Loading...
Resolution 2024-33150 RESOLUTION NO! 2024-33150 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING, IN SUBSTANTIAL FORM, AMENDMENT NO. 2 TO THE AGREEMENT DATED APRIL 16, 2019, BETWEEN THE CITY AND TRANSCORE ITS, LLC, PURSUANT TO REQUEST FOR PROPOSALS (RFP) NO. 2016-199-KB FOR THE DESIGN, BUILD, OPERATION, AND MAINTENANCE SERVICES FOR AN INTELLIGENT TRANSPORTATION AND SMART PARKING SYSTEM ("ITS/SPS" OR "PROJECT"); SAID AMENDMENT (1) APPROPRIATING FUNDING FOR PHASES 3 THROUGH 6 OF THE PROJECT, TO INCLUDE THE REMAINING CORRIDORS AND INSTALLATION OF ADDITIONAL DEVICES CITYWIDE, IN THE AMOUNT OF $7,502,842.60, INCLUSIVE OF A 10% CONTINGENCY, THEREBY INCREASING THE TOTAL CONTRACT AMOUNT FOR DESIGN AND CONSTRUCTION OF PHASES 1 THROUGH 6 FROM $12,904,661.17 TO $20,407,503.77; AND (2) INCREASING THE GUARANTEED MAXIMUM PRICE ("GMP") FOR DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE PROJECT DURING PHASES 1 THROUGH 6 FROM $25,000,000 TO $31,130,482.11; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE THE AMENDMENT AND SUBSEQUENT RELATED SERVICE ORDERS, SUBJECT TO FUNDING APPROVAL AS PART OF THE SEVENTH AMENDMENT TO THE FY 2024 CAPITAL BUDGET AT THE JUNE 26, 2024 CITY COMMISSION MEETING. WHEREAS, on April 16, 2019, pursuant to Request for Proposals ("RFP") No. 2016-199-KB for Design, Build, Operate, and Maintain Services for an Intelligent Transportation System and Smart Parking System ("ITS/SPS" or "Project"), the City of Miami Beach ("City") and TransCore ITS, LLC ("TransCore") executed a design, build, operate, and maintain agreement ("Agreement")" for a citywide ITS/SPS, for a total guaranteed maximum price ("GMP") of $25,000,000.00, with an initial contract price, in the amount of$12,468,178.00, for the design and construction of Phases 1 and 2 only, with Phases 3 through 6 to be subsequently negotiated by the Administration and a funding appropriation approved by the City Commission as a contract amendment; and WHEREAS, on September 14, 2022, the City Commission adopted Resolution No. 2022-32297, authorizing the City to execute Amendment No. 1 to the Agreement, (1) extending the contract time for two (2) additional years for a total of 10 years (until April 2029); (2) expanding the scope of work to include (i) temporary maintenance of Miami-Dade County traffic signals during construction of the Project, in the amount of $150,000.00; (ii) installation of a Bluetooth sensor as a stand-alone device on a dedicated pole on the Venetian Causeway, in the amount of$56,278.55, for a total sum of $206,278.55; and (iii) reducing the scope of work in the amount of $369,795.38; (3) approving a $600,000.00 contingency to cover the cost of any required change orders in connection with the design and construction of Phases 1 and 2 of the Project, thereby increasing the initial Contract Price for design and construction of Phases 1 and 2 of the • Project from $12,468,178.00 to $12,904,661.17, including the $600,000.00 contingency for Phases 1 through 2, utilizing previously approved funding for this Project; and (4) adding temporary traffic monitoring and management services, on an as-needed basis during construction of the Project, subject to funding availability, and provided that the cost of these services does not exceed the City Manager's purchasing authority under the City Code; and WHEREAS, on November 16, 2022, the City Commission adopted Resolution No. 2022-32408, amending Resolution No. 2022-32297 which approved Amendment No. 1 to the Agreement, said amendment modifying Item No. 4 of the Resolution to authorize the City Manager to approve expenditures for temporary traffic monitoring and management services in an amount hot-to-exceed $500,000.00 per year; and WHEREAS, the scope of the Project as stipulated in the Agreement includes the following components: • Traffic monitoring closed-circuit television ("CCTV") cameras with built-in data analytics; • Travel time data collection devices to track and forecast congestion levels; • Full color permanent digital message signs ("DMS") throughout the City to inform motorists of lane closures, congestion, and parking availability information in real- time; • Volume and speed data collection sensors; • DMSs at the entrances of all City parking garages and key surface parking lots to inform motorists of real-time parking availability; • Communication system and dashboard for monitoring and management of devices and data; and • Traffic Management Center ("TMC") to house the contractor's traffic monitoring and management equipment and operators with the capabilities to manage traffic incidents and parking conditions, communicate with the City's Public Safety Communications Division, Transportation and Mobility Department, Marketing and Communications Department, and other agencies/entities as appropriate, and disseminate traffic and parking information to the motoring public in real-time; and WHEREAS, as per the design criteria documents, the Project is divided into six (6) phases, strategically sequenced based on the deployment schedule of devices along the City's major thoroughfares: • Phase 1: MacArthur Causeway, Alton Road (from 5 Street to Julia Tuttle Causeway), Julia Tuttle Causeway, 17 Street (from Alton Road to Washington Avenue), and Dade Boulevard (from Alton Road to Washington Avenue); • Phase 2: 5 Street, 41 Street, and Washington Avenue; • Phase 3: Collins Avenue (23 Street to 44 Street), Indian Creek Drive/Collins Avenue (44 Street to 87 Terrace), Alton Road (from Julia Tuttle Causeway to 63 Street), and 63 Street (from Alton Road to Collins Avenue); • Phase 4: Collins Avenue (from 5 Street to 23 Street) and Indian Creek Drive (from 26 Street to 44 Street); • Phase 5: Harding Avenue/Abbott Avenue; and • Phase 6: Meridian Avenue and West Avenue; and WHEREAS, Phases 1 and 2 of the Project are currently in the construction phase and expected to commence operation as devices are installed and come on-line throughout 2024. Full operation of Phases 1 and 2 of the Project is expected to occur within the next 12 months; and WHEREAS, pursuant to the Agreement, the work associated with Phases 3 through 6 of the Project is subject to funding appropriation by the City Commission, with the estimated cost for design, permitting and construction of Phases 3 through 6 being $7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to $20,407,503.77; and WHEREAS, the current partial GMP of $25,000,000 is the total amount established in the Agreement which the City will pay for the full and complete performance (i.e. design, construction, operation, and maintenance) of Phases 1 and 2 of the Project, as required by Contract Documents, for the duration of the Agreement (April 2029); and WHEREAS, given the funding appropriation required for the design, permitting, and construction of Phases 3 through 6 of$7,502,842.60, and the costs associated with the operation and maintenance of the Project for the duration of the Agreement (April 2029) in the approximate amount of$10,722,978.34, the GMP needs to be increased to $31,130,482.11 ($12,904,661.17 + $7,502,842.60 + $10,722,978.34) to cover the costs for design, permitting, construction, operation and maintenance for Phases 1 through 6; and WHEREAS, the cost for operation and maintenance of Phases 1 through 6, in the approximate amount of $10,722,978.34, is an estimated cost based on the original operation and maintenance costs, which includes a 3% escalation cost every year, since the effective date of the agreement; and • WHEREAS, funds for the operation and maintenance are included in the Transportation and Mobility Department's operating budget on an annual basis; and WHEREAS, in order for the City to fully fund and complete Phases 1 through 6 of the Project, the Interim City Manager recommends approving, in substantial form, Amendment No. 2 to the Agreement, a draft copy of which is attached to the City Commission Memorandum accompanying this Resolution; and further authorizing the Interim City Manager to finalize negotiations and execute the Amendment. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve, in substantial form, Amendment No. 2 to the Agreement dated April 16, 2019, between the City and TransCore ITS, LLC, pursuant to Request For Proposals (RFP) No. 2016-199-KB for the Design, Build, Operation, and Maintenance Services for an Intelligent Transportation and Smart Parking System ("Project"); said Amendment, (1) appropriating funding for Phases 3 through 6 of the Project, to include the remaining corridors and installation of additional devices citywide, in the amount of$7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to $20,407,503.77; and (2) increasing the Guaranteed Maximum Price ("GMP") for design, construction, operation and maintenance of the Project during Phases 1 through 6 from $25,000,000 to $31,130,482.11, subject to funding approval as part of the Seventh Amendment to the FY 2024 Capital Budget at the June 26, 2024 City Commission meeting. PASSED and ADOPTED this 26th day June, 2024., ATTEST: even Meiner, Mayor 4°41 JUL ® 32024 Rafael E. Granado City Clerk s (IN(ORP ORAiED; . APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION Ci Attorney Date Agenda Item /717K , Resolutions- R7{{item.number}} Date 4-26 aY MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Rickelle Williams, Interim City Manager (.,;/ DATE: June 26, 2024 TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING, IN SUBSTANTIAL FORM, AMENDMENT NO. 2 TO THE AGREEMENT DATED APRIL 16, 2019, BETWEEN THE CITY AND TRANSCORE ITS, LLC, PURSUANT TO REQUEST FOR PROPOSALS(RFP) NO. 2016-199-KB FOR THE DESIGN, BUILD, OPERATION, AND MAINTENANCE SERVICES FOR AN INTELLIGENT TRANSPORTATION AND SMART PARKING SYSTEM ("ITS/SPS" OR "PROJECT"); SAID AMENDMENT (1) APPROPRIATING FUNDING FOR PHASES 3 THROUGH 6 OF THE PROJECT, TO INCLUDE THE REMAINING CORRIDORS AND INSTALLATION OF ADDITIONAL DEVICES CITYWIDE, IN THE AMOUNT OF $7;502,842.60, INCLUSIVE OF A 10% CONTINGENCY, THEREBY INCREASING THE TOTAL CONTRACT AMOUNT FOR DESIGN AND CONSTRUCTION OF PHASES 1 THROUGH 6 FROM $12,904,661.17 TO $20,407,503.77; AND (2) INCREASING THE GUARANTEED MAXIMUM PRICE ("GMP") FOR DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE PROJECT DURING PHASES 1 THROUGH 6 FROM $25,000,000 TO $31,130,482.11; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE THE AMENDMENT AND SUBSEQUENT RELATED SERVICE ORDERS, SUBJECT TO FUNDING APPROVAL AS PART OF THE SEVENTH AMENDMENT TO THE FY 2024 CAPITAL BUDGET AT THE JUNE 26, 2024 CITY COMMISSION MEETING. RECOMMENDATION The City Administration ("Administration") recommends that the Mayor and City Commission ("City Commission")adopt the Resolution. BACKGROUND/HISTORY On April 16, 2019, pursuant to Request for Proposals("RFP")No. 2016-199-KB for Design, Build, Operate, and Maintain Services for an Intelligent Transportation System and Smart Parking System ("ITS/SPS" or "Project"), the City of Miami Beach ("City") and TransCore ITS, LLC ("TransCore") executed a design, build, operate, and maintain agreement ("agreement" or "contract)"for a citywide ITS/SPS,for a total guaranteed maximum price("GMP")of$25,000,000, with an initial contract price, in the amount of $12,468,178, for the design and construction of Phases 1 and 2 only,with Phases 3 through 6 to be subsequently negotiated by the Administration and a funding appropriation approved by the City Commission as a contract amendment. On September 14, 2022, the City Commission adopted Resolution No. 2022-32297 (Attachment A)authorizing the City to execute Amendment No. 1 to the agreement, (1)extending the contract time for two (2) additional years for a total of 10 years (until April 2029); (2)expanding the scope of work to include (i) temporary maintenance of Miami-Dade County traffic signals during construction of the Project, in the amount of$150,000; (ii) installation of a Bluetooth sensor as a stand-alone device on a dedicated pole on the Venetian Causeway, in the amount of$56,278.55, for a total sum of$206,278.55; and (iii) reducing the scope of work in the amount of$369,795.38; (3) approving a $600,000 contingency to cover the cost of any required change orders in connection with the design and construction of Phases 1 and 2 of the Project, thereby increasing the initial contract price for Phases 1 and 2 of the Project from $12,468,178 to $12,904,661.17, including the $600,000 contingency, utilizing previously approved funding for this Project; and (4) adding temporary traffic monitoring and management services, on an as-needed basis during construction of the Project, subject to funding availability, and provided that the cost of these services does not exceed the City Manager's purchasing authority under the City Code. On November 16, 2022, the City Commission adopted Resolution No. 2022-32408 (Attachment B), amending Resolution No. 2022-32297 which approved Amendment No. 1 to the agreement, said amendment modifying Item No. 4 of the Resolution to authorize the City Manager to approve expenditures for temporary traffic monitoring and management services in an amount not-to- exceed $500,000 per year. The scope of the Project as stipulated in the contract includes the following components: • Traffic monitoring closed-circuit television ("CCTV") cameras with built-in data analytics; • Travel time data collection devices to track and forecast congestion levels; • Full color permanent digital message signs("DMS")throughoutthe City to inform motorists of lane closures, congestion, and parking availability information in real-time; • Volume and speed data collection sensors; • DMSs at the entrances of all City parking garages and key surface parking lots to inform motorists of real-time parking availability; • Communication system and dashboard for monitoring and management of devices and data; and • Traffic Management Center ("TMC") to house the contractor's traffic monitoring and management equipment and operators with the capabilities to manage traffic incidents and parking conditions, communicate with the City's Public Safety Communications Division, Transportation and Mobility Department, Marketing and Communications Department, and other agencies/entities as appropriate, and disseminate traffic and parking information to the motoring public in real-time. As per the design criteria documents, the Project is divided into six (6) phases, strategically sequenced based on the deployment schedule of devices along the City's major thoroughfares: • Phase 1: MacArthur Causeway, Alton Road(from 5 Street to Julia Tuttle Causeway), Julia Tuttle Causeway, 17 Street (from Alton Road to Washington Avenue), and Dade Boulevard (from Alton Road to Washington Avenue) • Phase 2: 5 Street, 41 Street, and Washington Avenue • Phase 3: Collins Avenue (23 Street to 44 Street), Indian Creek Drive/Collins Avenue (44 Street to 87 Terrace),Alton Road (from Julia Tuttle Causeway to 63 Street), and 63 Street (from Alton Road to Collins Avenue) • Phase 4: Collins Avenue (from 5 Street to 23 Street) and Indian Creek Drive (from 26 Street to 44 Street) • Phase 5: Harding Avenue/Abbott Avenue • Phase 6: Meridian Avenue and West Avenue ANALYSIS Phases 1 and 2 of the Project are currently in the construction phase and expected to commence operation as devices are installed and come on-line throughout 2024. Full operation of Phases 1 and 2 of the Project is expected to occur within the next 12 months. However, an amendment (Attachment C)to the contract is necessary for the following reasons: Funding Appropriation for Phases 3 through 6 Pursuant to the contract, the work associated with Phases 3 through 6 of the Project is subject to • funding appropriation by the City Commission. The estimated cost for design, permitting and construction of Phases 3 through 6 is $7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to $20,407,503.77 Increasing the Guaranteed Maximum Price (GMP) The current partial GMP of$25,000,000 is the total amount established in the contract which the City will pay for the full and complete performance (i.e. design, construction, operation, and maintenance) of Phases 1 and 2 of the Project, as required by contract documents, for the duration of the contract (April 2029). Given the funding appropriation required for the design, permitting, and construction of Phases 3 through 6 of $7,502,842.60, and the costs associated with the operation and maintenance of the Project for the duration of the contract (April 2029) in the approximate amount of$10,722,978.34, the GMP needs to be increased to $31,130,482.11 ($12,904,661.17 + $7,502,842.60 + $10,722,978.34) to cover the costs for design, permitting, construction, operation and maintenance for Phases 1 through 6. The cost for the operation and maintenance of Phases 1 through 6 in the approximate amount of$10,722,978.34 is an estimated cost (based on the contract prices) anticipated to start in early 2025 at $2,563,081.83 and escalating 3% annually until the end of the contract term(April 2029). Funds for the operation and maintenance are included in the Transportation and Mobility Department's Operating Budget on an annual basis. FISCAL IMPACT STATEMENT As part of a separate item on the June 26, 2024 City Commission meeting agenda, the Administration is proposing a Capital Budget Amendment for Project No. 28080 — Intelligent Transportation System, in an amount of$5,450,400, partially funded by Mobility Fee and Parking funds. If approved by the City Commission, this budget amendment will fully fund the design, permitting, and construction of Phases 1 through 6 of the Project. Execution of Amendment No. 2 will be subject to City Commission approval of the seventh capital budget amendment and funding appropriation. Does this Ordinance require a Business Impact Estimate? (FOR ORDINANCES ONLY) The Business Impact Estimate,(BIE)was published on . See BIE at: https://www.miamibeachfl.gov/city-hall/citv-clerk/meetinq-notices/ FINANCIAL INFORMATION $62,532.82 / 158-9615-061357-26-410-530-00-00-00-28080 $3,351,437.41 / 158-9615-069357-26-410-530-00-00-00-28080 $22,500.00/ 187-9615-069357-26-410-530-00-00-00-28080 CONCLUSION The Project will enhance the City's ability to monitor traffic flow, manage incidents causing congestion, and mitigate congestion more efficiently and effectively, as well as manage congestion during major events and high impact periods through the deployment of state-of-the- art technology. Additionally, the Project will provide accurate trip origin/destination information that can be used to analyze the traffic patterns along various corridors in the City. Through the deployment of this technology, the Project is expected to increase the capacity of the City's roadway network by enabling the City to manage incidents and traffic congestion, improve traffic flow on major thoroughfares, and provide real-time traffic information and parking availability to the motoring public more efficiently. In order for the City to fully fund and complete Phases 1 through 6 of the Project, the Administration recommends that the City Commission adopt the Resolution approving Amendment No. 2 to the agreement with TransCore, said amendment (1) appropriating funding for Phases 3 through 6 of the Project, to include the remaining corridors and installation of additional devices citywide, in the amount of $7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to $20,407,503.77; and (2) increasing the Guaranteed Maximum Price ("GMP") for design, construction, operation and maintenance of the project during Phases 1 through 6 from $25,000,000 to$31,130,482.11, subject to approval of the seventh capital budget amendment and funding appropriation at the June 26, 2024 City Commission meeting. Applicable Area Citywide Is this a "Residents Right to Know" item~ Is this item related to a G.O. Bond pursuant to City Code Section 2-17? Proiect? No No Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481, includes a principal engaged in lobbying? No If so, specify the name of lobbyist(s) and principal(s): N/A Department Transportation and Mobility Sponsor(s1 Co-sponsor(s) AMENDMENT NO. 2 TO THE DESIGN/BUILD/OPERATE/MAINTAIN AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND TRANSCORE ITS, LLC This Amendment No. 2 (the "Amendment") to the Design/Build/Operate/Maintain Agreement dated April 16, 2019 (the "Agreement"), is entered into this day of , 2024, by and between the City of Miami Beach, Florida, a municipal corporation organized and existing under the laws of the State of Florida, having its principal place of business at 1700 Convention Center Drive, Miami Beach, Florida 33139(the"City"), and TransCore ITS, LLC, a State of Florida limited liability company (the "Design/Build/Operate/Maintain Firm" or"DBOM Firm") and hereby amends the Agreement as follows: RECITALS WHEREAS, on October 18,2017, the Mayor. and City Commission adopted Resolution No. 2017-30064, accepting the recommendation of the City Manager to award an agreement, pursuant to Request for Proposals No. 2016-199-KB for Design, Build, Operate, and Maintain Services for an Intelligent Transportation System.(ITS) and Smart Parking system (SPS), to the DBOM Firm, as the top-ranked proposer, which Agreement was executed by the parties on April 16, 2019; and WHEREAS, on September 14, 2022, the City Commission adopted Resolution No. 2022- 32297, authorizing;the City to execute Amendment No. 1 to the Agreement, (1) extending the contract time for two (2) additional years for a total of 10 years (until April 2029); (2) expanding the '"scope of work to include (i) temporary maintenance,_of Miami-Dade County traffic signals during construction of the Project, in the amount of $150000.00; (ii) installation of a Bluetooth sensor as a stand-alone device on a dedicated pole on the Venetian Causeway, in the amount of $56,278.55,for a total sum of$206,278.55; and (iii) reducing the scope of work in the amount of $369,795.38; (3) approving a $600,000.00 contingency to cover the cost of any required change orders in connection with the design and construction of Phases 1 and 2 of the Project, thereby increasing the initial Contract Price for design and construction of Phases 1 and 2 of the Project from $12,468,178.00 to $12,904,661.17, including the $600,000.00 contingency for Phases 1 through 2, utilizing previously approved funding for this Project; and (4) adding temporary traffic monitoring and management services, on an as-needed basis during construction of the Project, subject to funding availability, and provided that the cost of these services does not exceed the City Manager's purchasing authority under the City Code; and WHEREAS, on November 16, 2022, the City Commission adopted Resolution No. 2022- 32408, amending Resolution No. 2022-32297 which approved Amendment No. 1 to the Agreement,said amendment modifying Item No.4 of the Resolution to authorize the City Manager to approve expenditures for temporary traffic monitoring and management services in an amount not-to-exceed $500,000.00 per year(the Agreement and Amendment No. 1 shall be collectively referred to as the "Agreement"); and WHEREAS, as per the design criteria documents,the Project is divided into six(6)phases, strategically sequenced based on the deployment schedule of devices along the City's major thoroughfares: • Phase 1: MacArthur Causeway, Alton Road(from 5 Street to Julia Tuttle Causeway), Julia Tuttle Causeway, 17 Street (from Alton Road to Washington Avenue), and Dade Boulevard (from Alton Road to Washington Avenue); • Phase 2: 5 Street, 41 Street, and Washington Avenue; • Phase 3: Collins Avenue (23 Street to 44 Street), Indian Creek Drive/Collins Avenue (44 Street to 87 Terrace),Alton Road (from Julia Tuttle Causeway to 63 Street), and 63 Street (from Alton Road to Collins Avenue); • Phase 4: Collins Avenue (from 5 Street to 23 Street) and Indian Creek Drive (from 26 Street to 44 Street); • Phase 5: Harding Avenue/Abbott Avenue;and • Phase 6: Meridian Avenue and West Avenue; and WHEREAS, Phases 1 and 2 of the Project are currently in the construction phase and expected to commence operation as devices are installed and come on-line throughout 2024 and the full operation of Phases 1 and 2 of the Project is expected to occur within the next 12 months; and WHEREAS, pursuant to the Agreement, the work associated with Phases 3 through 6 of the Project is subject to funding appropriation by the City Commission. The estimated cost for design, permitting and construction of Phases 3 through 6 is $7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to$20,407,503.77; and WHEREAS, the current partial GMP of$25,000,000 is the total amount established in the Agreement which the City will pay for the full and complete performance(i.e. design, construction, operation, and maintenance) of Phases 1 and 2 of the Project, as required by Contract Documents, for the duration of the Agreement(April 2029); and WHEREAS, as part of the permitting phase, DTPW has requested that the DBOM Firm assume responsibility of the maintenance of the affected traffic signals during the construction phase of the ITS project, at an estimated cost of not-to-exceed $150,000.00; and WHEREAS, given the funding appropriation required for the design, permitting, and construction of Phases 3 through 6 of$7,502,842.60, and the costs associated with the operation and maintenance of the Project for the duration of the Agreement(April 2029) in the approximate amount of$10,722,978.34, the GMP needs to be increased to $31,130,482.11 ($12,904,661.17 + $7,502,842.60 + $10,722,978.34) to cover the costs for design, permitting, construction, operation and maintenance for Phases 1 through 6; and WHEREAS, the cost for operation and maintenance of Phases 1 through 6 in the approximate amount of$10,722,978.34 has been estimated based on the original operation and maintenance costs set forth in Appendix "H", which includes a 3% escalation cost every year since the Effective Date of this Agreement; and WHEREAS, on June 26, 2024 the Mayor and City Commission adopted Resolution No. 2024-00XX, approving Amendment No. 2 to the Agreement; said Amendment(1)appropriating funding for Phases 3 through 6 of the Project, in the amount of$7,502,842.60, inclusive of a 10% contingency, thereby increasing the total contract amount for design and construction of Phases 1 through 6 from $12,904,661.17 to$20,407,503.77;and(2)increasing the Guaranteed Maximum Page 2 of 8 Price ("GMP") for design, construction, operation and maintenance of the project during Phases 1 through 6 from $25,000,000 to $31,130,482.11. NOW THEREFORE, in consideration of the mutual promises and conditions contained herein, and other good and valuable consideration, the sufficiency of which is hereby acknowledged, the City and the DBOM Firm hereby agree to amend the Agreement as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as part of this Amendment. 2. MODIFICATIONS. The Agreement is hereby modified (deleted items strusk—thr-eugh and inserted items underlined)as follows: (a) Section 7.1 of Article 7, entitled "Contract Price" is hereby deleted in its entirety and replaced with the following: 7.1 "Contract Price". In full consideration of the complete performance of the Work and all other obligations of the DBOM Firm under the Contract Documents and subject to the issuance of Notices to Proceed for Phases 1 through 6 as provided in Section 6.1., City agrees to pay the DBOM Firm the total GMP amount of Thirty-One Million One Hundred Thirty Thousand Four Hundred Eight-Two and 11/100($31,130,482.11)Dollars for phases 1 through 6 of the Project. (b) Appendix G to the Agreement is deleted in its entirety and replaced with the attached Second Amended Appendix G. (c) Appendix H to the Agreement is deleted in its entirety and replaced with the attached Second Amended Appendix H. (d) A new paragraph is hereby added to Section 5.1, as follows: In connection with the performance of the Work, the DBOM Firm shall comply with City of Miami Beach Human Rights Ordinance, codified in Chapter 62 of the City Code, as may be amended from time to time, prohibiting discrimination in employment (including independent contractors), housing, public accommodations, public services, and in connection with its membership or policies because of actual or perceived race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status, age, disability, ancestry, height, weight, hair texture and/or hairstyle, domestic partner status, labor organization membership, familial situation, and political affiliation. (e) A new Section 22.26 (DBOM Firm's Compliance with Florida Public Records Law), as follows: 22.26 DBOM Firm's Compliance with Florida Public Records Law. a. The DBOM Firm shall comply with Florida Public Records law under Chapter 119, Florida Statutes, as may be amended from time to time. Page 3 of 8 b. The term "public records" shall have the meaning set forth in Section.119.011(12), which means all documents, papers, letters, maps, books, tapes, photographs, films, sound recordings, data processing software, or other material, regardless of the physical form, characteristics, or means of transmission, made or received pursuant to law or ordinance or in connection with the transaction of official business of the City. c. Pursuant to Section 119.0701 of the Florida Statutes, if the DBOM Firm meets the definition of"Contractor" as defined in Section 119.0701(1)(a), the DBOM Firm shall: i. Keep and maintain public records required by the City to perform the service; ii. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes or as otherwise provided by law; iii. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed, except as authorized by law, for the duration of the contract term and following completion of the Agreement if the DBOM Firm does not transfer the records to the City; iv. Upon completion of the Agreement, transfer, at no cost to the City, all public records in possession of the DBOM Firm,or keep and maintain public records required by the City to perform the service. If the DBOM Firm transfers all public records to the City upon completion of the Agreement, the DBOM Firm shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the DBOM Firm keeps and maintains public records upon completion. of the Agreement, the DBOM Firm shall meet all applicable requirements for retaining public,records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. d. Request for Records; Noncompliance. i. A request to inspect or copy public records relating to the City's contract for services must be made directly to the City. If the City does not possess the requested records, the City shall immediately notify the DBOM Firm of the request, and the DBOM Firm must provide the records to the City or allow the records to be inspected or copied within a reasonable time. ii. DBOM Firm's failure'to comply with the City's request for records shall constitute a breach of this Agreement, and the City, at its sole discretion, may: (1) unilaterally terminate the Agreement;(2)avail itself of the remedies set forth under the Agreement; and/or(3) avail itself of any available remedies at law or in equity. iii. A DBOM Firm who fails to provide the public records to the City within a reasonable time may be subiect to penalties under s. 119.10. e. Civil Action. i. If a civil action is filed against a DBOM Firm to compel production of public records relating to the City's contract for services, the court shall assess and award against the DBOM Firm the reasonable costs of enforcement, including reasonable attorneys' fees, if: 1. The court determines that the DBOM Firm unlawfully refused to comply with the public records request within a reasonable time; and 2. At least 8 business days before filing the action,the plaintiff provided written notice of the public records request, including a statement that the DBOM Firm has not complied with the request, to the City and to the DBOM Firm. Page 4 of 8 ii. A notice complies with subparagraph (i)(2) if it is sent to the City's custodian of public records and to the DBOM Firm at the DBOM Firm's address listed on its contract with the City or to the DBOM Firm's registered agent. Such notices must be sent by common carrier delivery service or by registered, Global Express Guaranteed, or certified mail, with postage or shipping paid by the sender and with evidence of delivery, which may be in an electronic format. iii. A DBOM Firm who complies with a public records request within 8 business days after the notice is sent is not liable for the reasonable costs of enforcement. f. IF THE DBOM FIRM HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE DBOM FIRM'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: CITY OF MIAMI BEACH ATTENTION: RAFAEL E. GRANADO, CITY CLERK 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 E-MAIL: RAFAELGRANADOaMIAMIBEACHFL.GOV PHONE: 305-673-7411 (f) A new Section 22.27 (Inspector General Audit Rights) is hereby incorporated into the Agreement as follows: 22.27 Inspector General Audit Rights. a. Pursuant to Section 2-256 of the Code of the City of Miami Beach,the City has established the Office of the Inspector General which may,on a random basis, perform reviews,audits, inspections and investigations on all City contracts, throughout the duration of said contracts. This random audit is separate and distinct from any other audit performed by or on behalf of the City. b. The Office of the Inspector General is authorized to investigate City affairs and empowered to review past, present and proposed City programs, accounts, records, contracts and transactions. In addition, the Inspector General has the power to subpoena witnesses, administer oaths, require the production of witnesses and monitor City projects and programs. Monitoring of an existing City project or program may include a report concerning whether the project is on time, within budget and in conformance with the contract documents and applicable law. The Inspector General shall have the power to audit, investigate,monitor, oversee, inspect and review operations,activities, performance and procurement process including but not limited to project design, bid specifications, (bid/proposal)submittals, activities of the DBOM Firm, its officers, agents and employees, lobbyists, City staff and elected officials to ensure compliance with the contract documents and to detect fraud and corruption. Pursuant to Section 2-378 of the City Code, the City is allocating a percentage of its overall annual contract expenditures to fund the activities and operations of the Office of Inspector General. Page 5 of 8 c. Upon ten (10) days written notice to the DBOM Firm, the DBOM Firm shall make all requested records and documents available to the Inspector General for inspection and copying. The Inspector General is empowered to retain the services of independent private sector auditors to audit, investigate, monitor, oversee, inspect and review operations activities, performance and procurement process including but not limited to project design, bid specifications, (bid/proposal) submittals, activities of the DBOM Firm its officers, agents and employees, lobbyists, City staff and elected officials to ensure compliance with the contract documents and to detect fraud and corruption. d. The Inspector General shall have the right to inspect and copy all documents and records in the DBOM Firm's possession, custody or control which in the Inspector General's sole judgment, pertain to performance of the contract, including, but not limited to original estimate files, change order estimate files, worksheets, proposals and agreements from and with successful subcontractors and suppliers, all project-related correspondence, memoranda, instructions, financial documents, construction documents, (bid/proposal) and contract documents, back-change documents, all documents and records which involve cash, trade or volume discounts, insurance proceeds, rebates, or dividends received, payroll and personnel records and supporting documentation for the aforesaid documents and records. e. The DBOM Firm shall make available at its office at all reasonable times the records, materials, and other evidence regarding the acquisition(bid preparation)and performance of this Agreement, for examination, audit, or reproduction, until three (3) years after final payment under this Agreement or for any longer period required by statute or by other clauses of this Agreement. In addition: i. If this Agreement is completely or partially terminated, the DBOM Firm shall make available records relating to the work terminated until three(3)years after any resulting final termination settlement; and ii. The DBOM Firm shall make available records relating to appeals or to litigation or the settlement of claims arising under or relating to this Agreement until such appeals, litigation, or claims are finally resolved. f. The provisions in this section shall apply to the DBOM Firm, its officers, agents, employees, subcontractors and suppliers. The DBOM Firm shall incorporate the provisions in this section in all subcontracts and all other agreements executed by the DBOM Firm in connection with the performance of this Agreement. q. Nothing in this section shall impair any independent right to the City to conduct audits or investigative activities. The provisions of this section are neither intended nor shall they be construed to impose any liability on the City by the DBOM Firm or third parties. (g) A new section 22.28 (E-Verify) is hereby added to the Agreement: 22.28 E-Verifv. a. The DBOM Firm shall comply with Section 448.095, Florida Statutes, "Employment Eligibility" ("E-Verify Statute"), as may be amended from time to time. Pursuant to the E-Verify Statute, commencing on January 1, 2021, the DBOM Firm shall register with Page 6 of 8 and use the E-Verify system to verify the work authorization status of all newly hired employees during the Term of the Agreement. Additionally, the DBOM Firm shall expressly require any subcontractor performing work or providing services pursuant to the Agreement to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term. If the DBOM Firm enters into a contract with an approved subcontractor, the subcontractor must provide the DBOM Firm with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. The DBOM Firm shall maintain a copy of such affidavit for the duration of the.Agreement or such other extended period as may be required under this Agreement. b. Termination Rights. i. If the City has a good faith belief that the DBOM Firm has knowingly violated Section 448.09(1), Florida Statutes, the City shall terminate this Agreement with the DBOM Firm for cause, and the City shall thereafter have or owe no further obligation or liability to the DBOM Firm. ii. If the City has a good faith belief that a subcontractor has knowingly violated the foregoing Subsection 22.28(a), but the DBOM Firm otherwise complied with such subsection, the City will promptly notify the DBOM Firm and order the DBOM Firm to immediately terminate the contract with the subcontractor. DBOM Firm's failure to terminate a subcontractor shall be an event of default under this Agreement, entitling City to terminate the DBOM Firm's Agreement for cause. iii. A contract terminated under the foregoing Subsection (b)(i) or (b)(ii) is not in breach of contract and may not be considered as such. iv. The City or the DBOM Firm or a subcontractor may file an action with the Circuit or County Court to challenge a termination under the foregoing Subsection (b)(i) or(b)(ii) no later than 20 calendar days after the date on which the contract was terminated. v. If the City terminates the Agreement with the DBOM Firm under the foregoing Subsection(b)(i),the DBOM Firm may not be awarded a public contract for at least 1 year after the date of termination of this Agreement. vi. The DBOM Firm is liable for any additional costs incurred by the City as a result of the termination of this Agreement under this Section 22.28. 3. RATIFICATION. Except as amended herein, all other terms and conditions of the Agreement shall remain unchanged and in full force and effect. THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK. Page 7 of 8 IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed by their appropriate officials, as of the date first entered below. FOR CITY: CITY OF MIAMI BEACH, FLORIDA ATTEST: By: Rafael E. Granado, City Clerk Rickelle Williams, Interim City Manager Date FOR DBOM FIRM/CONTRACTOR: TRANSCORE ITS, LLC ATTEST: By: Title Title Print Name Print Name Date Page 8 of 8 APPENDIX G TCC-COMB Progress Schedule Update i COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-21 Sent 2024-0420 Added Munn'2yr TB 20-Jun-24 TASK titter All Activities Activity 10 Activity Nano Dur% Al Complete Stan Finish Total Foal 2024 2025 Comp Our 01 02 03 04 01 02 03 04 CCMB.PBOM ITSBSPS Schedule Update U24.C.W2 013124DD 2024-03.28 Sent 2024-06-20 Added'Assn I AO 1000 NTP PIP2 Notre to Proceed Design Phase 1 and Phase 2 100% 0 19-Jun-19 A A2.1000.NTPPIP2.SPS.L Notice to Proceed-Construction-Phase 1 and Phase 2(SPS)-Lots(Er-skirling P29) 100% 0 30.Apr-22A A2.1000.NTP PI P2.TUC Notice to Proceed,Constructor"Phase 1 and Phase 2(TMC) 100% 0 15-Nov-22 A2.1000.NTPP1P2.SPS Notice to Proceed-Coesuucnon-Phase l and Phase 2(SPS).Garages(Assumed) 1 DO% 0 24-Jul23 A A2.1000.NTPPIP2.SPS.LP29 Solon to Proceed Construction Phase 1 and Phase 2ISP5) Lot P29 i P02(On Hold per COMB) 0% 0 31-Jan-24 41 • A2.1000.NTPPIP2 Notice to Proceed-Constructor,-Phase 1 and Phase 2(Siruckn all 0% 0 01-Mar-24 "233 • A2 1000NTPPIP2 ITS Notice to Proceed-Construction-Phase I and Phase 2(ITS) 0% 0 01-Mar24 -135 • • A2 I000NTPP1P2 WIRE Notre to Proceed•Construction•Phase I and Phase 2(Wireless; 1'. 0 02-SeP-24 304 • Milestone Dashboard 25 4 1 / Key MB•stansa 74.23% 2276 30-0.1.19 22-Dec-25 -481 / :Metal Milestones t00°- ill. 3)5a• , cl AO.t 040 PLANS 60 Milestone'.60%Plans Subneted IOC% 30-Sep-I1 AU 1040.PLANS.90 Milestone 90%Plans Srbnnted 1UL U 28-Jan-21 A0.1180.UTIL Milestone:Utay Coordination Compere t 00% 0 17•Feb-21 A0.1070.PLANS.100 Milestone 100%Pens Submittal 0 07-Jun.21 AO 1100.PLNeS.RFC M4estone--Approval of RFC Plans"Design Approval for Construction IJC'.- 0 25-Jun-2T A0.1160.PERMIT Meeston°.Permmmg Complete C° 0 01-Sep-24 "4 •01-Sep-24 1004 909 18-hN.. 0.,c:Gu;dP Suhwur4 Mitestonrs , A0 1090 ATMS M Milestone DecOGUlde Software Ready la Production Release 8 Device SATs 10C% 16-140r-2" A0100C FAT Milestone.Factor),Acceptance Test SW Demonstration Complete I21;.. 10.N0v-2' AO 109C ATMS PA'GC' Milestone Go L.ye i0op atonal System 11 Production) DecOGurde Soltware on -a 14-May24 106 - •14-May-24 Test 8311480046 4`5 22-Alp-24 -c-25 - % 4 SW*A1enebsaa(*ATs)ComplaN ,rr..- - 11-Sa-84-i 3':... ♦ I A0.1030.SAT.SPS Milestone Stand Abne Test(SAT)Complete-Smart Parking System(SPS) 07. 0 13-Sep•24 16 •I3-Sep-24 A0.1030.SAT.MVOS Mies lone Stand None Test(SAT)Complete-Microwave Vehicle Deletion System(MVDSI 07. 0 17"Sap-24 -20 •17-Sep-24 AO 1030.SAT CCTV Mi.:stone StandAdte Test(SAT)Complete-CCTV•AlLoc dons 0% 0 26-Sep-24 -29 •26-Sep-24 AO.1030.SAT WIRE Milestone.Slane None Toet(SAT)Compete-Wheless Communication Network 07. 0 24-Oct-24 -57 ♦24-0c1-24 A0.1030.SATTTS Milestone Stand Alone Test(SAT)Complete-Travel Time System(ITS) 0% 0 30-0cl-24 -63 •30-Oct-24 A0.1030.SAT.ADMS Milestone Slane Acne test(SAT)Complete Natal Dynamic Message Signs(ALMS)-Al Locations 0% 0 26-4r"25 -243 • •23-Apr-2S A0.1030 SAT.OMS Milestone Starry Alone Test(SAT)Compete Dynamic Message Signs(DMS- 0% 0 30-Apr-25 -245 •30-Apr-25 • AO 1010.SUB.TMC Milestone Subsystem Test Compere-TMC 0% 0 22-Aug-24 6 : •22-Aug24 A0.1010.SUB TTS Milestone:Subsystem Test Compere-Travel Tents System(ITS) 0% 0 16-Oc1-24 "51 •18-Oc1.24 A0.1010 SUB SPS Milestone Subsystem Test Complete-Sman Parking System)SPS) 0% 0 26-N0v•24 •90 •26-N0v.24 AO 1010.SUB.MOOS Milestone Subsystem Test Complete-Microwave Vehicle Detection System(MVD51 0% 0 27-Nov-24 ,•91 •27-Nov-24 i A0.1010 SUB.CCTV Milestone Subsystem Test Complete-CCTV•Al Locations 0% 0 04-Dec-24 -98 •04-Dec-24 A0.1010.SUB.WIRE Milestone Maestlne.Subsystem Test Compete-Wheless Communication Network 0% 0 10-Jan.25 -135 •TO-Jan-25 A0.1010 SUB.ADMS Milestone'.Subsystem Test Compete-Arterial D)elamt Massage Signs IAOMS)-M Locations 0% 0 ICI-Jut-25 -316 •10-Jus 25 AO 1010.SUB.IMIS Milestone'Subsystem Test Complete-Dynamo Message Signs(DMS) 0% 0 14-Jul-25 -320 •14 Jul-25 S / A0.1000.OAT.TMC Maeslo00.Operational Test Complete"TMC 0% 0 21-Nov-24 -85 •21-Nor-24 A0.1000.OAT.TTS Milestone.Operational Test Compete-Travel Tonle System(TTS1 0% 0 01-Jan-25 -126 •01-Jan-25 A0.1000.OAT.SPS AWslone•Operational Test Complete.Smart Parking System ISM) 07. 0 02-Feb-25 -158 •02-Feb-25 A0.1000.OAT.WIRE Milestone.Operational Test Compete-Wireless Communication Network 07. 0 20-Mar-25 -204 •20-Mar-25 A0.1000.OAT.CCTV Weston*.Operational Test Compete-CCTV-Aa LOcalloes 0% 0 24-Sep-25 •392 •24.Sep-25 A0.t000.0AT MVOS Milestone:Operewr*Test Complete-Microwave Vehicle Detection System(MUDS) 0% 0 24-Sep-25 -392 •24-Sep-25 A0.1000.OAT.OMS Milestone:Operational Test Complete•Dynamic Message Signs(DMS) 0% 0 24-Sep-25 -392 •24.Soil 25 0* n..I4r. Owned Aso' 131 ACIu01 Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update t'24.0.W2013124DD 2024-03-28 Sent room-rs awwwsu.weemoameo VBN I I Remaining Work 2024-06.20 Added Missing 2yr TE illacv.a Cmek.400000140c.e,.0 0�r.Ur505R.lm0 POMOO PSE Project Start Date: 19-Jun-19 caws Aswan Armes anki vwu.treat u 170 dPnetKo NW 0111111. Distal Remaining Work Full Blown Schcdulc atao-a Ptye.eda...atleWreUr4ce WINO MEM I KM= NNW ♦ ♦Milestone T SCORE Project Finish Date:22-Dec-25 Pile I of 3M M.roe 05 Ago,.4Rm:,,eewt,.,,Perrl tProoe1,M0 o 'tea, �a Summary 30 wn SCiW40U UN.OSn2eNDD MI 29 An Sr.Ne Ueeee UN 0 WE P 3r24Db M. TCC-COMB Progress Schedule Update COMB o•OM PTSBPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-08-20 Added Muting 2yr TE 20Jun-24 TASK Mier All AcOveies M(rvly 10 Aedrhy Mama MI% Al Compete Start Finish Taal al 2024 2n25 r I` Gone Dur 01 1 02 I 03 I 04 01 ]_1)2 I o3 I 04 t Al 1000 OAT.ADMS Milestone:Opeltlonal Test Compete-Mene()namie Message Mrs(SCAM) Al Location 0% 0 24.Sap-25 •392•392 : --- ♦24-Sep 25 Bwel411.611111111111Ctidea7lpvt» 1 • , A')1000 Ht1HN MdeslOne.Bu/Mtn Concrete 0% 0 13,Dec-25 -472 ♦I System AaoapenaaTea CenpMe • AO 10,905A Mresrone System Acceptance Test Compete 0% 0 20-Dec-25 -479 ♦ Find Arceeitar.-e :t .. . . A0.1100.SA.D Deadane Final Acceptance Al Systems-Original Contract 100% 0 03•May2' A0.1100.SAD.TE01 004040e.Feral Acceptance-All Systems Time Extension COO)Notice of Resumption(300 co) 100% 0 27-Felt-2: AO 1100SA.D.TE02 Oeadane Final Acceptance-MI System-Time Extension C012 COVID-19 Structure Fabrication Delay/NOl 43 Rev i.(183 100"'. 0 29-Aug•20 A0.1100.SAD.TE03 Ceadsne Final Acceptance All System-Time Extension CO43 Amendment 1 Enem:Mg Contract Two Years (730 car 0% .. 28 Aug-24' 0 ♦e8 Aug 24' AO11005A M4eslone Final Acceptance Ail Systems ]°., 0 22-Dee-25 461 • NTM Milestones 0% 75 10-JW-19A 01.O8I.19 NTP.3)CO Oc IIr.rablos 'I• 75 Pk Ju1-113 'I. ••'I' AO.NTP30 Goal NTP.30 CD 100% 0 18-Jul-19A AO 1020 OA.M Milestone:(Duality Assuanco,Ouley Control 10AOCI Man SuOm4le0(OOMPj 100°.e 0 01.Oc'1s NTT.15 C"7 fkshier:ll-s ,. 6102 Aug 79 01.Oc1•15 AO t4PT45 Goal.NTP.45 CD 100% 0 02 Aoo It A01000 PAP Milestone Project Management Plan Submitted 10)`.. 0 01-0c1•15 Payment Milestones 70.73% 2334 19-Jw-19A 07-Nov-25 -436 I Payment Milestones Synam Saner. -.... 71.95%' 2334.L1,1110 45A,-'7•Nrv25, 'oar AO 1000.NTP.PIP2 PM Payment M4e5i00e Notice to Ptoceed 1.I-. J Iv Jn.t l' A01020 PM 60 Payment Milestone 60°'.Design I00./. 0 23-Deo-It AO 1040 PM.90 Paymera Milestone 90e.Design 100% 0 28•Jan•21 A01100.PM.RFC Payment Milestone.Feria Released Ice COnseucMn Plans 100% 0 25-Jun-2s AO.1110.PM.ITS Payment Milestone.Maintenance of Tra0c(MOT)-TTS 0N. 0 01-Mar-24 181 •01-Mar-24 A0 1000 PM.DMS Payment Maaslone'Maintenance of Train(MOT)•DMS/ADMS Subsystem 0% 0 04-Jun-24 86 •04-Jun-24 A0.1005 PM.CAM Payment Milestone Maintenance 01 Trattie(MOT)-Camera Subsystem 0% 0 04•Jun.24 86 •04-Jun.24 AO.1015.PM COMM Payment Milestone Maintenance of Traffic(MOT)-Wheless Communisation Network 0% 0 02-Sep-24 -a •02-Sep-24 A0.1080 PM.AB Payment Milestone.As•Bute Plans 0% 0 07 Nov•25 -436 •07 Nq Paymsnl Md->t•n-.CCTV Crmea+a - - - AO 1140 PM.CCTV Payment Milestone.Materials Received•CCTV 100% 0 26-Feb-21 A0.1100.PM-CCTV Payment Mieston e.Approval d Cut SheetsiShop Drawings-CCTV 100% 0 25-Jun-22 A01090.PM.CCTV Payment Milestone-Inslaeaton Complete CCTV 0% 0 07-A.4-24 21 . •07-Aug-24 A0.1200.PM.CCTV Payment Milestone Integraion Compete,Per Um Prop CCTV 0% 0 31.Oct-24 64 •31-00.24 AO1010.PM.CCTV Payment Mneslone Subsystem Test Compete CCTV 0% 0 10-Jan•25 •135 •10-Jan25 A0,1120.PM.CCTV Payment M4estone:Tralnrp/Wamenlalim Canpde•CCTV 0% 0 08-0st-25 -406 •08-Oet25 l447,tan1 Mi1..:1.•n:%.Yoh'O0 7..8k ankh LI ser.m AO 1100 PM.MVOS Payment Milestone:Materials Received-Vehicle Delechon System(MVOS) 100% 0 16•Mar-21 A0.1095 P0A.MV05 Payment Milestone Approval d Cut Sheets/Shop Drawings-Vehicle 0000)-on System(MVOS) 100% 0 25-Jan.22 A0.1090.PM MOOS Payment Milestone Installation Complete,Per Price Ural Vehicle Detection System tMV051 0% 0 24•Jun•24 66 •24-Jun-24 A0.1230 PM.MODS Payment Milestone-Integranun Compete/Per Price Unt Vehicle Detection System(MVOS) 0% 0 28-0c1-24 61 •28.Oct•24 A0 1010 PM.MOOS Payment Weston°Subsystem Tdsl Complete Whole Detection System IMVDS; 0% 0 06-Jan-25 -131 •06-Jan-25 AO 112D.PM.MVOS Payment Milestone Trainrq/Doamentaa Complete•Vehicle Detection System(MODS) 0% 0 06-0c1-25 -406 •00.061-25 P+ ,nl OF 1'-,,r-a -rn uric Mrsvagv Sicns(LM51 _. -- - . • A0.1100PM OMS Payment Milestone'Materials Reoereed•Dynamic Message Signs IDMS) 100% 0 08-Mar-2: A0.1090.PM.DMS Payment Mies tone:Approval of Cut SheetoShop Orawrngs,Dynamic Message Signs(OMSI 100% 0 25-Jun-22 A0.1070.PM.DMS Payment Milestone.Instalarnn Completer Per Price Una-Dynamic Message Signs(DMS) 0% 0 14-Apr-25 -226 •14-Apr-25 AO.1115 PM DMS Payment Milestone Integration Compete/Per Price unit-Dynan Message Signs(DMS) 0% 0 12-J86n25 •288 ; ♦I2-Jun-25 A0 1110 PM DMS Payment Milestone Subsystem Test Complete-Dynamic Message Signs(DMS) 0% 0 18-Aug-25 .355 •18-Aug 25 - -- 0an naafis Cheie 4 We.. IIMIE Actual Wars Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-20 Sent t►Onn siewheScrieve eel caielsoo van I Heman'ng Wak 2024-06-20 Added Missing 2yr TE 1888,4, Ce00,•o 00•14.8.88.1-80too.,1,5 0 SII-EK0 00901,00 roe Project Start Date: 19-Jun-19 auw-a hoaraeee.eep.ea,wrmeeerru17a00mmeo uw+ MIMI Crarcal Remanmq Went Full Blown Schedule Bona P.PWORwnroad.nww.i.ne.ell004 I rmaabp al ♦ ♦M'lesmne 7 R /l C�-)RE eject Finish Date:22-Dec-25 1,,,1 r176 mraa nor•.4n9sNeedvoVaaceinpurr860.X00onleb r+ 1 I`� 1 �Jt�-/I\L mMva 50...uawua051m'z0p 6uJ t �•Summary 3aa4•a &Mao UN.UN 05629230D kW I 36J8nt4 Scnmr.uaawuo Ow/OIJOOOG 1..1 TCC•COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312100 20244344 Set 2024411,20 Added Missing 2yr TE 20-Jun-24 TASK litter.All AdM11es &inky ID Ac1Niy Name Our% At Complete Start F9esh Total-Float 2024 I 2025 Comp Our 01 02 03 04 01 1 02 1 03 I 04 • AO 1120 PM DNS Payment MlostonC Tranrgl ecrem lariat Compee-Dynamic Message Sills(DMS) 0% 0 0e-Oct-25 -406 : •08-Oct-25 P.;ymant Mired ion.:II rtetl4l[Inant.e M:-esag•Signs l.5r2S1 4 A0.1100.PM.ADMS Payment Milestone'Materials Received•Arterial Dynamic Message Sens(ADMS) 100% 0 06-Mar-2: A0.1090..PM.ADMS Payment Milestone Approve:of Cut Sheete,Shop Drawings•Arterial Dynamic Message Signs(ADMS) 100% 0 25-Jun-22 A0.1115.PM.ADMS Payment Milestone)Instaaation Compete,Per Puce Oral-Arterial Dynamic Message Signs(ADMS) 0% 0 14-Ada-25 •229 •14-Apr-25 A0.1120.PM.ADMS Payment Milestone Integration Compote/Per Price UM-Arterial Dynamic Message Signs(ADMS) 0% 0 10-Jun-25 -266 •10-Jun-25 A0.1110 PM ADMS Payment Milestone'Subsystem Test Complete-Arterial Dynamic Message Signs(ADMS) 0% 0 18-Aug-25 355 •18-Aug-25 A0.1125.PM ADMS Payment Miestvrte.TranrgiDOevmmlaim Compete•Aeleral Dynamic Message Signs(ADMS) 0% 0 08-Oc1.25 -406 •06-Oct-25 Perrin-et%EsIentm Trtvli Tin,Sy.tern(ITS) _I A 08 Ur I.25 AO 1100.PM.BTTS Payment Milestone Materials Received•Tr eve Time System(TTS) 100% 0 30 Jo 21 A A0.1090 PM.BTTS Payment M.Bpstvne-Approval Of Cul Snects,Sttop Drawings•Travel Tine System(TTS) 100% 0 25-Jun-22 A0.1110 PM.BTTS Payment Milestone.lerlltalion Complete/Per Price Urin-Trawl Time System(ITS) 0% 0 30-Aug-24 -2 •30-Aug-24 AO t120PM.BTTS Payment Milestone Inlegreeon Compete/Per Pore Unit-Travel Tyne System(ITS) 55. 0 19-Sep-24 •22 ♦19-Sep-24 A0.1130.PM BTTS Payment Milestone'Subsystem Test Complete•Travel Time System(TTS) 0% 0 10-Oct-24 .51 ♦18.OCT24 An.1140 PM.OTTS Payment%testate.Iran rgrtbamenlaltot Compete Travel Tme System(T TS) 0% 0 08.0c1-25 406 •08-001-25 Perm nit Mtv',lonss:Smart 7 ark-n;System(SJ 0) e. 1 > I AO.I010 PM.SPS Payment Milestone)Materials Received•Smart Parking System)SPS, 100% 0 24-May-2 A0.1000.PM SPS Payment Milestone:Approval of Cut Sheets/Shop Drawings•Smart Parking Syste/n(SPS) 100% 0 25-Jun-22 A0.1020.PM.SPS Payment Milestone'InstaIa5On Compete-Smart Parking System(SPS) 0% 0 02-Feb-24 208 •02-Feb-24 AO 1030.PM SPS Payment Milestone Integration Complete/Per Uni Price-Smart Parking System(SPS) 0% 0 25-0ct-24 -58 •25-Oct-24 AO t 050 PM SPS Payment Milestone Traesrg/Ooalmentaat Carpeted•Smart Parking Sys+en(SP5) 0% 0 14-Fe-25 -170 ♦14-Feb•25 AO 1040 PM.SPS Payment Miteslotse.Subsystem Test Contp:ele-Smart Parkrg System jSPS) 0% 0 17-Feb-25 -173 ♦17 Feb-25 Pvr1,In1 M•1,I•n..3 TMCC ivlpOmirl .,.1 . „ I A0.1000.PM TMC Payment Milestone.Approval of Cal Sheets/Shop Drawings-TMC Equprnenr 100% 0 21-Jan-22 A0.1010.PM.TMC Payment Milestone Materials Renewed TMC Equipment 100% 0 30•May-2: A0.1020.PM.TMC Payment Milestone-Installation Complete TING Pomprneer 0% 0 03-Apr-24 147 ' •03•Apr-24 A0.1040.PM TMC Payment Milestone Subsystem Test Complete-INC Equpmetl 0% 0 22-Aug-24 6 •22-Aug-24 AO 1050.PM.7MC Payment Milestone.Traesrg,Tbwmmlaial Competed-TMC Equipment 0% 0 25-Nov.24 -89 •25 Nov-24 A0.1030 PM.TMC Payment MdeState.Software are Integration Complete/Per Una Price-TMC Equipment 0% 0 12-Jun-25 288 ♦12-Jun-25 rnytn.rlt M1--.1..n....Hl-rrl:ty TMC C, ,:On r - - A0.1000 PM.RTMC Payment Milestone:Approval el Cu Sheets/Shop Drawvgs-Renate TMC Equipment 100% 0 21-Jan•22 A01010PM.RTMC Payment Milestone--Materials Received Remote TMC Equipment 100% 0 30-May-2: A0.1020.PM.RTMC Payment Milestone.Installation Complete-Remote INC Equipment 0% 0 03-Apr-224 147 •03.Apr-24 A0.1040.PM.RTMC Payment Milestone Subsystem Test Complete•Remote TMC Frei ipmerf 0% 0 22-Avg-24 6 •22-Aug-24 AO1050 eaRTMC Payment Milestone Tra MieCto retrial laim Competed-Ren0eTMC Equipment 0% 0 25-Nov-24 -89 •25-Nov-24 A0 1030.PM RTMC Payment Milestone.Sellware and Integration Compote;Per Unit Price.Remote TMC Equipment 0% 0 12-Jun-25 -288 •12-Jun-25 Pnym.nl Mi.°a1^4sas:Cnmmenlceticns Equlpmunl - • - AO.1o10 PM COMM Payment Milestone-Materials Received-Wireless Comrm,nicabon Netwok 100% 0 02-Feb-21 A0.1000.PM COMM Payment Milestone-Approval Of Cut SherlSlStl4p Drawings-Wireless Cemmunicaeion Network 100°. 0 25-Jun-22 ' AO 1030 PM COMM Payment Milestone Integration Compleln Per Una Price-Wireless Communication Network 0% 0 10-Dec-24 -104 •10-Oec-24 A0 1040 PM COMM Payment Milestone.Subsystem Test Complete-Viceless Cpmmuncalen Network 0% 0 17-Feb-25 •173 •17-Feb-25 A0.1050.PM.COMM Payment Milestone TranrgiDocemmla ten Crenpeed•Weeless Communication Network 0% 0 03-Apr-25 -218 •03-Ap-25 AD 1020.PM.COMM Payment Milestone.Installation Complete-Wireless Communication Network 0% 0 15-Apr-25 •230 ♦15-Apr-25 Eolernal Mllestanes(By Others) 921%- tilt 196Ar12A;WOWS -209 I A01C40 C M Milestone Existing Communication Networks Available(by Others)(Not Required) 100% 0 19-Jun-18 ' A0.1000 TMC Milestone Trafic Management Center l TMC)Avalaelo(by OINKS) 100% 0 18-001-19 A0.1050-W IRE.04 Milestone'.Sae Access Granted-Wireless Communication Backbone Tower 04-City Halt Garage Tower-171h Si 100% 0 22-Nov it A0.1050.WIRE.05 Milestone.Sae Access Granted-Wireless Communcaton Backbone.Tower 05-Tower 41 Condos-MacArthur CswyiAtA 1(K% 0 22-Ngv 1! AO 1050 WIRE 01 M4eslone-Sle Access Granted•Wireless Comm Network Tower 01-Norm Rebecca Tower(Desceped) 100% 0 22-Nei-It 0a. P.m., 0.s1. PM. MEM Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-20 Sent u0cs e.w.e scm.w..ler doomed will 1 I Remaining Work 2024-06-20 Added Missing 2yr TE Iswa..Or c..bn..Uelae0e.ry.0Yse.nU1505R-freer osler0a rue Project Start Date:19-Jun-19 es Mayer Ryeswo.ais.00walrMJeeae Mpa.lollesNe111Ma NMJ ill♦ Cnical Remammg Work /-+ Fall Blown Schedule none, 0r ReanalbdeeVreabpcl Atari I,4aem0 NM, ♦ ♦Milestone T(�/]. C'/ 11/7C Project Finish Date:22-Dec-25 P.e.lelm (WW2) novmRen.eeaeh.amaewPw,e000. o0 NMJ • •Summar 1 R l SCC.I"E OFIIp-a S..U.S.UM s le)Im0 Mil Y soNtN.e4 Sovaieuatla.UN.a511494100 NMJ taJusN &weak Upa.VNawa MAIN. hMJ TCC-COMB Progress Schedule Update I COMB 05OM IT55P5 Schedule Update U24.0.W2 0131240132024-03-28 Sent 2024.08-20 Added Missing 2yr TE 20-Jun-24 TASK filter.All Acovifles Activity ID Activity Name Dur% At Complete Siert Finish Tote'Float 2024 2025 d Comp Dur Or 1 02_-_ 03 04 O' 1 02 I 03 I O4 i AS.1050.WIRE 02 Meeslone.Sao Access Granted•Woolens Communication Network rower 02-Council Tower(Descoped) 100% 0 22 Nov-It A0.1050 W IRE.03 Miestone.See Access Granted-Weeess Communication Backbone Moan Beach Poke Dept.Tower 100% 0 22•Nov-1! A0.1050.WIRE.06 Milestone.See Access Granted•Wireless Communication Backbone.Park View Point Tower 100% 0 22•Novn! AO.r000.TMC.MOU Milestone:MOU Approval between COMB and FOOT 06 for Traffic Management Censer(TMC)Per nailing end Buse di(by 100% 0 03 Nov•2' AO 1000 MOC MOO Milestone MOO Approval between MDC and COMB for ITS Maeenance(by Others) 0% 0 31-Jan-24' .135•31-Jan•24• A0.1000.MDC.MOU.PVP Mraslone.MOO Approval between Park View Pont Tower(PVP)and Coy of Miami Beach(by Others) 0% 0 03 Jun-24' 304 •03-Jun 24' Unloreseen Work;Extra Work'Change Orders 7.2:7. 070 22.Nov-IS to Apr 25 .. NOle _ .... _ ..... 100% 1970 22-Nov-19 14-Apr-25 487 ♦ N3102•Supplemental Work Orr..Inn Orrice Sando^ 1'0 365 22 Nor 19 2C•Ncr 21 A3.1110.SURV.WIRE.C2 COMB issues Slop Work Order for Pollee Service 100% 2 22 NOv19 23•NOv•I•. r A3.1115 TIA.C2 TranlCore PrepareiSubed Wort Sty entea Anarysis Report 100% 54 24-Non-19 17Jan•28 A3.I120.TIAC2 COMB Work Slop Order Period for Supplemental Work Order for Peace Service-Intended i1802.0(258 cell 100% 258 24•Nov-19 07-Aug•21 A3.1120.TIAC2.1 COMB Work Stop Order Period tor Supplemental Work Order for Poke Service Covered SA81 300 cd TE 100% 40 08-4u320 16-Sep-21 • A3.1120TIA C2 2 COMB Work Stop Order Period for Supplemental Work Order or Police Service-Not Covered in SAe1 300 odTE 100% 85 17-Sep20 20-Nov-21 A3.1110.PATH.W IRE C2 Wvdess Path Study-Wireless Co.nmunnaoon Network•Addoonal Poke Ser.ce Scope(NO)002 Impact)(No1 Required) 100% 0 20-Nov-20 20-Nov-21 A3 1111 PATH.W IRE l:2 Prepare'Subma Anarysa and Report,WirNess Communication Network(N01 002 know)(Not Required) 100% 0 20-Nov-20 20•Nov-21 NOI 03-COVI1119 Structure F4bncanon De et, •. . A0.1060.ALMS C3 TransCora Reserved Notification of COVID-19 Slruclure Fabncalbn Delays 100% 1 30.0c1.20A 30-Oct-2C A0.1000.OMS.CONTRACT.C3 Re-Negmiate Subcontract Agreement SO acWres lADMS an0 DMS) 100% 105 31-0c1.20A 12.Feb-21 A0.1061.ADMS C3 Add1nnai Slruclur al Fabrication Time for ARMS Suuclures due to COVIC 19 Force Maleure(406 col Original-dstributed) 0% 0 14-Apr-25 14•Apr-25 •467 I ,is ►Bps BOLOMMIt2NIl1bWee - 21A A0.1071.STRUC ARMS Slruclural pesge Analyse by BCC n00% 7 05-gp.21 A 14 Apr 21 , A0.1072.STRUC ARMS Slruclural Design Anays6 by C--leer 100% 7 05-Apr-21 A 14-Apr 2I t A0.1070.STRUC COMB and TC hob ADIOS Structure Design Workshop 100% 1 15-Apr-21 A 154pr-21 A0.1071.STRUC.1 ADMS Structure/Design Post Analysts by BCC 100% 11 16•Apr-21 A 03-Mey2' ' A0.1072 STRUC.I AOMS Structural Design Posi Analyse by Client 100% 11 16-Ap-21 A 03-May-2' A3 1060 STRUC.I Prepare/St/tune Re•Desgn Plans and Specticarorrs 100%-Structural 100% 38 16-Apr-21 A 07-Jtw21 '3 IVO STRUC.1 COMB RevrOws/Commenls On Re Design Pans and SOaana1nns 100°r% Structural 100% 37 01-Jun-21 A 30-Jul-21 A Change Orders/Thee Extensions 71.eg161- -• tine, ♦ AO 1000 COI Time Extension-Change Order 4I Notice of Resumption(300 cd) 100% 300 04-May-21 27-a•-2i Cri'llfE7IOtder e2•COVID-I9 Stricture FabdcMlon Oelay'NOI03 Revision 1•Time Extension(183 col - 1.3 2.F.