LTC 362-2024 G.O. Bond Program - Project Implementation Update No. 34
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 2 of 8
Approximately $84.9 million have been expended and another $34.4 million are encumbered for
a total of $119.3 million out of the $157.4 million of available Tranche 1 funds. Chart 2 below
shows the full breakdown of the expenditures broken down by Category.
Chart 2
Tranche 1 Progress
Most of the 45 projects in Tranche 1 have different components which are considered distinct
projects, or “subprojects”, that are tracked separately and have separate budgets, procurement,
and implementation schedules.
The Tranche 1 Subproject Activity Summary depicted in Charts 3 and 4 on the next page summarize
the subproject activity into Status, Category and Funding amount.
Subproject Tracking Summary by Phase
The tracking summary indicates that 47 (53%) of the 89 total Tranche 1 subprojects have been
completed, 12 (13%) are under construction, 23 (26%) are in a design phase, 3 (3%) are in a
planning phase, and 4 (4%) are pending to become active. Chart 3 on the following page shows the
status of all subprojects broken down by Phase and Category.
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 3 of 8
Chart 3
The total expenditures funding summary for each of the subproject categories on Chart 4 below
indicates that as of July 18, 2024, the 47 completed subprojects equate to $37.5 million of the
budget (24%), $47.8 million (30%) equate to subprojects under construction, $67.2 million (43%)
equate to subprojects that are in the design phase, $1.6 million (1%) equate to subprojects that
are in the planning phase, and a total equating to $3.2 million (2%) are for subprojects which are
pending to become active. For a full breakdown, by project, refer to attached Exhibit B.
Chart 4
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 4 of 8
Subproject Progress
Chart 5 below compares the status of subprojects from previous months to the current month, dating
back to October 2019.
Chart 5
Construction Commencements for 2024
A summary graph of all projects proposed to commence construction during the 2024 calendar year
was reported. Refer to Exhibit C.
Tranche 1 Projects Update
The following Tranche 1 project updates were discussed at the May 9, 2024 and July 18, 2024
meetings. Refer to www.GOMBinfo.com for further details and information for each of the
following:
#01 72nd St. Community Complex
#23 Baywalk
#23 Pedestrian Bridge
#40 41st Street Improvements
#45 Fire Station #1
Fire Station #1
At the July 18 meeting, the Committee made a motion recommending to the City Commission to
proceed with the Fire Station 1 Project at the South Shore Community Center site, and not proceed
with the Flamingo Park location, regardless of the Referendum, because of concerns over the costs
spent to date, significant cost increase, and reduction of fire safety services over the next three
years (due to project delays). LTC# 351-2024 was sent to the City Commission to notify them of the
motion made.
41st Street Improvements
At the July 18 meeting, the Administration gave a presentation about the history, scope, and design
of the project. The Committee made a motion to move forward with the 41st Street Corridor
Improvements Project as presented. LTC# 350-2024 was sent to the City Commission to notify
them of the motion made.
No.%No.%No.%No.%No.%No.%No.%
ACTIVE/COMPLETE 44 68% 69 95% 80 95% 83 98% 85 96% 86 97% 85 96%-1
CONSTRUCTION 16 15%9 12% 11 13%8 9% 11 12% 11 12% 12 13%1
PLANNING / DESIGN 23 21% 31 42% 36 43% 35 41% 29 33% 28 31% 26 29%-2
CLOSED / COMPLETE 5 5% 29 40% 33 39% 40 47% 45 51% 47 53% 47 53%0
REMAINING 21 32%4 5%4 5%2 2%4 4%3 3%4 4%1
TOTAL SUB-PROJECTS 65 73 84 1 85 2 89 3 89 89 4
1 Total number of subprojects was updated to reflect the revised G.O. Bond Implementation Plan approved by the City Commission on April 21, 2021
2 GO# 25 - Waterway Restoration Project moved from Tranche 2 to Tranche 1
3 GO# 18 - Scott Rakow Youth Center - One sub-project sub-divided into 2
GO# 34 - Above Ground Improvements - Indian Creek Sub-Project moved from Tranche 2 to Tranche 1
GO# 52 - LED Lighting in Parks - One sub-project sub-divided into 2
GO# 5 - Flamingo Park Historic Lodge - One sub-project sub-divided into 2
GO# 43 - Alton Rd Shared Use Path sub-project removed
GO# 48 - Real Time Intelligence Center sub-project added
4 GO#13 - North Shore Path & Fields moved from Tranche 1 to Tranche 2 & GO# 27 Log Cabin moved from Tranche 2 to Tranche 1
11/18/2112/17/20 05/09/2412/14/2312/01/22 07/18/24
SUMMARY SUB-PROJECTS - TRANCHE 1
10/17/19 VARIANCE
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 5 of 8
Inspector General Quarterly Report Discussion
The Inspector General attended the May 9 meeting at the Committee Chair’s request. Committee
members discussed key findings from the OIG Quarterly Report and expressed the need for clear
legislative tools to prevent late-stage changes to projects.
