-state entity for Federal program matching requirements '7Y =k 2. In connection with the audit requirements addressed°ut art II, patlagraph 1 of Exhibi is tl" of this Agreement, the recipient shall ensure that the audit cbtnplies;,with the requirements of Section 215.97(7), Florida Statutes. This includes submission of 4altcial reporting package as defined by ,,.Section 215.97(2)(d), Florida Statutesand Chapters 10.550�" l al governmental entities) or 10.650 (nonprofit and for-profit organizations),Rkles pf the Auditor Gentilt,, 3. If the recipient expends less than $500,00p n state,;f ancial assist Wan its fiscal year, an audit conducted in accordance with the provisio4 of S'eh1 15.97 Flo da Statutes, is not required. However if the recipient elects to have an audit`condu_t<d i -ccordance with the provisions of Section 215.97,Florida Statutes,Ythegost of the audit m 't bepaid from`t `ion-state entity's resources(i.e.,the cost of such an audit ittia.b raid from the i cipient's resources obtained from other than State entities). A41, 4. State awards are to ar,g3tttifigtdistoj9.g4he Catalog of State Financial Assistance (CSFA) title and number, war.f umber annsg,an atnerfAsstafe agency awarding it. PART"II 'OTHER AUDIT R Q`UIREMt,b I SA The recipient sH$I(':follow up and :'e corrective action on audit findings. Preparation of a summary schedule of prior year auditclings, including corrective action and current status of the audit findings is required. Current year audit figaiiiks require corrective action and status of findings. Records related to unresolved audit findings,appeals,or litigation shall be retained until the action is completed or the dispute is resolved. Access to project records and audit work papers shall be given to the Department,the Department of Financial Services, and the Auditor General. This section does not limit the authority of the Department to conduct or arrange for the conduct of additional audits or evaluations of state financial assistance or limit the authority of any other state official. PART IV: REPORT SUBMISSION Page 19 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 • 1. Copies of reporting packages for audits conducted in accordance with OMB Circular A-133,as revised, • and required by PART I of this agreement shall be submitted, when required by Section .320(d),OMB Circular A-133,as revised,by or on behalf of the recipient directly to each of the following: A. The Department at each of the following addresses: Florida Department of Transportation Office of Comptroller,MS 24 605 Suwannee Street Tallahassee, Florida 32399-0405 Email: FDOTSingleAudit@dot.state.ft.usri9 B. The Federal Audit Clearinghouse designated in OMB Circular'A33, as revised (the number of copies required by Sections .320 (d)(1) and (2), OMB Cii.ular A: 3, as revised, should be submitted to the Federal Audit Clearinghouse),at the followi address � ;. ;.. Federal Audit Clearinghouse - Bureau of the Census 1201 East l0''Street 40 %: 'µ%r. Jeffersonville, IN 47132 r2M C. Other Federal agencies and pass-through entities in a•."'dance with Sections .320 (e) and (f), OMB Circular A-133,as revised. :.r .. 2. In the event that a copy of the reporting package fooran audit require li.' ,4RT 1 of this agreement and conducted in accordance with OMB Circular A=134 revised, is nott quired to be submitted to the Department for reasons pursuant to section .320(e)(2)'�pMB Circular:A=133, as revised, the recipient t tF�o ectt. shall submit the required written notificationspursua'tit on; '.320 (e)(2) and a copy of the recipient's audited sched tlerofexpenditures of Federal awards directly to each of the following: Florida Department of4ansportation Office oftdXmptroller,qs 24 605 Suwann elStreet Tallahassee,F el�i fa:323 Email;FDOTSii Audit@do ate;l s ' addition, pursuant td$Secuon 320%(f) OMB Circular A-133, as revised, the recipient shall submit a co y df the reporting pacgige described in Section .320(c),OMB Circular A-133,as revised,and any management letters issued bythe auditor,to the Department at each of the following addresses: Florida Department of Transportation Office ofComptoller,MS 24 605 Sii vappc0.Street Tallahassee,Florida 32399-0405 Email: FDOTSingleAudit@dot.state.f1.us 3. Copies of financial reporting packages required by PART II of this agreement shall be submitted by or on behalf of the recipient directly to each of the following: A. The Department at each of the following addresses: Florida Department of Transportation Office of Comptroller,MS 24 605 Suwannee Street Page 20 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 Tallahassee,Florida 32399-0405 Email: FDOTSingleAudit@dot.state.fl.us B. The Auditor General's Office at the following address: Auditor General's Office Room 401,Pepper Building Ill West Madison Street Tallahassee,Florida 32399-1450 4. Copies of reports or the management letter required by PART III of this agrepm t shall be submitted by or on behalf of the recipient directly to: .s .r.