Resolution 2024-33089 RESOLUTION NO. 2024-33089
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE
RECOMMENDATION OF THE PUBLIC SAFETY AND NEIGHBORHOOD
QUALITY OF LIFE COMMITTEE (PSNQLC) AT ITS JUNE 5, 2024,
MEETING AND DIRECTING THE ADMINISTRATION TO DEVELOP A
DESIGN AND IMPLEMENT THE INSTALLATION OF SIGNS OF
POSITIVE AFFIRMATIONS AT BAYSHORE PARK, CURRENTLY
UNDER CONSTRUCTION,AS RECOMMENDED BY THE CITY OF MIAMI
BEACH YOUTH COMMISSION.
WHEREAS, on April 16, 2024, the City of Miami Beach Youth Commission
(the "Youth Commission") unanimously passed a motion recommending the Mayor and
City Commission create signage with positive mental health affirmations along the jogging
trail/butterfly garden in Bayshore Park to coincide with the park opening in fall 2025; and
WHEREAS, on May 15, 2024, the Mayor and City Commission referred item C4
D, sponsored by Vice-Mayor Laura Dominguez, to the Public Safety and Neighborhood
Quality of Life Committee (PSNQLC), to discuss the installation of positive mental health
affirmation signage at Bayshore Park as recommended by the Youth Commission; and
WHEREAS, Bayshore Park is approximately 19.4 acres, located at 2300 Pine Tree
Drive between Miami Beach Senior High School and the Scott Rakow Youth Center, and
is enjoyed by residents, including the City's youth; and
WHEREAS, the new park will include a children's playground for different ages,
exercise station, sports tennis courts, pathways, jogging trails, and a dog park and will
also include a bathroom/office building, site furnishings, lake with infrastructure for future
connection to the neighborhood drainage system, lake circulation and ozone water
treatment system, and lake littoral zone; and
WHEREAS, in addition, the park will feature entrance and park identification signs,
a parking lot, lighting system, landscaping including the butterfly garden, an irrigation
system, and connection to the utilities and FPL system; and
WHEREAS, on May 19, 2016, the City executed an agreement with Savino Miller
Design Studio (SMDS) for the Landscaping, Architectural, and Engineering Design
Services for the Bayshore Park Project; and
WHEREAS, the park's design was presented at many public meetings including
the Design Review Board, Parks and Recreation Advisory Board, Sustainability
Committee, and the Bayshore Homeowner's Association; and
WHEREAS, on December 14, 2022, the Mayor and City Commission approved
the award of a contract to Buslam Company Partners Inc., for the construction of the
Bayshore Park and the City hosted a groundbreaking ceremony for the project on
September 19, 2023; and
WHEREAS, Bayshore Park is currently under construction, and is approximately
thirty (30%) complete, with an anticipated completion of Fall of 2025; and
WHEREAS, the City of Miami Beach Youth Commission has expressed that one
of the biggest problems faced by teens in our City is mental health; and
WHEREAS, the Youth Commission's initiative of creating positive affirmation and
mental health signage in Bayshore Park aims to help tackle this prevalent issue in our
community; and
WHEREAS, Bayshore Park will have an expansive jogging trail circling and
bordering different parts of the park, including the butterfly garden; and
WHEREAS, the Youth Commission believes that the butterfly garden can provide
calming places for people to relax, meditate, and enjoy nature, and their proposal is to
install positive affirmation and mental health signage along the jogging trail in the portion
of the park bordering the butterfly garden; and
WHEREAS, the signage could serve as a validating and educational tool, raising
awareness about the importance of mental health and destigmatizing conversations
surrounding mental health struggles and burnout; and
WHEREAS, and through carefully crafted messages, visitors may gain insights
into coping strategies, mindfulness practices, and resources available for mental health
support within the community; and
WHEREAS, examples of positive affirmation and mental health signage artwork
can be seen in Exhibit B, which, If implemented, would be the first signage of its kind in
City parks; and
WHEREAS, under this plan, the artwork for the positive affirmation and mental
health signage would be created by local Miami Beach artists and art students at Miami
Beach Senior High, thereby highlighting Miami Beach artists and youth while achieving
