Resolution 2024-33090 RESOLUTION NO.' 2024-33090 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS MAY 24, 2024 MEETING, TO IMPROVE P-63 SURFACE PARKING LOT LOCATED AT 4166 ROYAL PALM AVENUE, BY ADDING SHADE TREES ALONG THE NORTHERN LIMITS OF THE PARKING LOT AND PRIORITIZE FUNDING FOR THIS PROJECT THROUGH THE FY 2025 CAPITAL BUDGET PROCESS. WHEREAS, on December 14, 2022, the City Commission referred an item to the Public Safety and Neighborhoods Quality of Life Committee ("PSNQLC") to discuss adding shade trees at the City-owned P-63 surface parking lot, located at 4166 Royal Palm Avenue; and WHEREAS, this item was discussed at the June 21, 2023 meeting, and the PSNQLC asked that staff prepare a cost estimate to add shade trees on the interior of the parking lot, understanding that this would be a capital project; and WHEREAS, the item was included on the October 24, 2023 PSNQLC meeting agenda, with an order of magnitude estimate but was not heard; and WHEREAS, on December 13, 2023, the City Commission referred item C7 W, to the Finance and Economic Resiliency Committee("FERC"), to discuss the estimated cost of adding shade trees at P-63 surface parking lot; and WHEREAS, the proposed project, occurring within the limits of a Government Use District (GU) property, would require a full permit review and issuance by the City's Building Department, as the project would include relocation of existing underground • electrical infrastructure as well as new asphalt, concrete, and irrigation, in addition to the new trees; and WHEREAS, considering the existing conditions, the project would include work to remove the compacted limerock, concrete and asphalt, which, if not removed, would impede root growth and establishment and to ensure the longevity of the trees, provide sufficient area for root growth, and encourage larger tree growth, the sub-surface soils would have to be replaced with a nutrient rich, non-compacted material, while simultaneously providing the structural bearing capacity to withstand vehicular loads; and WHEREAS, this "suspended pavement" system includes a structural grid, infilled with a mix of favorable planting materials, fostering root growth while providing a durable paving surface and eliminating future root damage to the asphalt; and WHEREAS, in order to provide proper root area, the suspended pavement system should include an area generally equivalent to the spread of the tree canopy. In this case, the system would cover an area of 20'x 201.(400 sf) for each tree, with a depth of approximately 36"; and WHEREAS, staff developed a conceptual plan (Exhibit D)for the parking lot which also identifies the limits and quantities of the anticipated work. Based on this conceptual plan, an order of magnitude estimate was derived, utilizing historical cost data for other city projects, including a variable for cost escalations over time; and WHEREAS, at the time, the cost estimate to install twenty-four (24) trees within the P-63 surface parking lot, with a minimum overall height of 18', inclusive of related suspended pavement, irrigation, electrical work, design, permitting, milling and resurfacing the parking lot, and other soft costs is approximately $1,655,000; and WHEREAS, at the FERC meeting on May 24, 2024, the project scope and order of magnitude estimate were discussed, and a recommendation was provided by the Committee to limit the installation of canopy trees to only one of the raised concrete medians, add trees in the swale at the northern limits of the parking lot, and prioritize funding for this project through the FY 2025 Capital Budget process; and WHEREAS, FERC passed a motion, by acclamation, recommending to the Mayor and City Commission to improve Parking Lot P-63 by adding shade trees along the northern limits of the parking lot and prioritize funding for this project through the FY 2025 Capital Budget process; and WHEREAS, subsequent to the FERC meeting, City staff developed a revised conceptual plan which includes installation of trees on the northern concrete median, and due to insufficient room in the swale, the installation of three (3) bulb-outs on the northern parking lane; and WHEREAS, the revised order of magnitude estimate for the reduced scope is approximately $765,000; and • WHEREAS, the revised scope includes the installation of eleven (11) trees within the parking lot, with a minimum overall height of 18', inclusive of related suspended pavement, irrigation, electrical work and milling and resurfacing of the northern areas disturbed by the tree installations; and WHEREAS, the Administration recommends accepting the recommendation provided by FERC at their May 24, 2024 meeting to improve Parking Lot P-63 by adding shade trees along the northern limits of the parking lot and prioritize funding for this project through the FY 2025 Capital Budget process. