Resolution 2024-32913 RESOLUTION: 2024-32913 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN AGREEMENT BETWEEN THE CITY AND HAZEN AND ZAWYER, INC, PURSUANT TO REQUEST FOR PROPOSALS (RFQ) 2022-122-ND, FOR ENGINEERING SERVICES FOR WATER AND WASTEWATER SYSTEM PROJECTS, TO COMPLETE THE ENGINEERING AND CONSULTING SERVICES REQUIRED FOR THE DESIGN AND POST-DESIGN SERVICES OF THE BELLE ISLE WATER BOOSTER PUMP STATION (W-5) REHABILITATION RESILIENCY IMPROVEMENT PROJECT, AND FURTHER AUTHORIZING A WORK ORDER IN THE AMOUNT OF $558,664.59. WHEREAS, on January 12, 2022, the City executed grant agreement #I0135 with the Department of Economic Opportunity for the hardening and resiliency improvements of the Belle Isle Water Booster Pump Station (W-5). The grant agreement is valued at$2,400,000; and WHEREAS, on March 25, 2022,the Mayor and City Commission awarded and authorized the execution of the Agreement with Hazen&Sawyer, Inc.for the Engineering Services for Water and Wastewater Projects (RFQ) No. 2022-122-ND; and WHEREAS, on February 8, 2023, the City and Hazen & Sawyer, Inc. entered into an Agreement for the Engineering Services for Water and Wastewater Projects (RFQ) No. 2022- 122-ND, having an initial term of three (3)years, with two (2)one-year renewal terms; and WHEREAS, the Belle Isle Water Booster Station (W-5) Rehabilitation and Resiliency Improvement Project is a priority water management project in Middle Beach; and WHEREAS, the pump station was identified as a High Criticality asset in the City of Miami Beach Water & Sewer Renewal and Replacement Report dated May 2018 and was included in the 2020-2024 implementation timeframe in the City of Miami Beach Water System Master Plan dated October 2019; and WHEREAS, this project seeks to increase the resilience of W-5 by rehabilitating the mechanical, structural, and electrical equipment; instrumentation and controls; ventilation and air conditioning systems; and performing overall facility hardening. A new emergency generator and fuel tank will be installed at the electrical building with sufficient capacity to run the belle isle booster station (W-5)and the sewer pump station (PS-10); and WHEREAS, additionally, these improvements will harden the station with the primary objective of mitigating flooding and water infiltration caused by intense rain events, high tides, and sea level rise. This pump station is used to supplement the system pressure supplied by the 30- inch interconnect from the Miami Dade Water and Sewer Department (WASD) system and increases system reliability during emergencies; and WHEREAS,furthermore,the Public Works Department is supported in the construction of hardening and resiliency improvements to the pump station by a $2,400,000 grant agreement with the Department of Economic Opportunity; and WHEREAS, this project will take the existing critical pump station and develop the changes to ensure it performs as a resilient, reliable, and safe cornerstone of the water infrastructure for the City of Miami Beach; and WHEREAS, pursuant to Request for Proposals (RFQ) 2022-122-ND Engineering Services for Water and Wastewater System Projects between the City and Hazen & Sawyer, Inc. and authorizing a work order to complete the engineering and consulting services required in the lump sum amount of$558,664.59; and WHEREAS, the Administration agrees with Hazen & Sawyer, Inc.'s scope of work and is prepared to move forward to the full Commission for approval. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to enter into an Agreement between the City and Hazen and Zawyer, Inc, pursuant to Request For Proposals (RFQ) 2022-122-ND, for engineering services for water and wastewater system projects, to complete the engineering and consulting services required for the design and post-design services of the Belle Isle Water Booster Pump Station(W-5) Rehabilitation Resiliency Improvement Project, and further authorizing a work order in the amount of$558,664.59. PASSED and ADOPTED this a/ day of ICb ,Y2024. • ATTEST: Steven Meiner, Mayor 4‘1 / FEB 2 3 2024 Rafael E. Granado, City Clerk 1.49 ."'*$ INCORP ORATE0 of �_= CH 6M'.