the goal of improving mental health throughout the City; and
WHEREAS, messaging for the signs could be implemented from the Poetry
Project, a social experiment originating to promote mental health awareness and well-
being within the London Underground; and
WHEREAS, the Poetry Project has experienced considerable growth over time
and there would be no cost for using quotes from this project; and
WHEREAS, the inclusion of signage featuring positive mental health affirmations
in Bayshore Park aligns with the City's commitment to promote the well-being of the
community members, especially the City's youth; and
WHEREAS, creating a supportive and uplifting environment within the park can
empower individuals to prioritize their mental health and foster a sense of belonging; and
WHEREAS, the Youth Commission's vision for this initiative would include 12 to
16 different, double-sided signs, using a typical size for traffic signs of approximately 12"
X 18", with an introduction sign stating information about the initiative, how it was created
by the Youth Commission and listing accessible mental health resources; and
WHEREAS, the colorful signs would be installed on poles that would border the
jogging trail in the area where it borders the butterfly garden; and
WHEREAS, City staff has shared the Youth Commission's proposal with SMDS
who expressed a preference "to keep the park virtually sign free, allowing the user to
curate his/her own feelings for the park experience"; and
WHEREAS, concerned that the signs could be distracting to park views, and
subjected to vandalism, the consultant suggested that similar results could be achieved •
through the use of fewer and smaller signs with QR codes, allowing for varying messages
and greater flexibility; and
WHEREAS, on June 5, 2024, the PSNQLC discussed this item, and asked that
staff provide a rough estimate of the cost required to implement this plan; and
WHEREAS, following PSNQLC direction, staff has discussed this project with
SMDS, the design consultant for Bayshore Park, who again expressed concern with
potential sign pollution concerns, and interference with the park experience; and
WHEREAS, the consultant has provided a proposal to design up to three alternate •
sign/message types for review and approval, more closely integrating park design
materials and concepts, while allowing for the incorporation of sign graphics as described
by the Youth Commission.
WHEREAS, design concepts would ensure that the following concerns are
addressed:
• Sign messages are incorporated into park design in various individual locations,
not grouped together.
• Sign "base structure" limited to 2'-6" in height and width and 2-0" depth, using
durable, non-frangible material, such as stone or metal.
• Sign message "panel" should be replaceable material, such as stone, metal, or
clear polycarbonate (no poles).
• Possible inclusion of QR Codes; and
WHEREAS, final Permit drawings and sign material would also need to be
developed once sign design and materials are selected;and
WHEREAS, should the Mayor and City Commission elect to implement this
initiative, City staff will need to engage the design consultant, coordinate permitting,
including the preparation and approval by the Building Department of a sign permit, and
explore potential zoning restrictions and the design of the signs; and
WHEREAS, the cost to implement this initiative is approximately $70,000; and
WHEREAS, Funding will have to be identified and appropriated for this project;
and
WHEREAS, pursuant to the recommendations. by PSNQLC, at its June 5, 2024,
meeting, the Administration recommends that the Mayor and City Commission adopt the
resolution.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission.hereby accept the recommendation of the Public Safety and Neighborhood
Quality of Life Committee (PSNQLC) at its June 5, 2024, .meeting and direct the
Administration to develop a design and implement the installation of signs of positive
affirmations at Bayshore Park, currently under construction, as recommended by the City
of Miami Beach Youth Commission.
PASSED and ADOPTED this .o?G day of ge4q , 2024.
Steven Meiner, Mayor
ATTEST: f JUL m 2Q24
•
st
APPROVED AS TO
Rafael E: Granado, City Clerk FORM & LANGUAGE
& FOR EXECUTION
Sponsored013 6,1)71toze/-
byCommissioner Laura Dominguez o City Attorney Date
05- ORATE
Commissioner Alex J.Fernandez ''•. y �
Co-Sponsored by Com ...........
