Loading...
94-21435 ResoRESOLUTION NUMBER, 94-21435 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING $103,811 FROM PARKING FUND 485 INTO EXISTING WORK ORDER #2108 FOR CHANGE ORDERS NUMBERS 1 THROUGH 12 FOR THE FLAMINGO PARK PARKING LOT AND MICHIGAN AVENUE IMPROVEMENTS WHEREAS, the Mayor and City Commission approved the Flamingo Park Parking Lot and Michigan Avenue Improvements on March 16, 1994; and WHEREAS, an appropriation and Work Order within Parking Fund 485 was established on.March 16, 1994, for this purpose. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission approve the appropriation of $103,811 from Parking Fund 485 into Work Order Number 2I08 for change orders, numbers 1 through 12 for Flamingo Park Parking Lot and . Michigan Avenue Improvements. PASSED AND ADOPTED this ATTEST: CITY CLERK AET:JCG:eh 21st FORM APPROVED Legal Dept By -IUD Date CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139 COMMISSION MEMORANDUM NO. TO: Mayor Seymour Gelber and Members of the City Commission DATE: December 21, 1994 FROM: Roger M. Carlt,� City Manager SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIANII BEACH, FLORIDA, APPROPRIATING $103,811 FROM PARKING FUND 485 INTO EXISTING WORK ORDER #2108 FOR CHANGE ORDERS NUMBERS 1 THROUGH 12 FOR THE FLAMINGO PARK PARKING LOT AND MICHIGAN AVENUE IMPROVEMENTS ADMINISTRATIVE RECOMMENDATION The City Administration recommends adoption of the attached Resolution in order to close out this project as per City Commission policy adopted on March 16, 1994. BACKGROUND & ANALYSIS The project scope consists of the construction of the new Flamingo Park Parking Lot and miscellaneous paving, landscaping and street lighting improvements to Michigan Avenue from 12th Street to 15th Street with a total original budget of $509,804.50. The attached listing of additional work and credits requested by the City, provides for upgrades and change of scope work to adjust and conform to changed project requirements, many of which resulted from requests of the residents. Changes totaling $132,125.50 less credits totaling $28,315.00 result in a net add for change orders #1 through #12 of $103,810.50. All changes and additional work have been verified by the City and the Architect/Engineer of record. CONCLUSION Change Orders #1 through #12 should be approved in the total amount of $103,810.50 and the attached Resolution adopted. AGENDA ITEMR—— C DATE 12-21- °I� Flamingo Park Parking Lot & Michigan Avenue Improvements Miscellaneous Changes Additions 1. Provide an additional 2" of crushed limerock base at Parking Lot. 2. Provide (2) #5 re -bar at curbs, and curbs & gutters on Michigan Avenue and Parking Lot. 3. Install new 1" raceways with #6 copper conductors for street lights along both sides of Michigan Avenue including service connection. 4. Asphalt overlay and reworking of high areas on Michigan Avenue from 12th Street to 15th Street. 5. New 5' wide sidewalk on Michigan Avenue west side from 12th Street to 15th Street. 6. New driveway aprons on Michigan Avenue west side from 12th Street to 15th Street. 7. New sod on Michigan Avenue west side from 12th Street to 15th street. 8. Adjust 11 manholes along Michigan Avenue from 12 Street to 15th Street. 9. Remove solid concrete wall with footing on Michigan Avenue and 14th Street. Amount Comments $ 5,648.50 Engineering change to account for unknown underground poor soil conditions. 7,287.00 Engineering change to reinforce curbs and curbs & gutters in lieu of wheel stops. 29,373.00 Upgrade to the electrical distribution system to meet Code requirements. 30,288.00 Engineering change to account for changed valley gutter elevations along Michigan Ave. See related credit in the amount of $19,033. 28,125.00 Change in scope to provide for new sidewalk at the request of the residents. 10,530.00 Change in scope to provide for proper access for property owners at the request of the residents. 5,174.00 Change in scope associated with items #5 and #6 above at the request of the residents. 2,200.00 Engineering change to account for new valley gutter elevations. 5,000.00 Change in scope to provide for the proper completion of the project at the request of the residents. Flamingo Park Parking Lot & Michigan Avenue Improvements Miscellaneous Changes ' Additions (Con't) 10. Remove asphalt in area east of Michigan Ave. at 14th St., Regrade and install sod. TOTAL Additions: Credits 1. Miscellaneous fencing changes. 2. Delete concrete ramps & pads in parking lot and additional fencing changes. 3. Delete milling and resurfacing on Michigan Avenue between 12th Street and 15th Street. 4. Install (9) Sabal Palms in place of (9) Maypan Palms in Flamingo Park Parking Lot. TOTAL Credits: NET TOTAL: 11/17/94 A\FLAMCHGS.WPD Amount . Comments 8,500.00 Change in scope to provide for the proper completion of the project at the request of the residents. $132,125.50 Amount Comments $(640.00) Change in scope providing for changed project needs. (722.00) Change in scope providing for changed project needs. (19,033.00) Engineering change associated with item #4 - Additions. (7,920.00) Landscaping change providing for a more appropriate plant selection for the project. (28,315.00) $103,810.50 Pg 2/2