-- Resolutions -C7 D MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Alina T. Hudak, City Manager DATE: February '21, 2024 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AN AGREEMENT BETWEEN THE CITY AND HAZEN AND SAWYER, INC., PURSUANT TO REQUEST FOR PROPOSALS (RFQ) 2022-122-ND, FOR ENGINEERING SERVICES FOR WATER AND WASTEWATER SYSTEM PROJECTS, TO COMPLETE THE ENGINEERING AND CONSULTING SERVICES REQUIRED FOR THE DESIGN AND POST-DESIGN SERVICES OF THE BELLE ISLE WATER BOOSTER PUMP STATION (W-5) REHABILITATION RESILIENCY IMPROVEMENT PROJECT (THE "AGREEMENT"), AND FURTHER, AUTHORIZING A, WORK ORDER IN THE AMOUNT OF $558,664.59; AND FURTHER, AUTHORIZING THE CITY MANAGER AND CITY CLERK TO EXECUTE THE AGREEMENT. RECOMMENDATION The Administration recommends approving the engineering and consulting services for the Belle Isle Water Booster Pump Station (W-5) Rehabilitation and Resiliency Improvement Project as described in the scope proposal from Hazen & Sawyer, Inc. (PC), a copy of which is attached. This scope is as follows: (1) Design of hardening, and storm proofing of the pump station and pump station building; (2) Design of the replacement,of aging pipes, pumps, valves, bypass and related infrastructure; (3) Evaluation and design of structural and electrical components related to hardening; (4) Site accessibility improvements; (5) Design of new fuel generator; (6) Surveying and geotechnical services in the amount not to exceed$558,664.59. BACKGROUND/HISTORY On January 12, 2022, the City executed grant agreement #I0135 with the Department of Economic Opportunity for the hardening and resiliency improvements of the Belle Isle Water Booster Pump Station(W-5). The grant agreement is valued at$2,400,000. On June 22, 2022 the City Commission accepted the recommendation of the City Manager, pertaining to Request for Qualifications No. 2022-122-ND,for Engineering Services for Water and Wastewater Systems Project; and authorized the Administration to enter into negotiations with Hazen and Sawyer, P.C., the top-ranked proposer, and A&P Consulting Transportation Page 293 of 1278 Engineers Corp., the Second-ranked Proposer, to serve as Co-Primary Consultants in addition to a prequalified pool of vendors for smaller projects (due to the estimate of projects to be implemented through 2027 being approximately $230 Million, and significant amount of work to being implemented), following a rigorous selection process. On February 8, 2023, the City and Hazen & Sawyer, Inc. entered into an Agreement for the Engineering Services for Water and Wastewater Projects (RFQ) No. 2022-122-ND, having an initial term of three (3)years,with two (2)one-year renewal terms. ANALYSIS The Belle Isle Water Booster Station (W-5) Rehabilitation and Resiliency Improvement Projects is a priority water management project in Middle Beach. The pump station was identified as a High Criticality asset in the City of Miami Beach Water & Sewer Renewal and Replacement Report dated May 2018 and was included in the 2020-2024 implementation timeframe in the City of Miami Beach Water System Master Plan dated October 2019. This project seeks to increase the resilience of W-5 by rehabilitating the mechanical, structural, and electrical equipment; instrumentation and controls;ventilation and air conditioning systems; and perfomiing overall facility hardening. A new emergency generator and fuel tank will be installed at the electrical building with sufficient capacity to run the belle isle booster station (W- 5)and the sewer pump station(PS-10). Additionally, these improvements will harden the station with the primary objective of mitigating flooding and water infiltration caused by intense rain events, high tides, and sea level rise. This pump station is used to supplement the system pressure supplied by the 30-inch interconnect from the Miami Dade Water and Sewer Department (WASD) system and increases system reliability during emergencies. Furthermore, the Public Works Department is supported in the construction of hardening and resiliency improvements to the pump station by a $2,400,000 grant agreement with the Department of Economic Opportunity. This project will take the existing critical pump station and develop the changes to ensure it performs as a resilient, reliable, and safe cornerstone of the water infrastructure for the City of Miami Beach. Procurement Selection Process: Pursuant to Request for Proposals (RFQ) 2022-122-ND Engineering Services for Water and Wastewater System Projects between the City and Hazen& Sawyer, Inc. and authorizing a work order to complete the engineering and consulting services required in the lump sum amount of $558,664.59. The Administration agrees with Hazen & Sawyer, Inc.'s scope of work and is prepared to move forward to the full Commission for approval. SUPPORTING SURVEY DATA Page 294 of 1278 Results from the 2022 Resident Survey related to the City's perception and satisfaction show an overall approval of 67.4%and rated the City as a good place to live. FINANCIAL INFORMATION Account Code: 418-0815-061357-29-418-000-00-00-00-28120. The total project budget for