Loading...
41st Street Corridor Presentation 7-18-24GOB PROJECT #40 MIAMI BEACH 41 STREET CORRIDOR REVITALIZATION PROJECT GOB OVERSIGHT MEETING JULY 18, 2024 July 18, 2024/ 41st St Corridor Revitalization 60% DESIGN SITE PLAN TO SOUTH BEACH TO SOUTH BEACH TO BEACHALTON RD.SHERIDAN AVE. PINE TREE DR. PRAIRIE AVE.ROYAL PALM AVE.TO NORTH BEACH CHASE AVE.MERIDIAN AVE. N JEFFERSON AVE.GARDEN AVE. Brooks + Scarpa Architects / 2 July 18, 2024/ 41st St Corridor Revitalization KIT OF PARTS Public Art Precast Seat WallsShade Trees Landscaping Branded ConcreteMiami Beach Red Concrete Bike Racks Trash Receptacles Benches Bus Stops Brooks + Scarpa Architects / 3 July 18,2024/ 41st St Corridor Revitalization PROPOSED PLANTING PALETTE Live OakQuercus virginiana Silver ButtonwoodConocarpus erectus Pigeon PlumCoccoloba diversifolia Wart FernPhymatosorus scolopendriaGROUND COVERSAutograph TreeClusia rosea Gumbo LimboBursera simaruba Mahogany TreeSwietenia mahogani Wild TamarindLysiloma latisiliquum Philodendron 'Burle-Marx'Philodrendron burle-marxii MonsteraMonstera deliciosa Dwarf palmettoSabal minor Green ButtonwoodConocarpus erectusRoyal PalmRoystonea regia Spartina GrassSpartina Fakahatchee GrassTripsacum dactyloides Green ButtonwoodConocarpus erectusStrangler FigFicus aurea Muhly GrassMuhlenbergia capillaris MilkweedAsclepias syriacaMEDIUM CANOPYLARGE CANOPYEXISTING CANOPYPerennial PeanutArachis glabrata IF THE ROOT OF AN EXISTING ROYAL PALM ARE AT GRADE, THEN METAL GRATING BECOMES THE PRIMARY TOOL TO PROTECT THE TREE AND EXPAND THE WALKS Brooks + Scarpa Architects / 4 EXISTING PROPOSED July 18, 2024/ 41st St Corridor Revitalization CURRENT DESIGN - ALTON ROAD Brooks + Scarpa Architects / 5 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 6 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 7 DRB 24-1023 / 41st St Corridor RevitalizationDRB 24-1023 / 41st St Corridor Revitalization LIGHTING OPTION 2 Brooks + Scarpa Architects / 8 DRB 24-1023 / 41st St Corridor RevitalizationCURRENT DESIGN Brooks + Scarpa Architects / 9 DRB 24-1023 / 41st St Corridor Revitalization CURRENT DESIGN - PINE TREE DRIVE AND HENRY LEIBMAN SQUARE Brooks + Scarpa Architects / 10 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 11 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 12 Construction: Construction will be executed in conjunction with the replacement of existing water transmission and distribution lines along 41st Street. Current Budget: $15,000,000 (All 2018 GOB) Estimated Construction Cost: $10,000,000 (excluding electrical improvements for palm tree lighting) Thank you