Resolutions - C7 D
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Rickelle Williams, Interim City Manager
DATE: June 26, 2024
TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE
PUBLIC SAFETY AND NEIGHBORHOOD QUALITY OF LIFE COMMITTEE
(PSNQLC) AT ITS JUNE 5, 2024, MEETING AND DIRECTING THE
ADMINISTRATION TO DEVELOP A DESIGN AND IMPLEMENT THE
INSTALLATION OF SIGNS OF POSITIVE AFFIRMATIONS AT BAYSHORE PARK,
CURRENTLY UNDER CONSTRUCTION, AS RECOMMENDED BY THE CITY OF
MIAMI BEACH YOUTH COMMISSION. •
RECOMMENDATION
The Administration recommends that the Mayor and City Commission adopt the resolution.
BACKGROUND/HISTORY
On May 15, 2024, the Mayor and City Commission referred item C4 D (Exhibit A), sponsored by
Vice-Mayor Laura Dominguez, to the Public Safety and Neighborhood Quality of Life Committee
(PSNQLC), to discuss the installation of positive mental health affirmation signage at Bayshore
Park.
On April 16, 2024 the City of Miami Beach Youth Commission unanimously passed a motion
recommending the Mayor and City Commission create signage with positive mental health
affirmations along the jogging trail/butterfly garden in Bayshore Park to coincide with the park
opening in fall 2025.
Bayshore Park is approximately 19.4 acres and is located at 2300 Pine Tree Drive. The park is
located between Miami Beach Senior High School and the Scott Rakow Youth Center and will
host many youth who reside in Miami Beach.
The new park will include a children's playground for different ages, exercise station, sports tennis
courts, pathways, jogging trails, and a dog park. The park will also include a bathroom/office
building, site furnishings, lake with infrastructure for future connection to the neighborhood
drainage system, lake circulation and ozone water treatment system, and lake littoral zone. In
addition,the park will feature entrance and park identification signs, a parking lot, lighting system,
landscaping including the butterfly garden, an irrigation system, and connection to the utilities and
FPL system.
On May 19, 2016, the City executed an agreement with Savino Miller Design Studio (SMDS)for
the Landscaping, Architectural, and Engineering Design Services for the Bayshore Park Project.
The park's design was presented at many public meetings including the Design Review Board,
Parks and Recreation Advisory Board, Sustainability Committee, and the Bayshore Homeowner's
Association.
On December 14, 2022, the Mayor and City Commission approved the award of a contract to
Buslam Company Partners Inc., for the construction of Bayshore Park. The City hosted a
Page 410 of 1862
groundbreaking ceremony for the project on September 19, 2023.
Bayshore Park is currently under construction, and is approximately thirty percent (30%)
complete, with an anticipated completion of fall 2025.
ANALYSIS
The City of Miami Beach Youth Commission has expressed that one of the biggest problems
faced by teens in our City is mental health. The Youth Commission's initiative of creating positive
affirmation and mental health signage in Bayshore Park aims to help tackle this prevalent issue
in our community.
Bayshore Park will have an expansive jogging trail circling and bordering different parts of the
park, including the butterfly garden. The Youth Commission believes that the butterfly garden can
provide calming places where people relax, meditate, and enjoy nature, and their proposal is to
install positive affirmation and mental health signage along the jogging trail in the portion of the
park where it borders the butterfly garden. The signage could serve as a validating and
educational tool, raising awareness about the importance of mental health and destigmatizing
conversations surrounding mental health struggles and burnout. Through carefully crafted
messages, visitors may gain insights into coping strategies, mindfulness practices, and resources
available for mental health support within the community. Examples of positive affirmation and
mental health signage artwork can be seen in Exhibit B. If implemented, such signage would be
the first of its kind in City parks.