Funding Swap
At the July 18 meeting, the Administration requested approval from the Committee to allow the
temporary realignment (or swap) of $150,000 from sub-project GO#30 Skate Park to GO#7 La
Gorce Park Playground. A memorandum explaining the swap is attached as Exhibit D, and the
Committee made a motion to accept the Administration’s recommendation to allow the funding
swap. LTC# 350-2024 was sent to the City Commission to notify them of the motion made.
Neighborhood Improvement Plan Update
At the July 18 meeting, at the request of a Committee member, the Administration gave a
presentation regarding the City’s updated Stormwater Master Plan. The meeting covered an in-
depth discussion on various aspects of stormwater management, including funding, project
prioritization, and coordination.
IMPLEMENTATION STATUS – 2022 ARTS & CULTURE BONDS
Project Dashboard and Program Progress Report
The G.O. Bond Arts & Culture bond was fully funded on July 27, 2023. Tranche 1 was issued in
the amount of $101,700,000. As of July 18, 2024, 19 out of the 20 Tranche 1 projects are in some
form of “Active” status and 1 has been completed. Chart 6 below shows the full breakdown by
Category and Project Status.
Chart 6
Approximately $7.6 million have been expended and another $3.4 million are encumbered for a
total of $11 million out of the $101.7 million of available Tranche 1 funds. Chart 7 on the next
page shows the full breakdown of the expenditures broken down by Category.
• 100% of all Tranche 1 Projects are
Complete or Active = 20
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 6 of 8
Chart 7
Tranche 1 Progress
Most of the 20 projects in Tranche 1 have different components which are considered distinct
projects, or “subprojects”, that are tracked separately and have separate budgets, procurement,
and implementation schedules. The Tranche 1 Subproject Activity Summary depicted in Chart 8
below, and Chart 9 on the next page, summarize the subproject activity into Status, Category and
Funding amount.
Subproject Tracking Summary by Phase
The tracking summary indicates that 6 (13%) of the 47 total Tranche 1 subprojects have been
completed, 8 (17%) are under construction, 20 (43%) are in a design phase, 8 (17%) are in a
planning phase, and 5 (11%) are pending to become active. Chart 8 below shows the status of all
subprojects broken down by Phase and Category.
Chart 8
G.O. Bond Program - Project Implementation Update No. 34
August 21, 2024
Page 7 of 8
The total expenditures funding summary for each of the subproject categories on Chart 9 below
indicates that as of July 18, 2024, the 6 completed subprojects equate to $2.5 million (2%) of the
budget, $15.9 million (16%) equate to subprojects under construction, $28 million (28%) equate
to subprojects that are in the design phase, $48.7 million (48%) equate to subprojects that are in
the planning phase, and a total equating to $6.6 million (7%) are for subprojects which are pending
to become active. For a full breakdown, by project, refer to attached Exhibit E.
Chart 9
Subproject Progress
Chart 10 below compares the status of subprojects from previous months to the current month,
dating back to March 2024.
Chart 10
Construction Commencements for 2024
A summary graph of all projects proposed to commence construction during the 2024 calendar year
was reported. Refer to Exhibit F.
No.%No.%No.%No.%No.%
ACTIVE/COMPLETE 40 87% 42 91% 42 91% 42 89% 42 89%0
CONSTRUCTION 6 6%8 17% 10 22% 10 21%8 17%-2
PLANNING / DESIGN 33 30% 31 67% 28 61% 28 60% 28 60%0
CLOSED / COMPLETE 1 1%3 7%4 9%4 9%6 13%2
REMAINING 6 13%4 9%4 9%5 11%5 11%0
TOTAL SUB-PROJECTS 46 46 46 47 *47
* #18 Aquatic Sculpture Park - PH3 added
4/11/24
SUMMARY SUB-PROJECTS - TRANCHE 1
3/7/24 VARIANCE5/9/24 6/13/24 7/18/24
__________________________________________________________________________________________________
Legend: (P) Planning Phase, (D) Design Phase, (C) Construction Phase, (PN) Pending, (V) Various Phases, (F) Future Tranche
General Obligation Bond Oversight Committee
City of Miami Beach
Karen Rivo, Chair
Maria Hernandez, Liaison
AGENDA
May 9, 2024
I.Roll Call and Introductions All 4:00pm
II.Committee Business Karen Rivo 4:05pm
•Adoption of Meeting Minutes from 4-11-24
III.Inspector General Quarterly Report Discussion Chair / Committee 4:15pm
2022 G.O. Bonds for Arts & Culture
IV.Arts & Culture Program General Status Update Maria Hernandez 4:30pm
V.2022 Bonds Projects Update PM / CIP / MH 4:35pm
•J. Gleason Theater (P), Byron Carlyle Theater (P),
Bass Museum (C), NOBE Oceanside Center (C), Reefline (P)
VI.Grant Projects Scope Variation Maria Hernandez 5:00pm
VII.Public Comment Public 5:15pm
2018 G.O. Bonds
VIII.Program General Status Update Maria Hernandez 5:25pm
IX.2018 Bonds Projects Update CIP 5:30pm
•FS#1 (D), Ped Bridge (D), Baywalks (D)
X.Public Comment Public 5:40pm
XI.Community Outreach N. Affairs Division 5:50pm
•Recent Past Public Meetings / Upcoming Events MH / KPulido
XII.Public Comment Public 5:55pm
XIII.Adjournment 6:00pm
Committee Charge
The purpose of the General Obligation Bond Oversight Committee is to make advisory recommendations to the City
Manager and City Commission from a macro perspective regarding the timely progress, overall goals, costs, including
financial efficiencies, and the timely completion of General Obligation Bond Program projects approved by the voters
in the City of Miami Beach. The Committee shall have the following powers & duties:
1.Receive input from the public, the City Administration, City consultants, and the City’s Inspector General, as
needed, to make recommendations relative to the overall timing, cost efficiencies, and prioritization of the G.O.