• AO r 1000 CO2 1E02 Tire Extension Change Order a2 COVI)19 Structure Fabrication Delay l NO1 03 Rektsnn 1 (183 cd) 100% 1113 26 Feb-22 29-Aug-2'. AO 1000 CO2 7E03 Tine Extension Change Order 83 Amendment 1•Extending Contract Two years Post COVID-(730 ed. 71.1% 73'. 77 . •l;n 0 1 UMoreseen Work 100% 846 26 Marl 21 19-.:x1.23A Miami Dode County Construcfloe Perms 7e5 S.-Mtn-21 19- ay-2' A3.1160.ITS.01 COMB Noshes trans Core or needle,Mant-0ale Cowry Co rticlrerl Permit 100% 126 Mar-21 26r Mar-21 A31160.r75.02 TranlCore Receives process for Mam•Dade County Construction Permit 100% 1 29-Mar-21 29-Mar.21 A3.1160.IT5.03 COMB Chanties process for Martin Dade County Construction Permit 100% 1 02-Apr 21 A 02-A v21 A3.1160.ITS.04 TranlCore PreparemSubmn Plans tor Miam6Oade County Censuuclan Perms 100% 195 28-Apr-21 A 094Nov 2' A0 1000.1'151.4OC MOU Approval between COMB and MDC lot Memi-Orde County Construction Permit'As Nolad t 00% 198 03-May-21 18-4ov-2 A0.10051TS.MOC COMM PreparaemT ones Tare Cole Contactua Mach alsmloPerbre Sgta Sys tern Mainenatce on al Masi.Arms 100% 561 05-Nov-21 19•May-2: A3.1160.IT5.05 Mramr Dade County Reviews'Appoves Plans tor Memt-Oade County COnsbuclon Pdma 100% 6 10-Nov-21 16-Nov-2- A0.1010.ITS.MOC Temporary Maintenance Of Mast Arms Change Order Executed btwn Coy 8 TranlCore or City a County 100% 30 20-Apr-23A 19-M8y-2: 'JOT Construction Agreement 0 2021-C.610-0 0 0 6 5(between FOOT end COMB _ - A0.1160.71A FOOT.CA COMB Nobles Trans Core of Rrquremenllo Submit RFC Plane tor FOOT Permitting 00% 1 13-Sep 13 Sep-21 A0.1165.TIA FOOT.CA COMB•F OOT'TrovnCac Perms Pre oppOallon Meeting I Ile-Oct A 04 Ocr21 A0.1170.TIAFDOTCA COMB TransCore Noshed by FOOT o)A aVsoe111a Coretuctim Agreement Prior to Perrlesrtg and Sliuctua Fabrlcal 100% 104-Oc1•21A 04-Oct21 - or. nee.e.r er.a.a ewer. NMI Actual With Data Date:31,-Jan-24 COMB OBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-26 Sent o-oe.n a 0.eserw.eorooe.00n .a. I 1 Remaining Work 2024-06-20 Added Missing 2yr TE 1e44.a1 ColimauaaeeeoWo.-RMeo.re U1S010•803 0 oil dr0O nob Project Start Date: 19-Jun-19 ene.en n1posedlin.coeaceeowor..in..;017.0%1.RD:4a 1:4.1 Critical Remaining Work Full Blown Schedule leo.]a Room.R.„N met.vvu'e.W.Knw 1.0 r e 10 041. NW,• •Milestone � (�� Project Finish Dated 22-Dec-25 Pager eo.o.•a neoK.aR..K.ameraclea.rin..iKaeaaosoanp W....,Summit• /// \/l. �l„ w+.wa scriw.um.unosrm,a,.o Y ARxa Sr...V.I.lac 051124/00 - M.MN Sx.a.a.om..ua10 WC 0ror7400 1.1J TCC•COMS Progress Schedule Update COMB 0130M ITSSPS Schedule Update U24.0.W2 0131240D 2024-03.26 Sem 2024-06-20 Added Mleldng 2yr TE T 20-Jun-24 TASK later.All ACliVOies !Activity 10 Aclmty Name Dur% At Compete Start Finish Total Float 2024 I 2025 s Comp Our 01 1 02 1 03 1 C4 CI J 02 1 03 1 04 A0.t175.TIAF00T.CA Prepare/Submit FOOT Constructer Agreement-Fast Dail 100% 31 05.0c1-21 A 04-Nov-2' A01160.TIAFOOT.CA FOOT RnvewsICommants on FOOT Construction Agreement-First DraN 100% 1 04-Nov-21 04-lea-2' A0.1185.TIAFDOT.CA Prepare/Submit FOOT Conslructen Agreement-Second Drag 100% 76 05-Nov-21 19-Jan-22 A0.1190.TIAFOOT.CA COMB&-ransCorelFOOT Can aeudipr Agreement Coordination Meeting 100% 1 20-Jan-22A 20.Jan-22 l A0.1195.TIAFDOT.CA Construcaon Agreement Comment Resolution(see log for details) 100% 490 21-Jan-22A 25-May-2: A0.1200.TIAFOOT.CA Prepare/Subma Design Flans and Specdnalions•RFC.Anal Updeles per Constuclon Agreement 100% 61 31-May22 25-Aug•22 A01160.M TIA FOOT CA Mtestpne FOOT Construction Agreements 2021.C•610-00065(between FOOT and COMB)Executed&Approved t00% 25-Jum22 Chan,-"r,•r NJ-Lot PSE 2•13 A4 n 22 • . A0.1000.P55.0O3 Prepare/Submit Change Order tot Lm P58 100% 10 01-A0g-22 12-Aug-22 AO 1015'58 CO3 FOOT Rev re*4Ado/oves Change Order for Lot P58 100% 233 15-Aug-22 19,Ju1•23A RFrs 100% 03 26-FelP20 01-Maya MU9er1•Use of FOOT 06 end COM Aarsss Control Po• atn45 eumy Plans A)1002 RF111 Prewar er'Suomc RE)all U se of FOOT D6 and COMB Access Control Pokey and Security Plans 100% 1 28•Feb.20 28-Feb-2f .Al 1012.14FI II COMB Remew.Approve NEl all Use of FOOT D6 and COMB Access Contro:Potty and Securay Plans 100% 44 02•Mar20 01.May 21 PrOleCt Management ,. .r I A r:D.; 25 I A,1000 R Month).Prciect Reports(LOE) 15.05% 2370 19 Jun,l9A 13-Dec 25 ,475 A1.1020 PIC CoordlnaIion wch Pubic Inlormalon Officer(LOE) 15.05% 2370 19-Jun.19A 13-Dec-25 -475 A1.1020.1OC Coordination with Local Agencies(LOE) 15.05% 2370 19-Jun-19A 13•Der25 •475 AO.1020.CON Coordination with M1anng Conseuclon Protects(1OE) 15.05% 2370 19-Jun-19A 13•Dec-25 -475 Al.1000.MON Monthly Progress Menings(LOE) 15.05% 2370 19.Jun-19A 13-Dec-25 -475 A,1006 wk weedy P.gecl Meetigs(LOE) '505% 237019 Jun.19A 13 Dec•25 •475 Project Management-Kick Ott Meetings 100% 10/3 1g,Iua•IeA 19Jgk23A Al'00,1.N Protect Kick On Meeting 100% 1>19-Jun-19A 19-Jun-if Al 005 1 Project Kick 011 Meeting-TMC Sweetwater 100% 1 19-Jan-22A 19-Jan-22 o AI.1010.14 L Protect Kick 011 Meeting Smart Parking System(SPS)-Into 100% 1 30-Mar-22 30-Mar-2: Al.1015.K Project Kick On Meeting-Wireless Cammudcaeons Network Tartu 100% I Be-Apt-22A 00Apr-22 AI'010.N G Preyed,Kick ON Mce0i9.Smart Parking System ISPS)-Garages 100% 1 t9-Jt423A 19-Jul-23A Installation Design Phase-Phase 1 and Phase 2 Design Piles.-Site. reties/investigations _ A3.110 SURV TMC Survey Ensong Facilities 8 Equipment-TMC 100% 120 13-A g-19 06-Feb.21 A3.1110.5URV Protect Site Sur,eys 100%. 32 07•Oct-19A 22-Nov-1l M3.1110.GE0 Milestone Holiday Moratorium Ergs for Geolechneal Investigation 100% 0 09.Oee1! A3.1110.0E0 Geotecnncal Investigation 100% 26 09-Dec-19 29Jam2C A31110.SURVCCTV CCTV 360 Degree Feld of Mew Video Survey 100% 15 16-Feb20 IT•Mar-21 In,'n•-v•5,ilc Surreys•Invi:yli.J.Its nc•W,.. -•C'rninunic,iti PIN•Ia:ilk vn, Al 1110 0LJRV WIRE Radio Pall,Sae Survey Wireless Con..nication Network 100% ^5 •2 Nov 19 22.Nov-I! A3.1110.INSP.WIRE Rooftop Inspections W.eIes5 Commurecaiion Network 1009, 8 12-Nov-19 22-Nov-11 A3.1110.INFK WIRE Verily Infrastructure•Wireless Communication Network 100% 8 12-Nov19 22-Nov I! A3 ttf0.PATH WIRE Wireless Path Study-Wireless Communication Network 100% 8 12-Nov-19 22.19ov-1'1 M3.1110.PATH WIRE Prepare+Suornt Analysis and Report-Wireless Commumcaoon Network t 00% 40 25-Noo-,9 20-Jan-2C DeslO1PYM-Mintiss ComiwdcsSmNelrsek-Phase 1 had Phan 2 100K 1467 20-Jun-19A 25-Jun42 b'•a liee,_n t'Inn.•Wleele5&Corn mums Ai cn Nctwei& 1} . ..a 1.:, 0 ..,. 031020 DWG COM Prepare%ober4 Design Plans and Specificall nor 60%•Wireless Commune awn Network I00% 70 20:Jum19A 30-Sep-I) A31030.DWG.COM COMB Reviews:Comments on Deo.gn Plans and Spec(flcalions-60'r.•Wireless Communication Network 100% 19 01.0c1.19A 28•Oc1-19 x .De.r:n k1+n:•Wlrnlen Comnruni.it ic'n tit try:14 A31040 DWG.COM Prepare/Suborn Design Plans and Specacaeans 90%-Woeless Comrnunrcalon Network 100% t42 23-Nov-20 28 Jan-21 A3 105C DWG COM COMET Rcvrews;Comments On Design Plans and Specdreauons-90%•Wireless Commune/ten Network 1000 45 29-Jan•21 A 02-Apr-21 t:v.Ceti U;n Plane•Winless Cvrnmunlc•Ili n tdein:tk • no. n.w& tits:1W AF.•. B1 Actium Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-29 Sent 'eon's aura.suns.epl°ammo One i I Remaining Work 2024-06.20 Added Missing 2yr'FE l6N0.2, Co,e,n up.nswrnrewwulS0 sot.ego oowroa sr Project Start Date:19-Jun-19 att.va A.w.mna...da.w vsanev.pesPROM o ''00090 nw Cynical Romanv,g Work Full Blown Schedule 2soe.ar i>.io..oe Rfolow eww..NF...vTe PROM,vv.., N.J • • M4e51pne )RE TR a Project Finish Date:22-Dec-25 Paey I o17a n,«.y.3 Ramsey n..i,weadvavwwo,, ente W l20023o0 "an �7 /\L m.NwL SOW.Voilis.u]J 0510)ie)DD N.1 �USummar y , la.w 2l 50•040 Urer.VM 05 n2piDe NMJ A Jon 2. sprout upMr0uex 4W701)174pU NMJ TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03.211 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-29 TASK litter:All Activities Activity ID i Activity Name Dui Al Clanpds Slav FiOdh Taal Float 2024 2025 Corp Our o, 02 03 0. at I 02 1 oa I 04 A3.1060.DWG.COM Preparo/S1At8 Desgn Runs and$pecacatidrl5•tDG^r. NO/class Communication Network 100% 45 OSApr 21 A 07-Jun 21 22 02-Jun-21 A 02-Jul-21 A A31070 OWG.COM COMB Reviews/Commenls On Desgn Plans and Specdtcatrons 100% Wireless Commundatron Rework 100% RelNsed,or Construction(RFC)Design Plans-Wheless Communication Newark A3 1080.OWG.COM Prepare/Submit Design Plans and Specifications RFC•Wireless Communication Network 100% 37 05.Jal-21 A 25-Aug-21 A3.1090.DWG.COM COMB Realews/Approves Design Bens and Spedlcalions RFC-Wreless Communlcakon Remora 100% 438 26-Aug•21 25-may2: A3 1100.DWG COM M.eslone:Approval of RFC Plans-Wrek•so Commurcatwn Network 100% 0 25-Jun-22 Design Plans-Transportation Matrgsended Center(TUC)'Phase 1 and Phase 2 i 6"%Piston Pilots- 'Mallon Man 151n1ali Cumin : -•> A31020.OWG TMC Prepare:Sudan,Cosign Plan•;and Specicalions-60%-Tr an spa tailor,Mana3em tot Canler(TMCI 100% 7020-Jun19A 30-Sep.II 1 A3)030.DWG TMC COMB Reviews/Comments on Oe.gn Rana nod Spec/cations 60%-Trelspatatan Mat log went Caner TMC) 100% 19 01-Oct-[9A 28-Oct-1S 3--'.DOsngn Flans-TMnapc telksn U.negem-11f Center(TMC) I00' ea) i15 12,Nc.- A3.1040 DWG TMC Prepare/Surma Design Plans and Spet/calcns 90% Tr aispaiatm Mal log amen!Center(TM CI 100`•^ 8306-Ayr 20A 03-Aug-21 I A31050 DWG TMC COMB Roars,'Commenls On Design Pans and Specarcalmns 90%-Trans Fortaton Man tg sonars Cerra(TMC) 1(9Y/. f.a;4-A.�;20 12-Nov-21 I"01v:esl-n Plana•Trmapnllellnn Me nlgemenl Cinder(TUC' 1.•. 21 I._.2 A3 1060.0WG.T MC Prepare/Sauna Design Plans and 5pocncalions 100r. TrarlsppnalonMonagencrl Confer(TMC) 100% 41 24-Nov-20 28-Jan-21 A3.1060.DWG.TMC.1 Prepare/Sub.-rat Design Plans and Spec ricanons-100%-Trara ponalon Management Center(TSCI REM SION 1009E 1 29-Jan-21A 29-Jan-21 A31070.0WG.T MC COMB RevewsiComments On Oesgn Pans and Specdcafrons-100%•Tr an span ohm Manager-mart Center IT MC, 100% 24 29-Jan 21 A 04-Mar-21 A3.1075.DWG.TMC Mleslone:1001%Design Ready ter Permebng and Suandah 103r 0 C4 Mai 2'1 Retested Iv-i'nnet,u[lion(RFC)DesIgn Plans-Transpnrtation Management Center(TMC, 1'J' J212 S Mar-:1 21 Jr,, An 1080 DWG TMC Preparn/Subne Desgn Plans and 5pec71callons RFC Iralspatatm Mnagenmt Carter ITMC) 100% t7605.Mar 21 I1,Nov21 A,i09C DWG.TMC COMB Raviewsrppprovns Desgn Plans and Specd,Calot, RFC-Transportation Management Cerra(TMC: 100°'. 45 12 Nov-21 21-Jan-22 85 1100.DWG TUC Mleslnre Approval of RFC Plans-r•anspartalcn Management Cent,:I M01 I0'7`•. 0 21-Jan 2: Design Plans-SIMfl Paining System•Phase 1 and Phut 2 100% 1466 20-Jun•19A 25•Jtn•2E Rr`s Design Flans•Smart Parking System i 2., 13 ...r Ir.,. ; "ct 15 Al 132C DWG SPS Prepare0SubnM Design Pans and Spechcalcns-60%-Smart Parking System(SPS, 100° n 70 20-Ju 19 A 30-Sep.I' Ai 1030 DWG SPS COMB Revews/COmmenls on Desgn Pans and Specdcatons-60% Smart Parkng System(SPS) 1001. 19 01-OCF19A 28 On'14 a-`.Descn P1:'ns-Smarr P:rhino System - a A 01 A3 1040 DWG.SP5 Prepare/Submit Design Plans and Specl,cargns.90%•Smart Parking System(SPS) 100% 153 15-Jun.20A 28-Ja-21 A31050 DWG.SPS COMB Reviews/Comments On Desgn Pan<and Spedlcations 9002-Smart Parke)System SPS) 100% 45 29-Jan-21 A 02-Apt-21 130•.Desicn Plans-Smart Paden System _'A A3 106C DWG SPS Prepere'Subml Design Ran,and Speck allons 100%•Smart Dery my System SPS) 100% 44 05-Apr.21 A 07 Jur,21 A3 1010.DWG SI'S COMB ile•aews/Comment;On Design Pans and Specificallon5 10II Smart Parking System{SPS'' 100'/. 18 08.Jun-21 A 02 Jul 21 A Releescc ler Cnndructlon(RFC)Design Plans-Smart Poking 5-stem - -.a 21 2. 25•!0:-,2: Al 1090 DWG SPS PreparefSub-na Dear Pans and SpOc4rcali4ns RFC Snarl Parking System ISPS: 100% '8 30,08-21 A 25 Aug 2. n3 1 33:;:wt;505 COMB Revlews!Appoves Desgn Plans nod Specdttatans RFC Smart Parking System i5051 100%. 438 26-Aug 21 25-May-2: • A3 1100 LW G SPS Mtesione Appl0vai al RFC Plans-Oman Parking System(SP51 100% 0 25 Jung' ' Design Plans-ITS Devices-Phase 1 and Phase 2 100% 1466 20Jun 19 A 25Jtn 2° 60%Deagn Flma-ITSDeyk s _r.l 2115 A3 1020 DWG.ITS Prepare/Srbrn9 Design Pans and Specsttalims 60%.-ITS Devices 100. 70 20-Jun-19A 30-Sep.1' A31030 OWG ITS COMB Reviews/Comments on Design Plans and Speclv:aems 609. ITS Devices 100% 1901-0e1,19A 28'Oct I': 30r.Desgn{Ass-ITS DedeM 13 23-10 U2-Apr.21 ' A31040 DWG ITS Prepare/S/bmn Desgn Plans and Specical'cns 90%-ITS Devices 100% 42 23-Nov-20 282 an 2' A3 1 C50 DWG I f S COMB Reviews/Comments On Design Plans and Spedcalrons 90%.ITS Devc es 100% 45 29-uan-21 A 02-Apr•21 IO-'-.Design Print.•ITS Dewiest A3.1060.OWG.ITS Prepare/Subma Desgn Plans and Spec6M1caIcns 100% 17S Devices 100% 44 05-Apr-21 A 07•Jun21 A3 1070.DWG ITS COMB ReviewslCommenls On Desgn Plans and Speds:alions•100°.-ITS Devices 100% 18 08-Jun-21 A 02-Jul-21 A RalwMd lee Conslroetlon(RFC/Design Pans•ITS Dov.r.• -. r.-a1-1:, At 1')9C JW O ITS Prepare/Subrrrtt Oesean Pans and Spoc8calBm-RFC-ITS Dovices 100% t9 30JW 21 A 25 Aug-2, A3 1090 DWG.ITS COMB Reviews/Approves Oesgn Plans and Specacatnns•RFC•ITS Devices 100% 438 26-Aug-21 25-May.2: no. R.rern Cr..: We* MEM AcluA Work Data Date-31-tan-24 COMB UBOM ITSSPS Seheduk Update U24.0.W2013124DD 2024-03-23 Sent 'ann. ono.se.aaese,Damsonwar (-- m-1 Reamatg Work 2024-06-20 Added Missing 2yr TF, rerun.-el cso.•mu••aen..er a....ulsa SR,aci 4093.DO Ne Project Start Date: 19-Jun-l9 OM..n Pram.Flew.SamarenvXie limos U,7.at*nso..e N. 1111.11. Critical Remanring Work Full Blown Schedule oe.on.a pro net Ren.•O Dwl1w04e.Nowt PROP 11P.aa00 NW • •Mlaslone TR C�pE Project Finish Date:22-Dec-25 Pap:6of76 PM.O Pn mamacon.81wmne0..anPReaa0501a32 Nw i,SUMITa,y / 1� s' /� a as S.M.U Ow uxe s n2vYlp F 1 20ann. 50.401.UO NOU2.0w2n1,2100 NMJ TCC COMB Progress Schedule Update COMB DOOM 1TSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sent 2024-06.20 Added Missing 2yr TE r 20-Jun-24 TASK Otter:AN Ac*les ;Wily ID Activity Name our% At Complete Start Finsh Total Foal 2024 2020 1 Comp Our 01 I 02 I 03 I 04 Q1 I 02 I 03 I 04 0.3110i.OW'SITS Mk7slon,App;U.a'Al Ilk C Par., :TSOrvrccs 100% 0 25-Jun-22 Design Plena•Waffle Control Men 100% 1230 06-Feb-20 25-Ju-23 30%Design Plana-Traffic Cen031 PTV 103'- 27a Oe-NOv-2r 43.1040 DWG TOP Prepare/Submit Design Pans and Specrle aeons•90% Baltic Control Plan 100%, 38 06-Feb-20 01-Apr.20 A3.1050.DWG.TCP COMB Reviews/Comments On Design Pans and Speelltcabons 90%,Tree%Control Pan 100% 36 02•Apr-20A 22-May-2( • A31040 DWG TCP1 Prepare/St0ml Desgn Plans and Speclicarions•90%-Tr epic Control Plan 100% 21 26-May-20 24-Jun-2C 0.3 1050 DWG TOP.I COMB Reviews/Comments On Desgn Pans and SpAcdreatrons 90% Trate Control Pan 100"/. 93 2S_tan 204 0P No.21 110%Deakin Pt.one•Tonic Control Pi m 215 -.t.----- 2•A Al.1060 DWG TOP Prepare/Subnra Design Pans and Speck abons•100%•Traffic Control Plan 100% 51 09•Nav,20 28-Jan-21 A3.1070.OWG.T Ca COMB Re:news/Comments On Desgn Pans and Spec:ocations-100% Tr ale Control Plan 100% 108 29-Jan-21 A 02-Ju1.21 A -released for Construction(RFC)Baskin Plans-helot Control Per - r. 43.1080.DWG TOP Prepare'Subnt Desgn Pans and Specocahons RFC-T.all2 Control Plan 100% 47 05•Ju1-2'A 09-Sep-21 43 1030 DWG TOO COMB Revrews/Appro.es Desgn Pans and Spectlrcalans RFC Traen Corand Plan 100% 428 10-Sep-21 25-May-2. 0.31100.DWG TCP Mleslone.Approval of RFC Puns Ttaec Control Plan 100% 0 25-Jun 2: Design Plans-Structural 100% 1466 20-Jun-19A 25-Jun-22 4.1%design Piers•Structural 2e, 2^Jun IRA 27-Mar-2r ' A3.1020.STRIIC PreuaretSubnl Design Pans and Spec4u4Inrn.-CA Stu:chiral 100% 70 20•J::n.19A 30-Sep•11 A3.1030.STRUC COMB Revetws/COmmenls On Desgn Pans and Specllrcaeons-60%'Structural 100% 19 01-Oc1-19A 28-Oct-15 AG 1035 STRUC Mrleslorie:COMB Dace:Ion Required for Aesthetic vs Non Aesthetic Desgn o1 DMS Structures.Structural 100`7. 0 27-Mar 2( In.Daman Plena•Structural 223 la Apr23-Nov-21 A3 1045 STRUC Preoarp/Suorn4 Slructrral Renderings for Square Paned Structure 100% 27 14 Apr 20 A 21-Map 21 A3.1046.STRUC Milestone:COMB Decision Required for DOT Suuclure vs Square Palmed Structure 100% 0 14-Sep-2( 43.1050STRUC COMB Reviews/Conments On Desgn Pans and 5pecrleauons-90%•Structural(Not Required) 100% 0 23-Nov-20 23-Nov-21 A3.1040.STRUC Prepare/Submt Design Pans and Spececanons-90%-Structural(Not Ragurred) 100% 0 23-Nov-20 23-Nov-21 17•J-.:e Stan i-,un.-SlNctunl - A3.1060.STRUC PreoareSubml Des:en Pans and Specdcatiens 100%-Structural 1009/. 42 23-Nov-20 28-Jan21 43.1070 STRUC COMB Rev ews'Commeirs On Desgn Pans and Speca'rcaeons•100%;Slructur al 100% 45 29-Jan-21 A 02-Apr•21 Released for Construction(RFC)Design Pions•Structure A3.1030 STRUC Prepare/SJbnt Design Pans and Specacallone•RFC-Structural 100'/. 17 02-44g-21 25-Aug-21 Ai 1090'STRU'. COMB RcrrnMslApprOves Design Pans and Specifications RFC-Structural 100 438 26-Aug-21 25-May-2: Al 110 S-PPP. Mlestone.Approval of RFC Plans-Scutt:oat 100% 0 25-Jun•2; Permits•Licensee 44.44% 1103 24-Aug-21 01-Sep24 •256 r Permitting 04 44 1IF1:.insy 21 01 5cf A3.1160.SPS.I PerrMbng Prepare7Subm4 RevrewlApprove-Smart Parking System(SPS) Lots 100% 244 26 Aug-21 26-Apr 22 43 1160 SPS Ferrnrlung Prupare/Subel.'Reurow/Approve-Smart Parking System(SPS)•Garages 100% 638 26-Aug-21 25-May-2: 43.I16OSTRUC Pe/mating PreparelSuaniiRuvlewlApprovc-Slructural 0% 918 26-Aug-21 29-Feb-24 •233 Ili= Al.I160.ITS Prrnunulg Prep1rerlkumr0Pevroo App-ore :TS Devices 094 918 26-Aug-21 29-Feb24 135 hrmMln9'.Wry.4 SMMtw11W A31t50'MC Pe-Mg Pr epare'Subra Regrew TlarapdMbn Merrgeton Cony(TMC)-ElechcalOn W y wdOte el 9lree _ 100% 13504-Nov-21 18-Mar-21 'nWl A31160 PTMC SW Frepare/Submt Trans PS na eon Management Center(TMC)-Appiootioo lie Municipal Permit wAtean.Dade Carey 100% 3001-JW1-22A 08-Jul-22A A3 1160.S.TMC SW COMB Review/Comment•Tramporgton Maragem.rs brier(TMC)-Mimi Dade Foe 9r1rrDssron System 100% 4 11-Jul-22A 14-Jul22A - A31160.P2.TMC.SW Prepare/Sub/nit 2nd Draft•Tram padaion Manegeeren bn.(7 MC)-Appica®n for Munepal Perrin w.?Aane Cade Ca 100% 4 19•Ju422A 10J14-22A ' A3.1160 S2.TMCSW MCC R0000tRetecl•Tremponalon Management Cana(T1L)-Mein DedeFae 9t ppressce System 100% ♦ 19-J4F22A 22JU1•22A A31,607MC SW Peronerrg PreparerSubinitiRevew/Approve-Tramp:minion Marugrrretl Ceder(TMC)-C4y d 9naalwC.Rein*rg0 100% t4 23-Ju622A 05-Aug-21 1 lippirehttng•Wireless Continuo- • - -t- 0% 1103 264u*21 91•Sep•1M •504 A3 I' 0-7i-41 Pernkitag Pr.pare/Subme/Review/Approve•Wi.psa Commuracason Backbone-C9y Hal Garage Tower 10C% 841 26•Aug-21 r SOec 2' 431160 COM PernMMlg PreparteSubma/Revaw/Approve Wiriness Communcatmn Backbone Miami React,P01ca Dept.Tower 0% 946 26•Atig-21 30 Mar.24 149 ---1 A3 1180 COM P.10inin9 PreparoTSubne/Revrec/Approve•Weeiess Communtcauon Backbone Tower 41 Condos 0% 940 26-Aug-21 30-Mar-24 149 BIPr` j A3.1190.COM Penroiling PreparolSubma/Rovow;Approve•Wireless Communcalron Backbone Park Veer PaYBTbwer 0% 110326-Aug-21 01-Sep•24 -304II MISMOMMI Dee r ReAdnr Mere hew. 11. Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03.20 Sent loon.a etieres 0o 4e ea a ammo wen 1 1 Remanng Work 2024-06.20 Added Missing 2yr TE I159 -CI 0A..rv0 r,wae 0o..t-n O15a31aeeaiOpwl00 ea Project Start Date: 19-Jun-19 caw..a P0rmRIn.,aeemraiwee maw Urn6lI eo.o NM Mi Critical Remanng Work Full Blown Schcdulc aqua PrapmeRe....Ba0.0.00te.w.wi Me.1r0e0+00 MCI • •Milestone I„ A [`�/\pE Project Finish Date:22-Dec-25 P.a.tnf'6 COW.53 RmmelAeo,.a ssrwtredee.poPR9ploi 0O NWNW ^�Sum many 7 �'l 7 110111..23 senwe urine UM 0 s n290105 IOU 20.Mr2. ee.oa 0uo4n4 024 0 W201r MO NUJ TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 013/24130 2024-03.28 Sent 2024-06-20 Added Missing lye TE [ 20-Jun-24 TASK Nler AU Aclivmes Minty ID Activey Name Our% At Complete Start relish Total Fbzl 2024 2025 Camp OurCI 02 03 a4 0 02 1 03 1 o4 UMW Coordination 100% 301 06-/Wg'19 17-Feb21 Wady Co'Cinnh:n•AT&T Flotign Bdbculh - A3.1110.UTIL.AIT Iden,dy EUsing Utley Agencies•AT&T FI4rlda,Bellsouln 10011. 3 06-Aug-19 06-Aug-11 A3.1120.UTIL.ATT Make Utiiy Conlacls-AT&T Fbrlda/Belsoulh 100% 2 12-Aug-19 13-Aug-II A3.1140.UTIL.ATT Field Meetings•AT&TFlgrdaiBensoulh(Not Required) 100•i. 0 22-Aug-19 22-Aug-It A3.I/50.UTLATT Review/Process tidily Work Schedules-AT&T Fbrd&Bellsouth 100% 53 22-Aug-19 07-Nov-11 A3.1160.UTILATT Unley CoadinationiF0/ow-up-AT&T FbrdalBe►south 100% 53 22-Aug-19 07-Noy1! A3.1170.UTLATT Utley Conshuclabley Review-AT&T Floridareehaulh 100% 53 22-Aug-19 07-N0r-11 A3.If30.UTLATT Cauccl 6 Review Plans.Data from Ugly Agencies-AT&T Fbria'Belsouth 100% 4 20-Sep19 25-Sep-It A3.1180.UTL.ATT Contact Plans l0 Utley Agencies/Close-out AT&T FlondoBelsooh 100% 0 07-Nov-19 07-Nov-11 11!Iilly C^..r.•ln Ai,„-,•ll.lnl,c hInc-St./Id '. -. A3.1110.UTILAB Identity Existing Utley Agencies Atlantic Broadband 100% 3 06.Aug•19 00-Aug-It A3.1120.UTL.AB Make Utley Contacts•Atlantic Broadband 100% 2 12-Aug-19 13-Aug-1I A3.1140.UTILAB Field Meetings-AllaM,c Broadband(Not Required) 100% 0 22-Aug-19 22-Aug-Il A3.1150.UTL.AB Review/Process Utley Work Schedules-Atlantic Broadband 100% 53 22-Aug-19 07-Nov-I! A3.1160.UTILAB Utley Coordmallon/FOAow-up-Manic Broadband 100% 53 22414-19 07-Nor-1! A3.1170.UTILAB UWy ConstruclabMy Review-Atlantic Broadband 100%/a 53 22-Aug-19 07-Nov-11 A3.1730.UTIL.AB Collect&Review Plano,Da1a amUtley Agencies-Atlantic Broadband 100% 4 27-Sep-19 02.Oc1-19 ' A3.1180.UTIL AB Contract Pans to UWy Agencies/Close-our Atlantic Broadband 100% 0 07-Nov-19 07-Nov-11. Ul,lty C-- n.fi-n-Comic.sf A31110.UTILC Identify Eusong Utley Agencies.Cancasl 100% 3 06-Aug-19 OS-Aug-II • A3.1120.UTL.0 Make Utley Contacts-Comcasl 100'/. 2 12.Aug•19 13-Aug-II • A3.1140.UTL.0 Field Meelegs Comcasl:Not Required) 100% 0 22-Aug-19 22-Aug-II A3./150.UTL.0 Review/Process t7Wy Work Schedules-Corneas! 100•/. 53 22-Aug-19 07-Nov-1! A3.I160.UTL.0 Ude),Coadlnalion'Follow-up•Caracas' 100% 53 22-Aug-19 07-Nov-11 A3.1170.UTLC Uliley Conslructabley Review-Comcasl 100% 53 22-Aug-19 07-Nov-11 A3.1130.UTIL.0 Cootie,&Review Plans/Data from unity Agencies-Cornea. 100% 5 22-Aug-19 28-Aug-1t A31180.SOIL C -,n,nracl Plans to UWyAgences/Cbse•oul Cemcasl 100% 0 07.Nov-19 07-Nov-It Uh11ty C.r r_In=11'n-City of latent Belch A3.1110.UTIL.COMB Idennly FoUrog Ut9yAgences-Cory of Menu Beach 100% 3 06 Aug-19 08-Aug-11 A3.1120 UTIL.COMB make Utley Contacts-Gay of Miami Beach 100% 2 12-Aug-19 13-Aug.I! A3.1130.UTL.COMB Collect&Review Plans/Dela horn Ut7AyAgencies-City of Miami Beach 100% 12 19-Aug-19 04-Sep-11 A3.1140.UTIL COMB Field Meetings-Cay of Mane Beach(Nit Required) 100y. 0 22-Aug-19 22-Aug-1! A3.1150.UTIL COMB Review/Process l7Wy Work Schedules•Cityot Marra Beach 100% 53 22-Aug-19 07-Nov.1! A3 1160.UTIL COMB Ulihy Coordnalion!Folow-up•Ciyol Miami Beach 100% 53 22-Aug-19 07-Nov-I, • A3.1170.UTILCOMB Uglily Conslruclabioy Review•Coy of Minn Beach 100% 53 22-Aug-19 07-Nov, A3.I180.UTIL.COMB Contact Plans to Utley Agencies/Close-out-Cly ol Nan Beach 100% 0 07 Nov-19 07-Nov-it U„illy C,;,trt ri-u:n•C,cwn C-,.11.•So,-, - A3.1/10.UTIL.CCF Identify Eusling UAIyAgencies•Crown Castle Filer 100% '3 06 Aug-t9 06-Aug-II A3.1120.UTIL.CCF Make Utley Conlacls Gown Castle Flyer 100% 2 12.Aug.19 I3-Aug-11 A3.1140.UTILCCF Fied Meetings Crown Carrie Fiver(N01 Regwad) 100% 022.Aug-19 22-Aug-1I A3.1150.UTLCCF Review/Process UWy Work Schedules,Gown Castle Fiber 100% 53 22-Aug-19 07-Nov-11 A3.1160.UTL.CCF Wetly Coordinelion'Folow-up-Crown Castle Fiver 100% 53 22-Aug-19 07-Nor-Il A3.1170.UTL.CCF UtAty Construclabety Review•Crown Caste Fiver 100% 53 22-Aug-19 07-Nor-11 A3.1130.UT6.-CCF Collect&Review ale.ns,Dala from UtitayAgencres-Crown Castle Fiver 103% 6 20-Sep-19 27-Sep-11 A3.1180 UTIL CCF Contract Plans to Ulily Agencies/Close out Crown Castle Five, 100% 007 Nov-19 07-Nov I,. Utility Cr,.^.71na1,-n-FPL-?teleluution 17-Feb.21 ASl lla.UTIL.FPL.O Identity fueling Ula4y Agencies FPL Dnlrbulon 100. 3 06 Aug-19 0e-A4-r A3.1120.UTIL.FP1.0 Make Utley Contacts-FPL-Drslrbuh0n 100% 2 12-Aug-19 13-Aug-11 oat Ahem Diodes naps - Actual Work Data Date:31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0.W2 0I3124DD 2024-03-28 Sent wlgdn rr.&mwrolostmm sew 1 I Remarxng Work c 2024-06-20 Added Missing 2yr TE 1100.01 csne eeuoawnwo.aroarae.ursesa mo Meemootpe Project Start Date: 19-Jun-19 oaew,e2 neArooM..egasecnn....wp.r,ulr0swnaemo MU IMES Critical Rema-eng Work Full Blown Schedule eno-v Rowse] R.a.wsins.:v,pr,Mm041,ds22oo NAU ♦ ♦Nekstone /R /�, [' Pl Project Finish Date:22-Dec-25 P.av R„(76 merya ntowm Rewvmemeucc.x t..,mda 2 moa300 wu MAU ✓ Summary / , .--_ --5" L^ 33Nee 23 ScrcWe llpaae UN aS 1verade NW 20Aw2. teaeauplee UN 0 W20312400 NW TCC-COMB Progress Schedule Update _ COMB DOOM ITSSPS Schedule Update U24.0.W2 013124D0 2024-0128 Sem 2024.08-20 Added Missing Tyr TE 20-Jun-24 TASK litter All Activities Activity ID Activity Name Dur% Al Complete Stan Finish Total Float 2024 2025 Carp Our 01 02 03 04 Or 02 03 04 A3 1140.UTIL.FPI D Field Meengs-FPL-Distrbuen 100% 1 19-Sep19 19-Sep.11. A31134UTIL FPL.0 Collect 8 Review Plans/Data from Utley Agencies-FPL•Distribution 100%. 48 29-Jun•20A 04-Sep-21 A3.1150.UTIL.FPL.O Review/Process Utley Work Schedules-FPI-Datnbilidn 100% 1 04-Sep20 04-Sep2t A3.1160 UTIL,FPL.D Ublay Coordinelgn'Fotow-up-FPI.-Obabukon 100% I 04-Sep20 04-Sep-21 A3.1170.UTIL.FPI.D U61ey Construclabkry Review-FPL-1,l,trlbn 100% I 04-Sep-20 04-Sep'21 A3.1180.UTIL.FPL 0 Conn To Plans to utihyAgencies/Close-out-FPl-Cesebution 100% 9 03-Feb-21 17-Feb-21 1Nstry Cosr.inet.n•FPL-Tr:;nsmrssl.n A31110 UTIL FPL.7 Identity Eosleg Utley Agencies•FPI•Tr a,smrs von 100% 306-Aug-19 08-Aug-15 A3 1120.UTIL FPL T Make(Airy Con,aces-FPL-Transmisson 100% 2 12-Aug-19 13-Aug-11 A3.1140.UTIL FPL T Fkid Meetings-FPL•Transmission 100% 1 19-Sap-19 19-Sep-1! A3.1130.UTIL.FPL T Collect 8 Review Flans/Data from Utley Agencies-FPL-Tram nesaual 1007. 1806Jae-20A 31-Jan-2C A3.1150.UTILFPLT Renew/Process UIMy Work Schedules-FPI.-Transrrsas on 100% 18 06-Jan20 A 31 Jan-2C ' 43.1160.UTIL.FPLT Utley Coordination/Follow-up-FPL-Transmission 100% 18 06-Jan-20A 31-Jan-2C 43.1170.UTIL.FPL.T Utley Consauctabiky Review-FPL•Transmission 100% 18 06Jan-20A 31•Jan-2C A31180.UTll FPL T Contract Plans to UtloyAgences/Cbse-0d-FPL-Teal sr0s son 100% 1806-Jen-20A 31-Jan-2C Ulllny Cn:.rlmnu-n-Scroll Nr.iel ' A3.1110.UTIL.SPR Idenkly Ereing Utley Agencies-SpmrMestel 100% 3 06-Aug-19 08-Alp-if A3.1120.UTIL.SPA Make UOay Contacts-SproUNedel 100% 2 12-Aug-19 13-Aug-IS A31140.UTIL SPR Feld Meetings Sprint/Newel(Nit Rewired) 100% 0 22-Aug-19 22-Aug•It A3.1150.UTIL.SPR Review/Process Utley Work Schedules SpreWNena 100% 54 22-Aug•19 07-Nov-1! A3 1160.UTIL.SPR Uglily Coadsiaoo,4fo0ow-up-Sprssnledal 100% 54 22-Aug 19 07-Nov,I! A3 1170.0 TIL.SPR Utley Conslruclabely Review-SpnII/Neolel 100% 54 22-Aag-19 07-Nov-1! A3 1130.UTIL.SPR Cvuecl s Review Ptans/Dala from Utley Agencies•Sprint/Newer 100•/. I 22-A g•19 22-Aug-It 43.1180.'UTII.SPR Contract Plans to UtelyAgencies/Close-out SpnUNeoror 10014 1 07-Nov-19 07-Nov-it Otllrly Cn^r..,nvll-n.TEC,,inn-JAW,Cas t 0.3 IIIO.UTIL TECO Idennly Easing Utley Agencies-TECO People's Gas 100% 3 06•Aug•19 Se•Auo-It A3 1120.UTIL TECO Make U141y Contacts•TECO People's Gas 100H. 2 12-Aug-19 13-Aug-I! A31730.UTIL.TECO Calecl B Review Plans/Data horn UWyAgettces-TECO People's Gas 100% 13 14-Aug-19 02•Sep-it A3.1140.UTILTECO Field Meetings,TECO People's Gas(Nol Reputed) 100: 0 22-Aug-19 22•Aug-Il A3 1150.UTIL TECO Review/Process thirty Work Schedules-TECO People's Gas 100% 54 22-Ag-19 07-Nov-I! A3.1160.UTIL.TECO Willy Coordnation,Foaow up•TECO Peoples Gas 100% 54 22.Aug-19 07-Nov-I! A31170.LITIL.TECO Utley Cnnslructabey Review-TECO Peoples Gas 100% 54 22-A4.19 07-Nov-11 A3 1180.UTIL TECO Contract Plans to Ul4640gence5/Cbse-oul TECO Peoples Gas 100. 1 07-NOv-19 07-Nov-1! DocumontatlonlSW Design/Procurement Phase-Phase 1 and Phase 2 - - --• I Docutnentedan Phase ,.4 1"'.:. .: 4 -48 • MMNfMs IPlane 9522% 1061 2-'•Jun•1JA 1.Jug-25 ' It heists Management Plens I'.', 093 20Jun-I9A_16-810,-2" Vroleel S4:ne•luferN TV.31c 11 Droll-Project SeneduW A2104G SCH Prepare'S.,onln Pr eim„any Draft Ptoletl Sr,(•dare 100. 20 20-Jura 19A 18_Jul-t 9A A3 1050 SCH COMB Rewiews/Comma.rrs on Preliminary Droll•Project Inpremenlarkv Schedule 100. 15 19-Jul-19A 08-Aug-It FrI:J inA,A1 SA.'TA. A2 1060 SCH Prepare/Subs*Feral Draft-Protect Schedule 100% 26 09-Aug-19 17-Sep•1! ' A2,10703CH COMB Reviews/Approves On Frig Draft Protect Schedule 100% 22 16-Sep-19 18-Oct-I1-: ' 1 111ruv :'ralr-ct Sclttr'l:l,• . . Prepare/Submit 120%Fowl-Project Schedule 100% 4 31-0c1,19A 06'Nov-tl Sehrklue or vast:- inr.,.,.i.. - • Ore11-Sehrau„• 1, - u. I A2.1041 SOV Prepare/Subml Oran Schedule of Values(Financial) 100% 20 20-Jun19A 18-A4-19A 0.e Ilwh,m CM.4 N.D.. EMI Actual Worn Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 0131240D 2024-03-28 Sent won. ann.semu.e o win n (=I Remaining Work 2024-06-20 Added Missing 2yr TE I►nw II Ca.emaume.nawel^nwe...LI ISO Si,emoe tOO tee Project Start Date:19-Jun-19 rsew-a Roca.rlsoswenimr.aoaueln..V.l.e31,M11w., rwiJ ming Critical Remaining Work //�•►� Full Blown Schedule redasie Repowe Rm.Ne..or. joceekrgd PROanlawn oak. ♦ ♦M4es10ne T1?A S� ) E Project Finish Date:22-Dec-25 P.a<9 alll OMA.23 Rae.Raa,aecon,...r<.a M.2 eoa.Y)0 MU 08 �, ) JI�Lrw 2ana.23 wtwauw..uxosnu3OO wu *.Fled Seel.WO.U24.0w20121020u .WJ TCC•COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 013124002014-03-20 Sent 2024-06-20 Added Missing 2yr TE 20Jun-24 CASK Meer.Al Ae1Mities [Anewly ID AcWiy Varna Dur Y. At Complete Start Finish Total Float 2024 2025 `! Comp our 01 1 02 1 03 1 04 ' 01 1 02 I 03 I 04 A3.1050 SOV COMB Reviews/Comments on Dr#I Schedule of Values(Financial) 100% 15 02.Dec 19 20-Dec-1: -mat•Schedule of Values(Fin ancla'- A2.1060 SOV Preparo'Subme Foal Schedule of Values(Financial) 100% 7 23-Dec-19 03Jan-2C �210/03OV COMB Revlews'Canments on Final Schedule 01VaNes(Finanewl) 100% 8 06-Jan-20A 16Jan-2C Publish Schedule of Values(Financla' 42 10e0 004 P, .,s'.-',vrhm4 100%Final-Schedule of Valdes(Financial) 100% 3 17-Jan-20 A 23-Jan-2C =ws!Approves on Foal Scheduleol Values(Fnancla0 100% 6 24-Jom20A 31-Jan-2C Pio,—it P1,n .',olect Marlacemenl Ran Ina; Preliminary Draft•Project Floe ?netted Mang.. 42,:2..'.1P -co....A+-Mint Prelmnary Dealt P'gecl Plant Protect Management Plan(PMPI 100% 7120-Jun-IBA 01-0c1.IS A- _.""Vc COMB Reviews'Cornmenls on Prelnmry Oran Pl9ecl Pan:Project Management Pier IPh4P1 100% 21 02-0ct-19A 31-0e1-15 Final Droll-Protect Ran 1 Protect Management Plan(PMP- A21Ci,t'1101, Prepare/Submit Feral Oral Project Plan/Wotect Management Plan(PMPI 100% 2301-Nov-19 06-Dec.it 42 1.) 'I I(- COMB Reviews'Comments on Feral Deal-Propel Plan/Protect Management Plan(PMP; 100% 9 09-Dec•19 20-Dec-I) 100%Fins,•Project Ran'Project Management Plan(PMF A2 109(our PrrparaSrtmr 100n,Final-Prolacl Plan i Project Management Plan(PMP) 100% 0 23-Dec-19 23-Dee-il 14oaa1YAcc-rann ,x,r-uy Co,-rrnli..r.+C.;inn Preliminary Intl ,-....oily Assurance Flu Ably Control(OA OC)Pan A2 , ,A P-cpal,-'Subn,r P,ehn'.na'f Dal Quail!),ConlrotOuaMy Assurance(OC/0A)Plan 100% 71 20Jan•19A 01.Oc1-1r A?Inli VA CCCMR R,vle,rr2cf,0,1,,,,n crelmnary Draft-OuaBy Coneo20uaaly Assurance(OC(QA)Plan 100% 12 02-Oct-19A 18-Oct-IS Furor^nil•Quality Assoc:nca'-.u:J,fy Cnnlrnl('OA CCI Ilan ' - A21060CA Preparu'Subme Final Oral!•Duality Control/Ovally Assurance(OC/0A)Plan 100% 8 21•0c1-19A 31-0c1-1S A2 1070 OA COMB Rev,ews'Comments on Final Draft•Quality ControV)uadyAssurance(000A)Plan 100% 11 01-Nov-19 19-Nov-1! 10i• Finn(•0ual.Iy Aszur•ncer:uehl,Cenlr•Ili2Al.CIRan .. .� A2 1/.C,A Pepere'SUbm,100,-,not OueJly ControlCwley Assuance(OC/OAI Ran 1009'. A2.10^,.OA COMB Reviews/Approves 100%:Fnal-Quality Controt'Oua14y Assurance(OC/OA)Plan 100% 1204-Dec-19 20•Dec•1! 0-alt•Safety Plan A21040 SP Prepare/54+bm%Draft Safety Ran 10014 71 20-Jun-19A 01.0d.14. A21060.SP COMB Rswlews/Comments on Malt Safely Plan 100% 12 02-00F19A 18-0CI-15 F Ina/-Safety Ran A21060.SP Prepare/Suomi:Feral Safety Plan 100% 8 21•OcI-IBA 31-OC1 II A2 1070 SP COMB Reviews'Comments on Foal Safely Plan 100% It 01.Nov-19 19-Nov-I', A2.1060.SP 1 Prepare/Submit Foal Safely Plan 100% 8 20-Nov-19 03-Dec-1'. A.1010 SP I COMB Reviews/Continents on Foal Safely Plan IDD% 12 04-Dec-19 20-Den-I! Fubhlh-S'1,ly R:,r, A2 1080 SP Prepare/Sulam 100%Foal•Solely Plan 1009: 0 20-Dec 19 20-Den-1! ' nt cuy Plan A2'1040 SP1C Prepare/5ubm%Draft Data Security Plan 100% 167 29-May-20 02-Feb-21 A2 1050 SP1S COMB Reviews/Comments on Draft Data Sewmy Plan 100% 40 03-Feb-21 31-Mae-21 Fin,- '.to lccunly Plan A2 1060 SP1C PreparolSub.01 Foal Dale Security Plan 100% 5 01-Apr-21 A 08-A r-21 A2 107C SP1C COMB Pewews)Commenls on Feral Data Serially Plan 100% 10 09-Apr-21 A 23-Apr-21 Prepare/Subne Final Data Seculy Plan 1009'. 4 26-Jpr•21 A 30-Apr-21 iR: SP COMB ReviewslComrnants an Final Data Security Plan 100% 8 03-May-21 13-May2 Paella!)-Dale Snowily Plan ' A2'JA 2l'1- Prepare/Setwel 100%Final-Data Security Plan 100% 8 03-May-21 13-Mey-2. , act S:54cros Fngm n ng Ma „ 11:':-Er.,,:,,,. ' Dial1-P'otecl Systems F.lglneerue,taanaoernenl I SBI. t Plan -1 - Ora NMelm 0ee,4e Ppm, MIIMM Actual Worn Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent 'souls hseres1 en.eel.o1nnax yea U Rernarting Work 2024-06-20 Added Missing 2yr TE lebern M'ed4M Ce, eenae+rP a,e Ome WS.sR-ensedtloo 18E Project Start Date:19-Jun-19 OM..Et wam.maewa.nen.u.a ee ineeu unpeaMeo.o NUJ II Craeai Remening Work �^ Full Blown Schedule moon waaU.a Rw,w awe.Uedee NFec,mapl+lpxm00 NUJ � /1 • ♦Milestone R it. CI.-]DC eject Finish Date:22-Dec-25 rage 10af"IAa0..a srJ.a.1y0 0gal0e l4eareto1avaen'ee MEW 40502f0o lW I`L o+n uAarMullom$+ lu7o MCI tl �Summary nMaea W.*UPem UNOS+,MrJOb NUJ ale2. emeaeumeeuN.cWJ 013,2100 NUJ TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 0/312400 2024-03-26 Sent 2024.06.20 Added Missing 2yr TE 20-Jun-24 TASK M1ar.AN Activates Acaysy ID Actnsy Namo Dur 95 At Complete Stan Finish Total Float 2024 2029 Comp Our 01 I 02 I 03 I 04 01 I 02 I 03 I 04 t A2 1050.PS£MP Prepare/SultanaPreliminary Draft Pno ecl Syslenrs Engineering Managemmr(PSEMP)Plan 100% 12 l6.Ocl-19A 01-Nov-I' A2 1O0.PSEMP COMB Renews/Comments on Prelmnary Draft-Picked*Systems Engineering Management 1PSEMP(Plan 100% 31 04-Nov-19 20-Den-/! Final rrolec1 Syelems Englneenng Management t i SEW)El - F21060.PSEMP Pin/a•c/Suborn Foal Oral!•Project Systems Engineering Management IPSEMP)Plan 100% 10 23-Dec-19 08-J an,2C A2 two PSEMi- COMB F eviewsiCommenls on Fn81 Oran Protect Systems Engineering Management(PSEMP)Plan 100% 31 09-Jan-20A 24-Feb-2( 1(,_• Fm n-rrol•<t Systems Eel.n-.-mg Man..-.1n:nt 1FSEl,I')Man Pv•tote ITEM' PrepereiSub it 10%Final-Protect Systems Engineering Management(PSEMP)Plan 100% 32 25•Feb-20 09-Apr20 ' Crisis Management Plan Drell Cnl44Mank3ement Plan • Prpare/Subms Draft Crisis Management Plan 100% 71 20-Jun-19A 01-Oct-1. COMB Reviews/Comments on Drag Crisis Management Plan 100% 21 02-001-19A 31-0ft-19 ' Final.anus MrM2ement Pen a... Prepare/Submit Final Crisis Management Plan 100% 20 01-Nov.19 03-Dee-I` A<`Oh CRVF COMB Reviews:Comments on Final Gnats Management Plan 100% 12 04-Dec-19 20-Dec-I! Fbbinh•Crisis Mani pitman Flee 42'.Oat,CAMP Proparl'S,ibm4 100%Final-Crisis Management Plan 100% 0 20-Dec-19 20-Dec-1! ,ero•.t 1 P,.. (Pratt S.'runly Pion t A2.111,11.SECP Prpare/Subm1 Draft Security Plan 100% 72 29-May-20 10-Sep•21 A2 1050 SEEP COMB Reviews/Commanre on Drell Security Plan 100% 35 11-Sep-20 30 Oct-2C ' Fin-I-S:cnritlllan A2 1060.SECP Prepare/Subnm Final Security Plan 100% 60 30 Oct-20A 02-Feb 21 A2 1010 SECP COMB Renews/Comments on Final Security Plan 100% 40 03-Feb-21 31-Mar21 l uuliln-S unty a tan A2.1080. ECP Prepare'Subrrm 100%Final Security Plan 100% 0 13-May-21 13-May-2 Plans e' I • A3 1050JGSS COMB Reviews/Canments on Draft Job Guide Schedule(Not Required) 100% 0 01-Mar-21 01•Mar-21 A3 1040 JGSS PrepareiSubnut Draft Job Guide Schedule(Not Requred) 100% 0 01-Mar-21 01 Mar-21 Final-Jib Gnlde Schedo • 431070 JOSS COMB Reviews/Comments on Final Job Guide Schedule(Not Mequred) 100% 0 01-Mar-21 01-Mar•21 A3 151,1 JOSS PreparelSubnal Final Job Guide Schedule(Not Reclined) 100% 0 01-Mar-21 01•Mar.21 ' Publish-Job Guide ScheAu4i .43'.,ai 'GS`.. Prepare/Svbme l00%Final-Job Guide Schedule(Not Regutred) 100% 0 01-Mar-21 01-Mar-21 01or'11w,inn,Bgliutien%recMlton.1 ,i..1 1,i Brett-51'rinw Mar Pollution Prc.vnli'n:':•.•s IS'i:F1: A2.1040 SW PPP 'repare/Submit Draft Stormwaler Pollution Prevention Plans(SWPPP)(Not Required,Included'n Design Package( 100% 0 01-Mar-21 01-Mar-21 A2 1 J5C SWIPE COMB Rev--sews/Conunrnis on Oral Slamwater Poeulron Prevention Plans(SWPPP)(Not Requited,Included in Design P; 100% 0 01-Mar-21 01-Mar-21 I Ina!-Stermweter P011ullnn Prevention Plan!SWPPr A2 I'n. SW 0PP Pr eparelSubrnn 1n31 Slotmwater Polulion Prevention Plans(SWPPP)(Nal Required,Included n Design Packagel 100% 0 01-Mar-21 01-Mar-21 A2 10041:In-i!, COMB ReviewslCommems an Final Slorenwawr Po1Won Prevention Plans(SWPPP)(Not Rego:red.Included n Design Pt 100% 0 01-Mar-21 01-Mar-21 Publish•t3tormwlMe Pollution Prevention Plan(SWPPP • A2 1080 SW Prr - ...,-ei2ubnri 100%Fi al-Slormwater Portion Prevention Flans(SWPPP(iNol Required.lirckded in Design Package) 100% 0 01-Mar-21 01-Mar-21 1.0 51.1n nsla/Melon Pion Frenn•nruy(-tall-Drilled Shaft lnvt.n•n•-• ,i .. A2 1040 IF 'i,pa•e5ubmn P-etminary Draft-Doled Shay,Instalaton Plan 100% 10 21.Ju121 A 04-Aug-21 A2.woo ip 1MH 9eviewslCcenmenls on Pre/mnary Draft °rillad Shall installation Plan 100% 42 05•Aug 21 05.Oct-21 ' Fin•l^r'II-OMed Shan InHtIlallOn Fh n - A2.1060'P 1,repare,Suhm1 Fnt)Draft•Drilled Shall Installation Plan 1130% 21 06.Oct-21 A 05-Nov-2 1 —- - on R.44r Cewas her a- - Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-20 Sent raonw ew.e so...eo,a 6srno0 VON I I Hemarmg Work 2024-06-20 Added Missing 2yr TE ru-Sw 11 ce,ei*domomme.a,amlwwseen-emonmlCIO eon Project Start Date: 19-Jun-19 ...Awn Prom.innetwnenelrwupea.wsanutr.emneeoco Neu Grata'Remaining Work T//�� Full Blown Schedule moms: Wposed Rms.,ememvuoserham1 el®arr 10MT1OO Neu • •Milestone Il /\ SCORE Project Finish Date:22-Dec-25 Pop:II Moe mwrya .,...ea.61.f6 •Uples...1 MEM ala�O° Nw lista 11 Summery 20Na73 S.W.Uprise um s S natio° NW 20 Jon At Svead 0 LIM.0 w 0w2o1)12400 6164 TCC•COMB Progress Schedule Update COMB DOOM RSSPS Schedule Update U24.0.W2 01312400 2024-03d6 Seel 2024-06•20 Added Missing 2pe TE 20-Jun-24 TASK alto AO Actitages fAegviy ID Andy Name Dor Ye At Complete Starr Finish Total Float 2024 2025 Carp Our _ 01 1 02 1 03 I 04 01 1 02 I 03 I 04 A21070.IP COMB ReviOws/Coer000rs On FnalDrah-Drsed Shah instMalion Plan 100% 38608-Nov-21 24•May.2. 100 _ •Drilled Shall Inslalla',on F',r A2.1080.IP Preparo/Subnit 100%Final-Driled Shalt Installation Plan 100% 1 25-May-23 25-May-2: - n...M+neJemenl Plan A2 1040.AMP Prepare/Subme Draft Risk Management Plan 100% 13 21-Aug-20 10-Sep-2t A2 1050.AMP COMB Reviews/Commonls on Draft Risk Management Plan 100% 35 11-Sep-20 30-Oct2i - Fins!.nisi,Mnne)emenl Pun i A2 260 RMP Prepare/Subma Foal Rah Management Plan 100% 68 30-0c1-20A 12-Feb-21 A2'172 RMP COMB Reviews/Comments on Feral Risk Management Plan 100% 35 15-Feb-21 06-Apr-21 • • •n Pahlrsh-rho*M'n,.)err.nnl Plan ,1x t A2:'8'RMP Prepare/Subme 100%Final.Risk Management Pan 100% ' 06,b+2'A 06-Apr-21 r ITS S.-'Srupee/Si m Draft•IT SSPS Rcpan Plan "0 . A2 ,-.,15P.P Prepare/Submit Draft lTS'SPS Repae Plan 100% 220 20-Feb-20 06-Jan•21 I. } A2 125,.I I;RP COMB Reviews/Comments on Draft ITSISPS Repair Plan 100% 58 07-Jan-21 A 31-Mar-21 • FIn,l.ITS 57S Repak Mon • A2 1265 ITSRP Prepare/Subm0 Final ITS'SPS Repay Plan 100% 55 01-Als-21 A 16-Jun•21 A2 I.:'II sill' COMB Reviews/Commems on Final ITSSPS Repay Plan 100% 4 21•.lion-21 A 25Jun-21 FMbliah•IFSSPS versa Plan Prepare/Subme 100%Final-ITS'SPS Repair Plan(Not Required) 100% 025 i.in 2,A 25 Jon 21 System Integration Plan Preliminary Draft•System Intryeaiion Plan 02- riIAN Prepare/Sian.,Preiinnary Draftt• ystem lnlegralbn Plan 100% 108 21-Aug-20 02-Feb•21 45 .TORN COMB Renews/Comments on Preliminary Draft System Integration Plan 100% 40 03-Feb-21 3l-Mar21 • Iola tra1l•':y.lem integration i'.^.• A2.1060 TRAN Prepare/Submit Feral Dram System Integration Ran 100% 5 01-Api-21 A 0B-Apr21 . A2.1172 TRAN COMB Reviews/Comments on Final Draft•System Integration Plan 100Y. 10 09-Apr-21 A 23-Apr-21 I.i1•.Final-System InSsig ton Han • A2 1 282 Ti'AN Prnnaie/Sabr14 100..Foul•System Inlagalr0n Plan 100% 15 23-Apr-21 A 13•Mey2' Transition Plan 11111, Prellminaey'1r n11-Trsinsill,rn Flan 949' A2 111r.TPP Prepare/Subma Preirwnary Orall Trans Son Pkn 0% 20 15-May-24 12Jun-24 •11 O ATI:.SO TRP COMB RewewsiCommenrs on Praknnary Draft Trans lion Pkn 0% 15 13-Jon.24 03-Jel-24 11 0 F,r1..l:2:lilt-Tr'n sawn Finn 11P A2'260 TRP Prepare/SubrN Final Draft-Trar Sewn Ran 014 10 05-Jul-24 18-JW-24 -11 ' ❑ A2.'CO TRP COMB Raviows/Continents On Feral Droll-Tralvlwr Plan 0N. 15 19-J1a-24 Oft-Aug-24 -11 0 1r..-.i in,-lransil.,,n Plan V .12'SOT:TP1' PreperefSubrne 100%Final-Trartilon Plan 09. 209-Aug-24 12-Aug-24 -11 0 rallinq P:an • Prelrmrr,ary 2.1'11-St rflin)Pi;.: A2'040 SIP Prepare/Subntl Preliminary Drall.Slatting Plan 100% 82 10-May-21 0-Aug-21 A2:050 STP COMB ReviowsiCommenls on Preliminary Draft-Slatting Plan 100% 178 06•Aug-21 22-Apr-22 Far I -r ill•Sl,flrn:Elan . . . A2'260 STP Mepere/Sebrn4 Final Oren•Slatting Plan 100% 58 25-Am-22 A 15-Jui•22 A A2.1070 STP COMB Reviews/Comments on Feral Draft-Staling Man(WAIVE)NOT 0EO FOR DEPLOYMENT) 1 00% 252 1BJsl-22 A 19J4b23 A 144-•.linnl-Sl.,tiin^Flan A2 r 080 STP Prepare/Submit 100%.Final Slatting Plan(WAIVED NOT REO FOR DEPLOYMENT) 100% 0 19.Ju623A 19 Ju123A • A2.1040.DIP Prrpare/Submll Prekrlinary Draft'Dec0Giade Acceptance System VenIcation Plan • 100% 34 04-Nov-20 28•Den-2l 0e1aa1 Work Dee -- - -some, ---- --- cworoe-We.i Data Date:31-Jan-24 COMBDBOMITSSPSSchedulellpdate(524.0.W20131240D3024-03-28Sent metals 9aMsow.swodu,n0 let. I I Remaneng Work 2024-06-20 Added Missing 2yr TE ,arse, eeaae ware.b[wae.Nemroua 0 isasaam a=moo eV Project Start Date: 19-Jun-19 cosrawa n®inn..n.ao ar lv,e...n..rulro I ire.. CM,l IIIMBM Critical Remaining Work lull Blown Schedule coma PswrRow.e ewe uww aa.,RIM I IMMO Mil • ♦Maesione TR i4 S�RE Project Finish Date:22-Dec-25 N.x.'.1.r,/r asM.y.a eramrif..a.eane..,r:oeee.n erreatmanoe W. MU t�0 Summary 1 \ ��_// nMo.n senade Uwe LIN 05 MMO NM. to are-N Scarce were aN a W731312.00 NMa TCC•COMB Progress Schedule Update C011s 0=OM ITSSPS Schedule Update U24.0.W2 01312400 2024-0346 Sent 2024-06-20 Added Missing 2yr TE 20Jun-24 TASK liter All Activities r Act' y Name Our% Al Compete Slag rash Total Foal 2024 2025 1 _.— __ Corp Ow 01 f O� 03 I 04 01 I 02 I 03 I 04 3 A2 i 050 ORP COMB Reviews/Comments on Prehninary Dyad-DocOGud ,dma eACceptancc System Ve ,cn Plan 100% 61 29•Dec-20 31-Mar-21 � , ,:cOGuide Acceplani.e System i. ion F A231060.DRP Prepare/Suolne Final Dran-0ec0Gude Acceptance System Vesication Plan 100% 0 31-Mar-21 31-Mar-21 A21970 DRP COMB Reviews/Comments on Final Draft•Dee0Guide Acceptance System Vercicalon Plan 100% 0 31 Mar21 31-Mar-21 Final•000004i4e Acceptance System Venl,cation Pl' AZ 1080 COP reurrnnS„orne 100`4 Plnal-DecOGvide Acceptance System Verification Pan 100% 0 31-Mar-21 31-Mar-21 •'orations and Maintenance Plan Preliminary Draft•Operations and MAntenenca Plan - - 0217a/:MP Prcoa,e'SuornnP-'iminary Drell-Operations and Maintenance Plan 0% 20 15-May-24 12Jun-24 10 p A2 1350 MP COMB Reviews/Comments on Prelmnary Draft-Operators and Mantenance Plan 0% 15 13-Jun-24 03-Jeer-24 I p I mat Drell-Operations and Maintenance P'4 14 ^► A2.1060.MP Prepare/Sabina Final Draft-Operations and Maintenance Plan 0% I0 05-Jul-24 12.u..4 IC p A213,0 MP COMB Reviews/Comments On Fatal Draft Operations and Maintenance Plan 0% 15 19-Ju1-24 OP-Aog 71 IO O li:._Fin-I-Ci,cr.t..-ns.,e•-'M Mi...tic,•Pin -A.,,:'4 AZ 1080.64P PreperefSubrne 1003'.Final Op8rh18,4-s and Maintenance Plan 0% I 09•Aag-24 09-Aug•24 10 I '4ting Guidelines(5'G'. tl V ...,tip%Standard OFerati.,,: tit awarrwh► A2.1040.'%P Peepare5ubml Presuunay Drell Siacdard Operating Procedures(SOPCSIandard Operating Guidelines(SOD) 0% 20 15•May-24 12-Jun-24 10 O A2.1050.SOP COMB Reviews/Comments on Prelmnary Drain-Standard Operating Procedures!SOP)/Standard Operating Gudeines(1 0% 15 13-Jun-24 03-JM-24 ID O I final Drill Standard Operating Pro,edurea lSOP)•Standard Operating Guidelines t SOG V . A2 1360 SOP Prepare'Subrle Frill Draft Standard Operanne Procedures(SOPI/Slandard Operating Guidelines(SOG) 0% 10 OSJul 24 16 Jre 2.1 10 0 A2 11370 SOP COMB Reviews/Comments On Foa)Oran Standard Cperaing Procedures ISOPI/Standard Operating Gudelnen(SOD) 0% 15 19-Jul 2•I O8-Aug:, 10 O •ce•.F,nai-Standard Operating Procedures(SOP)•Srandard Operating Guidelines(SOC 73 I:a , • A2,080 SOP re00,e'Soumi1100%Fro(-Standard Operatalg Procedures(SOP)/staMard Operaig Guldehnes(SOG) 0% 109 A-q 44 09-Aug:': 10 I ..' • ;r.'. 403.21•12K720 20-Jan-- ' r(. u1 :orn,nuv. L1'u-,ifs Man-a A2.1040 UM.AT MS.SW Prnoar•'Sonma Preliminary Draft•User Manual.TMC SW 100% 31 23-Jun-21 A 05-Au9-21 A2.1050.UM.ATMS.SW COMB Revlews/Comnenls on Prelmnary Nall-User Manual TMC SW 100% 118 06-Aug-21 213-Jan-22 A2.1060.UM.ATMS.SW Prepare/Submit Fnal Draft•User Manual•TMC SW(not regured) 100% 028Jan-22A 28•Jan-22 1 A2.1070.UM ATMS.SW COMB Reviews/Comments on FnB Draft•User Manual•TMC SW(riot required) 100% 0 28-Jan-22A 28-Jan-22 A2.1080 UM AIMS.SW Prepa.erSobrne 100%Final User Manual TMC SW(not required) 100% 0 28-Jan-22A 28-Jan-22 lc•cl.C....i S0118r.:rr Adm,nrtrator Ma • 42.1040.UMAOM.SW Prepare/Submit Preliminary Draft•DecOGude Software Adrnioisealor Manual 100% 156 21-Dec-20 05-Aug-21 A2.1050.UM.AOM.SW COMB Reviews/Comments on Prelirrm.ary Draft Dne0GurOe Software Adnlnislrato.Manual 100% 116 06•Aug-21 29-Jan-22 • A2.1060.UM.ADM.SW Prepare/Submit Fnal Draft Dec3Gude Software Administrator Manual(not requred) '00% 0 20-Jam22A 28-Jan-22 ' A2.1070.UM.ADM.SW COMB Reviews/Comrnems on Final Orals•DecOGuide Software Administrator Manual(not required) IDO% 0 28-Jan-22A 28-Jan-22 • A2 i 080 UM ADM SW Preparelubrne 100%Feel•DecOGude Software Admnsealor Manual(no'.required) 100% 0 28-Jan-22A 26-Jan-22 I.'mrn.n..rl,or Man„nl Prel,rmnary;.Intl ..•,mrustr-t,,,n M•n_.,I A2 lO1O:-µADM Prern,n/Sutrrat Prefrninary Orals-Administration Manual 100% 8 26.1.,1-21A 05-Aug-21 n2.1,/'I,M ACM 00MB Reviews:Comments on Prelmnary Oralt•Adminnea•on Manua- 100% 118 06•Aug-21 28-Jan-22 • - izinai Drell-Administration Manua' .. - A2'0781.'MADM COMB RevlewcrCorrrmems On Final Draft-Adnrestratidn Manual(rot required) 100% 0 28-Jan-22A 28-Jan-22 A2.1060.UM.ADM Preparc'Suoma Foal Orall Admo;sual;on Manual(not required) 100% 0 28-Jan•22A 28-Jan-22 0ue nNea tackle anew. MIMI Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-28 Sent iron,a e.•o.Soso.Nooasrnr0u ON l I Remaining Work 2024-06-20 Added Missing 2yr TE n0a.al car.aI uawnodrnre.e..u,S0.5,1o404114a000 era Project Start Date: 19-Jun-19 a tier-an Preens.Aomoria dln•Ugia.a..d UnTAIMMINA NMI (♦ C'ncal Remaining Work Full Blown Schedule sin-a n,e,e Armed awe.l wprrss.eeneepr ANON* NMI ♦ •Mieslone Tf v RE Project Finish Date:22-Dec-25 Page to 0076 psM.a n.eme1 nomad er AnrAloe�e elewremamoo atera 5[ba. geouxiasimlDdp NMI NM �►Summary ♦ *No.13 %novaupMriSi OS uaxipD NMI MMJinia knw.Un0dr U MO wamNarOD NUJ TCC-COMB Progress Schedule Update COMB 0130M ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-06-20 Added Aliening 2yr TE I 20-Jun-24 TASK Peer-Al 0018Vieet Panay 10 nicely Name Dur Y. At Compels Slarl Finish Total Fleet 2024 2025 j Carom Don 01 02 03 04 01 02 03 04 1.e Fines-Administration Manual ',Jar - - • i A2.1080 AM ADRI PreparerSubrni 100%Feral-Adnlasrraaon Manual(not required) 100% 026-Jan-22A 28-Jan- ' F,, y I-..It Uswr M.nual A2.1040.UM.SYS Prepare/Subnd Prelminary Draft-User Manual 100% 8 26-Juo21 A 05-Au0-21 A2.1050.11M.SYS COMB Renews1Comenents on Prelmnary Draft-User Manual 100% Ill 06-Aug-21 28-Jan-22 Fin. ;-U+..r rat:mug A2.1070.UM S02 COMB Reviews/Comments On Final Draft-User Manual(nor requred) 100% 0 28-Jun•22A 28-Jan-22 A2.1060.UM SYS Prapar0/Sotma Final Drat,-User Manual(not required) 100% 0 28-Jan-22A 28-Jan-22 10' :r Manua • ., . A21080.UN.SVS Prepare•Submn 100%Foal•User Manual(not required) 100% 0 28-Jan-22A 28-Jan-22 6kngrenance Manual 15u^mote^as•0uer•b-ns PA,me P4anual1 Prebmmary Drill-Marnl,.nAnn•PA,n.,I '' A2 1040 UM MAIN Prepare/Submil Prelminary Droll•Maintenance Manual 100% 8 26•Jul-21 A 05-Aug-21 A2 1050 AM MAIN COMB Rewews/Comments on Prelrrsnary Draft•Maintenance Manual 100% 118 06 Auq-21 28 Jan•22 -lnal Draft-Maintenance Manu:• A2 t 070 UM MAIN COMB Reviews/Comments Op Final Draft•Maintenance Manual Inca required) 100 J 28 Jan 22A 2P-Jan 22 A2 1060 UM MAIN P•epare•Sub1M Final Drag•Maintenance Manual Inol required) 100% 0 28•Jar•22 A 27'an„ 100',Fine-Maintenance Manua ., . A2 1080 UM MAIN Pi epareiSubna 100%Final-Maertenance Manual Mot requeedl 100% 0 26Jan-22A 26-Jan-22 TI:•1. •,,.- rr,Ill n.. M IAA•I.__'.-I�r. A41030�5W 172 Obtain Tray Pany Sollware Ux umentation 100% 22 23•Ape-21A 25-May-2- PrnbminaryGrn•TAGdP wry D:curs:mete n fA,nu.-I,•Scots•i, A2 104C AM.SW Prepare'Subnr Preiranary Draft•Third Party Documentation Manuals , ware 100% 50 26-May-21 05-A1g-21 A2.1050.UM.SW COMB Revlews7Comments on Prelminary Draft-Thad Party Documentation Manuals-Software 1009. 118 06•Aug-21 28-Jan-22 Fin,:l•I.. -Tr,u41,,rlj,.c.1 i of t..rl Mvru..I-•C ,,,.,Il, A2 1070 UM SW COMB Reviews:Comments On Foal Oran Thuo Party Documenlanon Manual Software(not requred) 100% 0 28-Jan-22A 28-Jan-22 A2 1060 UM SW Prepare.Sur.nrn Final Droll•Thad Pany 00Cumenlalan Manuals-Sollware(n0,required) 100Yo 0 28-Jan-22A 28.Jan•22 1',--F,n,i,Thud:•hny D:'oum:nl..t..n Manu,I,.Scliw,c ..•• r., A2.1080 UM SW P-epare/Sub.nr.'00%Foal-Third Party Documentation Manuals-Software(nol required) 100% 0 28-Jar-22 A 28 J an,22 III.:I:-.1n;. r,, .,;t•I..n FI Ira al; ll„r.::,. .. A4 103C HW.TTS Obtain Toad Pany Hardware Documentation 100% 225 09-Mar-21 2?Jan-22 .0Nrlil. ,1•r ill-in.n...I my I. c lol,I,.n PA nno1,-Hnr„w 1. .. , . A?1050 UM HW COMB Reviews/Comments on Prekmary Ora Third Party Documentation Manuals Hardware(not required) 100% 0 28 Jan 22A 26 Jan 22 A2 1040 UM HW Prepare•Sutrnr Preliminary Draft-Thed Parry Docurnenatlan Manuals•Hardware IMF required) 100% 0 26-Jan-22A 26-Jan-22 Frn, L.r I:.Tnu.t i•nly r, cu •n. r.11 n �r:u n M .1,•HA , A2 1070 UM.HW COMB Reviews/Comments On Feral Draft Thad Pany Documenlelbn Manuals•Hardware(not required) 100% 0 28 Jan-22A 28-Jen.22 A2 1060 UM OW PrepareiSubma Final Oral!.Third Party Documentation Manua3-Hardware(not l equved) 100% 0 28-Jan-22A 26-Jan-22 100' Final•Fnlyd Party Documentation Manuals•Marc,,"- .. A2 1090 UM OW P,.,uare Srtvnr.'70" r,na! Third Party Docureentalbn Manuals-Hardware(not required) 100% 0 28 Jar.-22A 28•Jan•22 Testing Doeww1Mellon Requirements Traceabmly Verification Maths(RTVM) -Mall He:(u11crn,-nls Tr,c._,brlily V:n_c nfl, n M qr.,il,TV1A1 ._, .. PrepareSut9nn Oran Requrentenrs Tr meabay Verakalbn Mann)RTVM) 100% 69 13-May-20 20-Aug•21 -. COMB RevtewsrCoeWcets on Draft Requeements Traeablly Venticalan MatrleiRTVM) 100% 45 21 Aug-20 27,Oc12C Fri.,,-(le Inca-A,AM TA.Caaha:l y':..rl•.^.,I,•n fJ.rr..,:i:l,•, a A2106C-RTVM Prepare.Sup e Final Requeenroms Tr acebOtyVerdcaeon Malre(ATOM) 100% 62 28•Oct•20A 02-Feb-21 A2 1070 RTVM COMB Review,.Com,nenls on Final Requirements Tr aceaeity Verrlicalion Mains(RTVM) 100% 107 03-Feb•21 07•Jul.21 A A210800.RTVM P•epare'Subnr•90%Foal.Requremenls Tr a:wtilty Ver4eauon Maim IRTVM).,Not Requredl 100% 0 07-Jul-21 A 07Jut2'A Mae141 OUT' 9-00-20A 19-0e1-2C Wont AMt., Owe. pro.. MIME Actual W Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W 2 0131240U 2024-03-26 Sent *0n n aw•,svea..e01 ass1511o0 ,Far, • l I Remanng Work 2024-06.20 Added Missing 2yr TE lsale.n eane,w4aee,Rawe,Raman U1sa Sa6wo os4n00 sir Project Start Date:19-Jun-19 Owns na00ennnmeoomilaenelire.nu17.0SWAIM0 NUJ Cracal Remaining Work �+ Full Blown Schedule aaa .o .. w.:0- P,%o,ol Rm.: lneec4R19Y,I I0ta1AD0 naM • •Mieslone I R S/ �1( E Project Finish Date:22-Dec-25 P.F,14 of76 sin er r0wuaoreadneueuncraenWBw, renp arrJ <.�l.J„C„ m+,rn snr.a..ucw.unos,m,mn .04 Summary 30ea,n Schad.Was UN O s nae2100 tO,awM SCAM.UeeelaUM 0 w21r13.00 AMJ TCC COMB Progress Schedule Update COMB DOOM rtggPS gaMdWa Update U24.O.W2 012124O0 2024-03-28 Sent 2021-0620 Added N,.ehtq lye TE F 20-Jun-24 TASK Etter Al Activities • 0s8y ID I Acitwly Name Our% At Complete Sled Finish Taal Moat2024 2025 Comp Dur 01 02 03 I Da 01 1 02 1 03 I 04 r Caned Tvst Pm,-arnnninaey D-a'r 'Taster Test Ptar.(MTT 19 no 204 A?1050 TPMTF COMB Reviiews,Commems on Preliminary Draft-Master Test Plan(MTP)(not required) 100% 0 19 Oct-20A 19-Oct-2C A2.1040 TPMTP Prepare-Submt Prntmnary Drag Master Test Pan(NIP)(not required) 100% 0 19 Uc1•20A 19-Oct-2C si Plan.F1nal Deell-Ma-.tet'e,1 Pr le Oil; A2.1070.MTP COMB ReviowsM,anments On Final Draft-Mader Test Plan(MTP)(rat requited) 100% 0 19.Oct-20A 19-Oct-21 A2.1060 TPMTP Prepare/Subma Final Oran•Master Test Plan(MOP)(not required) 100% 0 19-Oc1.20A 19.Oc62C Seta.,d Iasi Plan 100%Final•1A.... t - rfl 1.1 .t?1090'PMTP PreparelSobme 100i.,Final-Master Test Plan(MTP)(not requeed) 100% 019-Oct-20A 19•Oc1-2C Detailed Test Procedures 97 89% 1458 19.Oe420 A 15-Oct-24 57 / Tes.tnq'beumental,on.TMC Sotw r. ^. .1 ....nlrrnce Test SW Det,nn ra0o1�P.,r..e. �..es • A2.104QTP.FT Prepare/Subme Prelmnary Drag•Test Procedures and Test Cases-Factory Acceptance Test SW Demonstration(not rev 100% 0 19-Oc1-20 A 19•Oct-2C A2.1050.TP.FT COMB Reviews/Comments on Prelmnary Draft Test Procedures and Test Cases Factory Acceptance Test SW(rot rev 100% 0 19-Oct•20 A 19.Oct-2C • • A2.1000.TP.FT Prepare/Submit Final Draft-Test Procedures andTest Cases-Factory Acceptance Test SW Demonstration(not te0'd) 100% 0 19•Oct-20A 19-Oct-2C • A2.1070.TPFT COMB Reviews/Comments on Final Draft-Test Procedures and Test Cases•Factory Acceptance Test SW Inot eeq'd) 100% 0 19-Ocu20A 19-Oc1-2C A2.1080 TT'l' Prepate/Sutxne 100%Final-Test Procedures and Test Cases-Factory Acceptance Test SW Darnonsuabon(not teq'd) 100:', 0 19-Oct-20 A 19-Oct-2C ' Cernmissbning Test Procedures ant Test Cases .. A2 104C 1 P OCT Prepare Sobrne Prelminary Draft-Test Procedures and Test Cases-Commissioning Test Not Required) 100. 0 20-Nov20 20-Nov21 A2.1050.TP,OICT COMB Reviews/Comments on enelmaary Dealt-Test Procedures and Test Cases Commissioning Test(NR) I00% 0 20-Nov-20 20-Nov 21 A2.1080 TPOICT Ptapare'Subme Final Draft•Test Procedures and Test Cases-Commissioning Test(Not Required) 100% 0 20-Nov-20 20-Nov2( ' A2.1070.TP.OICT COMB Reviews/Comments on Fetal Draft-Test Procedures and Test Cases Commissioning Test(Not Reduced) 100n. 0 20•Nov-20 20-Nov-21 42'OTT TPOICT Prepere/SIdnM 100%Fetal-Test Procedures and Test Cases-Commhslonag Test(Not Required) 100% 0 20-Nov-20 20-Nov-21 Stan"Oboe Test(SAT)Prose 1u Stand Atone Test(SAT)Proceat - . ' A2 1040 TP SAT.AOMS Prepare/Subre Preiminary Draft-Test Procedures-Standalone Test(SAT)-ADMSDMS 100% 8 14-Dec-20 28.0cc-Of A2.4050.TP.SAT.AOMS COMB Reviews/Comments on Preiminary Oran-Test Procedures Standalone Test(SAT) ADMSDMS 100% 20 29-Dec-20 02-Feb-21 • A2.1080.TP.SAT.AOMS Prepare/Subnn Final Draft-Test Procedures Stand Anne Test(SAT)-ADMSDMS 100% 22 03•Feb-21 08-Mat-2t A2.1070 TPSAT ARMS COMB Revtews'Cemments On Final Draft-Test Procedures Stand Atone Test(SAT)-ADMSDMS 100% 17 09-Mar-21 01•Apr-21 A2.1080.TP.SAT.ADMS PrepatotSubma 100%Final-Test Procedures,Stara Alone Test(SAT)-ADMSDMS 100% 0 01-Apr•21 A 01-Apr-21 A21040.TP. T Prepare/Strbrna Preemetary Draft-Test Procedures,Stand Alone Test(SAT)-TTS 100Y. 9 21•Doc-20 06-Jam21 A2.)050 TP.SAT COMB RevrewstComments on Preem+nary Droll-Test Prosedures-Standalone Test(SAT)•TTS 100% 17 07-.Jan-21 A 02-Feb.21 A21080.TP.SAT Prepare/Submit Foal Draft-Test Procedures Stand Alone Test(SAT),TTS 100% 20 03-Feb-21 04-Mar•21 A2 1070TPSAT COMB RevtewslComments On Fine Draft-Test Procedures•Standalone Test(SAT)-ITS )00% 29 05-Mar-21 16 Apr 21 AD.1080TP.SAT Prepare/Sutere 100%Fetal-Test Procedures•Stand Alone Test(SAT).TTS t00. I 16-Apr-21 A 16-Apn2t 01 anti;al 1 :'.l.I CCTV ' A2 t 040 TP.SAT.CCTV PreparotSubnt Prelmnary Draft-Test Procedures-Stand - est( -CCTV 100% 8 14-Dec-20 28.Oee.21 A21050TPSAT.CCTv COMB Reviews/Comments on Prelminary Drell,Test Procedures-Stand Alone Tesl(SAT)-CCTV too`-. 2029-De-20 02.Feb•2, lee 9raete f Cltwue Ara. Sl♦ Actual Work Data Date:31-Jan-24 COMB DSOM 1TSS PS Schedule Update U24.0.W2013124DD 2024-03-2N Sent tepn.la sea"•swam,not oatnsoD lien t_7 Remaining Work 2024-D6-20 Added Missing 2yr TE Vne.21 caeam upon.AaPea,a•teen•wSAW,Mill o easy 00 WE Project Start Date:19-Jun-19 o...-n Pr apse!n ens.eneknP/Muvto.nun.osvrnt 04.0 nw SSSSS Greaal Remaining Work Full Blown Schedule rose Pr..nene]0airweaae.te.si PROP t 0000000 lea ♦ •Milestone T /7�( _/R S R Project Finish Date:22-Dec-25 Paeelin(76 esw;a wtateen..seeea,e.reumaeIvpsoPnaor2ommd0 NW 1��1 Summary • m+e.a sen.aaa uasrouaos+mraoo NW ao-nenT1 ar11d•up Pee UM as'PIM1 •rY2 ranat screen WPM Ue.e PIS PP 2eoe nsa TCC-COMB Progress Schedule Update COMB ODOM 1T'SSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sent 2024-01-70 Added Missing Tyr TE 20-Jun.24 TASK liner All Activities AeidyD Activity Name Dur% At Complete Start Finish Taal Float 2024 2025 a Comp Our 01 I 02 I 03 1 04 01 I 02 I 03 ' 04 A2.1060.TPSAT.CCTV Prepare/Subnel Fetal Draft-Test Procedures-Stand Alone Teal(SAT)-CCTV 100% 20 03-Feb-21 04-Mar-21 A2.1070.TP.SAT.CCTV COMB Reviews/Comments On Final Draft-Test Procedures-SlandAone Test(SAT)-CCTV 100% 29 05.Mar-21 16-Apr.21 A2.1080.TP.SATCCTV Prepare/Submit 100%Final•Test Proceduos•Stand Alone Test(SAT)•CCTV 100% 1 16-Apr-21 A 16-Apr-21 • A2.1040 TP.SAT.MFES Prepare/Submit Preliminary Ora1t.Test Procedures•Stand Alone Test(SAT)-MFES 100% 163 17-Feb.21 05.Oc1.21 • A2.t050.TP SAT MFES COMB RenewsrCommonls on Prelmnary Draft-Teal Procedures•Stand Alone Test(SAT)-MFES(Not Reduced) 100% 0 06-Oct-21 A 06-Oct-21 A2.1060 TP SAT.MFES Prepare/Submit Final Draft-Test Procedures-Stand Alone Test)SATI•MFES(Not Required) 1001. 0 06-Oct•21 A 06-Oct-21 A2.1070.TP-SAT.MFES COMB Renews/Approves-Test Procedures Stand Alone Test(SAT)•MFES 100% 140 06-Oc1-21 A 28-A0r-22 • 1' A2.10130 TPSAT.MFES Prepare.'Subma 100i.Final-Test Procedures-Stand Alone Test(SAT)-MFES(Not Rebored) 100% 0 28-Apr.22A 28-Apr 22 A2.1040.TP SAT MFESUPS Prepare/Submi Prelmnary Ora0-Test Procedures-Stand Alone Test(SAT;-MFESUPS 100% 13 17-Feb-21 08-Mar-21 A2.1050 TP.SAT.MFESUPS COMB Renews/Comments on Preliminary Draft•Test Procedures•Stand Alone Test(SAT) MFESUPS 100% 41 09-Mer-21 06•May-2 A2.1060 TP SAT MFESUPS Prepare/Submit Final Drat-Test Procedures-Sand Alone Test(SAT)-MFESAJPS 100% 20 07.May-21 07-Jun-21 • - A2.1070 7p.SAT MFESUPS COMB Revieses'Comments On Final Drab-Taut Procedures•Stand Alone Test(SAT)-MFESUPS 100% 13 08 Jun 21 A 25 Jurv21 A2'OBCTPSAT MFESUPS Prepare/Sabina 100%Final-Tits;Procedures Stand Alone TCYI(SAT)-MFESUPS 100% 025-Jun-21A 25-Jun-21 Scans Alan,Test(SAT)Procedures-UPS A2 040. P.SA7.UPS Prepsre'Submn Prelmnary Droll Test Procedures Stand Alone Test(SAT) UPS 100% 163 17-Feb21 05•Oct-21 A2.1050TP.SATUPS COMB Reviews/Comments on Prelmnnary Drell•Test Procedures-Stand Atone lest(SAT)-UPS(Not Regseed) 100% 0 06 Oct-21 A 06-Oct-21 A2.1060.TP.SAT.UPS Prepare./Submit Fetal Drell-Test Procedures Stand Alone Test(SAT)-UPS(Nit Scoured) 1001. 0 06-Oct-21 A 06.Oco 21 A2.1070.TPSAT.UPS COMB Reurewstappeoves Falai Dran•Test Procedures•Stand Alone Test(SAT)-UPS 100% 149 06•Oct.21 A 26•Apr-22 A21080 TPSAT UPS Prepare/Submit 100%Final-Test Procedures.Sand Alone Test(SAT)-UPS(Not Required) 100% 0 28-Apr-22 A 28-Apr-22 •.nit Alone Test(SAT)Procedures.MV'.•S A2.1040 TP SAT MVOS Pre pat e'S;tbnrb Preimllary Drab Test Proc edures Stand Alone Test(SAT) MVOS 100% 9 21-Dec-20 06-Jan.21 A2.1050 TPSAT MUDS COMB RevrewstComments on Preailnary DM-Teal Procedures•Stand Alone Test(SAT) MVOS 100% 17 07-Jan•21 A 02-Feb-21 A2.1060.TPSAT.MOOS PreparetSubnn Fetal Drell•Test Procedures Stand Alone Test(SAT)-MVOS 1001: 20 03-Feb21 04-Mar-21 A2.1070.TPSAT-MVOS COMB Reviews/Comments On Fetal Draft-Test Procedures-Stand Atone Test(SAT)-MVOS 1001: 29 05-Mar-21 16-Apr 21 A2 1080 TP SAT MODS Prepare'SJbmil 100%Final•Test Procedures-Stand None Test(SAT)-MVDS 100% 1 16-Ap•21 A 16-Apr-21 ...nd Alone Test(SAT)PeoceaOures-SP5 A2.1040.TP.SAT.SPS Prepare/Submit Prelmnary Drab•Test Procedures•Stand Alone Test(SAT)-SPS 100% 23 02-Feb-21 04-Mar-21 A2.1050.TP SAT.SPS COMB Reviews/Comments on Prelmnary Drell Test Procedures-Stand Alone Tell(SAT)-SPS 100% 41 09-Mar-21 08-May-2 A2 1060 TP SAT.SPS Prepare/Submit Final Dran-Test Procedures Sand Alone Test(SAT) SPS 100% 20 07-May-21 07-Jun.21 A2.1070 TP m SAT.SPS COMB Reviews/Co mens On Peal Oran Test Procedures Stand Alone Test(SAT) SPS 100v. 13 58-Jun 21 A 25-Jun 21 A2.10110.TP SAT.SPS Prepare/Sabina'00%Foal•Test Procedures Stand Atone Test(SAT)-SPS(Not Secured) 1001. 