This initiative proposes that the artwork for the positive affirmation and mental health signage be
created by local Miami Beach artists and art students at Miami Beach Senior High, thereby
highlighting Miami Beach artists and youth while'achieving the goal of improving mental health
throughout the City.
Messaging for the signs could be implemented from the Poetry Project, a social experiment
originating to promote mental health awareness and well-being within the London Underground.
The Poetry Project has experienced considerable growth over time and there would be no cost
for using quotes from this project.
•
The inclusion of signage featuring positive mental health affirmations in Bayshore Park aligns with
the City's commitment to promote the well-being of community members, especially our youth.
Creating a supportive and uplifting environment within.the park can empower individuals to
prioritize their mental health and foster a sense of belonging.
The Youth Commission's vision for this initiative would include 12 to 16 different, double-sided
signs, using a typical size for traffic signs of approximately 12" x 18", with an introduction sign
stating information about the initiative, how it was created by the Youth Commission and listing
accessible mental health resources. The colorful signs would be installed on poles that would
border the jogging trail in the area where it borders the butterfly garden.
City staff has shared the Youth Commission's proposal with SMDS who expressed a preference
"to keep the park virtually sign free, allowing the user to curate his/her own feelings for the park
experience." Concerned that the signs could be distracting to park views, and subjected to
vandalism, the consultant suggested that similar results could be achieved through the use of
fewer and smaller signs with QR codes, allowing for varying messages and greater flexibility.
On June 5, 2024,the PSNQLC discussed this item, and asked that staff provide a rough estimate
of the cost required to implement this plan. Since the meeting, staff has discussed this project
with SMDS,the design consultant for Bayshore Park,who again expressed concern with potential
sign pollution concerns, and interference with the park experience. The consultant has provided
a proposal to design up to three alternate sign/message types for review and approval, more
Page 411 of 1862
closely integrating park design materials and concepts, while allowing for the incorporation of sign
graphics as described by the Youth Commission. Design concepts would ensure that the
following concerns are addressed:
-Sign messages are incorporated into park design at various individual locations, not grouped
together.
-Sign "base structure" limited to 2'-6" in height and width and 2-0" depth, using durable, non-
frangible material, such as stone or metal.
-Sign message "panel" should be replaceable material, such as stone, metal, or clear
polycarbonate (no poles).
-Possible inclusion of QR Codes.
-Final Permit drawings and sign material would also need to be developed once sign design and
materials are selected.
Should the Mayor and City Commission elect to implement this initiative, City staff will need to
engage the design consultant, coordinate permitting, including the preparation and approval by
the Building Department of a sign permit, and explore potential zoning restrictions and the design
of the signs.
FISCAL IMPACT STATEMENT
The cost to implement this initiative is approximately $70,000. Funding will have to be identified
and appropriated through the annual budget process.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
The Business Impact Estimate (BIE)was published on . See BIE at:
https://www.miamibeachfi.gov/citv-hall/citv-clerk/meeti no-notices/
FINANCIAL INFORMATION
CONCLUSION
Pursuant to the recommendations by PSNQLC, at its June 5, 2024 meeting, the Administration
recommends that the Mayor and City Commission adopt the resolution. Funding for the project
would need to be identified and appropriated through the annual budget process.
Applicable Area
Middle Beach
Is this a "Residents Right to Know" item~ Is this item related to a G.O. Bond
pursuant to City Code Section 2-17? Protect?
Yes Yes
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481 t
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
Page 412 of 1862
Capital Improvement Projects
Sponsor(s)
Commissioner Laura Dominguez
Co-sponsor(s)
Commissioner Alex Fernandez
Page 413 of 1862
6/11/24,10:28 AM Coversheet EXHIBIT A
Committee Assignments-C4 D
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Vice-Mayor Laura Dominguez
DATE: May 15,2024
SUBJECT:REFERRAL TO THE PUBLIC SAFETY AND NEIGHBORHOOD QUALITY OF LIFE COMMITTEE-
DISCUSSION REGARDING BAYSHORE PARK POSITIVE AFFIRMATIONS AND MENTAL
HEALTH SIGNAGE.