Bond Program projects.
2.Provide general oversight to ensure that G.O. Bond Program project timelines, budgets (including cost efficiencies)
are prioritized and achieved, and that the projects are completed in accordance with t he scope of work
approved by the voters.
3.Review City staff and G.O. Bond Program project manager’s progress reports and provide monthly reports to the
City Commission.
EXHIBIT A
__________________________________________________________________________________________________
Legend: (P) Planning Phase, (D) Design Phase, (C) Construction Phase, (PN) Pending, (V) Various Phases, (F) Future Tranche
General Obligation Bond Oversight Committee
City of Miami Beach
Karen Rivo, Chair
Maria Hernandez, Liaison
AGENDA
July 18, 2024
I.Roll Call and Introductions All 4:00pm
II.Committee Business Karen Rivo 4:05pm
•Adoption of Meeting Minutes from 5-9-24
•Welcome New Members
•GO Bond Program Information Maria Henandez
•Sunshine Law Legal
2018 G.O. Bonds
III.Neighborhood Improvement Plan Update (Stormwater MP)PWD 4:15pm
IV.Program General Status Update Maria Hernandez 4:30pm
V.Funding Swap – #7 La Gorce Park (Playground)Thais Vieira 4:35pm
VI.2018 Bonds Projects Update CIP / PWD 4:45pm
•72nd Street (D), 41st Street Corridor (D), Seawalls (C),
Streets (C), Sidewalks (C)
VII.Public Comment Public 5:10pm
2022 G.O. Bonds for Arts & Culture
VIII.Grant Projects Scope Variation (JM of FL and NWS)Maria Hernandez 5:20pm
IX.Arts & Culture Program General Status Update Maria Hernandez 5:30pm
X.2022 Bonds Projects Update FAC / CIP / MH 5:35pm
•J. Gleason (P), Byron Carlyle (P), Bot. Garden (P), Reefline (D)
XI.Community Outreach N. Affairs Division 5:50pm
•Recent Past Public Meetings / Upcoming Events MH / KPulido
XII.Public Comment Public 5:55pm
XIII.Adjournment 6:00pm
Committee Charge
The purpose of the General Obligation Bond Oversight Committee is to make advisory recommendations to the City
Manager and City Commission from a macro perspective regarding the timely progress, overall goals, costs, including
financial efficiencies, and the timely completion of General Obligation Bond Program projects approved by the voters
in the City of Miami Beach. The Committee shall have the following powers & duties:
1.Receive input from the public, the City Administration, City consultants, and the City’s Inspector General, as
needed, to make recommendations relative to the overall timing, cost efficiencies, and prioritization of the G.O.
Bond Program projects.
2.Provide general oversight to ensure that G.O. Bond Program project timelines, budgets (including cost efficiencies)
are prioritized and achieved, and that the projects are completed in accordance with the scope of work
approved by the voters.
3.Review City staff and G.O. Bond Program project manager’s progress reports and provide monthly reports to the
City Commission.