-. A. The Department at each of the following addresses: Florida Department of Transportationirk4 Office of Comptroller,MS 24 ' '> 605 Suwannee Street r, Tallahassee,Florida 32399-0405 G£ a} Email: FDOTSingleAudit ct dot.state.fl.t s 5. Any reports, management letter, or other information required, 1to be submitted to the Department pursuant to this agreement shall be submitted timely in accordar `with OMB Circular A-133, Florida Statutes, and Chapters 10.550 (local governmental entities) or i10.650 (nonprofit and for-profit organizations),Rules of the Auditor General,as pppliaable. 6. Recipients, when submitting financial repotting packz e the Deepartment for audits done in accordance with OMB Circular A-133 or Chspters 10.550 (loc lat'governmental entities) or 10.650 (nonprofit and for-profitooghnitat►ons), Rules oftle Auditor General, should indicate the date that the reporting package was delivered tt"the recipient in correspondence acCITY OF MIAMI BEACHing the reporting package ,., PART V: RECORD RETENTION � ; ; . I. The recipient`steal retain sufficient records demonstrating its compliance with the terms of this agreement for a period oat leastftvegyears,from the date the audit report is issued, and shall allow the ;Department,or its desigrtethe statd C O'br Auditor General access to such records upon request. The recipient shall ensure that tliOnndependent audit working papers are made available to the Department,or its desig e;the state CFO,'"o„rnAudito General upon request for a period of at least five years from the date the au4ifreport is issued;unless extended in writing by the Department. "p4Y� Page 21 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 EXHIBIT- 1 FEDERAL and/or STATE resources awarded to the recipient pursuant to this agreement should be listed below. If the resources awarded to the recipient represent more than one Federal or State program,provide the same information for each program and the total resources awarded. Compliance Requirements applicable to each Federal or State program should also be listed below. If the resources awarded to the recipient represent more than one program, list applicable compliance requirements for each program in the same mariner as shown here: • (e.g.,What services or purposes the resources must be used for) • (e.g.,Eligibility requirements for recipients of the resources) • (Etc...) NOTE: Instead of listing the specific compliance requirements as shown above,the Stafewarding agency may elect to use language that requires the recipient to comply with the requirements of applicabll provisions of specific laws, rules, regulations,etc. The State awarding agency, if practical, may want to attach a copy if the specific law,rule,or regulation referred to. 1,►;., FEDERAL RESOURCES ��.sk Federal Agency Catalog of Federal Domestic Assistance Number&Title) Amount J Compliance Requirements I, � fx 1 '`Rpw ,,,... :, , STATE RESOURCES `_` ., State Agency Catalog of State Financial Ass a,,,,„... stance(N trili irTittl�b Amount Florida Department of V <:, 'es' S 19,956,480 Transportation "' a•: ht ffi Compliance Requirements ,.. 2. k ' f 3. t.. it Matching Resonrbs_for Federal Programs Federal Agency i .Catalog of Federal Domestic Assistance(Number&Title) Amount two, Compliance Requirements I. 2. 3. NOTE: Section.400(d)of OMB Circular A-133,as revised, and Section 215.97(5)(a), Florida Statutes, require that the information about Federal Programs and State Projects included in Exhibit I be provided to the recipient. Page 22 of 25 Deportment Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-0l EXHIBIT "E" STANDARDS AND SPECIFICATIONS All maps,plans and designs are to be prepared with English values in accordance with all applicable current DEPARTMENT manuals, memorandums, guidelines including but not limited to: General ,4444 kx z o 29 CFR, Part 1910.1101 —Asbestos Standard fofustry, U.S. Occupational Safety and Health Administration(OSHA) o 29 CFR, Part 1926, 1 101 —Asbestos Standard for Construction,OSHA o 40 CFR, Part 61,Subpart M -National;E:rnission Standaidfor Hazardous Air Pollutants(NESHAP), Environmental Protection Agency (EPA) o 40 CFR, Part 763,Subpart E—Asbestos-Containing Materialsf Schools, EPA o 40 CFR, Part 763,Subpart G—Asbestos Worker Protection,EPA o Americans with Disabilities Act Acce t b l}ty'guidelines(ADAAG) o Any special instructions from the DEPAR'1(~IvVIENT o Bicycle Facilities Planning and Design Manual-,.. o CADD Manual o CADD Production Criteria Handbookfa o Ch. 469, F.S. —Asbestos Abatement;`Florida Department of Business and Professional egulation (D) PR}' '' o Ch. 62237ja.