0 29-Jun-21 A 25-Jun-21 are.m7 • --___ __---._ ere N net 0,40.. Mpg. Actual Work Data Date:31-Jan-24 COMB DBO.M FUSSES Schedule Update U24.0.W2013124DD 2024-03-2S Sent ltoona auri.aatc0J.e010 PI1nO0 tar Remaining Work 2024-06-20 Added Missing 2yr TE 1aNw-21 Crnsnoburns.R.wwyo*w .asoae•12130eo2,00 nu Project Start Date: 19-Jun-19 05rl.y22 wineRwe.neu0 10atieImmea1r000040.o nNJ 11.1 Critical Remaining Week Full Blown Schedule 2a0n 22 Ros*Retuaeueiwum.runurser .t 1ma on Sara ♦ •Milestone T/� /�. C�/�E Project Finish Date:22-Dec-25 P.se 16 or7s e>.hero n.rm.mne,.lbsud sA100..care w 0e,za ra00 NUJ 115ummar 1 „/' �J " O)Nw-a 9cttaeru uri4ununa51m1a0o NUJ Y 30 Npa Sd1.A.91/4Ue Ute 0511292300 NMJ 2CAn2. Seo....el ul0Utr OW201311400 MCI -T- TCC COMB Progress Schedule Update I COMB DOOM ITSSPS Schedule Update U24.12W2 013124/20 2024 346 Sent 2024-0620 Added Missing 2yr TE 20-Jun-24 TASK tiler'Al Activities ActivityID Activly Name Our Ye At Complete Start Finish Total Fba1 and 2025 , Camp Cur or I 02 I 03 I 04 01 I 02 I 03 I 04 ' 1 eA?t 040 TP SUP Prepare/Submit Pr elmntary Draft-Test Procedures-Subsystem Test 0% IT 01 filly 24 . ,nay 14 117 111 A2 105C.TP.SUB COMB Reviews'Cornmeres on Prolrenary Draft•Test Procedures-Subsystem Test 0% r 14 Sty, t 14 'o, 24 112 IMII In tau+'1 T,-..1"1 sec.lures•Fin strrnl; stun,T. t , A2.1060.TP.SUB Prepare/Subme Final Draft Test Procedures-Subsystem Test 0Y. 5 17.Jun 24 21-Jun-24 -112 0 A2 1070 TPSUB COMB Reviews/Comments On Final Oran-Test Procedures Subsystem Test 0% 21 24-Jun-24 23-Jul-24 •112 net-,la it sit h-endures.Ir.-.Fin.l.Su,sy9e:n Tr n • A21080 TP.S'US ✓repare.5ubmn 100%Final-Test Procedures Subsystem Test 0% 1 24-Jul-24 24-Jed-24 -112 1 :pe,allOnal Test 2roterlures vr D.tslbn Test Prcafuma-Pr,Umnery Draft-OFerrtlnnal Test Ft,n rT i s A21040 TPOPS Prepare`Submn Preliminary Draft Test Procedures•Operational Test 0% 10 02-Map24 15-May-24 -62 DI . A2.1050.TPOPS COMB Reviews/Comments onPrehrnaryDraft.TestProcedures-OperationalTest 0% 21 16-May-24 14-Jun-24 -61 2® Detained Test Praeedures•Final Drell Operatloiral Test P• igr A; 1nr.1I,'✓'., PreparelSubml Final pram Test Procedures.Operational Test 0% 5 17-Jun-24 21-Jun-24 •82 a . 0-.4B eevcwstCommenls On Feat Oran-Test Procedures•Operational Test D% 21 24-Jun-24 23-Jst24 -61 ININ • Detailed Tint.Procedures•100'.einai-Op national Test F. ♦ 00 -' •,..''ty,bme 100%Final Test Procedures•OperatiorlalTesl 0% 1 24-Jul•24 24•Jte•24 •61 - System Acceptance Test Procedures - ert1 Draft.. em A- •inceTest Princedoms ^e to . I Oreparer'Subme Preliminary Draft•Test Procedures.System Acceptance Test Procedures O% 10 25-Jul-24 07-Aug-24 -40 G COMB P.eviews'Comments on Preliminary Draft-Test Procedures•System Acceptance Test Procedures 0%. 21 08-Aug-24 06-Sep-24 •40 COO Final-System AcceplMn Test 2 r-us lutes s r► A21,6f;A'i Prepare/Submit Feral Drell-Tesl Procedures•System Acceptance Test Procedures 0Y. 5 09-Sep-24 13.Sep-24 40 it :OMB Reviews/Comments on Final Draft-Test Procedures-System Acceptance Test Procedures 0% 21 16 Sep-24 14-Oct-24 40 _� Fut•esft-System Acceptance Tent I r ci.. . I l.1 A21AAC SAT Prepare/Submit 100%Final-Test Procedures-System Acceptance Test Procedures 0% 1 15-Oct-24 15-Oct-24 -39 reining elm -NA'•. Prepay me Pr nary raft- raring n 100% 27 23. c620A 03-Dec-21 42 1050 TRAIN P COMB ReviewslCoenments on Prolmnary Draft-Icahn Ran 100% 18 04-Dec.20 08-Jan-21 r-n•'•'.•I•-T•'tin -.:tin A2.1070 TRAIN P COMB Reviews/Comments On Foal Draft Tramg Plan(Not Recurred, 100% 0 08-Jan.21 A 08-Jan.21 • A2.1060 TRAIN P Prepare/Submit Feat Draft Tranirg Plan 100% 10B•Jan.21 A 08.Jan 21 A21080 TRAIN F Prepare/Submit 100%Final -framgPan 1.. 11-Jan.21 A 31-Mar 21 A2.1080 TRAIN P' 1-.it MS RevlewslApproves 100%Fetal-Training Ran 100% 0 01 Apr-21 A 01-APr-2t 110IMNb 23-pet-20A.- .,-,1 1 ,-n,,t I,n.Trstnin0 hater 11. A210401RAIN M Prepare/Subme Preimnary Draft Training Materets 10DY. 27 23-Oct20 A 03-Dec-2t A21050'PAIN'`t COMB Reviews/Comments on Preliminary Draft•Tramp Meters Is 100a. 18 04-Dec-20 08-Jan-2i r.r.rl .Ti ll .;Materials 42.1060 TRAIN Mn Preparc/Subml Feet Draft-Traneg Maoias 160". 0 08 Jan-21 A 08-Jan-21 A21070 TRAIN COMB Reviews/Comments On Feat Dran-Tram g Materials(Not Regrared) 100% 08-Jan-2,A 08-Jan•21 r.r..• T•.•ni.n:Jtatenals A2.1080 TRAIN M Prepare5ubmA 100.4 Final-Tressg Mate iris tOO'S 54 11-Jan-21 A 31-Mar-21 A2.1080 TRAIN.MI COMB Renews/Approves l OC%Final Trainrq Maenals 1OJS. 0 01 Apr 21 A 01 Apr 21 Software Design&Development-DecOGeide Software 100% 561 07-May-20 18-Non-2- ' Software Design.Dec00uld.S-.nwary 100% 220 12-Ma 20 18-Dec•21 System Sefsree Renews i ' __ 100% 1 12-May.20 12•Mey.21 Om RMnet 0eeO amw. Actual Wore Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent goo.,. eeeaee re.w.tbtoemsm sew I 1 Remaining Work 2024-06-20 Added Missing 2yr TE 1140.-it Cerm.4umaanem..r6snweulsasRBOO CMM10d osr 11111.111111 Project Start Dater 19-Jun-19 BF-ra..M Raw.merwa449aselmo eca.,wnt17.0awnepae r.•ua Cynical Remaining Work Full Blown Schedule reon.n Rms..And..4 Boe;ocnec.v�iert001.I 1eMn0 sea ♦ ♦M,kstone /l/`��//,a�� C) ///,��/F Project Finish Date:22-Dec-25 .a4.14 it( eMq.af an,.m nem.eaermAre el..,etew34eamae NUJ / l Summary �• _' • �`---. ana,n Wed.1100.Uri.OS 11212300 a M..a. S[M}e1Up4re UN 0 W3013124. Nita TCC-COMB Progress Schedule Update CONS BOOM rTSSPS Schedule Update U24.0.W2 01312413D 2024-03-20 Sent 2024.06.20 Added Missing 2yr TS 20-Jun-24 TASK liter AN Actuaies Activity ID Anna),Name Dre% At Compote Stan Finish Total Float 2024 2025 Comp Dw 01 I 02 I 03 I 04 01 I 02 I 03 I On A3,1090 _- Initial Workshop Schedukrg 100% 1 12-May-20 12-May-21 A3.1030.SR System.Software Requirements Clareearun Review Meetings 100% 1 12-May-20 12-May-21 [' 011 Ooelstmnt 213 1t44ay-20`! . A3.1120 rAlesione Begin System Produce Descrea on Decu-nenl 100% 0 19 May-20 1',ctimir dr,,rail Seat,tr.I,-,-.0," n 1 i, 0, 43 1240 St/DO Prepare/Subrre Prelmnary Draft-System Product Desorption Document 100% 120 19-May-20 03•Nav-21 ' t A3.1050 S000 COMB Reviews/Comments on Preomnary Draft.System Product Oescrpuon Document(Approved in 12/18/2020 Meeting) 100% 29 04 LNov-20 18-Dec-21 I. A3.1055 SDDD Document Review and Comment Resolution Meeting-Preliminary Drag-System Product Description Document(not lewd 100% 0 18-Dec-20 18-Deo21 • taoa Oran Sy:two Ir-uct,acr.r ti-n:,.c•,n..,.• A3.13713 SDDC Do<amenl Review and Comment Resolution Meeting Feral Breit-System Product Description Document(not requied) IOD% 0 18 Deo20 18-Dec-21 A3 1060 SDDD Prepare/Submt Foal Drat(-System Product Description Document(not required) 100% 0 18-Dec-20 18-Dec-21 • Al 1 370 SODC COMB Reviews/Comments on Final Draft-System Product Desorption Document(not required) 100% 0 18-Dec-20 18-Dec-21 1 .fir Spur,Intl...u,..,. ,. ....ii.•,. A3.0801 SDDD PrepereiSuomy•00%Final-System Produce Desorption Document(tot requeedl(Approved In 12/18/2020 Meeting) 100%100% 0 IB Oec-20 18 Dec-21 100% 0 12 May-20 12-May 2I Snnware Developrnenl-C.cCOeide S:ltwsn A3'/201*0 A3'720lip' Sdnra e Dev aoemenl Envrpr,-nenl Soup l001)0e.not required 100"0. Test Environment Se!vo ierisivlg.'rot reyareo i/M1,,-2i, f2-May-2t follow*Daveropmanl SS6 OT-May-20 18.N1w-S A3 162'1 Mee hone.Begin Software Development150% 07 May'etA372P0 MI,/.003 5'h� =r.,r.,opmen!Senn s Corncob I,'i00, 16-Nov2 Softwure nevclopmcnl'AT7 Dev man and lntr n Mrrayor A I -.,c,. e $nllwm Dey0lgpmeml•SurdRnduet A3 1' SP'.'. wor.shop Software Set elupment-Base Product 100% 0 07-May-20 07-May-21 SW Development and Internal Function Teslmg-Sollware Development-Base Produce 100% 2 07-May-20 11-May-2f A3'3',- CPO, SW Review Test B Release Software Development Base Product 100% 1 08-May-20 11 iMay-21 Suhwnt-4vvvloperent-CCTV 7:11:1 , , A3 313:3 SP02 Workshop•Software Development CCTV API Inlegralion(nor required) 100% 0 07-Sep-21 07-Sep-21 3 a SP02 SW Development and Internal Aunclean Teslrng-Software Jevelopmar/ CCTV API!Mgr awe 100% 10 09-Sop 21 22-Sep 21 ,,0 a..,v(17 SW Rvicw lest 8 Release Software Development CCTV APIlnlegraton 100% 522-Sep-21 28-Sep21 5:11wnry to0810pm.nl•ITS API Inlunrollgn ' A33100 SP03 Works mop Software Development TTS API Imegratgn(not regiwed) 1)/. 0 07-Sep-21 07-Sep-21 . 6 A3.3110 SP03 SW Development and Internal Function Testa,' Software Development TT API Integration IDOY. 1 21-Sep-21 21-Sep-21 1 - A3 3/10 SP03 SW Ravrew rest 8 Release-Software Oevebpmenl-TTS API Integration 100% 36 23-Sep21 16-Nov-2' • t ' SaIlwete Cnv,t pmelt-SOS ATI Integration ' A3 31 00 SP04 Workshop-Software Development-SPS API Integration(not required) 1007. 0 07- .p.21 07-Sop-21 A33110 SPO4 SW Development and Internal Function Teskng Software Development-SPSAPI Integration 100%. 9 08-Sep-21 21-Sep-21 ' A3.3130.SP04 SW Review Test 8 Release Software Development SPS API Integration i not rewired due to properly nlert ace 1 100% 0 22•Sep-21 22-Sep-21 ''-oltware Development•Video Wall Soh WIN..Rod.Development(previously API Integration A3 3100 SP05 Workshop Software Development Video Wat API Integration 01dt requvedl 100% 0 07 Sep-21 07 Sep 21 A33110 3P05 SW Development and Internal runceeon Testing Software Development Video Wall Software Product Development 100% 10 08•Sep-21 22-Sep 21 A33130 SP05 SW Rowe.Test&Release•Sunward Development•Video Wall Software Product Development 100% 36 23-S p-21 16-Nov-2 S I tw.m Is eel'(mcne-1::.nt:in -,t •lrai A3 3 r0^SP% Workshop•Software Development•Rernarrang Buller(n01 required) 100% 0 12-May-20 12-May-21 .. _. SW Development and Internal Function Testing•Software Development•Remaeninq Buie Ina recite edl 100% 0 12-May-20 12-May.21 o SW Review Test 8 Release-Software Development-Rerracing Bogor(no/*gored, 100% 0 12-May-20 12-May-21 3 3i.60 ale Wanolvough Demonstra.an 82 API lntegratgn(not requlred) 100% 0 12-May-20 12-May-21 .v)5e0)I i'ware Walkthrw,gn Derronsnaien e1 Basc Product 100% 1 12 May20 12.May-21 Ow flown Mumma Mora 6111.. Actual Work Data Date:3l-Jan-24 COMB DBOM ITS.SPS Schedule Update 1124.0.W20131240D 2024-03-28 Sent INC., Sag.*WNIynor 00Nrl10 YIN 1---1 Remarmrg Work 2024-06-20 Added Missing 2yr TE loN,..:i ceeweaeae.R:omyleeen•r.u150 WIam 0000100 NW Project Start Date: 19-Jun-19 DIM.-A PoWNW ROM.eeaaireurawwmwUn.0swwag00 lava MEM Critical Remammg Work Full Blown Schedule moo Cl Rapes.R.wsmmrwpeae oweleMON t laaaa00 NW • •Milestone T SCORE Project Finish Date:22-Dec-25 east to nr)c ea4w'n w,ywetNwwN eeslreupaae wpae.11Barr.®d rpY ��Summary OI Np.D Yimrr JtWlrUIIeS i0liryn NW - Y ANw-fl SOW*.U0.10 UN QS.11000 NW Mani. No..umwe UN II W70111100 NW TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03.28 Sent 2024.06.20 Added Missing 2yr TE 204un-24 TASK alter.All Activities 1:0Wily ID Meetly Name Our% Al Compete Start Finish Total Final 2024 2025 Camp Our 01 I 02 I 03 I 04 01 I 02 I 03 ) 04 • A3.1001 FAT Factory Acceptance Test(SW API lelorlac0 Demonslalbn)•Dry Run 1007. 1 17-Nov-21 17-Non 2 A3.1000.FT Facloey Acceptance Test(SW API Interlace Demonstrated)•demonstration 100% 1 18-Nov-21 18-Nor-2' A3.1010.FT Prepare/Submit Test Report.Factory Acceptance Test,SW API Interface Demonstration) 100% 1 18-Nov-21 18-Nov.' A3.1020.FT Factory Acceptance Test(SW API Interlace Demonstration)-Validate Punch List terns(none regAled) 100% 1 la-Nov-21 1B-Nov-2' A3.1030FT COMB Reviews/Approves Test Report-Factory Acceptance Test(SW API Interlace Demonslraton) 100% 1 18-Nov-21 18-Nov-2' A3.1090.AIMS M4esl0ne.DecOGude Software Ready for Produclon Release a Device SATs(not required) 100% 0 18-900-2 Sublhittats 100% 721 111J01P19A 09-JOil-21 I A4 1000 CCTV PrepareSubmm Submittals•Closed Cancun TV(CCTV)Cameras Subsystem Components(APL, 100%. 71 19•Jan-19 A 30-Sep-IS M 100D MUDS Prepare/Supra Scandals Microwave vehicle Detection Systems IMVDS)Subsystem Components(API.) 100% 71 19-Jun-19A 30-Sop•1! A4.1000.WIRE Prepare/Soave Sc nnlns-Woeless Commumcanon Network 100% 71 19-Jun-19A 30-Sep11 - A4.1000.TTS Prepare!Suborb Submittals.Trav 8 Time System(TTS) 1009/. 71 19-Jun-19A 30-Sep-Il A4.1010.CCTV COMB Reviews/ApprovesSubmmals-Cbsed Circuit TV(COTS)Cameras Subsystem Components 100% 57 01-Oct-19A 30-Dec11 M.1010.MVDS COMB Reviews/Approves Submittals Merowave Vehicle Detection Systems(MVOS)Subsyslem Components 100% 57 01.Oct-19A 30-Dec I! M 1010.WIRE COMB Reviews/Approves Submittals-Wireless Communication Network 1000. 57 01.OcU19 A 30-Dec 1! M.t010.TTS COMB Revews/Approves Submittals•Travel Tame System(ITS) 100% 185 30-Dec.19 25-Sep2( M.1000.UPS Prepare/Scone Subnehas-Unnnerruplble Power Supply(UPS)la DMS(APL) 100% 20 04-Feb.20 04-Mar2( A4.1000.ITSC Prepare/Submit Submivas.Intelgent Tr al sporlaion*stem(ITS)Cancels and SmalEpapnentEne Decree(API) 103% 2004-Fe-20 04-1.1ar-2( • M.1010.UPS COMB Reviews/Approves Submittals•Uninterruptble Power Soggy(UPS)to DMS 100% 65 OSMar-20 05-Jun-2C A4.1010.ITSC COMB Reviews/Approves Submittals ImalgOm Transportation System(ITS)Cabinets aM Smell EO.pmerl Enclosures 100% 6505-Mv20 05-Jun-2C • M.1000 MFES Prepare/Su0M Scandals•layer 2 Managed Feld Ethernet Switches(MFESs)(APL) 100% 13 01-Jun-20A 18-Jun2t ' A4.1010.MFES COMB RewewsrApprOves$canals-Layer 2 Managed FieI Ethernet Sw4ctles(MFESs) 100% 49 19-Jun-20A 28-Aug-2( M.1000.PSP Preparer0ubme Submittals-Parking Garage and Surface Parking Lot Systems 1007. 24 03-Aug-20 04-Sep2( i M.1000.OMS Prepare/Scam Sutminas-dynamic Message System(DMSt tAPL) 100% 22 10-Aug-20 10-Sep-2( M.1000ARMS Prepare/Scant Submittals•Mena!Dynamo Message Signs IADMS)Subsystem(APL) 100% 22 10-Mel-20 10-Sep-2( A4.1010.DMS COMB Reviews/approves Submittals Dynamic Message System(DMS) 100% 16 01-Sep20 25-Sep-2( ' M.1010.PSP COMB Reviews/Approves Submittals-Parking Garage and SM.lace Penang Lot Systems 100% 13 07.Sep20 25-Sep2( A4.1010 ADMS COMB Reviews/Approves Suarrmals-Mortal Dynamic Message Signs(AOMS)Subsystem 100% 11 10-Sep-20 25•Sep-2( M.1000.0MS I Prepare:Sobmn Subrenals Dynamo Message System(DINS)(APL)•DAKTRONICS Technical 100% 16 23-Dec-20 21-Jan-21 A4.1000.ADMS.1 Prepare/Submit Slanders-Menai Dynamic Message Signs(ARMS)Subsyslern(APL)-DAKTRONICS Technical 1009/. 16 23-Dec-20 21-Jan-21 A4.1000.CCTVP Prepare/Submit Scandals•CCTV Poles(API)(Not Required) 100% 0 28-Dec-20 28-Dec21 M.1010.CCTV.P COMB Reviews/Approves Submittals•CCTV Pops(Nor Regueedl 100% 0 28-Dec-20 28-Dec-21 M.1000.MVOS.P Preperet5uare Submit-Vs-MVOS Poles(API.)(Not Reglaredl 100% 0 28-Dec-20 28•Dec21 M.1010.MVGS P COMB Reviews/Approves Su00e4tas-MVOS Poles(APL)(Not Required) 100% D 28-Dec-20 28-Dec-2f M 1060.GEN Prepare/Suomi Submittals-Generators(APL)(NO Required) 100% 0 31-08c-20 31-Dec-21 A4.1010,OEN COMB Reviews/Approves Submittals-Generators(Not Required) 100% 0 31-Dec-20 31-Deo21 A4.1010.OMS I COMB Reviews/Approves Scannlas.Dynamic Message System(DINS)•DAKTRONICS Technical 100% 15 22-Jan-21 A 12-Feb-21 A4.1010.AOMS.1 COMB Reviews/Approves Scanners-Mena Dynamic Message Signs(AOMS)Subsystem-DAKTRONICS Technical 100% IS 22-Jan-21 A 12-Fee-21 A4.1000,GRND Prepare/Subml Submdas-Surge Suppression for DMS(APL) 100% 27 06-Apr-21 A 13-May-2 M.1000.POW Prepare/Scorns Submittals•Power Services Eolganen!for DMS(APL) 100% 27 06•Apr-21 A 13-May-S M 1001 GRND Prepare/Submit Submittals-Grounding and Lightning Protecl0n for DMS(API) 1009,% 27 06 Apr-21 A 13-May-2' M.1010GRN0 COMB Reviews/Approves Submittals.Surge Suppression for DAIS 100% 10 14-May-21 28-May2' A4.1010.POW COMB Reviews/ApaOves Scandals Power Services Egupnent to UMS 100% 10 14-May-21 -MB¢2' • M.1011 GRND COMB Reviews/Approves Scandals•Grow-deg and lightning Prolecaan for DAIS 100% 10 tor-May-21 28-May-2 ' Material Submittals-TUC BUILOOU- - '• i M 1DOC Prepare/Submit Material Submittals 100% 29 04-Apr20A 15-May-21 A4 1080 Prepare/Subnae Workstations;Keyb0ar01 a Peripherals Submittals 100% 29 06•Apr20A 15-May-21 M 1090 Prepare/Spine Window Treamerl Sambas 100% 29 06-Apr-20A 1S-May-21 A4.1110 Prcparo!Subms Wal Mourn Monitor Submittals 1001s 29 08-0pr-20A 15-May-21 ----__-. 0e. 1MUm Ci,ad. M.. tttttttttttf♦ Mice Work Data Date:31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-20 Sent neon-re Base.*ssh.a..WI ew1111900 Slot 1 '- T Remaining Work 2024-06-20 Added Missing 2yr TE aN.e1 c roa4umaen..ornemtl,nA1101 em0mtO0 F5C Project Start Date: 19-Jun-19 Full O1M.r22 Pram,...ism Odse,.l.00e`I"oa`au'z0SVPRO.e NW MINN Critical Remaining Work MQ+22 Reposed K.mm Batln rjec00lno.0 mea'lo erso Iowa ♦ •Milestone Tf� /l. C�/�C Project Finish Date:22-Dec-25 I,,.19.116 oca er Re..ann:,erooeoraeo..Ir.�a maw rarsa»0 hku 1r�1 Summary 1 I'� 1 ,J „C� loam?. ]mW.ppynUM 04i�D Val IS AA.. SO...UWm.UN 0W291112.100 NW TCC•COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 013124D0 202403.24 Sent 2024.06.20 Added Milling 2yr TE 1 - 20-Jun-24 TASK filter.All Actuates Acheiy ID Active),Name Our% At Complete Sian Finish Total Float 2024 2025 1 Cane Our 01 I 02 I 03 I 04 01 02 03 I 04 A4 1130 Prepare/Submit Workstation Motlors Submittals 100% 29 06-Apr-20A 15-May-21 AA 1140 Prepare/Subnot 1 ghing Slbmmab 100% 29 06-Apr-20A 15-May-21 4400.1000 Prepare/Submit Operator Furniture SLbrn4lals 100% 87 06-Apr-20A 07-Aug-2( ' 44 i 060 PrepareiSubmil Other Ancillary Equipm0nl Subnttals 100% 130 06-Apr-20A 08-Oc1.2C A4 1070 PreparelSubrrkl Electrical 6 Cubing Submittals 100% 259 06-Apr20 A 20-Apr-21 A4.10'0 COMB Reviews/Approves Material Subnitats 100% 19 18-May-20 15-Jun-2C A4 1170 COMB ReviewtApprove Workstations:Keyboards 6 Peripherals Submittals 100% 19 18-May-20 15-Jun-2C A4 1180 COMB Revew,Approve Window Troll men StAyet as 100% 19 10-May-20 15-Jun-2C A4.1200 COMB Review/Approve Wee Mount Menace Submnals 100% 19 18•May.20 15-Jun-2C A4.1220 COMB RevewtApprove Work station Monitors Submittals 100% 19 18-May.20 15-Jun.2C A4.1230 COMB Review/Approve Lighting Subnalas 100% 19 1&May-20 15-Jun-2C ,• A4.1050 COMB Review/Approve Operator Furniture Sulmpals 100% 32 10-Aug-20 25-Sep-2( A4 1150 COMB Review/Approve Other Mc8ary Equpmen Submmal5 100% 12 09-Oct-20 A 27-Oet-2C • A4.1160 COMB Review/Approve Electrical 6 Cabling Submittals 100% 34 21-Apr-21 A 09-Jan-21 ProelpeiMAt 73.207. -- ?rr.5s I A4 1000 BOM Prepare/SuMod Be of Malerias(BOW(Not Requited) 100% 4 16-Mar-20 20-Mar-2( . A4 1010 BCM COMB Reviews/Approves Eta of Materiels(BOM)(Not Required; 100% 0 23-Mar-20 23-M3,-2( AS 12280 POW Material Procurement-Electrical Equipment 100% 290 03-Nov-21 19-Aug-22 AS 12340 CAB Malarial Procurement-Conductor Cable 100% 61 10•Nov-21 10-Jan-22 Subc-tntrct Agreements 1 19.un 13A ... A51000 DM$CONTRACT Negobate Subcontract Agreement•Structures 100% 614 19,.:un•19A 22.Feb-21 AS 1000 DMS CONTRACT 1 Structure Fabricate.Decays due to Contract Agreement(CA)EaectAgn Delays-Stockers 100% 142 26-Jun-234 15•Nov-2. Material Procurement-Sonwere oeveiapment Enoiran men.s t a0-e - ..uy AS 1015.DEV Hoseng Coordination-Development Environment n Cloud(not reputed existing) 100% 0 12-May-20 t2•May-2l AS 1015 TEST Hosting Coordination-Test Envnonmenl in Cloud(not regtiedl wasting) 100% 0 12.May-20 12-May.21 AS.1015.TRAIN Hoseng Coordnatlan-Tranirg Elcnolmeliet Clad•Da6Gutle Software 0% 5 02-May 24 06 May-24 -168 0 P,c..ur:•err'-y`I,einsq Communicai,on Nelwors � .. A51070.WIRE Material Procurement Wetness Communication Network-Base Una(BTU) 100% 79 11.Jan-21 A 3t-Mat-21 A5.1160.WIRE Material Procurement Wireless Communication Network•Rados 100% 77 01-N0v-21 17-Jen-22 A5.1130.WIRE Mal«.a,P,ocurrmenl W-reless Comm„r.calan Network Antenna 100% 77 01-Nov-21 17-Jan-22 A51070.FOC Maler,ai Procurement Fiber Opl,Commomcelens Equipment(Drop Cables Only) 100% 77 01-Nov-21 17-Jan-22 A5 12730 WIRE Malena Pr ocu,emenl-Wireless Cornmuneaticn Network-Mouning Brackets 100% fl Or Nov.21 02-Feb-21 Procurement-hensponatton Management Center(TUC, A5.1060 TMC Material Procurement-LAN/WAN Equipment(Layer 2-Internet) 100% 7 20-Apr-21 A 27-Apr.21 1 AS t005.TMC Material Procurement Layer 3 Ellerrel Switches 100% 7 18-May-21 25.May-2- 45.1000.TMC Material Procurement Racks 100% 48 18-Jun-21 A 05-Aug-21 AS.1200.TMC Material Procurement-Operator FurMure&Temporary'Nall 100% 711 18-Jun-21 A 30-May-2: • A5.1090.NOST.ATMS Material Procurement-Primary Hosl Sae.Decd6ude Software Equpnlent(Cloud Based) 100% 28 02-Jul-21 A 30Jul 21 A • A5.1240.TMC Material Procurement Workstation Monitors 100% 85 19-Jul-21 A 12-Ocl-21 A5.1070.TMC Material Procurement•Wprkslaeoos 100% 91 18-Jd.21 A 18O9P21 A5.1250.TMC Material Procurement•W orkslabons Keyboards&Perpherals 100% 91 19-Jul-21 A 18-Oct-21 AS.1030.TUC Malenal Procurement-Equpmera Cabling,C.neclors:Terminations,etc 100% 29 08-Sep-21 07-Oct-21 A5.1220.TMC Materiel Procurement-Wee Mount Monitors 100% 40 08-Sep-21 18-Oct-21 AS.1270 TMC Material Procurement-Lgrtt Futures 100% 72 16-Nov-22 28-Jan-22 A5.1180.TMC Materiel Procurement Other Ancillary Equpmem 100% 133 17.Jae-23A 30-May-2: A5.1190.TMC Materet Precut emery,-Hoc 6 Cabling Enurement 100% 133 17.Jan-23A 30-May-2'. A5.1280.TUC Material Procurement-Window Trn2l0e15 100% 133 17-Jan-23A 30-May-2: A5.1010.T1AC Malenel Procurement•Servers(Ude°Wall OAy-iVOS and Video Displays) 100% 134 17-Jan-23A 30-May-2'. _.._- • .__ -_.des_. Aeriere Credos Myer. l l Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124D0 2024-03-28 Sent taar.,a ewe..Sow.r.eel oestereoo vet I 1 Remanng Work 2024-06-20 Added Missing 2yr TE II-rm.N coosmal104440eanr.nn.94wu1s03ae010ewt,o0 P0E Project Start Date:19-Jun-19 MN.72 RCPoee1 Pros.B8.1,1VevehnlUrl05YPRuWa NW - Critter Remaining Work ,4 Fall Blown Schedule Mon It Prame4 Am.tidsoimMaue*Pis PR00r.+ta.Qt00 N61. • • MAeslone T A SCORE Project Finish Date:22-Dec-25 Y.ge70 o(16 arse,a3 Proom11 Rem.Baetlrw'01.1el. MEW 7 300 NW r1 Summery I /� 7 I`Lrt a1Na1J scewaunmeuflesimlm0 NW Y 30 Na23 SerW/eUnaee UN0.511moo NW A.itnN 5e+e4l.Uaoen07,Get 7131N00 NMI TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update 1.124.0.W2 0131240D 2024-03-28 Sent 2024-08-20 Added MiaiMO Opr TE 20-Jon 24 TASK filter All Activities 1Ae6vey ID Activey Name Due% Al Compete Start Finish Total%el 2024 2025 Camp Der o, I 02 I 03 ( Da 53-1 oz D3 D4 ' A5.2000.TUC Milestone- Procurement Complete•To Start TMC Sued Out 107% 0 30 May-2: ' - - - -_ 1 AS 1010 TIlT DECO Maier 4 Procurement•OecOGulde(by Others) 13 33% 94 20-Dec-23 22 r4ar.24 .173 IpllE=1 Procurement-Structures it.Apr 25 RecursOMB - . -" 34-s _ �: , 7 F B.r.9-1 r n z-C.nr,IC,00r Sit,' AS 194C 7M S 08 TIC Fabricate Structure-COS DB-Julia Twee Cs vy'19M W 41st$USR112•Artnur Godtred Rd 0% 316 15-Nov-23 25-Sec 24 492 r N rc 4.•'`'!JS-L-:I1.1:01,:.Into,.'. .. ♦ AS/16C.OM518 P(. Fabricate Structure•DMS 18•Julio TLC leCsvyl199W.41st SVSR112/Arlhur Godtred Rd(Descoped) 01'. 0 14•Apr25 14•Apr-25 . AS I]h:.DnlS 4o.1T- Fabricate Structure-DMS 20-Jule TMlle Csog/199W.4111 BAR 112/M 1Ra Godtred Rd(Removed per COa IJ 0% 0 I I Apr-25 l4-Ap.25 4E9 Procure AIMS .65yt r 161.;j A 19-41-25 -173 I Fat r.cat.c..ar17_17ont v:•, A - Fetinc:4oACMS•Canute..53- 'I-- 1 OS 106C ADMS 07 MC Fabricate Structure-DMS 07-MacArthur CswyrAt Nl-41/5th St 0% 316 15-Nov-23 25-Sep-24 -482 A5.1050 ARMS 03.W A Fabricate Structure•ADMS 03.Washington Avenue-Canleever Sae 0% 316 15-Nov23 25-Sep-24 -482 • Galvanize A0135•Cantilever Sr: A 45.1060 ADMS 07 MC GA'. 0a6 awe Sleucluro•DMS 07-MacArthur Cswy:A1 A9•41/5th St 0% 2 26•Sep-24 27•Sep-24 -343 I AS.1060.AOMS 03 WA GAL Ga6anue Structure•ARMS 03•Washington Avenue-Cant4ever Ste 0% 7 26-Sep-24 02-Oct-24 •348 0 Prunn AOt.,1 runttiever 0,14 A AS 1060.ADMS.07 MC PVT Pam Structure•OM5 07-MacArthur Cswy/AIM-4115th SI 0% 2 28-Sep-24 29•Sep 24 343 I A5.1060 ADMS.03.WA.POT Faint Structure•ADMS 03-Washington Avenue-Cantilever Ste 0% 7 03-Oct-24 09-Oct-24 -346 0 F.I.n,II,2•:US L"I.oc Structures e A51060.ADMS 32.VC ,-4tie ale Structure-ADMS 32-Venetian Cswyl0ade Blvd(Not Included-Removed per Change Order el'. 100% 0 25•Jun-23A 25•Jun-22 A5.1060.ADMS28.MC Fabricate Structure•ADMS 28•Macketur Cswy/A1 MI-41/51h SI(Not Included-Removed per Change Order A11 100% 0 25-Jun-23 A 25-Jun-2.'! A5.1060.ADMS 29.MC Fabricate Slruche.-ADMS 29-MacArthur Cswy)AlM1-41/51h SI(Not included•Removed per Charge Order lull 100% 0 25-Jun-23A 25-Jun-22 • A5 1060 ARMS.It JTC Fabricate Structure•ADMS 11•Julia Tole Cswy195JW.atst SUSR112/Mhur Gadded Rd 0% 126 26•Sep-24 29-Jan-25 -482 A5.1060.ADMS.21.AR Fabricate Structure-AOMS 21•Alton Rd 0% t26 26-Sep-24 29-Jan-25 -482 A5 1060.ADM5.30.AR Fabrcae Structure-ADMS 30•Alton Rd/16011 Brest 0% 126 26•Sep-24 29-Jan-25 .482 AS 1060.ADMS.06.MC Fabricate Structure•ADMS 06-MacArthur Cswy/AtMI.41/511,St 0% 126 10.Oc1-24 12-Feb-25 -482 AS 1060.ADMS.09.NBC Fabricate Structure-AOMS 09-North Bay Cswy 0% 126 10-Oct-24 12-Feb-25 .482 A5.1060.ADMS.02.JTC Fabricate Structure-ARMS02•Jule Tuttle Cswy/195/W.41st SUSR112,Artnur Godleeo Rd 0% 126 10-Oc1-24 12-Feb-25 -482 IIII AS.1060.AOMS.I0.MC Fabricate Seuctore-ADMS 10 MacAnitur Cswy/AIMI-41/5th St 0% 126 24-0[1-24 28-Feb-25 -482 • A51060ADM5.14.MC Fabricate Structure ARMS 14 MacArthur CswyA1Ml 41/51h SI 0% 126 24-Oct-24 28-Feb•25 -482 mionimmin A5.1060 ADMS IS.MC Fabricate Stricture•ADMS 15-MacArthur Cswy/A1MI-41/5th St 0% 126 24-Oct.24 26•Feb•25 -482 AS 1060-ADMS17.MC Fabricate Structure ARMS 17•MacArthur Cswy/A1MI-41/5th SI 0% 126 24.Oct•24 28-Feb-25 -482 AS.1060 A0MS.19.AR Fabricate Structure-ADMS 19•Alton Rd 0% 126 07-Nov-24 12-Mar-25 -482 IIMIIIMM A5.1060 ADMS.22.MC Fabricate Structure-ADMS 22 MacArthur Cswy/Al M1.41/5th SI 0% 126 07-Nov-24 12-Mar-25 -482 INIMIMININI P51060.ADMS 23MC Fabricate Structure-ARMS 23-MacArthur Cswy/A1M4-41/5111 SI 0% 126 07•Nov-24 12-14ar-25 -482 INIIIIMMIll A51060.ADMS.24.MC Fabricate Structure•ADMS 24 MacArthur Cswy/AIM-41/5111 St 0% 126 07-Nov-24 12•Mah25 -482 INIIIMMIll AS.1060 ADMS26.JTC Fab ate Structure-ADMS 26•Julia Tuttle Cswy/t95AN 41st SUSR112/Arthur GoOred Rd 0% 126 21-Nov-24 26-Mer-25 -482 A5.1060 ADMS27.JTC Fabricate Structure-ADMS 27•JOB*Tuttle Cswy/I9SAN 41s1 SUSR112/Mlhur Go0lred Rd 0% 126 21•Nov-24 26•Mae-25 -482 IIMII A5.1060ADMS25.MC Fabricate Structure-ADMS 25•MacAea*r Cswy/Al AA-4151Fr St 0% 126 21-Nov-24 26-Mar-25 _482 A5.1060.ADMS31.WA Fabricate Structure-ADMS31•Washington Avenue/171h Street 0S. t26 21-Nov-24 26-Mir-25 -482 MMIIMII AS 1060.ADMS.t 2JTC Fabricate Structure•ADMS 12•JuY Tuttle Cswy/195W 41st SUSR112/04Ihur Godlred Rd 0% 126 05-Dec-24 09-Ap-25 -482 IIIMINIMIN A5.t 060.ADMS 16.NBC Fabricate Structure-ARMS 16-North Bay Corry 07. 126 05-Oec-24 09-Apt-25 -479 I A51060.ADMS.t 3 VC Fabricate Structure-ARMS 13 Venetian Cswy/Dade Blvd 0% 126 05-Dec-24 09-Apr-25 •477 1- 1 AS 1060 ADMS.33.VC Fabricate Structure-ARMS 33•Venetian Cswy/Dade Blvd 0% 126 05-Oec-24 09-Apr-25 •475 1 I A5.1060 ADMS.34 VC Fabricate Structure-ADMS 34-Venetian Cswy/Dade Blvd ST. 12605-Dee24 09-Ape25 •473 F - l Gr(,.1n•a.ALMS•LuIrpole St ructu .. - - • ♦ T --- gar R.rm C1r6e1 eapw. MIMI AUua.work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent loon Is swam SUMP,lel 0 L*1911:0 VS. I 1 RemaewtgWork 2024-06-20 Added Mincing 2yr TE r055.4: Co:a:.uuoew.eanevnsra..A/5140lMcornt00 ASS Project Start Date 19-]un-19 4a Mw-a Rw7.ee e.n.,e e.so'soma.a 1 u.t.A0N11eM.o .Me Oat• Cr4cal Remamng Work /� Full Blown Schcdulc Son C. n�.m nw aeoM+v 4.•wsan rRea n�o0 NM, ♦ •Milestone I R SCORE Project Finish Date:22-DEC-25 r.,;:tl�:>h musn new.aRns..meur..utneewpmPAK 2050E500 �M+ �1 Summery I\ l to non Savpu,warm urns 0 MMJ ro,0>.-s<.eol.upaa.uleewaetl,&OO --_ NUJ - TCC COMB Progress Schedule Update COMB OSOM ITSSPS Schedule Update U24.0-W2 01312400 2024.03-28 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK filter Al AcbMles Activity 10 Actively Name Our% At Complete Stan Finish Total Flog! 2024 2025 Corn) Our 01 I 02 I 03 j 04 01 I 02 I 03 104 A5.1060.A0e6.32 VC.GAL OaNanue Structure-ADMS 32.Venetian Cswy,Dede Nod(Not Included•Removed per Change Order el) 100% 0 25-Jun-23A 25-Jun-22 �I AS.1060.AOMS.28.MC.GAL Galvanize Structure•ADMS 28-MacArthur Cswy/AlAtl-41/5th SI(Not Included-Removed per Change Order Olt 100% 0 25-Jun-23A 25-Jun-23 A5.1060.ADMS29.MC.GAL Galvaniz.Structure•ADMS 29-MacArthur Cswy/A1M-41/511 SI(Not Included-Removed per Change Order 1111 100% 0 25-Jun-23A 25-Jun•22 A5.1060AOMS.11.ITC.GAL Galvanize Structure ADMS 11-Juke Tunic Cswyn95AN.41st S1.5RI121Artlur Gadred Rd 0% 2 30-Jan-25 31-Jan-25 -4s4 1 A5.1060.ADMS21.AR.GAL Grivamae Structure•ADMS 21-Mon Rd 0% 2 30-Jan.25 31-Ja025 -453 1 A51060.ADMS.30.AR.GAL Galvanize Structure-ADMS 30-Mon Rd/ISO/Street 0N. 2 30Jan-25 31-Jan25 -446 1 A5.1060.ADMS.02.JTC.GAL Galvanize Structure ADMS 02•Jute Tune Cswy1195/W.41st St/SRt12/Aetur Godhed Rd 0% 2 13-Feb-25 14-Feb-25 -461 • 1 A5.1060AOM5.06.MC GAL Galvanize Structure•ADMS 06-MacArthur Cswy/A1M-41/5th St 0% 2 13-Feb.25 14-Feb-25 -459 1 A5.1060.AGMS.09.NBC.GAL Galvanize Structure.ADMS 09-North Bay Cswy 0% 2 13-Feb-25 14-Feb25 -456 1 A5.1060.ADMS.10.MCGAL Calvenu.Structure-ADMS tO-MacArthur Cswy/AIM•41/5m Si 0% 2 27.Feb-25 26-Fab-25 -468 1 AS 1050.ADMS.14.MC.GAL Gawanae Structure-ADMS 14•MacArthur GswyrAIM-41/51h SI 0% 2 27-Feb-25 28-Feb-25 -487 1 A51060.ADMS 15MC.GAL Galrsrhze Structure-ADMS 15-MacArthur Cswy/A1At1-41/91h St 0% 2 27-Feb-25 26•Feb•25 -461 1 A5.1060.ADMS.17.MC.GAL Cayenne Structure•ADMS 17•MacArthur Cswy/A/M-41/5M St MY. 2 27-Feb25 28-Feb-25 -480 ' 1 AS.1060 ADMS LAP GAL Galvanize Structure ADMS 19•Mon Rd 0% 2 13-Mar-25 14-Mar25 -472 1 A5.1060.ADMS22.MC.GAL Galvanize Structure ADMS 22•MacArthur Cswy/AIM-41/5th St O% 2 13-Mar-25 14-Mar-25 -466 1 AS1060.ADMS.23.MC.GAL Gatvarxze Structure.ADMS 23-MacArthur Croy/AIM-41I51h St 0% 2 13-Mar•25 14-Mar-25 •467 1 A5 1060 ADMS.24.MC GAL Galvanze Structure-ADMS 24•MacArthur Cswy/AIM•41151h St 0% 2 13-Mar•25 14-Mar-25 -468 1 A51060.ADMS.25.MC.GAL Galvanize Structure.ADMS 25•MacArthur Cswy/A1M-41/50 SI 0% 2 27-Mar25 28-Mar•25 -476 1 A5.1060 AOMS.26.JTC.GAL OWanize Structure•ADMS 26-Jule Tonle Cswy/195/W.41st St/SR112/Armur Godtred Rd OW. 2 27-Mar-25 26-Mar-25 -475 I A5.1060 ADMS.27JTC.GAL Galvanize Structure-ADMS 27-Jude Tune Cswy195tW.41st St/SRl t 2/Armur Godlred Rd 0% 2 27-Mar25 28-Mar-25 -473 1 AS 1060.ADMS.31.WAGAL Galeanee Structure.ADMS 31-Washington Avenue/17th Street 0% 2 27-Mar-25 28-Mr-25 -172 1 AS 1060.AOMS.12.JTC.GAL GatraneeStructure-ADMS 12-Jule Tune Cswy/195/W.41s1 StSR1l 2/Ashur Godtred Rd 0% 2 10-Apr-25 11-Apr-25 -482 1 A5.1060ADMS.16.NBC.OAL Galvanize Structure-ADMS 16-North Bay Cswy O% 2 10-Apr-25 it-Ape-25 •479 1 1 A51060ADMS.33VC.GAL Gakearnee Structure-ADMS 33-Venetian CswytDade Blvd 0% 2 10-Apr-25 11•Apr-25 -475 ' 1 A5.1060 ADMS 34.11C.GAL Galvanize Structure AOMS 34 Venetian Cswy/Dade Blvd 5% 2 10-Apr-25 11-Apr-25 -473 - I P,nl:l..MS-L.1,A ,1, , A5.1060 AOMS.32 VC.PNT Pant Structure ADMS 32•Venetian Cswy'Dade Blvd(Not Included Removed per Change Order a1) 100% 0 25-Jun-23.' Jun-OS ' AS I060.ADMS.28.MC.PNT Pact Structure-SUMS 28 MacArthur Cswy/A1 Ail-115th St(Not Included Removed per Change Order a1) 10J% 0 25-Jun-23A 25-Jun-22 A5.1060.ADMS.29.MC.PNT Pant Structure•AOMS 29-MacArthur Cswy0A1M-41/501 St(Not Included-Removed per Change Order 011 100% 0 25-Jun-23A 25-Jun-22 4 A5.1060.ADMS.II.JTC.PNT Pant Structure•ADMS 11•Jule Tuttle Cswyt195AN atst SOSRtl2/Artlur Godtred Rd 0% 201-Feb-25 02-Feb-25 -454 1 A5.1060.ADMS.21.AR.PNT Paint Structure•AOMS 21•Mon Rd 0% 2 01-Feb25 02-Feb-25 -453 1 A51060.ADM530.AR.PNT Pent Structure AOMS60 Mon Rd/15th Street 0% 2 01.Feb.25 02-Feb-25 -446 1 A5.1060.ADMS.02JTC.PNT Paint Structure AOMS 02•July Tuttle Cswy'l9LW 41st Sr/S11112iMhur Godlred Rd 0% 2 15-Feb-25 18-Feb-25 •461 I A5 1060 A0M5.06.MC PNT Part Structure-ADMS 06-MacArthur Cs..VVAIM-41/581 St O% 2 15-Feb-25 16-Feb-25 -459 1 - A5.1060.ADMS.09.N8C.PNT Pant Structure-ADMS 09-North Bay Cswy 0% 2 15-Feb25 16•Fe0-25 -458 1 A5 1060.ADMS.10.MC.PRO Pant Structure ADMS 10•MacArthur Cer y/AIM-41/5th St 0% 2 01.Mar-25 02•Mr-25 .468 ' 1 A5.1060.ADMS.14.MC PRO Pant Structure ADMS 14.MacArthur Cswy/Alin-41/5lh St 0°. 2 Or Mar-25 02-Mr-25 -467 1 A5.1060.ADMS.15.MCPNT Pant Structure-ADMS 15-MacArmur Cswy/A1M-41/51h SI 0% 2 01-Mar-25 02-Mar-25 -461 I A5.1060 ADMS 17.MC PNT Pain!Structure ADMS 17 MacArhur CswyiAtM-41/5Ih SI 0%, 2 01-Mar-25 02•Mar-25 -480 1 A5.1060 ADMS.19.ARPNT Pant Structure-AOMS 19-Mon Rd 0% 2 15-Mar-25 16-Mar-25 -472 1 A5 1060 ADMS 22 MC PNT Pant Structure ADMS 22-MacArthur Cswy,AIM-41/5th St 0% 2 15-Mar-25 16-Mar-25 -469 1 1 A5.1060.ADMS.23.MC.PNT Pant Structure ADMS 23-MacArthur Cswy/AtM-41/51h St 04. 2 15-Mar,25 16-Mar-25 -467 1 A5.1060AOMS.24.MC.PNT Pant Structure-ADMS 24-MacArthur Cswy/A1M-4151h St 0% 2 15-Mar-25 16-Mr-25 -466 1 A5.1060.ADMS.25.MC.PNT Pant Structure.ADMS 25-MacArthur Cswy,AIM-41/Stt St 0% 2 29-Mar•25 30•Mr-25 -476 1 ` A5.1050.ADMS.26.JTC.PNT Paint Structure•AOMS 26-Juta Tuttle Csery/195/W.4191 StSRI12/Mhur Godhed Rd 0% 2 29-Mar 25 30-Mar-25 -475 , t A51060.ADMS27.JTC.PNT Paint Structure•ADMS 27•Julia Tune Cswy195AN 41st SVSR112/Mhur Godtred Rd 0% 2 29-Mar•25 30-Mr-25 -473 1 A5.1060 ADMS.31.WAPNT Pant Structure-ACING 31-WasnngtonAvenuetl7m Street 0% 2 29-Mar-25 30-Mar-25 -472 I AS l060 AOMS.12.JTC.PNT Pa Arrows ce ADMS 12•lola TuttleCewy/195M/4151 SVSRI tO/Ashur Godtred Rd 0% 2 12-Apr-25 13•Apr-25 -182 I On. A.Anv cnw MPer_ MMI Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W201312413D 2024-03-23 Sent unioc n nure.xhanur eat oarsn00 sine F 1 Remanelg Work 2024-06-20 Added Missing 2yr TE ,►hr a, corbrar Unaneasa.ern.e...r.unit!60 010100z10a Ps1: Project Start Date: 19-Jun-19 WMwn Proor.On Rows taea....Ue.:r 1 .ourro5eeUM.o hru MII Critical Remaining Work a) Full Blown Schedule alas 22 ern m e nr sa0 eas...rtceerr.rwrrata ra,e ,ruoou hay • ♦Milestone TR . S RE Project Finish Date:22-Dec-23 Page 22 or la mrw-a nmc,m 0w..raere0 rer v,y.,PAm zm®00 err, �••��Summr m.Mwa srh.ea.uPmrunas,m,ma WU Y 30-10e.13 SCMva trod,.UN 09„2%000 Mel AM-N Scr.We Urea.UN 3 W➢at3trrle MU TCC•COMB Progress Schedule Update CORM DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03.28 Sent 2024.06-20 Added Missing 2yr TE 20-Jun-24 TASK 1i09[All Activities A[Hay ID Activity Name Our Y. Al Cornpbte Start Finish Total Float 2024 2025 1 Comp out 01 I_ 02 I 03 I 04 D I.i I 02 I 03 04 .1 AS 106n ARMS.16.NBC.PNT Paint Structure.ADMS 16•North Bay Cswy 0% 2 12-Ap,25 13-Apr•25 -479 1 A5 1060 ADMS 33 VC.PNT Paint Structure•ADMS 33•Venetian CswylDade BNd 0% 2 12 Apr-25 13-Apr 25 475 1 A5 1060 ADMS J4 VC.PVT Pant Structure-ADMS 34-Venetian CswyiDade BNd 0% 2 A4r-25 13-AA,25 -473 Preeurement-11S Oorkm. 47, irt rl-.v 20 08-Mar-21 A5 1070 OMS Material Procurement,Dynamic Message System(CMS)Subsystem Components 100% 4/,. 23-Nov 20 013`,19,21 1 AS 1070 ADMS Material Procurement Artena Dynamic Message Signs(ADMS(Suheyslem Components 100°`. .17' 23-4ov20 06-Mar-2: • A5.1140.CCTV.LD Material Prxuremenl CCTV Camera Lowering Device(CLD)not required) 100% 0 28-Dec-20 28-Dec-2l ' A5.112SCCTVP Malena Procurement•CCTV Poles(Not Regueed) 100% 0 28.Oec•20 28-Dec•21 1 A5.1125.MVOS.P Material Procurement•MVOS Poles(API-)INOI Required) 100% 0 28.Dec-20 28-Dec-21 • AS.1130.MVDS Malone(Procurement-Microwave Vehicle Selection Systems(MVOS)Subsystem Components 100% 50 25-Jan-21 A 16-Mar-21 A5.1130CCTVASMBL Melva/Procurement-CCTV Camera Assembly 100% 25 01-Feb-21 26-Feb-21 • AS 1090.ITSC Material Pracutemers-(meager)!Tra,epataticn System OTS)ADMS and OMS Cabinets t00Y, 117 25-Feb-21 22-Jun-21 AS.1200.GRNO Material Procurement•Surge Suppression for OMS 100% 13 08-Sep-21 21-Sep-21 , 45.1201.GRNO Mates,al Procurement-Grounding and Lightning Protection or DMS 100% 14 CM-Sep-21 21-Sep-21 45 1090 CABBuec Coronet Ei..1t Out-Intelligent Tra.sportlm System(ITS)ADMS and OMS 100'•. 15 08-Sep 21 28-Sep-21 Procurement-Smart Parking System(SPS 0 A5.2750.SPS Malerie Procurement-AVl Transponders•SPS(Not Required) 100% 0 30-Ocl-20A 30-Oct-2C A5.2752 SPS Material Procurement-Handheld AVl Readers•SPS(NO Requite) 100% 0 30.0c1.20A 30-Oct-2C ' ' A5 12510 SPS Material Procurement Soler Power Equipment SPS 100% 104 09-Feb-21 24•May-2- A5.1130.SPS Maternal Procurement-Detectors-SPS 100Y. 104 09.Feb21 24May-2- A512730SPS Maternal Procurement Mooning Brackets SPS 1001. 164 09-Feb-21 24-May-2- A5.n070.SPS Material Procurement Monument DMS.SPS 100% 104 09-Feb-21 24-May-2' t Procurement-Travel Time System(TTS, ,. AS 1130.TTS.D I Matetme Procurement ITS Detecto•s BlueToad 100% 29 01-Oe1.20A 30•Oct•2C A5.1060 ITS Maternal Procurement•Conductor(Not Required) 100% 28 02-Oc1-20A 30-Oct-2C ' A5.1140.TTS.A Material Procurement•TTSMtermas(Not Required) 100% 28 02.Oot-20A 30-Oct.2C A5.1130TTS.D Material Procurement TTS Deteclas-MVOS 100Y. 28 02-Oct-20A 30-Oc42C AS 1130.7T5-M Naomi Procurement 775 Mnedeg Brackets100% 28 02.Oc1•20A 30.Oc1.2[ A51090.TT5 Maternl Procuremera-BTU(CCTV/TTSIMVDS) 100% %08-Jan-21A 1400,21 Fncouuemrl•F.wrr:Cvmms 13 At,01 A5 1050.GEN MaterialProcurement-Generale.(Not Required) 31-Dec-20 31-Dec-2l A5 1171.PS Material Procurement•Terminal Server-MVOS 0r11y 100% 50 25-Jan•21 A 16-Mar-21 - A5.1t82UPS Material Procurement•Uninlerruptible Power Supply(UPS)for-ADMSOMS ONLY 100% Ill 25-Feb-21 22-Jun-21 A5.1170 MFE5 Material Procurement•Layer 2 Managed Field Ethernet&etches(MFESs)-ADMS,OMS ONLY 100% 8 19•Apr-21 A 27-Apr•21 A5.10450.PS Mammal Procurement•Power Services Equipment tor-ADMSiDMS ONLY(Service Pores) 100% 351 03-Sep-21 19-Aug-2: AS.1095.CAT6 Material Procurement-Palen Cebtes 100% 20 o8•Sep•21 20-Se0-21 ' Pre-lnstall.lion Testa(PIT)'Bench To.,• '0A '24.;.71 la A6.1100.ITS Pre-lostaletion Test(Bench Test)•TTS Pee-Instalabn Test(Bench Test) 100% 1 30.Oct-20A 30-Oct-2C A611000CTV Pro-batalason Test(Bench Test)-Closed Circle TV(CCTV)Cameras Subsystem Cmpetents 100% 1 26-Feb-21 26-Feb-21 A61100MVDS Pre.Installation Test(Bench Test)-Microwave Vehicle Detection Systems(MVDS)Subsystem Components 100% 1 16-Mar•21 16-Mat-21 A6 1110.ITSC Pre-installation Test(Bench Test)-Inteagent Transportabn System(ITS)Cabinets and Small Equipment Enclosures 100% 5 23-Jun-21 A 30-Jun-21 AB I100 WIRE BTU Pre-Instalabn Test(Bench Test)•Wireless Commuticalen Network•Base Una(BTU, 100% 23 07-Sep-21 08-Oct-21 A6.1100.SP5 Pre-Installation Test(Bench Test)-Smarm Parking System(SPS)Subsystem Components 100% 1 30-Sep21 01.0[1.21 A6.NOO.fOC Pre-Installation Test(On-the-Reel Test)-Faso Optic Communications Equipment Not Refired Drop Cables 0nly( 100% S 17-Jan32A 17-Jan-22 A6.1100.WIRE.A Wei Installabn Test(Bench Test)•Wireless Communication Network-Radios 100% 0 17•Jae-22A 17-Jan•22 03 1000.FAT,TMC Factory Acceptance Test(FAT)tor Video Wal Mont Menaces r Video Bitches(Pre-Inste8aeon) 100V. 5 12-Apr-23A 18 4p-23 46.1100.ADMS PFe•Inslutabr,Test(Bench Test)•Menet Dynamic Message Signs(ADMS)Subsystem Components 0% 10 01•Mar-24 14-Mar-24 -92 Cl A6.1100.DMS Re•e,staaation Test(Bench Test)-Dynamic Message System(OMB) 0% 10 01-Mar-24 14-Mar-24 •89 ID A8.1040 PITP Prepare/Submit Test Aspen-Pre-Instal/aeon Test(Beech Test) 3% 5 t 5•Mar-24 21-Mar.24 14 0 S. AM•b, Crac.1 Asper. IIII Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03.23 Sent ,agog home sm...hat ea,s,no inc 1 I Remaining Work 2024-06-20 Added Missing 2yr TE rOs•-a1 ce.e.o A..Reovo,Ro»sa.e U13 e3A 8030 0113en00 PSF Project Start Date: 19-Jun-19 a0 e,2 Promseo Reese4 oQe,w pace loy.o,o,7ow snee.o aa42 Ill Crete.)Remaining Work Full Blown Schedule even Prom..Fier..Bow molloew.1....ea,1... MNJ ♦ •Milestone I RA C RE Project finish Date:22-Dec-25 Page 21 er76 carte Rom .Re..caeud+ov[ewe eri.n,o1Bo 2030123M MN W...."Summer / l J ` myna-a s<w•uPmauaoslminoo ..IY 30 Mwa SckWO UnY•UN 0 S 1,aa03 MCI A Jul 2. WM.Valve,Y.0 VI20131 XX, ..1 TCC•COMB Progress Schedule Update r COMO OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sent 2024-06-20 Added Missing Syr TE 20 Jun 24 TASK filter.Al Activities Pctivey ID ACtieNy Name Our% At Complete Start Farah Tdal Float 2324 2025 9 Comp Dur 01 02 03 Q4 01 1 02 1 03 I 04 jA8 1050 PITP COMB Reviews/Approves Tesl Report•Pre•Inslallaeon Tesl(Bench Test) 0% 15 22 Mar-24 12-Apr-24 13 Bp FCC Licenses 100% 100 04-Feb21 424421 A A3.1060.FCC FCC Licence Processing Approval 100% 155 04-Eeo-21 12-10-21A A3 1040.FCC Prepare/Submit FCC Appiiealgn 100e. 3 21-Apr-21 A 26-Apr 21 A3.1050 Ft.C FCC Hevews/Approves FCC App0cattbn 100% 69 27-Apr 21A 06 Jul 21 A Equipment Staging and Configuration 61 A7% 1603 I2-M y-20 30-gep24 -176 e A7.2750.SPS Conlgwe and Provide Wireless Handheld AM Deader s 8 Transponders Io COMB-SPS Not Required) 100% 0 30•001-20A 30-0c1-2C E uipeeri t S1aun,AConllgWetlnn-"c•:Gul'1•S-11w,re - - A6.101 SDEV Configure Servers in Clout' Development-DevelopnB EnviroEnviroEnvironment(exiling;rot required) 100%• ,. 0 12-May-20 12-May-21 Conslguwt h • ,.100% III 08.1ate21 48436621 -Ago • A6.1015.TEST CwlAgure Servers to Cloud•Test 6a*YonmwB too°, 16 re See-21 04-06621 Equipment Sta81ng&Cpolgu1allu- , " 735'2-Sac 21 30.Sep-24 12. / Stagings,0onllgu . 43 21-Dec-23 23-Feb-24 -101 A6.1000.TMC Assemble Servers-Trdac Management Center(TMC)(VEeo Wet Orly-NOS and Video Displays) 60% 27 21 Dec 23 31 Jan 24 101 A6.1010.TMC Configure Servers Trate Management Center(TMC)(VEeo WON Only-NDS and Vneo Displays) 0% 15 01•Feo-24 22•Feb-24 101 Eli A6 1020 TMC Ship to Site Servers-Trarc Managemee Cooler(TMC)(Veeo Were Only-SOS and Video Deploys) 0% t 23-Fe.24 23-Feb-24 •101 Egelenent Ill o11l0At NgNS . 11•eMgyY 111% 100% 19 02•144-21 20- A61000 HOST.ATMS Assemble Eguymenr•Primary Host Site•DecOGuide Software 100% 4 02,Aug•21 05 Aug-21 A61010.HOST.ATMS COnligure Equipment Primary Host Sole OecOGuloe Software 100% 15 OE Aug-21 26 Aug 21 A6 1020.HOST ATMS Sill to SIM Equipment Prenwy Host See DecOGutde Software(cloud envronment-net regwed) 100% 3 2a Aug 2, 26 0ug•21 Eglalpmser Olaiplg S - r 20 03-Sep-24 30-: - - ► Ail 1015 TRAIN Co.0p on Servers n Cloud•Training ERYtOnner' 0% Z.. 03 Sep 24 30 Sep 24 -123 MS Construction/Testing/Acceptance Phase-Phase 1 and Phase 2 1331 02-May 22 2- 25 e aluYBNNn Phase - .,_: __,-,J• 1092 02-May-22 Tr.-25 ' / Al.1010o5P5.L Monotone:Beg.Construction SOS-Lots(E.clua0ng P251 P021 100er 0 02-May 22 A7.1010.TMC.SW 1vslestone Begin DecOGede Software Instalatron(earliest ready date) Cloud Based t No Inslallalen 100% 0 15-Nov-22 A7.1010.TMC.B Milestone Beget Construction-TMC 100% 0 17•Jarr-23A A7.1010.SPS Mdeslone.Begin Construction•SPS-Garages 100% 0 24-JUL23A A7.1010.SPS.LP29 ferestone Bean Construction-SPS•Lot P29/Lot P02(On Hob per COMB) O% 0 31-Jan-24 -41 • A7.IOIOAOMS Milestone Begin Construction-Structures IADMS Only) 0% 0 01-Man24 •233 • A7.t010.ITS Milestone.Begin Construction•ITS 0% 0 01-64ar•24 -134 • A7.1010 TTS Miestone Berge Construction-ITS 0% 0 01•Mar•24 .127 • A7-10101TS.1 Milestone.Begin Construction ITS Mane-Cane County 0% 0 04-Jun-24 -222 ♦ A7 1020.W IRE Miestone Begin Constructon•Wireless Communication Backbone•Coy Hal Garage Tower(Gov't) 0% 0 02-Sep24 -304 ♦ A7.1010.W IRE Milestone'Begin Construction-Wheless Communication Backbone•Miami Beach Pace Dept Tower(Goes) 0% 0 02-Sap-24 -294 • A7'040 WIRE Milestone.Begin Construction,Wireless Communcalon Backbone-Park View Pont(POP)Trove(Pe.ere) 0% 0 02•Sep24 -294 • A7 t030.WIRE Milestone Begin ConsIruoeon-Wireless Communication Backbone-Tower 41 Condos(Protract 0% 002 Sep24 294 • C-nsnuwIlon-WMWLs Cummunicsliufl Network .- . -207 ignmerey IP' .. . ., u a. ... - - • �•.trucll-.n-Wire/cis Ccmmunmcmicn Network-Noah Werner•I rr,r r.-nl e.1) ' • • A7.1133.WIRE 0' Ir sial'Anir rr e..e.-o,Conmuncai Network Toner 01 Norm Rebecca Tows(Descopod) 0% 0 03-Sep-24 03-Sep-24 185 1 A7.12340.WIRE.Cr instal Conductor Cable-Wrees,Communication Network Tower 01.North RebeccaTowem(00scoped) 0% 0 03•Sep24 03-Sep-24 -185 I A7.12240.WIRE.O' Dealing See Prepareron-Wireless Communication Network Tower 01 North Rebecca Town(Descoped) 0% 0 03-Sep-24 03-Sep-24 -/85 I A7.1 t65.WIRE 01 Establish Network COmmooceeons-Wireless Communica8on Network Tower 01-North Rebecca Tower(Descopedl 0% 0 03-Sep24 03-Sep-24 -185 1 A7.12280 WIRE.01 Install Eleclrcal Equipment it Easing Caherel Wireless Communication Network Tower 01 North Rebecca Tower(Ileac 0% 0 03-Sep24 03-S4p-24 185 I j A7.12730.WIREO1 nstall Mounting Brackets on E4se g Structures-Wooess Communication Network Tower 01 Nam Rebecca Tower IDS 0% 0 03•Sep24 03•Sep-24 -ISO I A7.1I60.W IRE.0/ Install Wireless Comm Network•Radios-Weobss Communication Network Tower 01-North Rebecca Tower(Descnped) 0% 0 03-Sep-24 03-Sep-24 -185 I A7.1070 W IRE01 Instal Wireless Commricatierl Network-Base Une(BTU)-Wireless Communication Network Tower Or•Norm Rebecca 0% 0 03-Septa 03-Sep24 -185 I Ds, Aerate Conte Age. Oil Actual Work Data Date:31-Jan-24 COMB DOOM!IMPS Schedule Update U24.0.W2013124DD 2024-03-20 Sent won el errm Salem eotoeismm° vwr 1 I Remaining WOrk 2024-06.20 Added Missing 2yr TB '►sew 21 Cream uw.w newer Ar.dueu1s1in eaONearno WA Project Start Date:19-Jun-19 arwn Preeng Mawreineramoae Marietta WeNtaMA Rio MEN Critical Remaining Work Full Blown Schedule Ann Pre .Re...Boakdue.er nsw+PR®e l MOM) lee • •Milestone TR - SCO .. RE Project Finish Date:22-Dec-25 Par,24 of 76 le taw Rr.seROSS.Ba de V Nee Mr•r0 PAew.2o®DO na4 MN ' � m Sumary Pn,r: S.helo der.UN OSn2teD0 RMJ AA.N Schere upse.usr ew.ai310400 )nwa TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03-28 Sent 2024.08-20 Added Missing 2yr TE I 27 J-in-z4 TASK liter Al A<uvroes AciAly ID 0e104y Nana Due% AI Compete Start FMish Total Wiest 2024 2025 Camp Dur 01 I 02 j 03 I Oa O1 I 02 1 O3 I O4 t A7 1095.WIRE.D' Cabe Connection and Termination•Wireless Communication Network Tower 01-North Rebecca Tower(Dese0pe0) 0% 0 03-Sep-24 03-Sep-24 •185 : 47 1130 WIRE 02 Instal Antenna.Wireless Communication Network Tower 02-Coursed Tower(Descoped) 0% 0 03-Sep-24 03-Sep-24 -185 I 47.12340.WIRE.02 Instal Conductor Cable•Wireless Communication Network Tower 02-Council Tower(Descopedl 0% 003-Sep-24 03-Sep-24 -185 I 1 A7.12240,W IRE.02 Existing Sae Preparation-Wireless Communlcanon Network Tower 02-CounciTower(Descoped) 0% 0 03-Sep-24 03-Sep-24 -185 I A7.1165.WIRE 02 Estabssh Network Commurscatens-Wireless Communication Network Tower 02-Council Tower(Oescopedl 0% 0 03-Sep-24 03-Sep-24 -105 A7.12280.WIRE.02 instal Electrical Equipment n Existing Cabinet Wireless Communicator Backbone Tower 02 Counc/Tower(Dencaped) 0% 0 03•Sep-24 03•Sep-24 -ISO I i A7.12730.WIRE 02 Instal Mounting Brackets on Existing Structures-Wireless Communication Network Tower 02 Councs Tower(Descoped) 0% 0 03-Sep-24 03-Sep-24 -185 I : A7.1160.WIRE.02 Instal Wireless Communication Network•Rados•Wireless Communication Network Tower 02-Councs Tower IOeseopo 0% 0 03•Sep-24 03-Sep-24 -185 I rrm 47.1070.W IRE.02 Instal Wheless Communication Network•Base UM(BTU),Wireless Communication Network Tower 02-Council Tower I 0% 0 03-Sep-24 03-Sep-24 -185 I A7'013 WIRE.02 Cable Connection and lornalpn WirelesWirelessrmu ess CnicaeorrNetwork Town 02-Council Tower(Descoped) 0% 003 She-24 03-Sep-24 •ISO I 444/ r• A7 12240 WIRE.03 i-,.•.era'See Preparation Wireless Communication Backbone Miami Beach Ponce Dept Tower 0% 1 03-Sep-24 03-Sep-24 -ISt A712730.WIRE.03 Innlal Mounting Brackets on besting Structures Wheless Communication Backbone Marna Beach Ponce Dept Tower 0% 203-Sep•24 04.Sep-24 -185 I A7 12340.WIRE 03 Instal Conductor Cable•Wireless Communication Backbone-Miami Beach Policn Dept.Tower 3%. I 04.Sep-24 04-Sep-24 -185 I A7.12280 WIRE.02 Install Electrical Equipment in Fasting Cabinet-Wireless Communication Backbone•Miami Beach Poe Dep.Tower 0% 1 05•Sep-24 05-Sep-24 -144 1 A7.1160.WIRE.03 Install Wireless Communcaton Backbone-Radios Wireless Communication Network-Miami Beach Police Dept.Tower 0% 1 05•Sep-24 05•Sep•24 -184 I A7.1130.WIRE.03 Install Antenna-Woolens Communication Backbone•Miami Beach Pollee Dept.Tower 0%. 2 05-Sep-24 06-Sep-24 -ISO 1 A7.1070 WIRE.03 Install Wireless Communication Network-Base PM(BTU) Wheless Communication Backbone Miami Beach Police Del 0% 2 05.Sep-24 06,Sep-24 -185 e A7.109SWIRE.03 Cable Connection and Termination Wireless Communicates Backbone-Miam:Beach Ponce Dept Tower O% 5 09-Sep-24 13-Sep-24 .185 0 07.1165.WIRE 03 Establish Network Communications-Wreless Communication Backbone•Wham Beach Police Dept.Tower 0% 5 16•Sep-24 20-Sep•24 -185 0 .. .. • Bel.,ink , Hai 1;a.a4..- .. A A7.12240.WIRE.04 Bening Ste Prepararse Wonted Commoracalan Backbone- ly a erage Tower 0% 1 03-Sep-24 03-Sep-24 -207 I ` A7.12730.WIRE 04 Install Mounting Brackets on Existing Structures•Wireless Communcaton Backbone-City Hal Garage Twiner 0% 2 03-Sep-24 04-Sep•24 -207 I • A7.12340.WIRE 04 instal Conductor Cable Woolens Communication Backbone City Hall Garage Tower 0% 1 04-Sep-24 04•Sp-24 -207 I Al 12280.WIRE D4 1ns1a1 W Electrical EOmenl in rr Existing Cabernet.Woolens Commucalan Backbone•Cry Hall Garage Tower 0% 1 05-Sep-24 05.Sp•24 -206 1 t A7.1160.WIRE.04 Install Woolens Communcaton Network•Radiosnr •Wireless Comuncallon Backbone•Cry Hal Garage Tower 0% 1 05-Sep-24 05-Sep-24 .205 I A7.1130.WIRE04 Install Antenna Wireless Communication Backbone City Hal Garage Tower 0% 2 05-Sep-24 06-Sep-24 -207 , A7.1070.WIRE.04 Instal Wireless Communication Network•Base Una(BTU) Woolens Communication Backbone-Coy Hal Garage Tower 0% 2 05-Sep-24 06-Sp•24 .207 I A7.1085.WIRE.04 "abe C cense eon and Te•rvnalenr-Wireless Communication Backbone-City Hat Garage Tower 0% 2O9-Sep-24 10-Sep 24 -207 A7.1165WIRE.04 '•- - Wreless Communication Backbone-City Hal Garage Tower 07. 2 11-Sep-24 12-Sep-24 •207 1 Ggmmunlc.11on Network-Private Town,% r ,.... 111•1110100y WI A7.12240.r' .- Existing Ste Preparation Wooesn Co'n,nuncal.on Backbone Tone-41 Condos 0% I 06-Sep-24 06-Sep-24 --, 1 A7.t2310,WIRE.05 Install Conductor Cable•wireless Commumoaon Backbone Tower Al Condos 0% 1 09- ep-24 09-Sep-24 •202 1 A7.122130.WIRE.05 Instal Electric.Equipment in Existing Cabinet•Wireless Communication Backbone-Tower 41 Condos 0% 1 IP Sep-24 10-Sep 24 201 1 A7.12730.WIRE.05 Instal Mounting Brackets on Existing Structures-Wireless Comnicatron Backbone-Tower 41 Condos MY. 2 13-Sep-24 16-Sep•24 -207 1 nu i, A7.1160.WIRE.05 kolaWireless Communication Network-Radios-Wireless Communication Backbone-Tower 41 Condos 5% t I7-Sep-24 17•Sep-24 •206 1 A7.1130.WIRE 05 Instal Antenna•Wireless Communication Backbone-Tower 41 Condos 0% 2 17•Sep-24 18•Sep-24 -207 1 A7.1070 WIRE 05 MVOWireless Communication Network•Base Unit(BTU; Wheless Communr:atlon Backbone-Tower 41 Condos 0% 2 17-Sep-24 18-Sep-24 -207 1 i A7 1095.WIRE.05 Cade Connection and lermnarron Wreless Canmurrcaeoe Backbone Tower 41 Condos 0% 5 19•Sep-24 25-Sep•24 207 B A7.1165.WIRE.05 Eslablslr Netwntk Commurwaians-Wreless Communication Backbone-Tower 41 Condos 0% 5 26-Sep-24 02-0c1-24 •207 0 - 1 A7 12240.WIRE 06 Existing See Preparation-Wireless Communication Backbone-Park Yew Point Taos, 0% 1 11-'p-24 It.Sp-24 -191 A?12340 WIRE 06 Instal Conductor Cable Wireless Communication Backbone-Pak View Pont Tower 0% 1 12-Sep•24 12-Sep-24 -191 I A7.12250 WIRE 06 Instal Beene*Equprleu n Existing Gannet Woolens Commuracalm Backbone•Park Vow Pont Toner 0% 1 13•Sep-24 13•Sep-24 190 1 A7 12730 WIRE 06 Install Mounting Brackets on Existing Structures•Wireless Communication Backbone-Red Vrew Pant Tower 0% 2 03.Oct-24 04-Oct 24 -207 1 A7 1160.WIPE 06 Install Wireless Communication Network•Rados•Wireless Camrrsoom ice Backbone-Park Vow Point Tower 0% 1 07.Octr24 07•051-24 206 1 O0, nwro t crmc.e Now MEI AclualWak Data Date:3l-Jan-24 COMB DBOM ITS.SPSScbedWe Update C24.0.W201312400 2024-03-2B Seat Sown reek.snw0..tone%Irian we I I Remaining Work 2024-06-20 Added Missing 2yr TE *ewer ConwrmuM.-Aaw.reerewun 0500or O%avr DO PS( Project Start Date; 19-Jun-19 mnwa Proposed AewrwtaaioVO.enomuir0s0PB9wo NNJ Min Crr.cal Remamng Work Full Blown Schedule xe a ww m � ot nw,..a E.....v.0.w3ort KW.l isaapD ,..1♦ •MAestone TR - SCORE., Project Finish Date:22-Dec-25 v.ki�zs.;7e WaIpo ...Mina,nw..ia,anwram. .v,a PM.kax%aasoo sr+a n.Nwn S.rofletlpei.Dnen Mr T97D WC 8�Summary osnoon Schow•UMr.D N OS,12073mt NMI xeJnx. 9o..n.UMW UM4 W2orirno0 sow TCC•COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2028-03-26 Sent 202406.20 Added Missing 2yr TE 20-Jun•24 TASK filter'AA Aclmties M*aiy ID Asbury Marne Our% At Complete Stan Finish ' Total Flat 2024 2025 Comp Doe 01 I oa I 03 I 04 01 I 02 I 03 [ 04 A7.1130.WIRE OE Install Wrrrorna Wireless Communtatnn Backbone•Park Vow Poet Tower 0% 2 07-Oct-24 08-Oct-24 -207 1 A7.1070 WIRE 06 Install Wireless COmmue€atotr Network-Base Un4(BTUI Wireless Commurlealen Backbone-Park View Pont Tower 0% 2 07-0c1-24 08-Oe1-24 -207 1 A7.1095 WIRE06 Cable Connection and Termination•Wireless Communication Backbone-Perk New Pont Tower 0Y. 5 09.0c1-24 15-Oc1-24 -207 0 A7.1165 WIRE 06 Establish Network Communications-Wreless CorrmrunIca0on Backbone.Park View Point Tower 0% 5 16-Oct-24 22-Oct-24 -207 B Rho,1111 Newark _.,..I R A7 1070 FOC NAP Fir Optic Communications drop from Wireless Comrrrurrtalen Network to Pristine Flow-NAP(Drop Cedes Only) 0% 7 03-Se-24 11-Sep-24 -202 A7.1070.FOC CCTV.607 Fber Optic Communications drop from Wireless Communication Network to Existing Fiber CCTV 6071.395 East End(Dr. 0% 7 03-Sep-24 11 Sep 24 202 a A7 1070 FOC CCTV.405 Fber Omit Communtauons drop Iron,Wireless Communicates,NNw0/k 10 EMSMg Fber•CCTV 4051-195(Chap Cabe t 0% 7 03 Sep 24 11 Sep 24 202 0 • Con*uclbrr-TMC EuOd•,ut 495 17;ar-23A 25-Mar Construction-TMC Bulldeut-FOOT TtenHBon(Not Required) ._:. 0 18-JOP-23A 11-J A71015.TM.^_B Mles1ute Stan 0DC'Transann Ealing TUC Control Rowe to Temporary TMC Commit Room(Not Required) 100% 0 18-Jan-23 A7.1050 Milestone:Complete FDOT Transilen(Not Required) 100% 0 18-Jan-22 A7 1040 Transition of lMC Operations sbl/system,%etlWment born existing Control room to temporary control room(Not Required) 100% 0 10 Jan 23 A 18 Jan-23 • . A7 1020 Temp Control ROOM Preparations Not Re@aed) 100% 0 18.Ja,-23A 18•Jan-25 • A7 1030 Temp Co'Irol Room Teu•rg(Nd Required- 100% 0 18-Jan-23A 18-Jan-23 A7.1330 Freparo:Sucoo Intl Renorl IFna TAB Pan wJY Complan^e Regis and CcrI led Fred Data Reports,,Nob Required: 100% 0 18-Jan-23A 18•Jan-23 man-TMC 80ddoul MAIM A7.1060 TUG R Mleslcna.Start TMC Con.rd R0o-n Bold OA 107% 0 17-Jan-23A Al 1070 Miestone.Complete TMG Control Room Build Om 0% 0 25-May-24 -93 •25-May-24 C-,.irr,crl.n.TMC buddwu1.1',r• ., ..0 ,. - A7.1090 Secure TMC Work Areas for Sound and Dust 100% 3 17-Jan-23A 19-Jan-22 A7.1110 Permanent Sound Barrer Irmlatalion 100% 3 17.Jan-23A 19.Jan-25. A7.1100 Electrical.Data ClMcd 8 Cabtrg Installation 100% 15 26-Jam23A 15-Fe0-2E A7.1120 Install Window Tre amen 100% 3 08-Feb.23 09.Feb-22 A7.1150 Final True&Finishes 100% 22 24•Feb.23 28-Mar.21 t:.-micro„•-rr-trrC A;11'C Install Video Wel Mount Mortars/Video Switches 100% 20 19-Apt-23A 17.May-2: C,nslroct,.n.TMC hurl'•a• .. . Al 12/0 Install Light Futures 100% 6 26-Jan-23A 03-Feb-27 A7.119G Instal,Electrical OrOels 100% 33 01-Mar-23 18-Apr-23 A7.1220 Install Was Mount Monitors 100% 2 19•Apr-23A 21-Apr-23 • A7-1180 Install Other AncAary Egwpmenr 100% 5 19-Apr-23A 26-4n23 A7.1240 install Wukslation Monitors 100% 3 21-Apr-23A 26-Apr-23 A7.1300 Computer Setup"Equpment Conlguration and Integration 100% 5 26-yips-23A 03-May-2: A7.1290 TMC Control Room Egwpnlent Cabing and Conorclnnc 100% 5 26-A0-23A 03-May-2: A7.1200 Install Operator Furrdure 100% 5 26-Ape-23A 03-May-2 A7,7',1 Install Workstalgns•Keyboards 8 Perpherals 100% 5 28-Ap-23A 03-Mae-2: - ,1 r.<1n, ir.1_i it•-... Patin tl In.,::tn.nt Cont..111d1, In, al1 A7 1005.NAG Install Layer 3 Ethernet Swach•Traffic Management Center(TMC) 0% 2 26-Feb-24 27-Feb-24 •101 1 A7 1010 TMC Install Servers-Trati Management Center(T MCI(Video Wall Only•,VDS and Video Doplays1 0% 2 25-Mar-24 26-Ma-24 -119 - I A7 1060 TMC Install EANWAN Equepr,ent-Tratlt Management Center((TMC) 0% 5 27-Mar-24 03-Apr-24 -119 ' 0 A7.1010 TMC Integrate Dedicated User Workslalons Traffic Management Center(TMC) 0% 5 04-Ap-24 10-Apr-24 419 ; 0 Al 1030 TMC Remanent Cabling Traac Management Center ITMC) 0% 5 11-Apr-24 17-Apr-24 -119 0 A7 1040 TMG. Equipment Configuration-Tradic Management Center(TMC) 0% 5 16•Ap-24 24-Apr-24 -119 0 A7.1050 TMC Establish Network Communications-Trate Management Center(TMC, 0% 5 25-Ap-24 01-May-24 •119 0 nsteaelron•Primary Host Sire•DecOGoide Software(Cloud Environment-No MS,allalion Required - A7 1030 HOST ATMS Equtpntenl Cabling•Pnmary Host See-OecOGude Software jCloud Environment•No Installation Required) 100% 0 15-Jan-23 A tit-Jan-22 • A7-1Ot0 HOS1 tTMs Insult Servers Pronary Host See•Doc lGude Sdrware(Cloud Envronmem No Installation Rcqurod) 0 10-Jaer 23A Ja F23 . oay nw4.la user APO, Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013I24DD 2024-03-28 Sent r Oeo is a.resrmauen.4o.n,sed VON f 1 Renaming Work 2024-06-20 Added Missing 2yr TE iewo-n coro,eousee.nae.ee-neamrreur5a9eemoo 0rl0 ass - ProjectStanDate: 19-Jun-l9 aewn Paws.Ane.we..aan001ewparu11030805*o Nsu Crncal Remarmng Worn Full Blown Schedule 26.A.22 Howleya.e.ea Oml.e.cestaarn.c,PROW',0wn0o NUJ • •Milestone TO i1 c�l7C Project Finish Date:22-Dec-25 ree=26of76 nAra ...al New..dna,,.uoWeee,a,MOW2 300 rem t�F Summary / \�1 J /\L.,e mNaa serrw.uome50005 NM 0O NMJ 00 No.II Sc...Upr.UN OS NMOD NUJ SO,"2. SfYPI0V0010 UN ew201312.00 sA0a TCC-COMB Progress SCMOute Update COMB 1380M ITSSPS Schedule Update U24.0.W2 013124D0 2024-03-28 Sent 2024-06.20 Added Missing Tyr TV 20-Jun-24 TASK Iner All Activities Acavly 10 Activ4y Name Our% At Compere Stan I Finish Total Float 2024 2025 Caro Our o+ I 02 I 03 I 04 01 I 02 I 03 ] 0-0 • A7.1000.HOST.ATMS Instal Racks-Prmary Host Sae-DecOGuide Software(Cloud Environment-No installation Required) 100% 0 18-Jan-23 A III-Jan-2 2 A7 1020.140ST.ATMS Install SW on Servers Primary Host Site•DecOGuae Software Updates 0% 1 02-May-24 02-May.24 -119 I A7.1040./40ST.ATMS Equipment CoMOurarion.Primary Host Site•DacOGtedo Software(Cloud Environment) 0% 2 03•May24 06-May-24 •119 0 A7 I050.HOST.ATMS Establish Network Communeations-Primary Host Site-DceOGuae Software 0% 5 07-May-24 13-May-24 -III 8 A7 1316 System Testing Prior to Culover(Post Co Live) 0% 10 15 May24 24•May-24 -93 111 A71320 Transamn of TMC Operaiols stafffrom temporary coned roomi0 revolined coned room 0% 1 25-May-24 25.May-24 -93 ' .'.onstructlan•Generator Installation Power Modifies)nr.s • A7 1050 PW R.HUB Instal and Connect Generator Generator 04.Progress BNd Hub Site Mod:at ins(Eustn9)INN Received) 0% 0 01-Mar-24 01-Mar-24 -77 ! I A71050 PWR.WA Install and Conned Generator•Generator01•Washngta,Avenue(Nol Requited) 0% 0 01•Mar-24 01-Mar-24 .65 , I A71050.PWR.CA Instal and Connect Generator•Generator 01-Cans Avenue(Not Required) 0% 001-Mar24 0I-Mar-24 -66 I A7 1050 PWR M(' Instal and Connect Generator-Generator 03-MacArthur CswytAl A1-41151h Si(Not Required) (W. 0 01-Mar-24 01-Mar-24 -67 I A7.1050 Pw tl install and Connect Generator•Generator 02•171(1 61(Not Required) 0% 0 01-Mar•24 01-Mar or •56 I Construction., SS('S DrVltrs • a,. _r ire-Apr-25 I ' :.-'.38% 1092 02-May 22 29-aye 25 I Construction North Gay Cswy ii 1 tat �5 rt;,.+1 I 'Ac•15 Construction-ADNS-Norm Bay Cswy • 1 I Ir,-(er ,n,1'2.,,,C-,m. 4,00, , ♦ / i 1 A7.1030.AOM5.09.NBC n Underground Locates-ADMS 09-North Bay Cswy 0% 0 28-Mar-24 28-MM•24 -90 1 7 A7 1040 ADMSA9 NBC Install Pull Boxes•ADMS 09-North Bay Corey 0% 1 28-Mar-24 26-Mar-24 -90 r I A7 1135.ADMS.OANBC Pull Conductor Cade!rem Service Pont loADMS-ADMS C9-North Bay Cswy 0% 1 28-Mar-24 29-Mar-24 .90 1 • A7.1195.A0MS.09.N8C Pul Conductor Cable torn Power•ADMS 09•North Bay Cswy 0% 129 Mar 24 02-Act 24 -90 l 0 A7.1045.ADMS,09.NBC Malay Power Services(4 required) ADMS 09-Nortn Bay Cony 0% 1 02-Apr-24 03-Apr-24 -60 t A7 1100.A0MS09 P18C Pour and Cure Maintenance Pad•ADMS 09-North Bay Cswy 0% 1 02-Apt-24 03-Apr-24 •25 1 A7.1r60.AOMS.09.NBC Install Wireless Communication Newyork•Radios-ADMS 09•North Bay Cswy 091, 1 17-Feb25 18-Feb-25 311 A7.1165.ADMS.09 NBC Establish Network ComneuecMwrs ADMS 09•NOrlh Bay Cs wy 0% t 24.Feb-26 24-Feb-25 305 I A7 1'20 ADMS 09.NBC Ldca eslSurveytnstat Plan-Drn Shaft ADMS 09-North Bay Cswy 0% 2 '-Mar-24 :-Mar-4 •160 ( A7.1O1SADMS.09.01BC Clearing and Grubbing ADMS09•North Bay Cowry 0% 127•Mar24 27-Mar-24 -90 1 A7.1022.AOM509.NBC Installation of Dr4 Shalt-ADMS 09-North Bay Cswy 0% 2 27•Mar-24 213-Mar24 •131 I A7.1020.ADMS.09 NBC Embankment/Excavation-ABM509•North Bay Cswy 0% 127-Mar-24 27-Mar•24 -90 I A7.1025.ADMS.09.NBC Cure 8 CSL Test of Drl Shaft•ADMS 09 North Bay Cswy 0% 28 29-Mar-24 25-Apr 24 -151 MI A7.1090.A0MS 09.NBC Install Cabinet(Pad Mount)•ADMS 09•North Bay Corry 0% 1 02-Apr-24 03-Apr-24 -90 A71060.ADMS,09.NBC Ins/all Structure•ADMS 09-North Bay Cswy 0% 1 17•Feb-25 17-Feb-25 411 1 A7.1070.AOMS 09 NBC Install Sign.ADMS 09.North Bay Cswy 0% 1 17-Feb-25 17-Feb•25 -310 I Al 1095.ADMS.09.NBC Cable Connection and Termination-ADMS 09•North Bay Cswy 0% 121-Feb25 21•Feb-25 •314 A7.1200.ADMS.09.NBC Surge Suppessmn-ADMS 09 North Bay Cswy 0% 1 24-FeD25 24-Fe0-25 -314 I A7.1201.ADMS 09.NBC Grounding and Lightning Protection ADMS09•holly Bay Cswy 0% 1 24-Feb-25 24-Feb-25 314 ♦ / i, ..,.0 n,,.i -Irot::I': .rth - ♦ I A71030.ADMS.16.NBC s Underground Locate.