design services is $558,664.59. This project will provide a cost estimate for the proposed infrastructure improvements. The City has been awarded a total of $2.4M in Community Development Block Grant Mitigation Program funds from the Department of Economic Opportunity(DEO)for the hardening and resiliency improvements of the Belle Isle Water Booster Pump Station(W-5). This project is funded under the City's Five-Year Water and Sewer Capital Improvement Plan and the D E O Grant. CONCLUSION The Administration recommends approving the engineering and consulting services for the Belle Isle Water Booster Pump Station (W-5) Rehabilitation and Resiliency Improvement Project as described in the scope proposal from Hazen& Sawyer, Inc. (PC), a copy of which is attached. These services were competitively procured through RFQ 2022-122-ND. This scope is as follows: (1) Design of hardening, and storm proofing of the pump station and pump station building; (2) Design of the replacement of aging pipes, pumps, valves, bypass and related infrastructure; (3) Evaluation and design of structural and electrical components related to hardening; (4) Site accessibility improvements; (5) Design of new fuel generator; (6) Surveying and geotechnical services in the amount not to exceed $558,664.59. Applicable Area South Beach Is this a"Residents Right Does this item utilize G.O. to Know" item. pursuant to Bond Funds? City Code Section 2-14? Yes No Strategic Connection Environment & Infrastructure - Reduce risk from storms, high tides, groundwater, and sea level rise. Legislative Tracking Public Works ATTACHMENTS: Description ❑ Scope of Services ❑ DRAFT Reso Page 295 of 1278 Hazen SCOPE OF SERVICES HAZEN AND SAWYER SERVICE ORDER No. 31 CITY OF MIAMI BEACH PUBLIC WORKS DEPARTMENT Belle Isle Booster Station Detailed Design Services PROJECT BACKGROUND The Belle Isle Water Booster Station (W-5) is located at 28 Venetian Way in Miami Beach, Florida. W-5 is used to supplement the system pressure supplied by the 30-inch interconnect from the Miami Dade Water and Sewer Department (WASD) system and increases system reliability during emergencies. W-5,is the only one-pump "booster station" in the City's water system. W-5 is also comprised of an above-grade electrical building(that is located across the street from the booster station and is shared with sewer Pump Station No. 10) that houses controls, electrical gear, and an indoor diesel emergency generator. W-5 is nearing the end of its useful life and requires significant hardening and rehabilitation to improve reliability moving into the future. This project seeks to increase the resilience of W-5 by rehabilitating the mechanical, structural, and electrical equipment;instrumentation and controls;ventilation and air conditioning systems;and performing overall facility hardening.A new emergency generator and fuel tank will be installed at the electrical building with sufficient capacity to run the booster station and sewer pump station. W-5 was identified as a High Criticality asset in the City of Miami Beach Water & Sewer Renewal and Replacement Report dated May 2018 and was included in the 2020-2024 implementation timeframe in the City of Miami Beach Water System Master Plan dated October 2019. In order to ensure reliability moving forward, a complete hardening and rehabilitation of the booster station is proposed. As the improvements described above are grant funded,the design team will take careful consideration of the terms of the grant and the items that are eligible for reimbursement for construction. The CITY has requested that Hazen and Sawyer (HAZEN) submit a proposal for engineering services related to the detailed design of upgrades to W-5, Belle Isle Booster Station. HAZEN shall provide professional engineering services consisting of the tasks further described below. • November 17, 2023 Page 1 of 10 Page 296 of 1278 Hazen TABLE OF CONTENTS Task 1 —Site Investigation and Data Collection 2 Task 2—30% Design 3 Task 3—60% Design 6 Task 4—90% Design 7 I Task 5—100% Design 7 Task 6—Permitting and Bid Phase Services 7 Task 7—Construction Phase Services 8 SCOPE OF SERVICES Task 1 —Site Investigation and Data Collection HAZEN will coordinate with CITY staff to gather relevant as-builts and site-specific data on W-5 and its associated transmission mains. Utility locates will be called for using Sunshine 811 for the pump station site and the streets surrounding the pump station. Using this design ticket information, HAZEN will request . as-built data from all utilities identified in the area. HAZEN will utilize this data during the design process to verify