RECOMMENDATION
Please place on the May 15,2024 agenda a referral to the Public Safety and Neighborhood Quality of Life Committee("PSNQLC")to discuss
the installation of positive mental health affirmation signage at the Bayshore Park.
At its March 16, 2024 meeting, the Youth Commission passed a unanimous motion recommending for the Mayor and City Commission to
create signage with positive mental health affirmations along the jogging trail/butterfly garden in Bayshore Park to coincide
with the park opening in Fall 2025.
The Bayshore Park is a 19.4-acre park that is currently under construction and is set to open in the Fall of 2025.The park is located between
Miami Beach Senior High School and the Scott Rakow Youth Center, and will host many teenagers and other youth who reside in Miami
Beach.
The City's advisory Youth Commission has recently established that one of the biggest problems faced by the teens in our City is mental
health. The Commission's initiative of creating positive affirmation and mental health signage in Bayshore Park aims to help tackle this
prevalent issue in our community.
The Bayshore Park will have an expansive jogging trail circling and bordering different parts of the park,including the butterfly garden. Butterfly
gardens are known to be calming places where people relax, meditate, and enjoy nature. The Commission's proposal is to put positive
affirmation & mental health signage along the jogging trail in the portion of the park where it borders the butterfly garden. The signage can
serve as a validating and educational tool, raising awareness about the importance of mental health and destigmatizing conversations
surrounding mental health struggles and burnout. Through carefully crafted messages, visitors can gain insights into coping strategies,
mindfulness practices,and resources available for
mental health support within the community. If implemented,such signage would be the first of its kind in City parks.
The idea is to have the artwork for the positive affirmation and mental health signage be created by local Miami Beach artists and art students
at Miami Beach Senior High,in order to highlight Miami Beach artists and youth while achieving the goal of improving mental health throughout
the City.
I would like for the messaging on the signage to be implemented from the Poetry Project.Originating as a social experiment to promote mental
health awareness and overall well-being within the London Underground, the Poetry Project has experienced considerable growth over time
and there is no charge to use the quotes from this project(See attached Exhibit A).
I believe that the inclusion of signage featuring positive mental health affirmations in Bayshore Park aligns with our commitment to promoting
the well-being of our community members, especially our youth. By creating a supportive and uplifting environment, we can empower
individuals to prioritize their mental health and foster a sense of belonging within the park space.
BACKGROUND/HISTORY
Please place on the May 15, 2024 agenda a referral to the Public Safety and Neighborhood Quality of Life Committee("PSNQLC")
to discuss the installation of positive mental health affirmation signage at the Bayshore Park.
At its March 16, 2024 meeting, the Youth Commission passed a unanimous motion recommending for the Mayor and City
Commission to create signage with positive mental health affirmations along the jogging trail/butterfly garden in Bayshore Park to
coincide
with the park opening in Fall 2025.
The Bayshore Park is a 19.4-acre park that is currently under construction and is set to open in the Fall of 2025. The park is
located between Miami Beach Senior High School and the Scott Rakow Youth Center, and will host many teenagers and other
youth who reside in Miami Beach.
The City's advisory Youth Commission has recently established that one of the biggest problems faced by the teens in our City is
mental health.The Commission's initiative of creating positive affirmation and mental health signage in Bayshore Park aims to help
tackle this prevalent issue in our community.