EXHIBIT A1
Ac
t
i
v
e
Ph
a
s
e
P
r
o
j
e
c
t
Na
m
e
Ca
t
e
g
o
r
y
D
e
p
a
r
t
m
e
n
t
Tr
a
n
c
h
e
A
n
t
i
c
i
p
a
t
e
d
En
d
Da
t
e
↑
Co
u
n
t
%
Count $ Budget $ Encumbered $ Spent % Spent $ Available
Cl
o
s
e
d
#5
3
PO
R
T
A
B
L
E
BO
L
L
A
R
D
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
07
‐31
‐20
1
9
1
1%599,916 ‐ 599,915 100%‐
Cl
o
s
e
d
#1
7
PO
L
O
PA
R
K
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
08
‐11
‐20
1
9
1
1%493,673 ‐ 493,673 100%‐
Cl
o
s
e
d
#1
9
SO
U
N
D
S
C
A
P
E
4K
TE
C
H
N
O
L
O
G
Y
Pa
r
k
s
To
u
r
i
s
m
& Cu
l
t
u
r
e
1
09
‐30
‐20
1
9
1
1%3,748,495 ‐ 3,748,495 100%‐
Cl
o
s
e
d
#1
3
NO
R
T
H
SH
O
R
E
LI
G
H
T
S
& PA
I
N
T
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
10
‐14
‐20
1
9
1
1%130,300 ‐ 130,210 100%89
Cl
o
s
ed
#5
2
TA
T
U
M
PA
R
K
LE
D
LI
G
HT
IN
G
Pu
b
l
i
c
Sa
f
e
t
y
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
10
‐14
‐20
1
9
1
1%52,758 ‐ 52,758 100%‐
Cl
o
s
e
d
#5
2
CR
E
S
P
I
PA
R
K
LE
D
LI
G
H
T
I
N
G
Pu
b
l
i
c
Sa
f
e
t
y
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
10
‐21
‐20
1
9
1
1%41,780 ‐ 41,780 100%‐
Cl
o
s
e
d
#5
2
ST
I
L
L
W
A
T
E
R
PA
R
K
LE
D
LI
G
H
T
I
N
G
Pu
b
l
i
c
Sa
f
e
t
y
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
10
‐21
‐20
1
9
1
1%41,780 ‐ 41,780 100%‐
Cl
o
s
ed
#2
6
CO
L
O
N
Y
TH
E
A
T
R
E
R OO
F
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
10
‐24
‐20
1
9
1
1%299,650 ‐ 299,650 100%‐
Cl
o
s
e
d
#2
1
ST
I
L
L
W
A
T
E
R
PA
R
K
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
11
‐08
‐20
1
9
1
1%142,440 ‐ 142,440 100%‐
Cl
o
s
e
d
#3
CR
E
S
P
I
PA
R
K
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
11
‐09
‐20
1
9
1
1%184,920 ‐ 184,919 100%1
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
PA
I
N
T
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
11
‐12
‐20
1
9
1
1%116,776 ‐ 116,776 100%‐
Cl
o
s
ed
#4
7
MA
C
A
R
T
H
U
R
CS
W
Y
RE
AD
E
R
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
11
‐28
‐20
1
9
1
1%64,904 ‐ 64,904 100%‐
Cl
o
s
e
d
#5
2
NO
R
M
A
N
D
Y
IS
L
E
PA
R
K
LE
D
LI
G
H
T
I
N
G
Pu
b
l
i
c
Sa
f
e
t
y
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
12
‐02
‐20
1
9
1
1%212,599 ‐ 212,593 100%5
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
HV
A
C
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
12
‐06
‐20
1
9
1
1%137,303 ‐ 137,302 100%‐
Cl
o
s
e
d
#1
3
NO
R
T
H
SH
O
R
E
RO
O
F
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
12
‐16
‐20
1
9
1
1%375,000 ‐ 374,722 100%276
Cl
o
s
ed
#1
8
SC
O
T
T
RA
K
O
W
R OO
F
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
01
‐05
‐20
2
0
1
1%127,218 ‐ 127,217 100%‐
Cl
o
s
e
d
#2
6
MI
A
M
I
CI
T
Y
BA
L
L
E
T
RO
O
F
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
01
‐15
‐20
2
0
1
1%758,824 ‐ 758,824 100%‐
Cl
o
s
e
d
#1
3
NO
R
T
H
SH
O
R
E
CA
M
E
R
A
S
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
02
‐04
‐20
2
0
1
1%205,699 ‐ 60,858 30%144,841
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
CA
M
E
R
A
S
Pa
rk
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
02
‐05
‐20
2
0
1
1%110,660 ‐ 110,659 100%‐
Cl
o
s
e d
#3
2
PA
L
M
& HI
B
I
S
C
U
S
LA
N
D
S
C
A
P
I
N
G
In
f
r
a
s
t
r
u
c
t
u
r
e
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
03
‐25
‐20
2
0
1
1%1,000,000 ‐ 1,000,000 100%‐
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
WI
N
D
O
W
S
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
04
‐16
‐20
2
0
1
1%373,420 ‐ 198,887 53%174,531
Cl
o
s
e
d
#2
6
FI
L
L
M
O
R
E
RO
O
F
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
05
‐15
‐20
2
0
1
1%1,874,156 ‐ 1,874,155 100%‐
Cl
o
s
e
d
#4
FA
I
R
W
A
Y
PA
R
K
PA
V
IL
I
O
N
Pa
r
k
s
Pa
r ks
& Re
c
r
e
a
t
i
o
n
1
05
‐15
‐20
2
0
1
1%50,000 ‐ 35,044 70%14,955
Cl
o
s
e
d
#2
CO
L
L
I
N
S
PA
R
K
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
05
‐28
‐20
2
0
1
1%557,287 ‐ 557,287 100%‐
Cl
o
s
e
d
#1
3
NO
R
T
H
SH
O
R
E
GE
N
E
R
A
T
O
R
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
06
‐30
‐20
2
0
1
1%524,999 ‐ 503,861 96%21,138
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
GE
N
E
R
A
T
O
R
Pa
r
k
s
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
06
‐30
‐20
2
0
1
1%729,719 ‐ 729,717 100%‐
Cl
o
s
ed
#1
8
SC
O
T
T
RA
K
O
W
PO
O
L
Pa
r ks
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
07
‐06
‐20
2
0
1
1%977,105 ‐ 977,104 100%‐
Cl
o
s
e
d
#4
7
71
ST
.