if any existing utilities will be impacted by the proposed W-5 work HAZEN will also conduct site visits to document the accuracy of the record drawings and inspect mechanical and structural elements of the pump station. During the site visits, HAZEN will discuss with CITY staff any items that are to be replaced, modified, and/or salvaged. The following supports services will be provided as part of the this task: • The services of a licensed State of Florida Surveyor to conduct a topographic survey of the area proposed for the W-5 improvements. See Figure 1 for approximate survey limits. The topographic survey will include elevations, easements, right of way limits, edges of pavement, visible utilities, and other surface features. Utility locates and soft digs are also included in the surveyor scope. • The services of a geotechnical engineering subconsultant to perform a total of(3)three Standard Penetration Test(SPT)borings in accordance with American Society of Testing Materials(ASTM) D-1586. (2)two borings to a depth of 30 feet and(1)one boring to a depth of 100 feet will be taken November 17, 2023 Page 2 of 10 Page 297 of 1278 Hazen in the vicinity of the pump station site. Soft digs at various locations in order to verify existing below ground utility locations to avoid conflict with new pipelines. • ■) _ gape late(W•5) s. ' Venetian Way Shared Electrical and Generator Fac ity Sewer Pump Station No.10 Figure 1.Approximate Survey Limits HAZEN shall review the completed survey performed to assure its completeness prior to its utilization. Signed and sealed copies of the survey shall be provided for CITY record. HAZEN shall review the completed geotechnical analysis performed to assure its completeness prior to its utilization. Signed and sealed copies of the final geotechnical report shall be provided for CITY record. A signed/sealed geotechnical report will be included within the bid specification as an appendix. HAZEN shall manage the subconsultants under this task including coordinating subconsultant's activities, scheduling, reviewing submitted surveys, and processing invoices. Task 1: Deliverables 1. Topographic Survey: (1)Signed and sealed copy, (1)electronic copy. 2. Geotechnical Report: (1)Signed and sealed copy, (1)electronic copy Task 2—30% Desisan Upon completion of Task 1, HAZEN will take the information gathered and prepare drawings and specifications for the upgrades to W-5. The drawings and specifications will include all necessary November 17, 2023 Page 3 of 10 Page 298 of 1278 Hazen information to accommodate the proposed improvements. The proposed project includes numerous resilience improvements to W-5 including: • Replacement of existing booster pump and installation of a permanent bypass. • Structural rehabilitation, repairs,and overall facility hardening(flood proofing)of the booster station per Florida Building Code High Velocity Hurricane Zone requirements • Replacement of existing booster station electrical equipment and controls (all booster station electrical and controls panels,and corresponding electrical components in the Sewer Pump Station '10 electrical building: VFD BI-1 in MCC-10, PCP-1, associated controls, wiring) and hardening (flood proofing)of the Sewer Pump Station 10 electrical building (replacement of windows, doors, louvers)per Florida Building Code High Velocity Hurricane Zone requirements • Replacement of the ventilation and air conditioning systems at the booster station and Sewer Pump Station 10 electrical building • Overall improvements for increased safety and improved accessibility of the booster station and Sewer Pump Station 10 electrical building for City maintenance operations • Install new generator at Sewer Pump Station 10 electrical building of sufficient capacity to operate both the sewer and booster pump in the event of a power outage, including all structural, mechanical, instrumentation and/or electrical work integral to the generator. HAZEN will examine both existing and proposed booster station operating conditions. The City's current water model will be utilized to confirm existing/proposed hydraulic operating points as well as the impact pf the proposed improvements to the transmission system and associated ancillary equipment. Flow and pressure monitoring will be deployed in the field to verify current booster station performance and system conditions. A preliminary drawing list is presented below. Sheet No. Drawing No. Drawing Title General 1 G-1 Cover Sheet and Location Map 2 G-2 List of Drawings 3 G-3 Abbreviations/Acronyms 4 G-4 General Notes 5 G-5 Survey Sheet 1 Civil 6 C-3 Existing/Demolition Site