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY • COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, hereby accept the recommendation of The Finance and Economic Resiliency Committee at its May 24, 2024 meeting, to improve P-63 surface parking lot located at 4166 Royal Palm Avenue, by adding shade trees along the northern limits of the parking lot and prioritize funding for this project through the FY 2025 Capital Budget process. PASSED and ADOPTED this ?G day of .314 , 2024. teven Meiner, Mayor ATTEST: • f,T J i L - 3 2024 8 Rafael E. Granado, City Clerk ; ` ?Ik[ORP OPMEO Sponsored by Commissioner Kristen Rosen Gonzalez r APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION City Attorney 4fS Date Resolutions - C7 F MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Rickelle Williams, Interim City Manager DATE: June 26, 2024 • TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS MAY 24, 2024 MEETING, TO IMPROVE P-63 SURFACE PARKING LOT LOCATED AT 4166 ROYAL PALM AVENUE, BY ADDING SHADE TREES ALONG THE NORTHERN LIMITS OF THE PARKING LOT AND PRIORITIZE FUNDING FOR THIS PROJECT THROUGH THE FY 2025 CAPITAL BUDGET PROCESS. RECOMMENDATION The Administration recommends the Mayor and City Commission consider the recommendation of the Finance and Economic Resiliency Committee (FERC), and if favorable, it is recommended that the Mayor and City Commission adopt the resolution. BACKGROUND/HISTORY On December 14, 2022, the City Commission referred an item to the Public Safety and Neighborhoods Quality of Life Committee (PSNQLC) to discuss adding shade trees at the city owned P-63 surface parking lot, located at 4166 Royal Palm Avenue. This item was discussed at the June 21, 2023 meeting, and the PSNQLC asked that staff prepare a cost estimate to add shade trees on the interior of the parking lot, understanding that this would be a capital project. The item was included on the October 24, 2023 PSNQLC meeting agenda, with an order of magnitude estimate but was not heard. On December 13, 2023, at the request of Commissioner Rosen Gonzalez, the Mayor and City Commission referred item C7 W (Exhibit A), to the Finance and Economic Resiliency Committee (FERC), to discuss the estimated cost of adding shade trees at the P-63 surface parking lot. The item was prepared and included in the February 23, 2024, March 22, 2024, April 19, 2024 FERC agendas, but was not heard. The item was ultimately discussed at the May 24, 2024 FERC meeting. ANALYSIS The P-63 surface parking lot is an existing city-owned asphalt paved parking lot, consisting of four (4) aisles of parking divided by three (3) raised concrete medians (Exhibit B). The lot has an existing drainage system connected to the City's public right-of-way drainage, and existing parking lot lighting. Permitting and Underground Infrastructure Requirements The proposed project, occurring within the limits of a Government Use District (GU) property, would require a full permit review and issuance by the City's Building Department, as the project would include relocation of existing underground electrical infrastructure as well as new asphalt, concrete, and irrigation, in addition to the new trees. Page 431 of 1862 Considering the existing conditions, the project would include work to remove the compacted limerock, concrete and asphalt which, if not removed, would impede root growth and establishment. To ensure the longevity of the trees, provide sufficient area for root growth, and encourage larger tree growth, the sub-surface soils would have to be replaced with a nutrient rich, non-compacted material, while simultaneously providing the structural bearing capacity to withstand vehicular loads. This "suspended pavement" system (Exhibit C) includes a structural grid, infilled with a mix of favorable planting materials, fostering root growth while providing a durable paving surface and eliminating future root damage to the asphalt. In order to provide proper root area, the suspended pavement system should include an area generally equivalent to the spread of the tree canopy. In this case, the system would cover an area of 20'x 20' (400 sf)for each tree, with a depth of approximately 36". Cost Estimate Staff developed a conceptual plan (Exhibit D) for the parking lot which also identifies the limits and quantities of the anticipated work. Based on this conceptual plan, an order of magnitude estimate was derived, utilizing historical cost data for other city projects, including a variable for cost escalations over time. At the time, the cost estimate to install twenty-four(24) trees within the P-63 surface parking lot, with a minimum overall height of 18', inclusive of related suspended pavement, irrigation, electrical work, design, permitting and other soft costs is approximately $1,655,000. This estimate also includes milling and resurfacing the parking lot. At the FERC meeting on May 24, 2024, the project scope and order of magnitude estimate were discussed, and a recommendation was provided by the Committee to limit the installation of canopy trees to only one of the raised concrete medians, add trees in the swale at