•ADMS 16•North Bay Cswy 0% 0 10-May-24 10-May-24 •160 I A7.1040.ADMS 1 e.NBC Inslal Pul Boxes•A0M5 16.Nam Bay Cswy 0% 1 10-May-24 10-May-24 •160 I A7.1135,/I0MS.16 NBC Pull Conductor Cable from Service PON to ADMS-ADMS 16-North Bay Cswy 0% 1 10-May-24 13-May-24 -160 I A71195AOMS.16NBC Pull Conductor Cade for Power-ADMS 16-North Bay Cswy 0% 1 13-May.24 14-May-24 -160 I A7.1045.ADMS16.NBC Mody Power ServtceS(e requeedl ADMS 16 Norm Bay Cswy 011, 1 14.May24 15-May-24 -95 I A7 1100.AOMS.16.NBC Pour and Cure Maamenance Pad.ADMS 16-North Bay Cswy 0% 1 14-May-24 15-May-24 •160 . 1 A7.1160.ADMS.IB.NBC Instal Wireless Communcavor Network-Radios-ADMS 16•North Bay Corry 0•i. I 14-Apr•25 15•Ape-25 -926 , 1 • A7 1165ADMS.16 NBC Establish Network Conrmurcations•ADMS 16 North Bay Cswy 0% 1 22-Apr-25 22•Apn25 -330 i 1 r Ore 9w1.,m RAM New. INI Actual Work Data Date:31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03.2/Sent rebny aoa-.n,soup,.ea;oaelmoo WM 1 I Remaining Work 2024.06-20 Added Missing 2yr TE 1441x21 Co.E+.o1eoaena>er0e4aooeA,N0 Sa-emaaanoq MIE Project Start Date:19-Jun-19 Dull Blown Schedule new-a 2r.w.oreon.rdeoe.,euoace lroctur0Aaw aotoo mu - CriticalRemaenngWork son-ar Rwn.eer,0 Owd.wrupar l.w.nga0.1 Iw1yt00 Nitta • •Milestone rI? C�/1 RE Project Finish Date:22-Dec-25 ' Pall.27of76 new-a elw,ourOAce oBaso'euxseer nPlnSl2mgm0D u, /\ J��/�\L, OrNwa Ono.0 ep.uaosr0f1rJ60 Wert •'�Summary 304.23 Scnccoo Urglweu240S m14eaa0 WM 00-a..24 avows warp Vac OW20,3,l100 NW TCC-COMB Progress Schedule Update I COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03@11 Sant 2024-06-20 Added Missing 2yr Th I 20•Jun-24 TASK latter.Al Activates ACWay D AN A*Name Our% Al Complete Start Finish 161x Moat 2020 2025 1 Comp Our or I 02 , 03 1 04 01 I 02 I 03 I 04 Dar,.,.-I rat allnln•..P01.1.. ..r rr F N A7 1120 ADMS'5.NOC Locates/Survey.Tnstat Plan-Ore Shall ADMS 18-North Bay Cswy 0% 2 07-May24 08-May-24 -139 A7 1015.AONS 16 NBC Csaarng and Grurong.ADMS 16•North Bay Corry 0% 1 09-May-24 09-May-24 -180 • A7 1022 ADMS.16.NBC Inslalalon 01 D.I Shaft-ADMS 16-North Bay Cswy 00. 2 09-May-24 10•May24 •118 - A7 1020.SUMS.16.NBC Embankment/Excavator,SUMS 16-North Bay Cswy 0% 1 09•May 24 09-May-24 •160 A7.1025.SOMS.16.NBC Cure 8 CSL Test of Dra Shall•ADNS 16,North Bay Cswy 0% 28 11-May-24 07-Jun-24 -169 ' O A7.1090.ADMS.16 NBC Instal Cabinet(Pad Maws) SONS 16-North Bay Cswy 0% 1 14-May24 15•May24 -98 : I A7.1060.AOMS.I6.NBC Install Suucture•SONS 16•North Bay Cswy 90. 1 14-Apr-25 I4-Apr.25 -328 - i A7.1070 ADMS.16.NBC Install Sign-ADMS 16 North Bay Covey 0% 1 14•Adr-25 14-Apr-2S -328 . I A7.109SAONS.16.NBC Cable Connection and Termination-ADMS 16-North Bay Corry 0% 1 18-Apr-25 18-Apr-25 -331 I A7 1200.SOMS.16.NBC Surge Suppression-ADMS 16.North Bay Cswy 0% 1 22-Apr-25 224.0r-25 -331 I A7.1201.ADMS.t6.NBC Grounding and Lightning Protection•ADMS 16•North Bay Cswy 0% 1 22•Apr-25 22•Apr-25 -331 - I • C.. A"rut Ca..v 4t3 WI IV A A7 1030MVOS.0I.MC Underground Locates MVOS 01•MacArthur Cswy/AIM-41/5th St 0% 0 10-Jun-24 10-Jun-24 -Ill Al 1015.MVOS0/.MC Clearing and Grubbing-MVOS 01-MacArthur Cswy/A1N1-41/51h St 2% 0 10-Jun-24 10-Jun-24 .114 Al.1020.MVDS01.MC Embankrr.ent/Escavalton•MODS 01•MacArthur Cswy/A1ML41151h SI 0% 0 10-Jun-24 10-Jun-24 -114 A7.1040.MVOS01 MC Instal Pul Boxes-MVOS 01-MacArthur Cswy/AIM-41i5th St 0% 0 10Jun-24 10-Jan-24 -113 A7.1160.MVOS.01.MC Install Wheless Communication Network-Radios•MVOS Or-MacArthur Cswy/A1M-41/50/Si 0% 1 11-Jun-24 12-Jun-24 -115 A7 1135.MVOSOI.MC Put Conductor Cable Irorn Service Pant to MVOS•MVOS 01•MacMMr Cswy/A1M-41/5lh SI 0% 1 12-Jun-24 13-Jun-24 -115 A7 1195.MVOS.01.MC Put Conductor Cable for Rawer•MUDS 01 MacArthur CswyiA1M-41/50r S1 0% 1 13-Jun-24 14Jan-24 -115 1 A7 1045MVOSOI.MC Modify Power Services 51 regu.ed1•MVOS 01•MacArthur CswytA l got 41,5th St cr. 1 14-Jun-24 14-J1n-24 -109 A7.1100.MVDS.0I.MC Pour and Cure Maintenance Pad•MODS 01-MacArthur Cswy/A1M•41i5lh St 0% 1 14-Jun-24 17-Jun-24 -114 - A7 t t 65 MVOS 0 i MC Estonian 61ewo,4 Communications-MVOS 01 MacArthur Casty/AIM-41/9h SI 0Y. 1 17-Jun-24 17-Jun-24 •110 ' W A?1120.MVOS.0I,MC Locates for MODS-MVOS 01•MacArthur Cswy/Al M-41/51h St fa Needed) 0% 0 11-Jun-24 11-Jun-24 -115 A7.1125.MVOSOI.MC Install Poe•MVOS 01•MacArlha Cawy/Al0l-4t/5th St(Nor Rewind) 0% 0 11-Jun-24 11-Jun•24 -115 I A7.1122.MVOS.OI.MC OM Pole Hole•MVOS 01-MacArthur Cswy/A10/I•41/51h St(Not Ragutred) 0% 0 11-Jun-24 11-Jun-24 -115 I A7.t130.MVOS.01.MC Instal MVOS Assembly-MVOS 01,MacArthur Cswy/A1N1-41Ath SI 0% 011-Jun-24 11-Jun•24 -112 I A7.1090.MOOS.0I.MC Instal BTU(Pole Mona)-MODS Os-MacArthur Cswy/AIM-41/5th SI 0% 1 14-Jun•24 14-Jun-24 -115 I A7 1170.MVOS.08.MC Instal Layer 2 Managed Field Ethernet Switches(MFESs) MUDS 01 MacArthur Cswy/AIM-41i5th SI(N/A) 0% 0 17-Jun-24 17-Jun-24 -Ill Al 1182.1IVDS.OI.MC Install Unnlerrupuble Power Supply(UPS)-MOOS 01,MacArthur Cswy/A1N1-41/5M SI(N/A) 0% 0 17-Jun•24 17-Jun-24 -111 Al 1095MVOS.01.MC Cable Connection and Termination-MODS 01 MacArthur Cswy/A1NI-41/501 St 0% 1 17-Jun-24 17•Ja-24 -115 1 A71180.MV0S01.MC Instal Terminal Server-MVDS 01 MacArthur Cswy/Al A/1.41/5th SI 0% 1 17-Jun•24 17-Ja-24 •111 I A7.1200.MVOS.OI.MC Surge Suppressior.-MVOS 01 MacArthur Cswy/A1M-41/51h SI 0% 1 17-Jan-24 18-Jun-24 •I tS A7.1201.MVOS.01.MC G rounmeg and Lghlnng Protection-MODS 01.MacArthur CswyrA1 N1,4115th SI 0% 1 17-Jun-24 18-Jun-24 •115 I A71210.MVOS.01.MC Calibrate and ConIctre-MVOS 01-MacArthur Cswy/A1M-41/501 St 0% 2 17-Jun-24 19Jun-24 -111 1 W dc,- ,^..I. :,C- n,ns la r.t VP 0- aIAllito CIA,CIA 11.-.t_. W A71030.MOOS.00.MC Vndorground Locator MVOS 03 MacArthur Cswy/AIMI.41/51h St 0% . 1.-Jun•24 17•Jun-24 •114 1 A71015MVOS.03.MC Clearng and Grubbng•MODS 03•MacArthur Cswy/AINl•41/Sth SI 0% 0 17-Jun-24 17-Jun-24 -114 1 A7.1020.MVOSO3,MC Embankrnent/Eacevahon-MVOS03•MacArthur Cswy/A1NI-41151n SI 0% 0 17-Jun-24 17-Jun-24 -114 I A71040 MVOS 03.MC Install Pull Boxes-MVOS 03-MacArthur Cswy/AlM1-41,5th St 0% 0 17-Jun.24 17•Jun-24 -113 1 ' A7.1160.MVDS.03.MC Install Wireless Communication Network Radios MVOS 03 MacArthur Cswy/A1M-41151h St 0% 1 18-Jun•24 19•Jat-24 •115 A7 1135MVDS.03.MC Psi Conductor Cable Iroat Service Pant l0 MVOS•MVOS 03•Macaellar Cswy/AINI-41/5th SI 0% I 19-Jun-24 20-Jun-24 -115 I A7 1195.MVDS.03.MC Pull Conductor Cable:la Power-MUDS 03-MacArthur Cswy/AI AA 41/51h St 0% 120•Jun-24 21-Jun-24 •115 I • A7 1045.MVOS03.MC Modify Power Services(i required;-MVOS 03-MacArthur Cawy/AIM.41/5Ih SI 0% 1 21-Jun-24 24-Jurv24 112 0 `ow Renner a4d e eu Ap . Actual WOO. Data Date'31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-26 Sent .on,, sad.sw..no.camto0 v1 1 1 Rematnrp WWI( 2024-06-20 Added Missing 2yr Tf. »6..r1 Caebre0Um»NCO.,.Rma,e..011010 ern 0 09E12100 me Project Start Date: 19-Jun-l9 asww•a noaaaly.w.maewrama a,am.ou170SVARSw0 NM/ MM. Ctncal Renaming Worn Futl Blown Schedule mw.22 Pt..Nevi.Bwe,.Mada.wwneRao. '0202200 Na/ • •Milestone T//�� S //�E Project Finish Date:22-Dec-25 Pge2a of76 men-a etao,e R.w.mas.00r due imstmm..:aozno0 "Ma NMJ �I Summary • ' ` v • "--` *Ma Al sow.um..ux.0s u2n00 NM/ ' 20 An N, Sawa..Uwe UN OW?01112400 roar TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 013124D0 2024-0120 Sent 2024.04-20 Added Missing 2yr TE 20•Jun-24 TASK filler:All Activities ACMy ID Actively Name Our% Al COmplcle Shen Flre0h Total Float 2024 2025 Cane Our, 01 I 02 I 03 I 04 01 1 02 I 03 I 04 _ 1 A7.1100.MVOS.03.MC Pour and Cure Manlenanlce Pad-MVOS 03•Macklnur CswyrA1M•41/5ih St 0% 1 21•Jun-24 24-Jun-24 .82 0 • € A71165.MVOS 03 MC Establish Network Communicators•MVOS 03•MacArthur Cswy/A1A1-41/51h SI 0% 1 24-Jun-24 25-Jun-24 -1/3 1 fii -Ur,"lnsroliat on MVDS 03 I...I nor l a :IT., w A7 1120 MVOS 03 MC Locales for MVOS-MVOS 03-MacArthur Cswy!AI M-41/51h SI(If Needed) 0% 0 18-Jun-24 18-Jun-24 -115 1 A7.I i 25.MOOS.03.MC Install Pole•MVOS 03-MacArthur Csw5AIM-41,5th St(Nat Requeed) 0% 0 18-Jun-24 18-Jun-24 -115 I. ', A7.1122.MVOS.03.MC Dna Pole Hole MUDS 03-MacArthur CswyiAlN/-41/5th St(Not Required) 0% 0 18-Jun-24 18-Jun-24 -11S I A7.1130.MVOS.03.MC Install MVOS Assembly-MVOS03 MacAnhur Cswy/A1M-413th St 0% 0 18-Jun-24 18Jun.24 -112 ' I A7.1090 MVOS.03 MC Install BTU(Pole Mount)-MVOS 03.MacArthur Cswy/AIM-41/51h SI 0% 1 21-Jun-24 24•Jun-24 -1/5 , 0 A7.1170.MVDS 03.MC Install Layer 2 Managed Field Ethernet Swlches(MFESS)-MVOS 03-MacArthur Cawy/A1M-41/51h Si(N/A) 0% 0 24-Jun-24 24-Jum 24 -114 ' 1 A7.1182.MVOS03,MC Install Uninlerruptible Power Supply(UPS)-MVOS 03-MacArthur C9wy/A1NI-41/sth St(N/A) 0% 0 24-Jun-24 24-Jun-24 -114 I A7.1180.MVDS03.MC Install Terminal Serve--MVOS 03-MacArthur Cswy/AIM-41/5m SI 0% 1 24-Jun-24 24-Jun24 -115 I A7.1095.MVOS.03.MC Cable Connection and Termination-MVOS 03•MacArthur CswylAt NI-41/5111 SI 0% 1 24-Jun-24 24-Jun-24 -/15 I A7.1200 MVDS.03.MC Surge Suppression-MVOS 03-MacArthur CswylA1M•41/51h Si 0% 1 24-Jun-24 25-Jun-24 114 1 A7.1201.MVOS.03.MC Grounding and Llghrning Protector•MVOS 03-MacArthur Ctwy/AIM-41/51h St 0% 1 24•Jun•24 25•Jun-24 •114 ' I A7.1210.MVOS.03.MC CaONale and Conhguro-MVOS 03 MacArthur CswyfAl AA-41/5th St 0% 2 24-Jun-24 26Jus24 -115 1 wig w ]' rim. cc,-;I5 1.1-eSrlli,.,Csv:VAlAl 2151h 51 w A7.1015.CC V.15.MC Clearing and Grobbng-CCTV 15 MacArthur CswylAINI-41'S1h SI 0% 0 09-Jul-24 09-Jul-24 •140 A7.1020.CCTV.I5.MC Embankment/Excavation-CCTV 15-MacArthur Cswy/At N1-41/51h St 0% 0 09-Jul-24 09•Jut-24 -140 A7.1030CCTV.I5.MC Underground Locates CCTV 15-MacNInur CSwy/AIN141/5111 St 0% 0 09-Jus24 09•Jul-24 -140 A7.104000TV.15.MC Install Pull Bores•CCTV IS•MacArthur Cawy/AIN1•41/5111 St 0% 0 ea-Jul-24 09-Jul-24 •139 A7.II60.CCTV 15 MC Install Wireless Communication Network-Rados-CCTV 15•MacArthur Cswy/A1N1.41/5th SI 0% 1 11-Juk24 12-Jul24 -141 A7.1135.CCTVIS.MC Put Conductor Cable hpnService Pale t*CCTV-CCTV 15-MacArthur Cow/ WM-41/5th Si 0% 1 12•Jul•24 15-Ju24 •141 : 2 A7.1195.CCTV.IS.MC Put Conductor Cade tor Power•CCTV 15-MaCNthur Ctwy/A1NI-41/51n Si 0% 1 15-Jul-24 16•Jul-24 -141 1 A7.1045CCTV.IS.MC Moddy Power Services(a mewed)-CCTV 15 MacArthur Csw96A1 NI-01/51h SI 0% 1 16•Jul-24 16 Jul•24 -140 1 A7.1165.CCTV 15.MC Eslabssh Network Communications-CCTV 15-MacArthur Cawy/A1M-41i5th SI 0% 1 17•Jul-24 17•Jul-24 -126 I •TSD,viceinstillalion•CCTV 15-MacArthur Cwwy AlA 1-4,:5'.I- i w A:1120 CC7 V.15 MC Locates for CCTV CCTV 15-MacArthur Cswy/AtNI-41/51h 5t(II Needed) 0% 0 It-Jul24 11•Jul-24 .141 I Al 1125.CCTV 15 MC install Pole CCTV 15•MacArthur Cswy/AINI-41/51h SI(NW Required) 0% 0 11-Jul-24 11-Jul-24 -141 I A7.I122.CCTV15.MC DM Pole hide-CCTV 15•MacArthur CswyaA1M-41/5ih St(Nor Required) ay. 0 11-Jul-24 11-Juk24 -141 1 A7.1130.CCTV.I5.MC Install CCTV Camera Assembly-CCTV 15•MacArthur Cswy/AIA/I.41/51h SI 0% 011-Jul24 11-Jul-24 -138 1 A7.1140.CCTV15.MC Install CCTV Camera Lowelslg Device(CID)L CCTV 15-M4cAnhur Cswy/AIA9-41/5th SI III Needed) 0% 0 11-Ju-24 II-Jul•24 -123 I A7.1090.CCTV.15.MC Install BTU(Pole Mona)-CCTV 15•MacArthur CswylAt NI-41/51h SI 0% 1 16-Jul-24 16-Jul-24 -141 ' I A71101.CCTV/S.MC Pour and Cure Mekeenance Pad-CCTV 15-MacArthur Cswy/AIM-41/5th SI 0% 1 16-Jul-24 17•Jul-24 .98 I A7.1170.CCTV.15.MC Install layer 2 Managed Field Ethernet Swaches(MFESS)•CCTV IS-MacArthur Cswy/Al N641/51h Si(N/A) 0% 0 17-Jul.24 17•Juk24 •127 I A7 1190.CCTV15.MC Install Terminal Server CCTV 15•Macnlhur CswylAlM•41/5N St(N/Al 0°. 0 17-Jul-24 17-JIA24 -127• A7.1102.CCTV.15.MC Install Unmierrupeble Power Supply(UPS)-CCTV 15-MacArthur Cswy/AINI-41/51h SI(N/A) 0% 0 17-Jul-24 17-Jus24 -127 A7.1095.CCTV./S.MC Cable Coninecaon and Termination-CCTV 15-MacArthur Cswy/A1N641/5111 St 0% 1 I7-Ju-24 17-Jul-24 •141 A7 1200.CCT..15.MC Surge Suppression CCTV 15•MacArthur Cs.ry/AIM-41/5th SI 0% 1 17-Jul-24 MI-Jul-24 •141 A7.1201.CCTV.I5.MC Grounding and Ligtlhung PrgnCeon•CCTV IS L MacAnmrr Cswy/A1 An..1/Sth St 0% 1 17-Jul-24 le-Jul-24 -111 A7 1210 CCTV 15.MC CaKxole and Conlgurc-CCTV 15 Macamur CswylAtM 41/9n S1 0% 2 17-Jul24 19Jul-24 -127 w n• 1,•. w A7.1015. TV 16.MC Chance and Clubbing•CCTV 16 Mac/rhor Cswy/AlN641'5th 51(MDC) 0% 0 17-Jul-24 17-Jul-24 -140 A7.1020.CCTV.16.6AC Entbankmem/E0cevalon.CCTV 16-MacArthur CswyIAlM 41/51h SIIMDC) 0% 0 17-Jul-24 I7•Jus24 -140 A7.1931 CCTVI6.MC Underground Locales CCTV 16 uxMnur GSwy/AIM 11/5Ih SI(MDC) 0% 0 17•JW 21 77-JW24 •110 A7.1040.CCTV 16.MC Install Put Boxes CCTV 16 MacArthur CSvny/AI M-4I75th SI)MDC) 0% 0 17•JW24 17Jul-21 •139 A7.11110.CCTV.1S.MC Install Wireless Communtallan Network-Rados-CCTV 16-MacArthur Cswy/A1A/l-41/51651(MDC) 0% 1 le-Jul-24 19-Jul-24 -141 ow I AMdw Crerard Mow. Actual Work Data Date 31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-2B Sent M C..,a erw,.Srdm1•00001r411lo tdi. Q Rernanng Worn 2024-06-20 Added Missing 2yr TE r►tw,21 C.1OreaUW.o21000..r Reesre UrS a SR-amo NOV,nth ME Project Start Date: 19-Jun-19 wMw22 nhmn•.0 lam.e40.1newt2w.•herl 0hloorr0 .c .11 IIII Critical Remaining Work ///��� Full Blown Schedule 24 Ort72 owesea an.2eae•ra„sup.4.Fsal Pero..1 AMMO 101 ♦ ♦Wesione IR /�, C( �(�c Project Finish Date:22-Dec-25 Pace29of76 as1tr.al R.gmesR.e.unneM1Mlww000w01Mad2C-422300 tM1 r♦Summer l _7�-�-J„[M1 m w-a s.o•u.eaauaoarmn»0 awl Y 31nw 23 50.21•Volt.UN o 511200300 MAU 20 022. 50..es um.UN e11/2013124130 .MJ TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sent 2024-06-20 Added Missing 2yr TE 20Jun-24 TASK tiller:Al Aeivliea Ac 8p 10 Activity Name Our% N Compete Snarl Finish Total Float 2024 2013 Comp Our 01 1 02 1 03 1 04 01 1 02 1 03 ' 04 A7.1135.CCTV.I6.MC Put Conductor Cable Iron Snn eo Point to CCTV•CCTV 16•MacArthur CswylA1M-4115u,SI(MDC) 0% 1 19-Jul-24 22-Jul-24 -tat 1 A71195.CCTV.16.MC Pal Conductor Cable for Power-CCTV 16.MacArthur Cswy/A1A4-41/51h SI(MDC) 0% 1 22-Jul-24 23-Juf24 -141 1 A7.1045.CCTV 16.MC Modlly Powe,Services(il requred)-CCTV 16-MacArthur CswylAlM-41/5th SI(MOC) 0% 1 23-Jul-24 24Ju424 -140 I A71165.CCTV,16.MC Eslab6sh Network Commumcalans-CCTV 16-MacArthur Clwy/AtM-41/51h SI(MOC) 0% 124-Jul-24 25-Jul-24 •130 I 0e.-re Insta1lar1ot--CCTV IS-MacArthur Cswy Al A 1-J1..5II•it IM, w A/.1120,CCTV 16,MC LOp4te5 Ion CC V CCTV 16 MacArlh.:r Cswy/AJNI-41151h SI(II Needed)(MDC) 0% 0 18-Jul-24 VI-Jul-24 •14 I Al.1125.CCTV,I6.MC Instal Pole CCTV 16 MacArthur Cswy/AIN1.41,5lh SI(Not Requred)(MOC) 0% 018-J4Q4 18-Jul-24 .141 1 A7-1122.CCTV.I6.MC Oral Pula Hole-CCTV 16-MacArthur Cswy/A1M-41/5th SI(No Requred)(MOC) 0% 0 18-Jul-24 18-Ju424 -141 I A7.1130.CCTV,16.MC InsIa8 CCTV Camera Assembly-CCTV 16-MacArthur Cswy/AIA1-4I151h SIIMDC) 0% 0 18-Jul-24 IT-Jul-24 •13$ 1 A7.1140.CCTV16MC Instal CCTV Camera Lowering Device(CLD) CCTV 16•MacArthur Cswy/AIM-41151h SI(II Neededl(MOC) 0% 0 18-Jul-24 16-Jul-24 -12$ 1 II A7.1090.CCTVI6.MC Install BTU(Pole Mount)-CCTV 16-MacArthur Cswy/Ala-41/51h 91(M0C) 0% 1 23-Jul-24 24-Ju424 •141 I I A7.1101.CCTV.I6.MC Pour and Cure Maintenance Pad-CCTV 16 MacArthur CSwyiA1M 415h SI(MDC) 0% 1 23-Ju421 24.Aa 24 •103 I A71170.CCTV.16.MG Instal Layer 2 Managed Field Ethernet Switches(MFESe)-CCTV 16•MacArehor Gswy/At NI-415th St(N/A)(MDC) 0% 0 24-Jul-24 24-Jul 24 -131 I I A71180.CCTV.I6.MC Instal Terminal Server-CCTV 16.MacArehe CswyrAl M.41/511151 IWA)IMOC) 0% 024-Ju424 24-Jul-24 •131 1 I 1 A7.1182-CCTV 16.MC Instal m Unerrupablo Power SUM*(UPS)-CCTV 16-MacArthur Cswy/AIM-41/5th St(N/A)(MOC) 0% 0 24-Ju424 24-Jul-24 -131 I 9 A7.1095.CCTV.IB.MC Cable Connection and Termination-CCTV 16•MacArthur Cswy/A1A/I.41/5Ih SI(MOC) 0% 1 24-Jul-24 24-Jul-24 -141 I A7.12000CTV.16MC Surge Suppression-CCTV 16 Ma0Ar111w CswylA1M-41/51h 51(MOC) 0% 1 24-Juk24 25-Jul•24 -141 ' I A7.1201.CCTV16.MC Grounding and Lightning Protector CCTV 16-MacArthur CswylAlM-41/51h SI(MOC) 0% 1 24-Jul-24 25-Jul-24 -141 • 1 A7.1210.CCTV.I6.MC Cabale and Configure-CCTV 16•MacMhur Cswy/A1N1.4151h St(MOC) 0% 2 24Ju624 26•Jul24 -132 1 w i. a ccrr,. w A7.1015 CCTV t'MC Clearing yid Grubbrg CCTV 17•MacArthur Cswy/AtM-41,6ih SI(MDC) 0% 0 24-Jul-24 24-Jul-24 -140 I • A7.1020.CCTV.17 MC Embankm0nVExcavation-CCTV 17-MaeAnhur Cswy/A1N1•41/511 51(MOC) 0% 0 24-Jul-24 24-Jul-24 •140 I I A7 1030.CCTV 17.MC Underground Locales•CCTV 17-MacArthur CswylAlM-41/51h SIIMDCI 0% 0 24-Jul-24 24•Jul-24 •140 • I A7,1046CCTV.17.MC Instal Pull Boles-CCTV 17-MacArthur Cswy/AlNI.41/Sth SI(MDC) 0% 0 24-Jul-24 24-Jul-24 -139 I Al.1160.CCTV.t7-MC Instal Wireless Communication Network-Rados-CCTV 17-MacArthur CswyrAlM-41/511,9s(MDC) O%. 1 26-Ju424 26-Jul24 -141 1 A71135.CCTV,I7.MC Pull Conductor Cable from Service Ppm to CCTV-CCTV 17-MacArthur Cawy/A1M-41/501 SI(MOC) 0% 1 29-Jul-24 29-Ju424 -141 1 A7.1195.CCTV.17.MC Pul Conductor Cable to Power-CCTV 17-MacArthur Cswy/AIM-41/5n St(MCC) 0% 1 30-Ju424 30-Jul24 -141 I A7.1045.CCTV.17.MC Mod0y Power Sorvic es(i required)•CCTV 17,Macklhur Cawy/A1M-4I/SIh SI(MDC) 0% I 31-Jul-24 31-Jul-24 -140 1 A7 1'65 CCTV 17 MC E,Iialisl-Network Commune al Uhs-CCTV 17•MacArthur CswylA1M•41/51h 51(MOC) 0% I 01-Aug-24 01-Aug-24 -135 I ,,-., ,+i I?r,n,, TV1/-iMa,Anhut Cr_vy AIA IJ15'h St IMOC w A7.1120`CCTV I7.MC Locates for CCTV•CCTV 17-MacArthur CswyrAl M-4115th St(If Needed)(MDC) 0% 0 20-Jul-24 25-Ju624 -141 I A7.1125.CCTV,17.MC Install Pole-CCTV 17•MacAnnur CswpiAIN0.415m SI(No Requtred)(MOC) 0% 0 26-Jul-24 26-Jul-24 •141 I A7.1122.CCTV17.MC Cali Pole Hob-CCTV 17-MacArthur Cswy/AIM-41151h SI(Np1 RequeedllMOC) ar. 0 26-Ju424 26-Jul-24 -141 - I A7.1130.CCTV.I AMC Instal CCTV Camera Assembly-CCTV 17-MacArthur Cswy/AIM-4115th SIIMOCI 2% 0 26-Jul.24 26-Jul-24 -130 I A7.1140.CCTV.I7.MC Install CCTV Camera Lowering Deuce lCLO)-CCTV 17-MacArthur Cswy/AIM-41/5th SI III Needed)IMOC) 0% 0 26-Jul-24 26-Jul•24 •133 1 A7.1090.CCTVI7.MC Instal BTU(Pole Mount)•CCTV 17-MacArthur Cswy/A1NI-41,51h SIlMDCI 0% 1 31-Ju624 31-Jul-24 •141 1 A7.1101,CCTV17,MC Pour and Cure Maintenance Pad•CCTV 17•MacNawl Cswy/A1M-41,51h St(MOC) 0% 1 31-Ju424 31-Ju424 •108 1 Al.1170.CCTV17,MC Install Layer 2 Managed Fled Emarnel Switches(MFESo)•CCTV 17 MacArthur Cswy1AI NI-41/5th SI(NIA)(M0C1 0./. 0 31-Ju•24 31-Jus24 •136 I • A7.1180.CCTV 17.MC Install Terminal Se,von•CCTV 17•MacArthur Cswy/AIM-41/50r St IWA)II40C) 0% 0 31-Ju424 31-Jul-24 -136 A7.1182.CCTVI7.MC Install Unnlerruptale Power Supply(UPS)-CCTV 17-MacArthur Cswy/AIM-4175tth SI IN/A)(MDC) 0% 0 31-Ju424 31-Ju424 -136 I • A7.1095.CCTV.17.MC Cable Connection and Termination•CCTV 17•MacArthur Cswy/A1M•41/51h SI(MOC) 0% 1 31-Jul-24 31-Jul.24 -141 I ' A7.1204CCTV.17.MC Surge Suppression-CCTV 17-MecArmur Cswy/AIM-4115th Shale) 0% 1 01-Aug-24 01-Au9-24 -141 A7.1201 CCTV.17.MC Grounding and Lightning Protection-CCTV 17 MacArthur Cswy/AIM-41/51n SI(MDC) 0% 1 01-Aug.24 01-Aug-24 -141 A7.1210-CCTV.17.MC Calb.ale and Configure-CCTV 17-MacArthur Cswy/AtM-41/51h SI(MOC) 0% 2 01-Aug-24 02-Ause24 •137 I w _ w • A7.1015. .18. Clearing and rubbing-CCTV 18•MacArthur Csm9lA1M•41/Sth SI)MDC) 0% 0 31-Jul.24 31 Jul-24 -140 I A7 1020.CCTV 18.MC EmbankMem/E.ccvalan-CCTV 18•Mac*llrrr Cswy/AIM-41/51h SIIMOC) TI. 0 31-Jul-24 31 Jul-24 -140 I . Ow. Rwl•im Cl4444 %ww- IgIMMI1 Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule llpdate 1124.0.W2013124DD2024-03-2SSent Is on. anew.sLwiemeh°onrsbn wen I 1 Ramanng Work 2024-06-20 Added Missing 2yr TE 1*Rw-21 to..t.aUp.*Rao-env R•ain.nrUISO 0A-001001r11r00 the Project Start Date: 19-Jun-19 m.•1a Paco.uane-nlealwm w um wuo .irnu,7oawrlaw.o rune - Critical Remaining Work Full Blown Schedule 244.20 r+me,mnr..,ra ew.eua.rewpc,PAW.t nnv21o0 1a1J • •uiesane I •R/� C�RE, Project Finish Date;22-Jac-25 P.l,ldof 76 muw.a v...tmOr„.a0.ot w oaceirpa,m00 041 mob NUJ r�Summary { J o Nor.a se,•w•uome uzads lmlmo wMJ Y 13 Are.21 Sd...Waif U24 lrne1e3D0 NUJ 20Jr2l Spwwet/MMU2.0 W2011r2400 NJ TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sant 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK liner.AN Acuntles Acrwiy 10 Ac W by Name Dur% AI Cnmmplele Slant finish Total Float 2024 2025 Comp Dur 01 02 03 0* 01 1 02 ' 03 I 04 s A7 1030CCTV.I8.MC Lindero:mem Locales•CCTV 18-MacArthur Cswy/AIM-41/5th Sl(MOC) 0% 0 31-JUL24 31-Juk24 -140 1 Al.1040CCTV.I8.MC avail Pun Boxes-CCTV 18-MacArthur Cawy/AINI•41/511151(MDC) 0% 0 31•Ju1.24 31-3U1-24 -139 I A7.1160.CCTV.111.MC msial.Weeless Communication Network•Radios•CCTV 18-MacArthur Cswy/A1A'l-41isl11 St(MOC) 0% 1 02-Aug-24 05•Aug-24 -141 1 A7.113%CCTV.IB.MC Putt Conductor Cable horn Service RAM to CCTV-CCTV 18-MacArthur Cswy]Ar A'b 41/541 SIMOGI 0% 1 05-Au0-24 06-Aug-24 -141 I A7.1106.CCTV.18.MC Pull Conductor Cable for Power-CCTV 18-MacArthur Cswy/AlNI.41/51h 51(MDC) 0% 1 06-Au9•24 07-Aug-24 •141 1 A7.1045 CCTV.IB.MC Moddy Power Seron es(4 required) CCTV 18•MacArthur CswylA1M•41/5I11 SIIMOC) 0% 1 07.Aug-24 07-Au9-24 -130 I A71.65 CCTO 19 MC Establish Netwelk Cpinmunipalioro CCTV 18-MacArthur C swylAlAl•41i5th Si(MOCI 0% t 04.44g-24 08-Aug-24 -140 I rr A7.1120.CCTV 18 MC Locates for CCTV-CCTV 18-MacArthur Cswy/A1 Ail-41/51h Si 111 Neeoe4)(MDC) 0% 0 02444.24 02-Aug-24 -141 I A7.1125.CCTV 18.MC Instal Pole-CCTV 18 MacArthur Cswy,AtN1.41151n S1(N01 RequeedlIMIC) 0% 0 02-Au9-24 02-Aug 24 -141 1 A7.1122.CCTV18.MC DM Pole Hole•CCTV 18-MacArthur Cswy/A1NI-41/51h SI(Not Requtred)lMOC) 0% 0 02-Aug-24 02-Aug-24 •141 I A7.1130.CCTV.18.MC Install CCTV Camera Assembly•CCTV 18•MacArthur Cswy/A1A1-4 t/51h SI(MDC) 0% 0 02-Aug-24 02-4.4.24 -136 1 A7.1140CCTV18.MC Install CCTV Crevice Camera Lowering (CLO) MacArthur 16-Machur Cswy/A1 A3-41151n St(II NalWedl(MOC) A7.4090.CCTVIB,MC A7.I1O7.CCTV 18.MC Install 'Pole Mount CCTV 18 MacArthur Cswy/A/N1-415tt 51(MOC) 0% 0 02•Auq•24 02-IWg24 1 07-Aug 21 07 Aug21 •-1tl I I Pour and Cure Maintenance Pao CCTV IB•MacArthur CswylA1M-11/Sth 0% SIIMDCI 0% t 07-Aug-24 04-Aug-24 •/38 -113 I A7.7170.CCTV.I8.MC Instal Layer 2 Managed Flak]Ethernet Switches(MEESs)-CCTV 18-MacArlhur Cswy/AIA1.4115th SI(N/A)(MDC) 0% 0 07•Au9.24 07•Aug-24 -141 I A7,1180.CCTVI11.MC Instal Terminal Server-CCTV 18-MacArthur CSwy/AI M-41/581 SI(N/A)(MDC) 0% 0 07-Aug-24 07-Aug-24 -141 I A7.1182.CCTV.18.MC Install Unnlerrupnble Power Supply(UPS)-CCTV 18-MacArthur Cswy/A1 NI-41/51h St IN/AWE/CI 0% 0 07-Aug24 07-Aug-24 -141 I A7.1095.CCTV.I8.MC Cable Connector and Termination•CCTV 18-MacArthur Cswy/A1N1-41/50,St(MDC) 0% 1 07-Aug-24 08-Aug-24 -141 - 1 a7.1200.CCTV.I6.MC Surge Sm0ores son CCTV 18-MacArthur Carry/AIM-41/5th SI(MOC) 0% 108-Au9.24 09-Au9•24 -140 1 A7.1201.CCTV.16MC Groandnq and Lgnlnog Protection-CCTV 18-MacArthur Cswy/A1M-41/51h SIIMOC) ON. 1 08-Au9-24 09-Aug-24 .140 I Al.1210.CCTV.18.MC CaMrale and Configure•CCTV 18-MaC#11ml Cswy/AlM-41/5tl SI(MDC) 0% 2 08-Aug-24 12-Aug-24 -1a1 I u ,ct,0cllon A MS-U--•c;,rIBur Cow.01.:1 4i-_1n_ N e ♦ I -___-- Ili,:f,.i-r. rr n r:1. C. A. �t , , . .. ,.-.ru C- -. h'.I:1 l. I`� ♦ A]10.30 AIMS 06.MC Underground Locales ARMS 06 MacNrr l% GswyfAI Ad 41/5th St 0% 0 26-Mar-24 26-Mar-24 135 I Al 1040.AIMS.06.MC Install Pull Boxes ADMS 06-MacArthur Cswy/A1N1-4I/5th SI 0% 1 26-Mar-24 26-Mar-24 -135 I A7.1135.ADMS 06.MC Put Conductor Cobb from Service Point loADMS,AOMS 06-MacArthur Cswy/Alio-41/51h SI 0% 1 26-Mar-24 27-Mar-24 -135 A7 1195.ADMS.06.MC Pull Conductor Cable for Power•ADMS 06•MacArthur Cswy/AI NI-4115th SI 0% 1 27-Mar-24 28-Mar24 .135 I A7.1045.ADMS.06.MC Modify Power Services(d required) ADMS 06 MacArthur Cswy/A1M-41151h St 0% 1 28-Mar-24 29-Mar-24 -79 A7.I100A0MS 06 MC Pour and Cure Maintenance Pad-ADMS 06 MacArthur Cswy/AIM•41/S1h Si 0% 1 28•Mar-24 29-Mar•24 -135 1 A7.1160.ADMS.06.MC Install Wreiess Communication Nahvork-Rados-ADMS 06-MacArthur Cswy/A1M-41/51h S1 0% 1 17-Feb-25 18-Feb-25 -312 I A7.1165.A1M505 MC Establish Network Communications-AIMS O6,MacArthur Cswy/Ar M-4I/51h SI 01. I 20•Feb-25 20-Feb.25 •304 • 1 ..c. -1s1nll71.0r.ADMS CIO•MacArthur Cswy A'A 1.4'S1n 11 A7 1120 AIMS 06 MC I.ncates,S/roey.Install Pan•Drill S11all AIMS 06-MacArthur swy/AtAll-41/5m 51 0% 2 21-Mar-24 22-Mar•24 •/ . 1 • A7.1015.ADMS O6.MC Clearing and Grubbing•ADMS 06 MacArthur Cswy/AIM-4115th SI 0% I 25-Mar-24 25-Mar-24 -I35 I A7.1022 ADMS 06.MC Installation of Da Shall-ADMS 06-MacArthur Cswy/Ar M-41151h SI 0% 2 25-Mar-24 26•Mar•24 -108 I A7.1020 ADMS.06.MC Embankment/Excavation•ADMS 06•MacArthur Cswy/A1N1-41/51h 51 0% 1 25-Mar-24 25-Mar•24 -135 I A7 1025 ADMS 06.MC Cure 8 CSL Test of Dra Shah•ADMS 06-MacArthur Casey/A1 M-41/51h St 0% 26 27-Mar-24 23-Ppr-24 -160 O A7 1080 ADMS 06 MC Pour and Cure Cabinet Pad,ADMS 06 MacArthur Cswy/A1M,4115111 SI(Not Required, 0% 0 MI-Mar-24 28-Mar-24 •89 I A7.1090 ADMS 06.MC Install Cabinal(Pad Mount)•ADMS 06•MacArthur Cswy/AINI-41/5171 SI(No Required) 0% 0 29-Mar-24 28-Mar-24 -89 I A7 1060 ADMS 06.MC Instal Structure AIMS 06-MacArthur Cswy/A1M-41/5th St 0% 1 17-Feb 25 17-Feb-25 -312 A7.1070.ADM5.06 MC Install Sign-AIMS 06•MacArthur Cswy/A1AI.4151h Si 0% 1 17-Feb•25 17-Feb-25 -312 A7.1095.ADMS.06.MC Cable Connection and Termination,ADMS 06•MacArthur Cswy/ArNI-41/51h St 0% 1 20-Feb-25 20-Feb-25 -314 A7.1200.ADMS 06.MC Surge Suppressor ADMS O6-MacArthur Cswy/At0.1.41/5.h Sr ON. 1 20•Feb-25 21-Feb-25 •314 A/1201 ADMS 06 MC Grounding and Lightning Protoclon AOMS 06 MacArthur Cswy/A1A1-41/5I1,St 0% 1 20-Fob25 21•Fo0•25 -314 ♦ I - A7 1030 ADMS D7 MC Underground Locates•CMS 07-MacArthur Ccwy/A1M-41,510 St 0% 0 29-Mar-24 29-Mar-24 -135 I Da. 111.411m Ch.." how ACal Work Data Date:31-Jan-24 COMB OBOM ITSSPS Schedule Update U24.0.W2013124DD 2024.03-20 Sent no0-It sun,. se...we01,13on owl '*Vidal 1 ' Remanmg Work 2024-06-20 Added Missing 2yr TE Ierlw-n Corm.eu0ialeAse.rna.+lne u154an-et3001062100 e5F Project Start Date: 19-Jun-19 osom20 15o0noen.eraneolrollowe1novelu17a1yrne9411 133.1.1 Cre¢al Remaining Work Full Blown Schedule 2a0n22 Rwwmllmnsed ewrv.tledrr. mtPR11o.r 00a00o '0, ♦ •M1eslone TR 5'CORE Project Finish Date:22-Dec-25 Pogo11 of 76 wuw fur ne.a nsedn.8.6e/mvm.eImpd 11111101.200ar nu, t1o0 �7 SunlTel / '` ��// onw a StlWL uoYn u23051Wiado nu, r Sara 23 Srhareur4p4u240S n216100 nth, al..ie Srnw.us.ou24.11w201312000 NO. TCC•COMB Progress Schedule Update COMB DBOM 1TBBPS Schedule Update U24.O.W2 01312400 2024-07.211 Sent 2024-06-20 Added Missing 2yr TE 1 20-Jun•24 TASK titter Al Activities Pawky 10 Aetna),Nemo Our% At Complete Start Finish Total Float 2024 2025 { Corp Dur 01 I 02 I 03 ' 04 01 r 02 1 03 [ 04 A7.1040.ADMS 07 MC tins.,Pul Boxes•DMS 07-MacArthur Cswy/AlNL41151h SI 0•. 1 02-Apr-24 02-Apr.24 -135 I A7.113SAOMS.07 MC Put Conductor Cade from Service Poem to OMS-OMS 07.MacArthur CswyMI M•41/501 St 09. 1 02-Apr-24 03-Apr44 -135 I A7.1195ADMS.07744C Put Conductor Cable for Power•DMS 07-MacArthur Cswy/A1M-41/5lh Si 0'Y. 1 03-Apr-24 04-Apr-24 -135 I A7.1015 AOMS.07.MC Modify Power Services(i required)•DMS 07-MacArthur Cswy/AIM-41/51h St 0% 1 04-Apr•24 04-Apr-24 -90 A7.1100ADMS.07.MC Pour and Cure Maintenance Pad•DMS 07-MacArthur Cswy/A1A4-41/51h St 0% 1 04-Apr-24 05-Apr-24 -13S 1 A7.1160.ADM5.07,MC Install Wireless Communication Network•Pathos-DMS 07-MacMnur CswyrA1AI-41/5th Si 0% 1 10-Oc1-24 11-Oct-24 -235 I 47.1165.ADMS•07.MC EstMMsh Nelegek Carnmuncatans-OMS 07•MacArthur Cswy/AlN1-41/51h SI 0% 1 17-0c1-24 17-001-24 -227 I ,r c. - A71120.ADMS07MC Locates/Stoney/Instal Plan-DM Shaft DMS 07 MacArlur Cswy/At Al 41.5th St 0% 2 05-Mar-24 06-Mar-24 •160 A7.1015 ARMS 07 MC Clearing and Gritting-DMS 07-MacArthur Cswy/A1N1•41/50r St 0% 107•Mar-24 07-M4/24 -119 I A71022 ADMS.07.MC Installalion of Doll Shall DMS 07-MacArthur Cswy/A1N1-41/5th St 0% 2 07-Mar-24 08-Mar-24 •106 1 ii A7.1020.ADMS.07.MC Enrbankmenl/Excavalan-DMS 07•MacArthur Cswy/AINI.41/51h St 0% 1 07-Mar-24 07-Mar-24 .119 I A71025 ADMS 07.MC Cure&CSL Test of Ora Shaft-OMS 07-MacArthur Cswy/A1N1-41/5111 SI 0% 28 09•Mar-24 05.Apr•24 -156 1•a� A7 1080.ADMS.07.MC Pour and Cure Cabaret Pad•OMS 07-MacArthur Cswy/A1AI.41/51h St(Not Regaeod) 0% 0 04-Apr-24 04-Apr-24 -102 I A7 1090 ADMS 07 MC insla,Cabinet(Pad Mount)-OMS 07-MacArthur Cswy1Al M-41150 St Not Rrqured) 0% 0 04-Apr-24 04•Apr24 -102 I A7 1060.AOM507 MC Install Structure DMS 07,MacArthur Cswy/AtM-41i51h SI 0% 1 10.Oct-24 10-Oct-24 -235 I 4 A7,1070.ADMS.07,MC Instill Slgn-DMS 07 MacArthur Cswy/A1M-41151 SI 0% 1 10-Oct-24 10-Oct-24 -235 I A71095.AOMS.07.MC Cable Connection and Termination-DMS 07 MacArthur Cswy/A1N1-41.5th SI 0% 1 16-00.24 16•Oct-24 -238 I A7.1200ADMS 07 MC Surge Suppression-DMS 07-MacArthur Cswy/ArNl-41/5th St 0% I 17.Oe1-24 17-Oct-24 -238 • A71201 AOMS.07.MC Grounding and Lghtrag Proleclon OMS 07 MacArthur Cswy/A1Ar1-41/5th St 0% 1 17-0044 17.Oct-24 .238 ♦ • •..�•c _. ♦ A7 1030 ARMS 10.5C Underground Locates.ADMS 10-MacArthur Cswy/AIM-41/5th SI 0% 0 05.Apr-24 05-Apr-24 -135 1 A7 1040 ADMS 10.MC Instal Pul Boxes-ADMS 10•MacArthur Cswy/Ales-41/51h St 0% 1 05-Apr•24 08-Art 24 -135 ' A71135.ARMS.It)MC Pull Conduclor Cable horn Service Poles to ADMS-ADMS 10-MacArthur Cswy/AINM-415th Si 0% 1 08.Apr-24 09•Api•24 -135 A7 1195 ADMS 10.MC Pull Contactor Cable for Power-AOMS 10-MacArthur Cswy/AI Ad a1!51h St 0% 1 09-Apr•24 10-Apr-24 -135 1 A7 1045 ARMS 10.MC Modify Power Services(if reamed)-ADMS 10-MacArthur Cswy1A1A1I-41/5th St 0% I 10•Apr24 10-Apr-24 •85 I A71100.ADM5.10.MC Pour and Cure Maintenance Pad-ADMS 10•MacArthur Cswy/A1M-41/5In St 0% 1 10-Apr-24 11-Apr•24 135 I A7 1160.ADMS.10 MC Install Wireless Communcattn Network•Pathos ADMS 10-MacArthur Cswy/AI NI 4115th St 09. 1 03-Mar-25 04-Mar-25 .319 1 Al 1165.ADM5.10 MC hsiabksh Network Communications-AOMS 10 MacArthur Cswy/A1M-4t151h S1 0% 1 05-Mar-25 05-Mar-25 -311 1 -4 nt,17-tt •.tor-An!„cs.�v A.A ♦ • A71120.ADMS.10 MC Locates/Survey/Install Plan Ore Shah•ADMS tO MacArthur Cswy/Ales-41/5th St 0% 2 27-Mar-24 20-Mar-24 -160 I A7.10r5.ADMS.IO.MC Clearing and Grubbing.ADMS 10.MacArthur Cswy/A1N1.41;5th SI 0% 129-Mar•24 29-Mar-24 -131 I A7.1022 ADMS.10.MC Installation 01 Ora Shah-ADMS 10-MacArthur CSwytAIM-41/51h SI 57. 2 29-Mar-24 02-Apr-24 •129 0 A7.1020 ADMS.10 MC Embankmenl/Excawaf-ADMS 10-MacArthur Cswy/AIM-41/51h 5t 0% 1 29-Mar-24 29-Mar-24 -131 I Al.1025.ADMS 10.MC Cure 6 CSL Test of DrkShah-ADMS 10-MaEM0ur Cswy/A1M-41/51h SI 0% 26 03-Apr-24 30-Apr-24 -162 MN Al 1080 ADMS.1 C.MC Pour and Cure Cabinet Pad-ADMS 10.MacArthur Cswy/AIM-41/511h SI(Not Required) 0% 0 10•Apr-24 10-Apr-24 -94 I A7.1090 ADMS 10.MC Install Cabinet(Pao Mount),ADMS 10•MacArthur Cswy/AlA641/5th St(Nor Requred) 0% 0 10-Apr-24 10-Apr-24 -94 I A7.1060.ADMS IC MC Install Structure ADMS 10 MacArthur Cswy(AIA4•41/Sth St 0% 1 03-Mar-25 03-Mar-25 -319 1 A7.1070 ADMS 10.MC Install Sgn-ADMS 10-MacAnnur Cswy/AI NI-4151h S1 cm. 1 03-Mar-25 03-Mar-25 -319 - 1 A7.1095.ADMS.10.MC Cable Connector and Tornrnaton.ADMS 10-MacArthur Cswy/A1M-41/51h St 0% 1 04-Ma1.25 04-Mar-25 -319 I A7.1200.ADMS.I13.MC Surge Suppression-ADMS 10-MacArthur Cswy/AIM-41/5th St 0% 1 05-Mar-25 05-Mar-25 •319 A7.1201 AOMS 10.MC Groundn0 and Lghlning Prolocean ADMS 10-MacArthur CswylA1A1.41/51h St 0% 1 05-Mer-25 05•Mar•25 •319 I ♦ I tander,..tin tI.vet.C-mm ADMS It-a ♦ I A7 1030 ADMS I a MC s 2rder9round Locates•ADMS 14•MacArthur Cswy/Ales-ds/Seh' 0% 0 II-Apr-24 11•Apr-24 -135 I A;1040 ADMS 14 MC Instal Pul Boxes•ADMS 14-MacArthur Cswy/AtM•41/511r Si 0% 1 11-Apr•24 11-Apr-24 -135 1 • A:1'35.ADM5.'4 MC Pull Conductor Cable Irom Service Port to ADMS ADMS 14.MacArthur Cswy/MA1-41151h St 05. 1 12-Apr-24 12-Apr-24 135 I Al 1195.ADMS.4 MC Pull Conductor Cable tor Power•ADM514-MacArthur Cswy/A1Nl-alrsth St 0% 1 15-Apr-24 15-Ap,24 135 I Oat health chdtr/ two. IMMII Actual Work Data Date 31-Jan-24 et COMB DBOM ITSSPS Schedule Update U24.O.W2013124DD 2024-03.20 Sent rsdn.rs .r,ni sever.eel oos,sien sate l •1 Remaining work 2024-06-20 Added Missing 2yr TE WOW a eamor uAeae ftwehm 20442.44 e.aec uos0sae1804 o40 ME Project Start Date:19-Jun-19 auw n Am4waa.....auoeae eoe.a-w oulee.I non r0 au Crncal Remaining Work Full Blown Schedule It)onla wwe,e,Rental evek•vole.mau PROP 11or4aoo wMJ • •Miosionn / /\ SCORE Project Finish Date:22-Dec-25 e.,�Iz of76 marts ',time,e.wu4 emewwvPwea eneuovlmoo- Oct 2412 ��Summary ]akaa S.M.u Gs*.UN es n7p21312 NUJ 1are7 smear,uromuN0WS0111N00 NUJ TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 013124D0 2024.03.26 Sant 2024.06.20 Added Missing 2yr TE 20-Jun-24 TASK Eller:M Activeus ACN4y10 Aclndy Name Dur% Al Complete Start Finish Total Foal 2024 2025 Comp Dur Or I 02 1 03 1 04 0, I 02 I 03 I 04 C r A7.1045AOMS,14 MC Modify Power Services(a required).ADMS 14•MacArthur Cswy/AIA1,41r5th St 0% 1 16-Apr•24 16-Apr-24 -88 I A7.1100,ADMS.14.MC PM!,and Cure Maimanance Pad-ADMS 14-MacArthur Cswy/AIM-41/5e,SI 0% 1 16-Apr•24 16•Apr-24 •135 I A7.1160.ADMS.14 MC Install Wireless Communication Network-Radios-ADMS 14 MacArthur Cswy/A1NI-41/561 Si 0% 1 03-Mar 25 04-Mar-25 -318 I A7.1165.ADM5.14 MG Establish Network Communcatxrrs-ADMS 14-MacArthur Cswy/AIM-41/51h SI 0% 106-Mar-25 06•Mar-25 -311 I TS Device I-'stallar,o--ADMS 14-MacArthur Cows AlA r-41 5111 I 5 A/.1120AOMS 14 MC Locatesi5urvey..lnstall Plan Or ill Shan ADMS 14 MacArthur Cswy/A1 A 141/51h St 0% 2 29-Mar-24 02-Apr•24 -160 A7.IOt5.ADMS 14 MC Clearing and Grubbing ADMS 14 MacArthur Cswy/A1M,41,51h SI 0% 1 03-Ap•24 03•Apr•24 -129 I A7.1022 ADMS 14 MC InsraMton or Or1 Stan•ADMS 14.MacMhur Cswy/AIM-411511,St 0% 2 03-Apr-24 04-Ap4-24 •126 A7,1020.ADMS.to MC EmbankmunlEacavalgn-ADMS 14.MacArthur Cs yrAINl-41/5Ih St 0% 103•Apr-24 03•Ap•24 •/29 I A7 1025 ADMS 14 MC Cure&CSL Test of DtII Shalt-ADMS 14.MacArthur Cswy/AIM-4lr5111 51 0% 28 05-Apr-24 02-May-24 •163 0.11 A7.1000.ADMS.14.MC Pour and Cure Cabinet Pad•ADMS 14-MacArthur Cswy0A1M41151h Sr(Nor Reguire0) 0% 0 16-Apr-24 16-Apr-24 -96 I ' A7.1090.ADMS.I4 MC Instal Gabriel(Pad Mount)-ADMS 14-MacArlhur Casey/A1 M-41/5M St(Not Required) 0% 0 16-Apr•24 16-Apr-21 -96 I A7.1060.AOMS.14.MC Instal Structure•ADMS 14•MacArthur Cswy/AIM-41/5th SI 074. 1 03-Mar-25 03-Mar-25 -318 I I A71070.ADMS.14.MC Instal Sign.ADMS 14 MacArthur Cswy/AIM•4151h Si 0% 1 03-Mar•25 03.Mar•25 •317 I A7 1095.ADMS.14.MC Cable Connection and Termination ADMS 14-MacArthur Cswy/AINI-41/51h Si 0% 1 06-Mar-25 06-Mar-25 -319 I . A7 1200.ADMS.14.MC Surge Suppression-ADMS 14-MacArthur C1wyIA1N1-41,51h St 0% 1 06-Mar-25 07-Mar-25 -319 Al.1201.ADMS.I4.MC Grounding and Lightning Protection.ADMS 14-MacArthur Cswy/Arad-415t1 St 0% 1 06-Mar-25 07-Mar-25 •319 1 I n.r G•'rr.r '.1.r.r,l lri.nllU,C'.r : ...:1'l I `Vl 7I A7 1030 AOMS 15 MC n Undergro_.d_ccates ADMS 151 Mac A•,hur Cswry/A1NF415m SI 0% 0 17.Ap1-24 17-Apr-24 •135 1 A7 1040 AOMS 1 S MC Instal Pull Boxes ADMS 15-MacArthur Cswy/A1A/1-41/51h St 0% 1 17-Apr-24 17-Apr•24 •135 I IA7 1135.400MS.15 MC Purl Conductor Cable from Service Point 10 ADMS-ADMS 15•MacArthur Cswy/A1M41/5dr Si 0% I 17-Apr,24 16-Apr-24 -135 1 17 1195 ADMS.15 MC Pull Conductor Cable for Power-ADMS 15-MacArthur Cowp/A1NI-41/5lh St 0% 1 18•Apr•24 19•Ap.24 -135 I A7.1045 ADMS 15 MC Moddy Power Services(4 required) ADMS 15,MacArthur Cswy/Al0I.4154h SI 0% I 19-Apr•24 22Apt24 -90 I Al.r100.ADMS.15 MC Pour and Cure Maintenance Pad-ADMS 15 MacArthur Cswy/A1M-4115111 SI 0% 1 19 Apr-24 22-Apr 24 -135 0 A7 1,60.ADMS 15 MC Instal Wireless Communraten Network-Radios-ADMS 15-MacArthur Cswy/A1NI.415M St 0%. 1 03-Mar-25 04-Mar-25 -316 1 A7 it 65.ADMS 15.MC EstatAsh Nelwcrk Communications-ADMS 15-MacArthur Cswy/A1M-4151h Si 0% 1 10-Mar•25 10-Mar-25 -312 I ,T 5 Dovrcelnsra'Iatno'1 AOMS 15 MacArtnur Cswy.Al A-I 41 Sin r % I A7 1120.ADMS 15 MC 1 rratesISureey'Install Plan-Dal Shan•ADMS 15•MacArthur Cswy/AtNM-11/51h St 0% 2 03-Apr-24 04-Apr.24 -160 i "+/1015.ADMS.I5.MC Clearing and Grubbing•ADMS 15-MacArthur Cswy/A1M-4115th SI 05. 1 05-Apr-24 05-Ala•24 -129 • 'IT A7.1022.ADM5.15.MC Inslalalion01 Ori Shall-ADMS 15•MacArthur Cswy/AIM41/5N Sr 0% 2 05-Apr-24 06.Apr•24 -126 I ,1 471020.ADMS.15-MC Embankrnenthaaoo.lxxn-ADMS 15•MacArthur Cswy/A1M-415th St 0% 1 05-Apr•24 05-Apr.24 -128 . I 11 A7 1029.ADMS.15.MC Cure&CSL Test of Dar Shalt-ADMS 15•Macalhw Cswy7AIM-41/51h SI 0% 28 09-Apr-24 06-May-24 -161 IMP A7.1080.ADMS.15.MC Par and Cure Cabinet Pad-ADMS 15-MacArthur Cswy/AlM41/51h St(Not Regraral) 25. 0 19-Apr-24 19-Apr-24 •96 I A7.1090 ADMS.t5.MC Moral Cabaret(Pad Mount)-ADMS 15-MacArthur Cswy/A1 NA-Apr-24 SrSt(Not Required} 0% 0 pr-24 19-Apr-24 -98 I ,. 47.1060.ADMS.IS.MC Instal Structure-ADMS 15-MacMhur Cswy/A1M-415th SI 0% 1 03-Mar-25 03-Mar-25 -316 I A7 1070 ADMS.15MC Inslat Sign-AOMS 15•MacMhsr Cswy/AlM415111 St 0% 1 03-Mar-25 03-Mar-25 -316 ' A7 1095.A0MS.I5.MC Cable Corvrection and Termination-ADMS 15•MacArthur Cswy/A1Nf-41/51h SI 0% 1 07•Mar-25 07-Mar•25 -319 I ' A7.1200ADMS.15.MC Surge Suppression ADMS 15 MacArthur CSwyrArM-415lh SI 06. I to-Mar-25 10-Mar-25 -919 I A7.1201.ADMS.15.MC Grounding and Lightning Protection-ADMS 15.MacArthur Cswy/AIA1•41,5th St 0% I 10-Mar-25 10-Mar-25 •319 1 I u.'I ,. urn.} ..l.1-1'. ,:..lI r.r C---- I A7,1030.ADMS 17.MC underground..scares-ADMS 17-MacArthur Cswy/AINI-4lt0th St 0% 0 22-Apr-24 22-Apr-24 .135 I A7.1040.ADMS.I7.MC Instal Pull Boxes ADMS 17 MacArthur Cswy/A1 NL41,5th St 0% 1 23-Apr•24 23-Apr-24 -135 I A7.I135.AOAIS.17.MC Pul Conductor Cable from Service Point to ADMS ADMS 17-MacArthur Cswy/A1M4151h SI 0% 1 23-Apr,24 24-Apr-24 -135 1 A7.1195.AOMS 17 MC Put Conductor Cade tor Power.ADMS 17-MacArthur Cswy/AIM41501 SI 0% I 24-Apr-24 25-Apr-24 -135 I A71045 ADMS.17.MC Modify Power Services(I required).ADMS 17.MacArthur CIwy+A1Ns4t/5m Sr 0% 1 25-Apr-24 25-Apr-24 -93 I A7 1100 ADM5.17 MC Pour and Cure Maintenance Pad•ADMS 17-MacArthur Cswy/AINI-41/51h SI 0% 1 25.Apr•24 26 Ap•24 -135 1 A7.1160 ADMS.I7.MC Instal Wireless Communicaron Network-Radius-ADMS 17 MacArthur CswyrAt M•41/5th St 0% 1 03-Mar•25 04-Mar-25 •315 bes hw+tm Card.d hew. 9!_ Actual Work Data Date 31-Jan-24raw,' .e,e COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-29 Sent raw,' 8. snw ro r.aam.more° e Se I Remaining work 2024.04.20 Added Missing 2yr TE .141. cemwa ubwnsa.wr Rlre Is.,lsanamwsote oo ese Project Start Date: 19-tun-19 Ia 0*0 Rwo.ol R.w.p aweewllew<wser:ul00,,6,Wo NM+ GWza-Remanrng Work - Full Blown Schedule zson a nm..w A.ti1N aw.D�wvo+.<.mw�nleor 1 raa®o 1.+ ♦ •Milestone TD A C� )�JE Project Finish Date:22-Dec-2$ P.1e torn mega A�.on.» a,ulws0a.< w. eaealgmroo w+ 1 "�1 J JI` 07Nw Semi.UMW.ua o 510.LJo rew 9�1y Summary as No,r+ Sr...urmle I..as r,A7a0n ..he 7. X,+a<upene uN 0 w70.312.D0 nli. TCC-COMB Progress Schadrde Update COMB DOOM ITSSPS Schedule Update U24.0.W2 0131240132024.03.28 Saul 2024.06-20 Added Missing 2yr TE 20-Jun-24 TASK filter All Activities (MFi ID Ac000 Nam* Dur% Al CarlpMe Start Finish Total Float 2324 2025 Comp a^ 01 ' 02 I 03 I 04 01 I 02 ' 03 ( 04 A7 1165.ADMS 17 MC Establish Network Comnwnicartors-ADMS 17.MacArthur Cswy/AIM-41,Slh SI 0% 1 11-Mar-25 11-Ma-25 .312 1 ♦ • A7 1120 ADMS•7 MC Locates/Survey/Instal Pan-Drll Shah•ADMS 17-MacArthur Cswy/A1to-41/9h St 0% 2:05-Apr-24 08-Apr•24 -160 A7 1015.ADM5 17 MC Clearing and Grubbing-ADMS 77 MacArthur Cswy/AlM-at/9h St 0% 1 09-Apr•24 09-Apr.24 -128 I A7.1022.ADMS.17.MC Installation of Ora Shan-ADMS 17•MacArthur Cswy/A1A0-41151h SI 0% 2 09-Apr•24 10-Apr-24 -119 I A7 1020AOMS.17.MC ErnbankmenVExtaval.on-ADMS 17-MacArthur Csey/A1M-41/51h S1 0% 1 09•Apr-24 09•Apr•24 •126 I A7.1025.ADMS.17.MC Cure 6 CSL Ten,of Dr9 Shah ADMS 17 MacArthur Cswy/Alto-41/51h SI 0% 28 11-A0•24 08-May-24 -162 i A7.1030.AOMS17.MC Pour and Cure Cabinet Pad-AOMS 17•MacArthur Cswy/A1M-41/51h SI(Not Required) 0% 0 25-Apr-24 25-Apr.24 •101 I A7 1090.ADMS.I7.MC Install Cadnol Wad MOant)-ADMS 17-MacArthur Cswy/ArM-41/9h St(Not Pagaeed) 0% 0 25-Apr-24 25-Apr.24 -101 I A7.1060,ADMS I7.MC Install Structure-AOMS 17 MacArthur CswyIAIM-41151h SI 0% I 03-Mar-25 03-Mar-25 -316 I A7.1070.ODMS.17.MC Install Sigel-ADMS 17 MacArthur Cswy/AIM-4175ih St 0% 1 03-Mar-23 03-Mar-25 •314 1 A7.1095.AOMS.I7.MC Cable Connection and Terminator-ADMS 17•MacArthur Cswy/Alto-41/511,SI 0% I 11-Mar-25 t1•Mar-25 -319 1 A7.1200 ADMS.17.MC Surge Suppression-ADMS 17-MacArthur Cswy/A1NI-41151h Si 0% 1 II-Mar-25 12-Mar-25 -319 I A7.1201,AONS.17.MC Crooning and Lgnmtng Protector-AOMS 17 MacArthur CswylA1M-4151h St 07. I 11-Ma-25 12-Mar-25 -319 I ♦ • h1: 1. min .:. . . . ,.�PA,..r,11,r i Cony.1141•:1 Ilr:S. _ , ♦ A7.1030.ADMS.22.MC Underground Locates ADMS 22•MacArthur Cswy;AINI-41i51h Sr 00. 026-Ap-24 26-Apr.24 -135 1 A7.1010.ADMS.22.MC Install Pull Boxes-AOMS 22-MacArthur Cswy/A1A11-41/561 SI 0% 1 26-Apr-24 20-Apr•24 -135 1 , A7.1135.ADMS.22.MC Pull Conductor Cable from Service PointloADMS-ADMS 22-MacArthur Cswy/A1M•41(51h SI 0% 1 29.Apr-24 3A-Apt-24 •135 I A7.1195.ADMS.22.MC Pull Conductor Cable for Power-ADMS 22-MacArthur Cswy/AINI-41r5th St 0% 1 30-Apr-24 01-May-24 -135 1 A7.1015-A0MS.22.MC Modiy Power Servees(I regrared)•ADMS 22 MacArthur Cswy/A1M-41/51h Sr 0% 1 01.May-24 01•May-24 -35 1 A71100.ADMS.22.MC Pour and Cure Maintenance Pad-ADMS 22•MacArthur Cswy/A1M-4151h SI 0% 1 01-May-24 02.May-24 -135 ' A7.1160.AOM5 22.MC Install Wireless Communication Network•Radios•ADMS 22-MacArthur Cswy/AlM-4115111 51 0% 1 17-Mar•25 18-Mar-25 -322 : 1 A7.I185,ADMS 22.MC Esta6ash Network Commuracaaons ADMS 22-MacArthur CswylAIM-41/501 SI 0% 1 20Mar-25 20-Mar-25 -317 1 • • ♦ I ` A7 1120 AOMS 22.MC Locates/Survey/Install Plan Del Shall ADMS 22 MacArthur CswyMINI-41/51h SI O% 2 11-Apr-24 12-Apr-24 .160 ' I A7 1015.A0MS.22 MC Clearing and Grubbing•ADMS 22-MacArthur CswylAld-41/5th SI (1% 1 15-Apr-24 15-Apr-24 -126 I 1 A7.1022.ADM5 22.MC Installation of Ord Shall•AOMS 22-MacArthur Cswy/AI M-4151h SI 0% 2 1 SApr-24 16-Apr-24 •124 1 A7.1020.ADM522 MC Embankment/Excavation-ADMS 22-MacArthur Cswy/A1M-41151h SI 0% 1 15-Apr-24 15-Apr-24 426 I A7.1025.ADMS.22.MC Cure&CSL Test al Ord Shaft-ADMS 22-MacMse,CswytAINI-41/5111 SI 0% 28 17-Apr-24 14-May-24 -163 Blli • ' A7 1080 ADMS.22.MC Pour and Cure Cabinet Pad-ADMS 22•MacArthur Cawy/A1M-41/51h SI(Nor Required) 0% 0 01-May-24 01-May-24 -101 1 47 1090 ADMS 22.MC Instal Cabinet(Pad Mount/-ADMS 22-MacArthur Cswy7AIN1-41151h SI(Not Required) 0% 0 0f-May24 01-May.24 -101 I L 1.7 1080 AOMS 22 MC Instal Structure•ADMS 22•MacArthur Cswy/AINI.4l5th St 2% 1 17-Mar-25 17-Mar-25 -322 3 7 1070 ADMS 22 MC Install Sgn-ADMS 22-MacArthur Cswya*1 M-4151h St 0% 1 17-Mar-25 17-Mar-25 -321 1.7 1095ADMS 22 MC Cable Connection and Termtnatron-ADMS 22-MacArthur Cswy/A1M-415l St 0% 1 20-Mar-25 20-Mar-25 -323 ( 17.1200.ADM522,MC Surge Suppression-ADMS 22 MacArthur Cswy/A1N1-41/51h S1 D% 1 20-Mar•26 21-Max-28 •323 : 1 07 1201 ADMS 22.MC Grounding and Lrghlning Protector-ADMS 22•MacArthur CsverA1 Arl-41151h St 07. 1 20-Mar-25 21-Mar•25 -323 A71030 ADMS 23.MC Underground Locates ADMS 23-MacArthur Cswy/AIM•41/51h St 50. 0 02-May24 02•May24 •135 I A71040.ADMS 23 MC Instal Pul Boxes•ADMS Z3-MacArthur Cswy/A1NI.41/5th Sr 0% 1 02-May-24 02-May-24 -135 I A7 1135 ADMS 23.MC Pull Conductor Cable from Service Pok41oAOMS-ADMS 23-MacArthur Cswy/A1M-41/51h 51 0% 1 03-May-24 03-May-24 •135 1 A7 1135.ADMS 23.MC Pal Conductor Cable for Power•ADMS 23-MacArthur Cswy/AINI.41/5Ih Si 0% 06-May-24 06-May-24 •135 I A7 1045.ADMS.23.MC Monty Power Services(r required)•ADMS 23-MacArthur Cswy/A1M-41/511,SI 0% r 07•May24 07-May-24 -98 1 A7.130 ADMS 23.MC Pour and Cure Mantenance Pad•ADM523 MacArthur Cswy/AINI-41,51h SI 0% • 07 May-24 07.May 24 -135 A7 I1 EO AOMS 23 MC Insl41 Wireless Communication Network-Rados-ADMS 23-MacArthur Cswy/A1N1.41/5lh SI 0Y. I 17-Mar•25 18-Mar-25 -320 1 A7:165 ADMS 23 MC Establish Network Cammuncarions-ADMS 23.MacArthur Cswy/AIM-415Ih Si 0% 1 24-Mar-25 24-Mar-25 -318 I 7S Drury Invt altar 0n ADMS 23 M.ICAnhu I Cswy All,1,4 I a ♦ I A?1120 ADMS 23 MC t ocatt-n:S„1.,y 1.1e131 Plar-No Shaft• eT 23-Macdlktr Cswy/AIN1-4151h- 0% 2 15-Apr-24 1,Apr-24 -160 1 I da. - -----lIM4m C14.4d /ypv.. 1. Acwal Worm COMB DBOMITSSPS Schedale Update U24.0.W20I3124OD 2024-03-28 Sent leas, eow�awusaei oalssne, esr Data Dale:31-Jan-24 ur4,21 C.31.uaeu.dew.y.Rew.e u is OP Bur OO10Vr00 rrse 1 1 Remaining Work 2024-06-20 Added Missing 2yr TF. Project Start Date:19-Jun-19 Full Blown Schedule fdw.a Awrra Re•.oBled.Jaa.lnn.0PBEll sunea.0 MN/ � Cnn�cal Remaining Work MOa 23 nmdaia4w.a eoa..umn•urs.ci pRtwrr hm�ou rwa ♦ ♦M.Oslore R A, C'aC2)RE Project Finish Date:22-Dec-25 Page 14of76 awara wr.a,o4Re..Bast.wsm.ura.Ienao.2 0 Rliu �9 Summary /�/1 �7`�_/ NM.a Sank.uodn.U240 a nMJDO RN! MA.N Sox..ups.UN OW201312400 IOU TCC•COMB Progress Schedule Update -1 COMB DSOU!TI M Schedule Update U24.0.W2 01312400 2024-03-26 Sent 2024.06.20 Added Missing 2yr TE 20-Jun-24 TASK filter Al Activities AceMy 0 Activity Name Dar T. At Complete Start Purdah Total Moat 2024 2025 Comp Dur 01 1 02 1 03 I 04 01 I 02 I 03 I 04 A7.1015ADMS.23.MC Clearing and Grubbing-ADMS 23-MacArthur CSwy/AINI-41l51h St 2 1 17-Apr-24 17-Apr-24 -124 I A7 1022ADM5.23.MC Installation of Drat Shalt-ADMS 23-MacArthur CswytAl M.41/5t h St 0% 2 17-44•24 18-0p424 -123 , I A7.1020.ADMS23.MC EmbankmenclEacavahan-ADMS 23•MacArthur Curry/Al M-41/5n St 0% 1 17.Apr-24 17-00•24 •124 I A7,1025,ADMS.23,MC Cure&CSL Test of Dill Shah-ADMS 23•MacArthur CawytA1 NI-41/51h St 0% 28 19-Apr-24 16-May-24 •163 In A7.1060ADMS.23 MC Pour and Cure Cabinet Pad-ADMS 23-MacArthur CswyIAIM•41/5pt SI(Not Required) 0% 007 May-24 07-May-24 -104 I A7.1090.ADMS.23.MC install Cabinet(Pad Mount)-ADMS 23-MacArthur Cswy/AINI-41/5th St(Not Required 0% 0 07-May-24 07-May24 -104 : I , A7.1060 ADMS.23MC instal Structure•ADMS 23•MacArthur Cswy7AIM-41/31h St 0% 1 17-Mar-25 17-Mar•25 •320 1 A7-1070.ADM$23.MC Mud Sign•ADMS 23•Macnnur Cswy/A1M-41/5th St 0% 1 17-Mar-25 17-Mar-25 -320 ' I A7.1095ADMS.23.MC Cable Connection and Ternenaton•ADMS 23-MacArthur Cswy/A/M-41/51h SI 0% 1 21-Min-25 21•Mar•25 -323 , I A71200ADMS.23.MC Surge Suppression-ADMS 23-MacArthur Cswy/AIAl-41/5th St 0% 1 24-Mat-25 24-Mar-25 -323 I A7 1201 ADMS 23 MC Grounding and Lightning Protection•ADMS 23•MacArthur Cswy;AlAII.41(5th Si 0% I 24-Mar•25 24•Mar 25 .323 1 A7.1030 ADMS.24 MC Underground Locates-ADMS 24 MacArthur CawyiAlA1.41/9h St 0% 0 08-May24 08-May-24 •135 I A7.1040.AOM5.24.MC Instal Pull Boxes ADMS 24-MacArthur Cswy/AlA/l-41/51h SI 0% 1 08-May-24 08-May.24 •135 1 A7.1135.ADMS.24.MC Pull Conductor Cable from ServicePum to ADMS-ADMS 24-MacArthur CawyIAl M-41/5411 St 0% 1 08•May24 09-May-24 -l35 1 A7.1195.ADMS.24.MC PuS Conductor Cable tar Power-ADMS 24-MacArthur Cswy/A1 M-411516 SI 0% 1 09-May 24 10•May-24 -135 1 A7.1045.ADMS.24.MC Madly Power Services(a requited) ADMS 24-MacArthur CSwy/At MA4I/5lh SI 0% 1 10-May-24 13-May24 -100 A7.1100.ADMS,24.MC Pour and Cure Maintenance Pad•ADMS 24 MacArthur CswyiA1M•41/5lh St 0% 1 10-May24 13-May-24 -135 1 A7.1160.ADMS 24.MC Install Wireless Communicator,Network•Rados-ADMS 24-MacArthur Cswy.!A1M-41/5ih Si 0% I 17-Mar-25 18-Mar-25 -319 A7.1165AOMS24 MC Establish Network Comrrunoatons•ADMS 24•MacArthur Cswy/AIM•41/51h SI 0% 1 25-Mar-25 25-Mar-25 -316 I • I .1c In51511a1.a- ADMS i4•MacArthur Cswy A.a-I.41 5th Sr A7.1120.ADMS.24 MC Locales/Surveylnnalt Plan Drill Shaft•ADMS 24•MacArthur CswytAIA1.41/51h SI 0% 2 17-Apr-24 16-Apr.24 -160 : 1 A7.1913.ADMS.24.MC Clearing and Grubbing•ADMS 24-MacArthur Clwy/A1M-41i51h SI 0% 1 19A0r24 19•Apr-24 -123 I A7.1022.ADMS.24.MC Installation al Ore Shaft-ADMS 24-MacArthur Cswy'A1M-41151h SI 0% 2 19-Apr-24 22-Apt24 •121 ' U A7.1020.ADM524.MC EmbarermenVEscaval.on-ADMS 24•MacArthur CSwy.AINI-41/5th Si 0% 1 19-Apr-24 19-Apr-24 •123 I A7 1025 AOMS 24 MC Cure&COL Test of Ora Shah-ADMS 24•MacArthur CSwyfAtM.41/51h St 0% 28 23-Apr24 20-May-24 -166 IN A7.1080 ADMS.24.MC Pour and Cure Cabinet Pad-ADM5 24•MaCMhur Cswy/A1M-41/5th St(Not Rammed) 0% 0 10-May-24 10-May-24 .106 : I A7 1090.AOM5.24.MC Install Catwpt(Pad Mount)•AOMS 24-MacArthur Cswy/A1 NI-4'din SI(Not Required) 0% 0 10-May-24 10-May-24 -106 I A7.1060 ADMS 24 MC Install Structure ADMS 24•MacArthur Cswy/AINk41/51h SI 0% 1 17-Mar25 17-Mar-25 3 ,19 I A7.1070.ADM5.24.MC Instal Sign-ADMS 24•MacArthur Cawy'AIM•41/51h Sr 0% I 17-Mar-25 17-Mar-25 •316 I A7.1095ADMS.24.MC Cable Connection and Termination•ADMS 24-MacArthur Cswy/A1Nn4//51h SI 0% 1 25•Mar-25 25-Mar-25 323 I A7.1200.ADMS.24.MC Surge Suppression ADMS 24 MacArthur Cswy/Ara-41/51h Sr 0% 1 25•Mar•25 26-Mar-25 -323 - I A7.1201.ADMS.24.MC Grounding and lightning Protection ADMS24•MacNlrur Cswy/A1A3•41/501 Si 0% 1 25-Mar-25 26-Mar-25 -323 1 ♦ N I A7.1030 ADMS25.MC Underground'.ocales ADMS 25MacArthur Cswy,AINI-41.'51h S1 0% 0 13•May `•ay 24 •135 1 A7.1040.ADMS 25.MC molar Pull Bores-ADMS 25 MacArthur CSwy.AI NI.41,51h SI 0% 1 14-May24 14 May-24 -135 1 A7.1135.AOMS.25MC Pull Conductor Cable from Service Pont to ADMS•ADMS 25•MacArthur Cswy/At M-41/Sth SI 0% I 14-May-24 15-May-24 -135 I A7.It95.ADMS25 MC Pull Conductor Cable for Power AOMS 25 MacArthur Cswy/Al Ail-4 I'Sth Sr 0% 115-May24 16-May-24 -135 I A7.1045 ADMS 25 MC Modify Power Services(4 required)•ADMS 25•MacArthur Cswy/A/NI.41/5th St 0% 1 16•May-24 16•May-24 -103 1 A7.1,00.ADM5.25 MG Pour and Cure Maintenance Pad-ADMS 25•MacArthur CiwyAIM•41/5in St 0% 1 16-May24 17-May-24 -135 ' 1 A71160.ADM525 MC Install Wneess Communcalon Network Radios-AOMS 25 MacArthur Cswy/Al M•41(5th St OP. 1 31-Mar25 01-Apr-25 327 1 Ai I165.AD05 25.MC E0tabhih Network Communications ADMS 25•MacMhu-Cswy'AI M-41/5th SI 0% 1 02-A6r•25 02-Apr-25 -323 I A71120.ADM525MC Locales/Survey'instal Plan Oct Shah-ADMS 25-MacArthur CswyAtArl-a1:510 SI 0% I 40'24 22-Apr-24 -1 0 A7.1015 ADMS 25 MC Clearing and Grubbng-ADMS 25•MacArthur CswyyA/M•41i5th SI 0% 1 23-Aat•24 23-Pp-24 -121 I A7.1022.ADM5.25 MC Installation or Dim Shalt-AOMS 25-MacArthur Cswy/AIA1441158r SI 0% 2 23-Apr-24 24-Apr-24 -135 1 ' A7.1020.ADMS.2514C EmSanhmentE.cavatnn-ADMS 25 MacArthur Cswy/AIM-41/511 St 0% 1 23-A r-24 23-Apr-24 -121 I - Ow. ninth., Checker raw EMMI Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124D13 2024-03.26 Sent ,soon dem scheme cal 20/1/1200 VON 1 Remahneg Work 2024-06-20 Added Missing 2yr TE 10110.21 Car.me UAeweRew.wr-R stow r.Ur0a]-l02l rO0 rs¢ Project Start Date: 19-Jun-19 llama Rapoaadnaa.aalaso.li Manlnpa U17.050.0901.0 M. SZ! Grdlca Remanmg Work Full Blown Schedule au.a ..Pue.Ne-nsea linogrtipace.e.IRte0l 1 402100 M. • •Maestone 77? a)(�e Project Finish Date:22-Dec-25 asp:15 of 1. o5M.rn 'Napa.Rrrwmemuwuraae w000meaa taemd0 win+ 61111 �•Summary „ J`/�_//�LM1 311 r.73 W..v.UM.UN os naaa+oo NM! AM74 (aaoa.uI4weUNII WM1r74ou Rea TCC•COMB Progress Schedule Update COMB MOM ITSSPS Schedule Update U28.0.W2 013121D0 2024-03-21 Sent 2021.0620 Added Missing 2yr TE 20-Jun-24 TASK later All Activities AcMly ID Activity Name Dur% Al Complele Start finish Total Poet 2024 2025 Comp Our 01 I 02 I 03 1 04 01 I 02 I 03 I 04 if A7 1025.ADM525.MC Cum 6 CSL Test d Ore Shalt-ADMS 25 MacArthur Cswy/AIM-4115111 SI 0% 20 25-di1M-24 22-May-24 -164 A7 10130.ADMS.25 MC Pour and Cure Cabinet Pad-ADMS 25-MacArthur Cswy/AIM-41/5th St(Not Required) 0% 0 16-May24 16.May-24 -108 A7.1090.ADMS25.MC Install Cabinet(Pad Mount) ADMS 25-MacArthur Cswy/A1N1.41/5th St(Not Required) 0% 0 16-May-21 16-May-24 -108 I A7 1060.ADMS.25 MC Install Structure•ADMS 25-MacArthur Cawy/A/M-41.50 SI 0% 1 31-Mar-25 31-Mar-25 -327 1 Al.1070ADM525.MC Install Sign.ADMS 25.MacArthur CswyM1 M-41,5th St 55. 1 31-Mar-25 31-Mar-25 -327 1 A7 1095.AOMS.25.MC Cable Connection and Terrrenaton ADMS 25.MacArthur CSwytA1M-41/5th SI 0% 1 01-Apt-25 01-Ap-25 327 I A7 1200.ADMS.25.MC Surge Suppression-AOMS 25-MacArthur Cswy/A1AA41/51h St 0% 1 02-Apr•25 02-Apr-25 •327 I Ai t 201.ADMS 25 MC Grounding and Lghlrrg Protectron ADMS 25-MacArthur Cswy/A1 M-.t/5th St 0% I 02-Apr-25 02-Apr-25 .327 1 dal d.r, ,rrr .w. ., ion.. .r r..r n• n .C x emate A7 It SO ADMS.28.MC instalnWireless Communication Network-Radios-ADMS 28•MacArthur Cswy/At M.41/51h SI(Not Inc-Removed per O 0% 0 01-Mar-24 01-Mar-24 .80 I A7 1135 ADMS 28 MC Puy Conductor Cable from Service Point IuADM5.&DNS 28•MacArthur Cswy/AINI-41/51h Si(Not Inc-Removed per C. 0% 0 17-May.24 17-May-24 •135 I A7.1195.ADMS 28.MC Pus Conductor Cable tor Power-SUMS 26•MacArthur Cswy/A1M•41/5th Sr(Not Inc-Removed per COI,) 0% 0 17-May.24 17-May-24 -135 I A7.1040.ADMS.28.MC Install Put Boxes•ADMS 28-MacArthur Cswy/AIN1.41/SIh St(Not Inc-Removed per CO41) 0% 0 17-May-24 17-May-24 -135 I A7.1030.ADMS 28 MC Underground Locates ADMS 28•MacArthur Cswy/AIM•41/5th St(Not Inc-Removed pet CON1) 0% 0 17-May.24 17-May-24 -135 I A7.I100.ADMS.28.MC Pour and Cure Maintenance Pad ADMS 28-MacArthur Cswy/AINI-41/51h St(Not Inc Removed per COSI) 0% 0 17-May.24 17-May.24 •135 I A7.1165 ADMS.26 MC Establish Network Communications-ADMS 28-MacArthur Cswy/AIM-41/5th St(Not Inc-Removed per CON1) 0% 0 17-May.24 17-May-24 .122 1 , A7.1045.ADMS.28.MC MoOdy Power Services(a required)•ADMS 28-MacArthur Cswy/MA1-41/5th St(Not Inc-Removed per COa11 0% 0 17-May-24 17-May-24 .122 1 A 11rAi 1P Irt, r.h.,ir(:.v-7 AlA 4!--.r-�i N rvn 1:.-•(i:::1 • A7.1120.ADMS211.MC Locales,Survey Instal Par Oro Snan ADMS 28 Mac/et Cswy,Al A541/51h St(Not Inc-Removed per COSI) 0% 0 01 Mar-24 01-Mar•24 .160 1 A7.1025.ADMS.28.MC Cure&CSL Test of Dre Shalt-ADMS 28-MacArthur Cswy/At Am-41/5tn St(Not Inc-Removed per COa1) 0% 0 01-Mar•24 01-Mar-24 -120 1 A7 1022.ADMS.28.MC Inslaaa8on of On Shall•ADMS 28•MacArthur Cswy/A1N1-41/51h Sr(Not Inc•Removed per COO1) 05. 0 01-Mar-24 01-Mar-24 •B0 I A7.1060.ADMS.28.MC Inslan Structure ADMS 20.MacArthur Cswy)AIM-4151h Si(Not Inc-Removed per COSI) 0% 0 01-Mar-21 01-Mar-24 60 I A7.1015.ADMS.26.MC Clearing and Grubbing•ADMS 28•MacArthur Cswy/AIM.41/5lh 51(Nat Inc•Removed per COOT) 0% 0 01-Mar-24 01-Mar-24 -BO I A7.1020ADMS.26.MC Embanknlent/Ercavaaon-ADMS 26-MacArthur CswyM1M-41l5m St(Not Inc•Removed per COCI) 0% 0 01-Mar-24 01-Mar-24 -80 I Al.1070.ADMS.26.MC Instal Sap-ADMS 28-MacArthur Cswy/Al NI•41/5th St(Not Inc•Removed per COOL t 0% 0 15-Mar-24 15-Mar-24 .90 I A7 1080.ADMS26.MC Pour and Cure Cabinet Pad-ADMS 28.MacArthur CswylA1 AA-41151h SI(Not Inc-Removed per CORD 0% 0 17-May-24 17-May-24 •135 I A7.1090 ADMS,26 MC Install Cabinet(Pad Mount)-ADMS 28 MacArthur Cswy/AI WI-41i51h St(Not Inc Removed per COSI) 0% 0 17•May-24 17.May-24 135 I A7.1200.ADMS.28.MC Surge Suppression•ADMS 28•MacArthur Cswy/A/NI-41/5th St(Not Inc•Removed per COe1) 0°r. 0 17-May-24 17-May-24 135 I A7.1095 ADMS26.MC Cade Connection and Ternalanon-ADMS 28•MacArthur Cswy/A1N1-41/5m St(Not Inc•Removed per COa1) 0% 0 17-May.24 17-May-24 -135 I A7 1201 ADMS.26 MC Grounding and Lightmn1 Protecnnn-ADMS 28-MacArthur CswytA1M-41/5M St(Not Inc-Removed per COa11 0% 0 17-May-24 17-May-24 .135 I irreirre r, rr, r:i C'mrn. M-Cl,inun Csv.v.11A1 15 ,. ipearwp Al 1160.AOMS.29.MC Install Wifeless Communcnior Network•Radios-ADM 29-MacArthur swy/A1M•41/5th (Nor Inc-Removed per 0 0% 0 01-Mar-24 . -tar-4 ..'• , I A7.1135.AOMS 29 MC Pull Conductor Cable from Service Pont 10 ADMS-ADMS 29-MacArthur Cswy/A1NI-41151h St(Not Inc•Removed per C. 0% 0 17-May.24 17-May-24 -135 ' I k A7 1195 ADMS.29 MC PIA Conductor Cade for Power•ADMS 29•MacArthur Cswy/A1NI.41/5111 St(Not Inc-Removed per COat) 05. 0 17-May.24 17-May-24 •135 I t A7 1040.ADMS.29.MC Install Pull Roses-ADMS 29-MacArthur Cswy/A1A1.41/5th St(Nat Inc Removed per CON 11 0% 0 17-May.24 17-May-24 -135 ; I } A7.1030.AOMS.29.MC Underground Locales-ADMS 29•MacArthur Cswy/AIM-41/5th St(Not Inc•Removed per COSI) 0% 0 17-May.24 17-May-24 135 I A7.1165.ADMS29.MC Estaalsh Network Canvnuracaltons-ADMS 29-MacArthur Cswy/At M-41/5tn St(Nth Inc•Removed per COOL) 0% 0 17-May-24 17•May-24 -122 I Alt 045.AOM5 29 MC Morley Power Services(il required) ADMS 29 MacArthur Cswy/A1M-41/5th St(Not Inc Removed per COR1) 0% 0 17-May.24 17-May-24 .122 I Al.1100.ADMS.29.MC Pour and Cure Maintenance Pad•ADMS 29-MacArthur Cswy/A10.I-41,5th SI(Not Inc-Reeroveo per COON 0% 0 17.May 24 17 May-24 -57 I Itiwthly A7.1120.ADMS29.MC Locales:Survey/Instaa Plan Dr 1.91121 ADMS 29 Mac Ar1^.ur CswyA1A-1 41/511 SI(Not Inc-Removed per COIN! 0% 0 01-Mar-24 01-Mar-24 -160 I Al.1025.ADMS29.MC Cure&CSL Test of Ore sun-ADMS 29 MacArthur CswyAIM-41.51h St(Not Inc•Removed per CORD 05. 0 01.Mar-24 01-Man-24 •120 I A7 1022 ADMS.29.MC Installation of DM Shaft-ADMS 29-MacArthur Cswy/AI N1.41)5111 St(Not Inc-Removed per COSI) 0% 0 01-Mar-24 01-Mar-24 .80 I A7.1060 ADMS.29 MC Install Structure ADMS 29-MacMhur Cswyrkl M-41/5Or St(Not Inc-Removed per COal) 0% 0 01-Mar-24 01-Mar-24 -80 I 1 Al 1015.AOMS.29.MC Clearing and Grubbing•SUMS 29-MacArthur Cswy/AINI-4115M S1(Not Inc•Removed per COO11 0% 0 01-Mar-24 01-Mar-24 -80 1 A71020.AOMS.29.MC Embankment/Excavation-SUMS 29-MacArthur Cseey7AIN1-41/5th St(Not Inc•Removed per COSI) 0% D 01•Mar-24 01•Mar•24 -B0 I A7 1070 ADMS.29.MC Ins lam Sean-SUMS 29 MacAnhur Cswy.AI NI-41/5th St(N01 Inc•Removed per CONN) 0% 0 15-Mar-24 15-Mar-24 -90 1 OM nw:um Cm..e Acre. OEM Actual Work Data Date-31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0.W201312412D 2024-03-26 Scat noes enom smnan ea oalrtoo veal _ f Remaanng Work 2024.01-20 Added Missing 2yr TE knoll Cong.0 Uaan.Rewer-Maoaev.U150 Sp-Iela1017100 Psi Project Start Date:19-Jun-19 Full Blown Schedule oaarwa nmmrnnewwewkaMae.eramwaeswneac NNJ NM= Critical Remaining Worknews Proposed R..h.aeww rccearne.r PRen l raaaoo vNr • •Milestone TR SCORE Project Finish Date:22-Dee-25 Pap.76 of76 a ear.a n.v.m na.em aw..wlf.a.o Im oPRarr oratawo rveJ ��•Summary ` 30-Nwn W.I.Uaenrs UN 05140000 NNJ 20 an al aciw.Uow.uylwlrlrlap0 vat, TCC'COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.11W2 01312413D 2024-03-28 Sent 2024.06-20 Added Missing 2yr TE 20-Jun-24 TASK Aker:Al Activities AWNS),ID Activity Name OW% Al Compere Slarl Finish Total Fbat 01 02 2 I24 03 I 04 01 02 2�5 Camp D 03 04 w A7.1000.AOMS 29 MC Poe and Cure Cabinet Pad-ADk1S 29-MacArthur Cawy/AIM-41/501 SI(Not Inc-Removed port C0e1) 0% 0 17-Mat24 17-May24 -135 I A7.1090.AOMS.29.MC Instal Cabinet(Pad Mount)•AOMS 29-MacArthur Cswy/A1M-41/5th St(Not Inc-Removed per COSI) 0% 0 17-May24 17-May-24 -135 1 A. A7.1200.ADMS.29.MC Surge Suppression-AOMS29-MacArthur Cswy/A1M-41/5d1 St(Not Inc-Removed per C001) 0% 0 17-May-24 17-May24 -135 , 1 A7 1095.ADM5.29.MC Cable Connection and Termination•AOMS 29-MacArthur Cawy/A1 NI-41/5th 5t(Not Inc•Removed per CO411 DY. 0 17-May24 17-May24 -135 I A7 12CI.AOMS 29 MC Groundng and Lightning Protection-ADMS 29-MacArthur Cswy7AIM-41151h SI(Not Inc-Removed per COst i 0% 0 17-May-24 17-May24 -135 i C.:,, I I ^ SI-;rack. oG.... ,nt J7Il,v:C,.., -.:.IJI:'Ihc• Al.12340.5PS.G01 Instal Conductor Cable•SPS Garage G01'MacArthur Cswy/AlAII.41/5rh SI 100% 1 24Jui•23A 24Juh23A A7.12240.SPS.G01 Proof E.sing Condos t SPS Garage G01-MacArthur Cswy/A7M 41/5lh St 100% 1 24-Jut-23A 26-JW23A • Al12730.SPS.G01 Instal MomMg Brackets on Unsung Structures-SPS Garage G01 MaoMlsu Cswy/A1M-41150 St 100% 1 24-JW23A 24 Jul-23A A7 12280.SPSGOI Instal Electrical Equipment n Existing Cabinet•SPS Garage G01•MacArthur Cswy/ArM•41)511151 I00% 1 25•JW23A 25•JW23A A7.12510.SPS.GOI Install Solar Power Equipment In Easing Gabriel-SPS Garage Got•MacArthur Cswy/ArM-41/5tm Si 100% 1 25-J0-23A 25-Jul23A 1 A7.1160.SPS.GO1 Install Wireless Communication Network-Rados-SPS Garage G01•MacArthur Cawy/AtM-41/5e1 St 100% 1 25-Ju423A 25JW23A ' • A7.1130.SPS.GO1 Install Detectors SPS Garage Got MacArthur Ccwy/AIM-41/51h Sr 100% 2 26J1.11-23A 27JW23A • 1 A7.1070.SPS.G01 Install Monument DMS-SPS Garage GO1•MacArthur Cswy/AIM-41/50 SI 100% 2 26-Jul23A 27-Jul-23A Al.1095.SPS.G01 Cable Connection and Tennanalion-SPS Garage GO1-MacArthur Cswy7A1M•41r51h SI 100% 5 28.Jul-23 A 03-Aug2- Al.1,65.6PS.GO, Es/abbsh Network Connnunicalcns-SPS Garage G01 MacArthur Cswy/A1M-41hth SI 100% 5 04-Aug-23 10 Aug-2: A7.12340SPS.GOB Install Conduclor Cable•SPS Garage GO8-MacArthur Cswy/AIA/1-41/5th Si 100% 124-Jul-23A 24J01-23A . A7.12240.SPS.G08 Prod Existing Conduit SPS Garage G08-MacArthur Cswy/At A'I-41/5th SI 100% 1 24-Jul-23A 24Jub23A A7.12730.SPS G08 install Mounting Brackets on Easing Structures•SPS Garage GOB-MacArthur Carry/AI M-at/5th St 100% 1 24-JW23A 24-JW23A A7.12280.SPS.G08 install Electrical Equpment in Eustrg Cabinet-SPS Garage GOB-MacArthur Cswy/At Ai I-41,501 St 100% 1 25-dal23A 25-Jul23A A7.12510.SPS.G08 Instal Soar Power Equipment n Eoo/ng Cabinet•SPS Garage GOB-MacArttslr Cswy/At Artat/5th Si 100% 1 25-J4-23A 25JW23A A7.1160.SPS.G08 Install Wreless Communication Network-Radios-SPS Garage Gore'MacArthur Cawy/A1A11'41/Sth St 100% 1 25-JW23A 25-Jul-23A ' A7.1130.SPS.G08 Install Detectors•SPS Garage G08•MacArthur Cswy/AIA/I-41/51h St 100% 2 26JW23A 27-J0-23A A7.1070.SPS-G08 Instal Monument OMS-SPS Garage G55-MacArthur Cswy/AIA4-4115111 St 100% 2 26J0123A 27-Jul23A A71095 SOS GOB Cade Connection and Terrrnahon•SPS Garage G08-MacArthur CswylA1 A/ba1/5t11 SI 100% 5 26.44-23A 03-Aug-2: Al 1165.SOS GOB Establish Network Cammunicaions-SPS Garage GO8-MacArthur CswyrAlM•4115t1+St 100Y: 5 04-Aug-23 10404.25 A7.12340 PS G03 Install Conductor Cable SPS Garage G03-MacArthur Cswy/AIA/I 41/5n St 100% 1 31-Aug-23 31-Aug-2 A7 12240 SPS G03 Proof E4slrg Conduit-SPS Garage G03•MacArthur Cswy/AIA4-41/5th St 100% 1 31-Aug-23 31-Aug-2: A7.12730.SPS G03 Instal Moulin&dickers on Eusing Structures-SPS Garage G03-MacArthur CswyrA1 M•41/5th St 100% 1 3i•Wg.23 31-Aug•2` A7.12280SPS.G03 Instal Electric*Equ polled er Eosin()Cabinet-SPS Garage G03'MacArthur Cswy/A1 Art 41/51k SI 100% 1 0,-Sep'23 01-Sep-22 A7.12510.SPS.G03 Install Solar Power Equipment n Existing Calmet-SPS Garage G03-MacArthur Cswy/AIA/l.41/501 Sr 100% 1 01-Sep-23 01•S4p2F A7.1160.SP5 G03 Ms/at:Wireless Communication Network Rados SOS Garage G03-MacArthur Cswy/AIM•41/51h SI 100% 1 01-Sep23 01•Sep-2: A7.1130.SPS.003 Install Detectors-SOS Garage G03-MacArthur Cswy/AIM-41151h St 100% 2 05-Sep23 SO-Sep-2: 1 A7.1070-51.5.G03 Instal Monument OMS-SPS Garage G03-MacArthur Cswy/AIM 41/51h SI 100% 2 05-Sep23 06-Sep22 < A7.1095.SPS.G03 Cable Connection and Termination SPS Garage G03 MacArthur Cawy/A1M-al/51h SI 100% 507•Sap23 13-Sep-20 A7 1165 SPS.G03 Establish Network Commuracatons SPS Garage G03 MacArthur Cswy/A1M-4115n S1 100% 5 14-Sep-23 20-Sap-2: 1. Conshuctwn-Sty Surtacl Lot ., ,. i. 1 -...: n ,:tt, A7.1130 SPS.P01 Install Detectors SPS Lot P01-MacArthur CswyiAlAd•41/51h SI 100% 2 02-May-22 03-MayS A7.12730.SPS.P01 Install Mounting Brackets on Eowlerg Structures.SPS Lot POI MacArthur Cswy/A1M-4115u1 St 100% 2 02-May 22 03•May-2: A7 1070.SPS P01 Install Monument DMS-SPS Lot P01-MacArthur Cswy/AtM-41/SIh SI 100% 2 03-May-22 04-MayS A7.12340.SPS P01 Install Conductor Cade-SOS Lot P01•MacArthur CswyrAIM-41/51h St 100% 1 05-May22 05-May-2; A7.12240.SP5.P01 Poet Existing Candid'SPS Lot P01•MacAnnur Cswy/AIM-41/501 St 100% 1 05-May-22 05-May21 A7.12280.SPS.P01 Instal Electrical Equipment n busing Ca/am er SPS Lot P01•MacArthur Cswy/At Arb41/5n St 100% 1 06-May-22 06-May-27 A7 12510:SAS.POI Instal Solar Power Equipment n Existing Cabnet•SPS Lol P01-MacArthur Cswy/AtM-41/5er St 1005. 