Plan 7 C-5 Proposed Site Plan 8 C-8 Proposed Grading and Drainage Plan g. C-10 Pavement Restoration Plan 10 C-12 Civil Details-Sheet 1 11 C-13 Civil Details-Sheet 2 November 17, 2023 Page 4 of 10 Page 299 of 1278 • Hazen Mechanical 12 M-1 Bypass Pumping Plan 13 M-2 Bypass Pumping Details 14 M-4 Belle Isle Yard Piping Plan 15 M-6 Belle Isle Demolition Plan 16 M-9 Belle Isle Proposed Plan 17 M-10 Belle Isle Proposed Section 18 M-11 Generator and Fuel Storage Tank Plan 19 M-12 Generator and Fuel Storage Tank Sections-Sheet 1 20 M-14 Mechanical Details Sheet 1 21 M-17 Mechanical Details Sheet 2 Instrumentation 22 I-1 Symbols,Abbreviations and Legend 23 1-2 Control System Architecture 24 1-3 Booster Station P&ID 25 1-4 Generator P&ID 26 1-5 Intrusion Alarm Monitoring P&ID 27 1-6 Instrumentation Details 1 Structural Architectural 28 S/A-1 Structural General Notes 29 S/A-2 Belle Isle Demolition Plan and Sections 30 S/A-3 Belle Isle Proposed Plan and Sections 31 S/A-4 Electrical/Generator Building Hardening 32 S/A-5 Electrical/Generator Building Hardening 33 S/A-7 Generator Room 34 S/A-8 Fuel Storage Tank Slab 35 S/A-9 Structural Details—Sheet 1 36 S/A-10 Structural Details—Sheet 2 Electrical 37 E-1 Electrical General Notes, Legends and Symbols 38 E-3 Electrical Site Plan 39 E-4 Booster Station Electrical Demolition and Modifications Plan 40 E-5 Electrical/Generator Building Demolition 41 E-6 Electrical/Generator Building New Work Plan 42 E-7 Single Line Diagram 43 E-9 Electrical and Control Risers November 17, 2023 Page 5 of 10 Page 300 of 1278 Hazen 44 E-12 Electrical Details HVAC 45 H-1 HVAC Symbols,Abbreviations and Notes 46 H-2 Booster Station Demo and Proposed 47 H-4 Electrical/Generator Demolition Plan 48 H-5 Electrical/Generator Building Plan 49 H-6 HVAC Schedules 50 H-8 HVAC Details 1 The 30 percent complete set of construction documents will be submitted to the CITY for review and comment. HAZEN will also provide an estimate of probable construction cost in accordance with American Association of Cost Engineering (AACE) International Recommended Practice 56R-08 Cost Estimate Classification System—As Applied for the Building and General Construction Industries. HAZEN will attend one (1) meeting with CITY representatives to receive their design input. It is anticipated the CITY will complete its review of the 30 percent drawings and specifications within 10 working days of receipt of the submittal package. Upon receipt of the 30 percent comments from CITY staff, HAZEN will proceed with the preparation of the 60 percent construction documents. Task 2: Deliverables 1. 30 Percent Submittal: (1)electronic copy of drawings and draft technical specifications 2. 30 Percent Estimate of Probable Construction Cost: (1)electronic copy 3. 30 Percent Submittal meeting minutes: (1)electronic copy emailed to meeting participants Task 3—60% Design The 60 percent complete set of construction documents will be submitted to the CITY for review and comment. HAZEN will also provide an estimate of probable construction cost in accordance with American Association of Cost Engineering (AACE) International Recommended Practice 56R-08 Cost Estimate Classification System—As Applied for the Building and General Construction Industries. HAZEN will attend one (1) meeting with CITY representatives to receive their design input. It is anticipated the CITY will complete its review of the 60 percent drawings and specifications within 10 working days of receipt of the submittal package. Upon receipt of the 60 percent comments from CITY staff, HAZEN will proceed with the preparation of the 90 percent construction documents. Under this task, all necessary administrative and managerial efforts are included, such as communication and coordination with the various governmental agencies, CITY representatives, and all other parties involved in the project. Task 3: Deliverables 1. 60 Percent Submittal: (1)electronic copy of drawings and draft technical specifications 2. 60 Percent Estimate of Probable Construction Cost: (1)electronic copy November 17, 2023 Page 6 of 10 Page 301 of 1278 Hazen 3. 