the northern limits of the parking lot and prioritize funding for this project through the FY25 Capital Budget process. FERC passed a motion, by acclamation, recommending to the Mayor and City Commission to improve Parking Lot P-63 by adding shade trees along the northern limits of the parking lot and prioritize funding for this project through the FY25 Capital Budget process. Subsequent to the FERC meeting, City staff developed a revised conceptual plan (Exhibit E) which includes installation of trees on the northern concrete median, and due to insufficient room in the swale, the installation of three(3) bulb-outs on the northern parking lane. The revised order of magnitude estimate for the reduced scope is approximately $765,000. The revised scope includes the installation of eleven (11)trees within the parking lot, with a minimum overall height of 18', inclusive of related suspended pavement, irrigation, electrical work and milling and resurfacing of the northern areas disturbed by the tree installations. FISCAL IMPACT STATEMENT The revised order of magnitude estimate for the reduced scope is approximately $765,000. Funding would need to identified, budgeted and appropriated. Does this Ordinance require a Business Impact Estimate? (FOR ORDINANCES ONLY) The Business Impact Estimate (BIE)was published on . See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/ FINANCIAL INFORMATION Not applicable. CONCLUSION Page 432 of 1862 The Finance and Economic Resiliency Committee recommends that the Mayor and City Commission adopt a resolution accepting the recommendation provided at their May 24, 2024 meeting to improve Parking Lot P-63 by adding shade trees along the northern limits of the parking lot and prioritize funding for this project through the FY25 Capital Budget process. Applicable Area Middle Beach Is this a "Residents Right to Know" item, Is this item related to a G.O. Bond pursuant to City Code Section 2-17? Proiect? Yes No Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481, includes a principal engaged in lobbying? No If so, specify the name of lobbyist(s) and principal(s): . Department ' Capital Improvement Projects Sponsor(s) Commissioner Kristen Rosen Gonzalez Co-sponsor(s) • Page 433 of 1862 EXHIBIT A Resolutions-C7 W MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Rafael A. Paz,City Attorney DATE: December 13,2023 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND DIRECTING THE CITY ADMINISTRATION TO PLANT TWENTY- FOUR (24) CANOPY TREES WITHIN THE P-63 SURFACE PARKING LOT LOCATED AT 4166 ROYAL PALM AVENUE. ANALYSIS The proposed Resolution was prepared at the request of the sponsor,Vice-Mayor Kristen Rosen Gonzalez. The Resolution will be submitted via Supplemental Agenda. SUPPORTING SURVEY DATA N/A FINANCIAL INFORMATION Estimated cost of this proposed measure is$1,655,000. Is this a"Residents Right to Does this item utilize G.O. Know"item,-pursuant to Bond Funds? Cry Code Section 2-14? No No Legislative Tracking Office of the City Attorney Sponsor Vice-Mayor Kristen Rosen Gonzalez ATTACHMENTS: Description 0 Resolution I] Exhibit Page 434 of 1862 EXHIBIT B Yr fit/ I , . • 1Sf � ff . 111.411. d :1) • itaft `` mow.,. . . ,=�' • IA 41 • 111111,1104000006001.01.0006040.604044. 1 ,, . • , I ,a ami Beach Par ing Lot g ' . * • 4 4, , g ii j -r) f.,.,, .0, • . . , a Central Hardware • 4 » .' Hardware s — « or.„ .,,.µ W - Miami F. . rid. .sers Toaste5 . ' . ill ,.;: 1- „Aga litri tut 533 i_a i Beac`� \ ,a, L Eo' 0) i ' Si7 ' 9 ,/ k �. YY 'U - S o0 oe Miam li 4101 Santoro, a go •, E " ,�nt.Rea ty . V i 41 st t ! 'l. '.�` P-63 Aerial P{hotograph Page 356 of 402 EXHIBIT BI'1 1, 41114.4c. ., rl 71[Tr•.thmiho.' . ,ire 1..111 • 13 c cD — co 0 cn P-63 Existing Conditions Page 357 of 402 EXHIBIT C . evapotranspiration - , r it ..° water uptake infiltration Y`- 'I''" ' ' ' '. P 00 isis' t /11 ii , . 4 ..4'. - 7 :' .: •_.. . - I if - Suspended Pavement System Diagram „.. . ' • ' * - -4 - . • f ' t 4., e Pam' ' - _ ! w ..). y�. r .1 CJ"yam ` t 111 7 IF. a +^ -4, * . -1.... ''°- , 2/21/28?9 14:10 Suspended Pavement System Installation Progress Photo Page 358 of 402 Page 437 of 1862 EXHIBIT C AO • _* ,7 $1 . .' ... .... • • a • • - `ma y , '^a 3 " s .�, "0 ' r� . F ,. t �( laill' - . .._. - . ./ii,..,s. ; iir . 0 '" ' 1 ; 'Ititlfie Suspended Pavement System installation Progress Photo d • • t 4111.110 - - jj .4 ! ti drie litimiliii*-*44/V . P , . ,, i-Z, 4"" • �► r. • t * MI . et*: Suspended Pavement System Installation Progress Photo Page 359 of 402 Page 438 of 1862 EXHIBIT D v CO W 0 CMB SURFACE PARKING LOT P-63 LANDSCAPING ENHANCEMENT PROJECT EXHIBIT E IF: !#. °< ♦ �o` 7 i`Yu`m+gt� 4 . S T I, __ _ `. 111 F + , ;'e'y ;III . `+;-tiJV y 4 . W �~ 1. Q I "151141 .111r' I ' I 0101elit" - • 'a ill"' t. , ".4 0., --, ., II's*: -?,. . ts,• k ; * , % '° / PROPOSED LANDSCAPING IMPROVEMENTS JUNE 7TH, 2024 (NOT TO SCALE) LEGEND • PROPOSED LARGE CAMPY TREE(20'CANOPY DIAMETER) ASPHALT IRUIG AM RESURFACING 1'AVERAGE aNEW LANDSCAPE AREA