1 Og•May-22 09•May-S t A7 1160 SPS.POt Install Wreess Communcanon Network•Radio-SPS Lot P01-MacArthur Cawy/A1M-41/5111 51 100% 1 13-May22 10-May-2: S.. A.:nm Cltschetl rpm. - Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124D0 2024-03-28 Sent *Quit Nsnsweceen summon serf { I Remaining Work 2024-06.20 Added Missing 2yr TE n.«d cerax.auwe.naaern.tin.r.u•sosn-emoomu000 _ time Project Start Date: 19-Jun-19 Full Blown Schedule sr.ha n�.mAgh reWekr l ref s+m7maMnowa MAI Mil Crtcal Remaining Work -�� auma Wm+.ae..s.emeseuwn..,,,,cI nnaw 1 tomato own • •Milestone /RA /� C. ]!RF Project Finish Date:22-Dec-25 Pop17 (76 raga Prr.ran..,,,,Eta a..aa1/,tmemwna000aoarZpn M. 11. 8 Summary / ' 0) //` LMZ Swell.u�euN 0512117300 MAI 20.An al Sdma.Were OM.CW201310.00 •Ma TCC•COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-26 Sent 2024-06-20 Added Missing 2yr TE 1 20-Jun-24 TASK tiller Al Activities Activity D Activity Name Our% Al Complete Start Finish Total Float 2024 2025 comp Dar• 01 I 02 I 03 1 oA 01 1 02 1 03 1 04 A7.1095 SPS.P01 Cable Connection and Termination-SPS lot POI•MacArthur Cswy4A1 M-41/5th Sit 100% 2 11-May-22 12.May-2: A7.1165,SPS.P01 Establah Network Commurvcaaons•SPS Lot Pot•MacArthur CswytAl M•41/5111 9 100% 2 12-May.22 13-May.2: w A7.12730.SPS.P02 Install Mounting Brackets on Ending Strucwras-SPS Lot P02-MacArthur Cswy/A1M•411541 St 0% 1 31-J4n.24 31-Jan-24 •26 I 1 A7.12340.SPSP02 Install Conductor Cable-SPS Lot P02-Mee elhur Cswy/A1M-41/51h SI 0% 1 31-Jam24 31-Jan-24 25 1 Al.12240.SPS.P02 Proof Easing Cordon•SPS Lot Po2•MacArthur Cswy/A1A1-41/51h SI 0% 1 31-Jan-24 31-Jan-24 -25 1 A7.12280.SPS PO2 Instal Electrical Equipment it Existing Cabinet-SPS Lot P02•MacArthur Cswy/A1M-41/5th 9 0% 1 01.Fe-24 01-Feb-24 25 I • A7.12510.SPS.PO2 Instal Solar Power Equipment in Eluting Cabinet•SPS Lot P02-MacArthur Cswy/AtM.41/501 9 0% I 01-Feb-24 01-Feb-24 .25 1 A7.1100 SPS.P02 Instal Wireless Comokmicalion Network-Rados•SPS La P02.MacArthur Cswy/A1M.41/50 9 0% 1 01-Feb-24 01-Feb-24 -25 1 A7.1130.SPS.P02 Instal Detectors-SPS Lot P02•MacArthur Cswy/AI AA-41/5th 9 0% 2 01-Feb.24 02-Feb-24 •26 I A7,1070.SPS.P02 Install Monument DIAS•SPS Lot P02-MacArthur Cswy/AI M-415th SI 0% 2 01-Fe-24 02-Feb-24 -26 1 A7.1095.SPS.PO2 Cade Connection and Termination-SPS Lot Po2•MacArthur Cswy/AINI-41/51h St 0% 2 05-Fep24 06.Fe624 .26 .1 A7"05 SPS P02 EMU/oh Ne'.wor,Communications-SPS Lot P02 MacArthur Csw5AIM-41/5th Si 0% 2 07-Feb-24 09•Feb•24 -26 Ccr4 .,1 Tr�.....-iT ...SI t II .:inn„C•.:.,:.tn':1:n,. way w A7.1010. -.17 Milestone-Begin 54e Work-TTS 17•MacArthur Cswy.AIM•41/51h SllMOCI 0% 0 31Jul-24 -217 • A7.1160.TTS.17 Install Wireless Communication Network•Radios-ITS 17-MacArthur Cswy/A INl-41/51h SMOG) 0% 1 31-Jul-24 31-Juk24 -147 A7.10913 TTS.17 mules BTU(Pole Mutest-ITS 17 MaCAter Cswy/A1M-41/Slh 9(MOC) 0% 2 31-Jul•24 01-Aug-24 -146 I A7.1130.TTS.17 Instal TTS Detectors ITS 17•MacArthur Cswy/Al NI-41/5th SIIMDC) 0% 4 31-Jul-24 05-Aug-24 -150 . 0 A7.1140.TTS.17 Instal TTS Antennas-TTS 17-MacArthur CswyrA1M-41/5th 9(MOC) 01. 4 31-Jul-24 05-Aug-24 -150 0 A71095.T75.17 Cade Connection and Termnalun•TTS 17•MacArthur CswyA1Nl-415119(MDC) 0% 2 06-Aug-24 07•Aug-24 .150 1 A71165TT5.17 Estabkah Network Cbrnmuncathons-TTS 17•MacArthur CswyAINl•41/5th9(MDC) 0% 2 08.Aug-24 09-lap-24 -150 1 w A7'010 TTS.20 Mtitcna.Begin See Work-TTS 20-MacArthur Cswy/At AI-41'Sth 51(MOC) 0% 0 10444-24 -214 • A7.'160 TT S.20 Install Wireless Communicator Network-Radios TTS 20 MacArthur CswyrA1Nl-41/51h SIIMOCI 0% 1 12-Aug-24 12•Aug-24 148 A7.1090 TTS.20 Install BTU(Pole Mount) TTS 20 MacArthur CswyIAlN1-4175411 SI(MDC) 0% 2 12-Aug•24 13-Aug-24 149 ' A71130TTS.20 Instal TTS Detectors ITS 20•MacArthur Cswy/A1M-41/Slh 9(MOCI 0% 3 12-Aug-24 14-Aug-24 -150 1 A7.1140.T75.20 Instal TTS Antennas-TTS 20•MacArthur CswyAIM-41/51h St(MOC) 0% 3 12-Aug-24 14-Aug•24 .1SO I A7.1095 TTS 20 Cade Connection and Ternmat., V7S 20-MacArthur CswyAt MJ15th 9(M)C) 0% 2 15-Aug•24 16-Aug-24 -150 I A7.1165.TTS.20 Establish Network Communications-ITS 20•MacArthur CswKAIM-4llS019%MDC1 2% 2 16-Aug-24 19-Aug-24 -150 0 w • A7.1010.TT.21 Mlesionir Begin Site Work-TTS 21•MacArthur Cswy/AIM-4115th SI crA 0 20-Aug-24 -215 • ' A7.1160.TTS.21 Instal W iretess Communication Network-Rados-ITS 21•MacArthur Cawy/AINI-41/5lh 9 0Y. 1 20-Aug-24 20-Aug-24 .148 I A7.1090-TTS.21 Instal BTU(Pole Mount)-TTS 21•MacArthur Cswy/AlM-41/50 Si 0% 2 20-Aug-21 21-Aug.24 •149 A7.1,30.TTS.21 instal TTS Detectors-TTS 21•MacArthur CswyiAINl-41/5tth 9 05'. 3 20-Aug.21 22.Aug-24 -150 • • A7.1140.TTS.21 Instal TTSAtenras-TTS 21-MacArthur Cswy/AINI-41/Sth 9 0% 3 20.00924 22-Aug-24 .ISO 1 A7 1095 TT5.21 Cade Connection and Termination TTS 21•tamAnhur CswyA1 NI-415819 0% 2 23-Aug-24 28.Aug-24 -150 0 A7.1165.TTS.21 Establish Network Communications-ITS 21-MacArthur Cswy/AI N1.41.5th 9 0% 2 26-Aug-24 27-Aug-24 .150 I w A7.1010ITS 22 Milestone•Begin Site Work•TTS 22-MacArthur Cswy/AMA1.41/51h SIIMOC) 0% 0 28-Aug-24 .215 • A7./160TT522 Install Wireess ComnsulcaWn Network-Rados-TTS 22•MacArthur CswyMAIM-41/5th 9(MDCI 0% 1 28-Aug•24 211-Aug-24 -148 I A7 1090 TTS 22 Install BTU(Pole Maim)-TTS 22-MacArthur Cswy/A1A'l-41/51h 9(MDC) 0% 2 28-Aug•21 29-Aug•24 •149 I A7.1130.TTS.22 Install ITS Detectors•TTS 22-MacArthur Cswy/A1M•41/5et StrMDC) O% 3 28-A g-24 30 Aug-24 -190 A7.1140 TTS.22 Install TTS Antennas-ITS 22•MacArthur Cswy/A1A4-41,Sth 9IMOC) O% 3 28-Aug-24 30-Aug-24 .150 A7 a095 TTS.22 Cable Connection and Termination-ITS 22•MacArthur CawyAl NI.415th 9(ACC) 0% 2 03-Sep-24 04'Sep-24 -150 I A7't65 TT522 Establish Network COmmurWalians•TTS 22-MacArthur CswyyAIM-41/5th S11MDCI 0% 204-Sep-24 05•SeD•24 -150 ; 1 A w o - Awtm -- cr+aal Meet NMI Actual Work Data Date:31-Ian-24 COMB DBOM 1TSSPS Schedule Update 1.324.0.W2 013124DD 2024-03.28 Sent sic, e..,•, r,,a rnw7.eo+0.0.y, von Awar u1s O Rema.mng wort 2024-06-20 Added Missing 2yr TE .ahw nit cram.11Pw 5uo.,rn<0000.rcllse em04.0 -Ps6 Project Start Date: 19-tun-19 won 22 A1wsalFirisw eeem,ovcte.wowlul004.110m..o MCI � Crnica Rc^tan:ng Worn Full Blown Schedule rsoun Proposal Firm.aos,nouvu<wowl meoi.l lmv2oo MCI • •Milestone 7R /�. C( IRE Project Finish Date:22-Dec-25 Paso 1a4r76 manp72 w.usm R.I.aaareNwe<wprl erteol 2 e,�nb ewJ 1041 t>-g Surnma'y / l J��_/ L, nno.n YroN.bo4es uN Stt71Ob0 PAU 20 tin 2. SCMwe UPI.UM 0 w241317400 NMJ TCC,COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-08-20 Added Missing 2yr TE 20-Jun-24 TASK filter All Activities Activity 10 Activity Name bur Y. At Complete Stan Finish Total Fba 2024 2025 7 Cone Der 01 02 03 04 01 02 I 03 I 04 47.1015 CTV It.17S Meeting and Grubbing-CCTV 11-17thSI(1413C) 0% 0 24-Jun-24 -Jun-4 -140 1 A7.1020.CCTV.11.17S EmbanknwnlExcavalion-CCTV 11•17111S1(MDC) 0% 0 24-Jun-24 24-Jun-24 -140 1 A7 103CCCTV.11.175 Underground Locales CCTV 11-17th$t(MDC) 0% 0 24-Jun-24 24-Jun-24 .140 I 47.1040.CCTV.11.17S Instal PullBones-CCTV 11-171h%MCC) 0% 0 24-Jun-24 24-Jun-24 .139 1 47 1160.CCTV.11.175 Instal Wireless Communicator Network-Radios-CCTV 11-171h SI(MDC) 0% 1 26-Jun-24 26-Jun.24 -141 I '' r.7 1135CCTV.11.17S Pol Conducter Cade from Service Pont Ia CCTV CCTV I1 17th SI(MDC) 0% 1 27-Jun 24 27-Jun-24 141 1 I /.7 1195.CCTV 11 17S Pull Conductor Cable for Power•CCTV 11-17111 51(MDC) 0% 1 28-Jun.24 28-Jun-24 •141 1 47 1045 CCTV.11.175 Modify Power Services(1 required)•CCTV 11-171h SI(MOCI 041. 1 01-Jul24 01-Jul-24 -140 . I 47 1165 CCTV m 11.17S Establish Network Comuncanons-CCTV 11•171h Sl(MDC) 0% 1 02-JuS24 02-Jul-24 •116 I • ,5 0e.i.e l.-5i91lat,on-CCTV II-1.16 St 11r1CC A A7 1120.CCTV it 175 Locates for COTS CCTV 11•17th Si(If Needed)(MDC) 0% 0 25-Jun-24 25-Jun-24 .141 I A7.1125.CCTV 1t 17S Instal Polo•CCTV 11-171h St(Not Req.wed)(MOC) 0% 0 26-Jun.24 26-Jun-24 -141 1 47 1122 CCTV.11 175 Drill Pole Hole.CCTV 11 I71 t St(Not Requr0%ed((MOCI 0 26-Jun-24 26-Jun-24 •141 I A7 1130.CCTV.11.175 Instal CCTV Camera Assembly•CCTV 11•171h SAMDC) 0% 0 26-Jun24 26-Jun-24 -138 I 47 1140.CCTV It 17S Instal CCTV Camera Lowerng Device(CLD)-CCTV II.171h St(II N.edad)(MOC) 0% 0 26Jun-24 26Jun-24 •114 I A7.1090.CCTV.11.17S Instal lrlU(Pole Mount)-CCTV 11-17th StOMOCI 0% 1 01-Ju624 Ot-Jui-24 -141 1 A71101.CCTV11.17S Pour and Cure Maintenance Pad-CCTV II.171h SI(MDC) 0% 101-Jul.24 01-Jul.24 -B7 l A7 1170.CCTV 11 175 Install Layer 2 Managed Field Ethernet Sweches(MFESs)-CCTV 11 17th Si(NIA)(MDC) 0% 0 01•JU.24 01 Jul-24 117 1 A7 I1e0.CCTV 11.175 Install TerminalServer-CCTV 11-171h St(WA)(MOCI 0% 0 01.Jul-24 01-Jul-24 ,117 1 A7.1182.CCTV 11.17S Inslan Unnterrupnble Power Supply(UPS)-CCTV 11-17th SI(WA)(MOC) 0% 0 01-Jul-24 01-Jul-24 -117 1 A7.1095.CCTV Termination Cable Connection and -CCTV 11•1711 SI(MDC) 0% 1 01-Ju-24 01-Ju624 •141 1 A7 1205CCTV.11.17S Surge Suppression•CCTV 11•17d1 SII(MOC) 0% 1 02-Jul-24 02Jul-24 .141 I A7 1201.CCTV.11.17S Grounanbg and Lg9lning Prol.COon-CCTV 11-17th SIIMOC) 0% 1 02-Ju624 02-Jul-24 •141 1 47 12,0 CCTV 11 17S Calibrate and Configure-CCTV ii-17th St(MDC) 0% 2 02.Ju624 03-Jul-24 -118 I • w .u,ti' ...r C Ip619 CCTV 2'•rn11 Si(6r1CCI w A7.10t5.CCTV.20.17S Clearing and Grubbng•CCTV 20-17th St(MDC) 0% 0'01-Jul-24 -01-Jul-24 -140 - I A7 1020.CCTV20.17S Embankment/Excavation-CCTV 20.171h SIIMDC) 0% 0 01•Jul-24 01-Jul-24 .140 1 A7.1030.CCTV.20.17S Underground Locates-CCTV 20-171h St(MOC) 0% 0 01-Jul-24 01-Jul-24 -140 I Underground A7.1040.CCTV.20.17S Instal Pull Boxes•CCTV 20-17ih SIIMDC) 0% 0 01-Jul•24 01-Jul-4 .139 I • A7.1160.CCTV 20.17S Instal Wireless Communicator Network•Radios-CCTV 20-171h St(MDC) OY. 1 03-Jul24 05-Ju624 .141 I A7.1135.CCTV.20.175 Pus Conductor Cable from Service Pant to CCTV-CCTV 20-1701 SI(MOC) 0% 1 05-Jul-24 08-Ju624 -141 1 ' Al.1195.CCTV.20.17S PW Conductor Cable nor Power-CCTV 20-17th S1(MOC) 0% 1 08-Jul-24 09-Jul-24 -141 I A7.1045 CCTV 20.17S Muddy Power Services(4 required)-CCTV 20-17th Sl(MOC( 0% I 09-Jul-24 09-Jul-24 -140 I A7 1165.CCTV.20.17S Esublsh Network Communications•CCTV20•171h SIIMDC) 0% I 10-Jul-24 10-Jul24 -121 I • IV 1 A7.1120.CCTV 20.175 Locates for CCTV-CCTV 20•17th 01 Needed9MDC) 0% 0 03-Jul-24 03-Ju624 •141 I. Al.1125.CCTV,20.17S 1651311 Pole CCTV 20-171h SI(Not Repared)(MOCI 0% 0 03-Jul•24 03-Jul-24 ,141 I A7.1122.CCTV.20 175 Doll Pole Hole CCTV 20•171h St(Not Requned)(MOC) 0% 0 03Jul-24 03•Jul 24 141 1 A7 i130.CCTV20.17S InstalCCTV Camera Assembly-CCTV 20-171h SI(MDC) 0% 0 03-Jul-24 03-Jul24 -138 1 47.1140.CCTV.20.175 Instal CCTV Camera Lowerrlg Device(CLO)-CCTV 20-171h SI IV Noeded)(MDC) 0% 0 03-Jul-24 03-Jul-24 -119 I A7.1090.CCTV 20.17S Instal BTU(Pole Mount)•CCTV 20-1741 SI(MDC) 0% I 09-Ju.24 OS-Jul-24 .141 1 A7.1101.CCTV20.175 Pour and Cue Maintenance Pad•CCTV 20 17111 SIIMOC) 0% 1 09-Jul-24 10-Ju624 -92 1 A7 1170.CCTV 20.17S Instal layer 2 Managed Field Ethernet Switches(MFESo)-CCTV 20-171h St IWA)IMOCI 0% 0 09-Jul•24 09J01-24 •122 1 47 1100 CCTV 20.175 Instal Terminal ServerCCTV 20-1Th SI(WA)(MOC) DV. 0 09-Jul-24 09-Jul 24 122 I A7 1182CCTV 20-175 Instal Unnwrrupole Power soppy(UPS)•-CCTV 20 171h 51(N7A)(MDC) 0% 0 09-Jul-24 09-Jul-24 •122 I •14) I Al 1p85.CCTV 20.ti5 Cable Connection and Termnalon-CCTV 20•17th St(MDC) 0% 1 09-Ju424 10-Ju-24 A7.t200.CCTV.20.175 Sorge Suppression CCTV 20 1Th SIIMDGI 0% 1 10-Jul II-Jul 141 v.. nwdw ._. CI.. n.ww OEM Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Seat ,sons ewwsn.14.en connuo w.b 7 1 Remaining Work 2024-06.20 Added Missing 2yr TE 10044-21 ciweinwUreavnwenrynaeseinie U.SOlAemo,OO _ 615E Project Stan Date: 19-Jun-l9 ocNwa nww.eerwaweww,suws I.r1 1112.425291111150 NW Critical Remaining Work Full Blown Schedule taa,.a ... wow.wow.el swan.A.Ww.mow maw. 1162no06 NW • •Milestone " SCORE Project Finish Date:22-Dec-25 pus.19.r76 wr.ra n.n anis...s.eewel..uewl..e.om000bww roe m nw+ �Stamm I r.w a s.I.v.uldrs ono s lm.aoO luau � Summary , wTn'sea.unto.Ur.a e)tmeo -._-_ NMJ 10 l.n7 s.wl.Wattle Ul.0w2ol316400 6141.1 TCC•COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-06-20 Added Missing 2yr TE 20 Jun-24 TASK hoer All Activities Activity ID Activity Name Our Y. Al Complele Start 'Finish Total foal 2024 2025 Corry Po 01 I 02 I 03 I 04 , 01 [ 02 I 03 I 04 ' A7t 201.CC,TV.20.175 Grounbrgend Llgnanng Protection-CCTV 20.17th StIMOC1 0% 1 10-Jul-24 11-JuF24 -tot I 47.1210 CCTV20 17S Caeorale and Configure-CCTV 20-171h StIMOC) O% 2 10-JuF24 12.Jul-24 -122 I Congruchon Sf8 Po3�ng Garage-171h 51 Al 12340.SP5 G05 Instal Conductor Cable SPS Garage G05,17810I 100% 1 21-Aug-23 21-Aug-255 A7.12730.SPSG05 Install Mounting Brackets on Erotica Structures-SPS Garage G05•171h St 100% 1 21-044-23 21-Aug2! A7.12240.SPS.305 Prod besting Conduit•SPS Garage G05-17th St 100% 1 22-Aug-23 22-Aug-2: A7.1t 60.SPS.G05 Instal Wheless Commurocabon Network-Radios-SPS Garage G05•17111 Si 100% 1 22-Aug-23 22-Aug-2 47.1130.SPS.G05 Instil Detectors.SPS Garage G05 171,1 SI 100Y. 2 22-Mg-23 23-Aug-22 47.1070 SPS.G05 Instal Monument DMS-SPS Garage G05.171h Si 100% 2 22-A41g-23 23-Aug-2! 47.12280.SPS G05 Install Elocirical Bowpmenl in Easing Cabinet-SPS Garage G05-171h St 100% 1 23-44-23 23-Aug-22 • A7 12510 SPS G05 Install Solar Power Equipment er Edsdrg Cabinet-SPS Garage GOS-17th 51 100% 1 23-Aug-23 23-Aug,21 A7.1095.SPS.G05 Cabe Connector ano Termination-SPS Garage G05-171h St 100% 5 24-Aug-23 30-Aug-2E A7.1165 SPS.G05 Establish Network Comnaukcabons-SPS Garage G05-171h SI 100% 14 31-Aug-23 20•Sgs2F rr. I L W w . A7.12730.SPS.P29 Instal Mounling Brackets on Existing Structures•SPS Lot P29.171h St 0% 1 31-Jan-24 31-Jan-24 -26 I A7.12340.SPS.P29 Install Conductor Cable-SPS Lot P29•17th SI 0% 1 31•Jan-24 31.Jan•24 -25 I 47.12240.5PS P29 Proel Easing Conduit-SPS Lot P29.17th St 0% 1 31-Jan•24 31-Jan-24 -25 I 47.12280.SPS.P29 Install Electroal Eglapnent n eating Cabinet.SPS Lot P29-171h SI 0% 1 01-Feb-24 Ol Feb-24 25 I 47.12510.SPS.P29 Install Solar Power Equpment in Ending Cabinet-SPS Lot P29.176r 5t 0% 1 01.Feb•24 01.Feb-24 -25 I A7.1160.SPS.P29 Install Wireless Communication Network-Radios-SPS tot P29•171h St 0% 1 01-Feb-24 01-Feb-24 -25 I A7.1130.SPS.P29 Instal Detectors-SPS Lot P29.171h SI 0% 2 01.Feb-24 02.Feb-24 •28 I 47.1070.SPS.P29 Instal Monument OMS•SPS Lot P29.17th Si 0% 2 01-Feb•24 02-Feb-24 •26 I i AA7 1095 SPS P29 Cable Connection and Termination-SP5 La P29•171h St On. 2 05-Feb-24 06-Feb-24 -26 I 1165 5F5�:a Esraeilsn Network Communications SPS Lon P29•171h Si 0% 2 07 Feb-24 OB Feb-24 -28 , C.,, ,elion T.;..i Trme Sy.trm.1,,,,, P7 1 W 47101 0.TT5 13 Mission,Begat Site Work-TTS 13 17th St(MDC) 0% 0 13.JuL24 -218 • L A7.1090 TTS.13 Instal BTU(Pole Mount)•ITS 13.17th SI(MDC) 0% 1 15•Jul-24 15Ju624 -149 I I 47.1160.TTS.13 Instal Wireless Communication Network-Radios-TTS 13-171h SIIMDC) 0% 1 IS-Jul24 15-Jul-24 •149 I 47.1130.TTS.13 Install TTS Detectors 1'T513 17th SIlMOC) 0% 2 15•Jub24 16-Jul-24 -150 I A71140.TTS.13 Instal ITS Antennas TTS 13 17th SI(MOCI 0% 2 ISJul-24 16Jul,24 150 I 47.1095.TTS.13 Cabin Connection and Termination-TTS 13-17th St(h0C) 0% 1 17-J4-24 17-Jul-24 -150 I A7.1165 TTS 13 Establish Nolwork Communications-TTS 13 171h SIIMDC) 0k 1 18-Jul-24 18-Jul-24 -150 I W A7 1010 TTS.16 Milestone:Sego Site Work•TTS 16-171h St(MDC) 0% 0 19-Jul 24 -218 ♦ A7.1090.TT5.16 Instal BTU(Pete Mount)-ITS 16,171h SI(MOC) 0% I 19-Jul•24 19•Ju124 •149 I A7.1160.TTS.16 Instal Wreless Comnanicalnn Network-Radios-TTS 16-171h SIIMDC) 0% t 19Jul-24 19-Jul-24 •149 • I • A7.1130.TT516 Instal TTS Detectors-TTS 16.17th SLlMDC) 0% 2 19-Ju1-24 22-Ju424 -150 ' 47 1140 TTS 16 Instal TTSMIennas-ITS 18-170 S1(MOC) 0% 2 19-Jul-24 22-Jul.24 .ISO I • 47.1095.TT5.16 Cable Connection and Termination-TTS 16-171h St(MDC) 0% 1 23-J11•24 23-Ju624 -150 I ' 47.1165.TTS 16 Establsh Network Cornnunlcalons-ITS 16 171h SI(MDC) 0% 1 24-JuF24 24-Jul-24 -150 I w A.1010.- .18 Milestone.Begin Sae Work-TTS 18.17th S1(MOG) 0% 0 25-Jul-24 -218 • 47.1090.TTS.18 Instal BTU(Pole Mount) ITS 18 171h SI(MOG) 0% I 25JUF24 25-Jul-24 149 I A7.1160.TTS.18 Instal Wireless Communication Network-Rados•ITS 18-1701 S&(MOG) 0% 1 25-JuF24 25-Jot-24 -149 I A7.1130.TTS.18 Instal TTSDQlecIars•TTS 18,170,SIIMDC) 0% 2 25-J4-24 26-Jul-24 -ISO I A7.1140.TTS 18 Instal TTS Mlennas•TTS 18-17th MINIM) 0% 2 25J4.24 26-JuF24 150 ----— De. RMen Chokes hoer. Actual Work Data Date-31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent mar.:. ea,40e1,w.a,r omstsno tan I •I Remaing Work • 2024-06-20 Added Missing 2yr TE r►Ro.ar Carew4ttW0eAsw.e#.m,E,0 wso set goo ammo PSE Project Start Date: 19-Jun-19 B-an-R Roomed Revised lre.wwa.now url.0awnea.o bent Crilica Remainng Work �^ Full Blown Schedule aon u r,onou R.o..ee..awcm.e,,uoaew.r rmaaoo Rua ♦ •Mtestru,e Tip S( / RE Project Finish Date:22-Dec-25 nsc ra„176 eh.ra n®,wA. ear BINIrrdum.eenao Maass asomoo ISSN ♦�♦Summary I /\ w�\ 311410,a Scharf.upW.UP...MM Rw 1e.u.14 se.a..uoauua.0w70,3,NOo NI, ' 1 TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03.21 Sent 2024-06-20 Added Missing 2yr TE 1 20-Jun-24 TASK litter:Al Active's ANN*,ID Aniray Name Dur� P4 Compete Slant Finish Total Float 2024 2025 j C Dor 01 I 02 I 03 I 04 01 I 02 I 03 ' 04 ‘i 1 47.10953T5.18 Cade Connection and Termination•TTS 18•17tn9(61DC) 0% 1 29-Jul-24 29-Jul-24 -150 1 jt A7 n65 T 151E Es t ad, r4p5wa mrn k Couamabons-TTS 18 171h SI(MDC) 0% 1 30-Juk24 30•Jul,24 150 1 S Conrnacenon-Venetian Cswy Dade FM_ • . ti Construction-MVOS-Venetian Cswy De4e Btvd W tJnJn,r• n1P-w.n� W A:1030.MOOS.OS.VC Underground Locales MVOS 05-Venetian CawyOade Bvd(MOC) 0% 0 04-Jun-24 04-Jun-24 -115 1 i Al.1015.MV05.05.VC Clearing and Grubbing-MVDS 05.venetian CswylOade Bvd(MOC) 0% 0 04-Jun-24 04-Jun-24 -115 I Al.1020 MODS.05.VC Embankment/F.cavatlon•MVOS 05•Venetian CswyDade BNd(MDCI 0% 0 04-Jun-24 04-Jun-24 -115 1 Al.1040,MVOS.05.VC Instal Put Boxes•MVOS 05•Venetian Covey/Dade Blvd(MDC) 0% 0 04-Jun-24 04-Jun-24 -114 I Al.1160.MVOS.0SVC Instal Weeless Communication Network•Radios-MVOS 05•Venetian Cswy/Dade BNOIMOCI 0% 1 04-Jun•24 05-Jun-24 -115 1 A7 1135-MVOSOS VC Pull Conductor Cable from Service Point to MVOS•MVOS 05-Venetian CswyDade rev0(MDC) 0% 1 05-Jun•24 06-Jun•24 -115 I A7 1195.MVDS.05 VC Pul Conductor Cable for Powet MVDS 05 Venetian Cswy/Dads Blvd(MDC) 0% 1 06-Jun-24 07•Jun•24 115 1 A7 1045 MVDS.05 VC Mobley Power Services(4 required)-MODS 05•Venetian CSwy'Dade Blvd(MDC) 0% 1 07-Jun-24 07-Jun-24 -104 1 A71100.MVDS.05.VC Pour and Cure Maintenance Pad MVOS 05 lenenan Cswy/Ueda Bud(MUCI 0% 1 07-Jun-24 10-Jun-24 •114 A7 1165.MVOS.05.VC Establish Network Commumcalmns•MVOS 05-Venetan CswyDade Blvd(MDC) 0% 1 10-Jun•24 10-Jun-24 -105 I • ,.,..-i,i II.,.l,l or. 1.1VUS 05-Venel, .:two C.ide Blvd!MCI, W A71120.MOOS.05 VC Locales la MVOS MVOS 05 Venetian Cswy/Dade Blvd(Il Needsd)(MDC) 0% 0 04-Jun-24 04•Jun•24 -115 1 A7.1125.MVOS.05.VC Instal Pole-MVOS 05-Venetian CswyDade Blvd INol Req lred)(MDC) 0% 0 04-Jun-24 04•Jun-24 -115 I A7.1122.MVOS.05.VC Ore Pole Hole-MVDS 05-Venetian Corey/Dade Bed(Not Requred)(MDC) 0% 0 04-Jun-24 04-Jun-24 -115 I A7.1130.MVOS 05 VC Install MVDS Assembly MVDS OS Venetian Cony/Dade Blvd(MDC) 0% 0 04-Jun-24 04-Jun-24 -112 1 A71090 MVOS 05.VC Instal BTU(Pow Mount) MVDS 05-Venetian CswylOade Btvd(MDCI 0% 1 07-Jun•24 07-Jun-24 -115 I A7.1170MVDS.05.VC Instal Layer 2 Managed Field Ethernet Sw4cncs(MFESSI-MVDS 05 Venetian Cswy/Dade Blvd(N/A)(MDC) 2% 0 07-Jun-29 07-Jun-24 -IOff I Al 1182 MVDS.05VC Instal UnnlerruptMe Power Supply(UPSI•MVOs OS-venetian Cswy/Oatle Bind(NrA)(MDC) 0% 0 07-Jun-24 07-Jun•24 -146 I A7 1095MVDS0SVC Cade Connection and Termination-MVDS OS•Venation Cswptbid.Bud(MOC) 01. 1 07-Jun•24 10•Jun-2A •11S 1 A7.1180.MVDS.OS.VC Instal Termini Server-MVDS 05 Venetian CswyDade B.vdlMOC) 0% 1 07-Jun-24 10-Jun-24 -106 I A7 1200 MVDS.05 VC Surge Suppression MVDS 05 Venaban Cowy/Dade BlvdIMDC) 0°r: 1 10-Jun 24 11 Ju-24 115 t 1 A7.7201 MVDS.05 VC Groundng and Lghlnng Protection•MVDS 05-venetian CswyDade Blvd(MDC) 0% 1 10-Jun-24 11-Jun-24 •115 t 1 A7 1210.MVDS 05.VC Colbr ale and Conlgune-MVOS 05•Venetian CswyDade BNdlMOC) 0% 2 10 Jun-21 12-Jun-24 -108 1 • Const,vblwn-CCTY-Wnrrn Cswy'. �. . �� w W A7.t0!S.CCTV.t2.SC Clearing and Is bongo CCTV 12 Venaan Cswy/DedeBvd 0% 0 0t hyr-24 01 Mr-24 •62 I A7 1020.CCTV.I2.VC EmbankmenVE.cavation-CCTV 12•venetian CswyDade Blvd 0% 0 01-Mar-21 01-Ma•21 -82 I A7 1030.CCTV.12VC Underground Locates•CCTV 12.Venetian CswyDade Blvd 0% 0 01-Met-24 01-Mee-24 -62 I iiiA7.1040.CCTV.I2.VC Instal Pull Bones-CCTV 12-Venetian Cswy/Dade Bled 0% 001-Mar•24 01-Mar•24 -80 I A7.1160.CCTV.12.VC Instal Weele0s Com...canon Network-Ratios-CCTV 12-Venetian CswyDade BOO 0% 1 01-Mar•24 04-Mr•24 .82 1 A7.1136.CCTV.12.1/C Pull Conductor Cede root Service Poem In CCTV-CCTV 12-Venetian CswyDade Blvd 0% 1 04-Ma-24 05.Mr-24 -82 • I A7.1195.CCTV 12.VC Pun Conductor Cade for Power•CCTV 12-Venetian CswyDade Blvd 0% 1 05-Mr-24 06-Mr-24 •82 I A7.1045.CCTV.12.VC Modly Power Services(d tequ.edl•CCTV 12 Venetian CswyOu0e Blvd0% 1 06 Mar•21 06 Mr-24 -60 47./165.CCTV.12.VC Establish Network Communeul005-CCTV 12-Venation Cswy/Oude BOO 0. 1 07-Mar-24 07-Mar-24 -90 1 w A7�1t 20.CCTV.12.VI Al 1125.CGTV 12.VC I Locates tor CCTV CCTV 12-venetan CswyDad d(e Blvd(II Needed 0% 0 01-Mar•24 01-Ma-24 -82 1 -82 I Instal':Pole CCTV 12 Venation CswyJDado Blvd(Not Requred) 0% 0 01-Mr 29 01-Mr-24 A7.1122.CCTV I2.VC Dr4l Pole Hole-CCTV 12-Venetian Covey/Dade (Not Reoured) 0% 0 01-Mar 01 Mar-21 82 1 A7.1130.CCTVI2.VC mstet CCTV Camera Assembly-CCTV 12-Venetian Cswy;Oade Blvd 0% 0 01 Mar-24 01-Mr-24 -78 A7.1140.CCTV.I2VC Install CCT V Camera Lowering Device(CLO)-CCTV 12-Venetian CswyDade Blvd III Needed) 0% 0 01-Mar-24 01-Mar•24 -36 1 A7.I040.CCTVI2.VC Install BTU(Pole Mau%•CCTV 12-Venetian CswyDade Blvd 0% I 06-Mar-24 06-Mr-24 -82 i 1 A7.1101.CCTV12.VC Pour and Cure Mantenance Pad-CCTV 12-venetian CswyeOade Blvd 0% 1 06-Mae24 07-Mr-24 •6 I Dole kmue, Cew441 %Pa-. - Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 0I3124DD 2024.03.2E Sent ...at is aua.wsowu.eel swoon Wu I 1 Remaining Wrk 2024.06-20 Added Missing 2yr TE t►na-n cant..unwunse.ernw.,an.Ulnasaeos0ownoo ME Project Start Date: 19-Jun-19 0auw-m Rowse,rim,ma..e,weuweev U0Ta SWAM I wu 11. Crnrcal Remaining Work Full Blown Schedule Bna n On-Cr mw4.wv w o.mn.., as05. oe1 md a l r0922po kw • •MleOtune TR SCORE Project Finish Date:22-Dec-25 P.sc41 o/76 mr.w•as R ceases Aanne%wee*.....ry..,9,100,20rra00 1w2 MAJ W11 0 Summary 201.19.•23 Stlwdl.Undo.UN 0 S 1,222300 mu 29 an 2. 50904.Upae00241wlirl124013 nod TCC-COMB Progress Schedule Update COMB DOOM IMPS SahaOil Update U24.O.W2 01312400 2024-03-28 Sent 2024.08-20 Added Missing 2yr TE 20Jun-24 TASK leer:All Acbvelas A&Ivey ID ActN4y Name Do,5'. Al Compete Star) Finish Taal Float 2024 2025 Camp 0,a 01 I 02 I 03 I 04 01 j 02 I 03 1 w 47.1 t70 CCTV 12.VC Instal Layer 2 Managed Fiekl Ethernet Switches(MFESs)-CCTV 12-Venalian Cswy/Dade Blvd(WA) 0% 0 OiMar-24 06-Mar-24 -39 . I 47.1180.CCTV12.VC Instal Terminal Seiner•CCTV 12-Venetian CswyDade Blvd(WA) 0% 008-Mar-24 06-Mar-24 -39 • I 47.1182.CCTV 12.VC Instal Unintenupble Power Supply(UPS)-CCIV 12•Venetian Cswy/Dade Blvd{WA) 0% 0 06-Mar-24 08-Mar-24 -39 ' I A7.109SCCTV.I2.VI Cable Connection and Termination-CCTV 12-Venetian Cawy/Dade Bled 0% 1 013Mar•24 07-Mar-24 •02 . 1 A7.1200.CCTV pp 12.VC Surge Suppression-CCTV 12-Venetian Cswy/Dade Blvd 0% 107-Mar-24 08-Mar.24 •82 I A7.1201.CCTV.12.VC Grounding and Lightning Protector CCTV 12.Venetian Cswy/Dade Bled 0% 1 07-Mar•24 08-Mar-24 -82 A7.1210.CCTV.I2.VC Calbraie and Configure CCTV IL 1.73•:01:30 C s wy.Dade dived 0%: 2 07-Mar-24 It-Mar-24 -39 0 • w AV 47.1015 CCTV 13.VC Clearng and Grubbed CCTV 13-Venetian Cswy/Dade BNd)MDCI 0%. 0 04-Jun-24 04-Jun-24 •141 I 47.1020.CCTV.I3.VI Embankment/Excavannn-CCTV 13-Venetian Cswy/Da0e Blvd(MOC) 0% 0 04-Jun-24 04-Jun-24 -141 . I 47.1030.CCTV 13.VC Underground Locales-CCTV 13•VenettsnCswyDade BNd(MOC) 0% 0 04•Jun-24 04-Jun-21 -141 I 47.1040CCTV.I3.VC Install Pull Bones•CCTV 13-Venetien Cswellade Blvd(MOC) 0% 0 04-Jun-24 04-Jun-24 -140 : I 47 1160.CCTV.13.VC Instal Wireless Communication Network•Radios-CCTV 13-Venetian Cswy/Dade 131vd(MDC) 07. I 04-Jun•24 05-Jun-24 -141 I A7.1135.CCTV 13.VC Pu1 Gorduclor Cable from Service Point to CCTV-CCTV 13-Venetian Cswy/Dade BNOIMDC) 0% 1 05-Jun-24 06-Jun-24 •141 - I 47.1195.CCTV.13.VC Pull Concluder Cable tot Power-CCTV 13-Venetan Cswy/Dade Bled/MOCI 0% I 06-Jun-24 07-Jun.24 .1 el ' 1 A7 1045.CCTV.13.VC Meetly Power Services Ia requredl•CCTV 13-Venetian Cswy/Dade BNdIMOC) 0% 1 07-Jun-24 07-Jun-24 -140 i I 47 1165.CCTV 13.VC Eslabhsh Network Communications-CCTV 13-Venetian Cswy/Dade Blvd(MDC- 0% 1 10-Jun-24 10-Jun-24 -102 ' I T::1,,,.o ,4r..Il..t.nn-CCIV11 V.0+710n Csnv 0. w Al 11 23.CCTV 13 VC Locates for CCTV-CCTV 13-Venetian Csw rOade Blvd(If Needed)(MOC) 0% 0 04-Jun-24 04-Jun-24 -141 I A71125.CCTV 13.VC Instal Pole CCTV 13 Venetian Cswy/Dade Blvd)Not Required)(MOC) 0% 004-Jun-24 04-Jun-24 .141 ; I A7 1122-CCTV 13.VC OM Pole Hole-CCTV 13-Vendean CswyDade Bled(Not Requked)(MDC) 0% 0 04-Jun 24 04Jun-24 -141 . 1 A7.1130.CCTV.13.VC Instal CCTV Camera Assembly-CCTV 13•Venetian Cswy/Dade&vd(MOC) 0% 0 04 Jun-24 04-Jun•24 -138 t I 47 1140.GCTV 13.VC Instal CCTV Camera Lowering 0evice(CLO)-CCTV 13-Venetian Cswy/Dade Blvd(0 Needed)(MOC) 0% 0 04-Jun-24 04-Jun-24 -100 1 • 47.1090.CCTV.I3.VC Instal BTU(Pole Mount)-CCTV 13-Venetian Cswy/Dade Blvd(MOCI 0% 1 07-Jun-24 02-Jun•24 -141 I 47 1101.CCTV 13.VC Pour and Cure Maaeenance Pan•CCTV 13 Venetian Cswy/Dade Bvd(MOC) 0% 1 07-Jun-24 10-Jun-24 -71 1 • 47.1170.CCTV 13.VC Instal Layer 2 Managed Field Etilernel Selches(MFESs)-CCTV 13•Venetian Cswy/Dade Blvd(N/A)(MDC) 0% 0 07-Jun-24 07-Jun-24 -103 I ' 471180•CCTV 13.VC Instal Terrain&Server-CCTv 13•VeneMn Cswy/Dade Blvd(WA)(MDC) 0% 0 07-Jun-24 07-Jun-24 -103 I 47 1102.CCTV I3.VC Install Uninlerrupeble Power Supply(UPS)-CCTV 13-Venewn Cswy/Dade Bled(Nd)(MOC) 0% 0 07-Jun•24 07-Jan-24 •103 I t A7 1095.CCTV.t 3.VC Cable Connection and Termination-CCTV 13-Venetian Cswy/Dade Blvd(MDC) 0%. 1 07-Jun•24 10Jun-24 -141 1 47.1200.CCTV.13.VC SurgeSuppression-CCTV 11-Venetan Cswy/Dade BNd(MDC) 0% 1 10-Jun-24 11Jun-24 .141 I 47.1201.CCTV.13.VC GrainWa and Lightning Protection•CCTV 13•Veneaan Cswy/Dade Bvd(MOC) 0% 1 10Jun-24 11-Jun-24 •141 1 A71210.CCTVI3.VC Calibrate and Configure CCTV 13 Wnelian CswyiDade SNd(MDC) 0% 2 10-Jun•24 12-Jum24 103 1 w .. IV 47.1015.CCTV.2I.VC Clearing and Grubbing-CCTV 21-Venetian awylDade Died( r I 0% 0 07-Jun•24 07-Jun-24 -140 I A7.1020.CCTV21.VC Embankment/Excavation-CCTV 21-Venetian Cswy/Dade BkrdIMDC) 0% 0 07.Jun-24 07-Jun-24 -140 I A7 1030.CCTV.21-VC Underground Locates-CCTV 21-Venetian Cstvy/OadeBlvd(MOC) 0% 0 07-Jum24 07Jun.24 -140 I 47 1040 CCTV.21 VC Instal Pull Boxes-CCTV 21•Venetian Cswy/Dade Blnd(MOC) 0% 0 07-Jun-24 07-Jun-24 •139 I A7.1160.CCTV21.VC Install W'veless Communication Network Radios-CCTV 21 Venation Cswy/Dade BNd(MOC) 0% I 11-Jun-24 12-Jun-24 -141 I A71135.CCTV2I.VC Pull Conductor Cable from Service Pam to CCTV.CCTV 21.Venelanl Cswy/Dade Bvd(MDC) 0% 1 12-Jun-24 13-Jun-24 -141 I 47.1195.CCTV21.VC Pull Conductor Cable for Power-CCTV 21-Venetian Cswy/Dade Blvd(MDC( 0% 1 13-Jun-24 14-Jun-24 •141 I A7 1045 CCTV 21.VC Madly Power Services la required)-CCTV 21-Venetian Cswy Dade BNdIMOC) 0% 1 14-Jun-24 14-Jun.24 -140 1 47 1165CCTV21.VC Establsh Network Commune aeons CCTV 21•Venetian Cswy/Dade Blvd/MDC) 0% 1 17-Jun-24 17•Jun-24 .107 1 IS Dr•-.u•I•u CCT'.21-Vo„o1,an Ivey Dade Blvd;MDC w 471120.CCTV2I.VC Locates for CCTV-CCTV 21 Veneuae Cswy/Dade Blvd 111 Needed)(MOC) 0% 0 11-Jun-24 11-Jun-21 •141 I A7.1125.CCTV2IVC Instal Pole•CCTV 21•Vlerelian Cswy/Dade Blvd(Nor Requved)(MOCI 0% 011-Jun-24 11-Jun-24 -141 I A7.1122.CCTV21.VC Ord Pow Mole-CCTV 21-Venetian Carry/Dade/31yd(Nor Requnred)(MDC) 0% 0 11-Jun-24 11-Jun-24 -1.1 I A71130.CCTV.21.VC Instal CCTV Camera Assembly-CCTV21 Venetan Cswy.'Oede BNd(MOC) 0% 0 11-J1n-24 11-Jun.24 138 1 -_ ban Rwlim Ctnoad 04... MOM Actual Work Data Date 31-Jan-24 COMB DBOM ITSSP-S Schedule Update UI4.0.W20I3124DD 2024-03-28 Sent rams Iwl-.uk.sa.am 4 44s7300 Se.. 1 1 Remanne Work 2024.06-20 Added Missing 2yr TE lose.al em4n.4u1wRww. .lnmw..ulsaR-m�5e100 PsE Project Start Date: 19-Jun-19 m an-n 144073t4nnr.ne43ei7nVpseee6e16178 SY0Rro1.e NW MCritical Remaning Work Dull Blown Schedule aeon-n nwvrun.n..00n4un1aa..ay.nwrealsavao0 nru 0 •6Mlestane 71? 1/�. SCORE Project Finish Date:22-Dec-25 vap.12of7n aca.rn nnooal..mmal.wupmwwaatmeaab®oo nw m Nwn srl.n..uparl.una s+m1a00 NW �S Summary 36Na.73 .•upm.use s11zam0 NUJ 76.707•24 Sr.we Wane UN 0 wet 0172430 _NMJ TCC•COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-08-20 Added Missing 2yr TE 1- 20-Jun-24 TASK tiller:All Activities Cavity ID Actinly None Our% Al Compete Start Finish Total Float 2024 eBiiS 1 Comp Our or 1 02 [ 03 J o4 01 1 02 1 03 1 04 . 47 I140.CCTV21 VC Install CCTV Camera Lowering Device(CLD)-CCTV 21-Variorum Cswyr lade Bivd(ti Neededl(MOCI 0% 0 11.Jun.24 11•Jun 24 •104 I 47 1090 CCTV.21.VC nstall BTU(Pole Mount)-CCTV 21-Venetian Cswy/Dade BIv0(MOC) 2% 1 14-Jrun24 14•Jun-24 •141 47.1101.CCTV.21.VC Pour and Cure Maintenance Pad-CCTV 21-Venetian Cswy/Dade BNd(MDC) 0% 1 14-Jun-24 17-Jun-24 •77 I 47 1170.CCTV21.VC Instal Layer 2 Managed FMB Ethernet Swishes(MFESs)-CCTV 21-Venetian Cswy/Dade Blvd(N/A)(MOC) 0% 0 17-Jun-24 17-Jun-24 -108 ! I A7 1184CCTV21.VC brutal Terminal Server-CCTV 21-Venetian CswylDade Blvd(N/A)(MOC( 0% 0 17-Jun-24 17-Jun-24 -108 I 471182.CCTV.21.VC Instal Umterruptible Power Supply(UPS)-CCTV 21-Wneaan Cswy/Dade Blvd lN/A)(MDC) 0% 017-Jun-24 17-Jun-24 -186 ' A7 1095 CCTV.21.VC Cable Connection and Termination-CCTV 21-Verrenan CswyrDade Blvd(MOC) 0% 1 17-Jun-24 17-Jun-24 -141 I, 471200.CCTV21.VC Surge Suppression-CCTV 21-Venetian Cswy/Dade Blvg140C1 01. 1 17Jun-24 18-Jun-24 •141 47 1201.CCTV21,VC Grounding and Lig1nw9 Prolecien•CCTV 21•Venetian Cswy/Dade BlvdIMOC) 0% I 17-Jun-24 18-Jun-24 -141 I 47 1210 CCTV21.VC Calarale and Configure-CCTV 21-Venation Cswy/Dade Blvd(MDC) 0% 2 17•Jun-24 19J1.on-24 -108 1 WI Underv:tin n i .,,.C,.nrm. .. W A7 1015.CCT V.23 VC Clearing and Grubbing-CCTV 23•Wnelan swyrDade Blvd 0% 0 17-Jun-24 -Jun.. -14, : 47 1020.CCTV23.VC Embarerment/Eauavatlon-CCTV 23,Venetian Csvy/Dade Blvd 0% 0 17-Jun-24 17-Jun-24 -140 A71030.CCTV23.VC Underground Locales-CCTV 23-Vrrefan Cswpfade Blvd 0% 0 17-Jun-24 t7-Jan-24 -140 I Al 1040.CCTV 23.VC Install Pul Bows-CCTV 23-Venetian Cswy/Dade Blvd 0% 0 17-Jun-24 17-Jun-24 -t39 A7.1160.CCTV23.VC Install Wireless Communication Network-Radios•CCTV 23-Venetian CswyrDade Bed 0% 1 18.Jun-24 19-Jun-24 -141 I A7.1135 CCTV.23.VC Pus Conductor Cable from Service Pont to CCTV-CCTV 23-Venelian CswpDade Blvd 0% 1 19-Jun-24 20-Jun-24 -14I A7 1195CCTV.23.VC Pull Conductor Cable for Power CCTV 23•Venetian Cswy/Dade(WO 0% 1 20-Jun-24 21-Jun-24 -141 I 471045.CCTV23.VC Madly Power Services()required)-CCTV 23•Venetian CswylOade Blvd 01. 1 21-Jun-24 24-Jun•24 •140 0 A71165.CCTV23.VC Establish Network Corrntunnatuns-CCTV 23-Venetian Cswy/Dado Sod DX 1 24-Jun-24 25Jun24 -Ill I if S rev,.a r, n rr.CCTV 23•V,. .,.rrC.n,, r W A7 1120.CCTV 23'VC I«ales for CCTV,CCTV 23-Venetian Cswy/Dade Blvd(II Needed) 0% 0 18-Jun-24 18-Jun-24 -141 , I A7 1125.CCTV23 VC Ir.s'a.Pole.CCTV 23•Venetian Cswy-Oadn Blvd(Not Required) 0% 0 18-Jun-24 18•Jun-24 -1a1 I Al.1122.CCTV23.VC Doti Pole Hole-CCTV 23-Venelian Cswy/Dade WO(Not Required) 0% 0 18-Jun-24 18-Jun-24 -141 ' I A71130.CCTP23.PC Instal CCTV Camera Assembly•CCTV 23-Venetian Cswyrlede Blvd 0% 0 18-Jun-24 18-Jun.24 -138 I A7 1140 CCTV23-VC Instal CCTV Camera lowering Device(CLD)-CCTV 23-Venetian Cswy/Dade Bvd In Needed) 01. 0 18-Jun-24 18-Jun24 •109 I 47 1090 CCTV,23-VC Insult BTU/Pole Mount)•CCTV 23-Venetian Carry/Dade Baud 0% 1 21-Jun-24 24-Jun.24 -t41 0 47 1101,CCIV 23 VC Pour and Cone Maintenance Pad-CCTV 23-Venetian Cswy/Oade Blvd 0% 1 21-Jun-24 24-Jun•24 -82 0 A7 1170.CCTV23.VC Instal Layer 2 Managed Feld Ethernet Sweeties(MFESs)-CCTV 23-Venation Cswy/Dade Blvd IN/AI 0% 0 24-Jun-24 24-Jun-24 -112 1 A7.1re0.CCTV.23.VC Maud Temnte Server-CCTV 23-Venetian CeryDede Bvd(N/A) 0% 024Jun.24 24Jn-24 -112 A7.1182.CCTV.23.VC Instal Urakerruptiole Power Supply(UPS)'CCTV 23-Venetian Cswy/Dade Blvd(NA) 0% 0 24-Jun-24 24-Jun24 -112 1 47.1095 CCTV.23.VC Cable Cenection and Termination CCTV 23 Venetian Cswy/Dade Blvd 0% 1 24-Jun24 24-Jun21 -141 I A7 1200.CCTV.23.VC Surge Suppressor-CCTV 23 Venetian Cray04de Blvd 0% 1 24•Jun-24 25-Jun-24 -141 I ' A7 1201 CCTV.23.VC Grounding and Lighueg Preledeon-CCTV 23-Venolien CSwy/Dade Did 0% 1 24-Jun-24 25-Jun24 -141 I A'1210 CCTV 23 VC CeiDrate end C4rdptre-CCTV 23-Venelmn Cswy/04dc Blvd 0% 2 24-Jun-24 28-Jun-24 -113 C:--',' .trio-RI•MS Woman C . r'- r 7 % I ,. r,'I .•rC nrn :�rIV Ili-l'..n.li.n i,.wy D..:/n P'.,d Al.1030.AIMS.13 VC r'Underground Locates-ADMS 13-Venetian Cs •tide 1 d 0% 0 1-Jun-24 1'-Jun-4 -1•0 1 Al 1040.ADM5.13.VC Instal Pull Bows-ADMS 13-Venetian C3wy,Dede Blvd 01'. 1 19Jun-24 19-Jun-24 -160 - I r Al.1135.AOMS.13.VC Put Conductor Cable Iron,Service Pond to ADMS-ADMS 13•Venetian CawpDade Blvd 0% 1 20-Jun•24 20Jum24 -180 I A7.1195.ADMS.13.VC Put Conductor Cable for Power-ADMS 13-Venetian Cswyoade Blvd 0% 1 21-Jun-24 21-Jun24 -160 I A7.1045AOMS.13.VC Modify Power Services(0 required)-ADMS 13-Venetian Cswyloade Bird 0% 1 24-Jun-24 24-Jun-24 -124 I A7 1100.ADMS.13.VC Pour and Cure Mareenance Pad•ADMS 13-Venetian Cswy/Dade Blvd 0% 1 24-Jun-24 24-Jun24 -160 I 47 1160.AIMS.13 VC nslall Wireless Communication Network-Rados•ADMS 13•Venetian CswylDade Blvd 0% I 10-Apr•25 11-Apr-25 -328 1 47 1165 ADMS 13 VC Establish Network Communications-ADMS 13-Venetian Cswy/Dade Blvd 0% 1 17-Apr-25 17-Apr-25 -329 1 V I i ..- 47 1120.ADMS.13 VC LacatettSurvey/Inslal Plan-Da Shag-ADMS 13-Venetian Cswy/Dade Blvd 0% 2 03-May-24 06-May-24 -160 0 be. Rom* eNetr hem IIIIIIIIIIII Actual Work Data Date:31-Jan-24 COMB DB(IM ITSSPS Schedule Update U24.0.W2013124DD 2024-03.20 Sent neon,, e.a.,.sewa..eon awrsraoe van, 1 J Remaining Work 2024.06-20 Added Missing 2yr TF: rar..at cw,er.cuo0ooRawer-Rowe+..urse.9R-ewomm00 en. Project Start Date: 19-Jun-19 s�ay w/ ...a w. , R.,+.a eeoeu wm.lass,un 0 w.nsRao ne7 MINIC•4cai Remaavng Work Full Blown Schedule aoe-n oowosn.mwaan.wn wise PA se s•pssa 1 r0t62200 IWJ -' • •Weston., Project Finish Date:22-Dec-25 Psis 01 Mrs ..w..ue...ae..•.Nw..ers.r MO/OSSUMW nut 1F_,Summary Tiz s RE ,,ran S .0.Nuwu.U10451ernoun nNJ 36-Kw Z. Sch..1.u oft e 1124.0 s memo ALI AM 2. ...NUM.LH.awt anlNOe Pi. TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 013124110 2024.03.26 Sent 2024.06.20 Added Missing 2yr TE 20-Jun-24 TASK Nter:Al Activates heftily ID Activity Name Cho I. At Compete Start Fresh TOW Float 202e 2025 Comp Der 01 I 02 I 03 f 04 01 I 02 I 03 I 04 L ' A7 1015 ADMS 13.VC Clearing and Grubbing-ADMS 13-Venetian Cswy.,Dade Blvd 0% 1 07-May-24 07.May-24 -131 I • A7 1022 ADMS.I3.VC Installation of Drill Shan-ADMS 13-Venetian CswyDade Bvd 0% 2 07-May.24 08.May-24 -160 I A7.1020.ADMS.13.VC EmbarMmenVEacav abort-ADMS 13-Venetian CswyDade Blvd 0% 1 07-May24 07-May-24 .131 I A7 1025 ADMS 13.VC Cure a CSL Tesl of Dr/Shalt-ADMS 13 Venetian Cswy,Dadc Blvd 0% 26 09-May-24 05-Jul-24 -169 A7 1090 AOMS.13.VC Pour and Cure Cabinet Pad•ADMS 13•Venetian CswyDade Blvd Not Repined) 0% 0 24-Jun.24 24-Jun-24 -126 I A7.1090.ADMS.I3.VC Instal Cabinet(Pad Mount)•ADMS 13•Venetian Cswy/Oade Bed(Not Requited) 0% 0 24-Jun•24 24-Jun-24 -126 I A7.1060ADMS.13.VC Instal Structure ADMS 13.Venalwn Cswy/Dade BNd 0% I 10-Ape•25 10-Apr•25 -326 1 Al 1070 ADMS.13.VG Instal Sign•ADMS 13•Venetian CswyiDade Blvd 0% 1 10-Apr-25 10-Ape.25 -327 1 A7 1095ADM513.VC Cable Connection and Termination ADMS 13-Venetian Cswyl000e Blvd 0% 1 17-Apr-25 17-Ap2•25 -331 I A7.1200.ADMS.I3.VC Surge Suppression-ADMS 13-Venetian CswyDade Blvd 0% 1 17-Apr-25 16-Ap-25 -331 I A7.1201ADMS..13.VC Grounding and Lightning Proteclon•ADMS 13-Venetian CswyDade Blvd 0% 1 17-Apr-25 IS-Apr-25 -331 ' I giim1 A7.I160.ADMS.32.VC Instal WI es s Cemrnuncallen"...or,. Rados ADMS32 Venetian CswyDade Bvd(Nol Included Removed per CC 0% 0 01-Mar•24 01-Mar.24 -60 I A7 1135.ADM5.32 VC Pull Conducla Cable from Service Point to ADMS•ADMS 32-Venetian CswyDade BNd(Not Included-Removed per CO 0% 0 25-Jun-24 25-Jun-24 -160 • 1 A7.1195.ADMS 32 VC Pull Conduct°,Cable to Power•ADMS 32•Venetian Cswy/Dade Sod(Not Included.Removed per CO I I) 0% 0 25-Jun-24 25-Jun-24 -160 1 A7.1010.ADMS.32.VC Instal Pul Bores•ADMS 32.Venetian CswyDade ENO Nor Included-Removed per CO al) 0% 0 25-Jun-24 25-Jun-24 -160 1 A7 1030 AOMS.32.VC Underground Locales•ADMS 32-Venehan CswyDade BNd(Not Included•Removed per CO 61) 0% 0 25-Jun-24 25-Jun-24 -160 I A7.1100.ADMS.32.VC Pour and Cure Maintenance Pad-ADMS 32 Venetian CswyDade Blvd(Not Included Removed per CO An) 0% 0 25-Jun•24 25-Jun-24 -Is 1 r A7.1165.AOM5.32.VC Establish Network Cpmrexecatrons-ADMS 32•Verrenan Cswy/Dade Shed(No1 Included-Removed per CO it 1) 0%. 0 25Jun-24 26-Jun-24 -147 1 m A7.1045.ADMS.32.VC Modify Power Savlces(il required)-ADMS 32-Venetian CswyDade Blvd(Not Included-Removed per CO 61) 0% 0 25-Jun-24 25-Jun-24 -147 1 linnillimir A7.1120.ADMS.32.VC Locates/SurveyAnstall Plan-Drill Shah•ADMS 32•Venetian CswyDade I d(Nob Included-Removed per CO A1) 0% 0 01-Mar-24 01-Mar•24 -160 I A7.1025.ADMS.32.VC Cure&CSL Test of DIA Shah•ADMS 32-Venetian CswyDade Blvd(Not Included-Removed per CO All 07. 0 01-Mar-24 01-Mar-24 -120 1 A7.1022.AOMS.32.VC Installation o1 DIA Shall ADMS 32-Venetian CswyDade ONO(Not Included•Removed pee CO 61) 0% 0 01-Mar-24 01-Mr-24 -84 I A7.1060.ADMS.32 VC Instal Structure ADMS 32•Venetian Cswy70adc ONO(Not 100040d-Removed per CO e1) 0% 0 01-Mar-24 01-Mar-24 -60 I A7 1015 ADMS32VC Clearing and Grubbing-ADMS 32•Venetian Cswy,'Dade Bud(Not Intruded•Removed per CO A1) 0% 0 01-Mar-24 01-Mar•24 -60 I A7.1020.ADMS.32VC EmbankmarWEecavalr,n-ADMS 32-Venetian CswyDade Shed(Not Worded-Removed per CO II) 0% 0 01-Mar-24 01-Mr-24 -60 I A71070.ADM5.32,VC lnsral Sign-ADMS 32 Venetian Cswy/Oado Blvd(Not Included-Removed per CO AI) 0% 0 16-Mar-24 15-Mar-24 -90 1 . A7.1060.ADMS.32.VC Pour and Cure Cabinet Pad-ADMS 32 Vewuan CswyDade Blvd(Not Included-Removed per CO II) 07. 0 25-Jun-24 25-Jun•24 -160 I A?1090.ADMS.32 VC Install Cabinet(Pad Mount)•SONS 32-Venetian CswyDade Blvd(Not Included-Removed per CO e1) 0% 0 25-Jun-24 25-Jun-24 -too I A7.1200.A0MS.32VC Surge Suppress'ar•ADMS 32.Venetian CswyDade Blvd(Not Included•Removed per CO At) 0% 0 25-Jun-24 25-Jun-24 -160 I A7.1095.AOMS.32.VC Cable Connection and Term/laton ADMS 32 Venewn CswyrDade Blvd(Not Included Removed pee CO A1) 0% 0 25-Jun 24 25-Jun-24 .160 1 A7.1201 AOMS.32-VC Grounding and Lgnlrnng Protection ADMS 32 Venetian CswyDade BNd(Not Included•Removed per CO e1) 0% 0 25-Jun-24 25-Jun.24 -160 1 • % I 1 r.• , .•..C.n n,. _!.1'i:- .,u.-I�n 1,:'rv1'iro.,n) % I AT I030 ADMS 33 VC Underground tic ales ADMS 33 Venetian CswyDade Blvd 0% 0 25.Jun.24 25-Jun-24 •129 1 A7.1040.ADMS 33 VC Install WIIBones ADMS 33 Venetian Cswy/Dade Blvd 0% 1 25,Jun-24 25-Jun-24 -129 1 A7.1135.ADMS 33 VC Put Conductor Cable Iron,Service Pont to ADMS-ADMS 33 Venetian Cswy/Oade Blvd 0% 1 25-Jan•24 26-Juo24 -129 I A7.1195.ADMS.33.VC PIA Conductor Cable for Power-ADMS 33 Venetian Cswy/Dade Blvd 0% 1 26-Jun-24 27-Jun-24 •129 A7 1045 ADMS.33 VC Molly Power Services(I/squired)•ADMS 33•Venetian CswyDade Bed 0% I 27-Jan-24 26-Jun-24 -126 1 A7 1100.A0MS 33 VC Pour and Cure Maintenance Pad•ADMS 33•Venman CswyDade Blvd 0% 1 27-Jun-24 25-Jun-24 •129 I A7 1160.ADM5.33 VC Instal Wireless Communcatcn Network-Radios-ADMS 33•Venetian CswyDade Blvd 0% 1 14-Apr-25 15-Apr-25 •327 - 1 Al 1165.ADMS.33 VC Establsh Network Communcatces••ADMS 33-Venetian CswyiDade Blvd 0% 1 23-Apr-25 23-Apt-25 -330 1 • Il5- .i t..nl•,I 1,.�....._-- i.tit.,.,.w ..I.. 'I.1 % e A7 1120 ADMS.33 VC n I.ocales/Surveytnslall Play, Orb Shan•ADMS 33•Venetian Cswy/Dade Blvd 0% 2 09-May-24 10-May-24 -139 I . A7.1015.ADMS33.VC Clearing and Grubbing ADMS 33-Venetian CswyDade Blvd 0% I 13-May-24 13-May-24 100 1 A7.1022.ADMS33.VC Instalanol of Ord Shan-ADMS 33-Venetian CswyDade Blvd 0% 2 13-May-24 14-May-24 117 A7.1020ADMS.33.VC EmoankmenVeeconrion-ADMS 33.Veerran CswyDade Bled 0% 1 13May 24 13 May 24 100 I de. Plantar CM*, POa, mom Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-2B Sent 0adan Passim s<nno..Our 00611rt0o yet( I 1 Remamng Work 2024-06-20 Added Mining 2yr Tit ten„-el Co.m.a UM..n,r,.ere.smen.Ursa sn.ar 0wem0o :se Project Start Date:19-Jun-19 o6Mw.a Awrm el•w n ln, n.r»e0e.re0er Winn 1661.1 Grecal Remaining Work ///'''''��� lull Blown Schedule Pa OP or wwnaSPe,.ecaonnwpae.n,e,n Maen.MONO° P. ' • •MJesrone �R S�R c Project Finish Date:22-Dec-25 r,s.ro of 7e 4.rI a wrersm Ar.eonmea un,r..na.n.naa:awla°o no, • Summer L' m.rawa sc,w.usa,r.unosrm,aa: su Y 3a Me.M SNM.. r.awnta00 NM Mar,M Seam.up4.r.6126 0 w}013r7600 ., • TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 0/312400 2024-0329 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK filter.All ACtivivas Activity ID Activity Name Dur Sr. Ai Complete Start Finish Total Fbat 2024 2025 Comp Dw 01 I 02 1 03 I 04 01 I 02 1 03 I 04 A7.1025.AOMS 33.SC Cue 8 CSL Test of Dre Shah•ADMS 33-Venetia^CswyrDade Bkd 0% 28 15-May-24 II-Jum24 -169 i 111.1 A7.1000.ADMS.33VC Pour and Cure Cabral Pad•AOMS 33•Venetian CswyiDade Blvd(Not Requred) 0% 0 27•Jun-24 27Jun-24 -127 j I A7.1090.AOMS.33.VC Install Canner/Pad Mounc-ADMS 33-Venetian CswyiDade Blvd(N01 Reputed) 0% 0 27-Jun-24 27-Jun•24 -127 1 I A71060.ADMS.33.VG Install Structure-ADMS 33-Venetian Cur/Made Blvd 0% 1 14-09r-25 14-Apr25 .327 : I - Al.1070.AOMS33.VC Install Sign ADMS 33•VeneNn CswyiDade Blvd 0% 1 14-Apr-25 14-Ayr25 -328 1 I A7.1095.ADMS.33.VC Cable Connection and Termination,ADMS 33•Venetian CswyrDade Blvd Os', 1 2314.-25 23-Apr-25 -331 : I • A7.1200.ADMS33.VC Surge Suppression•ADMS 33•Venetian CswylOade Blvd 07. I 23-Apr25 24-Ap025 -331 A7.1201 AOMS 33 VC Groom/ono and Lghtnine Protection-ADMS 33-Venetian Cswy/Dade Blvd 0% I 23Apr-25 24-Apr25 -331 i 5 - / ‘ / A7.1030.ADMS.34 VC Underground Locates•AOMS 34-Venetian CswyDade Blvd 0% t 28-Jun-24 28-Jun-4 •1: I A71040.AOMS34.SC Install Putt Boxes ADMS 34-Venetian Cswy/Dade Blvd 0% 1 01-Jub24 01-Jul-24 -126 1 A7.1135.ADMS34.VC Pul Conduct.Cable from Service Point to ADMS-ADMS 34-venetian CswyiDade Blvd 0% 1 01•Ju1.24 02-Jul-24 •129 1 A7.1195A014S34 VC Put Conduct.Cable I.Power-ADMS 34.Venetian CswyiDade Blvd 05. 1 02-Jul-24 03Ju1.24 •129 I ' Al.1045.ADMS.34.VC Modify Power Services(4 required)•BUMS 34.Venetian CswyiDade Ova 0% 1 03-Jul•24 03Jut24 -128 1 A7 1100,ADM5.34.VC Pour and Cure Mantenance Pad•ADMS 34 Venetian CswyDade Blvd 0% 1 03-Jul-24 05-Jul-24 .90 1 A7.1160.AOMS.34.VC Insists Wreless Communication Netw.k-Rados-ADMS 34-Venetian CswyiDade Blvd 0% 1 14-Apr•25 15-Apr 25 •325 1 A7 1165.ADMS34.VC Establish Netw.k Communications•ADMS 34 Venetian CswyiDade Blvd 0% 1 25-24.-25 25-Apr-25 •331 I A7 1120.SUMS 34 VC l.ocales'Su'vey,lnstal Plan•Drn'Shalt ADMS 34-Venetian CswyiDade Blvd 0% 2 13-May-24 14-May-24 •139 1 A7.1015 ADMS 34 VC Clearing and Grubbing-AOMS 34•Venetian CswyOade Blvd 0% 1 15-May.24 15-May-24 •98 1 • A7 1022.ADMS.34 VC InsMlafron Ol Drill Shall-ADMS 34-Venetian CswyiDade Blvd 0% 2 15-May-24 16-May24 -139 1 A7 1020.ADMS.34.VC Embankment/Excavation•ADMS 34•Venetian CswyiDade Blvd 0% I 15-May24 15-May-24 -9$ I A7.1025.AOMS.34.VC Cure 8 CSL Test of Dr6 Shall-ADBIS 34-venetian CswyiDade Blvd 0% 28 17-May24 13Jun-24 -169 IIIIII - A7.10110.ADMS34 VC Pour and Cure Cabinet Pad-ADMS 34 Venetian CswyiDade Blvd tNot Required) 0% 0 03-Jul•24 03-Jul•24 •129 1 A7 I0g0.ADMS34.VC Instal Cabinet(Pad Mann,-ADMS 34-venetian CswyDade Blvd(Not Required) 09, 0 03-Jt4-24 05-Jul-24 •129 I A7.1060.A0MS.34,VC install Structure ADMS 34-Venetian CswyDade Blvd 0% 1 14•Apr25 14-Ayr-25 -325 1 A7.1070.AOMS.34.VC nstal Sign ADMS 34 Venetian CswyiDade Blvd 0%. I 14-Apt-25 ta-Apr-25 -325 1 A7 1095ADMS.34 VC Cable Connection and Termination-AGMS 34•Venetian Cswy/Dade Blvd 05. I 24-Apr25 24-Apr-25 -331 I A71200.A0M5.34.VC Surge Suppression•ADMS 34•Venetian CswyiDade Blvd 0% 1 25•Apr25 25-Apr-25 •331 I A7 1201.ADMS.34 VC Grounding and Lightning Promotion•ADMS 34•Venetian CswyiDade Blvd 0% 1 25•Ap4•25 25-Apr-25 -331 I C.+struawn 5FS Parking Garage-Venetian Cswy❑e tie t Iv] A7.12240.SPSG07 Proof Existing Conduit i SPS Garage 007•Venetian CswyiDade Blvd 100% 1 26.O41.23A 20-oc1•20 A7,12340.SPS.G07 Instal Conduct.Cable-SPS Garage G07 venetian Cswy/Dade Blvd 1 00 5. 127•Oc1-23A 27.0c0-2/ A7.1070.SPS.G07 Install Mvnumanl OMS-SPS Garage G07-Woollen Cswy/Dade Blvd 100% 5 30-Ocl-23A 03-Nov2: 47.12730.SPS.G07 nstal Mounting Brackets on Exiling Structures•SPS Garage GO7 venetian CswyiDade Blvd t 00% 1 30-OCI.23A 30-Ocl-22 A7.12200.SPS.G07 Instal Electrical Equpmenl in Eating Cabinet-SPS Garage G07-Venetian Cswy/Dade Blvd 100% 1 31-O01.23A 31-Oct-22 A7 12510.SPS.G07 Instal Solar Power Equipment in Eustng Cabinet•SPS Garage GO7•Venetian CswyiDade Blvd 100% 1 31-Od-23A 31.Oc-22 A7.1160.5PS.G07 Instal Wireless Communication Network Radios SPS Garage GO7 Venetian Cswy/Dade Blvd 100% 131-Oc1-23 A 31-Oct-22 A7.1130.5PSG07 Instal Detectors•SPS Garage G07 Venetian CswyiDade BNd 100% 2 31-081-23A 01-Nov-21 A7.1165.SPS.G 07 Eslablsh Network Communicator-is i SPS Garage G07 Venetian Cswy/Dade Blvd 100% 2 03-NOv23 BB-Nov-2: A7.I095.SPS.G07 Cable Cormeclion and Termination-SPS Garage GO7.Venetian CswyiDade fetid 100% 2 03-NOv-23 06-Nov-S A712340 SPS.GIO Instal Conductor Cable-SPS Garage G10-Venetian CswyiDade Blvd 100% I 20-Sep-23 20-Sep-22 A7 12240.SPS.G10 Proof Existing Conduit-SPS Garage G1O•venetian CswyiDade Bend 100% 1 21-Sep-23 21•Sep-2S - A7 12280 SPS.G10 Instal EIecne al Equpmennt in[.011ng Cabinet•SPS Garage G10•venetian Cswy/Dade Blvd 100% 1 22-Sep-23 22-Sep-S A7.12730 SPS G10 nstal Mounting Brackets on Eusling Structures•SPS Garage G 10•Venetian CswyiDade Blvd 100% 1 22-Sep-23 22-Sep2T A7.12510 SPS.GIO Instal Solar Power Equipment In Eating Cabinet-SPS Garage G10-Venetian Cswy/Dade MO 100% I 25-Sep-23 25-Sep-2: - --- Owe nw,um Crake. Now. AC1.1 Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update I124.0.W2013124DD 2024-03-28 Sent nee ifs abwvw s.n.eb eat a NeineID W11 I Remaining Work 2024.06-20 Added Missing 2yr TE lOWe2t Cmur.ruenwMecwern...,..alnm00osde7100 esE Project Start Date: 19-Jun-19 06Y4r22 Awe.mne..ve.ieirevma.Irlw.0 un.eS1,911er.0 NMJ non Grace.Remaining Work T Pall Blown,Schedule re-On Aw„nt anima armanwpme erect waw.i lmvroo ncu • •Milestone / ['�RE Project Finish Date:22-Dec-25 y.s,+-Of of 0auwa eia..mnw.neee4w..veaa.ir�tl++ea2wwmo m+J �•SummaryRAI �J nw.rJ srnw•uta+uunoalmlrw0 M. 20as72 S .M.trim.UN s 1t212200 raw 26a.0. Se.w..0 rem u2.IVO 0rOI2400 a0u TCC•COMB Progress Se e&Is update COMB DOOM ITSSPS Schedule Updsl.U24.0.W2 0/312400 20244/ Mt3-28 Sent 2024.06-20 Added Missing 2pe TE 20-Jun-24 TASK filter All Ac ies 1 Acw♦y ID Activity Name Our% At Complete Sari Finish Total Float 2024 2025 Comp as al ( 02 I 03 1 04 01 1 02 j 03 04 A7,1130.SPS.G10 Instal Detectors SPS Garage GIO-Venetian Cswy/Dade Blvd 100% 2 25-Sep23 26-Sep-20 47,1070.SPS.G10 Instal Monument OMS-SPS Garage GI•Venetian Cswy/Dade BNd 100% 2 25-Sep-23 26•Sep21 • A7.1160.SPS.G10 Instal W,reiess Communication Network•Rados SPS Garage GI Venmlae Cswy/Dade Blvd 100% 1 26-Sep-23 26-Sep-21 . A7 1095.5P5 G 10 Cable Connection and Termination-SPS Garage 010-Venetian Cawy/Dade Blvd 100% 5 27-Sep-23 03-Oct-23 AT•155.SPSG10 Es:ablan Newo,k Communications-SPS Garage GtO-Venetian Cswy/Dade Blvd 100% 8 04-0cl-23A 13-Oct-22 Co.,wruC text-S(`S Suit.,Lot: •.F„ut a.C',../",aria 2,.•1 • Al'13.1 SPS.P32 Instal Detectors SPS Lot P32-Venetian Cswy/Dade Blvd IOes0Opedl 100% 0 28-N0v-23 28-Nov-2: • A7 12340.SPS P32 Install Conductor Cable•SPS Lot P32-Venetian Cswy/Dade Blvd(Descoped) 100% 0 28-Nov-23 28-Nov-21 • A7.12240.SPS.P32 Proof Existing Co.fua•SPS Lot P32•Venetian Cswy/Oade Blvd(Deseoped) 100% 0 28-Nov-23 211•Nov-2: A7.1165.S2S.P32 Establish Nelwo'k Communications-SPS Lot P32•Venetian Cswyr0ade Blvd(Descopedt 100% 0 28-Nov-23 26-Nov-2: Al 12280,SPS.P32 Instal Electrical E9upe enl in Exsting Cabinet-SPS Lot P32 venetian Cswy/Dade Blvd(Descoped) 100% 0 28-Nov-23 28-Nov-2: A7.12510.SPS.P32 Instal Solar Power Egcpment in basting Cabinet.SPS Lot P32 Venetian Cswy/Dade Blvd(Descoped) 100% 0 28•N0v-23 28-N0v2: A7.12730.SPS.P32 Instal Mounting Brackets on Eustng Structures;SPS Lot P32-Venetian Csvey/Dade Blvd(Descoped) 100% 0 26-Nov-23 28-Nov-2: • A7.1160 SPS.P32 Instal Wumess Communication Network•Rados•SPS Lot P32•Venetian Cswy!Dade Blvd(Doscaped) 100% 0 28-Nov-23 28•Nov-2: 47 1070.SPS.P32 Ms1a/Monument DMS.SPS Lot P32 Venetian Csveyloade Blvd(Descoped( 100% 0 28-Nov-23 28-Nov2: A7,1095.SPS.P32 Cable Connection and Termination-SPS Lot P32-Venetian Cswy/Dade Blvd(Descoped) 15055. 0 28-Nov-23 20•Nov-2: C • - I i I , ,• r - - 1W , VI • 47.1010 TTS.08 Milestone Begin Sae Work•TTS 06.Venetian Cswy/Dade Blvd(MOC) 0% 0 28-Jun-24 -219 • A71160 TTS08 Instal Wireless Communication Network Radios-TTS 08 Venetian Cswy/Dade Blvd(MDC) 0% 128-Jun•24 28-Jun-24 -145 1 i Al 1090 ITS 08 Instal BTU(Po otia e Mount)-TTS 08-Vevn Csw•y/Dade BNd(MDCI 0% 1 20-Jun-24 01-Jul24 -149 0 A7 1130 TTS.08 Instal ITS Detectors TTS 08-Venetian Cswy/Dade BIvdlMDC( 0% 3 28•Ju-24 02-Jul.24 -150 0 A71140.ITS.08 Instal TTS Antennas-TTS 08•Venetian CswyDade Blvd(MDC) 0% 3 28-Jun-24 02-Jul-24 -150 0 A7 109S.TTS.08 Cable Connection and Termnator-ITS 03-Venetian Cswy/Dade Blvd(MOC) 0% 2 03-Jul-24 05-Jul-24 -150 ; 1 i A7,1165.TTS.08 Establish Network Communlcalsons ITS 06 Venetian Cswy/Dade BlvdIMOCI 0% 2 05-Jul-24 08Ju1-24 -150 I 1 V • A7.1010.—..1; Mlestone:Be jn Site Work•T1S 19•Venetian CswyOode Blvd 0% 0 09-Jul-24 -218 1 ♦ A7.1090.TTS 19 Instal BTU(Pole Mount)•TTS 19.Venetian Cswy/Dade Blvd 0% 1 09-Jul•24 09-Jul.24 -149 1 I A7.1160.TTS.19 Instal Wireless Communication Network Radios ITS IV Venetian Cswy/Dade Blvd 0% 109-Jul-21 09-Jul-24 -149 1 A7.,1301TS19 Instal TTS°elecwrs TTS 19•Venetian Cswy/Dade Blvd 0% 2 09-Jul-24 10-Jul-24 -150 A7.1140.TTS19 Instal nn Blv TTSAnteas-TTS 19-Venetian CswyDade d 0% 2 09-Jul-24 10WJ 24 -150 1 j{ A71095.7TS.19 Cable Connection and Terminatcn TT519 Venetian CswyrOade Blvd 0% 1 11•Jul-24 II Jul 24 -150 :j 47 ti65 TTS 19 Establish Network COmmonevl-r;-TTS 19•Veneten Cswy/Dade Blvd 0% I 12-Ju1.24 12Jul.24 -150 I Consl,uct:o,,-CCTV-Jul,o Tuttle CS. 155W.411 SI S9112,Anh ur G0,9, „" �0 w r •I' ,.0 m,ms CCT/y 5-Julio Tutu,Cswy 1;5 W Jr: - I112 .,tturr Cl„ill. „ W 47.1015.CCTV.05.JTC Cle a,ny a-d GIubbny CCTV 05 Just Tuttle Cswy195W al sl SVSR112,A0Fur Godlred Rd(MDC( 39% 0 04-Jun-24 04•Jun-24 -126 1 Al 1020.CCTV05.JTC Embankment/Exc aval,on CCTV C5 Job Tune Cswy195/W elst St/S14112.Arinur Gddbad RdtMOCI 0% 004-Jun-24 04-Jun-24 -126 1 ' 47.1030.CCTV05.JTC Underground LCCal05•CCTV 05-Juba Tulle Cawty196M/41s1 SUSR1121Arinur Golfed Rd(MDC) 0% 0 04Jun•24 04•Jun-24 -126 1 A7.1040.CCTV.05.JTC Instal Pul Boxes CCTV 05-Julia Tulle Cswle96AN.41st SVSR112/Armor Godlred RI(MOC) 0% 0 04-Jun-24 04-Jun-24 •125 I A7,1060.CCTV05.JTC Instal Wheels COmmuncalon Nehrak-Radios-CCTV 05-Jule Tulle Cswy196AV.41st SVSR112/A llrur GotVed Rd( 0% 1 04-Jun-24 05•Ju1-24 -126 I 1 A71135,CCTVOS.JTC PullConductor Cable vow Swell.Pant to CCTV-CCTV 05.Juba Tuna Cs wit 96/W.41 tit 5414112/Arlhur Godlred Rd( 0% 1 05-Jun-24 06-Jun-24 -126 I A7.1195•CCTV05.JTC Pull Conductor Cable la Power CCTV 05 Juke T0Oe Cewy/196/W.41st SI/SR112/Mher Godtred RO(MOC) 0% 1 06-Jun.24 07-Jun-24 •126 1 A7 t045 CCTV 05.JTC Muddy Power Services rt required CCi V OS Julia Tulle Cawy195"N.41sl SVSR112/Nlho Godlred RtlIMOC) 0% 1 07-Jun-24 07-Jun-24 -125 Al t+.55 CCTV.OS.JTC Ev eer t N ,5V, -CCTV JJtie v Cswt•,'95VV els(SVSRlt2/Allhur Godlred Rel(MDC( 0% 1 10•Jun•21 10-Jun-24 -108 I W 1 I�"�,. I^ , C• - C... I.S'.r J1•,'. �S' .tit-, Godtred BO(2aDC Al 1120.CCTV.05.JTC Locales for CCTV-CCTV 05-Jule Twee Cary/19SW/1st SVSRlt2/Mhur G edited Rd(II Needed)(MDC) 0% 0 04•Jun-24 '-un-4 .1 8 I I Chia 0wlnm CMaee APP. Acted Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent 1sa1 is e.,m,aawJ.ell o14mf0d yell I I Remaining Work 2024-06-20 Added Missing 2yr TE Ise..-n Gar ble UeY .c MAwep6.We'n101S05n•e 09000'010OO rse Project Start Date: 19-Jun-19 061.2na n.eon.*Nan..013106 2.1206.00000,lo.51.k004.0 W1J MI. Gomel Romaong Work Full Blown Schedule 2soe•22 N.,.ndne.sees460wUue.0Parnn001 I•.0laa00 all • •Mlesw � /�ne � C'�RE Project Finish Date:22-Dec-25 pen nf 1616 a M.y a 80 9 (ev ev, easoeo.. v rn� eo:vm opo 'saJ �1 Summary "\ ,J xk«-a wines UpewuH OS nessiatto kuJ 20.knN Snw.UWa U KO 20 0.2600 nw/ TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-26 Sent 2024-06-20 Added Missing lye TE T 20Jun-24 TASK filter:AM Aelkmies AnNy 10 Aotivey Name Our% At Complete Slam Finish Total Float 2024 2025 Comp DI+, 01 I 02 I 03 I 04 01 I 02 I 03 I G4 A7.1125.CCTVASJTC Instal Pole-CCTV 05-Julia Tulle Cswy/195 W.4/s1 SVSR112/Arllur Godlred Rd(Not Requeed)(MDC) 0% 0 04-Jun•24 04.Jun-24 •126 1 A7.1122.CCTV.05.JTC DIP Pole Hole-CCTV OS-Juke Tull Cswyil 95AV.41st SVSR112/Arllur Godred Rd(Not Rogt/ired)(MDC) 0% 0 04-Jun-24 04-Jun•24 •126 I 47.1130.CCTV05J7C Install CCTV Camera Assembly•CCTV 05•Jule Tuttle Cswy/195W.41s1 SVSR112/An ur Godred Rd(MDC( 0% 0 04•Jw1-24 04-Jun-24 -123 I A7.1140.CCTV.05JTC Install CCTV Camera Lowering Device(CLO)-CCTV 05-Julia Tulle Cswy/199W.41s1 St'SR112/Arihur Godlred Rd(II le 0% 0 04-Jun-24 04-Jun-24 -105 I A7.1090.CCTV.05.JTC Install BTU(Pole Mount)•CCTV 05.Julia Tolle Cswy195Aw.41s1 SUSR112/ArVtur Godlred Rd(MDC) 0% 1 07-Juk24 07-Jun-24 -126 1 47.1101.CCTV05JTC Poor and Cure Maintenance Pad-CCTV 05•Jul Tuttle Cswy195W.4151 S1/SRI12/Mhu,Godlred Rd(MOC) 0% I 07-Jun-24 10-Jun-24 -71 : I A7.1170.CCTV.05.JTC Instal layer 2 Managed Field Ethernet Sweeties IMFESI)-CCTV 05-Julia Tutte Cswy195.W 41s1 St/SR1121Anhur(WA 0% 0 07-Jun-24 07-Jun-24 -109 I Al.I1110.CCTV05JTC Install Terminal Server.CCTV 05•Julia Turtle Cs.y195/W.41st 9/SR 112/Anhur Godlred Rd(WA)(MOC) 0% 0 07-Jun-24 07-Jun-24 .109 : 1 47.1162.CCTV 05JTC Instal llnoterruptible Power Supply(UPS)-CCTV 05-Jule Tulle Cswy195AV.41st S1/SR112/Arlhor Gobbed Rd(N/AI!M 0. 0 07-Jun-24 07-Jun-24 -109 f I 47.1095.CCTV.05JTC Cable Connection and Termination-CCTV OS-Jule Tuttle Cawyn95/W.41st 9/SR 112/Annub Godhed Rd(MOC) 0% 1 07-Jun-24 10-Jun-24 •126 ' 1 A7.1200.CCTVA6.JTC Surge Suppress on.CCTV 05 Jura Tuttle Cewy196AV.41st Sl/SR112/Arlhu,Godlred Rd(MOC) 0% 1 10-Jun-24 11-Jun-24 -126 Al.1201.CCTV.05.JTC Grounding and Lightning Proleolon-CCTV 05-J06 Tulle Cewy195W.41s1 SVSR112/An ur Godtred Rd(MDC) 0% 1 10-Jun-24 11-Jun-24 -126 A/.1210 CCTV.05.JTC Calibrate and Configure-CCTV 05-Jule Tulle Cswy/951W.41s1 SI/5R112/Arthur Gbdhed Rd(II6)C/ 0% 2 10-Jun-24 12-Jun.24 -109 1 A ..n r;C7t Ju i.i tultl.•C.r.r 1.... .. - A • A7 1015.CCTV 06JTC Cleorto and Grubtro CCTV CO Jula Tuttle Cswyl9SW Vs:9,-SR112'Arthur Cocked Rd 0% 0 07-Jun-24 07-Jun-24 -125 I 47.1020.CCTV.06.J IC Embarurment/Excavation-CCTV 06-Jule Tune Cswy195/W 41st SVSR112/Arthur Godlred Rd 0% 0 07-Jun-24 07-Jun-24 -125 I A7.1030.CCTV.O6 JTC Underground Locates-CCTV 06.Julia Tulle Csvy195AN.41 s1 5USR112/Ardwr Godred Rd 0% 0 07-Jun-24 07-Jun-24 -125 ' I A7.1040.CCTV.06.JTC Install Pun Boxes CCTV 06 Julia Tuttle Cswy1954/V.41st SUSR112/Arthur Godred Rd 0% 0 07-Jun-24 07-Jun.24 •124 I A7.1160.CCTV06JTC Install Wveless Communlcauon Network Radios-CCTV 06-Jul.Tuttle Cswy195AN.41s1 SVSR112/Mhur Godred Rd 0% 1 11-Jun24 12-Jun-24 -126 1 A7.1135.CCTV.06JTC Pug Conductor Cable lour Service Poem to CCTV-CCTV 06-Jule Tuttle Cswy195/W 41s1 SUSR 112/Mihur Godlred Rd 0% 1 12-Jun•24 13-Jun24 -126 1 A7.1195.CCTV.06.JTC Pug Conductor Cable for Power-CCTV 06•Jun Tittle Cswyn 95/W 4151 SVSR112/A,Otur Godred Rd 0% 1 13-Jun-24 14-Jun-24 •121 1 A7.1045.CCTW06.JTC Muddy Power Services(1 I equeed)•CCTV 06-Julia Tulle Cswy199W.41st SI/SR112/Mnur Godlred Rd 0% 1 14-Jun-24 14-Jun•24 .125 1 • A7.1165.CCTV.06.JTC Eslablsh Network Communcalons-CCTV 05-Atka Tulle Cswy/I95'W.41st 51/SA112'M15e Gobbed Rd 0% 1 17-Jun-24 17-Jun-24 -112 I --CIV 06•Julie Tuttle Cswy-195W 4,31:.ISR1t2 Arthur C. '--J R. W A7.1120.CCTV.06.JTC Locates la CCTV CCTV 06 JUNd Tulle Cs e --_{ wy/19YW.alkt 3VSR 112Mhur Gobbed Rd Ili Needed) 0% 0 11-Jun-24 11-Jun-24 -128 1 47.1125.CCTV.06JTC Install Pole-CCTV 06-Juke Tulle Csw/195W.41st 51/SR112/Arihur Godlred Rd(Not Rowena) 0% 0 11-Jun-24 11-Ju0-24 -126 1 A7.1122.CCTV.06.JTC Oro Pole Hole•CCTV 06•Jule Tut*Cswyd 95/W 41st SUSR1lZkllrur Calked Rd(Not Required) 0% 0 11-Jun-24 11-Jun-24 -126 1 A7./130.CCTV06.JTC Ins tall CCTV Camera Assembly-CCTV 06-Jule Tuttle Cswy/195W.4151 SVSRI12/Anhur Godlred Rd 0% 0 11-Jun-24 11-Jun-24 -123 1 A7.I140.CCTVOIJTC Install CCTV Camera Lowering Device(CCD)•CCTV 06-Julia Tulle Cs y/195%41s1 St/SR 112/Ashur Godlred Rd(11 el 0% 0 11-Jun-24 11-Jun-24 -t10 1 ' i A7.1090.CCTV06.JTC Instal BTU(Pole Mount)•CCTV 06-Julia Tulle Cy1%AN.41s1 SU ae SR112/Ara Godlred Rd 0% 1 11J 1n un•24 14-J •24 -120 I A7.I101.CCTV.06JTC Pour and Cure M3mlenance Pad-CCTV 06-Juke Tulle Cswy195W 4151 SVSR112/Mhur Geared Rd 0% 1 14-Jun-24 17-Jun-24 -7r 1 I 47.1170.CCTV.06JTC Install Layer 2 Managed Field Ethernet Sweches(MFESs)-CCTV 06,Julia Tulle C wy1951W.41st SVSRI12/Mmu,(N/A 0% 0 17-Jun-24 17-Jun-24 •110 i 1 8 A7.1160.CCTV06JTC Install Terminal Server.CCTv 06-Julia Tuttle Cswy/195/W 41s1 9/SR 112/Maur Godred Rd(N/A) 0% 0 17-Jun-24 17-Jun-24 -113 1 1 A7.1182.CCTV06JTC Install Urwrterrupuble Power Supply(UPS)•CCTV 06-Jule Tulle Cswy195AV 41st SVVSR 112/Adhur Godred Rd(N/A) 0% 0 17-Ju1.24 17Jun•24 •113 ' I 1 A7.1095.CCTV06.JTC Cable Conned eon and Termnatron-CCTV 06-Julia Tuttle Cony/195/W.4151 SVSR112/Anhw Geared Rd 0% I 17•Jun•24 17-Jun-24 ' •126 '. I A7.1200.CCTV.06.JTC Surge Suppression-CCTV 06.Juke full Caryl 96NY.41st SVSR112/Mnur Godlred Rd 0% 1 17-Jun-24 113-Jun24 -126 ' 1 A7.1201.CCTV06.JTC Groundng and Lightning Proleclon-CCTV 06-Jule Tulle Cawyl95AN.41st SVSR112/Aresur Godlred Rd 0% I 17-Jun-24 16•Ju.-24 -126 • I A7.1210.CCTV.06.JIC Cal eats and Configure•CCTV 06•Julia Tuttle Cswyn 95/W 41st SUSR112/AHhur Geared Rd 0% 2 17-Jun-24 19-Jun-24 -114 w ... _.,,,.,I..,.brhu,G r. W A7.1015.CCTV.25.J C Clearng and Gruhbng-CCTV 25-Juke vale Cswyl9 SW.41st St/ -112/Arthur Geared Rd 0% 0 17-Jun-24 17-Ju11-24 -125 I 47.1020 CCTV.25 JTC Embankment/Ercavaliun-CCTV 25-Ju/e TulleCswy195rW 41st SI/SR112/Mhur Geared Rd 0% 0 17-Jun-24 17-Jun-24 •125 1 I A7.1030.CCTV.25.JTC Underground Locales•CCTV 25-Jake Tune Can y195M.41st SUSR112/A.Ihu Calked Rd 0% 017•Jun•24 17-Jun•24 •125 I A7-1040CCTV.25.JTC Install Pug Bores-CCTV 25-Ada Tulle Csetyl95AV.41st SVSR112/Arihte Godlred Rd 0% 0 17-Jun•24 17•Ju,-24 -124 I A/1160.CCTV.25.JTC Instal Wireless Commune200n Network•Rados-CCTV 25-Juta Tull*Can y196M/.41st 9V9R112/Mhu,Godlred Rd 0% 1 18-Jun-24 19-Ju-24 .126 I A7.1135.CCTV25JTC Pull Conductor Cobb 'bIn Service Pon to CCTV-CCTV 25-Juke TuneCswy195/W.41st Sf/SR112/Mhur Cocked Ro 0% 1 19-Jun-24 20-Jun-24 -126 I 47.1195.CCTV.25.JTC Puts Conductor Cable for Power-CCTV 25-Juke TROOP Cswyn 95/W.4151 SVSR112/Mlur Cooked Rd 0% 1 20-Jun-24 21-Jun-24 -126 I 47.1043.CCTV.25JTC Madly Power Services{4 iequeed)•CCTV 25•Jule Tulle Cswy195W 4In SUSRII2/ArtMa Godlred Rd 0% 1 21-Jun-24 24-Jun-24 -125 0 Du nwrlor ensue her. - Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 0131240D 2024-03.26 Sent ifa.is asiiiiiiisminissai 4e0nr8tn .e11 t-"-I Remaining Work 2024-06-20 Added Missing 2yr TE teninel co,an.suese•Are.vvnow.