60 Percent Submittal meeting minutes: (1)electronic copy emailed to meeting participants Task 4—90% Design The 90 percent documents will be submitted to the CITY for review and comment. HAZEN will also provide an estimate of probable construction cost in accordance with AACE International Recommended Practice 56R-08 Cost Estimate Classification System — As Applied for the Building and General Construction Industries. It is anticipated the CITY will complete review of the 90 percent complete plans and specifications within 10 working days of receipt of the submittal package. After receipt and incorporation of the 90 percent comments, HAZEN will proceed with the preparation of the 100 percent construction documents and start the permitting process, see Task 6. Upon receipt of all permit approvals, HAZEN will generate a final bid set of construction documents to be utilized for bidding purposes. Under this task, all necessary administrative and managerial efforts are included, such as communication and coordination with the various governmental agencies, CITY representatives, and all other parties involved in the project. Task 4: Deliverables 1. 90 Percent Submittal: (1)electronic copy of drawings and specifications 2. 90 Percent Estimate of Probable Construction Cost: (1)electronic copy 3. 90 Percent Submittal meeting minutes: (1)electronic copy emailed to meeting participants 4. Permit Set Submittal: (1)electronic copy of drawings and specifications Task 5—100% Design The 100 percent documents will be submitted to the CITY for final review and comment. HAZEN will also provide an estimate of probable construction cost in accordance with AACE International Recommended Practice 56R-08 Cost Estimate Classification System — As Applied for the Building and General Construction Industries. It is anticipated the CITY will complete review of the 100 percent complete plans and specifications within 10 working days of receipt of the submittal package. Upon receipt of all permit approvals, HAZEN will generate a final bid set of construction documents to be utilized for bidding purposes. Under this task, all necessary administrative and managerial efforts are included, such as communication and coordination with the various governmental agencies, CITY representatives, and all other parties involved in the project. Task 5: Deliverables 1. 100 Percent Submittal: (1)electronic copy of drawings and final technical specifications 2. 100 Percent Estimate of Probable Construction Cost: (1)electronic copy 3. Bid Set Submittal: (1)electronic copy of drawings and specifications Task 6—Permitting and Bid Phase Services HAZEN will develop the required permit application packages to obtain the following permits/regulatory approvals: • Notice of Intent to Use the General Permit for Construction of Water Main Extensions for PWs November 17, 2023 Page 7 of 10 Page 302 of 1278 Hazen (FDEP)(DERM and FDOH) • MDWASD • Miami Beach Building"Dry Run" • Miami Dade County Public Works(work on Venetian Way) Any permit comments will be addressed prior to generating the final Bid Set. Although HAZEN will make every effort to submit in a timely manner to all permitting agencies, it is recognized that review time is often beyond the Consultant's control. It is assumed that all permits may be obtained from the applicable regulatory agencies within sixty(60)days of initial submittal. The selected bidder shall utilize the approved permit plans to secure the construction permit from the Building Department.The City shall be responsible for payment of any permitting fees not specifically listed under the"Assumptions" heading. HAZEN will attend(1)one pre-bid conference. HAZEN will receive and provide timely responses to Requests for Information (RFIs) from contractors during the bid process. HAZEN will prepare written addenda with RFIs and responses and the final version of each addenda will be transmitted to the CITY project administrator for review and issuance. Within five(5)calendar days of receipt of bids, HAZEN will evaluate the bids for technical responsiveness and price and will make a formal recommendation to the CITY regarding award of the contract. Non- technical bid requirements shall be evaluated by others. Task 6: Deliverables 1. Bid tabulation and letter discussing the technical responsiveness of the bidders and a recommendation for award. 2. Permits and approvals from each regulatory agency. Task 7—Construction Phase Services Hazen will complete and submit the regulatory agencies certification of completion of construction forms. Hazen will perform the following services during construction: • Attend one (1)pre construction meeting with awarded contractor to discuss scope of work, design plans, permits and any additional documentation required for construction • Attend bi-weekly progress meetings with the City and Contractor.The number of meetings shall be limited to twenty-six(26)under this scope of work. • Preparation of Responses to RFIs.The number of responses to RFIs from the Contractor shall be limited to ten (10) under this scope of work • Respond to Requests for Information(RFI)within 5 days after RFI is received