EN
T
R
A
N
C
E
RE
A
D
E
R
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
07
‐12
‐20
2
0
1
1%31,582 ‐ 31,582 100%‐
Cl
o
s
e
d
#4
7
JU
L
I
A
TU
T
T
L
E
CS
W
Y
RE
A
D
E
R
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
09
‐21
‐20
2
0
1
1%89,186 ‐ 89,185 100%1
Cl
o
s
e
d
#5
7
LU
M
M
U
S
PA
R
K
/
O
C
E
A
N
DR
I
V
E
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
02
‐28
‐20
2
1
1
1%824,845 ‐ 824,845 100%‐
Cl
o
s
ed
#4
FA
I
R
W
A
Y
PA
R
K FE
N
C
E
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
03
‐10
‐20
2
1
1
1%209,999 ‐ 205,917 98%4,082
Cl
o
s
e
d
#4
0
41
ST
R
E
E
T
LI
G
H
T
I
N
G
UP
G
R
A
D
E
S
In
f
r
a
s
t
r
u
c
t
u
r
e
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
03
‐13
‐20
2
1
1
1%102,999 ‐ 99,173 96%3,825
Cl
o
s
e
d
#5
6
CA
M
E
R
A
S
‐
BE
A
C
H
W
A
L
K
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
04
‐02
‐20
2
1
1
1%693,219 ‐ 693,218 100%‐
Cl
o
s
e
d
#2
4
MI
D
D
L
E
BE
A
C
H
BE
A
C
H
W
A
L
K
PH
3
P ar
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
1 2 ‐27
‐20
2
1
1
1%4,214,179 ‐ 4,214,178 100%‐
Cl
o
s
e
d
#4
2
NA
U
T
I
L
U
S
TR
A
F
F
I
C
CA
L
M
I
N
G
In
f
r
a
s
t
r
u
c
t
u
r
e
T
r
a
n
s
p
o
r
t
a
t
i
o
n
1
01
‐14
‐20
2
2
1
1%739,499 ‐ 712,631 96%26,867
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
GY
M
FL
O
O
R
S
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
01
‐21
‐20
2
2
1
1%322,451 ‐ 322,451 100%‐
Cl
o
s
e
d
#1
2
N.
