41st Street Corridor Presentation 7-18-24GOB PROJECT #40
MIAMI BEACH 41 STREET CORRIDOR
REVITALIZATION PROJECT
GOB OVERSIGHT MEETING JULY 18, 2024
July 18, 2024/ 41st St Corridor Revitalization
60% DESIGN SITE PLAN
TO SOUTH BEACH
TO SOUTH BEACH
TO BEACHALTON RD.SHERIDAN AVE. PINE TREE DR. PRAIRIE AVE.ROYAL PALM AVE.TO NORTH BEACH
CHASE AVE.MERIDIAN AVE. N JEFFERSON AVE.GARDEN AVE. Brooks + Scarpa Architects / 2
July 18, 2024/ 41st St Corridor Revitalization
KIT OF PARTS
Public Art
Precast Seat WallsShade Trees Landscaping
Branded ConcreteMiami Beach Red Concrete Bike Racks
Trash Receptacles
Benches
Bus Stops
Brooks + Scarpa Architects / 3
July 18,2024/ 41st St Corridor Revitalization
PROPOSED PLANTING PALETTE
Live OakQuercus virginiana
Silver ButtonwoodConocarpus erectus Pigeon PlumCoccoloba diversifolia
Wart FernPhymatosorus scolopendriaGROUND COVERSAutograph TreeClusia rosea
Gumbo LimboBursera simaruba Mahogany TreeSwietenia mahogani Wild TamarindLysiloma latisiliquum
Philodendron 'Burle-Marx'Philodrendron burle-marxii MonsteraMonstera deliciosa Dwarf palmettoSabal minor
Green ButtonwoodConocarpus erectusRoyal PalmRoystonea regia
Spartina GrassSpartina Fakahatchee GrassTripsacum dactyloides
Green ButtonwoodConocarpus erectusStrangler FigFicus aurea
Muhly GrassMuhlenbergia capillaris
MilkweedAsclepias syriacaMEDIUM CANOPYLARGE CANOPYEXISTING CANOPYPerennial PeanutArachis glabrata
IF THE ROOT OF AN EXISTING ROYAL PALM ARE AT GRADE, THEN
METAL GRATING BECOMES THE PRIMARY TOOL TO PROTECT THE TREE AND EXPAND THE WALKS
Brooks + Scarpa Architects / 4
EXISTING PROPOSED
July 18, 2024/ 41st St Corridor Revitalization
CURRENT DESIGN - ALTON ROAD
Brooks + Scarpa Architects / 5
DRB 24-1023 / 41st St Corridor Revitalization
Brooks + Scarpa Architects / 6
DRB 24-1023 / 41st St Corridor Revitalization
Brooks + Scarpa Architects / 7
DRB 24-1023 / 41st St Corridor RevitalizationDRB 24-1023 / 41st St Corridor Revitalization
LIGHTING OPTION 2
Brooks + Scarpa Architects / 8
DRB 24-1023 / 41st St Corridor RevitalizationCURRENT DESIGN
Brooks + Scarpa Architects / 9
DRB 24-1023 / 41st St Corridor Revitalization
CURRENT DESIGN - PINE TREE DRIVE AND HENRY LEIBMAN SQUARE
Brooks + Scarpa Architects / 10
DRB 24-1023 / 41st St Corridor Revitalization
Brooks + Scarpa Architects / 11
DRB 24-1023 / 41st St Corridor Revitalization
Brooks + Scarpa Architects / 12
Construction:
Construction will be executed in conjunction with the replacement of existing water
transmission and distribution lines along 41st Street.
Current Budget: $15,000,000 (All 2018 GOB)
Estimated
Construction Cost: $10,000,000 (excluding electrical improvements for palm tree
lighting)