by Hazen, in writing. RFIs will be tracked in a spreadsheet or database format. • Review of shop drawing submittals provided by contractor that comply with the contract documents and are coordinated with associated items of work. The number of shop drawings shall be limited to thirty(30)under this scope of work. • Periodic site visits towards project certification. The number of site visits shall be limited to twelve (12)under this scope of work.These visits shall not constitute project inspections • Review and approval of contractor as-built drawings,including verification of regulatory compliance • Project certification (contingent upon the City providing Hazen with daily inspection reports and progress photographs or videos) • Change order reviews and coordination with the City for final determination.The number of change November 17, 2023 Page 8 of 10 Page 303 of 1278 Hazen order reviews from the Contractor shall be limited to three(3)under this scope of work • Review start up documentation, pump tests, and support the City on substantial completion, and project closeout. The City shall provide Hazen with daily inspection reports and photographic records for Hazen to certify the project. Task 7: Deliverables 1. Shop drawing reviews and RFI response. ASSUMPTIONS This scope of services is based on the following assumptions: 1. Responses to various inquires shall be made based on the best available information provided to HAZEN at the time of the review. 2. The latest water model used in the Water Master Plan(October 2019)will be used to assess the impacts of the proposed upgrades to W-5. 3. The CITY will provide available information and record drawings for W-5 and PS 10 in ACAD format(if ACAD unavailable then PDF format is acceptable), as well as any other pertinent data requested by HAZEN. 4. The CITY acknowledges that HAZEN's scope is based on information made available at the time of this Task Order and data gathered during site visits and meetings. 5. The CITY will provide all requested information within a reasonable timeframe. It is assumed that all information provided by the CITY is complete and accurate. 6. Site visits in this task will require the presence of CITY personnel.Additionally,the CITY agrees to work with HAZEN to ensure compliance with the proposed schedule. 7. Performance durations provided assume timely permit processing by regulatory agencies having jurisdiction over the project. Delays in obtaining permits, beyond the control of HAZEN and our subcontractors, may results in delays to the performance schedule for which we cannot be held liable. 8. Proposed regulators and permits have been identified to the best of HAZEN's knowledge. 9. Permitting fees for CITY Building Department dry run shall be waived or paid directly by the CITY. 10. HAZEN will follow the provisions of the City of Miami Beach Public Works Manual as relevant and appropriate. 11. Demolition and replacement or raising the roof of the existing electrical/generator building is not included in this scope. Hardening measures to address required design flood elevation requirements for the existing electrical/generator building will include various flood proofing measures(flood barriers, flood proof doors and hatches, etc)and raising of equipment if feasible. 12. The list of drawings proposed is based on the current estimated level of effort to complete the design of the upgrades to W-5. Should additional drawings be required as the design progresses in order to satisfy all project and regulatory requirements, HAZEN reserves the right to request additional compensation for the additional work. 13. Should additional permits not listed in Task 6 be required, HAZEN reserves the right to request additional compensation for services needed to obtain the additional permits. 14. $1,500 has been included in the Direct Expenses allowance to cover permit fees and travel expenses. Should the total permit fees exceed$1,500, HAZEN will request the CITY to pay the permit fee directly or HAZEN will request additional compensation to cover the permit fee. November 17, 2023 Page 9 of 10 Page 304 of 1278 Hazen PERFORMANCE SCHEDULE The Notice to Proceed (NTP) defines the official commencement of the HAZEN's contract. The schedule presented below assumes receipt of NTP in November 2023. Task Description Calendar Days after NTP Site Investigation and Data Collection 60 30%Submittal 90 60%Submittal 150 90%Submittal 180 100%Submittal 210 Permitting and Bid Phase Services 240 Construction Phase Services 300 METHOD OF COMPENSATION HAZEN shall perform the services defined in this scope of services for a lump sum fee of$557,164.59 and reimbursable expenses of $1,500.00 for a total fee of $558,664.59. Reimbursable expenses are an allowance set aside by the CITY and shall only include actual travel related expenditures made by HAZEN's project team members in the interest of the project.Justification for travel would include necessary in person meetings by subject matter experts.Travel reimbursement will be in accordance with the City's travel policy OD.20.01 "Travel on City Business." The breakdown of fees per task is detailed in Appendix A — Fee Estimate. Authorization Jayson Page, PE Vice President November 17, 2023 Page 10 of 10 Page 305 of 1278 p..x, r ri . nmM.14-30, ,.