-.uuosn...37 Vsoeeto0 'Pig11 - Pro)eCiStattDale:l9-Jun-19 0441ga, nem.a e...ma.rleatee :e!moan t 10400'0B0i o n4J Crdica Remaining Work Fu II Blown Schcdulc alma Proposed eran.e.wve lwa,�rrm MOO l ro,n100 NUJ ♦ ♦Mrleslone //,'e]�- _C) F Project Finish Date:22-Dec-25 P.g.n7 of on lea.,.,, rv�el lire. 05551.w,/P4ewpcl PReer)05emp0 nwJ �11 5ummary /�' v R`^ 300,4w-23 nowousul Y•UN..05 h714100 NUJ T5A.r N Sorep..upeteb2411w201312.bb NM/ TCC•COMB Progress Schedule Update [ COW DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03-24 Sent 2024-08-20 Added Missing 2yr MI 20Jun.24 TASK Tree Al AOtielisl Activity ID Aclney Name Our Y. At Complete Start Fish Total Pipet 2024 2025 Comp Our 01 02 03 04 01 02 03 at 471165.CCTV25JTC Establish Network Communicatiors-CCTV 25 Julia Tuttle C swy!195W.41s191/519112/Arthse Gartered Rd 0% 1 24-Jun-24 25-Jun-24 •118 I --T _ !95'/!11;1$ISR112 Arthur Godlred Pc W A7.112000TV,2SJTC Locales for CCTV-CCTV 25-Julia Tote Cswy-195W.41s15V5R112/Mlhur Godlrod Rd)tf Needed) 0% 0 18-Jun-21 18-Jun-24 -126 A7 1125.CCTV25.JTC Instal Pole-CCTV 25-Juke Tuttle Cswy/195/W.41st SUSRl I2JAdhnr GOdired Rd(Not Requited) 0% 0 18-Jun-24 18-Jun-24 •126 A7.1122.CCTV25.JTC DM Pole Hob•CCTV 25-Jug Tutt6 Cswyn 95/W.41st SUSR11 2/Nlhur Godlred Rd(Not Regwed) 0% 0 18-Jun-24 18-Jun-24 -126 A7.1130.CCTV25.JTC Instal CCTV Camera Assembly•CCTV 25•Jule Tuttle Cswy/195/W.4I51 SUSRI12/Arthur Coated Rd 0% 0 18-Jun-24 16-Jun-24 •123 A7.1140.CCTV-25.JTC Intl CCTV Camera Lowering Device(CLO)•CCTV 25•Julia Tulle Cswy/195W.41st SUS111112/Amhur Gndtred Rd(II N 0% 0 18-Jun-24 18-Jun-24 -114 A7.1090.CCTV25.JTC Instal BTU(Pole Mount)-CCTV 25-Julia Tulle Csy195NV.41st SV5R112/Arthur Godlred Rd 07. 1 21-Jun-24 24-Jun-24 -126 - 0 A7.t101.CCTV25.JTC Pour and Cure Maintenance Pad-CCTV 25-Jule Tueb Cswy 195W.41s1 SVSR112/Mhur Godlred Rd 0% 1 21-Jun-24 24-Jun-24 -62 0 { A7.1170-CCTV25.JTC Install Layer 2 Managed Field Ethernet Switches(MFES5).CCTV 25•Jule Tulle Ceey195/W/list SUSR112lAMur(N/A 07. 0 24-Jun-24 24-Jun-24 -117 I 1 A7.1180.CCTV25-JTC Install Terminal Server CC)V 25 Juba Tulle Cawy195 W-41 s 9U9R 112 Mllsx Godlred Rd(N/A) 0% 0 21Jun 21 24-Jun-24 -117 A7.It82CC7V25JTC Insult Unin/erruplole Power Supply(UPS)•CCTV 25 Jule Tulle Gwy195NJ.41 sl SVSR112/Mihur Godlred Rd(NIAI 0% 0 26•Jun•24 24-Jun-24 •117 1 yy A7.1095.CCTV25.JTC Cable Conneclon and Termination-CCTV 25.Juke Tuttle Cswy/1951W.41s 1 St/SR 112/Anhur Go4lne0 Rd 0% 1 24•Jun•24 24-Jun-24 -126 I 7 A7.1200.CCTV25.JTC Surge Suppression-CCTV 25-Juba Tuttle Cswyi ZAN.41st S1/SA112/kin.Godtrad Rd 0% 1 24-Jun-24 25-Jun-24 -126 I A7.1201.CCTV25.JTC Grounding and Lightning Proleclion-CCTV 25-Jolla Tulle Cewy195'W.41s1 S/SR112/Mihur Godlred Rd 0% 1 24-Jun-24 25-Jun-24 -926 A7.1210CCTV.25.JTC Collbrate and Configure-CCTV 25-Julia Tutle Cawyn 96/W.4151 SV5R112/Mlhur Godlred Rd 0% 2 24-Jun-24 26-Jun-24 •118 1 M A7.1015.0 TV•26.JTC Cleating and Grubbing-CCTV 26-Julie deb swy195 W.41s1'7 112/Anhur G00ired Rd 0% 0 24-Jun-24 24-Jun-24 -125 47.1020.CCTV26.JTC ErnbankmenUFacevabon•CCTV 26-Jule Tune Cswy195/Vit.4151 SUSR112/Anhut Godlred Rd 0% 0 24-Jun-24 24-Jun-24 -125 I 47.1030.CCTV26.JTC Underground Locales•CCTV 28-Julia Tulle Cswyt%NV 41 st St5R1121Armur Godlred Rd 0% 0 24-Jun-24 24-Jun-24 -125 I A7.f040.CCTV26.JTC Instal P lBoxes-CCTV 26•Juba Tulle Cswy195NV_41s1 SVSRI12/Mthur Godretl Rd 0% 0 21•Jun-21 24 JurvN •12a A7,II60.CCTV26.JTC Install Wireless Communcalion Network•Rados-CCTV 26-Julia Tuttle Cswy195AV.41s1 SVSR112'Mdwr Godred Rd 0% I 26-Jun-24 26-Jun-24 -126 471135,CCTV.26JTC Pull Conductor Cable from Service Point to CCTV-CCTV 26-Jule Toth GSwy195/W 41st SIISR112/M1nur Godlred Rd 0. I27-Jun24 27Jum 24 126 a7.1195.CCTV26JTC Pull Conductor Cable to Power-CCTV 26•Juba Tulle Gwyn 96NV.41st SUSRt12/ArtMlr Calked Rd 0% 1 2&Jun-21 28-Jun-24 -126 I I A7 1045.CCTV26.JTC Madly Power Services 01 required)-CCTV 26 .nufra Tuttle Cswy/951W 41st SVSRt f 2/Mlhur Gddhed Rd 0% 1 01 JUF24 01-Jul-24 -125 n71165.CCTv26JTC Establish Network Communications sw I CCTV 26 Juba Tuthe Cyrl9YW.♦1 s15U5Rt12'M1nur Gomrad Rd 00% t 02-Jul-24 02Jul-21 -121 I 1 A I ITS Device installation-CCTV 26 Jul.Tullle Caw y,195'IV 41s!5t 56112.Arthur Godlred R- 471120.CCTv.26 JTC Lwdins tc.CCTV-CCTV 26-Jwb Tuus Cswyn9YW dlst St-SRlt 2lMmur Weed Rd In Needed} 0% 0 25Jun-24 25-Jun.24 -126 A7.1125-CCTV26JTC Instal Pole-CCTV 26-Juke Tillie Give/195''W.41s1 SUSR112/MIMrr Godlred Re(Not Requited) 07. 0 26-Jun-24 26-Jun-24 •126 I A7.1122.CCTV26.JTC DM Pole Hole.CCTV 26-Jule Tulle Cswryn 96M'.413t SUSHI I2/Mlhur Godred Rd(Not Required) 0% 0 26•Jun-24 26-Jun-24 •126 I A7 1130.CCTV26.JTC Instal CCTV Camera Assembly-CCTV 26-Julia Tuttle Cswy/195/W.41s1 ST/SR112/Artlor Godlred Rd 0% 0 26-Jun-24 26-Jun-24 -129 1 A7.1140.CCTV26JTC Install CCTV Camera Lowering Device(CLD)-CCTV 26-Julia Tug*Cswy/195W.41st SVSR112/Mlhur Godlred Re(If N 0% 0 28-Jun-24 26-Jun-24 -118 - I A7.10130.CCTV-26.JTC Instal BTU(Pole Mourn)-CCTV 26-Jule Tulle Cs'y195/W.4151 SVSR112/Mmur Godlred Rd 0% 1 01•Jul-24 01-Jul24 -126 I A7.1101.CCTV26.JTC Pour and Cure Manlenance Pad-CCTV 26-Julia Tuttle Cswyl95W.4131 SVSR112/Mlhur Godlred Rd 0% 1 01-Jul-24 01-Jul-24 -87 I A7.1170.CCTV26.JTC Instal Layer 2 Managed Field Ethernet Sweeties(MFESs)-CCTV 26•Julia Tulle C swy195NV.41s1 SUSR112+Mthur(N/A 0% 0 01 Ju424 01-Jul-24 -122 I 47.1180.CCTV 28JTC Install Terminal Server-CCTV 26-Juba Tuttle Cswy/195/W 41st SUSR 1121M1hur Oadlred Rd(N/A) 0% 0 01-Jul-24 01-Jus24 -122 A7.1182.CCTV26.JTC Instal Uninterrupl'lble Power Supply(UPS)-CCTV 26-Juba Tulle Gwy195AV.41st SUS13112/Mthur Godlred Ra)N/A) 0% 0 01-Jul-24 01-Jul-24 -In A7.1095.CCTV26.JTC Cads Connection and Termmaton CCTV 26-Julia Tun*Cswy/195M/41st St/SR112/Anhul Go4Ued Rd 0% 1 01,Juh24 01-Ju-24 126 - A7.1200.CCTV26JTC Surge Suppression CCTV 26-Juba Tul/C Csy195/W.41s1 SOSRt12/Annur Godlred Rd 0% 1 02-Jul-24 02-Jul-24 -126 47.1201.CCTV.26.JTC Grounding and Lgnewig Proleclon-CCTV 26,Juba Tulle Cswy 199W.41s15V5R112/Maxe Godlred Rd 0% 1 02-Ju41-24 02-Jul-24 -128 ! I A7.1210.CCTV.24.JTC Catty ate and Configure-CCTV 26-Juke Tlslle G wyn 95iW.41st 5uSR112/Mt!wr Godled Rd 0% 2 02-Jul•24 03-Jul-24 •122 w mull. Gc1r.- Jui�sum:c:�, --,. .._�- .,v.au"•c ......., W A7.1015.CCTV.29JTC Clearing a.td Grubb.-y CCTV 29 Julia Tulle Cswyl95511 41s!SLSR112'M'nur Godlred Rd(MDC; 0% 0 01-Jul-24 01-Jul-24 -125 47.1020.CCTV.29.JTC EmoankmeneE.c:,vahon•CCTV 29•Jusa Tulle Csw y195A7.41st St/SR112:A1h,.,,Godhed Rdll/CC) 0% 001.1-24 DIJul-24 •125 47.1030.CCTV29.JTC Underground Locates•CCTV 29-Jule Tulle Csvey195AV.41st SUSR112/Md1Ur Godlred Rd(MDC) 0%i. 0 01-Jul-24 01-Jul-24 -125 A7.1040CCTV.29.JTC Instal Pul Boxes CCTV 29-Jusa Tulle Cewy195A4 41st SUSR1121MItur Godlred Rd)MOC) 0% 0 01-Jul-24 01-Ju424 •124 A7.1160.CCTV-29.JTC unwell Weed's Communication Network•Rados-CCTV 29-Juke Tutu Csw VI 95AV.41,1 SUSR112.Annur Godred Rd) 07. 1 03-Jul-24 05-Jul-24 •126 1 no, Nook.. Cobol Aar oe. IMP Actual Work Data Date:31-Jan-24 COMB DBOMIT.SSPS Schedule Update U24.0.W2013t24DD 2024-03-28 Sent ,eon,,_ere..sue..am premiss very I 1 Remaming Work 2024-06-20 Added Missing 2yr TE. ,sno.n Co*.4Upa.wrroo,-netir✓•wW50L1-wa00pD,00 ow Project Start Date: 19-Jun-19 Oarwa Prommw.nsec a r,n,50r.trail tan o,,waw.o kMJ Mill Creme]Remaining Wok Full Blown Schedule as.n ,v.m.ra.w...ewrvvnnaur wo.l,vaeo,,ammo ww ♦ ♦Milestone TR [��(�e Project Finish Date:22-Dec-25 wa<4a.rTa mu.ra eneeob w..,ewaw.I+w.4w..,vr,mow 2 leaner ww ♦�Summary J „C.` inn.m s r vu..wuaos,mlaaq OW Y 30 Na23 SO4.14,wareUxas,neaW wen Cu.,?, Soto...V.141.0 2,4 OW2013,240C wed TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-06-20 Added Missing 2yr TE 1 20-Jun-24 TASK Saw.All Activities Ac6v4y 10 Aetir'Iy Mane Our. Al Complete Start Finish Teal Float 2024 2025 Comp Our Or I 02 ' 03 I 04 01 I 02 I 03 I 04 11 t. A7.1135.CCTV29.JTC Purl Conductor Cable horn Service Paint to CCTV-CCTV 29•Julie Trate Cswyl 95/YV 41st SUSR112/74lhur Gadked Rd( 0% 1 OS-Jul-24 20-Jub24 ,126 I A7.1195.CCTV.29JTC Pull Conductor Cable tor Power.CCTV 29-Ju1a Tale Cs wen 96.W.41s1 SUSR112/Arthur Godlred RO(MOC) 0% 1 013•JLL24 09•Jul-24 126 1 A7.1045.CCTV.29.JTC Moddy Power Services(1 required)-CCTV 29 .;ula Tube Cswy19SW.41s1 SVSR112/Arlhur Godlred Rd(MOC) 0% 1 09•JUF24 09-Jul-24 .124 I A71165.CCTV29.JTC Estab0Sh Network Communlcalions-CCTV 29 Jena Tulle Cowy:195'W 41sI St/SR l Z/Arthur Godlred Rd(MOC) OP. 1 10-Jut-24 10Jub24 -125 I TS Devi,Inslakal,on•CCTV 29•Ai.Tultle Cowy1951V.41s•.St5P112 AdFut Quilted Rd tMDC A A/1120 CCI V29.J1C Locates for CCTV CCTV 29 Juba lullV Cswo'ldbW 41st SUSH112MIhur Godlred Rd 01 Needed)(MDC) 0% 0 03•Jul 24 03-Jul-24 126 I A7.1125.CCIV.29.JTC Install Pole-CCTV 29 Juke Tulle Cswyr195rW.41st SUSR112/Mthur Godlred Rd(Not Require4)(MOC) 0% 0 03•Jut24 03-Jul24 •126 . 1 A71122.CCTV29.JTC Drill Pole Hole-CCTV 29•Juba Tl4lle Csvryn95Ml 41st SUSR1121Mthur Godlred Rd(Not Requred)(MOC) 0% 003-Ju-24 03Jul.24 -126 I A7.1130.CCTV29JTC Instal CCTV Camera Assembly•CCTV 29-Juba Tuttle Cswy/195NV.41s1 SUSRrl2/Mthur Go46od Rd(MOC) 0% 0 03-Jul24 03-Jul-24 -123 ' 1 A7.1140.CCTV29-JTC Instal CCTV Camera Lowerng Device(CLO)-CCTV 29-Juba Tulle Cswy/195/W.41s1 SUSR112JAnhur Godlred Rd(It N 0% 0 03-Ju-24 03-Jul-24 -123 I Al• .1090.CCTV.29.JTC Instal BTU(Pole Mount),CCTV 29-Juel Tulle Cswel 95/V.41st SUSR112/Arthur Goebert RdIMDC) 0% 1 09-Jul-24 09-Jul-24 125 I A7.1101.CCTV.29.JTC Pour and Cure Manterrance Pad-CCTV 29-Julia Tulle CSwyr195W.41s1 SUSR112/Arthur Godlred Rd(MDC) 0% 1 09-Jul-24 10-Jul-24 -92 1 A7.1170.CCTV29.JTC Instal Layer 2 Managed Reid Eihanet Swatches(MFESs)-CCTV 29•Jule Tulle Cswy195NY.41st SUSR112JMIhur(N/A 0% 0 09-Jul-24 09-Jul-24 -126 I A7 1180.CCTV29.JTC !nude Terminal Server-CCTV 29-Julia Tulle Gswy7195/W.41 sic SOSR112/Arthur Gaoled Rd(N/A)1840C1 0% 0 09-Jul-24 09-Jul-24 -126 I A7.1182.CCTV29.J7C Instal Unnlerruptrole Power Supply(UPS)-CCTV 29-Julia Tulle Cswy195rW.41s1 SI/SRI I2/Mlhur Godred Rd(N/A)IM 0% 0 09Jul-24 09Jul•24 •126 I A7.f095.CCTV29.JTC Cable Connection arM Termelalion-CCTV 29-Jr/6aT0010 Csv.y195/W.41s I SVSR112/Anhur Godfred Rd(MDC) 0% 1 09-Jut24 10Ju1-24 •126 1 ' A7.1200.CCTV.29.JTC Surge Supyeesson•CCTV 29-Jule Tulle Curry!96NV.41s1 SUSR112/da hur Godlred RO(MDC) 0% I I0-Jul-24 11-Jul-24 -125 1 A71201.CCTV29.JTC Grounding and Lgdntng Proteclbn CCTV 29-Jule Tulle Cswy195NI.41st SUSR112/Anhur Godfred RdtMDCI 0% 1 10-Jul-24 II-Jul-20 -125 1 A7 1210 CCTV.29 JTC Calibrate and Configure CCTV 29•Juba Tuttle Cs wy/r 95/W.41st SUSR 112/Mthur Godlred Rd(MDC) 0% 2 10-Jn424 12-Jul-24 -126 1 - co,slr.Mr,n Ar.MJ;•Julia Tun I.C .r:Vf 31 sic 51.5T.112 AdieurGon too RI ♦ I tor„I tr .:.C•:mms-A:WAS',2•Julia Tullio Cswy 195 W.i1 s151 SRI 12 Adhu G Allis l Ti l ♦ A71030.ADMS.02 JTC .".ire:gr cr ate. CM-^,/. Joy I-Vlwy195'W 4151;I1SR112 Arthur Godrd Rd 0% 0 15-May-24 15-May-24 -1e0 - I A7 1010.ADMS 02 JTC Instal Pus Boxes•ADMS 02-Juia Tuttle Cswyn95J911.41st SVSRl121Mlhur Godlred Rd 0% 1 16•May-24 16-May-24 .160 ' I A71135.ADMS 02 JTC Pull Conductor Cablelrom Service Pont loAOMS•ADMS 02-J1441.4(9 Cswy/195AN.41s15VSR112/MMw Godlred R0 014 I 16•May-24 17•May-la •180 A7 1195 ADMS.02 JTC Pull Conductor Cable let Power ADMS 02 Jule Tuttle Cswy195AM.41s1 SUSR112/Mhur Godrsd Rd 014 1 17 May 24 20 May 24 •160 ' 1 A7 1045 ADMS 02 JTC Molly Power Services(I required)•ADMS 02•Juba Tulle Cswy/195A V.41st SUSR112JMthur Godlred Rd 0Y. 1 20-May24 20-Mey-24 -116 I A7 1100 ADA43.02.JTC Po.and Cure Manlenance Pad-ADMS 02-Jule Tuttle Cswy/195/W 41st SUSR112JAr1hur Godlred Rd 0% 1 20-May24 21-May-24 -180 ; I A,1160.ADMS 02.JTC Instal Wireless Cornmurscalen Newark-Radios-ADMS 02-Julia Tuttle Cswyi195/W.41st SUSR112/Arllur Godlred Rd 0"/. I 17.Feb-25 19-Feo-25 -314 1 A/1165..AUMS 02 J1 C es'adsh Network COmmunoalrns ADMS 02 Juba lotto Cswy:1951W.4151 SVSR112/Anhur Godlred Rd 0% 1 19-Feb-25 19-Feb-25 304 1 TS Device Inslal'-.11ion-ADMS C1-Jolla Tuttle Cswy 195 V!4151 Sl SA112 Aehu rGoJlral ll ♦ V A7 1120.ADMS.02 JTC uocales/Surveyinstal Ran-0,01511a1.ADMS 02-Juba Tuttle Cswy/195/W.41st 51/SA112/Nthu.Godlred Rd 0% 2 19-Mar•24 20-Mar-24 -160 I A7.II'5.ADMS 02 JTC Clearing and Grubbing-ADMS 02„Julia Tuttle Cswy/195AM.41st SYSR112/Arthur Godlred Rd 0% 0 21•Mar•24 21 Mar-24 -122 I Al.1020.AOMS.02 JTC Embankmenl/Excavaon•ADMS 02-Julia Tulle Cswyr195JW.41st SUS171112/M9rur Godlred Rd 0% 1 21•Man24 21-48ar-24 -122 ' I A7.1022.4OMS.02 JTC Installaeon of Ord Shan-ADMS 02-Juba Tuttle Cswy/195uW a1s1 SI/SR112/Mihur Godtred Rd 0% 2 21-Mar-24 22-Mar.24 •135 A7.1025.AOMS.02.JTC Cure 8 CS.Tesl 01 Dri Shaft-ADMS 02-Julia Tuttle Cswy/1951W.41 s1 St/SR I12/Mthur Godne0 Rd 0% 28 23-Mar-24 19-Apr-24 -158 MI A71090.A0MS.O2JTC Inslali Cabinet(Pad Mount)-ADMS 02•Jule Tulle Cswy195/W 41st SUSR112'Mlhur Godred Rd 0% 1 20-May24 21-May24 .128 I A?1060.AOMS.02.JTC Install Structure•ADIOS 02-Jul.Tuttle Cswy195/W.41s1 SVSR112/Mtnur Godlred R4 OY. 117 FeD 25 17-Feb 25 -314 • A 11070.ADMS.02JTC Install Sign•ADMS 02,Julia Tuttle Coey/195AY 41st St584112/Mthor Godred Rd 0% I 17-Feb25 17-Feb25 -313 Al.1095.AOMS.02JTC Cable Connection and Termination ADMS 02•Jule Tulle Cswy196M.41st Sd/SR112/Anhur Godlred Rd 0% I 16.Feb-25 18-FeD25 -3/4 - A7.1200.AOMS.02 JTC Surge Suppression-ADMS 02-Julia Tuttle Cswy195/W.4151 SUSR112/Mlsn Godred Rd 0% I 19-Feb-25 19-FeD25 -314 Al.1201AOMS.02JTC Grounding and Lightning Praleclon ADMS 02-Juba Tuttle Cswy/195/W.41st SVSR112JArthul Godlrod Rd 0% I 19-FeD25 19-Fab25 314 • ♦ ♦ I A7.1030.ADMS.11.JTC •Jncergroued LJcale3 ADMS II-Jolla Tuttle Cswy'195-W.41st SIIIVI12/Mthur Gad/red Rd 0% 0 21-May-24 21-May24 •160 I A71040.A0MS.II JTC nsial Pu4 Boxes ADMS 11-J Jo Tuttle Cswp195AN.41s1 S'CSR112'Mlhul Godhed Rd 0% I 21 May24 22-May24 160 I A7.1135.ADMS 11.JIG �Aun Conduct.Cable from Service Pant to ADMS ADIOS 11 Juba belle Cswy/195/W.41s1 SUSR1/2/Arllrur Gained Rd 0% 1 22 May 24 23 May 24 160 1 Al 1195.AOMS/1.JTC out Conductor Cade lot Power•ADMS II-Jule Tuttle Cswy/195W 41st Sl/SR112/AAhu Godlred Rd 0% 1 23-May-24 24-May.24 .160 Al 1045-ADMS.II JTC MaJily Power Services(l required]-ADMS 11•Jute Tuttle Cswy/199PuNN 41st SU5R1127MthirGWI1ed Rd 0Y. 1 24 MaM24 24•May-24 -123 1 -- OS. nwtum Cl.Oaa Now BEM Aclual Work Data Date'31-1an-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent 100wv en+r.st6w.air oawlsoo San I I Remarmng Work 2024-06-20 Added Missing 2yr TE 16ewe1 Conti-Kwulmu Rawer-n.la.wee 111505I4em00901210O PIE B;;! Cnecal Remalmnp Work Project Start Date: 19-Jun-19 full Blnwn Schedule %Mw72 nmosodWW.010 w wmclu n v .aosl7.enwle.0 ry 44 noon Prowled Wm no BanooW/epv o Aatr Pnew 1 IMMO ♦ ♦Milestone IR SERE Project Finish Dale:22-Dec-25 Yaer49of/6 tarp-23 Wow.Cle„tdS,aore-mrev�een WOW 205da»p uJ IOW �7 Summary /` „ 30 Noe 21 YAWeureneu..cs IMOOD rwJ 10awd. ,So .e 4d0e UN C W20111NDo ow. TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24A.W2 01312400 2024-03.26 Sent 2024-06.20 Added Missing 2yr TE 20-Ju11.24 TASK tier Ad ACliMNs IAttivey ID Actenly Name Dur% At Compete Start Finnish Total Foal 2024 20115 Comp Our 01 I 02 I 03 I 04 01 ) 02 I 03 I 04 ry A7.1100ADMS.II.JTC Pour and Cure Maintenance Pad ADMS 11 Jule TNtio Cswyn 95/W 4151 Su5R112Mlur Godred Rd 0% 1 24-May-24 28-May-24 -160 1 A7 I160.ADMS 11 JTC Install Wireless Communication Network•Radios ADMS 11-J.I.Tulle Cswy/195AN.41st Sl/SR112/Mhur Gsilted Rd 0% I 03-Feb-25 04-Feb-25 •308 I A7,,55.AIMS.'-JT. Eslab•15h Network Communications.ADMS 11 tla Tuttle Cswy'l 95'W.41st SLSP112/Prelur Cocked Rd 0% 1 05•Feb-25 05-Feb25 -297 I IS Device Inclailat.or.-s Cntic 11 e e wy 1-J',•.-, 1 1 -. 2 ann.,r,o;iivn 11 ♦ A/1120.AUMS''.J IC Locales/SJrveylnstal Plan Drill Shalt ADMS I1•JJ1a Tulle Cswy/1951W.41s1 SUSRI12/Mhu Godtred Rd 0% 211-Mar-24 12-Mar-24 •160 I Al 1022 SUMS'.I JTC Insitda6on at Ord Sinn ADMS 11•Juba Tuttle Cswy19b.W 41st SUSR 112/Ares,Godred Rd 0% 2 13•Mar-24 14•Mar-24 -107 I A7.1025.ADMS.11JTC Cure 8 CSL Test of DNI Shah ADMS 11 Juba Tuttle Cswy/195 N 41st SUSR112/MIwr Coined Rd 0% 28 15-Mar-24 11-Apr-24 -157 MI A7 IO/5.AIA4S11JTC Clearing and Grubbing•ADMS 11-Jule Tullis Cswyl195/W.4151 SUSR112/Mtur Geared Rd 0% 1 19•Mar-24 19-Mar-24 -117 ' I A7.1020ADMS.II.JTC Embankment/Excavator)•ADMS 11-Juba Ttalie Ciwy/l95AN.4151 SUSR112/Arttur Godlred Rd 0% 1 19-Mar-24 19-Mar-24 -117 I A7.1090.A0M5.11.JTC Install Cabinet(Pad Mount).ADMS 11 Julia Tulle Cswy/196W.41s1 SUSR112/Mhur Gaited Po 0% 1 24-May24 28-May-24 -136 0 A7 1060.ADMSII.JTC Install Structure•AOMS 11-Juba Tuttle Cswy/195/W.41s1 SUSR112/Ar tor Godled Rd 0% 1 03-Feb-25 03•Feb25 -308 A7.1070.ADMS.II.JTC Install Sign•ADMS 11 JAla Tulle Cswy/195MW.41st SeSR112/AJOka Coined Rd 0% 1 03-Feb-25 03-Feb-25 -308 A7.1095.ADMS11.JTC Cable Connection and Termnetion-ADMS 1/-Juba Tulle C1wy/1951W.41s1 SUSR112/Arlhu,Geared Rd 0% 1 04-Feb-25 04-Feb-25 -308 I A71200.ADMS II.JTC Surge Suppression-ADMS 11-Jena Tuttle Cswy/195/W 41st 5USR112/Arlhur Gaited Rd 0% 1 05-Feb.25 05-Feb•25 -308 I A7 1201.ADMS.11.JTC Grounding and L4l11ning Protector ADMS 11 Jule Tu1110 Cswy/195/W.41s1 St'SR112/ArIRlr Geared Po 0% 1 05-Feb25 05-Feb25 -308 , II - -.-..i .,- - r-r, .i. -.,-'.r:I:•Jul..Tot,:c. .. 12Sii1:1:1 - 12:.l111..r l:.-.tt1, ♦ I A;I:JC,.ADMS.IL.:TC Jrdergrourd,ocsle; ADMS 12 Ali.Tuttle Cswy195,N 415I SOISR112/Arthur Godred Rd 0% 0 28-May-24 28-May-24 -160 1 A7.1 040.ADMS.12.JTC Install Pus Boxes•ADMS 12-Juba Tulle Cswy195/W.41st SUSR112/Arlhur Godlred Rd 0% 1 28-May-24 28-May-24 -160 1 A7 1t35.ADMS.12.JTC Pul.Conductor Cable from Service Point to ADMS.ADMS 12•Juke Tuttle Cswy/195IW.41st SUSR112/Mhur Godlred Rd 0% 1 29-May-24 29-May-24 -100 1 ' A71195ADMS.12.JTC Pal Conductor Cable tar Power•ADMS 12•Jute Tubb Cswy/195W.41s1 SI/SR112/Amur Coarse Rd 0% I 30•May-24 30•May-24 -160 I A7.1045.ADMS.12.JTC Modify Power Services(I regured)-ADMS 12•JIAa TO*Cswy/195/W.4141 SUSRl12/Mhur Geared Rd 0% 1 31-May-24 31-May-24 -109 I ' A7.1100 ADMS.I2,JTC Pour and Cure Maintenance Pad-ADMS 12-J1da Tulle Cswy195/W.41st SI/5RI12/Mhur Godlred Rd 0% 1 31-May24 31-May-24 •160 1 A7.1160.ADMS.12JTC Install Wireless Comnunkaean Network.Radios-ADMS 12.Julia Tuttle Cswy/195AN.4111 SUSR112/Arthur Godred Rd 0% 1 14•Apr-25 15-Apr-25 -331 1 • A7 1165.AOMS.12-JTC Establish Network Commurocalons-ADMS 12 Julia Tu01e Cswy195/W.els154SR112/Arthoe Gatlred Rd 0% 1 16•Apr-25 16-Apr•25 -329 I •TS Clr,vi,e Inslallal o. -DM512-Jolla Tuttle Cswy 155 2/41s1 St.SRI12.Arms,t:o,11,101 2 • e A71120ADMS.12.JTC Locales/Surveylnstal Plan•Dins Shan-ADMS 12 Dula Tuttle Cswy/195W.41st SVSR 112/ArIhW Godlred Rd 096 2 01-MaY-24 -'ay 24 A7.1015.ADM5.12.JTC Coaling and Grubbing•ADMS 12•Jub Tullle Cswy/195Mr 41s1 SUSA I IT/Arthur Godlred Rd 0% 1 03.May-24 03-May24 -145 1 A7 1022 ADMS-12JTC instalaton of DOI Shaft•ADMS 12•Julia Tuttle Cswy/195/W.41s1 SUSR112/Arthur Godlred Rd 0% 2 03-May-24 06-May-24 -131 0 47,1020.A0146,12JTC Enbanknleat/Excavahon-ADMS 12-Jul.Tuttle Cswy/195/W.41s1 St/SR112/Arthur Geared R0 0% 1 03•May-24 03-May-24 -145 I A7.1025.ADMS,12-JTC Cure 8 COO Ted of COO Shall-ADMS 12•Julia Tulle Cswy/195/W.41s1 SUSA 112/Anhur Godlred Rd 0% 28 07-May24 03-Jun•24 468 INN A7.1000 ADMS.12JTC Inslaa Cabinet(Pad Mount)-ADMS 12-Juba Tuttle Cswy/195/W.41st SeSR112/Arlhu Godlred Rd 0% I 31-May-24 31-May24 •113 1 47.1060.ADM5.12JTC Install Structure-ADMS 12-Juba TuOb.Cswy/195lW.41s1 SUSR112/Ar(hur Geared Rd 0% 1 14.Apr-25 14-Apr25 -331 A7.1070.ADM5.12JTC Install Sign.AOMS 12•Jule TutIC C6wy/195W..4151 SUSR112/Arlhur Godlred Rd 0% 1 14•Apr-25 144pr-25 -331 A7.1095.AIMS.12.JTC Cable Conneoaon and Termination-ADMS 12•iota Tulle Cswy195tW 41s1 SUSR112/Art tar Godlred Rd 0% 1 15-Apr-25 15-Apn25 -331 A7.1200.ADM5.12JTC Surge Suppression-ADMS 12 Julia Tuttle Cswyi195/W.41st SUSR112/Artlur Godlred Rd 0% 1 16-Apt-25 16-Apr-25 -331 A7.1201.AOM5.12JTC Grounding and Lightning Protection.ADMS 12•Julia Tuttle Cswy1951W.4I07 SUSR112/Areur Godlred Rd 0% 1 16-Apr-25 lb-Apr-25 •331 ♦ I ,, , ♦ A7.1030ADMS26 JTC Underground Locates•ADM 26•Jule Tuttle Cswy/195IW 41st SUSRI I2/Arlhur Geared R0 0% 0 03-Jun-24 '03-Jun-24 -160 I I A7 1040.ADMS.26.JTC Install Pun Boxes•ADMS 26-Juta Tuttle Cswy:195/W 41st SUSR112/A7ilair Goared Rd 0% 1 03-Jun-24 03-Jan-24 460 ' • I Al 1135.A045.26.JTC Pus Conductor Cable from Service Pont loA0M5 ADMS 26-Juba Tuttle Cswy/19SW.41st SUSR112'Ardrur Gained Rd D% 1 03-Jun-24 04-Jun-24 -160 • I A7.1195.A0MS.26.JTC Pull Conductor Cable Inn Power-ADMS 26•Julia Tuttle Cswy/195 W.41s1 SUSR112/Ar11Wr Godlred Rd 0% 1 04-Jun-24 05-Jun-24 -160 A7.1045.ADMS.26.JTC Moistly Power Services(il raguredl-ADMS 26 Juba Tunic Cswy195/W.41s1 St/SRI12/Mrur Godlred Rd 0% 1 05-JV1•24 06Jun•24 -III 1 A7.1100.AOM5.24JTC Pour and Cure Maintenance Pad-AOMS 26-Jule Tuttle Cswy195/W.41st SUS111112/Mhur Gardner/Rd 0% 1 05-Jun-24 06-Jun-24 -160 ` A7 1160 ADMS 26 JTC instal Wireless Communication Network Rados ADMS 26•Juba Tuu12 Cswyn95W.41st SeSR112/Arelut Godlred Rd 0% 1 31-Mar-25 01-Apr-25 -325 1 A7 1165.ADMS.26.JTC Establsh Network Can-anuncalons-ADMS 26-Juaa Tuttle Cswy 195AN,4111 SUSR112/Mhoe Goehed Rd 0% 1 03-Apr-25 03-A.25 -323 ;Drvlceinslallattn- AC-':.26•l.,a 7.11 I-.,r:y 195 r'f 41,,,' --,, ur(ndil ell- ♦ / A?1120.ADk15.26 JTC Locales'Surveylnstan Plan.One Shall•ADM526•Juta Tuttle Cswy/195ML 41s1 SUSRIt2/Arlhur Geared Rd 0% 2 23-Apr-24 24-Apr-24 -140 1 __. 0a. Pinner I Ceecke4 asset IIMMNI Actual Work Data Date 31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0-W .2 013124D0202443.2S Sent tad..a u wwsow .sot daron5oo van L-i Remameg Work 2024.06-20 Added Missing 2yr TE 1►nw-11 Corot,U0 eniraver eees4t.U1563P 6611.136111100 ISO Project Start Date:19-Jun-19 6Nrya1 Fiord Prove40m.wnaae00.nul7.osomesbo hMJ Critical Remaining Work T /'�� Full Blown Schedule mor1.n wwwal RHO.M rulo41alae Inp.rt oR9w 1 Iaaao0 lMJ ♦ ♦Milestone / n S / ARE Project Finish Date:22-Dec-25 e.e,1n M16 ...men wgo.m Proses am.wllia.,P.c:onew 70lOaJ0d MU y�Summary // (\ `` // Lin mnw-n Se.10Ue4rwuN0Sn7mpo NJ le JueM XMre Um.UM 0 Wt 01117400 nMJ TCC-COMB Progress Schedule Update COMB DOOM tTSSPS Schedule Update U24.0.W2 0131240D 2024-03-26 Sent 2024,06-20 Added Missing 2yr TE I 20-Jun-24 TASK Inter All Actrvures l kWWAy ID Activity Name our Y. Al Compete Start Flrilsh Total Float 2024 2025 Comb Du/ 01 I 02 I 03 I 04 i 0, I 02 I 03 I 04 A7.1022.A0M526JTC Ins taletiond 0ril Shaft-ADMS 26-Jura TWOe Cswy/195.'W 41s1 SVSR112/Mhur Godtred Rd 0% 2 25-Apr•24 26-Ap-24 •133 : 1 A7.1025.ADM5.26.JTC Cure 6 CSL Test d Dr41 Shaft-ADMS 26•Jula Tame Cswy/195MJ.41st SUSR n2JMthor Godred Rd 0% ee 27.137r-24 24.May-24 -I85 ' 0.11 A7.1015.ADM5.26.JTC Clearng and Grubbeg-ADMS 26 Jura Tuttle Cswy/195MJ.41St SVSR112/Mlur Gained Rd 0% 1 06-May-24 06-May-24 -142 I A7.1020.AOMS.28.JTC EmbankmenVExtavaton•ADMS 26 Juia Tuttle Cswyn 95AN.41st St/SR112/Arthw Godtred Rd 0% I 06-May-24 06-May-24 -142 I A7.1090.ADMS28.JTC Instal Cabinet(Pad Mount)•ADMS 26•Juka Tuttle Cswy/195/W.41st SUSR1/2/Mhar Godtred Rd 0% 1 05-Jun-24 06-Jun•24 -121 A7.t06C.ADMS.26.JTC Instal Structure-ADMS 26•Julia Tuttle CswytI95JW-41s1 St/SR712Mhur Godred Rd 0% 1 31-Mar-25 31-Mar-25 -326 I A7.1070.ADMS.26,JTC Instal Son•ADMS 26•Julie Tuttle Cswyi195JW.41s1 SV5R112/Arlhur Godtred Rd 0% 1 31-Mar-25 31-Mar•25 -325 I t A7.1095.ADMS.24.JTC Cable Connect and Terronalon•ADMS 26-Juke Tuttle Cswy1 95AW 41 at SUSRtt 2/Anhur Godirrd Rd 0% 1 03•Apr•25 03-Apn25 -327 1 • A7.1200.ADMS24LJTC. Surge Suppressl0n•ADMS 26•Jolla Tattle Cswy/195/W.41st SUSR112/Mhur Coned Rd 0% I 03-Apr-25 04-Apr-25 -327 I A7.1201 A01JS.26JTC Grounding and Lgnlnirrg Protecton-ADMS 26-Juba Tuttle Cswy/195/W.41s1 SUSR112/Arlhur Godtred Rd 0% 1 03-Apr-25 04-Apr-25 -327 - I V - - -0 ,, r r. .i C•.nuns•A761112'-Jul, Trin4 Caw I'a Y/:1,1 Sr St I117 dhu,0,.'h.-.,. Al• �1030.ADMS27JTC Underground Locates-ADMS 27 Juba Tuttle Cswy/195/W 41st SCSR112/Mihur Godtred Rd 0% 0 06-Jun-24 06-Jun-24 •160 1 r Al.1040.ADMS27.JTC Install Pull Boxes-ADMS 27-Jule Tuttle Cswyn95M/.41st S/SR112/AII5ur Godtred Rd 0% 1 07•Jun-24 07-Jun-24 •160 I A7.1135.ACMS.27.JTC Pout Conductor Cable(rote Service Point to ADMS•ADMS 27•Jute TWIN Cswy/195/W.41st St/SR t 12/Arthur Gained Rd 0% 1 07-Jun-24 10-Jun-24 •160 1 A7.1195.ADMS27.JTC Pul Conductor Cable for Power ADMS 27 Julia Tuttle Cswy/195/W 41s1 SuSR112Mhur Godtred Rd 0% 1 10-Jun-24 11-Jun-24 .160 1 A7.1045.AOMS27.JTC Moody Power Services(A rentoed)•ADMS 27•Juke Tuttle Cswy/195Mi.41st St/SR112lohur Gedlred Rd 0% 1 11-Jun-24 11-Jun-24 -118 1 Al.1100.ADMS27.JTC Pour and Cure Maintenance Pad•AOMS 27•Julia Tuttle Cswy/195M/4151 St/5R112/Arthur Godtred Rd 0% 1 11-Jun-24 12-Jun-24 -160 1 A7.1160.AOMS 27.JTC Instal Wireless Communoaton Network Radios ADMS 27 Jula Tuttle Cswy/195MJ.4151 SVSR112'Mhur Godtred Rd 0% I 31-Mar-25 01-Apr-25 324 , 1 A7.1165.ADM5.27 JTC Estabrsh Network Communications ADMS 2.' Ju'a I ohm Cswy/195yy.41st SVSR112/Artnur Godtree Rd 0% I 07-Apr25 07-Apr-25 -324 1 ,.,/-I,,,IoIl,,l,un•AG?,_.27-Julia ruIt'I,Csv:y 195 VJ 4151 Si SR112 AnhurGudtrat II. ‘ A7.1120.ADMS 27 JTC Loc ales'Su-ye/install Pan Oral Snort ADMS 21 ,tare Tunic Cswy/195/W.41s1 SUSR112/Arthur Godred Rd o% 2 25-Apr•24 26-Apr•24 I., A7.10t5.ADMS.27.JTC Clearing and Grubbelg-ADMS 27-Juba Tuttle Cswy/195W.41s1 SUSRI72/Mihur Godtred Rd 0% 1 29-7pr•24 29-Apr-24 •133 I A7.1022.ADM5.27.JTC Installation of Ora Shan•ADMS 27-Julia Tune Cswy/1951W.41st St/S11112/Arlhur Godlred Rd O% 2 29-Apr•24 30-Apr•24 -113 I A7 1020.AOM5.27.JTC EmbankmenllE.cevalon•ADMS 27•Jute Tuttle Cswy/195/88.41st SVSR112/Arthur Godtred Rd 0% I 29-Apr-24 29-4p-24 -133 I Al.1025.ADMS27JTC Cure 6 CSL Test of Dril Shan-ADMS 27-Juba Turtle Cswy/195/W.41sl St/SR 112JArihur Goa,ed Rd 0% 28 01-May-24 28-May-24 -187 101• A7.1090.ADMS27.JTC Instal Calenet!Pad Mount)•ADMS27-Jute Tuttle Cswy/195/W.41st SUSR112Mhur Godtred Rd 0% 1 11-Jun-24 12-Jun-24 -123 I A7.1060.ADM5.27.JTC Instal Structure-AOMS 27-Julia Tune Cswyb195M1.4191 SUS191121M/iur Godred Rd 0% 1 31 Mar-25 31-Mar-25 324 1 Al.1070.ADMS.27 JTC Instal Sign•ADMS 27-Jule Tuttle Cswy/195/W 4151 SVSR112Arlhur Godtred Rd 0% 1 31-Mar-25 31-Mar-25 -324 A7.1095.AOMS27.JTC Cable Connection and Termination•AOMS 27•Julia Tulle Cswyt 96A11.4151 SUSR112Mthur Gadlrrd Rd 0% 1 04-Apr-25 04-Apr-25 -327 I Al 1200.ADMS.27.JTC Surge Suppresson-ADMS 27-Julia Tune C5wt/io5, .41st SVS11112Mhor Godtred Rd 0% 1 07-Apr-25 07-Apr-25 327 1 A/t/"I.ADMS.27 ITC Grounding and Lgtttnng Protector ADMS 27 Juba Tuttle Cswy/1951W.41st SVSR112Mmur Godtred Rd 0% 1 074p-25 07-Apr-25 .327 I Canr4,''t II '1A: J.11a Nil,. 1,,r, 11. Sr ;,it:6,!hut Grellty Ad 9 N I V' . ... nn,. i017, ,.TIII,Cu.r, ,. 1151SISi.112 Anh., , - �1 Al 1030.0MS.08.JTC Underground Locates•DMS08�Juke Tulle Cs wy:195 W 41s1 SVSR112/Mthur odlred Rd 0% 0 1-Jun 1-Jun-24 I A7.1040.OMS.08.JTC Instal Pull Boxes DMS 08•Juke Time Cs wy/199W.41s1 SUSR112Mteir Godred Rd 0% 112-Jun-24 13Ju-24 -160 1 AT.1135.0M5 08 JTC Pus Conducla Cable groin Service Pont to OMS-OMS 08-Jura Tulle Camp 95/W.Clot SVSR112/Mlhur Godred Rd OY. 1 13•Jun-24 14-Jun-24 •160 1 • A7.1t95.0MS 08 JTC P,0 Conductor Cable for Power DMS 08-Jute Tu41e C9wy/195AN.41st SVSR112Mhu Godtred Rd 0% 1 14-Jun•24 17-Jun-24 .160 A7 1045.DMS.08.JTC Manly Power Services(A reganedl•DMS 08•Jule Tulle Cs wyn95/W.41s1 SVSR112/Arthur Godred Rd 0% 1 17-Jun•24 17-Jun-24 •140 1 Al 1100.DMS.08.JTC Pour and Cure Mantenance Pad-DMS 08•Julia Toth Csvy/1%M/41st SVSR112Mthur Godred Rd 0% 1 17-Jun-24 18-Jun-24 -180 1 A7 1160.0MS.08 JTC Install Wireless Communication Network•Rados-DIlS 08-Jona Tuttle Cswy/195'W.4151 St/SR1124/tnur Godred Rd 0•/. 1 10-Oc1•24 11.Oc124 -234 I A7.1165.OMS.08.JTC Esiabtah Network Communicatrons-OMS 08•Joke Title Cswy1%Mf.41st Si/SR112Arthur Godred Rd 0% 1 18-Oc1-24 18.Ocu24 •227 I A7.1120.OMS.08.JTC LCtales/Survey;lnstal Plan-Drill Shan DMS US Juha TunieC..sw II9SNJ.41st SvSR112Arthur Godred Rd 0% 2 07-Mar-24 06•Mar-24 -)60 I • I A7 1015.DM5 08 J'C Clearing and Grubong•DMS 08•Juke TJee Cory 1£,W 41st SVSR U VMhur Godhed Rd 0% 1 11-Mar•24 11-Mar-24 96 ' I A7 1022.DMS 013 J'C N Installation of Dna Stan DMS 08 Jule Tulle Cswy1%Ay.41s1 SVSR112/Arthur Godtred Rd-North 0% 3 11-Mar-24 13-Mar-24 117 1 A7 1020 DMS.08.J'c Ernbankmen0Excavatron DMS 08•Julia Tulle Cswy/19rYW.41st SUSR112'Mtho,G4alred Rd 0% 1 11-Mar-24 11-Mar•24 -96 1 Al 1 U22.DMS 08,TC S Instalanon of One Shan DMS 08•Juke TWte Cswy19SAN.41s1 SVSR112Marur Godred Rd-South 0% 3 14-Mer-24 ill-Mar-24 -117 0 One nwder Ciskei A.P. Anus'Work Data Date:31-Jan-24 COMB DRUM ITSSPS Schedule Update U24.0.W2013124OD 2024-03-20 Sant *on.,8 snare snawe nal amnrflo van i J Remammg Work 2024.06-20 Added Missing 2yr TE reaie.I, CaorsoaLengsspemwwWSt SR-SM00WVmp AY Project Start Date:19-Jun-19 oreeo-22 Awes.Aroma 616a1•Allmeerestu17.o5ume0ao 'tea NEM Crtoal Remaining Work Full Blown Schedule 240oA v,w,n,eew.,4eae uwee,nwn lnBor I'ma. i4W • •MIIo51One TR SCORE Project Finish Date:22-Dec-25 P.4.1tGJ7e wra wwin A nw,. n 4ecdk vlm.rceoetw8a.IemDO hw 0. ,Summary aRw 7J sr,.we uo4a.ul.esilsAoO NW AMN Sn.4,e Veeee UM.bWI 03Q,01, IOU TCC-COMB Progress Schedule Update COMB D8DM ITSSPS Schedule Update U24.D.d12 0111240D 2024-09-20 Sent 2024-00.20 Added elleelng 2yr TE 20-Jun 24 TASK liter.Al Aclvi40s (ACUviy 10 Acterey Name Due% At Complete Start Finish Total Float 2024 2025 Comp our 01 ( 02 I 03 I 04 0! I. G2 I 03 I 04 A7.1025.OMS.06.JTC.N Cure A CSLTest of Drat Shan-OMS08•Jul.Tuttle Cswy/195M141 s1 SUSR112/Mhur Godlred Rd-North 07. 28 19-Mar-24 15-Ape-24 .165 EMS 1 A7.1025.OMS.011.JTC.S Cure&CSL Tesl ol Da Shah•DMS 08-Jule Tulle Csw/195AN.41e1 SUSR II Godlred Rd•South 0% 28 19•Mar.24 15 Y PPr•24 •165 5293 A7.1080.OMS.06JTC Pour and Cure Cabin'Pad-DMS 08-Jule Tonle Cewy)95/W.41st SUS141t2/Nthur Godlred Rd(RR) 0% 0 17-Jun-24 17Jun24 •151 ' 1 A7 1090.0MS.08JTC install Cabinet lead Mount),DMS 08-Jule Tutleesvyn95lW.4151 StisRtt 2/Nlhur Godhed Rd(NR) 0% 0 17-Jun-24 17-Jun-24 •151 I 47.1060.OMS.08.JTC Install Structure-OMS 08-Julia Tune Gawp SAY.41st SUSR112/Nlhur Godhed Rd 0% 1 10-Oct-24 10-OCt-24 •134 ' 1 A7.1070.DMS.08.JTC install Sign•DMS 08•Julia Tune Cswyl%W.41st SUSR112/Nthur Godred Rd 0% 1 10-Oct-24 10-Oct-24 •233 I A7.1095.OMS.08.JTC Cattle Connection and Terminalon•DMS08•Jule Tuae Cswyi195/W.41st 9WR112/N1hur Godlred Rd 0% t 18.Oct-24 18.Oct•24 •230 I A71200.014S.06.JTC Surge Suppressor-DMS OB•Julia Tunic Csvy.'195W.4151 SUSR112/Mhur Godlred Rd 0% 1 18-Oc1-24 21-Oct-24 -238 0 A7.1201.13MS.06.JTC Grounding and Lightnkg Protection•DMS 08-Jule Tuttle Cs wyn 95Nv.41st St/SR112/Maur Godred Rd 07. 1 18.Oct-24 21-Oc1.24 •238 . 0 ♦ A71040.OMS.18.JTC install Pun Boxes DMS 18-Julia Tune Cs wy;195 W.41st SCSR112Arthur Godlred Rd(Descoped) 0% 0 18-Jun-24 18-Jun.24 -160 : I A71030.0MS.18.JTC Underground Locales•DMS 18•Jula 7raleCSwyr195'W4,st SUSR112/Nmw Godred Rd(Descoped) 0% 016-JWF24 18•Jan•24 -160 - 1 A7.1135.OMS 18JTC Pue Conductor Cade from Service Part to OMS-OMS 18•Julie Tulle Cswy195M/.41st S1/$R112/Nthur Godlred Rd(0 0% 1 10-Jur1-24 19-JIm•24 -160 1 47.1195.0MS 18 JTC P.O Conductor Cade for Power-DMS 18-J./47ulb C swy/195M1.41s1 SUSR112'Nlhw Godlred Rd(Descoped) 0% 0 19-Jun-24 19-Jun-24 -160 1 A7 1100.0/45.18.JTC Pour and Cure Maintenance Pad•DMS 18-Juts Tille Csvyll 96/W.41 sl SUSR112JMhor Godlred Rd(Descoped) 0% 0 19-Jun-24 19-Jum24 .160 ' 1 A7.1045.0MS.l8.JTC Modify Power Services(4 required) DMS 16-Jute Tulle Csvyn95/W.al st SUSR112/Mhu Gadred Rd(Oesccpedl 0% 0 19-Jun•24 19•Jan•24 -116 1 A71160.0M$.18JTC Install Wireless Communication Network-Radios•DMS 18 Julia Tuttle Gs wy/190W.41st Sh$R112/Nlhur Godhed Rd(I 0% 1 14•Ap-25 14-Apr•25 •322 - 1 Al.1165.0MS.18JTC Establish Network Communications•DNS 16•Jule Twe Cs wy196AN a1 st SUSR112/Mhur Godhed Rd(Descoped) 0% 0 28-Apr-25 28-Apr•25 930 I Golfed P ♦ I A7.1022.DMS.16JT .N Instata6on of OAS Shall-DMS 18-Jule Tulle Cery196W a1 st SUSR112/Nmur Godred Rd(Descoped)-North 0% 0 15-May-24 15-May-24 .136 1 47.1120.DMS.18.JTC Locates/Survey/1,1Ml Plan-Ore Shalt-OM518-Juka Tuttle Cswy195AN.4Ist SUSR112/N1nur Godlred Rd(Oescopedl 0% 015-May24 15-May-24 -136 1 A7 1022.OMS.to-JTC.S Insulation of DNA Shalt-DMS 18•Julia Tulle Cswy1958N.41 s1 S6SRI t2/Nmur Godked Rd(Descoped)-South 0% 0 15-May-24 15•Mey-24 -136 1 47.1025.OMS.18.JTCN Cure&CSL Teal of Ore Shah-DMS 18•Juba Tuttle Cawy/198AY.41st SUSR112/Nmur Godlred Rd(Descoped)•North 0% 0 15•May-24 15-May-24 •133 I A7.1025.OM5.18JTC.S Cure&CSL Teml of Ore Shalt-DMS 18 Jule Tulle Cswy/1950N.41st SUSR112/Nltur Godlred Rd IDescopedl-South 0% 0 15-May-24 15•May 24 •199 I 47.1015.0A15.18.JTC Clearing and Grubbing-DMS 18-Julia TJde Cswy095/W.4151 SUSR112/Nlrrur Godteo Rd tOescorcd) 0% 0 17-May-24 17-May.24 •129 ' I A71020.DMS.18JTC Embankment/Excavation.OMS18-Julia TIAIe C5wyv 95/W.41st SVS8112/Nlnur Godlred Rd)Descopea! 07. 0 17•May24 17-May.24 -130 I A71080.014S•18JTC Pour and Cure Cabinet Pad•OMS 18-Jule Tfede Cs wyn 95/W.41st SUSR112/Amhur Godlred Rd(Descoped) 0% 0 19•Jun-24 19-Jun•24 -116 1 A7 1090DMS.10.JTC Install Cabinet(Pad Mount)-DMS 18-Julie Tuttle Cs wy/195tW.41s1 SUSR112/Nlhur Godlred Rd(Descoped) 07. 0 19-Jun-24 19-Jun.24 •118 I A7.1060.DMS.IB.JTC Instal(Structure•DMS 18-Julia Tulle Cswy195W.4111 SUSR112/Mhur Godhed Rd(Descoped) 0% 0 14 Apr-25 14-Apt 25 -322 I 47.107&DMS.18.JTC Install Sign-13MS 18-Julia Tule Cawyl 954N.alit SUSR112/Nthur Godlred Rd(Oescoped) 0% 0 14.Apr-25 14-Ap•25 -321 ' A7.1200.0845.18.JTC Surge Sopteesstbn•DNS 1 e-Jule Tuttle Cswyn95 W.al st SUSR112/Ntteur Godhed Rd(Desccpedl 0% 0 28 Apr-25 28-Apt 25 -330 A71095.OMS.18 JTC Cabe Connection and Tarmenatbn DM518 Jule Tuttle Cswy/l95/W.41s1 S iSPn2/N1hur Godlred Rd(Descoped) 0% 028-Apr-25 28•Apr-25 330 - A7 1201 OMS,18.1TC Grount eg and Lghlron4 Protection•DNS 16-Julia Tut*Cseyn 95/W 41st SIJSRI12'Mhur Godred Rd(Descoped) 0% 0 28-Apr-25 28•Apo-25 -330 ♦ I A7.1135.. C.20.J C Pul Conductor Cable from Service Pant to DMS DM520 .:ula Tri le CS wyl9/W.41at SUSR112/Ntlwr Godlred Rd IRr 0% 0 19-Jun-24 19-Jun-24 •I 1 A7 1195.0M5.20.JTC Pull Conductor Cable lot Power•DMS 20•Jule To life Cswy71919W.4151 SUSR112/Mhur Godlred Rd(Removed per C04 07. 0 19-Jun•24 19-Jun.24 .160 I • A7.1040.DMS.20.JTC Install Pull Boxes OMS 20-Juts Tr04e Cs wy/199W.ClotSl/SR112/Amhur Godlred Rd(Removed per COel) 0% 019•Jtm-24 19•Jun-24 -160 I Al.1030.DMS.20.JTC Underground Locates DMS 20 Julia Tulle Csey/195W.41st St/SR112/Arthur Godred Rd(Removed per COet) 0% 0 19•Jun-24 19-Jun-24 160 - I 47 1100.DMS.20JTC Pour and Cure Maintenance Pad•DMS 20-Juts Tuttle Csvyn 95/W.41s1 Str5R112/Nthur Godlred Rd(Removed per CC 0% 0 19-Jun-24 19-Jan-24 MOO I A71045.0A15.20.JTC Modify Power Services(i mowed) 0MS20-Julia'Woe Cswyn 95/W.41st StrSR)12'Nlh r Godlred Rd(Removed per( 0% 0 19-Jun"24 19-Jun-24 -116 1 A7 1160 DMS 20.JTC Instal Wireless Communication Network,Rados-DMS 20 Jule Tuttle Cs wy/1950W 41 s1 SUSR112/Mhur Godhed Rd(I 07. 0 14-A0-25 14-Apr•25 -321 I 47 1165.DMS 20 JTC Establish Network Communications-DMS 20 .uta Tuttle Cs wy195/W 41 s1 SUSR1121Mhm Godeed Rd(Removed per' 0% 0 213Ap-25 26-Apr-26 -330 I .:.Device lnsla slat OF,•DMS 20-Jolla Tu'I In Covey 195'W.4151.911'2 Arthur Godlred H. k I A7 1015 DMS 20.JTC Clearing and Grubbing DMS 20 Jule TWO Cswyl95/W.4151 SUSR112/Nthur odred Rd(Removed per •l1) 0% 0 15-May-24 15-May-24 -1 7 1 A7.10200MS.20.JTC Errbankmern.'Excavahon-OMS 20-Juba Tune Cs vytt 96/W.41st SUSR112/Nthur Godlred Rd(Removed per C041) 0% 0 15-May-24 15-May-24 •136 ' 1 • A7 1025.0MS 20.JTCN Cure&COE Test o1 0'41 Shalt•DMS 20•Julia Tutde Cowy'195/W.slat SUSR1l2/NMur Godlred Rd-North(Removed per 0% 0 15-May2a 15•May24 -132 I A/1025.DMS.20JTC.5 Cure&COL Test o1 DM Shan-DMS 20 Julia Tull*Cswy/195/W.(Hsi SUSR112JAnhur Godlred Rd South(Removed pe 0% 0 15•May-24 15-May-24 •132 1 Sc. nMeat Crone rep.. ♦ Actual Work Data Date:31-Jan-24 COMB DBOM!TSSPS Schedule Update U24.0.W2 013124DD 2024.03.21 Sent la0x:.ls e.,a,.nuea.eoto p.m:, hen 1 I Ramat.,ng Work 2024-06-20 added Missing 2yr TE okra e.r0reoubea.awe..roa.,r«u15o.9P.emopeoevlon car Project Start Date: 19-Jun-19 sxq.aa wom3e48remweae.0Upan.h.e.ru17.09eWtaae u- NEM Great Romanmg Week full Blown Schedule ror.a w®,mme...pew..ruwaers rtslaoe I ru u u. • •Wastonc T C�RE Project Finish Date:22-Dec-25 v.., ,r m.rw.a n®.pem+r..p o.4..ume.nwrr enaor.:asomoo hut: r�Summary / �J +`L` »worn Schema tro4rtr time s tam o wu/ 04.eA I. S0404.0 s.u24 a w2013,7431, ear.i TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 202/-03-28 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK/Me:All Aeavlti.M Acliviy ID ActWily Name Cur% At Complete Snarl Finish 'pal Float 2024 2625 ry Comp Der 01 1 02 I 03 1 04 ' 01 j 02 1 03 1 04 I A7.102ZONS.20.JTC,N Installation of Ora Shah•OMS 20-Jule 7u110 Cswyl 95AM 41st SUSRI12iMthtu Godlred Rd-Monk(Removed per CON ON. 0 15-May-24 15-May-24 •92 .. I A7.1120.DMS.20.JTC Locales/Survey/Instal Plan•ore Shah-OMS 20.Julia Tune Cswy195M.41 st SUSR112'Arlhur Godred Rd(Removed p 0% 0 15.May-24 15•May-24 •92 I A7.1022.DMS.20.JTC.S Installation of Die Shalt•OMS 20-Juba Tune Cswel%Ay.41st SUSR112/Mtlur Godred Rd-South(Removed per CON 0% 0 15-May-24 15-May.24 .92 I A7.1080.OMS.20.JTC Pour and Cure Cabinet Pad OMS 20-JAM Tuttle Cswyn%M/.41st SlSR1 t 2/Mhur Godred Rd(Removed per COMI) 0% 0 19-Jun-24 19-Jun-24 -116 I Al.1090.OMS.20.JTC Install Cadnel(Pad Mount)•DMS 20•Julie Tuttle Cs wyn95'W.41st SUSR112/Mlhur Godlred Rd(Removed per COOL) 0% 0 19-Jun-24 19-Jun-24 -118 I A7.1060.0MS.20.JTC Install Structure•DMS 20 Julia Tulle Cswy195Ay.41s1 SUSR112/Arthur Godred Rd;Removed per COM1) 0% 0 146pr-25 14-Apr-25 -321 I A7.1070.DMS.20.JTC Install Sign DMS 20-Jule Tune Cswel%AN.41s1 SUSR112/Arinur Godlred Rd(Removed per COM11 0% 0 14Jpr-25 14-Apr-25 -321 I 47.t200.DM5.20.JTC Surge Suppression-DMS 20-Julia Tuttle SS myn95'W.41st SUSA1t2/Mhur Godhed Rd(Removed per CON I) 0% 028-Apr-25 28-Apr-25 -330 I A7.1095.DMS.20.JTC Cable Connection and Termination-OMS 20-Juia Tuttle Cswyr l95/W.41st 915R112/MAur Godlred Rd(Removed per C 0% 0 20-*-25 25- -25 -330 I Al 1201 DMS.20.JTC Grounding end Lightning Protection-DMS 20•Jule Tulle Crwy 195/W.41st SI/SR112/Arthur Godlred Rd(Removed per( 0% 0 28-Ap-25 28-Apr-25 -330 I qq- Conseuer.on•SPS Fading Garage-Julia Tuttle Cswy 115.W.41 et StSR112'ArthurGodNed R., i t A7.12340.SPS.006 Install Conductor Cable•SPS Garage G06 JWa Tune C.wyn 957W 41st SUSR112iMhur Godlred Rd 100% 1 21-Sep.23 21-Sep-20 A7.,2240.SPS G06 Proof Existing Conduit•SPS Garage G06 Julia Tube Cswyfl9YW 41st SUSR112/A>thur Godlred Rd 100% 1 22-SeP-23 22-Sep-21 Al.12730.SPS.G06 Instal Mounting Brackets on Existing Structures•SPS Garage G86-Juke Tulle Csvyr195 W.do StlSP I12Arthur Gotere 100% 1 25-Sep-23 25-Sep-2: : A7.12280.SPS.G06 Instal.Electrical Equipment n Ensing Cabnel-SPS Garage G06-Julia TudeCswyn95AW.41st SUSR112/Artlwr Godlre 100% 1 26-Sep-23 26-Sep-21 A7.12510.SPS.G06 Instep Solar Power Equipment in Eming Cabinet SPS Garage G06•Jule Tllile Cswyn%/W.41 st SUSR112JArthor God, 100Y:, 1 27-Sep 23 27-Sep-2: A7.1160.SPS.G06 Instal Wireless Conununlcabon Network-Radios•SPS Garage G06-Ada Tulle Cswe'1955W.41st SVSR112/Arthur God 100%. 1 28-Sep-23 28-Sep-21 • A7.1130.5E5.006 Instal Detectors SPS Garage G06 Julia Tulle Cswel S5NJ 41e1 SUSR1121MIhur Godred Rd 100% 2 29-Sep-23 02-Oct-22 A7.1070.SPSG06 Install Monument DMS-SPS Garage GO6•Julia Tulle Cswy1195W.41st SUSR112/Arlhte Godhed Rd 100% 5 03-Oct-23 A 09-Oct-22 Al.t 095.SPS.G06 Canto Connection and Torrredecn-SFS Garage G06•Julia Tulle Cswyl195JW.41 sl 0/94112/Arlhur Godlred Rd 100% 6 10-Oct-23 A 17.Oct-22 A7.1165.SPSGO6 Eslataah Network Communications.SPS Garage G06-Juia Tuttle Cs wyn 95 W.alst SUSR112m4t1%r Godred Rd 100% 5 18.0c1-23 A 24-Oct-22 n - ,. 11. I Jule intimC.oy 1351N 41 A 3'h112:rl nur G:'lt...1 kJ A7.1130.SPS.P58 Instal.Detectors•SPS Lot P58 Julia Tune Cswei%AN 41st St/SR112/Mthur Godred Rd 100% 2 02•May-22 03-May-21 47.12730.SPS P58 Instal Mooring Brackets on Easing Structures SPS Lot P58 Jul.Tulle Cswy/195W.41s1 SUSR112/Mhur Godlred Rd 100'. 2 02•May'22 03.May2: A7,1070.SPS.P58 Instal Monument DMS-SPS Lot P58-Jule Tuttle Cs wyn95'W.41st SUSR112/Arlhur Godred Rd 100% 2 03-May-22 04-May-21 A7.12340.SPS P58 Instal Conductor Cable-SPS Lot P58-Joke Tuae Cswy195 W 41 st SUSR1127Mmw Godred Rd 100% 1 05.May-22 05-May-2: I A7.t 2240.SPS.P56 Prod Existing Conduit-SPS Lot P58-Julia Tube C swy/195/W.41st SUSR112/Maur Godlred Rd 100% 1 05-May-22 05-May-2: A7.12280.SPS.PS8 Instal Sienese!Equipment in En slug Cabinet.SPS Lot P58•Julia Tulle Cswy/195M/.4151 St/SR112/Mmur Godlred Rd 100% 1 06-May-22 06-May-2: A7.12510.SPS.P58 Instal Sou,Power Equipment in Existing Cabinet.SPS Lot P58 Juta Tulle Cswy7195/W.41s1 SUSRhI2.'Mhur Godred 100% I 09-May-22 09-May-2: A7.1160.SPS.P58 Instal Wireless Commtirical n Network•Rados-SPS Lot P58•Jule Tulle Cewy195W.41s1 SI/SR112/Mhur Godlre 100% 1 10-May-22 10-May-2: A7.1095.SPS.P56 Cable Connection and Termination•SPS Lel P58•lull Tutus Cswyn951W.4151 SU9i112/Mhur Godred Rd 100% 2 11•May22 12-May-21 A7.1165 SPS.PSB Estadish Network Communications•SPS Lot P58-Juke Tittle Cswy.n 95M'.41st SOSR112/Armur Godred Rd 100% 2 12-May-22 13-May-2. A7.1130.SPS.P59 Instal Detectors•SPS Ld P59•Julia Tulle Cswy1%Ay 41st SUSR112/Arthur Godred Rd 100% 2 02-May-22 03-May-21 i A7.12730.SPS.P59 Instal Mounting Brackets on Eahting Slruclures•SPS Lot P59-Julia Tulle Cswy119YW 41st SVSRl1203.Ahur Godlred Rd 100% 2 02-May-22 03-May.21 Al.1070.SPS.P59 Instal Monument DOS-SPS Lot P59-Aka Tuttle Cs wy1195/W.41st SI/SR112/lulhoe Godlred Rd 100% 2 03-May22 04.May2: A7.12340.SPS.P59 Instal Conductor Cable-SPS Lot P59-Juba TOO Cswel95/W 41st SUSRI12/W1hur Godred Rd 100% I 05-May22 05-May.21 A7 12240.SPS.P59 Prod Eesting Conduit SPS Lot P59 Julia Tulle Cswy;195W 41s1 SUSR1121Mhur Godlred Rd 100% 1 05.May-22 05-May2: 47.12280.SPS.P59 Instal Electrical Equipment in Existing Cabinet-SPS Lot P59-Juke Tulle C swy)1951y 41st SUSR112/Mhur Godred Rd 100% 106-May22 06-May21 A7.12510.SPS.P59 Instal,Solar Power Equipment in Emtng Cabnel-SPS Lot P59 Julia Tulle Cs wy/1%/W.41st SUSR112/0/1her 002110d 100% 1 09-May.22 09-May-2: A7.1160 SPS.P59 Instal Wireless Communication Network•Radios-SPS Lot P59•Jute Tuele Cswy195/W.41 s1 SI/SRI12/Mlhur Godlre 100% 1 10-May-22 10-May-2: A7.1095.SPS P59 Cable Connection and Termination-SPS Lol P55-Julia Tuttle Cawy1195/W.41st 9/9i112/Mhur Godred Rd 100% 2 11-May22 12-May-2: 47.11655PS.P59 Establish Network Communications-SPS Lot P59-Juke Turtle Cswyn%M'.41st SJSR112/Mdtur Calked Rd 100% 2 12-May22 13-May-21 47 1130 SPS P60 Install Delectors•SPS Lot P60•Juke Tune Cswel%AN.41s1 SUSRI I2/Ar1hu Godred Rd 100% 2 02-May22 03-May 2: A7 12730 SPS P6J Install Mourning Brackets on Exaling Structures.SPS Lot P00-Julia Tulle Corry/195W 41 st SL/SR 1t 2/Mlwr Godred Rd 100% 2 02-May-22 03-May-2) Al 1070 SPS P60 Install Monument DMS SPS Lot P60 Julia T 4lteC.wy11951W.4141 51/SA112/Mlhur Godlred Rd 100% 2 03•May-22 04-May-2i Ow -Ramo, CMOked Ado. I♦ Acluat.Work Data Dale:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-28 Sent i6on.s a.m.scow,a0n aaliere DAP i I Remaining Work 1024-06-20 Added Missing 2yr TE isrd.an da eeelloda newer antra m a.50 SA MA 0 COMA 00 R Project Start Date: 19-Jun-19 a'um-ire n.,,,..4 Rryue4 emes...ma.00eot Ili ODSW.Ime0 MUJ Cynical Remanng work Full Blown Schedule >see-n Preen ne.wewl.6,aaoo.0 tteo.t AMMO Sal • •Milestone Tl1 C'�RE Project Finish Date:22-Dec-25 Past SI.r76 a-Mq-n a>nr.wRM>oewiwuma.woarlwmwaosumo �aJ a� 8 Summary 11 J��// 360/0003 xManiUpa.eux06 AMMO RAU oSaa2. Somas oada.e74 0w>01112400 MOO TCC•COMB Progress Schedule Update , COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03-26 Sanl 2024-06-20 Added Missing 2yr TE 20-Jun•24 TASK taler All Actmhes &Wr ly ID Ac(rvily Name Our% N Compete Start Finish Tdel Float 2024 2025 Camp Our 01 j 02 j 03 j 04 01 j C2 1 03 j 04 A7.12340.SPS P60 Install Conductor Cable-SPS Lot P60•Aka bite C6vgy19.51W.41s1 SUSR112/Arthur Godrod Rd 100% 1 05-May-22 05-May-2: A7.12240.SPS.P60 Prool Easing Conduit-SPS Lot P60-Jub Tone Cswyt 195'W.41s1 SUSR112IArthur Godlred Rd 100% 1 05-May-22 05-May-2: A7.12280.SPS.P60 Install Elecurcal Equipment in Easing Cabinet-SPS Lot P60-Julia Tulle Cswy/1959N.41st SUSR112/Anhur Godlred Rd 100% 1 06-May-22 06-May-2: A7.12510 SPS.PRO Install Solar Power Equipment rn Eestng Cabinet SPS Lot P60-Jule Tate Cswyll 95Mt 41st SUSR112/Arthur Godlred 100% 1 16-May-22 16-May-2: 47.1160.SPS.P60 Install Wireless Communicahon Network-Radios-SPS Lot P60-Juba Tune Csw5195W 41s1 SUSR112/Art11ur Godhe 100% 1 17-May-22 17-May-2: A7.1095.SPS P60 Cable Corneoeon and Ter mnatron•SPS Lot P60 Julia Tuttle Cswyn95W.41st 9/St1 12/Nlhu Godlred Rd 1004/. 2 17-May-22 18.May-2; A71165 SOS P60 Establish Network Communicattons-SPS Lot P60-Julia Turtle Csvryn 95/W 41s1 SUSRIt2/NIhmr Godlrled Rd 100% 219-May22 20 May21 A7.1130.SPS.P63 Install Detectors•SPS Lot P63•Jab Tulle C swV1951W 41st SUSRI12Nthur GOdred Rd 100%. 2 02-May-22 03-May-2: A7.12730-SPS P63 Install Mounting Brackets on Existing Structures-SPS Lot P63-Juba Tulle Cswy/19569.41st SUSR112•Mhur Godlred Rd 100% 2 02-May-22 03-May-2; 47.1070.SPS.P63 Install Monument DMS•SPS Lot P63•Julia Tune Cswyn95tW.41st SUSR112/Nlhur Godked Rd 100% 2 01May-22 04-May-2: 07 12340 SPS.P63 Install Conductor Cable-SPS Lot P63-Jula Tale Cswy195NJ.41st S1iSR1121Nthur Gotered Rd 100% I 05-May-22 05-May-2: ' 47.12240.SPS.P63 Proof Existing Conduit-SPS Lot P63-Juba Tulle Cswy/195,W 41st SUSRII2/Nthur Godfred Rd 100% 1 05-May.22 05-May-21 A7.12280.5PS P63 Install Electrical Equipment in Easing Cabrnel-SPS Lot P63-Juke Tulle C swy/195W.41st SUSR112/Nlhun Godlred Rd 100% 1 06-May-22 06-May-2: 47.12510.SPS.P63 Install Solar Power Equipment,n Easing Cabinet-SPS La P63•Jura Tale Cswya 95AN.41st SUSR112/Nthur Godlred 100% 1 16 May.22 I6-May-2: A7.1160.SPS.P63 Install Wireless Comm,ncanon Network Radios-SPS Lot P63•Jura Told Csw/195Ny.41s1 SUSRII2/Arthur Godhe 100% 1 I7-May22 17-May-21 A7.1095 SPSP63 Cable Corneylion and Ternrnation-SPS Lot P63•Juba Tuttle Cswy/195/W.a1 si 9/St112/Arlhur Godlred Rd 1007. 2 17-May-22 18-May-2: 47.1165.SPS.P63 Establish Network Commune aeons•SPS Lot P63 Julia Tuttle Cs wyn 95M/.41st SUSRI127Nlhur Godlred Rd 100% 2 19-May-22 20-May-2: I Tinr,Sv'rtr'nr•John Tuttle Cs,y 1/:V1'.1'a SI Sir112:uthtr 0o•ltre l F•'. genammemammme 47.1010 ITS 09 P Mkestorre Peen Site Work-TTS 09•Julia Tutbe Cswy719584 41 st 9/SR112/Anhu7 Godlred Rd 0% 0 01-Mar-24 -127 • 47.1180.TTS09-P Instal Woods,Cosrorunnaton Network•Radios•TTS 09•Jail Redo Cswy/195/W.41st SVSR112/Arthur G001red Rd IF 0% I 01-Mar-24 01-Mar-24 •63 I 47.1090.TTS09.P Install BTU(Pore Mount) TTS09 June Tonle Cawy'195AN 4,sl SU5R112/Armor Godlred Rd 0M. 2 01-Mar-24 04-Mar•24 84 0 A7.1140.TTS.09.P Install TTS Antennas-TTS 09•Julia Tule Cswy145M,.41st SUSR112/Nt11or GoOlred Rd 0% 3 01-Mar-24 05-Mar-24 85 0 A7.1130.ITS.09.P Install TTS Detectors-ITS 09-Jolla Tullle Cswya 95W 4151 St/SR t12rArthur Godred Rd 0% 3 04•Jun-24 06-Jun-24 -1 CO I 47.1095.TT5.09.P Cable Connecllon and Terrenatan-TTS 0-Jule Turtle Cs wy71951W 41st SUSR I,2/Nn1ur Godlred Rd 0% 2 07-Jun•24 10-Jun-24 150 • 47.11651TS.09P Establish Network Conrrturacabons-ITS 09•Julia Tuttle Cswyl195AN.41st SVSR112/Nmur GOdreo Rd 0% 2 10-Jun-24 11-Jtrr.24 150 • w A7 1010-TS 10 Milestone Sego Ole Work•TTS 10-Julia Tulle CSwyIIR5CW.41st SV911112tMhur odlred Rd{MDCI 0% 0 12-Jun-4 -222 ♦ A7.1160.TTS.10 11.514l Wkeless Commrnrcatcn Network-Radios-TTS 10-Job Tdoe Cswy1195419.41st SVSRII21NIhor Godred Rd1M 0% 1 12-Jun-24 12-Jun-24 •14e I 47.1090 TTS,10 Instal BTU I Polo Mount)-TTS 10-Jolla Tuttle Cswy/195AV.41st SUSRIt2/Ar1nur G00ked Rd(MDCI 0% 2 12-Jun-24 13-Jun-24 .149 47.1130.TTS.10 Install TT 5 Detectors-ITS 10-Julia Tuttle Cswy/19514/.41st SUSR112,NIhur Godlred RdIMDC) O% 3 12-Jun-24 14-Jun-24 -150 47.1140.TTS.10 Install TTS Antennas-TTS 10-Juba Tale Csvp195/W.41st SUSR112/Arlhur Godlred RdIMOCI 0% 3 12-Jun-24 14-Jun-24 -150 I 47.1095.TTS.10 Cable Conneclan and Termination-TTS 10-Jun Tuttle Cswya 95tW 41s1 SUSR112•Ntlur Godrod RdtMDC) 0% 2 17-Jun-24 10-Jun-24 -150 I 47.1165.775.10 Ea120Mh Network COnenurieeti0ns-TTS 10.Jda TWOo Cswy/195/W.41s1 SUSR112/Mhur Godlred RdtMDC) 0% 2 18-Jun-24 19Jun.24 ,150 1 w A7.1010 TTS.24 Miestone-009a,Sae Work-TTS 24-Julia Tuttle Cswy/195M1.415 9/SR 112/Mhur Godlred Rd(MDC) 0% 0 20-Jun-24 -219 ♦ • A7.1160.17S24 nstal Wides,Communcllon Network•Radios•TTS 24•Julia Tulle Cswy/195/W.41s1 SUSR112/Arthur Godlred ROW Olin 1 20Jun•24 20-Jun-24 -148 i A7.1090 TTS.24 Install BTU(Pole Mound)-TTS 24 Julia Tuttle Cswy/195M/41s1 SVSR112/Mhu Godlred Rd(MDCI 0'. 2 20-Jun•24 21-Jun-24 •149 I • 47.1130TTS24 Instal TTS Detectors•TTS 24-Juba Tune Cswyr195W.olsl St/SR112irthur Godlred Rd(MOC) 0% 320-Jun-24 24-Jun-24 -150 0 A7.1140.TTS.24 Instal ITS Amennas TTS 24-Jut Tuttle Csw0195/W.41st SUSR112tPothur Godred RO(MDC) O% 3 20-Jun-24 24-Jun-24 .150 0 A7.1095.TTS.24 Cade Connection and Tormnatron•TTS 24 Jolt futile Cs wyil951W.41s1 SUSR11 2/Artlur Godlred RdtMOCl 0% 2 25-Jun-24 26-Jun-24 -150 1 A7.116577524 Establish Network Commurlicaeons-TTS 24-Ana Tuttle Cswy/195W.41st SUS4112/Mlhur Godlred Rd(MDC) 0% 2 26-Jun-24 27-Jun-24 •150 Construction-Nenh-South Crandon _ 567C- s•626 2FJuS736 - - - -6059 Conslrugson-Abon lo• 1 rya nr 111....I 5 Conslruclnn MVOS•Alton Rd 3• ,7 Ut-Iota,24 - - - W W • A7 1030 MOOS 02 AR Underground Locales MUDS 02 Aeon Rd 3Y- 0 01 Mar 24 01 Mar 24 50 I Oka ---1W-da I enamel Aaner.. IIII Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-23 Sent ,sap., ease snpoaen..006.00 vest 1 I Remanng Work 2024.06-20 Added Missing 2yr TE ,iN.-Or Conte.update 0cc.w,8*44+..uls050803009082'00 as[ Project Start Date: 19-Jun-19 4ao.y wR.w,N n Prevoueaa-rpyse.100801u,1.45lR18MG NUJ MOM Crnrc al Remaring Work ). Ivll Blown Schedule a0n.a w x.aa 8.,81 v41,./palie hper m P..0..f, 4N0 NW • •M110510 a TI\ SCORE Project Finish Date:22-Dec-25 r.scvof76 nN.ya wa=.even,eaSae-rotea.N'nrn.+mew.b0omo0 NUJIIISummary 30 010.43 San..ua Upla.UN OS nT1e200 NUJ AJarN 50l8na..8800 JN.OW0 010104W M, TCC•COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03.20 Sent 2024-08.20 Added Missing 2yr TE E 20-Jun-24 TASK filter At Activities A 4yD Acso4yNome Our% AI Compote Start Finish Total Float 2724 2025 v Corp Our 01 I 02 03 04 01 02 03 ) 04 - 47 1015.MVOS.02AR Clearog and Grubbng-MVOS 02•Mon Rd 0% 0 01-Mar-24 01-Mal 24 50 I Al.1020.MVOS.02.AR Embankmen/Excavaaon-MVDS 02-Alen Rd 0% 0 01 Mar-24 01-Mar-24 50 I A7,1540,MVOS.02.AR Instal Pull Boxes-MVOS(12-Mon Rd 0% 0 01-Mar-24 01-Mar-24 •48 I A7 1160.MVOS.02,AR Install Wireless Comrnurdcaton Network-Radios•MVOS 02-Alton Rd 0% 1 01-Mar-24 04-Mar-24 50 0 A7 1135.MVDS.02.AR Put Conductor Cable from Service Point to MVDS-MVOS 02•Alton Rd DY. 1 04-Mar-24 05-Ma,-24 50 I Al.t195.MVOS.02,AR Put Conductor Cabo tor Power.MVDS 02.Mon Rd 0Y. t 05-Mar-24 06-Mar-24 S0I A7 1045.MVOS.02.AR Moldy Power Serves(t required)-MVOS 02-Mon Rd 0% I 06-Mar-24 06-Mar-24 38 I ld Services A7 1100.MVDS 02 AR Pour and Cure Maintenance Pad•MVOS 02-Al.Rd 0% 1 06-Mar 24 07-Mar-24 •49 I A7 11 ES Mons OP AP FstaN,sh Network Cemmunical,n5•MVDS 02.Mon Rd 0% 1 07•Mar•24 07-Mar24 -39 I WI• A7.1t 20.MOOS.02.AR Locates for MVDS-MVOS 02•Mon Rd(Il Needed) 0% 0 01-Mar-24 01- ar-24 •50 I A7.1125.MVDS.02.AR Install Poo-MVOS 02-Mon Rd(Not Required) 0% 0 01-Mar-24 01-Mar-24 •50 I 47.1122.MVDS.02.AR CoO Poo Hole•MVOS 02•Mon Rd(Not Required, 0% 0 01-Man24 01-Mar-24 -50 I A7.1130.MVDS,02.AR Instal MVDS Assemby MVOS 02-Mon Rd 0Y. 0 01-Man24 01-Mar-24 •46 I Al.1090.MVDS.02.R Instal BTU(Pole Mount)-MVOS 02-Mon Rd 0% 1 06-Mar-24 06-Mar-24 -50 I A7.1170,MVDS.02.AR Instal Layer 2 Managed Field Ethernet Switches(MFESs)-MVOS 02-Mon Rd(N/AI 0% 0 06-Mar-24 06-Mar-24 •40 I A7,1162.MVOS.02.AR Instal Uni terrupdble Power Supply(UPS)-MVOS 02-Mon Rd(WA) 0% 0 06-Mar-24 06-Mar-24 -40 I A7.1095,MVDS.02AR Cade Connection and Terminator-MVOS 02 Man Rd 0% 1 06-Mat•24 07-Mar-24 50 I A7 1180.MVDS.02.AR Instal Terminal Server•MVDS 02•Mon Rd 0% 1 06.Mar-24 07-Mar-24 -40 I A7 1200.UVOS,02.AR Surge Soppresslon•MVDS 02 Mon Rd 3% 1 07-Mar-24 08•Mar-24 50I A7.1201.MVDS.02.AR Grounding and Lighlnng Protector-MVOS 02•Mon Rd 0% 1 07-Mar-24 06•Mar-24 •50I A71210,MVOS02AR Calibrate and Configure MVDS 02-Mon Rd 0% 2 07-Mar-24 11-Mar-24 40 0 It, A7.1030.W/0.06.AR s Underground Loa axes MVDS06 Mon Rd 0Y. 0 07-Mar-24 07-Mar-24 -49 I A7 1015 MVDS 06 AR Coerng and Grubbing.MVOS 06•Mon Rd 0% 0 07-Mar-24 07-Mar-24 •49 I A71020.MVOS.06AR Embankment/Excavation MVOS 06 Mon Rel 0% 0 07-Mar-24 07-Mar-24 -49 47.1040.MV0S 06AR Instal Pot Boxes-MVOS 06-Mon Rd 0% 0 07-Mar-24 07-Mr-24 •47 A71160.MVOS.06.AR Instal Wireless Communication Network.Rados MVOS 06,Alton Rd 0% 108-Mar-24 11•Mar-24 -50 : I n7 1135.MVOS,06.AR Put Conductor Cable from Service Paint to MVOS-MVOS 06,Mon Rd 0% 1 II-Mr-24 12-Mar-24 -50 I A7.1195MVOS.06.AR Put Conductor Cable for Power MVOS 06-Mon Rd 0% 1 12-Mar-24 13-Mar-24 •50 I A7.1045.MVDS.06.AR Molly Power Services It required) MVDS 06-Mon Rd 0% 1 13•Mar•24 13 Mar-24 43 I A7 1100.MVDS.OBAR Pour and Cure Maintenance Pad MVDS 06 Mon Rd D% 1 13-Mar-24 14,Mar24 49 . I • A71165,MAVDS,OB,AR Establish Network Communicators•MVDS 06.Mon Rd 0% 1 19-Mar-24 20-Mar-24 .47 I w .1120.UIVDS.00AR Locales for MVDS-MVOS 06-Mon Rd(If Needed) 0% 0 08•Mar24 08-Mar•24 •50 ' I A7.1155MVOS.06.AR Instal Poo-MVOS 06•Man Rd(Not Reapedl 00, 0 06-Mar-24 08-Mar-24 .50 I A7 1122.MVOS.06-AR Orill Pole Hole•MODS 05-Mon Rd(Not Required) 0% 0 oe-Mar-24 08-Mar-24 ,50 I A71130.MV0S.06.AR Instal MVOS Assembly MVOS 06 Mon Rd 0% 0 08-Mar-24 08-Mar-24 46 I Al.109OMVOS.06,AR Instal BTU(Poo Mount)•MVOS 06-Mon Rd 0Y. t 13-Mar24 13-Mar•24 r50 I • A7.1170.MVOS06.AR Install Layer 2 Managed Fold Ethernet Switches(MFESs)•MVDS 06•Mtn Rd(Co(N/A) WY. 0 14-Mar-24 14-Mar-24 -45 I A7.1162.MVOS.06,AR Install UrtnrrupIole Power Supply(UPS) MVDS 06-Alton Rd(N/p 0% 0 14-Mar-24 14-Mar-24 •45 I A7.1095,MVDS06,AR Cade Connection and lomnation MVOS 06•Mon Rd 0% 1 14 Mar-24 14-Mat-24 •50 I A71160.MVDS.06.AR Install Ter mina)Server-MVDS 06•Mon Rd 0% 1 14-Mar-24 14rMar•24 •45 I A71200.MVOS06,AR Surge Suppressor-MVOS 06-Mon Re 0% 1 14-Mar•24 15-Mar-24 -50 I A7.1201.MVDS06.AR Grounding and Ltghming Protector.MVDS 06-Mon Rd 0% 1 14-Mar.24 15-Mar-24 -50 A7.1210 MVDS 06 AR Calibrate and Configure-MVOS 06-Mon Rd 0% 2 14-Mar-24 18-Mar-24 •45 I w undo,'an-1 1'ur,•r C•nuns•RIV/IS 17-Ail el,' W I'.. DM Nanrl, ep.awe Awe_ Iii AGtual Wok Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update 1.124,0.W2013124DD 2024-03-205ent ,wen e,....sena..sin o celsloo vet I I Renter/ling Work 2024-06-20 Added Missing 2yr TE ILI..11 cser.nucen.ewe..r.era.rr..u,sosl.am 0 min no R Project Start Date:19-Jun-19 a.M,it n a end..MI...vrpra UV/0 M ee10 NMJ B!♦ ernce Remaining Work Full Blown Schedule non ift Namediie,,.v and.0 poor kn..l weo..,,mRJ00 NMJ ♦ •PAWStone hA C��OF Project Finish Dale:22-Dec-25 P.tr 51 of 74 oserw.an naase0 Remee so.orw.r.'p..I MINA l woMJob NNJ •�Summer l /\ J !� ON.a xuW.ueaN,UnoS1.900 NMI Y JP I...13 S.N4r.Wel.a UN OS„2M]00 NMJ &AnN Sero0r,U0.,UN OW/01312400 NNJ TCC•COMB Progress Schedule Update I COMB DOOM ITSSPS Schedule Update U24.0.W2 013/2e13D 2024-03-28 Seal 2024-06-20 Added Missing 2yr TE 1 20-Jun-24 TASK fRe.Al AONNtIes Activity 10 Activiy Name Dur% AI Complete Scat Peesh Told Float 2024 2025 Comp Our 01 I 02 I 03 I 04 01 I 02 I 03 I 04 ®. A7 1030.MVDS.17.AR Underground Locates-MVOS 17.Mon Rd 0% 0 14-Mar-24 14-Mar•24 •49 I A7.1015.MVOS.17.AR Clearing and Grubbing.MVOS 17-Mon Rd 0% 0 14•Mar-24 14-Mar-24 49 I A7.1020.MVOS.17.AR Embankment/Excavation-MVDS 17-Mori Rd 0% 0 14-Mar-24 14-Mar24 •49 I A7.1040.MVOS.17.AR Instal Pull Boxes•MVOS 17-Mon Rd 0% 0 14•Mar•24 14-Mar24 .47 I A7 1160.MV135.17AR Instal Wireless Communkatbn Network-Radios-MVOS 17•Mon Rd 0% 1 15-Mar-24 18•Mar•24 •50 Al 1135.MVOS.17.AA. Prat Conductor Cable from Service Pont to MVOS-MVDS 17-Mon Rd 0% 1 18-Mar-24 19-Mar24 •50 I Al 1r95.MVDS.17 AR Pull Conductor Cable for Power•MODS 17 Mon Rd 0% I 19-Mar-24 20.Mar 24 -50 1 , A7 1045.MVDS.17 AR Morley Power SCrvkea(1 re0uved)•MVOS 17-Mon Rd 0% 1 20-Mar-24 21-Mar-24 -47 I A7.1100.MVDS.17.AR Pour and Cure Maintenance Pad.MVOS 17•Mon Rd D% 1 20-Mar-24 21-Mar-24 -49 I A7.1165 MVDS.I7.AR Establish Network Communications-MVOS 17-Mon Rd 0% I 21-Mar-24 22-Mar-24 -48 I IS Device Installation•MVDS 17-Alton Rr w A71120.MVOS.17.AR Locates Or MVOS MVDS 17-Mon Rd ill Needed) 0% 0 15-Mar-24 15-Mar-24 •50 I A7 1125.MVOS.17.AR Inside Pole-MVOS 17 Mon Rd(Nit Required' 2Y. 0 15-Mar24 15-Mar24 -50 . I A7.1122.MVOS.17 AR Oril Pole Hole•MVOS 17-Mon Rd(Not Required) 0% 0 15-Mar-24 15-Mar•24 -50 ' 1 A7.1130)MVOS 17 AR Instal MVOSAsserrbly•MVDS 17•Mon Rd 0% 0 15-Mar-24 15-Mar-24 •46 - 1 A7.1090.MVOS.17.AR Instal BTU(Pole Mount/•MVDS 17-Mon Rd 0% 1 20-Mar-24 21-Mar•24 -50 • I ) A7.1170.MVDS,17.AR Instal Layer 2 Managed Field E►lerner Swlches)MFESs).MVDS 17.Man Rd(N/A) 0% 0 21-Mar-24 21•Mar-24 .49 I Al.1182.MVDS.17.AR Instal Unnterrupbble Power Supply(UPSI-MVDS 17-Mon Rd(N/A) 0% 0 21-Mar-24 21-Mar-24 •49 A71095.MVDS.17.AR Cable Connection and Termination-MVOS 17-Mon Rd 0% 1 21-Mar-24 21•Mar-24 .50 A7.1180 MVDS.17 AR Instal Terminal Server MVOS 17 Man Rd 0% 1 21-Mar-24 21 Mar24 .49 A7 1200.MVOS.17.AR Surge Suppression-MVOS 17.Mon Rd 0% 1 21-Mar-24 22-Mar-24 .50 I A7.1201-MVDS.17 AR Grounding and Lightning Protection MVOS 17-Mon Rd 0% 1 21-Mar-24 22-Mar-24 •50 I I A7 1210 MVOS 17.AP Cafb ate and Configure•MVOS 17-Mon Rd 0% 2 21.Mar-24 25•Mar•24 49 0 C- ,nur.rc,i CCTV Allan Ro w w Jet,F..,,!P.-oot IC mm.-CCry.7 W A7 1015.CCTV.07 AR Cleanny arlc Grubbkg-CCTV 07-Mon Rd 0% 0 01-Mar-24 or•Mar-24 -65 I A7 1020.CCTV.07.AR Emba ime,Ercavabon•CCTV 07-Mon Rd 0% 0 01-Mar-24 01•Mar-24 •65 I A7.1030.CCTV 07.AR Underground Locates.CCTV 07-Man Rd 0% 0 01-Mar-24 01-Ma-24 65 I A7 1040.CCTV 07.AR Inside Pul Boxes-CCTV 07-Mon Rd 0% 0 01-Mar-24 01-Mar-24 -64 I A7.1160.CCTV.07.AR Instal Wireless Communication Network•Ratios-CCTV 07-Man Rd 0% 1 01-Mar-24 04-Mar-24 -65 0 A71135.CCTV07 AR Pal Conductor Cable Iron.Service PdM to CCTV-CCTV 07-Mon Rd 0% 1 04-Mar-24 05-Mar24 -85 I A7.1195.CCTV 07.AR Pull Conductor Cable for Power-CCTV 07•Mon Rd 0% 1 05-Mar-24 06-Mar-24 -65 A7.1045.CCTV.07.AR Molly Power Services(if required)•CCTV 07•Mon Rd 0% 1 06-Mar-24 06-Mar-24 -64 I A7.1165.CCTV.07.AR Establish Network Communications•CCTV 07-Mon Rd 0% 107-Mar24 07-Mar-24 -42 1 w A7.1120.CCTV07 AR Locates nor C -CCTV 07•Mon Rd(II Needed) 0% 0 01 Mar-24 01 Mar-24 65 I A7 1125.CCTV07.AR Instal Pole•CCTV 07.Mon Rd(Not Required) 0% 0 01-Mar-24 01-Ma-24 -65 I A7 1122.CCTV 07.AR Orli Pole Hole-CCTV 07•Mon ROOM Pole Hole 1Nol Regvred) 0% 0 01-Mar-24 01 Mar24 -65 I Al.1130.CCTV07AR Instal CCTV Camara Assembly.CCTV 07 Mon Rd 0% 0 01-Mar24 01•Mee-24 •82 I A7 1140.CCTV 07.AR moral CCTV Camera Lowering Device(CLD)-CCTV 07•Mon Rd(II Needed) 0% 0 01-Mar-24 01•Mar-24 -40 ! 1 A7.1090.CCTV.07.AR Install BTU(Polo Mount)-CCTV 07-Mon Rd 0% 1 06Mar24 06-Mar-24 .65 1 A7.n01.CCTV.O7.AR Pour and Cure Maintenance Pad-CCTV 07-Mon Rd 0% 1 06Mar24 07-Mar-24 .6 I Al 1170.CCTV.07.AR Melee Lay.,2 Managed Field Edema SaBchss(MFESs/•CCTV 07-Mon Rd(N/A) 0% 0 06-Mar-24 06Mar-24 •43 I A7.I180.CCTV.07.AR Moral Terminal Server-CCTV 07-Mon Rd(N/A) 0% 0 06-Mar-24 06-Ma•24 -43 1 A7 1182.CCTV 07 AR Instal Unnterrupilble Power Supply(UPS)•CCTV 07-Mon Rd(NIA) 0% 0 06-Mar-24 06-Mar-24 -43 I A7.1095.CCTV.07.AR Cade Connection and Termination•CCTV 07-Mon Rd 0% 1 06•Mar-24 07-Mar-24 -85 I A7.1200.CCTV.07.AR Surge Suppression-CCTV 07-Mon Rd 0% r 07-Mar-24 08-Mar-24 -85 I A7a .1201.CCTV.07.AR Grounding and Lightning Prd00110n CCTV 07 Mon Rd 0% I 07-Mar-24 0-Ma-24 -65 I OZ. - M.A., 0.101 Poway. .._ Mini Actual work 1 Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024.03-23 Sent u01... Ra....sc...S0 otersraw MI L 1 Remanmg Work 2024-06-20 Added Missing 2yr TE I000.-or Camara uwu.Rrw.rrsna-re U150.8B0000I T100 s6 Project Start Date: 19-Jun-19 Full Blown Schedule a6Mw'a Amusedaws.uer.ra.v.w.mertt u 17p SW IM.° NM4 I� Crake Remaining Work T//�� adl.n Amay.Irlea.Noalrouam.ln..a mew.I',moo FOCI • ♦MlIIISIOM 1 I \ SCORE Project Finish Date:22-Dec-25 P.ec S6 of 76 1001am Amwa Regis awa.woase W..tmaw201 O0 RM, n.Ra.