BE
A
C
H
OC
E
A
N
S
I
D
E
BE
A
C
H
W
A
L
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
06
‐06
‐20
2
2
1
1%1,999,999 ‐ 1,999,999 100%‐
Cl
o
s
ed
#5
0
DA
D
E
BL
V
D
. C OR
R
I
D
O
R
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
08
‐03
‐20
2
2
1
1%165,674 ‐ 131,420 79%34,254
Cl
o
s
e
d
#9
MS
D
PL
A
Y
G
R
O
U
N
D
AN
D
SI
D
E
W
A
L
K
S
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
08
‐05
‐20
2
2
1
1%553,999 ‐ 524,410 95%29,588
Cl
o
s
e
d
#1
8
SC
O
T
T
RA
K
O
W
OT
H
E
R
FL
O
O
R
S
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
10
‐28
‐20
2
2
1
1%203,798 ‐ 203,798 100%‐
Cl
o
s
e
d
#5
2
FL
A
M
I
N
G
O
PA
R
K
LE
D
LI
G
H
T
I
N
G
Pu
b
l
i
c
Sa
f
e
t
y
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
1 1 ‐14
‐20
2
2
1
1%1,044,143 ‐ 1,044,143 100%‐
Cl
o
s
e
d
#5
0 71
ST
R
E
E
T
CO
R
R
I
D
O
R
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
12
‐22
‐20
2
2
1
1%211,999 ‐ 85,307 40%126,692
Cl
o
s
e
d
#5
3
CO
N
V
E
N
T
I
O
N
CE
N
T
E
R
BO
L
L
A
R
D
S
Pu
b
l
i
c
Sa
f
e
t
y
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
09
‐07
‐20
2
3
1
1%783,128 ‐ 782,013 100%1,115
Cl
o
s
e
d
#5
3
SO
U
N
D
S
C
A
P
E
PA
R
K
BO
L
L
A
R
D
S
Pu
b
l
i
c
Sa
f
e
t
y
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
12
‐01
‐20
2
3
1
1%225,198 ‐ 223,665 99%1,533
Cl
o
s
ed
#5
3
SO
U
T
H
PO
I
N
TE
PA
R
K BO
L
L
A
R
D
S
Pu
b
l
i
c
Sa
f
e
t
y
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
12
‐11
‐20
2
3
1
1%391,668 ‐ 335,362 86%56,306
Cl
o
s
e
d
#3
4
AB
O
V
E
GR
O
U
N
D
IM
P
R
O
V
‐IN
D
I
A
N
CR
K
In
f
r
a
s
t
r
u
c
t
u
r
e
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
03
‐30
‐20
2
4
1
1%1,112,000 ‐ 1,111,636 100%363
Cl
o
s
e
d
Su
m
46
52%27,850,946 ‐ 27,210,463 640,462
Cl
o
s
e
d
Co
u
n
t
46
52%46 46 46 46
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
7/11/2024 ‐ 11:16 AM
EX
H
I
B
I
T
B
G.
O
.
BO
N
D
PR
O
J
E
C
T
LI
S
T
BY
PH
A
S
E
G.
O
.
BO
N
D
PR
O
J
E
C
T
LI
S
T
BY
PH
A
S
E
Ac
t
i
v
e
Ph
a
s
e
P
r
o
j
e
c
t
Na
m
e
Ca
t
e
g
o
r
y
D
e
p
a
r
t
m
e
n
t
Tr
a
n
c
h
e
A
n
t
i
c
i
p
a
t
e
d
En
d
Da
t
e
↑
Co
u
n
t
%
Count $ Budget $ Encumbered $ Spent % Spent $ Available
Co
m
p
l
e
t
e
#4
9
PU
B
L
I
C
SA
F
E
T
Y
RA
D
I
O
SY
S
T
E
M
Pu
b
l
i
c
Sa
f
e
t
y
F
i
r
e
1
04
‐30
‐20
2
2
1
1%9,700,000 1,183,314 8,510,032 1 6,653
Co
mp
l
e
t
e
Su
m
2
2%9,700,000 1,183,314 8,510,032 6,653
Co
mp
l
e
t
e
Co
u
n
t
1
1%1 1 1 1
C on
s
t
r
u
c
t
i
o
n
#3
8
ST
R
E
E
T
S
‐
TR
A
N
C
H
E
1
In
f
r
a
s
t
r
u
c
t
u
r
e
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
07
‐31
‐20
2
4
1
1%5,800,000 69 5,710,431 1 89,498
C on
s
t
r
u
c
t
i
o
n
#3
7
SI
D
E
W
A
L
K
S
‐
TR
A
N
C
H
E
1
In
f
r
a
s
t
r
u
c
t
u
r
e
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
08
‐30
‐20
2
4
1
1%3,960,066 15,494 3,838,071 1 106,499
C o ns
t
r
u
c
t
i
on
#3
3
TR
E
E
PL
A
N
T
I
N
G
‐
TR
A
N
C
H
E
1
In
f
r
a
s
t
r
u
c
t
u
r
e
E
n
v
i
r
o
n
m
e
n
t
a
l
1
09
‐30
‐20
2
4
1
1%2,770,000 12,774 2,520,573 1 236,652
C on
s
t
r
u
c
t
i
o
n
#5
0
AL
T
O
N
RD
.