•p .09-SIas.. .sw• • • .. im oom .. +w. .elr,.im....w...�,.a.e *.a......•••peu.ve.my • • cruet I mar I. • wen' S anon I Itlan, • OLEOCR • IS LO I R'Wtf I WW1 • alwa I flat', I wadi. I w1Wt• I cta5t I 0311102 10aun'II I oto'r • •lal,, 61 nu at ma IM a as Oa no at I ,. I IOtt pn R Iu L , A n SWIM III SWI 0w1 I I I I I I I I I I I 1 I ...US R.u1 W r•g1 M •n11•d•]laV adi0 I W a 0 • 0 0 a • • 0 Cl •I CO art •4 -- a La • 1•alwaPl.• RCS - 0 0 •• • •w•. PadP Pad 01 • • argot St Pt p • -" tzar*as s1 clam • • ra r a 91 0 • V go O pacts*, P't - 09051 • • a .1, tu• • • a • .W dV.S.•O•tl• CL ape.. I p •PI as •flaw.,"otp.d lamewpl Cl etc. a a L &awl aaNPAuoS-.a at • ...ma..fOM osfit atw0p•Iton t Mi t a in 0 • • a • •l 0 inI inIn, a at • II 0 ••nl MOPS lag I - • — o,i••V P.w,Pw•papnwtl • car • • 2 Pi 0 C 2 9dtl Oo.wda,, t o sat a a a a i t L9•••I2 ISt CO 8001C pl p PI R I Dt at •a p ,- • • IIOWPwo ataaaai o .Yduglgdd••OI•d I• ant to • a n LI L. 0 - n a a a a •I R • • WP.Iq iiiyd R•Wa 4.1 Sall pl • 01 pt LI 0 (u0•80%WOO OW*pa PO.00•Pq OS nap l Ot a • I Wasp%0al)leaa.•aa1.S mt.%•wa.Ow13 Sc L419 I "Ot _ St • I (05.p cat)•oatas Put waw.W u -lava.l3 Is •2We I at R • I • Nowa WOO g•1•,d•papa., Sc • 0C1t. 1 • • OL at LI • (.ga.0%W.11ta.n.p,1 fib'Pa,•IP.W SS co pee. I I R SL a a • (tm1••o stoat)gym•PO,.W. VS aROI OL • R PL pa • taboo SOW to...mita-I0NOa Z9SIS Cc tao (,0.0%COI)musts,.tarygp.YulS cc N ta. • Wass)soot)a.m..PIP stomp.•...swum a .s .Ow.OYat I 4— iY1ot I a0 • c a a $e ' *It 0 •l J RI to ' n n a n • •I•••P.•••• 0 Sarre •a a1 pC n 22 D tI0••0%a)O••d Par WO"Is 0.0 Or •Otte a .. R SC I - t a (,0.•0 gape)Ic.IPiouatel01Y.ua-InIO,3'I •'r Co Pail • I a at t (.dloo MSS.WOoapi.solitattatoolta•WOp•13 a• o atta • I oa aC • I WOIOa cop)tan...t-flint .p M cootI pa al a, . n pL • (,t•ra%am l.al.ulp.•p .d•IOItIP•n• Sr DO'LI • I Ga n L 1 W641/00)OVNoA�1•lt.p.•I •• W Sala R •• O• or IL 0 NO.O%Om rrwrl.ad•.-IWT•Oa115 tr LIP r (u0•seoa)wP.o.0•W4a•.WPP tr cn 110 a (u0.a0%am tlpnPN PLO acmorar1•W^.O0,O0PR at .��•O)•p• • LL •oI'ul a1 • • al ii R rot 0 a a1 a n P • _ R • 11.•1IMMO MC" I. a Cr tl R — GC pi • (oOngn%)O.OealaucnS•MO Oa •m'01 t' a a _ pt a I - (001.0tamtaaoe=As.•t aaa•Rlp.13 •C - •Ra'Ll 1' 1 a • P• a I (,t1�0"oh.Wwoa lad lw.lrW5Tll-P•lp.3 ac an! I. t a ra a I (urrasoc)Amore•Io11M3 ac pl{'CL f' L pt Li n at PC p (u0.n tip)4 n1 1wlp ...owd-P?,P.n SC plain I a at 2 I' (tt10%O0ar1St•Pary.P..• •C cal'YI t f2 2 I •a I a .a i, (,4P•O *kw..•• ..acidm-WInionfotc cc tool t • (u6w.0%a)wvlot0-ItsVIIS LC n01 t' S Pi Y a (,•.0Soo)&thetas t uat0•WI-.PtiAtta.PS It MVO I) WI • 0 0 • n n It R n p• •t n n a • a • La••1 P••lP•f OWL. 0 c a D pa et Cl 0 (...•O•ta)OI•aw 9ufr.0.9s-P.a aC two tl a 91 ri p a (,0.•C%O01n1IP4.,IMS •1•wop•IouM3 pC Pita t I pl • at a l (ofNutl*DO.Ieoa P+•iwlPp.,Pwul•I.aV0.3 Al .a'• t I 0I • as I C I (Ib..a%00.4n•IPt-I"otp,3 a'c tRa'lc I. t 0a a as at pa •t 0 (1.06.0%00 wapPtp.N" Id SOP_a DC anal t' I at It L t Mara rad OVON-tazarto.•I ra cwat f' pt t ••t•' • a LI • ('10•.0 mg) t ll•.O. tdhw-IM0•naPPS cc ala •' • a0..0a) ..0-. taS a Ott t' • • % .aw.. PMNT OA..°%a)tauaml PIP w.♦$Wtat-.W00aCl W6 I • I4..0%a 2 Olin •t I In 0 0.. In a - 0 LI CI • II 0 ♦ I II R • ♦ a • O • tI••11CIala• at'la I Olt •o.P•pmda WlIp•10r0 Si WW2 t I • • r r I w0 0Q rl caa'at •' Ill flownMadder AstonmatlauPadol Ca Saga a'Sa l a 0 • pI Won a.ldntadal as • Rate t' l L pl • • a • • ' t a QUA On mu'mum.. 4.1.1w.e ma at • ' .naa•wt Ma Put.w•.SP••...p I noel 1 Rsa. f at IC. t S•'a1 t toll f was t coat. f Pohl I Of WI t n111 •an. f ROCa a tt'tat t at/tt $ 000a 1 Watt f WOW t •n•i 10ad pa waro t.In••003 _a ...sr gam u.I.Iwtl wow =amt.ON• a.wla74 Ow.91.l.rt oeyo. r t0p,..w VO M Oa.3 n1•I OUP •OM4 ..1d 1 .. g' •M 4 I/M M tan .0•w0..ai O.D pza mg IIAMOy WYDIRO•B aim arospiaq eirimix fRvass7 a/•Wr. MI Iasi !sa faa•w1• WPD MVO MVO w0••w•l 1o*6•981/41 of 1•4,•44 NOW IatNY a.a• Ma •alt p1 awl IL'0.1.•p.0.aatn ti.up•]tj 1401930 NO1118 113,00.3a•1 Mlle peg••WTI ROW