-a Sd.e/.rlpl..uabb lanm6 NW �.Summary 16 Ne.23 SctN.Uwar.V%I6rl11ID0 NM4 20A0N Scn.a.0.6 Ua14W2013,240D NM4 TCC-C014O Progress Schedule Update I COMB ODOM ITSSPS Schedule Update U24.0 W2 0121241113 2024 0348 Sent 2024.0420 Added Missing 2yr TE 20-Jun-24 TASK later All AGivillea Aelivily ID Activity Nana Da% Al Cornpele Sin! Fnoh -Toral Fkal 2024 2025 1 Comp Dar 01 I 02 I 03 I 04 01 1 02 I 03 I 04 Al.1210.CCTV.07.AR Callrale and Configure•CCTV 07•Mon Rd 0% 2 07-Mar-24 11-Mar-24 -44 0 : ,i n \ •' 1 rd n N. 1 A7.1030_ADMS.19.AR Underground Locates-AIMS 19 Man Rd 0% 0 12-Apr-24 12-Aor-24 -119 I A7.1040.ADMS.19.M9 Instal,Poll Boaes-ADMS 19•Mon Rd 0% I 12-Apr-24 12-Apr-24 -119 I A7.1135.ADMS.19 AR Put Conducror Cabe from Service Pans IoADMS•ADMS 19-Mon Rd 0% I 12•Apr-24 15-Apr.24 -119 1 • A7.1195.ADMS 19 AR Pt.!Condom..Cable for Power-ADMS 19•Mon Rd 0% I IS-Apr.24 16-Apr-24 -119 I A7.1045 ADMS 19 AR Modly Power Services Or requredl-ADMS 19 Mon Rd 0% 1 16-Apr-24 17-Apr-24 -85 " A7 I100.ADMS.19 AR Pour and Cure Maintenance Pad-AIMS 19 Mon Rd 0% I I13•Apr•24 17-Apr•24 -119 ' 1 r'I A7.1160.ADMS.19.AR Install Wheless Communicate'',Communicate'',Network•Radios-ADMS 19-Mon Rd 0% 1 17-Mar-25 18-Mar-25 -323 A7.1165-ADMS.19.AR EstaMMh Network Communkattons-ADMS 19-Mon Rd 0% 1 19-Mar•25 19-Mar-25 317 1 A7.1120.AOMS.I9 AR Locale67Survey/tnstall Plan•Ore Silas•AIMS 19-Mon Rd 0% 2 09-Apr-24 10-Apr-24 -160 A7.1015.ADMS 19 AR Ckarn9 and Grobbng AIMS 19 Mon Rd 0% 1 Il-Apr-24 11-Apr-24 •119 1 A71022.ADMS.19.AR Vision/Ilion pi 045 Shan-ADMS 19-Mon Rd 0% 2 It-Apr-24 12-Apr•24 -128 '. A71020.ADMS.19 AR Ernbankment/Eacavalun-ARMS 19-Man Rd 0% I 11-Apr-24 11-/pr•24 119 1 I.1025.ADMS.I9.AR Cure d CSL Test of Orb Shaft•ADMS IA•Alton Rd 0% 28 13-Apr.24 10-May-24 162 NO A7.I080AOMS.19.AR Pour and Cure Cabinet Pad.AIMS 19-Mon Rd(Nor Required) 0% 0 16-Apr•24 16-Apr,24 -92 I 1 A7.1090.AIMS.19.AR Instal Cabinet(Pad Mount)-AIMS 19-Man Rd(Not Required) 0% 0 16-Apr-24 16-Apr-24 -92 I A7 1060 A0MS.19 AR Moral Structure-AIMS 19•Mon Rd 0% 1 17-Mar-25 17-Mar-25 -323 1 Al.1070.ADMS.19 AR Instal Sign ADMS 19-Mon Rd 0% 1 17,Mar•25 17-Mar-25 -323 I • A7 1095.ADMS.19AR Cable Connection and Termination.AIMS 19-Mon Rd 0% 1 18-Mar.25 18-Mar-25 -323 I A7 1200.ADMS.19.AR Surge Suppression-ADMS 19-Mon Rd 0% 1 19 Mar 25 19-Mar-25 323 I A7 1201.AIMS.19 AR Grourr0.g and LlaNrtarg Protection ADMS 19-Mon Rd 0% I 19-Mar-25 19-Mar-25 •323 1 \ e A71030.ADMS 21,AR Underground Locales AIMS 21 Mon Rd 0% 0 17-Apr-24 17-Apr-24 -119 I A7.1040.ADMS.21.AR Instal Put Boxes AIMS 2'' Mon Rd 0% 1 18-Apr 24 16-Apr-24 -119 A7.1135.ADMS.21.AR Pun Conducts Cable Iron,Service Pahl to ADMS•ADMS 21•Mon Rd 0% I 18-Apr-24 19-Apr-24 -119 1 A7.1195.AOMS.21.AR Pull Conductor Cable la Power-ADMS 21•Mat Rd 0% I 19-Ap.24 22-Apr•24 119 0 A7.1045.ADMS.2I.AR Modify Power Services(1 race reds.ADMS 21-Mon Rd O.Y. I 22-Apr-24 22-Apr-24 -98 I A7.1100,AOIdS.21.AR Pour and Cede Maintenance Pad ADMS 21 Mon Rd 0% 1 22 Apr 24 23-Apr 24 119 I A7.1160.ADMS.21.AR Instal Wadies Canmurecabon Network-Radios-ADMS 21.Mon Rd 0% 1 03-Feb-25 04-Feb.25 .307 A7 1185.A0MS.21,AR Establish Network Communications-ADMS 21.Mon Rd 0% 1 06-Feb-25 06-Feb-25 -297 A'1170 ADMS 21 AR _ocales.Surveylnstal Plan.MI Shaft-AIMS 21 Mon Rd 0% 2 13-Mar•24 14-Mar-24 •I00 A7 1015 ADMS 21 AR Clearrng and Grubbing-ADMS 21 Mon Rd 0% 1 19•Mar-24 15-Mar-24 -98 I A7 t 022.ADMS.21.AR Insralation of Da Shalt-AIMS 21•Mon Rd 0! 2 15-Mar-24 18-Mar-24 •108 1 A7 1020 AOM5.21 AR EmbanknMM/Eacaoatton-ADMS 21•Mon Rd 0% 1 15-Mar•24 15-Mar 24 .98 I A7 1025 ADMS 21 AR Cure&CSL Test of Die Shalt-ADM$21-Mon Rd 0% 28 19-Mar-21 15-Apr-21 -160 2221 A7 1080 AIMS 71 AR POW and Corn Cabinet Pad-ADMS 21-Mon Rd(Not Rebuked) 0% 0 22-Apr-24 22-Apr-24 .I10 A7 1090.AOMS 21 AA lnssal Cabnel(Pad Morel)-ADMS 21-Mon Re(Not Rebuked) 0% 0 22-Apr-24 22-Apr-24 -110 A7.1080.AIM$21 AR instal Structure-AIMS 21•Mon Rd 0% I 03-Feb-25 03-Feb-25 •307 A71070.ADMS 21,AR Instal Sign-AIMS 21•Mon Rd 0% 1 03•Feb-25 03-Feb-25 .306 1 A7 1095.AIMS 21 AR Cable Connection and Termnaeon-AIMS 21-Altai Rd 0% 1 06-Feb.25 06-Feb-25 -308 I A7 1200 ADMS 21 AR Sage Suppression ADMS 21•Mon Rd 0% 1 06-Feb.25 07-Feb-25 .308 1 A7 t 201 AIMS.21 AR Srau.nao and Lightning PrancAen•ADMS 21-Mon Rd 0% 1 06:Feb-25 07-Feb-25 •306 I C`` . I D. Aeeler CMIMe !ere.. Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update 1:24.0.W2013124DD 2024.03-28 Sent re.., eerlwseMAgaora anraoo Sek I I Removing Work 2024-06.20 Added Missing 2yr TE tale., La...lUnau.Aiwern.aaeee.Utsoso-amaolmioo rye Project Start Date:19-Jun-19 aeey,II Reposed Aa..eden.IrWpde.eresr U00.5aenaa0a nrM Cnmal Rernaerng Work Full Blown Schedule 7son-II R...d Rm..aaerseounda.ewr roan.:Inmzaao - Mu ♦ ♦Milestone / R S jRE Project Finish Date:22-Dec-25 P,a S7,d 76 er el Rmosto Aevraneaserreveannervwaeoi.:aoaaoo MU MU �►Summary / serial, 502e14 U04e01.100 os nmoo NYa 10.ear00 sno...:wm.u7.0.0013r7.D IrMJ TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Sent 2024.08-20 Added Miffing Op TE T 20-Jun-24 TASK BMW:N MOAN* * Actriey ID I Aclwly Name Der% At Compete Slat Finnish Total Fbal 2024 2005 1 Comp Der 01 f 02 03 04 DI 02 03 04 • Power .. 11 • V A7 1030 AOMS 30 AR Underground Locates-ADMS 30.Mon Rd,161h Seem 0% 0 25•Jun•24 25-Jun•24 •155 1 47.1040.40MS 30 AR Install Pull Boxes•AOMS 30-Alton RN161h Street 0% 1 25-Jun-24 25-Jun-24 -155 1 A71135.ADM5.30.AR Pull Conductor Cable from Service Panl to ADMS ADMS 30 Alton R616th Street 0% 1 25-Jun-24 26-Jun-24 -155 1 A7.1195.ADMS.30.Aft Pull Conductor Cable for Power-ADMS 30•Mon Rd'161h Seeel 0% 1 26-Jun-24 27Jun-24 •155 1 47 1045.MOMS.30.AR Moiety Power Services(4 recurred)•ADMS 30-Mon Rd'16Ih Street 0% 1 27-Jun.24 28-Jun-24 -144 1 A7.1100.43545.30.All Pour and Cure Mantenance Pad•AOMS 30 Mon Rd161h Street 0% 1 27-Jun.24 28•Jun-24 -137 1 A7.1160.ADAMS 30 AR Install Weeess Communicator Network-Rados ADMS 30 Anon Re:16th Street 0% 1 03-Feb-25 04-Feb-25 -305 1 A7.1165.6012 Ill AR E.s,aMsr Network Communications•ADMS 30-Mon Rdr16lh Street 0% 1 10-Feb-25 10-Fe-25 298 I A7.1120.ADMS.30.AR Locales/Surveylnslall Plan(.8415he11 ADMS 30-Alton R016t11 Street 0% 2 15-Mar-24 18-Mar 24 160 47.1015 ADMS 30.AR Clearing and Grubbing•AOMS 30 Aeon Rd/161h Street 0% 1 19-Maa24 19-Mar24 88 I A7.1022.ADMS.30.AR Insraltalion of Ore Shan•ADMS 30•Mon Rd/16th Street 0% 2 19-Mar-24 20-Mar-24 .122 1 47.1020.ADM5.30.AR ErnbankmenbEuavalnn•ADMS 30•Mon Rd1168,Sneer 0% 1 19-Mar•24 19-Mar-24 -88 t A7 1025.ADMS30.AR Cure 8 CSLTesl of Dal Snail•ADMS 30-Wlon Rt616113 Street 0% 28 21-Mar-24 17-4ll-24 •157 OM A7 1080 ADMS 30.AR Pour and Cure Cabinet Pad-ADMS 30 Mon RM16te Street(Not ReOuded) 0% 0 27-Jun-24 27-Jun-24 •155 1 A7.1090.ADMS.30.AR Instal Cabnel(Pad Mount)-ADMS 30-Mon Rd/16th Street(Not Required) 0% 0 27-Jun-24 27-Jun-24 -155 1 A7.1060.40MS.30.AR Insrae Structure-ADMS 30,Alton Rdll6ih Segel ON. 1 03-Feb-25 03-Feb-25 -305 1 A7.1070.AOMS.30.AR Install Sign.AOMS 30,Mon R016111 Street 0% 1 03•Feb•25 03-Feb-25 -305 I A7.1095.ADMS.30 AR Cable Conneollon and Termination ADMS 30 Mon Ra161n Street 0% 1 07-Feb-25 07-Feb-25 308 1 A7.1200.A0MS.30.AR Surge Suppression•ADMS 30-Man Rill6t11 Street 0% I 10-Feb-25 10-Feb-25 -308 1 A7.1201.4DMS 30 AR Grounding and Lightning Protection.ADMS 30-Alton Rdr16111 Street 0% I 10.Feb-25 10-Feb-25 308 , 1 C- t Travel Time System Arran R.: fl w A7.1010.TTS.14 Metes lore Begin Site Warp•TTS 14-Mon Rd 0% C 01-Mar-24 •43 • A7.1160.TTS.14 Install Wireless Communication Network Radios ITS 14 Mon Rd 0% 1 01 Mar 24 01•Mar-24 29 47.11130TTS.14 Install BTU(Pole Mount)-TTS 14-Mon Rd 0% 2 01-Mar-24 04-Mar-24 •30 0 A7.I130.TTS14 Install ITS Detectors-TTS 14•Mon Rd 0% 3 01•Mar•24 05-Mar•24 ,31 B 47.1140.TTS.14 Install ITS Antennas-ITS 14-Mon Rd 05. 3 01-Mar-24 05-Mar-24 •31 B A7.1095.TTS.14 Cabe Connection and Termnalen•II S 14-Mon Rd 0% 2 06 Man 24 0/-Mar-24 31 I A7.1165.TTS.14 Establish Network Communcatgns•TTS 14-Man Rd 0'. 2 07-Mae24 08-Mar-24 •31 w A7.1010.TTS.15 Milestone Begin Sae Work-TTS 15-Mon Rd 0% 0 09-Ma624 d3 • 47.1180.TTS 15 Instal Wreress Commurhcanon Network•Radios•TTS 15-Mon Rd 0% 1 11.Mar•74 11•Mar•24 -29 1 47.1090 TTS.15 Instal BTU(Pole Mount) ITS 15,Alton Rd 0% 2 11-Mar•24 12-Mar•24 30 1 A7.1130TT5.15 Install TTS Detectors-ITS 15-Mon Rd 06. 3 11 Mar24 13•Mar-24 31 47.1140.1TS 15 InslaI ITS Antennas-TTS 15-Mon Rd 0% 3 11-Mar•24 13-Mar-24 •31 I A7.1095.TTS.15 Cable Corineceon and Termination-ITS 15-Mon Rd 0% 2 14-Mar•24 15-Mar•24 -31 1 47 1165 ITS 15 Establish Network Com+uncalans TTS 15 Mon Rd 0% 2 IS-Mar•24 18-Mar-24 -31 I Construction Wasnlnolon Avenu^ - 4 Construction-MVOS-Washington Avenue IM WI Under ^.{'wer C^rnmf WC'S',I•Wafnrn;non Ave nun to A71036 MVOS.02 WA Underground Locates MVOS 04 Washington Avenue 0% 0 21-Mar-24 21-Mar-24 .49 I A7.1015,MVOS.02.WA Clearing end Grubbing-MVOS O4-Washington Avenue 0% 0 21-Mar-24 21-Mar-24 .49 I A7.1020.MVDS02.WA Embankmene5reavaben-MVOS 04•Washington Avenue 0% 0 21•Mar•24 21-Mar-24 49 I A7.1040.MVD502.WA Instal Pull Boxes•MVOS 04•Washngron Avenue 0% 0 21-Mar-24 21•Mar-24 -47 I A7.1160.MVDS.02.WA Install vweless Cornnronreaten Network•Radios•MVOS 04•Washington Avenue 0% 1 25-Mar-24 25.Mar-24 50 1 47.1135.MVOS.02.WA Pus Conductor Cable tram Service Pqm to MVDS-MVOS 04-Washington Avenue 0% 1 26•Mar.24 26-Mar•24 -50 1 r '-. Sc. Rotor. Cradk.4 hew. Actual Work Data Date-31-Jan-24 COMB DBOM ITSSPS Schedule Update ti24.0.W2 013124DD 2024-03-20 Seal radn a mpnweor.eal ammo° yen I 1 Remawng Work 2024.06-20 Added Missing 2yr Tt laaw-1 Cer#r.taeasnaerVI-n a a0.1.88_am041OOMb NE (� Cr4ical Remaining Work Project Start Date:19-Jun-19 a4Mp.n 19 cased n.vnneealrmrwa.wo.nmr.0.fwnexo nw Full Blown Schedule aabn72 0.rpodn44.0 Oma08101eresvn PRe0111M40d0 .W1 ♦ •Milestone TkA C2I)RE Project Finish Date:22-Doc 25 a, 034.t' 0.�aArwseE410310 loaa..ec nlaWzor oo 310013 Na 11/43 r�Summary ) I` J`i�.Jl\ 36M44n scrmle Up.uarosnaeeal0 AI Ail to Fin 14 94ae1.130491324.0W20,3iN0e NMl TCC COMB Progress S0hed5rle Update COMB 010W ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Sent 2024-06-20 Added Missing lye TE 20-Jun-24 TASK filter All Activities k tniy 0 Activity Name Due'. At Complete Stall Finish Total Ebel 2024 2025 Comp Oar _ 01 -I 02 I 03 I 04 01 I 02 I 03 I 0 . A7.1195.MVDS.02.WA Pull Conductor Cable for Power MVOS 04.Washnpon Avenue 0% 1 27-Mar-24 27-Mar•24 -50 I A7.1045.MVOS.02 WA Modly Power Services(it required)•MVOS 04•Washington Avenue 0% 1 28-Mar-24 28-Mar-24 -47 , I A7,1100.MVOS.02.WA Pour and Cure Maintenance Pad.MVOS O4-Washngton Avenue 0% 1 28-Mar-24 28-Mar24 -22 ( I A71165.MOOS.02.WA Establish Network Communications MODS 04-Washington Avenue 0% 1 29-Mar-24 29-Mar-24 -48 ' I itS; e.t:1•,1.ahlrrr.Mvl'75 V.W Mln.on Avenue A Ai 1120 MACS 02 WA Locates lot MVUS MVDS 34 Washngron Avenue(11 Needed; 0% 022-Mar24 22-Mar•24 .50 t A7.1125.MVDS.02 WA Instal Poe MVDS 04 Washington Avenue(Nit Required, 0% 0 25•Mar 24 25-Ma,•24 .50 ' I A7.1122MVD502.WA One Pole Hob•MVDS 04.Wasting!.Avenue(Not Requred) 0% 0 25-Mar•24 25-Mar•24 -50 I A71130.MVOS.02 WA Instal MVOS Assembly-MVDS 04-WashngtonAvenue(Co Located) 0% 0 25-Mar-24 25 Mar-24 -4e ' I 47.1090.MVOS.02 WA Instal BTU(Pole Mount)-MODS 04 Washington Avenue 0% 1 28-Mar-24 28-Mar-24 .50 I Al.1170.MVDS.02.WA Moral Layer 2 Managed Field Ethernet Switches(MFESs)-MODS 04•Washington Avenue(Co(NrA) 0% 0 08-Mar-24 28-Mar-24 .49 I 47.1182.MVDSA2.WA Install Uninlerruptole Power Supply(UPS)-MVOS 04-Washington Avenue(WA) 0% 0 26-Mar-24 28-Mar-24 •49 r 1 47.1180.MVDS.02.WA Insrag Terminal Server-MVOS D4•Washington Avenue 0% 1 28-Mar-24 28-Mar-24 -50 I A7 1095.MVOS.02.WA Cade Connection and Termination•MVOS 04-Washngton lwanue 3% 1 28-Mar-24 28-Mar-24 -50 I 47.1200.MVDS.02.WA Surge Suppression-MVOS 04 Washington Avenue 0% 1 29-Mar-24 29-Mar•24 -49 I A7 1201.MVDS.02 WA Grounds g and Lightning Proteclgn MVOS 04 Washington Avenue 0% 1 29-Mar-24 29-Mar-24 -49 A712.0 MVOS 02 WA Calbrate and Configure-MVDS O4 Washington Avenue 0% 221-Mar-24 02-Apr-24 -50 5 C .11-- CCTV•Wa Air ylo1.,venue w V A7.1015.CCTV.08.WA Clearing and Grubbing•CCTV 08-Washington Avonue(MDC) 0% 0 04Ju•24 04-Jun-24 -125 1 A7.1020.CCTV.08.WA Embankment/Excavation CCTV 08-Washrngtnn Avenue(MOC) 0% 0 04-Jun-24 04-Jun-24 -125 I A7.1030.CCTV.O&WA Underground Locates•CCTV 08•Waslinglon Averue(MOC) 0% 0 04-Jun-24 04-Jun-24 •125 1 A7.I040.CCTV.08.WA Instal Put Boxes-CCTV 08-Washeglan Avenue(MDC) 0% 0 04-Jun-24 04-Jan-24 -124 I A7.1160.CCTV.08.WA Install Wireless Communication Network-Radios•CCTV 08-Washington Averroe(MOC) 0% 1 04-Jun-24 05-Jun-24 •125 I A7.1135.CCTV.Oa.WA PW CoMrotOr Cabin from Service Point to CCTV-CCTV 08 Washngton Avenue(MDC) 0% 1 05Jun-24 06-Jun-24 -125 1 A7.1195.CCTV08.WA Pul Conducive Cable for Power-CCTV 08-Washington Avenue(MOC) O% 1 06Ju0•24 07-Jun-24 -126 I 47.1045.CCTV.O&WA Madly Power Swvkosill required]-CCTV 08-Washington Avonue(MDC) 0% 1 07-Jun-24 07-Jun-24 •123 I 0.71165 CCTV.08.WA Establish Network Communications•CCTV 08-Washington Avenue(MDC) 0% 1 10-Jun•24 10-Jun-24 -106 I .TS Devicelnslanalion CCTV OS ',a shington Avenue Mu:, w 0.7 1120 CCTVC8 WA Locales for CCTV-CC'V 08 Waorreglon Avenue(II Needed)(MOC1 0% 0 04-Jun•24 04-Jun-24 -1 I 47.U25.CCTV.08.WA Instal Poe-CCTV 08-Washngton Avenue(Nor Requved)IMDCI 0% 0 04-Jun-24 04-Jun-24 -125 I A7.1122.CCTVA6.WA OlU Pole Mole-CCTV 08-Washington Avenue(Not Requeed)(140C) 0% 0 04-Jun-24 04-Jun-24 -125 I A7.1130.CCTV-06.WA Install CCTV Camera Assembly-CCTV 08-Washington Avenue(MDC) 0% 004-Jun•24 04-Jun-24 -122 I 47 1140 CCTV.00.WA Install CCTV Camera Lowering Device(CLO)-CCTV 08-W eshugton Avenue(a Needed)(MOC) 0% 0 04-Jun-24 04-Jun-24 -104 I A7.I090.CCTV.08.WA Install BTU(Pole Mount)-CCTV 08-Washington Avonue(MOC) 0% 1 07-Jun-24 07-Jun-24 -125 1 47.1101.CCTV.08.WA Pour and Cure Maintenance Pad-CCTV 08-WashwgtonAvenue(MDC; 0% 1 07-Jun-24 10-J1w1-24 •71 1 A7.1170.CCTV.08.WA Install Layer 2 Managed Field Ettwrnet Switches(MFESs)•CCTV 08 WelNngron Avenue(hi/A)(MOCI 5% 0 07-Jun-24 07-Jun-24 -107 I A7.1IB0.CCTV.06.WA Install Terminal Server-CCTV 08-Washington Avenue(N/AIIMDC) 0% 0 07-Jun-24 07-Jun-24 -107 I 471182.CCTV.06.WA Instal Uninrerruprble Power Soppy(UPS) CCTV 08 Washngton Avenue(N:Al)MDC) 0% 0 07-JIn-24 07-Jun.24 -107 I 47.1091CCTV.0&WA Cable Connection and Termination-CCTV 08-Washngtonl Avaruel kCC I 01/. 1 07-Ju.24 10-Jun-24 -125 1 47.1200.CCTV.08.WA Surge Suppression-CCTV 08-Washington Avonuo(MOC) 0% 1 10-Jun-24 11-Jun-24 •125 1 A7.1201.CCTV.08.WA Grounding and Lightning Pr01ee6on-CCTV 08 Washington Avenue(MOC) 0% 1 10-Jun-24 11-Jun-24 -125 1 A7.1210.CCTV.O&WA Calibrate and Configure•CCTV 08•Washington Avenue(MOC) 0% 2 10-Jun•24 12-Jun-24 -108 ' Ili ir A7.1015.CCTV09.WA Clcarng and Grubbing CCTV D9 Washigton Avenue 0% 0 07Jun.24 07-Jun.24 123 I 471020.CCTV.09.WA EmbenkmenrExcavalun-CCTV 09-WashingtonAvenue 0% 007-Jun.24 07-Jun-24 •123 1 A71030.CCTV.09.WA Underground Locates•CCTV 09-Wasnngton Avenue Ow, 0 07-Jun-24 07-Jun-24 -123 1 o4M Aoevn D0we44 AIPe.. NNW Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U m euM 24.0.W2013124DD 2024-03-20 Sent loos ., sdw.e.eel enigma OM f I Remaming Work 2024-06-20 Added Missing 2yr TE 1a1112921 Gs,a0.a uo5.ienocwm.A.mnw..U1505n-emoavPl OD Ply Project Start Date: 19-Jun-l9 44110-22 nray..da en.muneswstnee.w.nurra.sl,vaew.o NW MEN Critical Remaining Work Full Blown Schedule 2130c-22 250205.421.w.Neae91.5.1iler lope,PRBo.i I132112200 NMI ♦ ♦Mleslone TR Project Finish Date:22-Dec-25 rage 59 of 76 030023 ewo.a4P.woa as4SLfar rn.c1 MIX20$03JpO m.Nsower. ra4 ua nw� I SummaryJ sm. .u +. eslm,2a0o NYJJ P SawW 21 Sows44100003 UM 0 S 11 gaper NW 1E4.024 Scn.a.45p1e.L'ae OW20111,0/0 NMI - __1 TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-2e Sen12024-06-20 Added Missing 2yr TE 20-Jun-24 TASK Baer:A2 AcAnAes (Act Dur% At Complete Stan Penh Total Haat 2026 2025 Livity l0 Activity Name Comp Dm 01 1 02 I 03 1 0. 01 j 02 j 03 I 04 Al.IOIOCCTV.09.WA Instal Pus Boxes-CCTV 09•Washigton Avenue 0% 0 07-Jun-24 07-Jun-24 -122 I A7.1060.CCTVA9.WA Install Wireless Communication Network-Radios-CCTV 09-Washington Avenue 0% 1 11-Jun•24 12•Jun.24 •125 I A7.1135.CCTVO9.WA Pun Conductor Cable from Service Pout to CCTV•CCTV 09-Washmgton Avenue 0% 1 12-Jun-24 13-Jun-24 -125 I Al.1195.CCTV.09.WA Pull Conductor Cable for Power.CCTV O9-Washington Avenue 0% 1 13-Jun-24 14-Jun-24 -125 I A7 104SCCTVOtWA Meekly Power Services(rt required)-CCTV 09•Washington Avenue 0% 1 14-Jun-24 14-Jun-24 -123 I A7.1165.CCTV.09.WA Estabash Network Connuntcatons-CCTV 09.WasMtgion Avenue 0% 1 17-Jun-24 17-Jtn-24 -111 1 w A7.11 r.e TV09.WA Locates for CCTV-CCTV 09•Washngton Avenue(II Needed) 0% 0 11•Jun-24 I1.Jun.24 •125 ' I A7.1125.CCTV09.WA Install Polo,CCTV 09-Washington Avenue Not Required) 0% 0 11.Jun-24 I1-Jun-24 -125 1 A7.1122.CCTVA9.WA DM Poie Rote-CCTV 09•Washington Avenue(Not Required) 0% 0 11-Jun-24 11-Jun-24 -125 I A7.1130.CCTVO9.WA Install CCTV Camera Assembly-CCTV 09-Washington Avenue 0% 0 11•Jun•24 11•Jun-24 •122 1 A7.1140.CCTV.09.WA Instal CCTV Camera Lowers g Device(OLD)-CCTV 09-Washington Avenue(II Needed) 0% 0 11-Jun-24 11-Jun-24 •ISO 1 A71090.CCTV.09.WA Instal BTU(Pete Mount)-CCTV 09-Washington Avenue 0% 1 14.Jun-24 14-Jun-24 -125 I A7.1101.CCTV.09.WA Pour and Cure Maintenance Pad-CCTV 09.Washington Avenue 0% 1 14-Jun-24 17-Jun-24 -77 I A7.1170.CCTV.09-WA Instal Layer 2 Managed Field Ethernet Switches(MFESs)•CCTV 09•Washnglon Avenue(N/A) 0T. 0 17-Jun-24 17-Jun-24 -112 A7.1150.CCTV.09.WA Install Terminal Server-CCTV 09-Washington Avenue(N/A) 0% 0 17-Jun-24 17-Jun-24 -112 1 A7.1132.CCTV.09.WA Install Unvnerruplbk Power Supply(UPS)•CCTV 09-Washington Avenue(N/A) 0% 017•Jun-24 17-Jtn•24 -112 1 • A7.1095.CCTV.09.WA Cade Connection and Termed0on-CCTV 09-Washington Avenue 0% 1 17-Jun-24 17-Jun-24 -125 I A7.1200.CCTV.00.WA Surge Suppression-CCTV 09-Waslaglon Avenue 0% 1 17•Jun-24 18•Jun•24 -125 A7.1201.CCTV.09.WA Grounding and Lighneg Protection CCTV09 Washigton Avenue 0% 1 17•Jun•24 18Jun•24 -125 A7.1210.CCTV.09.WA Condom and Configure CCTV 09-Washington Avenue 0% 2 17-Jun•24 19-Jun.24 •112 w w 47.1015CCTV.I0.WA Clearing and Grubbing.CCTV 10-Washington Avenue)MOC( 0% 0 17-Jun-24 17-Jun-24 -123 1 A7.1020.CCTV.I0.WA EmbankmerNExcavalion-CCTV 10-Washington Avenue(MDC) 0% 0 17-Jnn-24 17-Jun-24 •123 I A7.1030.CCTV.10.WA Underground Locates-CCTV 10-Washington Avenue(MDC) 0% 0 17-Jun-24 17-Jun24 -123 1 A7.1040CCTV.10.WA Install Pul Boxes-CCTV 10-WaslagtonAvenua)MDC) 0% 0 17-Jun-24 17-Jtn24 -122 . I A7.1160.CCTV.IO.WA Install Wireless Communication Network-Radios-CCTV 10-Washington Avenue(MOC) 064 1 16-Jun-24 19-Jun-24 -125 1 A7.1135.CCTV.10.WA Pul Conductor Cable from Service Pout to CCTV-CCTV 10-Washngton Avenue(MDC) 0% 1 19-Jun-24 20-Jun-24 -125 1 A7.1195.CCTV 10.WA Pus Conduces,Cable for Power.CCTV 10-Washington Avenue(MDC) 0% 1 20•Jun-24 21-Jun.24 •125 . I A7.1045.CCTV.10.WA Mo01y Power Services(I r equred) CCTV 10•Washington Avenue(MDC) 0% 1 21-Jun-24 24-Jun-24 •123 0 Al.1165.CCTV10.WA Eslabssh Nelwor iv Comntunncations CCTV 10 Washington Avenue(MDC) 0% 1 24-Jun-24 25-Jun-24 -115 ' w A7.1120.CCTV IO.WA locales for CCTV•CCTV 10 Washington Avenue(II Needed)IMOC) 0% 0 16-Jun-24 16-Jun-24 -125 I A7.1125.CCTV.10.WA Install Pole-CCTV 10-Washington Avenue(Not Requned)(MDC) 0% 01e•Jun-24 18-Jun-24 -125 I A7.1122.CCTVIO.WA Dnt Pole Hole-CCTV 10-Washington Avenue(Not Requoedl(MDC) 0. 018-Jun-24 16-Jun-24 -125 I A7.1130.CCTV.10.WA Inslai CCTV Camera Assembly•CCTV 10 W asinglon Avenue(MDC) 0% 016-Jtn-24 16-Jun-24 -122 I A7.1140.CCTV.10.WA Install CCTV Camera Lowemg Device(CID) CCTV 10•WasNrgesn Avenue(II Needed)(MOC) 0% 0 10-Jun-24 18-Jun-24 •113 • I A7.1090.CCTV.12WA Inslaa BTU(Pole Mount) CCTV 10 Waorwglon Avenue(MDC) 0% 1 21-Jun-24 24-Jun-24 -125 0 A7.1101.CCTV10WA Pour and Cu,e Maintenance Pad-CCTV I Washington Avenue(MDC) 0% 1 21-Jum24 24-Jun-24 -62 0 • A7.1170.CCTV30.WA Install Layer 2 Managed Field Ethernet Switches(MFESs)-CCTV 10-Washington Avenue(N/A)(MDC) 0% 0 24-Jun-24 24-Jun-24 -116 I A7.1160.CCTV.IOWA Install Terminal Server.CCTV 10-Wasnngton Avenue(N/AIIMOC) 0% 0 24-Jun-24 24-Jun-24 -116 I A7.1102.CCTV.10.WA Install Unnterrupooe Power Supply(UPS) CCTV 10-Washington Avenue(N,AKMDCI 0% 0 24-Jun-24 24-Jun-24 -116 I A7.1095.CCTV.I0.WA Cade Comes Iron and Termination-CCTV 10 Washington Ave nu e(MDC) 0% 1 24-Jun-24 24-Jun-24 -125 I A7.1200CCTV.I0.WA Surge Suppression CCTV 10 Wasinglan Avenue(MOCI 0% 1 24-Jun-24 25-Jun-24 -125 1 A7.1201.CCTV.I0.WA Grounding and L)ghlnng Prdreinn CCTV 10-Washmgton Avenue(MOC) 0% 1 24-Jun.24 25Ju-24 -125 I A7.1210.CCTV.10.WA Calibrate and Configure-CCTV i0 Washington Ai,enue(MDC) 0% 2 24-Jun-24 26-Jun-24 •116 I w W — _- on. RN* cr.c..e Mom. IIII Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03-28 Sent teon.I Pao.&morelT.o°Pump Pen 1 Remaining Work 2024-06-20 Added Missing 2yr TE lsnwst Carunvuwo.Rmwe,-0 4.WS0.snee°0°lerr00 PM Project Start Date:19-lull-19 maw Le lace.°Rena OIWenriw.ew..rl uv.osueneao RAN MIME Cr0081 Remaintnq Work Full Blown Schedule linen nwe,.a O.w Flem.uw.eln r,mea 1102100O 194 • •u,inoione //�� SCORE Project Finish Date:22-Dec-25 P.s 0o.(7a a6 .A ,......soR.emaea.vweet o.avRao:°omo0 NW - . Summary �• �� �^ �f as as s+.e+.00meu24 0s+1211000 su+ 2C Aw24 S.nw.V000.UN.0W2013,240D W. TCC•COMB Progress Schedule Update COMB OBON ITSSPS Schedule Update U21-0.W2 073121D0 2021-03-28 Seel 2O24-06.20 Added Missing Tyr TE I 20-Jun.24 TASK Mgr All Adivitly 'Activity 10 Aere4y Namo Our% Ai Complete Sian Finish Talal Float 2024 2025 Comp Our 01 1 02 I 03 I 04 01 1 02 I 03 1 04 A7.1015.CCTV 14.WA Clearing anti Grubbing•CCTV 14•Washington Avenue 0% 0 24-Jun-24 24-Jun-24 -123 I 47 1020.CCTV 14 WA Eebankment/E.cavahon•CCTV 14-WashirgbnAvertue 0% 0 24-Jun-24 24-Jun-24 -123 I Al.1030.CCTV 14.WA Underground Locales.CCTV 14-Washngton Avenue 0% 024Jun•24 24-Jun-24 123 I A7 1040.CCTV.14.WA Ins06G es Put BO. •CCTV 14-Wash or gtonArac 0% 0 24-Jun-24 24-Jun-24 -122 1 A7.1160.CCTV.14,WA Install Wireless CommunIcaion Network.Rados-CCTV 14-Washington Avenue 0% 1 26-Jun-24 26-Jun-24 •125 I Al.1135.CCTV I4.WA Put Conductor Cable horn Service P0nl Io CCTV•CCTV 14-Washington gton Avenue 0 1 27-Jun-24 27-Jun-24 .125 I Al.1195.CCTV.14.WA Pug Conductor Cable In.Power•CCTV 14•Washngton Avenue 0% 1 28-Jun24 28-Jun-24 -125 1 Al 1045.CCTV14.WA Modify Power Services(e"puree-CCTV 14-Washington Avenue 0% 1 01-Jul-24 01-Jul-24 -123 1 47 1165 CCTV 14 MA Estanish Network Communrca,ons CCTV'4-Washington Avenue 2% 1 02-Jul-24 02-Ju1-24 -119 I i',. .i h i CCT I".: 5•:-phi, t_. .... • W A7 1120.CCTV 14.WA Locates for CCTV-CCTV 14-Washington Avenue III Needed) 0% 0 25-Jun•24 25-Jun-24 -1 1 A71125.CCTV.14.WA Inslat Pole•CCTV 14•Washington Avenue;Not Reduced) 0% 0 26-Jun-24 26-Jun-24 •125 I A7 1122.CCTV 14.WA Doll Pole Hole•CCTV 14-Washington Avenue(Not Required) 0% 0 26•Jun-24 26-Jun-24 -125 1 A7 1130.CCTV.14.WA Install CCTV Camera Assembly-CCTV 14 Washington Avenue 0% 0 26-Jun-24 26-Jun-24 •122 ' 1 A7.1140.CCTV.I4.WA Instal CCTV Camera Lowemg Device ICLO)•CCTV 14•Washington Avenue 111 Needed) 0% 0 26-Jun-24 26-Jun-24 -117 I A7.1090.CCTV.I4.WA Install BTU(Pole Mourn)•CCTV 14-Washington Avenue 0%. 1 DiJul-24 01-Jul24 •125 I A7.1101.CCTVI4.WA Pour and Cue Maintenance Pad-CCTV 14•Washington Avenue 0% I 01-Jul-24 01-Ju•24 -87 I A7.1170.CCTV.14.WA Instal!Layer 2 Managed Field Ellrernel Switches(MFESs)•CCTV 14-Washington Avenue(N/A) 0% 0 01-Jul-24 01-Jul-24 -120 1 A71180.CCTV14.WA Install Terminal Server•CCTV 14-Washington Puenue INIA) 0% 0 01-Jul-24 01.Jul-24 .120 I A71182.CCTVI4.WA Install UnMeerruplble Power Supply(UPS) CCTV 14•Washington Avenue(N/A) 0% 0 01-Jul.24 01-Jul-24 120 I A7 1095.CCTV 14.WA Cable Connection and Termnaepi i -CCTV 14-WasM Ju gton Avenue 0% 1 01- -24 01-Jul-24 -125 1 A7.1200.CCTV 14.WA Surge Suppression•CCTV 14•Washington Avenue 0% 1 02-Jul-24 02-Jul-24 -125 I Al I201.CCTV 14.WA Grounding and Lighlrsrg Protection-CCTV 14-Washington Avenue 01/. 1 02-JuF24 02Jul•24 -125 I Al.1210CCTV.14.WA Calibrate and Configure-CCTV 14-Washington Avenue 0% 202-Ju•24 03-Jul-24 -121 I • ,ur,• CCTV 14-11:-.h,n 0 nl.v.nu-IM0C1 W 47.1015.CC .1..WA Clearing and Grubbing-CCTV 19 Washington Avenue(MOC) 0% 0 01-Jul-24 01-Jul24 -123 I 1 A7.1020.CCTV19.WA Embalknrere/Excevauon-CCTV 19-WashinglMAvenue(MDC) 0% 0 01-Jul-24 01-Jul-24 -123 I 1 Al 1030 CCTV 19.WA Underground Locales CCTV 19 Wasnrglon Aeenue(MOC) 0% 0 01-Jul-24 01-Jul-24 123 1 A71040CCTV 19.WA Install Pull Boxes•CCTV 19-Washington Avenue(MDC) 0% 001Jul-24 01-Jul24 -122 1 • A7.1160.CCTV I9.WA Insist Wireless Communication Network•Radios-CCTV 19-Washington Avenue(MOC) 0% 1 03-Jul-24 05-Jul-24 -125 1 A7.1135.CCTV19. PamA Pul Conductor Cable horn Service P0 to CCTV-CCTV 19-Waslrnglon Avenue(MDC) 0% I 05-Jul-24 08Jul-24 -125 1 A71195.CCTV.19.WA Pull Conductor Cade for Power CCTV 19 Washington Avenue(MDC) 0% 1 08.JuF24 09-Jul-24 125 I A7.1045.CCTV.19.WA Mobley Power Servkes(e required)-CCTV 19-Washngton Avenue(MOC) 0% 1 09-Jul-24 09Jul24 -122 I • 471165.CCTV I9.WA Establish Network Communications-CCTV 19-Washington Avenue(MDC) 0% 1 10-Jul-24 10-Jul-24 .123 W A7 1120.CCTV 19.WA Locales In CCTV`CCTV I y•Wasington Avenue(Il Needed)(MDC) 0% 003Ju-24 03Jul-24 •125 I A71125.CCTV 19.WA Install Pole.CCTV 19•Wash,nglon Avenue(Not Requved)(MDC) 0% 003Jul24 03-Jul-24 -125 1 A71122.CCTV MA 19.WA D POP Hole CCTV 19-Washington AvenueM Requrd)(eMDCI 2% 0 03Ju-24 03Jul-24 •125 I Al 1130.CCTV.I9.WA Install CCTV Camera As senility-CCTV 19-Washington Aveerue(MOC) 0% 0 03-Jul-24 03-Ju-24 -122 I A71140.CCTV.I9.WA Inslaal CCTV Camera Lowering Device(CLO)-CCTV 19-Washrgton Avenue(IINeeded)(MDC) 0% 003-JuF24 03-Jul-24 -121 : I A71090.CCTV.19-WA Inslae BTU(Pole Mount)•CCTV 19-Washington Avenue(MDC) 0% 1 09-Ju-2.1 09-Ju-24 .125 I 47.1101.CCTV.I9.WA Pour and Cure Mare4nence Pad•CCTV 19-Washington Avenue(MDCI 0% 109-JuF24 10-Jul-24 •92 I A7 1170.CCTV 19.WA Install Layer 2 Managed Field Ethernet Switches(MFESs)•CCTV 19-Washington Avenue(N/A)(MDC) 0% 0 09Ju-24 09-Jul-24 .124 A7 1180.CCTV.19.WA InslaM Terminal Server•CCTV 19•Washington Moue(NlAgMDC) 0% 0 09-JJ-24 09-Jul-24 •124 471182.CCTV.19.WA Install Urbaahiplble Power Suply(UPS)-CCTV 19-Washeglon Avenue(WA)IMOC) 0Y. 0 09-JuF24 09-Jul-24 -124 471095.CCTVI9.WA Cable Connection and Termination-CCTV 19-Washington Avorue)AOC) 0% 1 09-JuF24 in-Jul-24 .125 1 Al.1200 CCTV.I9.WA Surge Suppression-CCTV 19-Washiglar Arn,W(MOC1 0% 1 10-JuF24 11-Jul-24 -124 I t OM Soolsa, CA.li.a We.. MINN Actual Work Data Date;31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-26 Sent Isom-re e.*son..air c.mc1/0 earl I I Remaining Work 2024-06-20 Added Missing 2yr TE renm.n cr arveume.Aao..r-A.ne.•r.Uls0SA•0sowoerre0 Pet Project Start Date: 19-Jun-19 aaMern nw,me.e:me.el.wwue lope,Ulro.9loeeo.o !MU MEM Gnlelll Remaiing Work Full Blown Schedule moo.a -Pmen.R eased o..x.r uf.ceov.mmuo..I Imeasot NW • •Western //'�� _C) F Project Finish Date:22-Dec-25 P.sc61 of es sun 1 ,.re.e..ae.w.uwu.No.rrweol 2maan0 ski OiMIJ ��Summary �• v �`^ *Nov,a smeo4e uohl.u2alaenarao6 NW) AJ,nM Sc...pea..UM ew201312.70 to. TCC-COMB Progress Schedule Up0ale COMB DBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-20 Set 2024-00-20 Added Missing 2yr TE 20-Jun-24 TASK later Al AcWaes 1A01ivey 0) Activity Nemo Our% At Compete Start Finish Total Float 2024 2025 Donp Du' 01 I 02 I 03 I 04 01 I 02 I 03 j 04 A7.1201.CCTV.19.WA Grounding and Lightning Pruaeaen•CCTV 19-Washington AvenuelMDCI 0% 1 10-Jul-24 11•JW-24 -124 1 A7.1210 CCTV.I9.WA Calibrate and Configure•CCTV 19•Washington Avenue(MDC) 0% 2 10-Jul-24 12-Ju424 •125 - 1 ' i , n-4rMS-Wnsh,nglon Ai,-. i ♦ e A71030 ADMS.03.WA s Underground Locates•ADMS 03•Washnglon Avenue 0% 0 23•01.24 23•Apa24 -119 - 1 A71040ADMS03.WA Instal Pul Boxes ADMS 03 Washington Avow 0% 123-Apr-24 24-Apr•24 -111 1 A7.1135.ADMS03.WA Pun Conductor Cable from Service Pont to ADMS-ADMS 03•Washnglon aenue 01'. 1 24-Apr-24 25-Apr-24 -119 I A7.1195.ADMS.03.WA Pun Conductor Cable for Power•ADMS 03•Washnglon Avenue 0% 1 25.Apr-24 26-Apr-24 -119 1 A71045.AOMS 03.WA Modify Power Services(if required)•ADMS 03•Washington Avenue 0% 126-Apr-24 26-Apr•24 -/07 A7.1100.ADMS 03.WA Pour and Cure Maintenance Pad-ADMS 03-Washington Avenue 0% 126-Apr-24 29-Apr•24 -42 - 1 A7.1160.ADMS.03.WA Install Wireless Communication Network Rados-ADMS 03-Washington Avenue 0% 1 14-Oc1.24 14-Oct-24 -238 - 1 A7.1165.ADMS 03.WA Establish Network Cormruhicallons ADMS 03-Washington Avenue 0% 1 15-Oc1-24 15-Oct-24 -226 I ♦ • A7.1015.ADMS 03.WA Clearing and Gruebng-ADMS 03 Washington Avenue 0% 1 01-Mar•24 01-Mar-24 84 I A7.1120.ADMS.03.WA Loceles/Survey/Inslal Ran•Drll Shah•ADMS 03-Washnglon Avenue 0% 201-Mer•24 04-Mar-24 -160 0 A7.1020.ADMS.03.WA EcrlbankmencExcavaoun-ADMS 03•Washington Avenue 0% 1 01dpu-24 01-Mar•24 -84 I A7.1022.ADMS.03.WA Inslallabon of Dril Shaft-ADMS 03-Washnglon Avenue 0% 2 05-Mar•24 06-Mar 24 -I19 I A7.1025.ADMS.03.WA Cure 8 CSL Test of Ora Shaft ADMS 03 Washington Avenue 0% 2807-Man24 03-Ap'24 •157 A7.1080.ADMS.03.WA Pour and Cure Cabinet Pao•ADMS 03•Washington Avenue(Not Required) 0% 0 213-Apr-24 26•Apr-24 -119 I A7.1090 ADMS 03.WA Install Cabinet(Pad Mount)•ADMS 03•Washington Avenue(Not Reduced) 0% 0 26-Ap-24 26-Apr-24 .119 I A7.1060.ADMS 03.WA Instal Structure-ADMS 03•Washington Avenue-Cantilever Sao 0% 210.001-24 11-Oct-24 .238 1 A7.1070 ADMS.03.WA Instal 9gn ADMS 03 Washnglon Avenue-Cantilever Site 0% 1 14-001-24 14-00-24 -238 I Al 1095.A0MS.03.WA Cable Connection and Termination.-ADMS 03-Washnglon Avenue 0% 1 15-001-24 15-Oct-24 -238 I A71200 ADMS 03 WA Surge Suppress-on•ADMS 03-Washnglon Avenue 0. 1 15-Oc1-24 16.Oct-24 .238 1 A7 1201 ADMS 03.WA Grounding and lightning Prnecnon ADMS03 Washnglon Avenue 0% 115-Oct.24 16-Oct-24 238 1 ♦ I ., ... ♦ 4 A7.1030.ADMS.31.WA Underground Locates,ADMS 31 Washington Avenue/17th Street 0% 0 28-Jun-24 28•Jun-24 •137 I A7.1040.ADMS 31.WA Instal Pul Boxes-ADMS 31-Washington Avenue/17th Street 0% 1 01-Jul-24 01Juti24 -137 I A7.1135.ADMS 31.WA Put Conduct.Cable lion Service Pont loADMS•ADMS 31-Washnglon aenuet7lh Street 0% 1 01-Jub24 02-J9.24 •137 1 A7.1195.ADMS.31.WA Put Conductor Cable for Power-ADMS 31-Washington AvenuW171h Street 0% 1 02-5924 03-J9-24 -137 1 A7.1045.A0M5.31.WA Molly Power Services(4 mopped) ADMS 31 Washington Avenue/171h Street 0% 1 03•Jut24 03J924 133 I A7.1100.ADMS.31.WA Pour and Cure Maintenance Pad•ADMS 31•Washington Arenuerl7ih Street 0% 103•1ul•24 05•19•24 •90 1 A71160ADMS31.WA Install Wireless Communication Network Radios-ADMS 31-Washnglon Avenuerl 7th Street 5% 1 31-Mar•25 01•Ape25 •323 1 A7.1165.ADMS.3t.WA Eslablsn Network Communications ADMS 31 Washnglon Avencerl71h SlIeet 0% 1 08-Apr-25 06-Apr•25 •324 I ♦ - - - I A?1120.A•MS.31.WA Locales/Survey/lnslal plan-Oro Shah-ADMS 31•Washington Avenue/17th Sheet 0% 2 29-Apr-24 30-Apr-24 -160 1 I A7 1015 ADMS 31 WA Clearing and Grubbing-AOMS31-Washiglon Avenue/171h Sheet 0% 1 01-May.24 01-May24 .96 I A7.1022.ADMS 31 WA Instillation of Oro Shaft-ADMS 31•Washngtdnaenue/17th Sheet 0% 2 01-May-24 02.May-24 145 1 A7 1020 ADMS 31 WA Embankment/Excavation-ADMS 31-Washnglon Avenue/17th Sheol 0% 1 01-May-24 01-May-24 .96 I A71025ADMS 3t WA Cure B CSL Test of Die Shah-ADMS 31•Washington Arenue/17P 91.eat 0% 28 03-May-24 30-May-24 -ISO O A7 1080 ADMS 31 WA Pour and Cure Cabinet Pad-ADMS 31-Washnglon Avenue/171h Street(Not Requi•ed) O% 003-11.l-24 03-Ju424 -137 I A7.1090.ADMS.31.WA Install Cabnet Pad Mount)•ADMS 31 Washington Avenue/17th Street(Not Reduced] 0% 003-1924 03-Ju124 •137 1 A7.1060.ADM5.31.WA Instal Structure-ADMS 31 Washigton Avenue/171h Street 0% 1 31-Mar-25 31-Mar-25 -323 I A7.1070 ADMS 31 WA Instal Sign-ADMS 31-Washington Avenue/171h Street 0% 131-Man25 31-Mar-25 -322 I A71005 ADMS 31 WA Cable Connection and Termination ADMS 31 Washnglon Avenue/17th Street O% 1 08-Apr-25 08-Apr-25 -327 I A71200.ADMS.31 WA Surge Supoeession-ADMS 31•Washington Avenue/17th1 Sheol 0% 1 08-Ppr-25 09-Apr•25 •327 1 A7 1201 ADMS 31 WA Grounding and lightning Protection ADMS 31-Washington Avenue/171h Street 0% 1 08-/pr-25 09-Apr-25 -327 I OM R*+tka 000.t ARP. Actual Work Data Date:31-Jan COMB DOOM ITSSPS Schedule Update U24.0.W2 013124UD 2024-03-21 Sent 1a0.11 eewnaorom.eot oanmet) let Q Remanng Wok 2024-06-20 Added Missing 2yr TF.. 142.2.-2r Co.,.oKan Retawy-Raa04r54 SR 1302001112100 ant: Project Start Date:19-Jun-19 WPM/22 Prom,Revtaaeminw ao.nacn .u .O hm1 n 5,m.a.c lliMia Critical Re/naming Work Full Blown Schedule worn aa6.vtaa .n.uacee leper FROM 1 Ima2a2p NW • •Milestone Ti? RE Project Finish Date:22-Dec-25 2,fit,::6 a001.e n Rr80IEReAto4aaeu.Vase urge MOCK e5222210 era onsj .,Summary „ J���/JJ RE an0•a1 scheme ueu UM OS 11212112 NUJ 211Jur2, 5.000 V Mrs 024 2 20201112413n -.- Nu, TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.O.W2 01312400 2024-03-20 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK tiller,All Activlles IAtavay ID AClwiy Name Due% Al Compete Start Finish Total Float 2024 2025 LCOMP our 01 I 02 1 03 1 04 DI 02 03 01 w �.-sleit.SPS PIMA.G1 -Washington Avenue _ - . A7.12340.SPSG04 Instal Conductor Cable SPS Garage G04 Washington Avenue 100% 1 24Joh23A 24-Jul-23A A7.12240.SPSG04 Proof Existing C000un-SPS Garage G04-W oshngton Avenue 100% 1 24-Jw23 A 24-JU-23A A7.12730.SPSGO4 Instal Mounting Brackets on Eedstng Structures-SPS Garage G04•Washington Avenue 100% 1 24-Jri-23 A 24-JW23A A7.12280.SPS.G04 Instal EJectrcal Equipment in Existing Cabinet-SPS Garage GO4-Washngton Avenue 100% I 25-Jul23 A 23-Jul-23A A7.12510.SPS.G04 Install Solar Power Equpment in Eaning Cabinet•SPS Garage G04•Washington Avenue 100% 1 25•Jul-23 A 25Ju623A A7.It60.SPS.G04 Instal Wireless Communication Network Radios-SPS Garage G04•Washington Avenue 100% 1 25-JJ-23 A 25-Jul-23A A7.1130.SPS G04 Instal Detectors-SPS Garage G04.Washngtol Avenue 100% 2 26•Jut-23A 27-Jul-23A • A7.1070.SPS.G04 Install Monument DMS•SPS Garage 004-Washington Avenue 100% 2 26-J0-23 A 27-Jul-23A • A7.1095.SP5 004 Cable Connection and Termination-SPS Garage G04-Washington Molue 100% 5 25-J01-23 A 03-Avg-2: ' A7.1165.SPS 004 Esfatesh Network Communications-SPS Garage G04-Washington Avenue 100% 5 04-Auq-23 10-Aug-2: -7.12340. - .G02 Install C0doclor Cable SPS Garage G02 Washington Avenue 100% 1 31 Aug 23 31 Aug 2} ' A7.12240.SPS.002 Proof Eaising Conduit-SPS Garage G02-Washington Avenue 100% 1 31-Aug-23 31-Aug-2: A7.12730.SPSG02 Install Mounting Brackets on E.rsting Structures•SPS Garage G02•Washington Avenue 100% 1 31-Aug-23 31-Aug-22 A712280.SPS.G02 Install Electrca Equipment n Existing Cabinet-SPS Garage G02 Wasiengton Avenue 100% 1 01-Sap23 01•Sep-2: A7.12510.SPS.G02 Install Solar Power Equipment in Existing Calomel-SPS Garage G02 Washington Avenue 100% 1 01-Sep23 01-S4p2: A7.1I60.SPS.G02 Install Wteless Communication Network-Radios-SOS Garage G02-Washington Avenue 100% 1 01-Sep-23 01-Sep-2: A71130.SPS.G02 Install Detectors-SPS Garage G02-Washogton Avenue 100% 2 OSSep23 08-Sep-27 A7.1070.SPS.G02 install Monument DMS-SPS Garage G02 Washington Avenue f 00% 5 30-Oct-23A 03-Nov-2.. 117.1165.SPS.G02 EstaoKn Network Communcatons SPS Garage G02-Washington Avenue 100% 2 03-Nov.23 08-Nov-I • Al.1095.SPS.G02 Cable Connection and Tern-Mahon-SPS Garage G02 Washington MmIUD 100'7. 2 03•Nov.23 06-Nov-2 • A7.12340.SPSG09 Install Conductor Cable-SPS Garage G09-Washington Avenue 100% I 07-Sep.23 07-Sep 2: , A7.12240.SPS.G 09 Prod Etisvng Conduit SPS Garage G09 Washington Avenue 100% 1 07-Sep-23 07-Sap-2: • Al 12730.SPS.G09 Install Mounting Brackets on Ealsing Structures-SPS Garage G09-WashIngton Avenue 100% 1 07-Sep-23 07-Sep-2: . A7 12200 SPS,009 Install Electrical Equpnent in Eesing Cabinet•SPS Garage G09-Washington Avenue 100% I 06-Sep23 015-Sep2: A7.12510SPS.G09 install Solar Power Equpmenl in Eantng Cabinet•SPS Garage G09-Washington Avenue 100% 1 08-Sep23 08-Sep-2: 47.1160.5P8.009 Install Wireless Comrrluneca1on Network Rados-SPS Garage G09 Washington Avenue 100% 1 06-Sep23 08-Sep2: A7.1130.SPS.G09 instal Detectors•SPS Garage G09-Washington Avenue 100% 2 08- ep23 11-Stp-22 A7.1O70SPS.G09 Install Monument DMS-SPS Garage G09•Washington Avenue 100% 212-Sep-23 13-Sep•2: A71095 SPS G09 Cagle Connection and Termination-SPS Garage G09-Washington Men ue 100% 314-Sep23 18-Sep-2: A7'165 SPS.G09 Establish Norway+Cone-numerals-SPS Garage G09-Washngton Avenue I 00 3 19-Sep 23 21-Sep-2: Testing and Integration 0% 579 14•Map24 1342ee.05 401 ♦ ` I . Commissioning Test•DecoGulde Son wain lr- e . - • As 100501CI ATMS Commissonng Test DecOGude Software Dry Run(NOT REQUIRED) 0% 0 14-May-24 14-May-24 ,120 I A8.1010.OICT.ATMS Prepare/Submit Test Report•Coenassionng Test-DecOGuide Software(NOT REQUIRED) 00. 0 14-May-24 14-May-24 •120 I A81020.OICT.ATMS VaMate Punch Lai hems.Commssonng Test•Dec00uoe Software(NOT REQUIRED) 01'. 0 14-May-24 14-May-24 -120 I A8.10000ICT.ATMS Commissoneg Test.DeeSGuide Software(NOT REQUIRED) 0% 0 14-May-24 14-May-24 119 I AB 1030 OICT.ATMS COMB RevrewsrAppoves Test Report Commesrentng Test•000800de Software(NOT REQUIRED) 0% 0 14-May.24 14-May-24 -119 Oee0Gulde Software-Go-Live(Operational System In Production 6 Ready for Device SATs ,. '4.0ray 14 1 r • AB 109C.ATMS Ga-Lrve(Operational System n Production A Ready for Devoe SATs,•DocOGuide Sollware 0% 1 14-May-24 14 May•224 1/5 I Sterol Mon er T,»its ,u0 11'Sep-24 29-May.25 402 ♦ - .77 nteation Netwteh 0% 72 12-Sep-24 22-Nov-24 -202 P'omm• • Slrn!Al,na Torus r SAT'.t•W,rtie so CumroenK:lir,n Nriwtrk-N"nh R4Lscee Tr-ws r(De-.a,.. • Ad'030 WISE 01 Stand Alone Test(SA71 Wlees,Gommuncalan Network Iower 01 North Rebecca Tower(Des0Oped) 0% 0 12-Sep-24 12-Sep-24 -170 A8 Wit nnwc 1040 WIRE Or Prepare/Submit Test Report�Stand Alone Test(SAT) Weless Cornal Network nn Tower 01 0%North Rebecca Towe 0 12-Sep-24 12-Sep-24 -146 I r owe Atwnn Ceea Awn - Actual worn Data Date:31-Jan-24 COMB DBOM ITSSPS Sehedsde Update U24.0.W2013124DD 2024-03-2a Sept taee.ro arame seed..an nearer see O Remaining Work 2024-06-20 Added Missing 2yr TE 14.ee.21 cowman umaeaa,.ro.e a r.oroosa-a01401447too Nor Project Start Date: 19-Jun-19 e15w.r22 nmaed Pewsnw mi me irrp,ur o0 r.nssened aeJ Creiicar Remaming Work Full Blown Schedule Tpn.22 Ps aps44a4med ew,,.ude,;,in..Kt..1 4242200 NMJ ♦ ♦Wes tone 7 RA C�I>C Project Finish Date:22-Dec-25 Pap 63of76 Dow,-a n.osrae.nwea,w.v ea eaeeemwteo.20500*v NPM W�•Summery I J /\L, *Nor 23 xba4a1.4. dau240snam O w4J 20.N..24 WV,.Vd4e4 V7e0 W 20111N09 NMJ TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 013124D0 2024.03.26 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK titer All Activities Activity W Activity Name DUI% At Complete Stan Finish Total Float 2024 2025 Comp Dur 01 02 03 04 01 02 03 04 ' AB.1050.W IRE.01 COMB Reviews/Approves Test Report-Stand Alone Test(SAT)•Wireless CommunmalIOn Network Tower 01-North Rob 0% 0 12-Sep-24 12-Sep-24 -146 I and Alone Tests(SATs) V1ueler, - .- - n ,c-:tta.. • • AB 1030.WIRE 02 Standalone Test(SAT),Wireless Communication Network Tower 02•Courtci Tower(Descoped) 0% 0 12-Sep-24 12-Sep-24 -178 I A8 1040.WIRE 02 Prepare/Submit Test Report•Standalone Test(SAT)-Wireless Communication Network Tower 02-Council Tower(Desc. 0% 0 12-Sep-24 12-Sep-24 -146 ' I A8.IC50.WIRE.02 COMB ReviewsIAppr oyes Test Report Stand None Test(SAT)-Wreless Communication Network Tower 02-Courted To 0% 0 12-Sep-24 12-Sep•24 -146 1 weeny `Stand:.1..n,-T,tits(SATs)•Vim lens C:rumenn..,hon Netw'-rk-MrannSe.,ch r+.her 7.;:anment(RtBPD)Tow - - A8.1030WIRE.03 Standalone Toot;SAT).Wifeless Communication Backbone Mare,Beach Police Dept Tower 0% 2 23.Sep-24 24.Sep.24 -185 A8.1040.WIRE.03 PrepareiSubme Test Report-Standalone Test(SAT)-We eless CornmAn'calan Backbone-Mans Beach Police Dept T 0% 5 25-Sep-24 01.Oct-24 •185 0 1 Al.1050 WIRE.03 COMB Reviews/Approves Test Report Stand None Test(SAT)'Wreess Communication Backbone•Miami Beach Poke 0% 15 02-Oct-24 22-Oct-24 -1135 . Egg-1 Amn s's i,-I+ )Arsl•1' ele55 Common canon N. City Ha Canoe Towe .. gem, AB.1030.WIRE 04 Standalone Test(SAT)•Wireless Common-baton Backbone-City Hall Garage Tower 0% 2 13-Sep-24 I6-Sep-24 181 A81040.WIRE.04 Prepare/Suomit Test Report Standalone Test;SAT) Wireless Communication Backbone Coy Hell Garage Town 0% 5 17 Sep-24 23-Sep-24 179 0 A81050.WIRE.04 COMB Reviews/Approves Test Report-Stand None Test(SAT) Wreless Communicallon Backbone-Cey Hall Garage T 0% 15 24-Sep-24 14•001•24 179 • solim1 ..i 7 . ,.to ISATs)-Wr41c,S C'-mnlun,C1trin Narw:W•Tows:1 Ceetarmmurn IM`cAnnur Cswy rimy A8.1030.WIRE.05 Standalone tell'SAT) Wireless Commamcaton Backbone Tower 41 Condos 0% 2 03-Oc1•24 04-Oct-24 -193 1 A8.1040.WIRE 05 Prepare/Submit Tact Report-Stand Alone Test(SAT)-Wireless COrnmun,cation Backbone-Tower 41 Condos 0% 5 07-Oct-24 11-Oct-24 .193 0 AB.1050.WIRE.05 COMB Reviews/Approves Test Report-Standalone Test(SAT)-Wireless Communication Backbone-Tower 41 Condos 0% 15 14-Oct-24 01-Nov-24 -193 12121 gam, A8.1030 WIRE 06 Standalone Test(SAT)-Wireless Commumcatan Backbone-Park View Ponti Tower 0% 2 23(Oct-24 24-Oc1-24 •207 1 A81040.WIRE 06 Prepareloubm4 Test Report•Standalone Test(SAT)-Wireless Communication Backbone-Park View Pant Tower 0% 5 25-Oct-24 31•Oct2d -206 0 A8.1050.WIRE.06 COMB Reviews approves Test Report Stand Atone Test t TAT: Wireless Communication Backbone Park View Pectin 0% 15 01•Nov-24 22-Nov-24 -207 1212 4 = Stand Atone : Ts)-MVOS 0*: gem. f MVPSr-S.We. it Clwy Hone Vial 1 WI A91030.MVDS05.VC Standalone Test..SAT; MVOS 05 ve+Mran CswyrOade Swd 03, 1 12-Sep-24 12-Sep-24 170 I A8 t o40.MVOS.05.VC Prepare/Subrrre Test Report-Standalone Test(SAT).MVOS 05-Venetian CswyDade Blvd 0% t 12-Sep-24 12-Sep-24 •163 I A8.t050.MVDS.05.VC COMB Reviews/Approves Test Report-Stand/One Test(SAT).MVOS 05-Venetian CswylDede Bled 0% 15 13-Sop-24 03-Oct-24 -163 1x�.-. . - , t. - lima, A8.1030.MVDS.0I MC Standalone Test(SAT)•MVOS 01-MacArthur Cswy/AtM-41/51h St 031. 1 12-Scp24 12-Sep-24 -170 I P13.1040.MVOS.01.MC Prepare/Sabine Test Report-Stand Hale Test(SAT)-MVOS 01-MacArthur Cswy/AtN1-4115th St 2% 5 13-Sep-24 19-Sep-24 -168 S A8 1050.MVDS.08.MC COMB Reviews/Approves Test Report-Stark/Alone Test(SAT)-MVDS 01-MacArthur Cswy/A1 NI.41/5th St 0s: 15 20-Sep24 10-Oct-24 -168 C23 ra A8.1030.MVDS 03.MC - Standalone est(SAT)-MVOS 03-MacArthur Cswy7AlM-41151h St 0% 1 16-Sep24 16-Sep-24 -170 I A8.1040.MVDS 03.MC Prepare/Subrtta Test Report-Stand Alone Test(SAT)-MVOS 03-MacArthur Cswy/A1 NI-4115th St 0% 5 16•Sep24 23•Sep24 -170 - 0 A8.1050.MVOS.03.MC COMB Reviews/Approves Test Report-Standalone Test(SAT)•MVOS03-MacArthur Cswy/A1 Nl•41;51n SrSt c 15 23-S p-24 14-Oct-24 -170 - Ta MVUJ 02 A110,H. AST 030.MVOS.02.AR Stand None Test(SAT)-MVOS 02•Aloe Rd 0% 1 13•Sep24 13-Sep-24 .•170 A8.1040.MVOS.02.AR Prepare/Submit Test Report-Standalone Test(SAT)-MVDS 02-Moe Rd 0% 5 13-Sep-24 20-Sep-24 -169 0 AS 1050.MV05.02.AR COMB Reviews/Approves Test Report-Standalone Test(SAT)-MVOS 02-Mon Rd 0% 15 20-Sep-24 11-Oct24 -169 - AB 1030.MVDS 06.AR Stand Alone Test(SAT)-MVDS 06-Alan Rd 0% 1 13-Sep-24 13-Sep-24 170 I A8.1040 MVOS06 AR Prepare/Subml Test Raped•Stand None Test(SAT)•MVDS 06-Alton Rd 00'k 5 16-Sep•24 20-Sep-24 -169 0 A8.1050.MVDS.06.AR COMB Revlews7Approves Test Report-Standalone Test(SAT)-MVOS 06-Mon Rd 0% 15 23-Sep-24 11.Oct24 -169 EZI - A8.1030.MVOS.I7.AR Stand Alone Test(SAT)-MODS 17-Alton Rd 0% 1 16-Sep-24 16-Sep-24 -170 I A8.1040.MVOS.17 AR Prepare/Submit Tosl Report Stand None cost(SAT)-MVDS 11-Man Rd 0% 5 17-sop24 23-Sep-24 •170 0 A8.1050 MVD5.17 AR COMB Reviews/Approves Test Report-Stand None Test 1SAT)-MVOS 17 Mon Rd 0% 15 24•Sep24 14.O0t24 -170 CO WI 481030 MOD.02 WA Stand Alone Test(SAT) MVDS 04•Washington Avenue 0% I 17- :p24 17-Sep-24 -t68 I Da. n.inar 01.05.4 Nem, AcIuN Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-28 Sent '60n4 Rasa..Scea4s ea oantwo eau I Remaimrtg Work 2024-06-20 Added Missing 2yr TE 10Nw-Or e.44r.dueODna.,.o0m0,e.ArOOW WO 0.1.0rOS OW Project Start Date: 19-1un-19 oea.ea timer.4 Roo.lee a uwo era.rul7.000eN®ho sea ammo Critical Remaining Work Full Blown Schedule aorta 0r Name le do ctee Matt tt IMMO Me • •Milestone RE Project Finish Date:22-Dec-25 Fag,h1ar76 %erra a.paselern..4e.ar apineeweMee2oloawo sea MO Tr Summary ' I' . \-'a RNw,a sawn.,u owo UXe s n2p]Do MO m au.n UAW.ulat.U74.W>er3r2400 Sea TCC-COMB Progress Schedule Update COMB DBOM ITSSPS Schedule Update U24.0.1M2 01312400 2024-03-28 Seal 2024.0S-20 Added Missing 250 TE 20•Jun-24 TASK Bier AU Actuates Aclvey ID ACIrvIy Name 1 Our% At Compete Start Finish Total Float 2024 2025 Comp De 01 I 02 I 03 I 04 01 I 02 ( 03 j 04 ' A8.1040.MVDS,02.WA Propare/Subme Test Report-Standalone Test(SAT)•MVOS 04•Washingtm Avenue 0% 517•Sp24 24-Sp24 -147 0 A8 1058 MOO;02 WA COMR Rev,ews:Approv es Tns•Report•Stand None Test(SAT'•MVOS Ole.Wa4inglon Avert, 0% 15 17•Sep.24 08-Oc1-24 -166 Ill Stand Alone Teals(SATs)-CCTV row CCTV'•S•Jull•Tutll:Cswy 1 J5W :1::.a.h t 1:fall,.G-'l,.t•Rd A Al 1030 CCTV 05,'C Stand Alone Ted ;SAT,•CCTV 05 Juia Tuttle Cswy/195AN 41s1 505R112i2lhur Godlred Rd 0% 1 12-Sep-24 12-Sep-24 •173 A8 1040 CCTV 05 JT.7 Prepare/Subme Test Repon•Stand None Test(SAT)•CCTV 05•Julia Tutle CswyI195/W 41st SUS11112/Arlhur Godhe 0% 1 12-Sep24 12-Sep-24 -163 t A8.IOSOCCI V 051,C COMBReviews.Appro.es lest Report Stand None Test(SAT)-CCTV OS•Julia Tuttle Cswyil9SW.41st St/5R112'Art111 0% 15 13-Sep-24 03•Oct24 •163 Me ,:c1: .l.,li,1,I1,-1.-.•v,1:-':: _.::i,t'::41l,rC Oil..I-I Al 1030 CCTV 06 JTC Slone None Test i,'SAT,-CCTV 06-Atha Tuttle Cswyl195/W 41st 5VSR112/Arlhur Gedlred Rd 0% 1'13-Sep-24 13-S.p•24 -173 I A8.I040 CCTV.06.JTC Prepare/50Ome Telt Report Stand None Test(SAT) CCTV 06 Jule Tuttle Cswy/19588/4lst SI/SRN2/Arthse Godlre 0% 1 13-Sep-24 13-Sep-24 •164 1 ' A8.1050.CCTV 06.JTC COMB Reviews/Approves Test Report Stand None Test(SAT, CCTV 06 Juia Tonle Cswyl195M/.41st SVSRII2/Nee 0% 15 18-Sep24 04-Oct-24 •164 : e. , 11u111C C..rr 195'., tt re to 3i',2 Arthur 1d1n•1111• A . A8.1030.CCTV.25.JTC Stand None Test(SAT) CCTV25 Julia Tuttle Cswyl195IW.41st SVSR112/Nthur Godred Rd 0% 1 16-Sep24 16-Sep-24 •173 ' 1 A8.1040.CCTV.25.JTC Prepare/Sul:mi Test Report-Stand Alone Test(SAT)•CCTV 25•Juke Tuttle Cswy1195AN 41st St/SR112/Artlur Godlre 0% 1 16-Sep-24 16-Sep-24 .165 1 A8.1050.CCTV.25.JTC COMB Rovews/Approves Test Ropoel•Stand Alone Test(SAT)•CCTV 25•Juia Tonle Csw)1l96/W 41lit SVSR112/A/th1 0% 15 17.Sep24 07-Oc1•24 •165 IN • 50014IRS�:.1,.,�.v....:;ilia, ,u•..d r-. re A8.1030.CCTV,26.JTC S',and None Test(SAT)•CCTV 26•Julia Tuttle Csry/195/W.Clot SUSR1121NB.w Cadres!Rd 0% 117-Sep-24 17-Sep-24 -173 I A8.1040 CCTV26.JIG Prepare/Subml Test Report Stand Alone Test(SAT)•CCTV 26.JAM Tuttle Cswy/1951W 41st SVSR1l2/Arlhur Godlre 0% 1 17-Sep-24 17-Sep-24 .ISO I A8.1050.CCTV.26.JTC COMB Reviews/Approves Test Report•Stand None Test(SAT)•CCTV 26-Jugs Turtle Cswy/195(W.41st SVSR112/Nm1 0% 15 18-Sep-24 08-0c1.24 .166 Ell 'tlt•T,,"l.CsIvy 1:'.t•1 It•- ,.:,I1.1.,11,irt 11-.111,•,r:1 ^17 A8.1030.CCTV29.JTC Stand None loll SAT) CCTV 29-Juia Tuttle Cswy/195A8/.41lit SVSR112/Nlhor Godlred Rd 0% 118-Sep-24 18•Sep-24 -173 I A8.1040 CCTV.29.JTC Prepare/Submit Test Report-Stand Alone Test(SAT)•CCTV 29•Juba Tuttle Cswy/195tW.4151 SVSRI I2/Arlhur G0dhe 0% I 113.Sep24 18-Sep-24 •167 1 A8.1050.CCTV 29.JTC COMB Renews/Approves Test Report•Stand Abe Test(SAT)•CCTV 29•JAM Tuttle Cswy/195AN.41st SUSR112/Armt 0% 15 19-Sep-24 06-041-24 •187 • '1.4/ A8.1030.CCTV12.VC Stand None Test(SAT)• TV12 Venetian Cswy/Dade Blvd 0% 1 19-Ssep24 1.- • 4 -1- I A8.1040.CCTV.I2.VC PreparelSublee Test Report•Stand Alone Test(SAT)-CCTV 12-Venetian Cswy/Dade Blvd 0% 1 19-Sep-24 19•Sep24 -Ise I A8 1050 CCTV.12 VC COMB Renews/Approves Test Report-Stern Aisne Test(SAT)-CCTV 12-Wrelun Cswy/Dade 14wd 0% 15 20-Sp24 10•Oc1.24 .168 Iiill CCTV 13-Wnrlian Ct./_a,-. .• - ^• AN ts30 rat,-v IV:-: Stand None Test(SAT)• CTV 13-Venetian Cswy/Deee Blvd 0% 1 20-Sep-24 20-Sop-24 -173 I A8,1040 CCTV 13 VC Prepare/Sobna Test Report-Slane None Test(SAT)-CCTV 13•Venetian Cswy/Dade Blvd 0% 1 20-Sep24 20-Sep-24 •169 I `' A8.1050.CCTV.13.VC COMORevtews/Approves Tell Report•Stand None Test(WI•CCTV 13•Woollen Cswy/Dede Blvd 0% 1523-Sep-24 11•Oc1.24 .169 (7) • ,r-T.- .. i. ., ._, a, fie' v A8.1030 CCT V.21 VC Stand Alone Test(SAT)-CCTV 21-Venetian Cswy/Oade Bud 0% 1 20-Sep24 20•Sep-24 -173 I A8 1040.CCTV 21 VC Footsore/SAWS Test Report•Stand Alone Test(SAT)-CCTV 21•Wl nen Cswy/Dade Bloc 0% I 23•Sep-24 23-Sep-24 -170 I Ae.1050.CCTV.21.VC COMB Reviews/Approves Test Report•Slane None Test(SAT)-CCTV 21-Venetian CSwyiDade Blvd 0% 15 23-Sep-24 14-Oc1-24 -170 (M A8.1030.CCTV 23 VC Stand None Test(SAT).CCTV 23 Venetian Cswy/Dele Pod 0% 1 23-Sep-24 23-Sep-24 ,173 I A8 I040,CCTV 23.VC Prepare/Submit Test Repoli.Stand Alone Test(SAT)•CCTV 23-Venetian Cswy/Oade Sod 0% 1 23 Sep-24 23-Sep-24 -170 I Ae.1050.CCTV.23.VC COMB Reviews/Approves Test Ripon-Slane None Test(SAT)•CCTV 23•Venetian Cswy/Dade Blvd 0% 15 24-Sep24 14-Oct-24 •170 Mil 1.B A8 1030.CCTV.11.I7S Stand Mono Test(SAT)•CCTV 11.171h St 0% 1 23-Sep-24 23•Sep-24 173 I 48 1040 CCTV 11.17S Prepare/submit Test Retort-Stand None Test(SAT)-CCTV 11•170)St 0% 1 24•Sp24 24-Sp24 .171 I Ari lnx;CCTV.1l.17S COMB Renews/Approves Test Report Stare Acne Test(SAT1 CCTV 11 17m St 0% 15 24-Sep-24 15•Oct-24 171 Nil • WV A8.1030.CCTV20.17S Stand None Test(SAT)-CCTV 20•17th St 0% 1 24-'.p24 24.- •.24 •173 1 A8.1040 CCTV 20 ITS Prepare/Subme Test Report-Stand Aisne Test(SAT)•CCTV 20•171h St 0% 1 24-Sep24 24-Sep-24 -171 ' I AP 1050 CCTV 2J.17S COMB Rev,ews/Appraves Test Repon Stand Aisne Test(SAT)•CCTV 20-17th St 0% 1125-Sap.24 15•Oct-24 -171 BM 'Coy I, ..:A,111..,Cy A,A:41,, I WI A8.I030 CCTV 15.MC St anal Norte Test(SAT)-CCTV 15-MacMlur Cswy/A1 M-41/51R St 0% 1 24-Sep 24 24-Sep-24 -173 1 Dm e.Aslo, CM ANI Nero. Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 0131240D 2024.03-211 Seal woo.it, Ewe,.sdwe sotto ammo w. 1 1 Remaesng Work 2024-06-20 Added Missing 2yr TE 111.410.-21 Cnr0MI1JeWeR.[w pool• roUt1O5R-Bm0000atl00 lees Project Start Date: 19-Jun-19 we_-a wa...BRwimeweNAJNMM Wpm,U170.SUR/s4 NMl COMM Remaining Work T Full Blown Schedule not,: Reposed Remo,B a/NeNJ.d.e Oral MOW..14e4ao0 NW • •M4eslone / O S RE Project Finish Date:22-Dec-25 Yap At0(76 O May a lip..0R.w edseenvwe.t,.noMc.raeaoo Na/ >t�Summer / /\ \C„ w-Naa 6dWSUedosuaas.mlmd NMJ y mMrn S.W.A/0.I.1M a$rr21'M0 NN1 20anN S,we..Ud..MUNe W201a12eJa NM. - TCC•COMB Progress ScheduN Update COMB OSOM RSSPS Schedule Update U24.0.W2 01312400 2021413•26 Sent 2024-06-20 Added Missing 2yr TE I 20-Jun-24 TASK tater Al Ationdes 1AcOeBy ID Acliv4y Name Du% At Comptete Start Finish Total Float 2024 2025 1 Comp Dur 01 I 02 I 03 I 04 01 I 02 [ 03 I 04 ' A8.1040.CCTV.15.MC Preperet5,.bmn Test Report.Stand Alono Test(SAT)-CCTV 15-MacArthur CswytAr M•41/51n SI 0% 1 25-Sep-24 25-Sep-24 •172 AB.I050.CCT V 15 MC COMB RovrewslApproves Test Report•Stand Alone Test(SAT).CCTV 15•Ma1Mhur Cswy/A1M•41/5th St 0% 15 25-Sep24 16-Oct-24 -172 ' BD 'CTV 16 MacArthur Cs.-.J Al A,.15. Tr Al 103C CCTV 16 MC Stand None Tent(SAT) CCTV 16 MacArthur Cswy'AtM-41,51h St 0% 1 25-Sep 24 25-Sep-24 -173 I A8.1040,CCTV 16.MC PreparelS;,bm4 lest Report-Stand None Test(SAT)-CCTV 16•MacAMhur Cswy/A1A/I-41/5lh St 0% 1 25-Sep-24 25-Sep-24 -172 : I A8 1050.CCTV 16 MC COMB Rew tws,Approves Test Report•Staid Mono Test(SAT)-CCTV 16•MacArthur CswytA1M•41/50 St 0% 15 26-Sep24 16-Oct•24 •172 O CCTV 17.M.xtul till,C-.wy:•1i.!41 51,1::1 le A8 103C.CCTV MC „and None Test(SAT)-CCTV 17-MacArthur Cswy/A1A1•41,5th St 0% I 25-Sop24 - .24 1 I AS.1040.CCTV 17 MC PreparelSubma Test Report•Stand Alone Test(SAT)-CCTV 17.MacArthur Cswy/A140-41/5th St 0% 1 26-Sep24 28-Sep-24 -173 I A8.1050.CCTV 17MC COMB Revtews/Approves Test Report•Stand Alone Test(SAT)•CCTV 17 MacMIwr Cswy/A1M-41,511 SI 0% 15 26-Sep24 17.Oct-24 -173 O r.I A8103C.CCTV 118MCc Stand None Test(SAT)-CCTV IB-MacArthur Cswy/A1M-41/51h St 0% 126-Sep.24 26. ep-24 •1 I A8.104C CCTV 18.MC Prepare/Submit Test Report-Stand Alone Test(SAT)•CCTV 18•MacArthur Cswy/A14/1•4 t:5th SI 0% 1 26-Sep-24 26-Sep-24 -173 1 A8.1050.CCTV18.MC COMB Reviews/Approves Test Report Stand Alone Test(SAT) CCTV 18 MacArthur Cswy/A1M-41/51h SI 0% 15 27-Sp.24 17-0c1.24 .173 A8 103C CCTV O%.AR Stand Alone Test(SAT)-CCTV 07-WW1 Rd 0% 1 12-Sep-24 12-Sp-24 -173 I M.1040,CCTV 07 AR Prepare/Submit Test Report-Stand Alone Test(SAT)-CCTV 07-Man Rd 0% 1 13-Sep-24 13-Sep-24 -164 I A8,1OSO.CCTV.O7AR COMB Reviews/Approves Test Report-Stand Alone Test(SAT)•CCTV 07-Mon Rd 0% 15 13-Sep-24 04-O0-24 -1M ' NS Al.1030.CCTV 08 WA Stand None Test(SAT)-CCTVOB•Washington Avenue 0% 1 13-Sep'24 13-Sep-24 -173 I AS.1040 CCTV.08 WA Prepare/Submt Test Report-Stand Alone Test(SAT)-CCTV O8-Washigto1 Avenue 0% 1 16-Sep-24 16-Sep•24 •165 1 A8.1050.CCTV.08.AA COMB Reviews/Approves Test Report•Stand Alone Test(SAT).CCTV 08•Wesrargbn Avenue 3% 15 16-Sep24 07-Oc1-24 -165 O W. A8.1030.CCTV09.WA Stand None Test(SAT).CCTV 09-Washington Avenue 0% 116. •24 16-Sep-24 •173 1 A9.1O40 CCTVO9 WA Prepare/Subn.A Test Report-Stand Alone Test(SAT)-CCTV 09•Washnglal Avenue 0% 1 17-Sep-24 17-Sep-24 •166 1 A8 1051,CCTV O9 WA COMB Reviews lApprov es Test Report-Stand Alone Test(SAT)•CCTV 09•WesNngbn Avenue 0% 15 17-Sep 24 06-Oct•24 •160 0 CCTV is `7lr.shn',tun:.r, - . AS'TIC CCTV.r WA Stand None Test(SAT)-CCTV 10-Washington Avenue 0Y. 1 17-Sep 24 17-Sep-24 173 I A81(Wr(-CT'/ 'WA PreparetSubma Test Report•Stand None Test(SAT)•CCT V 10-Washngton Avenue 0% 110-Sep-24 1e•Sp•24 .167 I COMB Revews/Approves Test Report-Stand Alone Test(SAT)-CCTV 10-Wasra,gmn Avenue 0% 15 15-Sep-24 09-Oct•24 •167 O CCTV 14-Vlly inn-,ten:.1•• WV 45•03C CC'V.4 WA Stand None Test(SAT)-CCTV 14•WashngtonAverue 0% 1 18-Sep 24 18- .•24 •173 1 n.d twt(;CT v'4'.VA PrparelSubmr Test Report-Stand Non°Test(SAT I-CCTV 14 Was langlln Avenue Otl. 1 19-Sep-24 19-Sep-24 •168 1 Ag 10SC CCTV 14WA COMO Reviews/Approves Test Report Stand None Test(SAT) CCTV 14-Waslergbn Avenue 09'. 15 15-Sep24 10-Oct-21 16B (� CCiV Ir-I'la sn�n 1 .isen nN In AB.1036 CCTV 19.W A Stand None Test(SAT)-CCTV 19-Washngton Avenue 0`Y° 1 19-Sep2d 19-Sp-26 173 1 A8.1040.CCTV 19.WA Prepare/Subm4 Test Report Stand Mau Test(SAT) CCTV 19-Was hnglon Avenue 0% 1 20-Scp2d 20-Septa 169 I AB 105C CCTV 19 WA COMB Rss.ews]Appeoves Test Report 51enG Alum Test 1SAT1 CCTV 19 W4s'.,5e1,Ay ei uc 3•. 15 71 Sep 24 11-O�'1 24 169 O Stand Alone Tests(SATs).ADMS "' ' �-' 0% 256 12-Sep24 27-M -25 -� V hCu't.),-' I/-MIf I,Cv vy i► A8.1030 ADMS 09 NBC Stand None Test(SAT)-AOMSOS-North Bay Cswy 0% 1 25-F°tr25 25-Feb-25 -305 I Al INC ADMS 09 NBC Prepare/SON-nil Test Report-Stand Alone Test(SAT)•ADMS 09•North Bay Cloy 30. 5 26-Feb-25 04-Mar-25 -279 A8.105C ADMS n9 NBC. COMB Renews/Approves Test Report-Stand Alone Test(SAT)•ADMS 09-North Bay Cswy 0% 15 05-Mar-25 25-Mar-25 -260 IIIII ' lime AST 030.AOMS.16 NBC Stand None Test(SAT)-ADM516.North Bay Cswy 3% 1 23-Apt-25 23-Apt-25 -330 I Al 1040 ADMS 16 NBC Prepare/Subm4 Test Report-Stand Alone Test(SAT)-ADMS 16•North Bay Cswy 3% 5 24-Apt-25 30-Apr 25 -320 0 A8 1050 ADMS 16 NBC COMB Reviews-Approves Tell Report Stand None Test(SAT) ADMS 16 North Bay Cswy 3% 15 01-May-25 21-May-25 -320 O 4 1DMS0i Jul,a Tut(c Cswy 19S1A,41 C 9 SRO 2 Arthur Go111,ed 1- W7 A8.103C ADMS 02 JTC Stand None Test(SAT) AD MS02.Juba TM* awy/195AV.41st• -112/Mhur Codked Rd 0% ° 20Feb-25 20-Feb-25 -304 0a. Armes Ch Je4 Al►ar- MIN Actual Work Data Date.3l-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024-03.26 Sent flee,e eneram.9901oalnnn ODe I I Remaining Work 2024-06-20 Added Missing 2yr TV. ilia.,21 CarweuArnsseyc.eo.-.uI50.5R-emo0931.00 est Project Start Date: 19-Jun-I9 eeer .to Ramses oMne..e,wpuae Mew 111COSIM 010 MCI Critical Remaning Work /'�� Full Blown Schedule A00.2 P. n. A.es.ee..e.weJtoe.<.0F.n.90,1029,200 - Mel • •Weston° �n /A, S( / �Rc Project Finish Date:22-Dec-25 r.ae 66 nr 76 0000,0 Rww Rmsea s9.we000co.nwea.2 mr®o0 NUJ NW �1 Summary "/l �l_/ C.` ae14..23 fea0419 Oh*UN Os 11,11360 NW ala.N 3c9961,0sUpOes UN 0020r31N1e N44 TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update 1.124.0.W2 017124DD 2024.07.20 Sent 2024-06-20 Added Missing 2yr TE 20-Jun-24 TASK inter All Achedles Aetivty 10 Actively Name Our% Al Complete Start -Finish Taal Float 2024 2025 Cane Our 01 I 02 I 03 I 04 01 I 02 1 03 I 04 AB 1040 AOMS02JTC Preper&Subne Test Report-Sland None Test(SAT).ADMS 02-Julia Tuttle Cowy/195M/.41st 56SR112/Araha Oodles 0% 5 21-Feb25 27-Feb-25 -261 0 A8.1050.ADMS 02 JTC COMB Renews/Approves Test Report•Stand None Test(SAT)-ADMS 02 Jute Tuttle Cswy/1951W.41st SUSR112/Artht 0% 15 21•Fete25 13-Mar-25 -272 O :,Dr,.. ;I a Tuwee Cswy 19SW.4151 St 5R112 Antnur Godlred 1( • A8.1030.ADMS',I JTC Stand None Test(SAT) ADMS 1) Jo4a Tuttle Cswy/195/W.41st SUSR112/ArOtur Go08ed Rd 0% 1 08-Feb-25 08-Feb-25 -297 A8.1040.ADMS 11 JTC Prepare/Submit Test Report-Stand None Test(SAT)•ADMS 11•Julia Tuttle Cswy/195AV.41st SI/SR112/Arthur Godlre 0% 5 07-Feb-25 13-Feb-25 -252 : 0 A81050.ADMS t 1 JTC COMB Reviews/Approves Test Report Stand None Test(SAT)-ADMS 11-Julia Tuttle Cswy/195rW clot SVSR112IMlw 0% 15 07-Feb-25 27-Feb-25 -282 CIO ..Dins 12-Jura Lunn Cvwy 195 1V:11 A J:R 112 Anh.tt Godllod R r=e A61030 ADMS'2 JIG Stand None Tesl,'SA") ADIOS•2 Juba Tuttle Cswy/195AN.41st SUSRt12/Arthor Godlred Rd 0% 117-Apr-25 17-'•-25 1 A81040 ADMS 12 JTC Prepare./Sutxrd Test Report-Stand None Test(SAT)-ADMS 12•Julia Tuttle Cswy195lW 41 st St)Rtt 2/Mhur Godlre 0% 5 la-Apr-25 24-Apr.25 -301 D A8,1050.ADMS)2 JTC COMB Reviews/Approves Test Report.Stand Nona Test(SAT)•ADMS 12-Jule Tuttle Cswy/195AN.41st SI/SR112Artlt 0% 15 18-Apr-25 09-May25 -312 0 ,.OMS 2e JJha Tuttle Cswy 195\': .... .t... 111 Ae 1030.ADMS.26.JT; Stand Alone Test(SAT)-ADMS 26-Julia Tuttle Cswy/195/W 41st SVSR112/Ar1hur Godued Rd 0% 1 04-Ap-25 07•Apr•25 -324 I A5.1040.ADMS 26 JTC Prepare./Sub o Test Report Stand None Test(SAT) ADMS 26-Juka Tuttle Cswev195/W 415t SUSR112/Mha Soder 0% 5 07-Apr-25 14 Apr•25 293 0 A81050.ADMS.26.JIG COMB Reviews/Approves Test Report Stand None Test(SAT)-AOMS 26 Jule Tuttle Cswy/195/W.41s1 SUSR112Ntht 0% 1507 Apr-25 29•Apr-25 304 iza . • ... .Tutor CswyNV 195 41 4 St SR,1Art,/Artr Codlred R IP., A8.1036 ADM`2 J1_ Sand None test SAT) ADMS 2'-Jule Tuttle Cswy/195W 41st SVSRr12/Mnur GOdlred Rd 0% 1 08-Apr-25 t-- •-- --4 . 1 A81040 ADMS.27.JTC Prepare/S/brrd Test Report-Slant None Test(SAT)-ADMS 27-Jobe Tuttle C5wy195W 41st SUSR112/ArMu Godlee 0Y. 5 09-Apr-25 15-Apr-25 -294 0 A8.t 050.AOMS.27.JTC COMB Reviews/Approves Test Report Stand None Test(SAT)•ADMS 27•Juba Tuttle Cswy/195/W.41s1 SUSR1/2'A•Iht 0Y. 15 09-Apr-25 30-Apr-25 -305 O ry A8.1030.ADMS 13 VI' Stand Nonce Test(SAT)•ADIOS 13-Venetian CswyDade Blvd 0% 1 18-Apr-25 22-Apr•25 "330 0 A81040.ADMS 13.VC Prepare/Submit Test Report•Stand Alone Test(SAT)•ADMS 13-Venetian CsweeD ale Bind 0% 5 22-Apr•25 29-Apr-25 .319 0 ABA 050.ADMS.13.VC COMB Revtaws/Mprov es Test Report-Stand Alone Test(SAT).ADMS 13•Venetian CswyDade Bard 0% 15 2940.-25 20-May-25 •319 p '3-- •side Et. • A8.1030.ADMS.32.AC Stand Alone Test(SAT)-ADMS 32-Venetian awytDade Blvd!(Dese0000) 0% 0 12-Sep.24 12-Sep-24 -202 ' I A8 1040 AIMS 32 VC rreparetSubmn Test Report-Stand Alone Test(SAT)•ADMS 32•Venetan Cswy/D ad Blvd!