—AsbestosProgram, Florida Department of Environmental Protection zn o Cc de;of Federal l egulations o Design'"I'raf is P cpydure w ` o.;Fquivalen 'Single Axl'eJ.oad Guidelines �• PIorida Administrative Codes fN o Flo`ria?Depart ent;of Business& Professional Regulations Rules fs, o FloridaIg.partmenfiTtEnvironmental Protection Rules a:;;o Florida Department of Transportation Basis of Estimates Manual Florida Department of Transportation Design Standards for Design, Construction, Mai ,. ntenance, and Utility Operations on the State Highway System o Florida Department of Transportation Instructions for Structures Related Design Standards o Florida Department of Transportation Handbook for Preparation of Specifications Package o Florida Department of Transportation Materials Manual o Florida Department of Transportation Plans Preparation Manual o Florida Department of Transportation Project Development and Environmental Manual o Florida Department of Transportation Standard Specifications for Road and Bridge Construction o Florida Statutes o Florida's Level of Service Standards and Guidelines Manual for Planning Page 23 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-0! o K-Factor Estimation Process o Manual of Uniform Minimum Standards for Design, Construction,and Maintenance for Streets and Highways o Model Guide Specifications—Asbestos Abatement and Management in Buildings,National Institute for Building Sciences(NIBS) o Policy for Geometric Design of Highways and Streets o Project Traffic Forecasting Guidelines o Quality Assurance Guidelines o Rule 61G17-6, F.A.C., Minimum Technical Standards,for Professional Surveyors and Mappers '. o Safety Standards o Utility Accommodations Guidelines `Fv ' Permits '. F � o Chapter 373, F.S. K ) • '+ / iT Drainage .. R s o Cross Drain o Drainage Handbooks $ o Drainage Manual 44V, o Erosion and Sediment Con -,ol 'F3 o Hydrology ` ; .0-4 ` o Optional Pi a Materials o Storm Drain o Storrttwater Management Facility, :,f o TemporaiiyzDratnage.Handbook e rg g y `'`^•z 3 �:. :; Survey)an&Mapping o All app�cable Flo?id&Statutes and Administrative Codes ApplicableRules,Guidelines Codes and authorities of other Municipal,County, Uk State and Fe eral Agencies. l'FDOT AeriaVSurve in Standards for Transportation Projects Topic 550-020-002 ��;i. Surveying P 1 P� o ^FOOT Right of Way Mapping Handbook o FbtilAiveying Procedure Topic 550-030-101 o Florda'bepartment of Transportation Right of Way Procedures Manual o Florida Department of Transportation Surveying Handbook o Right of Way Mapping Procedure 550-030-015 Traffic Operation Manuals o AASHTO-An Information Guide for Highway Lighting o AASHTO -Guide for Development of Bicycle Facilities o American Disabilities Act o Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD) Page 24 of 25 Department Funded Agreement behveen the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-1-52-01 o Federal Highway Administration Standard Highway Signs Manual o FHWA- Roundabouts: An Informational Guide o Florida Department of Transportation-Florida Roundabout Guide o Florida Department of Transportation Manual on Uniform Traffic Studies (MUTS) o Florida Department of Transportation Median Handbook o Florida Department of Transportation Traffic Engineering Manual o Minimum Specifications for Traffic Control Signal Devices o National Electric Safety Code o National Electrical Code ��, Structures o AASHTO LRFD Bridge Design Specificatiji s and li terims x�N o AASHTO Standard Specifications for Structural Suppirt'sfor Highway Signs, Luminaires and Traffic Signals,and bterms- o Florida Department of Transportation Structures Manual . ,� o Florida Department of Transportation;Structures Design Office etmporary Design Bulletins(available on Flori pepartrttent of Transportation Structures web site only) !' o Florida Department of1Transportation Preferred Details(available on Florida Department of Transpo:• tion Structures we "ssi;te only) TicIf Geotechnical r� o FHW, >"t^liec• `st and Guideeess for Review of Geotechnical Reports and Preltt nary Spegfications 'A. o Ivraalpf Florid=Sampling and Testing Methods o Soils aoundattonHandbook ''nF }I, :; Cy 1yJ 3 • Fx ,, . 'C k ;Y, p u z' ,ryR3 x 1 Page 25 of 25 Department Funded Agreement between the Florida Department of Transportation and the City of Miami Beach Financial Project Number 439228-I-52-01 MIAMI BEACH City of Miami Beach, 1700 Convention Conker Drive,Miami Beach, Florida 33 139 www.miamibeach41.aw OFFICE OF THE CITY CLERK,Rafael E.Granada,City Clerk Tel:305.673.7411,Fax:305.673.7254 Email:CiyClerk@miomibeochll.gov January 19, 2024 Ms. Carolina Bolado 2939 Indian Creek Drive, Apt 502 Miami Beach, Florida 33140 SUBJECT: Transportation. Parking and Bicycle-Pedestrian Facilities Committee Dear Ms. Carolina Bolado: Your membership on the above committee has concluded. The City Commission has requested that I convey to you its appreciation for your contributions of time and effort, resulting in the successful functioning of this Committee, and for the interest shown by you throughout your service on it. The work that you and your fellow committee members have done is greatly appreciated. Please note that regrettably your parking pass will be deactivated, since your term of membership on the committee has ended. Respectfully, Rafael Granado City Clerk cc: Monica Beltran, Parking Director Monica Beltran, City Liaison