CO
R
R
I
D
O
R
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
11
‐30
‐20
2
4
1
1%211,999 ‐ 113,025 1 98,973
C on
s
t
r
u
c
t
i
o
n
#5
7
CO
L
L
I
N
S
AV
E
/
W
A
S
H
AV
E
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
11
‐30
‐20
2
4
1
1%665,154 313,589 291,565 0 60,000
C on
s
t
r
u
c
t
i
o
n
#1
9
SO
U
N
D
S
C
A
P
E
R ES
T
R
O
O
M
S
/
S
T
O
R
A
G
E
Pa
r ks
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
12
‐05
‐20
2
4
1
1%827,001 701,334 84,952 0 40,713
C on
s
t
r
u
c
t
i
o
n
#5
FL
A
M
I
N
G
O
PA
R
K
LO
D
G
E
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
12
‐08
‐20
2
4
1
1%1,051,675 1,019,639 495 0 31,541
C on
s
t
r
u
c
t
i
o
n
#1
0
MA
U
R
I
C
E
GI
B
B
PA
R
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
12
‐09
‐20
2
4
1
1%5,251,274 1,874,721 2,882,292 1 494,260
C on
s
t
r
u
c
t
i
o
n
#4
7
OT
H
E
R
RE
A
D
E
R
S
CI
T
Y
W
I
D
E
Pu
b
l
i
c
Sa
f
e
t
y
P
o
l
i
c
e
1
12
‐30
‐20
2
4
1
1%1,390,000 303,319 649,716 0 436,964
C o ns
t
r
u
c
t
i
on
#3
9
SE
A
W
A
L
L
S
/
S
H
O
R
E
L
I
N
E
S
‐
TR
A
N
C
H
E
1
In
f
r
a
s
t
r
u
c
t
u
r
e
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
12
‐30
‐20
2
4
1
1%4,999,999 687,234 4,179,726 1 133,037
C on
s
t
r
u
c
t
i
o
n
#4
8
RE
A
L
TI
M
E
IN
T
E
L
L
I
G
E
N
C
E
CE
N
T
E
R
Pu
b
l
i
c
Sa
f
e
t
y
P
r
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1
02
‐28
‐20
2
5
1
1%701,460 532,939 23,176 0 145,344
C on
s
t
r
u
c
t
i
o
n
#1
5
PA
R
3 / BA
Y
S
H
O
R
E
PA
R
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
09
‐17
‐20
2
5
1
1%20,166,104 8,228,173 11,936,971 1 959
C o ns
tr
u
c
t
i
o
n
Su
m
48
54%$47,794,732 $13,689,285 $32,230,993 $1,874,440
Co
n
s
t
r
u
c
t
i
o
n
Co
u
n
t
12
13%12 12 12 12
De
s
ig
n
#9
MS
D
PA
R
K
LI
G
H
T
I
N
G
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
12
‐01
‐20
2
4
1
1%127,999 27,638 12,737 0 87,624
De
s
ig
n
#1
3
N.
S
.
PL
A
Y
G
R
O
U
N
D
& RE
F
O
R
E
S
T
A
T
I
O
N
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
12
‐02
‐20
2
4
1
1%794,999 352,580 373,882 0 68,537
De
s
ig
n
#4
8
PO
L
I
C
E
HQ
FA
C
I
L
I
T
Y
‐
TR
A
N
C
H
E
1
Pu
b
l
i
c
Sa
f
e
t
y
P
r
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
1,
2
12
‐02
‐20
2
4
1
1%5,871,811 258,548 1,709,219 0 3,904,042
De
s
i gn
#4
2 PA
L
M
VI
E
W
TR
A
F
F
I
C
CA
L
M
I
N
G
In
f
r
a
s
t
r
u
c
t
u
r
e
T
r
a
n
s
p
o
r
t
a
t
i
o
n
1
12
‐30
‐20
2
4
1
1%86,349 ‐ 46,427 1 39,922
De
s
ig
n
#5
FL
A
M
I
N
G
O
PA
R
K
MA
S
T
E
R
PL
A
N
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
05
‐27
‐20
2
5
1
1%14,098,325 617,965 1,162,771 0 12,317,588
De
s
ig
n
#5
2
FL
A
.
PA
R
K
LE
D
LI
G
H
T
I
N
G
‐
FI
E
L
D
S
Pu
b
l
i
c
Sa
f
e
t
y
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
05
‐27
‐20
2
5
1
1%1,655,856 ‐ ‐ ‐ 1,655,856
De
s
i gn
#4
2 BA
Y
S
H
O
R
E
SO
U
T
H
TR
A
F
F
I
C
CA
L
M
I
N
G
In
f
r
a
s
t
r
u
c
t
u
r
e
T
r
a
n
s
p
o
r
t
a
t
i
o
n
1
08
‐24
‐20
2
5
1
1%380,148 16,788 335,207 1 28,153
De
s
ig
n
#4
3
CH
A
S
E
AV
E
/
3
4
ST
SH
A
R
E
D
US
E
PA
T
H
In
f
r
a
s
t
r
u
c
t
u
r
e
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
09
‐16
‐20
2
5
1
1%829,999 65,807 388,911 0 375,281
De
s
ig
n
#5
5
ST
R
E
E
T
LI
G
H
T
I
N
G
‐
TR
A
N
C
H
E
1
Pu
b
l
i
c
Sa
f
e
t
y
P
u
b
l
i
c
Wo
r
k
s
De
p
a
r
t
m
e
n
t
1
10
‐01
‐20
2
5
1
1%3,500,000 88,179 573,174 0 2,838,646
De
s
ig
n
#4
3
23
ST
.