(Descoped) 0% 0 12-Sep24 12-Sep•24 138 t I AS 105U AIMS 31 VC COMB Rev)ews/Approves Test Report-Stand Alone Tao(SAT)-AOMS 32•Venetian CswyDade Blvdt(DescOpedl 0% 0 12-Sep-24 12-Sep-24 -137 - I immr AB.1030 ADMS.33 VC Stand None Test(SAT)•ADMS 33•Venetian Cswy/Dade Blvd 0% 1 24-Apr-25 25-Apr-25 •31 I Art 1040 AIMS 33 VC Prepare/Submo Tel Report•Stand Alone Test(SAT)•ADMS 33•Venetian Cswy/Oade gee 0% 5 25-Apr-25 02-May-25 -322 B A8 1050 AIMS.43 VC COMB Revrws'Approves Test Report-Stand Aone Tost(SAT)•ADMS 33-Venetian CswyDade Bled W. 15 02-May-25 23-May-25 -322 Mil rA8.1030.ADMS 34.VC -Stand None Test(SAT/-AD .34-Venetian swyrOade Blvd 0% 1 26-Apr-25 28-Apr-25 -331 I A8.1040 ADMS.34 VC Prepareioubmn Test Report-Stand Alone Test(SAT)-ADMS 34 Venetian Cswy4Oade Bea 0% 5 29•Apr-25 05-May25 -323 0 A3.1050 ADMS 34 VC COMB Reviews/Approves Test Report-Stand Alone Test(SAT)•ADMS 34•Venetian CswyDade Bred 0% 15 06-May-25 27.May-25 •323 661 •;DMS 06•LintArthur CswyA1 A I.4•SIn . rim♦ A8.11330 ADMS 06.MC Stand None Test(SAT)-AD MS 06-MacArthur Cswy/A1M•411581 St 0% 1 21-Feb25 24-Feb-25 -305 0 A8 1040 ADMS 06.MC Prepare/Submit Test Report-Stand None Test(SAT)•ADMS 06-MacArthur Co sy/AIM-41/51h St 0% 5 24-Feb-25 03-Mar-25 -278 0 A8.1056 AIMS.06.MC COMB Reviews/Approves Test Report-Stand Alone Test(SAT)•ADMS 08-MacArthur Cswy/AtM•41/511t St 0% 15 03-Mar-25 24-Mar-25 -279 O •te A8.1030 ADMS 07 MC Stand None est(SAT) OMS07 MacArthur Cswy/AIM 41/5th Si 0% 1 18-Oct24 18-Oct-24 -227 AP.1040.ADM5.0T.MC Prepare/Subme Test Report•Stand None Test(SAT)-DMS 07-MacArthur CswylAt M-41/5tn SI 0% 5 21-Oct•24 25-00,24 -193 0 A8.1050.ADMS 07.MC COMB Reviews'Approves Test Report Stara Atone Test(SAT)•DMS07 MacArthur Cswy/AIA0-41/51h St 0% 15 28-Oc1-24 18-Nov-24 -194 0® r1 A8.1030AOMS.I0.MC Stand None Tcsl(SAT)•ADS&10-MacArthur CsvyMtn•41/51h Si 0% 1 06-Mar•25 06-Mar•25 •311 I A8.1040 AIMS 10.MC Prepare/Submit Test Report-Stand None Test(SAT)•ADMS 10•MacArthur Csvy/AtM-41:5t1 St 0% 5 07-Mar-25 13-Mar-25 -286 0 A8.1050 ADMS.10 MC COMB Renews/Approves Test Report•Stand None Test(SAT) ADMS 10-MacArthur CswpA1M-41/5b Si 0% 15 14-Mar-25 03 Apr-25 287 GB ;DAIS 14-tla.Arti-or Cswy Al O I.4'I't • A8 1030 ADMS 14 MC Stand None Test) )-ADMS 14-MacArthur Cswy/AtM-41/515 SI 0% 1 07-Mar-25 10-Mar•25 -312 1 48.1040 ADMS t4 MC Prepare/Subrne Test Report-Stand None Test(SAT)•ADMS 14-MacArthur CswpIA1M-41/51h 51 3% 5 10-Mar-25 17•Mar-25 -288 D ` OM A.Nan Creed NPa. 111111 Actual Wbrk Data Date:31-Jan-24 COMB DOOMITSSPS Schedule Update U24.0.W2013124013 202A-03.28 Seal s w0 5.o-•uaeroonl»o vent . I I (Ornertne Work 2024-06-20 Added Missing 2yr TE I.NP1-t= Co.rt.euwaeasw.r-nw.w+utasomh.eeomartoo POE Project Start Date:19-Jun-19 4641.10 Pgnttla..wpenae Snraeele.rnot>asWNB0r0 tthiJ 11 CrOc a Rernaoig Worn ^e-� Full Blown Schedule Taos-n Pww..eh.e.rveeaeeve.ee vm.0 MEIN ltm.m0 NN4 ♦ ♦Mleslot, TI? C RE Project Finish Date:22-Dec-25 P.5r67v1>6 aw.a RvvraM.pew..us4ca INN.PR..;M N.. 1.w4 9 •Summar Jwr`L^ mNan rJ s[ItW.upGl.uAos tmlmp NSW Y 14N46-=3 sN.04NU tSO UN 0 s 1121240D NM! 2114tn1 ser.w.WNW UN 0w2011r=405 1,.N4 TCC•COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 0131240D 2024 0128 Sent 2024-06-20 Added Missing 2yr TE 20 J,24 TASK hater All Anivities Activity ID Activity Name Dur% At Compete Start Fish Total Float 2024 2025 Comp our of 1 02 I 03 I 04 01 I 02 I 03 I 04 4 A5.1050.ARMS'4 MC COMB Rovnws/Approves Test Repel-Stand Aone Teal(SAT)-ADMS 14•MacArthur Cbwy/AIM-41/5th St 0% 15 17-Mar-25 07-Apr.25 -289 O i •DMS t5.Ma:A,th., 1.,v..AIA • - AB.1030 ADMS',5.MC Stand None Test(SAT)-ADMS 15•MacArthur CswyaAIM•41!9h St SO. 1 11-Mar-25 11-Mar-25 •312 . 1 A6.1040 ADMS l5 MC Prepare!Submit Test Report-Stand Alone Test(SAT)-ADMS 15-MacArthur Cswy/AINI.41/St1 St 0% 5 12-Mar•25 18-Mar-25 -289 0 AS 1050 ADMS 15.MC COMB Reviews/Approves Test Report-Stand Mate Test(SAT).ADMS t5•MacArthur Cswy/A1M•41/51h SI 5% 15 19-Mar-25 08-Apr-25 -290 MB DOS'' clacA.11,,,-svy A,A;4 .,dn.. • A8.1030 AOMS.I 7.MC Stand Alone Test(SAT)•ADMS 17-Mack bur Csay/AIM-4119h St 0% 1 12-Mar-25 13-Mar-25 -313 1 M.1040.ADMS.''7 MC Prepare/Submit Test Report•Stand Alone Teal(SAT)-ADMS 17-MacArthur CswylAlM-41i5th SI 0% 5 13-Mar-25 20-Mar-25 -291 5 M.1050.ADMS.17.MC COMB Ravows'Appoves Test Report Stand Aone Test(SAT) AOMS 17 MacArthur Cswy/AtM•41/5111 SI 0% 15 20•Mar•25 10-Ape-25 •292 g® wow A8.1030 ADMS 22.MC Stand Alone Test(SAT)-AD MS22-Mackbw Cswp0AlNI-41/9h St 0% 1 21•Mar-25 24-Mar-25 -318 I M.1040-ADMS.22.MC Prepare/Sublet Test Report•Stand Alone Test(SAT)-ADMS 22-MacArthur Cswy/A1M-41/51h St 0'/. 5 24•Mar-25 31-Mar-25 -296 B AB.1050 ADMS 22 MC COMB Reviews'Approves Test Report•Stand Alone Test(SAT)•ADMS 22•MacArthur CswyiAl AA-41/581 51 0% 15 31-Mar-25 22-Apr-25 -299 Cal -•DMS_t I.I../A•:r,r Cs:vy AlA1-41 51•,-• ' 1/1 A6.1030 ADMS 23 MC. .stand ASonc Test(SAT)-ADMS 23-Mac Arbor Cswy/AINI.41'9h SI 0% t 25•Mar-25 25•Mar•25 .318 I A81040.ADMS.23 MC Prepare/Subma Test Report•Stand Atone Test(SAT)•AOMS 23-MacArthur Cswy/AI AT 41/51h St 0% 5 26-Mar•25 01-Apr25 •299 0 AS 1050.ADMS 23.MC COMB Reviews/Approves Test Report Stand Atone Test(SAT)-AOMS 23 MacArthur CswyiAl Nl-41/50 Sr 0% 15 02-Apr-25 23-Apr-25 •300 • CD w 1).15. t7,.:.,it,tr .. . .. . 91 A81030 ADMS.24.MC Stand Aone Test(SAT)-ADMS 24-Mac Arthur Cswy/AINI-4l'9h Si 0% 1 26-Mar-25 27-Ma1-25 -319 I A8 1040 ADM5.24 MC Prepare/Submit Test Report Stand Alone Test(SAT) ADMS 21 MacArthur Cswy/A(M•41/51h St 0% 5 27-Mar-25 03-Apr•25 -301 0 A8.1050 ADMS 24.MC COMB Fievsws/Approves Test Report-Stand Alone Test(SAT)-AOMS 21.MacArthur Cswy/At M-41/5th 51 0% 15 03•Apr-25 25-Apr-25 •302 GO ADMS 23 MacArthur Cswy AIA I-al 5th S' le AS1030 ADMS25 MC Stand Wore Test tSATI.ADMS 25-Macpbu CSwyIAlM-41/9h SI 0% 1 03-Apr-25 03-Apr-25 -323 I A8.1040.ADMS.25.MC Prepare/SubrM Test Report•Stand Alone Test(SAT)-ADMS 25-MacArthur Cswy/A1M-41(5111 SI 0% 5 04•Apr-25 10-Apr-25 -306 • g A8.1050.ADMS 25.MC COMB Revews'Appreves Test Report Stand Alone Test(SAT)-AOMS 25•MacArthur CswyIAtM•41/51n St 0% 15 11-Apr-25 02•May-25 -307 MI ADMS/7 MacArthur(;-.,vy Ai n, - .. ♦ Al.1030 ADMS 28.MC Stand Alone Test(SAT)-ADMS 28•Mac Arbor CswilAl NV 41/9h St(Oast sped) 0% 0 12-Sep-24 I2-Sep-24 -202 • I A8,1040 ADMS 28 MC Prepare/Subme Test Report-SlaneAlone Test(SAT) ADMS 28 MacArthur Cswy/AIN1•11'S0h St(Oescoped) 0% 0 12-Sep-24 12-Sep-24 -138 1 AB.1050.ADMS.28.MC COMB Revlews(Approves Test Report-Stand Atone Test(SAT)-ADMS 28-MacArthur Cswy/ArNl•41/5th S1(Descoped) 0"/. 0 12-Sep-24 12-Sep-24 •137 I ..C.`.1' :'y-M.....1i0,,n C..wv Al A 1 it Sih 5' At 1030.ADMS.29.MC Stand Alone Test(SAT)-ADM529-Mac A bur CSwy/A1N1.41l9h SI(Dew aped) 3% 0 12-Sep-24 12-Sep-24 -202 I AB 1040 AOMS 29.MC Prepare/Suble Test Report•Stand Alone Test BAT)-ADMS 29-MacArthur Cswy/AlM-41/5th St)Descoped) 0% 0 12-Sep-24 12•Sep-24 •138 I A8 1050 AOMS.29.MC COMB Reviews/Approves Test Report•Stand Alone Test(SAT)•ADMS 29-MacArthur Cswy/AINI•41/5tr Si)Oescoped) 3% 0 12-Sep-24 12-Sep-24 -137 1 ra•- ♦ew AB 1030.ATOMS 19 AR Stand Mono Test(SAT)•ADMS 19-Mon Rd 0% 1 20-Mar-25 20-Mar-25 -317 I AB 1040 ADMS.19 AR PreparalSubme Test Report•Stand Alone Test(SAT)-ADMS 19•Mon Rd 5/. 5 21-Mar-25 27-Mar-25 -296 g 481050 ADMS.19 AR COMB Reviews/Approves Test Report•Standalone Test(SAT)•ADMS 19•Alton Rd 0% 15 28-Mar-25 17-Apr-25 -297 I I1 .. ♦m, A8.1030.ADMS 21 AR Stand Alone Test( )-ADMS 21•Mon Rd 0% 1 07.Feb-25 10-Feb-25 •298 1 A8.1040 ADMS 21.AH Prepare/Sutrnl Test Rayon Stand Alone Test(SAT) ADMS 21 Mon Rd 0% 5 10•Feb 25 18-Feb-25 269 g ' M 1050 ADMS 21 AR COMB Rev.ewslApproves Teal Report Stand Aone Test(SAT)-ADMS 21•Mon Rd 0% 15 I8-Feb•25 11-Mar-25 -270 glg eira A8.1030 AOMS.30.AR Stand Alone Test(SAT)•ADMS 30-Mon Rd/16th Street 0% 1 11•Feb•25 11•Feb•25 -298 1 • A8.1040 ADMS 30 AR Prepare/Subrn4 Test Report•Stand Alone Test(SAT)-ADMS 30-Mon Rd,161h Street 0% 5 12-Feb-25 19-Feb-25 -270 g A8.1050.ADMS.30.AR COMB RewewslAppoves Test Report-Stand Alone Test(SAT)-ADMS 30-Mon Rd161h Street 0% 15 20-Feb-25 12-Mar-25 -271 t;;;;I M1030 ADM503.WA Stand/4orne Test(SAT) AD MS 03-Washelgtoa Avenue 0% 116-•eh24 17-Oct-24 .227 I A9.1040.ADMS 03.WA Prepare/Salome Test Repport-Stand Alone Test(SAT) ADMS 03-Wastletgton Avenue 0% 5 17.001.24 24•Oct-24 -192 0 ' M.1050.ADMS03.WA COMB ReviowsrApproves Test Report-SlandAtone Test(SAT)-ADMS 03-Washington Avenue 0% 1524•Oc1.24 15-Now-2A .193 ; L ow nM11ar errand alp..- Actual Work Data Date:31-Jan-24 COMB DOOM ITSSPS Schedule Update U24.0.W2013124DD 2024.03-26 Sent m.oe.rs ee.a:rr Sm.,.evenisi a .eA tI Remaining Work 2024.06.20 Added Missing 2yr TE rene.b cenuan.nelwereReear.ut5ase-e oo aaeno0 IV Project Start Date:19-Jun-19 wM.e-er+ mReeewRemise ee4MwVpaelna.dul7CSWnsrar MCI 1111 Croce RemaeWg Work Full Blown Schedule moo 22 Rmwa Rmsme.ealiwae.»empr.wmor I roal2�o MMl • •Maas tone TI7 A. C�!>E Project Finish Date:22-Dec-25 P.arNdTA orate ameba nrer:aO.ror vetorEroa.,rweor2aamb0 NNJ 9�♦Summar / \/' �J �\ wJlwn ertwe/.up4a.urto9 tyr2]Dn MN1 Y 0aNe.23 S<Mae.upOa.uet D5112%100 NMI 2Ch.N rsM.e MAN,UN 0 w2013r2.00 MMl TCC-COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24J3.W2 01312400 2024-03-2a Sent 2024.06-20 Added Missing 2yr TB 20Jun-24 TASK tiller:Al Activates IMMO D Activity Name Ou,% Al CeenpMie Start Finish Total Float 2024 2025 1 Canp DIa 01 02 03 04 01 02 03 O4 y 48.t 030 ADMS.31 WA Stand None Test(SAT)-AOM531•Washington Aeenue.'17th Street 0% 1 09-AW-25 10 Apr-25 325 A8.1040.ADMS.31 WA Prepero/Sudna Tot Report-Stand Alone Test(SAT)•ADMS 31-W ashngton Avenue/17th Street 0% 5 10-Apr-25 17-Apr.25 -311 S A8 1050 ADMS 31 WA COMB Rev iewc'Appro.es Test Report-Stand Alone Teo!ISATI ADMS 31 Washington Avenue/17th Street 0% 15 17-Apr-25 09-May-25 -312 ow Stand Alone Tests(SATs).DMS 1 - - i DM5 r- Jul,hone C.wy 155 W-:I.t St Sill 12 Arthur Dreher!Rn romp An 1 a.C.,ONIS Oh 3--t_ Stand Aloee'est t8AI; DMS08 Julia"Are Cswy,l9SW.4 lot SNSR112;A,Ihur Godlred Rd 0% 221.Oe1.24 23-Oct-24 -228 1 Ad I04O lIMS OP J Prepare/Supra Tes:Report.Stand Alone Test(SAT)-DMS 08.Jule Tuttle Cswy/195AN 4151 SI/SR1121Artrur Gadred R 0% 5 23-Oct-21 30-Oct-24 -202 0 48105a 31AS08/a; COMB Revtews.Appdv es Test Report•Stand Alone Test(SAT)•OMS 08-Jule Tuttle Cswy/195AN.al at Sf/SR112/Mtltr 0% 15 30-Oct-24 21-Nov-24 -203 0® roil:=..1 .rt..,,Ti.tll C.nt IAta..:1•;r St S:.11::.rth„r C...•I,...l hi,I rlmtr A81030.0MS.18.JTC Stand None Tes•.(SAT; DMS 18.Juba Tuttle Cs,ry/195/W.A1st- '112rN1hur Godhed Rd(Oescoped) 0% 0 29-Apr-25 29-Apr.25 •331 I , A8.1040.0MS 18 SIC Prepare/Subma Test Report Stanealone Test(SAT) OMS 18 Julia Tuttle Cswyi195W Atst Sv5R1121Armur Godlred R 0% 5 29•Apr-25 05-May25 .319 a 48.1050.0MS-P 11.; COMB Reviews/Approves Test Report Stand None Test(SAT) DMS 18 Julia Tuttle Cswy/195JW.41st S6SR112/Mhte 0% 15 06•May25 27-May-25 319 ..its Tut11e Cswy195.V..- .• .. .. . '► A8,1030.DMS 2!)J' Stand None Test(SAT)-DMS20 Jufa Tonle Cswy/195/W.41st SUSR112/Nlhtee Godlred Rd 0% 2 29-Apr-25 30-Apr•25 -331 All.1040.DMS 20JTC PrepareaS bm4 Test Report.Stand None Test(SAT).OMS 20•Julia Tuttle Cswyi195,W 41s1 SUSR112/Nttrur Godred R O% 5 01-May25 07•May25 -331 I Ad 1 n50 r;MS 20(-4 r7MR R.)),w,AJ p.m.,Toy Rty,o^ Slane Ac•„-Test.SAT, I)MO 20 Jura T•ado 1-,ywr'195'W 1,,SI:SR112•Arthi:r 35 15 08-May'20 29 May-?5 231 1.11 Stand Alone Tuts(SATs)-SPS Parking Garage C'• 30 .-24 11 Oct 24 -252 - SOSGara;.C.r.Julia loth,Cswy tys\t:1st St Still2 Arthur Gn^hwt rad - V..• A8.1030.5PS.G06 Stand None Test(SAT)-SPS Garage GO6•Juke Tuttle Cswyl195/W.41st SVSR112JAethur Godtred Rd 0°': 2 12-Sep-24 13- -24 -176 I A8 1040 SPS G06 P,eparo/Subm4 Test Report•Standalone Test(SAT)•SPS Garage G06-Juke Tuttle Cswy'195W.41st StISR112/Nlhw I 07. 5 16-Sep24 20-Sep-24 •176 0 A8 05n 5=5 i-0d. COMB Reviews/approves Test Report.Stand None Test(SAT)-SPS Garage G06-Jule Tuttle Cswy/195/w.41st SVSRI 0% 15 23-Sep-24 I1-Oct-24 -176 , O StOG,r-a',c G-7 V.n:ban Cs., - I. ^e A8.1030 SPS G07 Stand None Test(SAT)-SPS Garage G07-Venetian C sweDade Bvd 0% 2 12-Sep-24 13-Sep-24 -176 1 A8.1040 SPS.GO7 Prepare/Submit Test Raped-Standalone Test(SAT).SPS Garage G07-Vennun CswyDade Blvd 0% 5 16-Sep-24 20•Sep•24 -176 0 Aa.105C SPS G07 COMB Reviews(Approves Test Report-Stand None Test(SAT)-SPS Garage G07-Venetian CswylOade Bald 0% 15 23-Sep-24 11-Oct44 -176 0 I0 A6.1030.SOS.G 10 Stand None Test(SAT1-SPS Garage G10-Venetian CswyDade Sod 0% 2 12-Sep-24 13- -•-24 1 A8 1040 SPS.G 10 Prepare/Subme Test Report-Stand None Test(SAT)-SOS Garage G10•Venetian CswylOede Blvd 0% 5 16-Sep24 20-Sep-24 176 0 Ad 1 n52 SFS.G 10 COMB Revews/Approves Test Report•Stand None Test(SAT)-SPS Garage G I 0-Venetian Cswy/Dade Blvd 0% 15 23.Sep-24 11-Oct-24 -176 dB A8.1030 SOS.05 Standalone Test(SAT)-SPS Garage G05•171h St 0% 2 12-Sep-24 13-Sep24 -176 1 A81040 SPSGO5 Prepare/Submit Test Report•Standalone Test(SAT)-SPS Garage G05-1717 St 0% 5 16-Sep-24 20-Sep-24 -176 0 n A81050 SPS.G05 COMB Reviews/Approves Test Report-Stand None Test(SAT) SPS Garage G05 17th SI 0% 15 23-Sep24 11-Oct•24 -176 O SI S f.ar4 c G l 1.-r r 1 ^♦ A8.103C.SPS G 01• Stand None Test(SAT)•SPS Garage GOt MacArthur Cswy/At NI-41/5th Si 0% 2 12-Sap-24 13-Sep-24 176 I A8.1040.SPS.G01 Prepare/S4bma Test Report-Standalone Test(SATi-SPS Garage G01-MacArthur CswtAl NI-41'5th S1 0% 5 16-Sep-24 20-Sep-24 176 0 A81050SPSG0I COMB Revieves:Appoves Test Report Stand Alone Test(SAT) SPS Garage GOl.MacArthur Cswy/A1N1-41,5th St 0% 15 23-Sep•24 11-Oct-24 176 Cl timm A8.1030 SPS G03 Standalone Test(SAT)-SPS Garage GO3•MacArthur Cswy/AIA0-41 JSth St 07. 2 12-Sep-24 13-Sep-24 176 1 A8.1040.SPS.G03 Prepare/Sabma Test Report-Standalone Test(SAT)-SPS Garage G03 MacO tteu,Cswy,Atkl•41/51h St 0% 5 16-Sep-24 20-Sep-24 -176 0 A8.105C SPS GO3 COMB Reviews/Approves Test Report-Stand Alone Test{SAT)-SPS Garage G03-MacArthur CswytAt O7-41i5th St 3% 15 23-Sep-24 It.Oct-24 •176 O ipmby A5 103C SOS.GC8 Stand alone Test(SAT)-SPS Garage GOB-MacArthur Cswy/A1N1-4115th SI O% 2 12-Sep•24 13•Sep•24 -176 1 I All 104C.SPS.GOB P,epare/Subma Test Report-Standalone Test(SAT)-SOS Garage G08 MaCNIhu,CSwyAINl•41151h St 0% 5 16-Sep24 20-Sep-24 176 0 A8.1050 SPS GOB COMB Reviews/approves Test Report Stand Alone Test(SAT) SPS Garage G08•MacArthur Cswy/At NI-41/51h Si 05'. 15 23-Sep24 It-Oct 24 -176 Ca . G.2-Wshun,on t,.: 8. / Ad.1030.St-:- Standalone Test(SAT) SPS Garage GO2 Washington Avenue O% 2 12-Sep24 I- 4 .1 1 A9 1040 SPS 1.,. t repareiSubmn Test Report•Standalone Test(SAT).SPS Garage(302 Wasl5t%Be Avenue 0% 5 16•Sep24 20-Sep-24 -1/6 0 A8.1050 SPS.G02 TOMB Reviews'Approv es Test Report Standalone Test(SAT)-SOS Garage G02-Washington Avenue 0°/. 1523 Sep-24 11-Oct-24 176 p or. ra,nl,. c•.rJu Award wrs 1 MEN Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Scheddle Update U24.0.W2 013124DD 2024-03.28 Sent I►e.s to se.dn.sonew.not orating-so ret• L=J Remanmg Wore. 2024-06-20 Added Missing 2yr TI' na.•.n Ce*ceelt.aooeeee'nree.ae.A,lasn WIWI0017r00 150 Project Start Date: 19-Jun-19 asrea earmeaacRev..Wee inelp0.eorc.n ur w rosneo..o IoMJ MM. Cralcet Rematrog Work aae Full Blown Schedule A a N•e On. mog.e avu.sBs„ pa.mad pt Rasa!lozenbb NM, • ♦Milestone TR Ste' RE, Project Finish Date:22-Dec-25 Irmo IA4(7n 0SMga /yema4M+std ea.�,eVwe•marr nRepeion900 rout 1�7 Summarynwsa SrMen Asa..Ul}e5 c2W080rotund NMJ sweat Swee..Upson,UM o s R21.31) NMJ 20.M ..1. SNYces.UM 0wr SI31MDo NMJ -.- TCC•COMB Progress Schedule Update COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-26 Sant 2024-04-20 Added Missing 2yr TE 20-Jun-24 TASK filter.All ACI M10es Activity ID Activity Name Dor% Al Complete SIart Fish Total Float 2024 2025 Comp Duo 01 02 03 04 01 02 03 04 ' t.+1., 10. .YashinVIon Avenue r1 A6.1030 SOS G04 ,.1^9None Test(SAT).SPS Garage G04•Washington Avenue 0% 2 12-Sep-24 13-Sep-24 •176 I A8.1040 SPS GO-I Prepare/Submit Test Report-Sand Alone Test(SAT)-SPS Garage GO4•Washing Ion Avenue 0% 5 16-Sep-24 20-Sep-24 -176 0 AT 1050 SPS 3GI COMB Reviews/Approves Test Report-Stand Nona Test(SAT)-SPS Garage G04•Washington Avenue 0% 15 23-Sep-24 11-001.24 -176 62 S-SG,•.,; c ,•1Yaehinymn2. pew AP 1030 SPS 13 f;9 Stand None Test(SAT)•SPS Garage GAS•WashingtonAvenue 0% 212-Sep24 13-Sep24 -178 1 a9 tOnri SPS Gt., Prepe+a/SubmA Test Report Stand None Test(SAT)-SPS Garage G09 Washroom Avenue 0% 5 16-Sep-24 20-Beg-24 -176 0 AT 1050 SPS GO t COMB Reviews/Approves Test Report-Stand Atone Test(SAT)-SPS Garage G09-Washington Avenue 0% 15 23•Sep-24 11.Oct-24 •176 cia t Slend Alone Tests(SAT s)-- -• :;..s 30 12 re hAS Lot P50•Julia TullA .`.s1StSR1ll AAhur Ccdlr^.0R0 pm. Send Atone Tess.oSeTt SPS La P58-Julia Tuttle Ccwy,1951W.4161 SUSR112/Mhur Goot.0 Rd 0% 2 12 Sep-24 /3-S4p-24 -176 - I , AS 1>: Prepare/Submit Test Report-Stand None Test(SAT) SPS Lot P58•Julia Tuttle Cswyl195)W.41s15USR112/Mhe God 0% 5 16-Sep-24 20-Sep-24 -176 0 COMB Reviews/Appeenes Test Rporl-Stand Alone Tell(SAT) SPS Lot PSa Julia Tuttle Cswy/195M).41st SUSR1l2/A 0% 15 23-Sep 24 11-Oc1-24 -176 ma 'PS l 01 P59-.I,,Iia Tu11Ie Cloy-3 ,. re A8.103C.SPS.P59 Stall Nate Test(SAT)•SPS Lot P59-Aria Tuttle Cswy/195AN.41st SR112/Mhur Godlred Rd O% 2 12-Sep-24 13-Sep-24 •176 ' I i A8.1040.SPSP59 Prepare/Subme Test Roped•Sand Alone Test(SAT)-SPS Lot P59•AIM Tuttle Csery/195lW.41s1 SOSR112lMtur Goa+ 0% 5 16-Sep-24 20-Sep-24 •170 0 A8.1050.SPS.P59 COMB Reviews'Appoves Test Ralson-Stand Alone Test(SAT)•SPS Lot P59•Julia Tuttle Cawy/195NY 415151/S11112/A 0% 15 23-Sep24 11-Oc024 •176 OD PS Lot POO t.ulla Tuttle Cswy 195 w.41st St SR112 A'. r. AT 1o"t -P=A,;. 'Stand NOoe Teo,.SAT)•SPS Lot P60-Julie Tiede Cswy)195W.41st St/SR112/Mhur Godlred Rd OY. 2 12-Sep-24 13-Sep24 -176 1 - - Preplo5ubmn T s 1 Report Stood Alone Test(SAT)-SPS Lot P60 Jura Tuttle Cswy/195'W.41st SUSR112/Mhur Godlr 0% 5 16-Sep-24 20-Sep-24 -176 0 Ay t.;. ... ,JMB-levtews.App.o.eS Test Report-Stand Alone Test(SAT)-SPS Lot P60-JUM Tuttle Cswyn95/W.41st SUSR112/A 0% 1523Sep-24 11-Oet•24 -176 i 117 ',it S L I F'•T•:t114 TunbCawy'1:.S V. till St 51.111 Anitur G WM. AT 1 T3C SPS P6"' Stand Noce Test 1 SAT''. SPS Lot P63-Jute Tulle CswNM/ 195 .41st SV M SR112/ hur Godlred Rd 0% 2 12Sep24 13-Sep-24 -176 I A8 104C SPS P6.1 2'repare/SubnlA Test Report-Stand Alone Test(SAT)-SPS Lot P63-Julia Tulle CswyI1957W.41st SUSR1l2/Mbur Godl 0% 5 IA-Sep 24 20-Sep-24 -178 0 AT 105C SP5.P63 TOMB Reviews/Approves Teat Report-Stand Atone Test(SAT)•SPS Lot P63-luts Turtle Cswyl1951w.4tst SUSR112/A O% 15 23-Sep-24 1t-Oct-24 -176 tig St 5 1.1,1.1 .. t ten Csoey{lada Blvd • AT 103C SPS P32 •t(SAT) SPS Lel P32 Venetia+Cso 0Dade Bvd(NO Required) 0% 0 12-Sep-24 12•Sap-24 -144 1 A8104C SPS.P32 Po eua,e•:>.,Drnl Test Report•Stand Nola Test(SAT) SPS Lot P32-Veneloe CswylDade Bled(Not Requeed) 0% 0 12-Sep-24 12-Sep-24 •144 I A8.1050 SPS.P32 COMB Reviews/Approves Test Report-Stand Alone Test(SAT)-SPS Lot P32-Venetian Csvy/Dade Blvd(Not Regure0) 0% 0 12-Sep-24 12-Sep-24 -144 I ( A5.1030`SOS.P29 SUM!None Test(5AT)•SPS Lot P29-17th SI 0%. 2 12-Sep-24 13-Sep-24 -176 I A8 104C SOS P29 Prepare/Submit Test Report•Stand None Teat(SAT) SPS Lot P29•17th SI 0% 5 16-Sep24 20-Sep-24 .176 0 A8.1050SPS.P29 COMB Reviews/Approves Test Report-Star!Mons Test(SAT)-SPS Lot P29•171h SI 0% 15 23-Sep24 11-Oc1•24 -176 Dal PS Lo,PO- ?acArtllor Cswy At L i . , why AS 1030.SPS.P01 Sr.and None Test(SAT)-SPS Lot POI-MacArthur awy/A1M-41 O% 2 12-S p.24 13-Sep-24 -176 I A8.1040 SPS P01 Prepare/Submit Toot Report•Bald/gone Test(SAT)-SPS Lol PO1-MacArthur Cswy1A1 M-41/51h St 0% 5 16-Seµ24 20-Sep24 -178 0 A8 1050 S.'.i- (TOMB Reviews/Approves Test Report-Stand Oboe Test(SAT)•SPS Lot P01-MacArthur Cawy/AINI-41/5th SI 0% 15 23-Sep-24 11-0M-24 -176 CI PS Lot P02•MacArthur Cswy Al A I r7 A8 IA, ''- Stand None Test(SAT)-SPS Lot P02-MaCNllee Cswy7At M-41/51h St 0% 2 12-Sep-24 13-Sep-24 -176 A9 rI Prep:ee-Subm4 Test Report-Stand None Test(SAT) SPS lot P02•MacArthur Cswy4At M-41/561 S 0% 5 16-Sep-24 20-Sep-24 -176 0 AS TWA:SPS Pc; COMO'.1c•+mws•Appoyes lest Report-StaMAbne Test(SAT)•SPS Lot P02-MacAtlw Csery/AlNI-41/5t1 St 0% 15 23-Sep-24 11-0ct-24 -176 110 Stipd Nam Tests(SA IOl•Travel TYne S Mao - r111, Ira..,.Stott,5y.I0e 08JuI1 Tu0l:CC,n.y 1:,Vv lI.OS''11,1;;. 1,,1.. 1 ,,• A AT 1000-I' Send None Tesl I SAT,-ITS 09-Jule Tuttle Csey'196,V/.41s1 SliSR1l2Z04lnur Godlred Rd(PIe 0% 5 12-- 24 16-- •-24 -153 0 AT 703C-T' '/111a10 P,10T-,s1 tress SlavO None Test t SAT ITS 09 lola Tootle Cswy'l95/W.4151 SUSR1t2lMhur Golf 0% 5 19 Sep-24 25-Sep-24 109 0 1...,, 1,n-Sy41om 10.Jogs Tun,. s .. • nr,.Soli:. .,,' VW St A8.1000.T TS IL and None Test(SAT) TTS 10 Julia Tutee Cstvy'196AN.*1st SVSR112/Mtw Godlred Rd 0% 3 19-Sep-24 23-Sep-24 •153 0 ABA 030 TTS.10 Vaedale Punch Lrsi Berns-Stand Alone Test(SAT)•TTS 10•Juba Tuttle Cswy/195W 41st SUSRt12/Mhur 0% 5 24 Sep 24 30-Sep-24 •112 0 A A8.1000.TTS.24 Stand No'e Test,SAT:. TTS 24.Julia Toile Coast 95M/41st - -•112/ hur nedhed Rd 0% 3 24- -p-24 26- ---24 15 1 oeo Aoaue, Dee. N'w- MIN Actual Work Data Date:31-Jan-24 COMB OBOM ITSSPS Schedule Update 1124.0.W2 013124DD 2024-03-23 Seat leo..is ann.5.1.en 00111100 Vet I I Remaning Work 2024-06.20 Added Missing 2yr TE tan..Tr COO.80e.neewey-RtlsenotS05Rem00Y0100 Asa Project Start Date: 19-Jun-19 arwa him.ms..;.411444 vwaemeanell.a.uwlw0 w, Crsc al Remainng Work Full Blown Schedule a�a erm.rMmsew.wuPr.Iae.o N111ar t ta4app EAU • •Mlostal8 T SCORE Project Finish Date:22-Dec-25 r.0.,OOI14 'm+Bot nit>oww.a.4aw..voael,.ocnleo,o MU �e Summary nNwD YM/e upae.uei0s lmlmo MMl y sown SEA..e011.111 Y s 110000 NYE SOvv1N 5[880.0U100011 a1'70.312400 toed TCC-COMB Progress Schedule Update COMB 0BOM ITSSPS Schedule Update U24.0.W2 01312400 2024.03-28 Sent 2024-0620 Added Missing 2yr TE 20-Jun-24 TASK liter All Aet w1Ns AMnOy ID Activity Name Our% Al Complete Start Finish Tad Float 2024 2025 I Comp Dur 01 02 03 04 01 02 03 O4 A8.1030 TT5.24 ',fasciae Punch Lot items•Stand Morro Test(SAT(•ITS 24•Julia Tuttle Cswy/195W.41st SUSRit?/NAhu, 00. 5 27-Sop24 03-Oc1.24 -115 U t. 11... I TT .yststhr,_ vow,"Csny i'-. .1. WI AS 1000-T:- None Test(SAT).ITS 08-Venetian Cswy/0ade Blvd 0% 3 27-Sep-24 01-Oc1•24 •151 1 A6 1030-T S.4, ..•.• Punch Let hems Stand Alone Test(SAT) ITS 08 Venetian Cswy;Oeoe Blvd 0% 5 02-Oc1-24 08-Oct-24 -118 8 1ra.t•T-m4Syskin 19•Venation Caw 5 r'. . , w AE 10.0-TS.9 .e.,a Alone Test(SAT)-TT5 19-Vene8an Cswy'Dade Blvd 0% 2 02•Oct-24 03-Oct-24 -153 1 AP.1030'T S.19 validate Punch Lot Items Stand Pone Test(SATI•ITS 19•Venetian CawytOade Blvd 0% 5 04.Oct-24 10-Oct-24 -120 0 ravel Time System 13-17th It eI► • A6 10.:PTTS4 3 Stand None Test(SAT) ITS 13,171h St 0% 2 04-Oct-2a 07-Oct-24 •153 I A8.1030:TS.'3 Validate Punch Let hems•Stand Alone Test(SAT(•ITS 13•17th St 0% 5 013-Oct-24 15-Oca24 .122 - 0 yet Time Sycte•n 16.11,l - W A8.1000'TS 16 Stand Alone Test(SAT)•TTS 16-171h SI 0% 2 08-Oct-24 09-Oct-24 -153 I AP t 010'TS 16 Valdate Punch Lot Items Stand Alone Test(SAT) TTS 16-17th St 0% 5 10.Oct-24 17-Oct-24 -124 ' 0 nave.Ti-,--r . . 18 1,1. - Pd - A81000.TTS.18 Stand None Test(SAT)-TTS 18.17th St 0% 2 10•Oct-24 11.Oci24 -153 I A8.1030.TTS.18 Vacate Punch List hems•Stand Alone Test(SAT)•ITS 18-17th St 0% 5 15-Oet-24 21•Oct-24 .126 0 WV A8 1000.775.17 Stand None Test:SAT) TTS 17-MacArthur Cswy/AIM41/511r St 0% 4 14-Oct-24 17-Oct-24 -153 0 Al 1030.TT517 Validate Punch List hems Stand Alone Test(SATI•TTS 17-MacArthur Cawy/A/M-41i5th St 0% 5 18-Oc1-24 24-Oct-24 •129 0 Ira,. 1+0.•,•S,.lam 20 r,Lilt:w r C..yy rut,:l it Me A8.1000 TTS 20 Stand Nono Test(SAT) ITS 20 MacArthur Cswy/AINI-41,51h St 0% 3 18 Oct24 22.Oet24 -153 0 AP 1030 t'S 20 Vd10Ate Puncn List Items Stand None Test(SAT) TTS 20•MacArthur Cswy/AIM-41/51h St 0% S 23.Oc624 29 Oc1-24 •132 0 !Iv,i. ..'r n 21 MacAlIt,,C.,,,A 1 A II•In • W A8.t000.TTS.21 Stand Alone Test(SAT)-TTS 21-MacArthur Csvey/AtA9-41/51h St 0% 3 23-Oct-24 25-Oct-24 153 I A6.1030.TTS.21 Vaidate Punch list hems Stand Alone Test(SATI TTS 21 MacArthur Cswy/AlNI-41:5th St 0% 5 28-Oct-24 01-Nov24 -135 0 r..ei T ime Syatern 22•MacArt hu•Csw y Ala 1.41 501 W A8.1000.TS 22 Stand Alone Test ISAT) T 22-MacArthur Cswy/AIM-41/5th SI 0% 3 28-Oct-24 30-Oct-24 •t 53 I AP 1030'TS 22 Vaidate Punch List Items•Stand Alone Test(SATI•TTS 22•MacArthur Cswy/AtN641•5Ih St 0% 5 31.Oc1.24 06-Nov-84 .138 0 IF,,,,:lit,,,•0I41e•11 I. .711.r I,' e♦ A8 10004"7 T 14 Stand None Test(SAT)-TTS 14-Aloe Rd 0% 3 12-Sep-24 16-Sep-24 -124 0 A8.1030 TTS.14 Valdate Punch List Items-Stand More Test(SAT)-TTS 14-Alton Ro 0% 5 17-Sep-24 23-Sep-24 •107 0 T,a,el Time Sy41em 15-Aiton R. W AP t Too TTc 15 Stand None Test(SAT) TTS 15 Akin Rd 0% 3 17-Sep-24 19-Sep-24 124 I A8 1030`TS 1 S Vaidate Punch List Items Stand None Test(SAT) TTS 15•Nbn Rd Alt. 5 20-Sep24 26-Sep-24 110 0 A87010.71'5 P,epare/Sulnh Toot Report-Stand Nono Test(SAT)•A'ITS 0% 5 31.Oct-24 06-Nov-24 -153 0 A11.1020.TTS COMB Reo,ewstiepproves Test Report•Stand None Test(SAT)-AA ITS 0% 15 07-Nov-24 02-Dec 24 154 EZI I_ V A7.1115.W IRE.01 integration wah Room 232 TMC-Wireless Can llel4eabr Network•Nord,Rebecca Town(• 'coped) 0% 0 12•S09.24 12-Sep-24 -146 1 A7.7115,W IRE 02 Integration with Room 232 TMC-Wialees Communication Network•Council Tower lDescaped) 0% 0 12-Sep24 12 Sep-24 146 1 Uan-Wtelei$ • _ II4 p.-a0 .. ♦w A7.1115 NIRF 0e Integration wan Room 232 TMC-Wireless Communication Backbone-City Hall Garage Tower-17117 9 0% 10 15-Oct-24 28-Oct-24 •179 ❑ A7.1115.WIRE 03 Integration with Room 232 TMC-Weele's Cornnunieabn Backbone-Mama Beach Police Oepl.Tower-Washington Ave. 0% 10 23-Oct-24 05-Nov24 -185 O allipen-Wireless Communication Metaak•file* . - -Be? moo♦ A?Ills.NIRE 05 Integration with Room 232 1 MC-Weeless Canna icabn Beckbee,e•Tower41 COMBO-hiecAotaa CswytATM-41,5th 0% 10 04-Nov-24 18-Nov 24 1 04 Cal A711.5 WIRE r-i. Integration with Room 232 TMC-Wireless Carnne icabn Backbone•Pak View Point Toyer 0% 10 25-Nov-24 10-0ec 24 20/ IR MtegrMUM r NMI .170 P♦ A-12301NT MVOS Integration lW.Reim 232 TMC•MVDS-Ntaceions 0% 1015-Ot-24 28-Oct-24 170 0 - -115 - MO ^ nw4w Ckeoei Jove VIM Actual Walk Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024.03-28 Sent ,eon.iv swwssc,oaa.own ammo vew I • I Renaming Work 2024-06-20 Added Missing 2yr TE ,awws, awak.nAIn,eRsareayn..wa'^.U1sosn-Am0010v,0b nse Project Start Date:19-Jun-19 very72 nm.�nemneae,Mt,Neaopwcc,T.esNneela Nor ✓Neel Remaining Work Full Blown Schedule teen.' Karma nlm,.4ewlwc,000ve.w,anuo.r,e:vao0 NM4 • •Mieslone T SCORE Project Finish Date:22-Dec-25 y.t.11 M76 mwq a now.e Nosed aa.Ite any cam,.ewroeoaop Nor V.. ...I Summery *ewr1 Sd,iW.11wY.02.CS 11202300 NW le.MNr 5eamc.'Ja4a.UN OW201112400 Area TCC•COMB Progress Schedule Update COMB DBOM ITSSPS Sehedute Update U24.0.02 0/312400 2024-03-20 Sent 2024-06.20 Added Missing 2yr TE 1-- 20-Jun-24 TASK IMer All AeMrryies Aoliva ID Activity Name Our% Al Complete Start Finish Tout Plan 2024 2025 Coe a Der o1 I 02 1 03 I D4 01 02 03 [ 04 ' A7.12001NT.CCTV Integration with Room 292 TMC-CCTV•NI Localities 0% ` .10 16 Oct-24 3�1-0,,,ct-.2a4 -173 173� NI ' A7,3015.ADMS.32.VC Integration with Room 232 TMC-AOMS 32-Ve,Oiat CawyOode Bvdl(Desconed) 0% 0 12-Sop-24 12-Sep-24 -137 . I A7 11I5.ADMS2B,MC Integration with Room 232 TMC-ADMS 26.MacMhur Cswy/A1 M-41/5111 SI(Oescoped) 0% 0 12-Sep-24 12-Sep-24 1 -137 I Al.1115A0MS29.MC Inegraeon with Room 232 TMC-ADMS 29-MacArthur Cswy/At M-41151h St(Oescoped) 0% 0 12-Sep-24 12-Sep-24 -137 I Al.1115ADMS.03.WA Integration relh Room 232 TMC-AOMS 03-Wesinglon Avenue 0% 10 15-Nov-24 03-Dec-24 -103 O A7.1115.ADMS.07.MC Integration with Room 232 TMC DMS 07.MacArthur Cswy/AIA4-41I51h SI 0% 10 19-Nov-24 04-Dec.24 -194 0 A7.3015AOM5.11.JTC Integration with Roon 232 TMC.SUMS I I-Jura Tulle Cswy/195W 41st SOSR112,Mnut Godlrad Rd 0% 10 26-Fes25 13-Mar25 -262 0 /17.1115 ADMS.21,AR Integration watt Room 232 TMC ARMS 21•Alon Rd 0% 10 11-Mar-25 25-Mat25 -270 0 A7.3015.ADMS 30.AR Inlegrelion with Room 232 TMC-ADM530-AlonRd/1681 Steal 0% 10 13•Mar25 26-Mar-25 -271 0 A7.3015AOMS.02.JTC Integraeon with Room 232 TMC-ARMS 02-Julia Tuttle Cswy/195rW.41st SI/SR112/Arthur Godtred Rd 0% 10 14-Mar•25 27-Mat•25 -272 0 A7.1115,ADMS.06.MC Integraeon with Room 232 TMC-ADMS 06-MacArthur Cswy/AIM-41/5th SI 0% 10 24-Mar25 07-Apr-25 -279 0 A7.3015.ADMS.09.NBC Integration watt Room 232 TMC-ADMS 09-North Bay Cswy 0% 10 26-Mar-25 00-Apr-25 -260 0 A7.1115,ADMS10MC Integration wen Room 232 TUC-ADMS 10•MacMMx CswyA1M-4//51h St 0% 10 04-Apr-25 17-Apr-25 -267 0 • A7.1115ADMS I4.MC Integration with Room 232 TMC-AOMS 14•MacArthur Cswy/A1M•41/5th St 0y. 10 07-Apr-25 22-Apr25 -269 0 A7.111 S ARMS 15.MC Integration with Room 232 TMC-ARMS 15•MacArthur Cswy/AlM-41/51h SI 0% 10 09-Apr-25 23-Apr-25 -290 0 A7.1115ADMS 17.MC Integration with Room 232 TMC-ADIOS 17-MacArthur Cswy/AIM-41151h St 0% 10 10-Apr-25 25-Apr-25 -292 0 A7.1115A0MS 19AR Integration with Room 232 TMC•ADMS 19-AlonR0 0% 10 16Ap-25 02-May-25 -297 0 A7.1115 AOMS.22 MC Integra4on with Room 232 TMC-PUNS 22 MacArthur CswyIA1A441/51h SI 0% 10 22-Apr-25 06-May-25 -299 0 A7.1115.ADMS.23.MC Integration with Room 232 TMC ADMS 23 MacArthur Cawy/A1M•41151n Si 0% 10 24•Apr-25 07-May.25 300 ❑ A7.1115.ADMS 24 MC Integration with Room 232 TMC-SUMS 24-MacArthur Cswy/A1M-41/51h St 0% 10 25-Apr-25 09-May-25 -302 0 A7.3015ADMS.26.JTC Integration with Room 232 TMC-AOMS 26•Jula Tuttle Cswy/195:W.41st SUSR/12/kdwr Godlred Rd 0% 10 29-Apr-25 13-May-25 -304 0 A7.3015ADMS.27.JTC Integration with Room 232 INC-AOMS 27 Jule TAW Cswy/195M/.41st SIlSR112/041tur Gopred Rd 0% 10 01-May-25 14-May-25 -305 0 Al.1115ADMS.25MC Integration rah Room 232 TMC-AOMS 25-MacMhur Cswy/A1M-41)5111 SI 0% 10 OS•May25 16-May25 -307 0 A7.3015ADMS.31.WA Integration with Room 232 TMC•AOMS 31•Washington Avenue/171n Street 0% 1009-May-25 23-May-25 -312 - 0 A73015.ADMS.I2.JTC Integration with Room 232 TMC-ADMS 12-Juu Tutde Cswy/195AV.41st SUSRI121kMH Gashed Rd 0% 10 12-May-25 23-May-25 -312 O A7.3015.ADMS.13.VC Integration with Room 232 TMC•ADNS 13•Venetia)CswyD0Oe Blvd 0% 10 20-May25 04-Jun-25 -319 0 A7.3015ADMS.16.NBC Integration with Room 232 TMC-AOMS 16-North Bay Cswy 0% 10 22-May-25 05-Jun-25 -320 0 A7.3015 ADMS.33.VC Integration watt Room 232 TMC-ARMS 33•Venial CswyDa de Blvd 0% 10 23-May.25 09-Jun-25 -322 0 A7.3015AOMS34.VC Integrahat vont,Room 232 TMC-ADMS 34-Vneen CeryDade WM 0% 10 26-May25 10-Jun-25 -323 ❑ '-:ae^-Ja-..vWu14;/ ♦ A7.I115.0MS.06JTC Inegation rah Room 232 TMC-DNS 06•J.Aa Ulla Cswyrt90mW.41st SVSR112/klMe Godlred Rd 0% 10 21-Nov24 09-Dec-24 -203 0 A7.1115.0M5.10.1TC Integration wM,Room 232 TMG-DMS 18-Julia Tuttle Cswy/195WW.41st SI/S14112/Arlhur GorPre4 Rd(Deseope4) 0% 0 20-May-25 219May-26 -319 I A7.11150MS.20.JTC Inlegral0n with Room 232 TUC-OMS20-Joe Tote Cswy/105714.41s1 SVSR112/Ar9Nr Godleed Rd 0% 10 30-May-25 12-Jun-25 -331 ■ : 4- ,.,r14. to A7.1115.SPS.006 Inegra6on with Room 232 TUC-SPS Garage G06•Jule Tuttle Cswy/195+W 41s1 SVSR112/klllur Godoed Rd 0% 10 14.Oct-24 25.Oc1-24 -176 O A7,I11S.SPS.G07 Integrahon with Room 232 TMC-SPS Garage G07-Venellan Cswy/Dade Blvd 0% 10 14-Oct-24 25-Oct-24 -176 0 A7.1115.SPS.010 Integration with Room 232 TUC-SPS Garage G10-Venetian Cswy/Dade Blvd 0% 10 14-Oe1-24 25-0024 -176 0 A7.1115.SPS.G05 Integration with Room 232 TMC-SPS Garage G05.171n St 0% 10 14.O024 25-Oct-24 -176 0 A7.1115.SPS.G01 Integration with Room 232 TMC-SPS Garage G01-MacMnur Cswy/AIM-41/51n St 0% 10 14.Oct-24 25-Oca24 476 0 A7.1115.SPS.G03 Integration with Room 232 TMC-SPS Garage G03-MacArthur Cawy/AIAI-41.5th SI 0% 10 14-Oe1-24 25-Oc1-24 -176 0 A7.1115.SPS001 Integraeon with Room 232 TMC-SPS Garage G0e•MacArthur Cswy/AIA/I•41151h SI 0% 10 t4-Oct-24 25-0c1-24 -176 0 A7.1115.SPS.G02 Integration with Room 232 TMC-SPS Swage G02•Washington Avenue 0% 10 14-Oc1-24 25-Oc1-24 -176 0 A7.1115.SPS.G04 Integration with Room 232 TMC-SPS Garage G04-Washngion Avenue 0% 10 14-Oct-24 25.Oc1.24 •176 Cl A7.1115.SPS.G09 Integration with Room 232 TMC-SPS Garage G09-Wasnncton Avenue 0% 1014-Oct-24 25Oct-24 •176 0 AT I t 5 525 P32 imcgralon woh Room 232 TMC-SPS Lot P32•lenses Csll54Oede Blvd(Conceded) 0% 0 12-Sep-24 12-Se-24 -Ill ' AJ 1115.SOS.P58 Integration with Room 232 TMC•SPS Lot P51•Jule Tune C.wy/196AV.41s1 SVSRI12/Artur OWWire0 RO 0% 10 14-Oct-24 25-Oct-24 •176 ❑ INIIIIIM Actual Work COMB DBOM ITSSPS Schedule Update U24.0.W2 013124DD 2024.03.11 Sent o01 Awirm emaeu AtPw. Data Dale:3l-Jan•24 P +sosety era»s»w.enoasmso0 veN I 3 Remaining Work 2024.06.20 Added Missing 2yr TE +►on-e cense*Umaoi.w.,-oowaw.utsose-w oonen00 .se Project Start Date:19-Jun-19 na.ya cram» EIsse.NOsie a.n0nu+'t0.5.weo.0 nu4 Critical Ramanng Work Full Blown Schedule am-a noM.na..w»a.w..ure..aoen rn00.1maze00 NYJ • ♦Muslone I r . ci(�E Project Finish Date:22-Dec-25 yage72a74 mnn.a-w..a..one„woer.,...v0a.et�,0Ne0.2m0 010 - wu I �\ J�JI m.Nwa snm.u..eunos,mtmo NUJ ��Summary 311Nw-23 Schema Um.a UM OS I12V3p0 NM., 10 J.a. Se.r.UmeaUM 0 w1a131M00 -- NN.. TCC,COMB Progress Schedule Update COMB 0110M ITSSPS Schedule Update U24.0.W2 01312400 2024-03-2e Sent 2024.36.20 Added Missing 2yr TE 20-Jun-24 TASK tiller.All ACIiWttes Acavty ID Activity Name Du% At Complete Start Relish Total Float 2024 2025 Comp O1r 01 I 02 I 03 I 04 a1 I 02 I 03 I 04 E r A7 1115.SPS.P59 Integration with Room 232 TMC-SPS Lot P59-Aria Tuttle Cswyl105(W.41s1 SVSR112/Anhur Geared Rd 0% 10 14•Oct-24 25-Oct.24 -176 ; 0 Al A7 1115.SP$.P60 integration with Room 232 TMC-SPS Lot P60-Jog TuBk Cswy/195/W.41st SVSR112/Mmur Godked Rd 0% 10 14.Oc1-24 25.Oct-24 -176 , CI 4 A7.1115.SPSP63 mlegraeon well Room 232 TMC-SPS Lot P63-Jule TOW Cswy/195/W.41st SVSR112i'Mlhur Godred Rd 0% 10 14-Oct-24 25-Oct-24 -176 C) I A7.1115.SPS.P29 Integration wtlh Room 232 TMC•SPS Lot P29.17111 Si 0% 10 14-Oct-24 25-0c1-24 •176 0 1 Al 1115.SPS.PSI Integration with Room 232 TMC-SPS Lot P01-MacArthur Cswy/A1M-41/5m St 0%. 10 14-Oct-24 25-Oct-24 -176 A7.1115.SPS.P02 Integration wan Room 232 TMC-SPS Lot PO2-MacArthur Cswy/A1M•41/5lh SI 0% 10 14-Oct-24 25-Oct-24 -176 0 A7.1115.7T514 Integration with Room 232 TMC-TTS 14•Mon Rd 0% 10 1SMay-24 29-May-24 -71 A7 1115.I7S.15 Integration with Room 231 TMC-ITS 15•Aeon Rd 0% 10 15-May-24 29-May-24 -71 IQ A7.1115.TTS.09.P Integration with Room 232 TMC-ITS 09-Jule Tuttle Cswy195/W.41st SVSR 1127MIhut Godlred Rd 0% 10 12•Jun-24 25-Jun 24 .90 ' ca A7.1115TTS.104 Integration with Roan 232 TMC TTS 10•Julia Tuttle Cswy195NV.41s1 St/SR 112/Arlhw Geared Rd 0% 10 20-Jun-24 03-Ju1-24 -% Al.11t S.T7S.24 Integration with Room 232 TMC-ITS 24-Juke Tuttle Cswy/195/W.41s1 SVSR 112/Mihur Godred Rd 0% 10 28-Jun-21 12-Jul24 102 la A7.1115T1S.09 Integration with Room 232 TMC-TTS 08-VeneMn CswyrDade Blvd 0% 10 09-Jul-24 22-Ju1-24 -108 p A7.1115.775.19 Integration with Room 232 PAC-TTS 19•Venetian Cswy/Oade Blvd 0% 10 15-Jul-24 26-Jul-24 •112 0 A7 1115.TT3.13 Integration with Room 232 TMC•7TS 13•17th St 05. 10 19-J.4-24 01-Aug-24 -116 O A7.1115 TT$.18 Integlalbn Mei Roan 232 TMC-TTS IS-17019 0% 10 25-Jul-24 07-AJg•24 -120 ❑ A7.1115.TT5.18 Integration with Room 232 TMC-TTS 18,17m SI 0% 10 31-Jul-24 13-Aug-24 •124 fJ • A7.1115.7TS.17 Integration with Room 232 TMC•TTS 17-MacArthur CswyrAtM-41,5th S1 0% 10 12-Aug-24 23-Aug-24 -132 ' A7.1115.TTS 20 Integration with Room 232 TMC•ITS 20-MacArthur Cswy/AtM-41151h St 0% 10 20-Aug-24 03-Sep-24 -138 0 A71115.TT5.21 Integration with Room 232 TMC TTS 21 MacArthur CswyrAlM1•41,5111 SI 2% 10 28-Aug 24 11-Sep-24 h+^ 0 Al.1115 TTS 22 Integration rdm Room 232 TMC-ITS 22•MacArthur Cswy/A1M1•41/5111 St 0% 10 06 Sep 24 19-Sep-24 150 0 CnmmunkMtnns End•lo•En7 Test • 79 Apr,.2 75 394 1, 11 A8.101U.E2E Communications End to-End Test 0Y. 4 28-Aor-25 01-May-25 271 A8.1040 E2E Prepare/Somme Test Report Communlcatns End-to-End Test 0% 502-May-25 0e-May-25 -271 0 AP 105C F2E COMB Reviews/Approves Test Report•Communications End-to-End Test 0% 1509-May-25 3C-May-25 -271 p SM4ayatem Teels 33^25•Jul24 18-Auo 25 - ♦ - 1 -~-Alt 1015.SUB.WIRE Subsystem Tesl-Dry Run-Wireless Connlmun,cal,onNelwork 0% 1 11-Dec-24 11-Dec•24 -207 1 A8.1010.SUB.WIRE Subsystem Test-Wreless Communication Network 0% 20 12-Dec-24 10-Jan-25 •207 GJ Ae.1040.SUB.WIRE Prepare/Submit Test Report-Subsystem Test-Wreleas Cammu.acebn Network 0% 10 13-Jan-25 27-Jan-25 •208 Q A8.1050.SUB WIRE COMB netnews/Approves Test Repot•Subsystem Test.Wheless Comrnun cation Network 0% 15 28•Jan-25 17-Feb-25 -207 - lai • illp • AB.l0I5.SUB TMC Subsystem Test-Dry Run-TMC 07'. 1 25,1424 24 25-Jul-24 -106 1 A8.1010.SUB.TUC Subsystem Test-TMC 0% 20 26-J41624 22-Aug-24 •106 051 A8.1040.SUB.TMC Prepere/Subnt Test Repot-TUC 0% 10 23-Aug-24 06-Sep-24 •107 A8.1050.SUBTMC COMB Reviews/Approves Test Report-Subsystem Test-TMC 0% IS 09-Sep-24 27-Sep-24 •t07 lammiE Al.1015.sua MVOS Subsystem Test-Dry Run-Microwave Vehicle Detection Systems(MVOS) 0% 1 29-Oct-24 29-Oct-24 -170 , 1 A8.1010.SUB MVDS Subsystem Test•Microwave Whole Detection Systems(MVOS) 0% 20 30-Oc1-24 27-Nor-24 170 On A8.1020.SUB MVOS PrepareiSudnt Test Report-Subsystem Test•Microwave Vehicle Detection Systems(MVOS) 0% 10 29-Nov-24 12-Dec-24 -170 el A81050.SUB MVOS COMB Reviews/Approves Test Regal•SlbsystemTest-Mlerowsre Vehicle Detection Systems(MVOS) 0v. 1S 13-Dec-24 06-Jan-25 -170 Ipm ...., A8.1015.SUB.CCTV Subsystem Test•Dry Run-Closed Cycle TV(CCTV) 0% 1 01-Nov-24 01-Nov-24 -173 I A8.1010.SUB.CCT V Subsystem Tess-Closed Cncuit TV(CCTV) 0% 20 04-Nov-24 04-Dec-24 173 DM A8.1040.SUO.CCTV PreparefSubme Test Report•Subsystem Test-Closed Circuit TV(CCTV) 0% 10 05-0ed-24 18-Dec-24 •174 GI AB.1050 SUB CCTV COMB Reviews/Approves Test Report•SlbsystemTest-Closed Circuit TV(CCTV) 0% 15 19-Dec•24 10-Jan45 -174 wa sowor DTwo. ...-... AB.1015 SUB ARMS Subsystem Test-Dry Run-Arlen&Dynamic Message Signs(ADM81 0% 1 11-Jun•25 11•Juo-25 -323 I A8.1010.SUB.AOMS Subsystem Test-Arterial Dynamic Message Signs(ADMS) 0% 20 12-Jun-2S 10-Ju1-25 •323 linil Om Rww.l °what Para. Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2 0131240D 2024-03-2d Sent ,sp..,, err,.xnu•e.eanbm VW 1 I Remamng Work 2024.06-20 Added Missing 2yr TE r►Rw-Tr Solveauraaell.cw.Mwate.,.wsosn0m000000 POE Project Start Date:19-Jun-I9 n.wat erwoweRr.we.aw.u11610iwaun.OSlmlmc0 NW llllltMI Craws]Remaining Work full Blown Schedule 211.0.82 •r R. •4 ROW.MeMl le4v wow moo.I,00200 NNJ • •M E lestone I R Sc(i) Project Finish Date:22-Dec-25 P.5.,:er-1n 0awrn mewraRa,40an i..u04r weed PRa 2m022300 mu r�Summit �\ RE Project aLNwO SdY1•upanutlaslml2]po MMJ Y 30Nwfl SUMar•Upae.U244 S h121000 N.J AA.,a4 SWOT•UN.UN 0 w)013 IMO MMJ TCC•COMB Progress Schadt.le Update COMB DBOM IT9SP9 ScIWdu!,Update U24.0.W2 01312400 2024.03-211 Sent 2024.05.20 Added Missing 2yr IF 20-Jun-24 TASK later.All Activities Activity ID Activity Name Our%T At Complete Sieri Finish Total Float 2024 2025 Coelp Doe 01 I 02 I 03 I 04 01 I 02 I 03 I 04 • A8.1040 SUBADMS Prepareisubnt Test Report,Subsystem Test Arterial Oynamic Message Signs(ARMS) 01.'2 10 It•Jut 25 24 Jul 25 -324 A8 1050 SOB ADMS COMB Reviews/Approves Test Report•Subsystem Test-Arterial Dynamic Message Signs(AOMSI 0'r. 15 25-Ju1-25 14-Aug-25 -324 • 1S Women Tests•OMB 0% 1.......1 Aa 1015 SOB DMS Subsystem Test•Dry Ron.Dynarna Message System IDMS• D% I 13-Jun-25 13-Jun-25 -331 I AS 101;SOB DMS Subsystem Tool-Dynarrac Message System(DMS) 0% 20 16-Jun-25 14J0.25 •331 MIN A8'NO SJR DMS Prepare/Submit Test Report-Subsystem Test-Dynamic Message System)DMS) 0% 10 15-Ju425 28-Jul25 -326 Bl i As.05.:SOB DMS COMB Revtews;Aporoves Test Report Subsystem Test Dynamic Message System(DMS) 0% 15 29-Jull-25 18-Aeg-25 -326 an 911M 6aliieu-SPa Pstldy Pitori,m0114 10,L,MO'. :VhalliallagliffiallallaaleatIK 1,i1 I A8.1015.SUB.SPO Subsystem Test-Dry Run SOS Parking Garages and SOS Surface Lots 0% 1 28-Oct-24 28-Oe1.24 -176 I A8.1010.SUB SPS Subsystem Test.SPS Parking Garages and SPS Surface Lots 0% 20 29.Oet-24 26-Nov-24 •176 CJ i A8.1040.SUB.SPS PreeareiSutfne Test Report-Subsystem Test-SPS Parking Garages and SPS Surface Lots 0% 10 27-Nov-24 11-Doc-24 -176 0 - AS.tosasu.SPs COMB Revlews/Approves Test Report-Subsystem Test•SPS Parking Garages and SPS Solace lots 0% 15 12-Dec-24 03-Jan-25 -176 (2:1 Aft1015 SJB.TTS Subsystem Test•Dry Run-Travel Time System(TTSI 01. 1 20 Sep 24 20 Sep•24 150 I A8 1010.SU8 TTS Subsystem Test•Travel Tenet*seam(TTS) 010 20 23 Sep 24 18.Oct 24 -150 O All 1040 SUB.TTS Prepare/Submit Test Report-Subsystem.Test-Travel bore System(ITS) 0% 10 21.Oct-24 01-Nov-24 •150 0 A9.1050.SUB.TTS COMB Reviews/Approves Test Report•Subsystem Test Travel Time System(ITS) O% t 504-Nov.24 25-Nov-24 •151 O A,:14p1..''1 s Test mar 09',.M,,Mes'.agv Sister,.I DM:.,•Arterial Dynamic Message Signs IADMS --' ^emimP A8 1010 DMS.ADMS Dynamic Message System(DMS)/Merial Dynamite Message Signs(ADMS)Subsystem Acceptance Test 0% 30 16-Jun-25 28 Jul-25 331 (! A8.1340.DMS ADMS Prepare/Subme Test Report•Dynamic Message System(OMS)/Arterial Dynamic Message Shins(ADMS)Acceptance Test 0% 5 29-Ju1-25 04-Aug-25 •331 6 A8 t050.DMSAOMS COMB Reviews/Approves Test Report-Dynamic Message System)OMS)/Mertel Dynamic Message Signs(ADMS)Accet 0% 15 05-Aug-25 25-Aug-25 -331 IN JT.1.1i-nal Toot . - beerier A8.1005.OAT.WIRE Operational Test Dry Run-Wireless Communication Network 0% 1 15.FeD25 15-Feb-25 -302 Ae.1000.OAT.WIRE Cperalonal Test-Wveless Commuacation Network 0% 30 19-Feb25 20-Mn-25 -302 i♦ ' A8.1010.OAT.WIRE Prepere(Subrne Test Report-OperaaonalTesl•Wireless Communication Network 0% 5 21-Mar-25 27-Mar-25 -206 I A8.1020..0AT WIRE Vasdate Punch Dsl Items Ooeralond Test-Wireless Communication Network 0% 5 28-Mar-25 03-Apr-25 -19a B A8.1030 OAT -'r COMB Revrews:Approves Teel Report.Operational Test-Wireless Communication Network 0% 15 28-Mar•25 17-0pr-25 -207 Ili •'l .Tefl-TMC Video W ^- A8.1005.OATTMC Operational Test Dry Run-TMC 0% 122.0c1.24 22-Oc524 -177 1 A8.I000.OAT TMC Operational Test.TMC 0% 30 23-0c1-24 21-Nov-24 -177 6l♦ A81010.OAT.TMC Prepare/St/WM Test Report•Opeeasonal Test-TMC 0% 2 22-Nov-24 25-Ma-24 -123 I A8.1020.OAT TUC Val date Punch List Moms-Operelnnel Test-TMC 0% 5 26-Nov 24 03-Dec-24 •113 0 AB tO30 CAT TOOT CC/MS ReviewSr0pprores Test Rsporl OperaeonatTest TMC 0% 15 26 Nov 24 15,Dec-24 124 NM .,-;„.assratioest Test-ITS ^. ' A81000 OAT.ITS Operational Test CS 0% 30 25-Aug-25 24-Sep•25 -481 • IIIIIII A8 1010 OAT ITS Prepare/St/end Test Report-Operational Test•ITS 0% 5 25-Sep-25 29-Sep-25 •481 8 A8.1030.OAT.ITS COMB Reviews/Approves Test Report Operatonal Test ITS 0% 15 30-Sep25 14.0ce25 •481 In A8.1020 OAT ITS Vasdate P_ncn Lrsl Item-; Operational Test ITS 0% 15 30-Sp25 14-Oe1-25 -481 IN A8 1000 OAT SPS Operalonal Test SPS 0% 30 04-Jen-25 02-Feb-25 -256 lmTd AB 1010.OAT SFS PreparerSuanl Test Report Cperal•onal Test SOS 0% 5 03-FeD25 07-Feb-25 -173 0 A8.1020.0AT.SPS Vaidate Punch List Items Operational Test SPS 0% 5 10-FeD25 14-FeD25 •1633 0 AA 1030 OAT.SPS COMBReviewsAppraes Test Report-Operational Test SPS 0% 15 10-Feb-25 28-Feb.25 •173 tat ,:1111.111.0011Mir NI 0% 59 034Dee-$4 30Jan-% r, - - AS1000OATTS Operational Test-1TS 0w. 30 03-0ec-24 01-Jan-25 -224 LISM A81010 OAT TTS Prepare/Subm4 Test Report-Operational Test TTS 0% 5 02-Jan-25 08-Jan-25 -152 0 I A8 1020 OAT.TTS Vasdate Punch List Hems-Operational Test.TTS 0% 5 09-Jan-25 15-Jan-25 -142 0 l A8.1030 DAT.TTS COMB Re-news/Approves Test Report Operational Teal•TTS 0% 15 09-Jan-25 30-Jan-25 -152 Mll CNN AMJs —TO....11 how NMI Actuat Work COMB DOOM ITSSPS Schedule Update U24.0•W2013124DD 2024.03-26 Sent tear R e..em.sa a.enoa,rnoe woo Data Date:31-Jan-24 lr— Remaining Work 2024.06-20 Added Missing 2yr TE ..Waal OovOrke ArOMAsa eo*ai^.W5650.et00.AF00 1'Sc Project Start Date:19-Jun-19 Fe)!Blown Schedule awwa Nomaan...w md,r.Ure.e in.am Uleoa r ro a.o aNa _ Crewe,Remaining Walk �^ am 22 nvarllwf.r ew,rwo4ue mast RONA r42eWp0 M.J • •Milestone TR S RE Project Finish Date:22-Dec-25 P.ge I4 of 76 towg.23 n0..rat...wewa�r.vp4..6 MON2marab0 Mu F15ummary 1 „ (` 3allor 1J S.rui/.UN.UN 03 uasta50 AM1 23J6e24 s..ea.U.ie UN 0w20ltr2400 r+740 TCC•COMB Progress Schedule Update I COMB OBOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03-28 Seed 2024-06-20 Added Missing 2yr TE I 20-Jun-24 TASK Btee Alt Aclivrties Mirky 0 Actredy Name Dur% At Complete Stan Finish i Tom!Float 2024 2025 7 Comp Dur O' J 02 03 L 04 01 I Q2 I 03 I 04 iria► A61000 BURN Burn-In Penal•A8 Systems C7% 60 IS-Oct-25 13-Dec-25 4Nl Mil halting and Close Out 53.35% 941 18.May-23 13-Dec-25 .474 I 4 TreMWg 0% 25' C'Co;'1 '3 n...25 26i \ A9 I720'RAIU Treirwlg EnveorlmeM Setup 5 01-Oct-24 07.Oc1-24 I 0 T8MMPS•WNW*Comm ' - ..- - cAld11111111111111.11111111111.11011 -151 WI A9.1120.TRAIN WIRE Training•Wireless Communication Network 04 10 21-Mar•25 03-Apr-25 151 ■ 11111111.1111110.6°'tO OPereq ,13 w A9.1100.TRAIN.SYS Training-DecOGulde Software System OperabonOvervrew Course 0% 2 08.Oe1.24 09-Oc1-24 -123 1 A9.1100.TRAIN.USR irainng-DecOGuoe Software-System Users Course 0% 2 10.Oct-24 11.Oet-24 -123 : I A9.t100.TRAINTMC Tramng D00001de Software DarabasaAdmnwtrator Course Chi. 4 14.Oe1-24 17-0ct-24 -129 • 0 A9.1100.TRAIN.FIN Trainng-Dec/Gudde Software Administrator Course 0% 2 18.0044 21-Oct-24 -129 ! 8 mobie-41111110 w A9.1120.TRNN.SPS Trolling•SPS Periling Gereges and SPS Surface Lots 0% 10 03-Feb-25 14.E co-25 -117 U -.x"g.. 1-25 ''"4.1462 WI A9.1120.TRAIN.ITS Tranng-ITS 0% 10 25-Sep-25 08 Ocr_25 292 0 +-24 -83 •A9.1120.TRAIN.TMC Traiwp-Operalans and Manlenance TMC O% 2 22-Nov-24 25-Nov-24 1,3 0 A9.1/20.TRAIN.TMC.VW Training-Video Wan Drspoy-TMC 0% 2 22 Nov-24 25-Nov-24 63 0 -4.181 1111111111111.111111W 18 024w.28 2041".25 -101 rf A91120 TRAIN.TTS Training-System Coercional Overview TTS 0% ` 02.:an-25 02.Jan•25 -101 A9.1130.TRAIN-TTS Tracing•Audi and Reeoncaation and Roadway Support System(RSS)Operations•ITS o% 1 03-Jan-25 03-Jan-25 -101 1 A9.1140.TRAIN TTS Training-Image Review Operations-ITS 0% 3 06-Jan-25 08-Jan-25 -101 I A9.1160.TRAIN.TTS Training System Monaotng and Roadway Suppon System(ASS)Adm nistratwn-TTS 0% 1 09•Jam25 09-Jan-25 -92 I A9.1150.TRAIN.TTS Tranng-Maerlenance-TTS 09L 10 09-Jan-25 23-Jan-25 -101 ❑ Close Out .Dec-25 I Punde llel ,, -. •ec-25 -475 r ! A9 10-%PL Punch List Weer/SystemAccgAance Prep 0%• 2816•NOv-2S 13 Dec 25 4'5 ( Close Out Documents ' O0b1t5 -409 A9 1012 Sub10rl/Rev45.42O0t101 Certificate of Occupancy!,TMC Control Room Build Out(NOT REQUIRED) 100% 0 18.May-23 18 May 2: A4 1020 Prepare/Submi Spare Parts Inventory 3% 10 25-Sep-25 08-Oct-25 -282 17 An 153^, Prepare-Sobnn Close out Dacumemalor 059 10 25-Sep-25 08-Oct-25 -282 ❑ AoBulh Product i Document I find SW Docunlsnlatlon(A•Bula 1 iten• W1 A9.1040.S000.AB PreparerBuomt Preimnary Draft-As-Bus System Product Description Document(SODD) 0% 20 03-Doc-24 31-Dec.24 129 O A9.1050.5DDD.AB COMB Revlews1Commen1s on Preliminary Draft-As-Bole System Produce Description Oocumeru(SDDD) 0% 15 02-Jan-25 23-Jan-25 129 CO A9 1050,SODO AB PrepoelS.:bml Final Draft•As-Bui System Product Descrpaon Document(SODO) 0% 10 24 Jan•25 06-Feb•25 129 C7 A9 1070.SDDD.AB COMB ReviewslCommenls On Foal Draft-As-Bun System Product Desorption Document(SDDO) 0% 15 07-Feb-25 27-Feb-25 -129 CO Ina' r • A9.1080 SDOD.AB Prepare it 100%Feral•As-Bus Systems Product Oescrpeon Document(S000) O% 2 e- r Mar- •128 0 As-Built Design Dra ,�.. _ • ^^ 1.191 ' A3.1040.DWG AB r',•:pinett'ubrnl Preiminary Draft•Installation Desgn Drawings As,Bui0s O% 15 26-Aug-25 16 Sep 25 .303 I CO A3.135C DWG AB COMB RA,rows:Cannrerrs on Profs-notary Oran Instalason Design Drawings-As-Buns 0% 15 17-Sep25 07-Oc1.25 -303 CO r o.Built Installation Design Drawings•FI^al Ore?. ^, A3.105c DWG AB PreparelSubn4 Foal Draft•Instaeatan Design Drawings-As•Bulls 0% 5 08-Oct-25 15-Oct-25 -303 0 A3 1070 OW G AB COMB Reeiews/Conmlenis On Final Draft•Inslalalon Design Drawngs-As-Bulls 0% 15 16-001.25 05-Nov 25 -304 tit • A3.1080.OWG AB Prepare/Suomi 100%Foal•Installation Design Drawings-As•Bues 0% 2 06-Nov-25 0-Nov-25 -303 1 Or, eMYW ermine Alpo. MINN Actual Work Data Date:31-Jan-24 COMB DBOM ITSSPS Schedule Update U24.0.W2013124DD 2024-03-20 Seat won. ewer.sae.,ens amo0 veer I - I Reficaomg Work 2024-06-20 Added Mining 2yr TE 4,..,21 Cantered Upe.I.nsa .o au ursoae-emo emred eM Project Start Date:19-Jun-19 aco.•a Pram.ReM..4BuuiMOW,Yowl uli.aaoroole AMA IMMO Gracie Remaining Work Full Blown Schedule mow nn.wmeew:mbu..euwwsrien PRSOCI lmnlno NMJ • •Mleslone 1 RA S�RE Project Finish Date:22-Dec-25 Pip 79o176 co qa Nwc.mn..r..aerueioil.meu,slrnaalo601a0O «wit III Summary 27 smw u.. .upava(Is rm1a1D0 NMJ y 36 Nov-a 90.6.iuuplaaLN 0 a 11212100 NMJ 204.N 4MOI.uIO.I.JN.lw11131Nd0 IBM • TCC-COMB Progress Schedule Update COMB DOOM ITSSPS Schedule Update U24.0.W2 01312400 2024-03.2a Sent 2024.08.20 Added Missing 2yr TE 20Jun 24 TASK liner All Actrohes Ac4y4 lO Activity Name D Al Coecdele Sten Polish Total Goal Comp Our D+ 02 2I24 OJ D 4 L 01 I 02 2I25 03 I 00 sysamAocs ance 0% 43 10-Nov-25 22-Dec-25 •4e1 tom, 49 000.SA System Acceptance Tesing•Al Systems 0% 7 14-Dec25 20-Dec-25 -481 a • A91010 SA WIRF Prepare'Subme Request for System Acceptance Wireless Commurlcation Network 0% 1 20-Dec25 21•Dec•25 481 I A9.1020 SA.WIRE COMO Reviews/Approves Request for System AcceptanceWireless Communication Network 0% 1 21-Dec25 22-Dec25 481 I System Acceptance-TMC -- -. 481 • A9 IOI C SA TUC B Prefmre/Submd Request for System Acceptance-TMC 0% I 20-Dec-25 21-Dec 25 •481 I A9 102C SA IMC.B COMB Reviews/Approves Request for System Acceptance TMC 0% 1 21 Dec-25 22-Dec-25 -481 1 System Accept:race•TMC SW •.., '2.Ncv 25 V A9 100C SA ATMS Prepare/Submit Request for System Acceptance•DecOGuide Software 0% 1 10-Nov-25 10-Nc4.25 -302 A91010 SA ATMS COM8Revwws1Approves Request for System Acceptance OecOGuide Shcware 0% 1 12-Nov•25 12-Nov-25 303 I System Acceptance•115 .. 481 V 49.101C.SA ITS Prepare/Stably-at Request for System Acceptance Imelegent Transportation System 11TSI 0% 2 29Dec25 21-Dlc25 481 I A9 1020 SA ITS COMB Reviews/Approves Request for System Acceptance-Intelgenl Transportation System(ITS} 0% I 22-Dec-25 22-Dec-25 -481 I Si stern 7.cceptance•SPS -_ 481 • A9.101C.SA.SPS Prepare/Submit Request for System Acceptance-SPS 0% 1 20-Dec-25 21-Dec-25 481 A9 102C SA SAS COMB Reviews/Approves Request or System Acceptance-SPS 0% 1 21-Dec-25 22-Dec25 481 I Sy stem Acceptance-TTS -481 • A9 1010 SA TTS Prepare/Sub/Art Request for System Acceptance•ITS 0% 1 20-Dec-25 21-Dec-25 481 I 49 1020 SA TTS COMA Revtewe pecses Request for System Acceptance ITS 0% 121-Dec-25 22-Dec 25 481 I In Operations&Maintenance-Phase 1 and Muse 2 0% 0 20-Dec-26 20-Dec-25 .479 • 49'010 NTPMAIN Nolce to Proceed Operaltans 8 Mantenence Period-An Systems P11ase 1 and Phase 2 0% 0 20-Dec-25 479 • L owe AMrm Ckslod Alpo. Actual Work Data Date:31-Jan-24 COMB DOOM ITSSPS Sehedtde Update U24.0.W2013124DD 2024-03-211 Sent 1em w.is e0iwsct.4.eetemi.IOO yeti 1 Remaining wore 2024-06-20 Added Missing 2yr TE 1aaseel CatYrer onwar x.oaw. 4,7.csec .IOan00 Psr Project Start Date: 19-Jun-19 sut.rn Rata.AmamiHenu.vM."1w11n.arr a NMI Gate al Remaining Work Full Blown Schedule no.n Rares.d Rw.M eud..ca.....Pt>OW 1•11•00 NW • •Mieslone �(>i1 C�f�e �J�tFinish Date:22-Dec-25 Page 76d76 par.pR bases.,RemoJeasu.M11100ry.nnalpt06011�a 0w /�� \ J I`L. mNo n eew.uw.uaosfmmpp MAW •.e Summary nNw yl kn.a.4 Volga ua.a s 11P1000 NW PO.a..a. scnwa up4e0u94 cw2 0+1.N00 NW APPENDIX H PHASES 3 Through 6 Item Description Design Phases 3 through 6 Units Total Price Survey LS $16,900.00 Sixty Percent(60%)Design LS $529,100.00 Ninety Percent(90%)Design LS $229,515.00 Mast Arm Structural Analysis LS $63,525.00 Final Design LS $123,585.00 Geotechnical Services LS $32,100.00 Mobilization Payment LS $243,750.00 Maintenance of Traffic*** LS $483,475.00 Permitting LS $67,410.00 As-Builts LS $27,071.00 Intelligent Transportation System (ITS) $1,316,43.1.jj CCTV Cameras Phase 3 Phase 4 Phase 5 Phase 6 Item Description QTY QTY QTY QTY Units Unit Price Total Price Camera(Previous Cameras for Phases 3 through 6)= 0 0 0 0 EA $76,500.00 $3,780.00 $0.00 Camera with Intelligence Video Analytics and Data Storage 14 0 6 0 EA $7,858.00 $157,160.00 Poles 0 0 0 0 EA $0.00 $0.00 Lowering System 0 0 0 0 EA $0.00 $0.00 Initial Spare Parts 1 0 1 0 EA $3,245.00 $6,490.00 Year 1 -PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 BTU SS(Level IP67, NEMA 6 Cabinet/UPS/Switch) 14 0 6 0 EA $5,126.00 $102,520.00 Cabinets/UPS/Communications 0 0 0 0 EA $0.00 $0.00 Installation 1 0 1 0 LS $200,947.00 $200,947.00 Integration 1 0 1 0 LS $93,919.00 $93,919.00 Testing 1 0 1 0 LS $30,420.00 $30,420.00 "Training 1 0 1 0 I LS $0.00 $0.00 Documentation 1 0 1 0 LS $3,960.00 $3,960.00 $595,416.DC PHASES 3 Through 6 Vehicle Detection System Item Description Phase 3 Phase 4 Phase 5 Phase 6 Units Unit Price Total Price QTY QTY QTY QTY Radar Unit 6 1 _ 4 0 EA $8,912.00 $98,032.00 Initial Spare Parts 0 0 _ 0 0 EA $0.00 $0.00 Year 1 - PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 Poles 0 0 0 0 EA $0.00 $0.00 BTU SS(Harden Cabinet/UPS/Switch) 6 1 4 0 EA $5,972.00 $65,692.00 Electrical 0 0 0 0 EA $0.00 $0.00 Installation 1 1 1 1 LS $71,303.00 $71,303.00 -Integration 1 1 1 1 LS $90,895.00 $90,895.00, Testing 1 1 1 1 LS $35,882.00 $35,882.00 **Training 1 1 1 1 LS $0.00 $0.00 Documentation _ 1 1 1 1 LS $5,830.00 $5,830.00 5367,634..'0 11 o 'n o m Doi co p p CD 0 m H co 3 n a m K m K cD c = > to Ot 52 61 D7 E co f (n N d m m c CD 0 0, E Co y 3 m a 3 (n a m n d CD t 3 co v ca 7 40 en m C) H 3 O Cn 3 O 3 Co 71 D D . 0 0 0 0 0 0 0 0 0 0 0 0 —1 0 CD w 71 0 0 0 0 0 0 0 0 0 0 0 0 O N LA) < CD S 2 O D (AI m 0 0 0 0 0 0 0 CD CD 0 0 0 p N cri 71 D D . 0 0 0 0 0 0 0 0 0 0 0 0 —1 0 -< coo co) C 0 0 0 0 0 0 0 0 0 0 0 0 Cl, C 3 Z Z Z Z z Z z z z Z Z Z "' — — '— � 71 D D > > > D > > > > > > 0 CD 0 z z z z z z z z z z z z °1 C, CD PHASES 3 Through 6 Arterial Dynamic Message Signs (ADMS) Phase 3 Phase 4 Phase 5 Phase 6 Item Description QTY QTY QTY QTY Units Unit Price Total Price ADMS(VS6-Hi Res) 2 0 0 1 EA $38,730.00 $116,190.00 Initial Spare Parts 0 0 0 0 LS $0.00 $0.00 'ARMS Structure 2 0 0 1 EA $46,018.00 $138,054.00 4- ADMS Powder Coating(NEW) 2 0 0 1 EA $2,710.00 $8,130.00 Year 1 -PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 Cabinets with UPS 2 0 0 1 EA $7,398.00 $22,194.00 Electrical 2 0 0 1 EA $34,788.00 $104,364.00 Communications 2 0 0 1 EA $5,872.00 $17,616.00 Installation 1 0 0 1 LS $233,888.00 $233,888.00 Integration 1 0 0 1 LS $21,945.00 $21,945.00 Testing 1 0 0 1 LS $2,803.00 $2,803.00 "Training 1 0 0 1 LS $0.00 $0.00 Documentation 1 0 0 1 LS $3,850.00 $3,850.00 Bluetooth Travel Time System $669,034.00 Item Description Phase 3 Phase 4 Phase 5 Phase 6 Units Unit Price Total Price QTY QTY QTY QTY TTS Unit with CDMA 7 0 2 1 EA $6,863.00 $68,630.00 Initial Spare Parts 0 0 0 0 LS _ $5,891.00 $0.00 Year 1 -PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 Bluetooth Server 0 0 0 0 LS $0.00 $0.00 Aluminum Break Away Poles 0 0 0 0 EA $0.00 $0.00 Electncal 0 0 0 0 LS $0.00 $0.00 Installation 1 1 1 1 LS $15,400.00 $15,400.00 Integration 1 1 1 1 LS $28,090.00 $28,090.00 Testing 1 1 1 1 LS $8,238.00 $8,238.00 "Training 1 1 1 1 LS $0.00 $0.00 Documentation 1 1 1 1 LS $3,300.00 $3,300.00 $123,658.00 PHASES 3 Through 6 Parking Sites (31 Surface Lots) Phase 3 Phase 4 Phase 5 Phase 6 Item Description QTY QTY QTY QTY Units Unit Price Total Price Ingress Sensors 27 8 8 21 EA $1,195.00 $76,480.00 Egress Sensors 28 9 9 22 EA $1,195.00 $81,260.00 Web Setup 13 4 4 10 EA $5,767.00 $178,777.00 Repeaters 31 9 9 24 EA $3,705.00 $270,465.00 VMS/Monument Post Signs&Post 13 4 4 10 EA $10,893.00 $337,683.00 Electrical 1 1 1 1 LS $94,628.00 $94,628.00 Installation 1 1 1 1 LS $841,134.00 $841,134.00 Integration 1 1 1 1 LS $72,937.00 $72,937.00 Testing 1 1 1 1 LS $25,660.00 $25,660.00 Training 1 1 1 1 LS $7,689.00 $7,689.00 Documentation 1 1 1 1 LS $3,850.00 $3,850.00 $1,990,563 0,' PHASES 3 Through 6 TMC Equipment Item Description Phase 3 Phase 4 Phase 5 Phase 6 Units Unit Price Total Price QTY QTY QTY QTY ITS Central Software-Dec.O Guide 1 1 1 1 LS $56,250.00 $56,250.00 Video Distribution System(VDS)(NEW) 1 1 1 1 LS $40,000.00 $40,000.00 Video Wall 0 0 0 0 LS $0.00 $0.00 Servers 1 1 1 1 LS $16,164.00 $16,164.00 Field Servers 0 0 0 0 LS $0.00 $0.00 Workstation Computers/Monitors 0 0 0 0 LS $0.00 $0.00 Workstation Furniture(by position) 0 0 0 0 LS $0.00 $0.00 Racks with Cable Management 0 0 0 0 LS $0.00 $0.00 L3 Ethernet Switch 0 0 0 0 LS $0.00 $0.00 Firewall/VPN with all licensing 0 0 0 0 LS $0.00 $0.00 Initial Spare Parts 1 1 1 1 LS $0.00 $0.00 Year 1 -PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 Single Mode Fiber Optic Cable 0 0 0 0 LS $0.00 $0.00 Fiber Optic Splice Management 1 1 1 1 LS $612.00 $612.00 Fiber Optic Patch Panel 1 1 1 1 LS $673.00 $673.00 Cat 6 Cable 1 1 1 1 LS $1,748.00 $1,748.00 Cat 6 Patch Panel 1 1 1 1 LS $429.00 $429.00 Electrical 1 1 1 1 LS $1,922.00_ $1,922.00 Misc.Operations Equipment 1 1 1 1 LS $3,460.00 $3,460.00 TMC Room Modifications 1 1 1 1 L5 $0.00 $0.00 Integration 1 1 1 1 LS $24,628.00 $24,628.00 Testing 1 1 1 1 L5 $8,481.00 $8,481.00 "Training 1 1 1 1 LS $0.00 $0.00 Documentation 1 1 1 1 LS $3,670.00 $3,670.00 j158,tl37 oo PHASES 3 Through 6 Remote TMC Equipment Phase 3 Phase 4 Phase 5 Phase 6 Item Description QTY QTY QTY QTY Units Unit Price Total Price Video Wall 0 0 0 0 LS $0.00 $0.00 Workstation Computers 0 0 0 0 LS $0.00 $0.00 Workstation Furniture(by position) 0 0 0 0 LS $0.00 $0.00 Racks with Cable Management 0 0 0 0 LS $0.00 $0.00 L3 Ethernet Switch 1 0 0 0 LS $0.00 $0.00 Single Mode Fiber Optic Cable 0 0 0 0 LS $0.00 $0.00 Fiber Optic Splice Management 0 0 0 0 LS $0.00 $0.00 Fiber Optic Patch Panel 0 0 0 0 LS $0.00 $0.00 Cat 6 Cable 0 0 0 0 LS $0.00 $0.00 Cat 6 Patch Panel 0 0 0 0 LS $0.00 $0.00 Electrical 0 0 0 0 LS $0.00 $0.00 Misc. Operations Equipment 0 0 0 0 LS $0.00 $0.00 TMC Room Modifications 0 0 0 0 LS $0.00 $0.00 Integration 0 0 0 0 LS $0.00 $0.00 Testing 0 0 0 0 LS $1,922.00 $1,922.00 **Training 0 0 0 0 LS $0.00 $0.00 Documentation 0 0 0 0 LS $641.00 $641.00 PHASES 3 Through 6 Communications Phase 3 Phase 4 Phase 5 Phase 6 Item Description QTY QTY QTY QTY Units Unit Price Total Price Hardened L2 Ethernet Switch 1 1 1 1 LS $29,125.00 $29,125.00 ITS Ethernet Integration 1 1 1 1 LS $58,250.00 $58,250.00 Transceivers/CDMA 13 4 4 10 EA $6,795.00 $210,645.00 Cat 6 Cable 1 1 1 1 LS $81,550.00 $81,550.00 Communication Cable 1 1 1 1 LS $72,230.00 $72,230.00 18GHz HC 300+300 Mbit radio with 2 foot dish 0 0 0 0 EA $8,155.00 $0.00 5800 MHz 2x2 MIMO Radio/23d8i and POE injector. (43 Total Links) 30 4 12 4 EA $4,427.00 $221,350.00 Communication poles for backbone wireless links in lieu of utilizing building(s)as tower sites(ie, PVP,etc.) 3 0 0 0 EA $91,935.00 $275,805.00 Initial Spare Parts 3 0 1 0 EA $5,825.00 $23,300.00 Year 1 -PMs and Maintenance 0 0 0 0 LS $0.00 $0.00 Electrical 1 1 1 1 LS $32,844.00 $32,844.00 Installation 1 1 1 1 LS $55,440.00 $55,440.00 Integration 1 1 1 1 LS $30,800.00 $30,800.00 Testing 1 1 1 1 LS $3,588.00 $3,588.00 **Training 1 1 1 1 LS $0.00 $0.00 Documentation 1 1 1 1 LS $2,503.00 $2,503.00 MEM Notes: Total= $6,820,766.00 1) Two ADMS Structures placement are dependent on Geotechnical Results.If additional Geotechnical bores at alternate locations are required.There will be an additional charge of$9,000.00 for each additional Geotechnical Drill performed. 2) Training performed for phases 1 and 2 will not be repeated for phases 3 through 6 3) Mast-Arm Structural Analysis can be moved to contingency funds incase no engineering is required 4) The cost shown for DecoGuide Software is for the Database Integration effort of all new devices added from Phases 3 through 6 5) Added cost for the VDS is to the labor effort to integrate the additional cameras added during Phases 3 through 6 into the VDS database. 6) The cost associated with the Server under TMC Equipment is to provide a larger VDS Primary and Secondary Server than what was priced in for Phases 1&2,it is not for two additional Servers which would of added another$18K 7) Pricing is based on quantities shown for each subsystem.Pricing will increase or decrease depending on final quantities required to complete Phases 3 through 6. 8) Wireless Communication includes the addition of three concrete spun poles to facilitate additonal backbone links if buildings are not available Additional poles may be required to complete wireless system for Phases 3 through 6.This will require the use of contingency funds. Resolutions - R7 K MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Rickelle Williams, Interim City Manager DATE: June 26, 2024 TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING, IN SUBSTANTIAL FORM, AMENDMENT NO. 2 TO THE AGREEMENT DATED APRIL 16, 2019, BETWEEN THE CITY AND TRANSCORE ITS, LLC, PURSUANT TO REQUEST FOR PROPOSALS (RFP) NO. 2016-199-KB FOR THE DESIGN, BUILD, OPERATION, AND MAINTENANCE SERVICES FOR AN INTELLIGENT TRANSPORTATION AND SMART PARKING SYSTEM ("ITS/SPS" OR "PROJECT"); SAID AMENDMENT (1) APPROPRIATING FUNDING FOR PHASES 3 THROUGH 6 OF THE PROJECT, TO INCLUDE THE REMAINING CORRIDORS AND INSTALLATION OF ADDITIONAL DEVICES CITYWIDE, IN THE AMOUNT OF $7,502,842.60, INCLUSIVE OF A 10% CONTINGENCY, THEREBY INCREASING THE TOTAL CONTRACT AMOUNT FOR DESIGN AND CONSTRUCTION. OF PHASES 1 THROUGH 6 FROM $12,904,661.17 TO $20,407,503.77; AND (2) INCREASING THE GUARANTEED MAXIMUM PRICE ("GMP") FOR DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE PROJECT DURING PHASES 1 THROUGH 6 FROM $25,000,000 TO $31,130,482.11; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE THE AMENDMENT AND SUBSEQUENT RELATED SERVICE ORDERS, SUBJECT TO APPROVAL OF THE SEVENTH CAPITAL BUDGET AMENDMENT AT THE JUNE 26, 2024 CITY COMMISSION MEETING. (ITEM TO BE SUBMITTED IN THE SUPPLEMENTAL) RECOMMENDATION BACKGROUND/HISTORY ANALYSIS Click or tap here to enter text. FISCAL IMPACT STATEMENT Click or tap here to enter text. Does this Ordinance require a Business Impact Estimate? (FOR ORDINANCES ONLY) The Business Impact Estimate (BIE)was published on . See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/ FINANCIAL INFORMATION Page 1330 of 1862 $62,532.82/ 158-9615-061357-26-410-530-00-00-00-28080 $3,351,437.41 / 158-9615-069357-26-410-530-00-00-00-28080 $22,500.00 1187-9615-069357-26-410-530-00-00-00-28080 CONCLUSION Applicable Area Citywide Is this a "Residents Right to Know" item, Is this item related to a G.O. Bond pursuant to City Code Section 2-17? Project? No No Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481 includes a principal engaged in lobbying? No If so, specify the name of lobbyist(s) and principal(s): N/A Department Transportation and Mobility Sponsor(s) Co-sponsor(s) • Page 1331 of 1862