The Bayshore Park will have an expansive jogging trail circling and bordering different parts of the park, including the butterfly
https://miamibeach.novusagenda.com/agendapublidCoverSheet.as x?ItemID=353 5&MeetinglD=1361 1/2
Page 414 of 1862
6/11/24,10:28 AM Coversheet EXHIBIT A
garden. Butterfly gardens are known to be calming places where people relax, meditate, and enjoy nature. The Commission's
proposal is to put positive affirmation & mental health signage along the jogging trail in the portion of the park where it borders the
butterfly garden. The signage can serve as a validating and educational tool, raising awareness about the importance of mental
health and destigmatizing conversations surrounding mental health struggles and burnout. Through carefully crafted messages,
visitors can gain insights into coping strategies, mindfulness practices,and resources available for
mental health support within the community. If implemented, such signage would be the first of its kind in City parks.
The idea is to have the artwork for the positive affirmation and mental health signage be created by local Miami Beach artists and
art students at Miami Beach Senior High, in order to highlight Miami Beach artists and youth while achieving the goal of improving
mental health throughout the City.
I would like for the messaging on the signage to be implemented from the Poetry Project. Originating as a social experiment to
promote mental health awareness and overall well-being within the London Underground, the Poetry Project has experienced
considerable growth over time and there is no charge to use the quotes from this project(See attached Exhibit A).
I believe that the inclusion of signage featuring positive mental health affirmations in Bayshore Park aligns with our commitment to
promoting the well-being of our community members, especially our youth. By creating a supportive and uplifting environment, we
can empower individuals to prioritize their mental health and foster a sense of belonging within the park space.
SUPPORTING SURVEY DATA
n/a
FINANCIAL INFORMATION
n/a
Amount(s)/Account(s):
n/a
CONCLUSION
n/a
Applicable Area
South Beach
Is this a"Residents Right to Does this item utilize G.O.
Know"item,pursuant to Bond Funds?
g_ty Code Section 2-14?
No No
Lpgislative Tracking
Vice-Mayor Laura Dominguez
S op nsor
Co-sponsored by Commissioner Alex Fernandez
https://miamibeach.novusagenda.com/agendapublic/CoverSheet.as x?ItemID=35335&MeetinglD=1361 2/2
Page 415 of 1862
6/11/24,10:29AM Coversheet EXHIBIT B
NEW BUSINESS 6.
MIAMI BEACH
COMMITTEE MEMORANDUM
TO: Public Safety and Neighborhood Quality of Life Committee Members
FROM: Rickelle Williams, Interim City Manager
DATE: June 5,2024
SUBJECT:DISCUSSION REGARDING BAYSHORE PARK POSITIVE AFFIRMATIONS AND MENTAL HEALTH SIGNAGE.
HISTORY:
On May 15, 2024,the Mayor and City Commission referred item C4 D (Exhibit A), sponsored by Vice-Mayor Laura Dominguez, to
the Public Safety and Neighborhood Quality of Life Committee (PSNQLC), to discuss the installation of positive mental health
affirmation signage at Bayshore Park.
On April 16, 2024 the City of Miami Beach Youth Commission unanimously passed a motion recommending the Mayor and City
Commission create signage with positive mental health affirmations along the jogging trail/butterfly garden in Bayshore Park to
coincide with the park opening in Fall 2025.
Bayshore Park is approximately 19.4 acres and is located at 2300 Pine Tree Drive. The park is located between Miami Beach
Senior High School and the Scott Rakow Youth Center and will host many youth who reside in Miami Beach.
The new park will include a children's playground for different ages, exercise station, sports tennis courts, pathways,jogging trails,
and a dog park.The park will also include a bathroom/office building, site furnishings, lake with infrastructure for future connection
to the neighborhood drainage system, lake circulation and ozone water treatment system, and lake littoral zone. In addition,the park
will feature entrance and park identification signs, a parking lot, lighting system, landscaping including the butterfly garden, an
irrigation system, and connection to the utilities and FPL system.
On May 19, 2016,the City executed an agreement with Savino Miller Design Studio(SMDS)for the Landscaping,Architectural, and
Engineering Design Services for the Bayshore Park Project.The park's design was presented at many public meetings including the
Design Review Board, Parks and Recreation Advisory Board, Sustainability Committee, and the Bayshore Homeowner's
Association.
On December 14, 2022, the Mayor and City Commission approved the award of a contract to Buslam Company Partners Inc., for
the construction of the Bayshore Park.The City hosted a groundbreaking ceremony for the project on September 19,2023.
Bayshore Park is currently under construction, and is approximately thirty(30%)complete, with an anticipated completion of Fall of
2025.
ANALYSIS
The City of Miami Beach Youth Commission has expressed that one of the biggest problems faced by teens in our City is mental
health. The Youth Commission's initiative of creating positive affirmation and mental health signage in Bayshore Park aims to help
tackle this prevalent issue in our community.
Bayshore Park will have an expansive jogging trail circling and bordering different parts of the park, including the butterfly garden.
The Youth Commission believes that butterfly garden can provide calming places where people relax, meditate, and enjoy nature,
and their proposal is to install positive affirmation and mental health signage along the jogging trail in the portion of the park where it
borders the butterfly garden.The signage could serve as a validating and educational tool, raising awareness about the importance
of mental health and destigmatizing conversations surrounding mental health struggles and burnout. Through carefully crafted
messages, visitors may gain insights into coping strategies, mindfulness practices, and resources available for mental health
support within the community. Examples of positive affirmation and mental health signage artwork can be seen in Exhibit B. If
implemented,such signage would be the first of its kind in City parks.
This initiative proposes that the artwork for the positive affirmation and mental health signage be created by local Miami Beach
artists and art students at Miami Beach Senior High,thereby highlighting Miami Beach artists and youth while achieving the goal of
improving mental health throughout the City.
Messaging for the signs could be implemented from the Poetry Project, a social experiment originating to promote mental health
awareness and well-being within the London Underground.The Poetry Project has experienced considerable growth over time and
there would be no cost for using quotes from this project.
https://miamibeach.novusagenda.com/agendapublic/CoverSheet.as x?ItemID=360518,MeetinglD=1380 1/2
Page 416 of 1862
6/11/24,10:29AM Coversheet EXHIBIT B
The inclusion of signage featuring positive mental health affirmations in Bayshore Park aligns with the City's commitment to promote
the well-being of the community members, especially our youth. Creating a supportive and uplifting environment within the park can
empower individuals to prioritize their mental health and foster a sense of belonging.
The Youth Commission's vision for this initiative would include 12 to 16 different, double-sided signs, using a typical size for traffic
signs of approximately 12"X 18", with an introduction sign stating information about the initiative, how it was created by the Youth
Commission and listing accessible mental health resources. The colorful signs would be installed on poles that would border the
jogging trail in the area where it borders the butterfly garden.
City staff has shared the Youth Commission's proposal with SMDS who expressed a preference"to keep the park virtually sign free,
allowing the user to curate his/her own feelings for the park experience." Concerned that the signs could be distracting to park
views, and subjected to vandalism, the consultant suggested that similar results could be achieved through the use of fewer and
smaller signs with QR codes,allowing for varying messages and greater flexibility.
Should the Committee elect to consider this initiative, City staff will need to coordinate permitting, including the preparation and
approval by the Building Department of a sign permit, and explore potential zoning restrictions and the design of the poles. The
Administration has not yet determined the potential cost implications for the design, permitting, manufacturing and installation.
CONCLUSION:
The foregoing is presented to the members of the PSNQLC for discussion.
Applicable Area
Middle Beach
Is this.a"Residents Right to Does this item utilize G.O.
Know"item,_pursuant to Bond Funds?
City Code Section 2-14?
Yes No
ATTACHMENTS:
Description Type
IO Exhibit A-Referral Memo from May l.2024 Meelinq Item C4 D Memo
p Exhibit 8-Examples of Positive Affirmation 8 Mental Health Slggage Artwork Memo
https://miamibeach.novusagenda.com/agendapublic/CoverSheet.as_ x?ItemID=36051&MeetingID=1380 2/2
Page 417 of 1862