ST
R
E
E
T
S
C
A
P
E
IM
P
R O VE
M
E
N
T
S
In
f
r
a
s
t
r
u
c
t
u
r
e
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
12
‐15
‐20
2
5
1
1%1,549,998 22,515 769,130 0 758,353
De
s
ig
n
#2
3
PE
D
E
S
T
R
I
A
N
BR
I
D
G
E
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
01
‐26
‐20
2
6
1
1%8,999,999 7,160,982 1,838,409 0 606
De
s
ig
n
#4
2
NO
R
M
A
N
D
Y
IS
L
E
TR
A
F
F
I
C
CA
L
M
I
N
G
In
f
r
a
s
t
r
u
c
t
u
r
e
T
r
a
n
s
p
o
r
t
a
t
i
o
n
1
02
‐01
‐20
2
6
1
1%293,999 18,212 254,524 1 21,263
De
s
ig
n
#8
LU
M
M
U
S
PA
R
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
04
‐28
‐20
2
6
1
1%4,736,999 1,034,172 58,107 0 3,644,719
De
s
i gn
#5
4 MA
R
I
N
E
PA
T
R
O
L
FA
C
I
L
I
T
Y
Pu
b
l
i
c
Sa
f
e
t
y
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
06
‐14
‐20
2
6
1
1%1,999,999 291,449 407,303 0 1,301,245
De
s
ig
n
#2
5
WA
T
E
R
W
A
Y
RE
S
T
O
R
A
T
I
O
N
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
09
‐18
‐20
2
6
1
1%499,999 ‐ 28,631 0 471,368
De
s
ig
n
#4
5
FI
R
E
ST
A
T
I
O
N
#1
Pu
b
l
i
c
Sa
f
e
t
y
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
10
‐25
‐20
2
6
1
1%5,746,058 1,579,524 2,866,801 0 1,299,730
De
s
ig
n
#4
0
41
ST
C OR
R
I
D
O
R
IM
P
R OV
E
M
E
N
T
S
In
f
r
a
s
t
r
u
c
t
u
r
e
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
06
‐08
‐20
2
7
1
1%2,428,318 808,278 1,508,933 1 111,107
De
s
ig
n
#5
0
41
ST
.
CO
R
R
I
D
O
R
CA
M
E
R
A
S
Pu
b
l
i
c
Sa
f
e
t
y
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
08
‐01
‐20
2
7
1
1%235,324 ‐ 17,999 0 217,324
De
s
ig
n
#1
72
ST
.
CO
M
M
U
N
I
T
Y
CO
M
P
L
E
X
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
04
‐22
‐20
2
8
1
1%10,800,000 5,935,536 3,129,235 0 1,735,228
De
s
ig
n
#2
3
BA
Y
GA
R
D
E
N
MA
N
O
R
LI
N
K
P ar
k
s
C ap
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
oj
e
c
t
s
1,
2
05
‐19
‐20
2
8
1
1%269,999 42,370 159,054 1 68,575
De
s
ig
n
#2
3
BA
Y
V
I
E
W
TE
R
R
A
C
E
LI
N
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
05
‐19
‐20
2
8
1
1%169,999 31,811 137,957 1 230
De
s
ig
n
#2
3
SO
U
T
H
BA
Y
CL
U
B
LI
N
K
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
05
‐19
‐20
2
8
1
1%559,999 28,206 294,756 1 237,037
De
s
ig
n
#3
1
OC
E
A
N
DR
I
V
E
CO
R
R
I
D
O
R
In
f
r
a
s
t
r
u
c
t
u
r
e
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
04
‐22
‐20
2
9
1
1%1,549,000 734,064 466,413 0 348,523
De
s
i
gn
Su
m
11
5
129%$67,185,176 $19,114,624 $16,539,580 $31,530,957
De
s
i
g
n
Co
u
n
t
23
26%23 23 23 23
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
7/11/2024 ‐ 11:16 AM
G.
O
.
BO
N
D
PR
O
J
E
C
T
LI
S
T
BY
PH
A
S
E
Ac
t
i
v
e
Ph
a
s
e
P
r
o
j
e
c
t
Na
m
e
Ca
t
e
g
o
r
y
D
e
p
a
r
t
m
e
n
t
Tr
a
n
c
h
e
A
n
t
i
c
i
p
a
t
e
d
En
d
Da
t
e
↑
Co
u
n
t
%
Count $ Budget $ Encumbered $ Spent % Spent $ Available
Pl
a
n
n
i
n
g
#3
6
WA
S
H
I
N
G
T
O
N
AV
E
.
CO
R
R
I
D
O
R
In
f
r
a
s
t
r
u
c
t
u
r
e
E
c
o
n
o
m
i
c
De
v
e
l
o
p
m
e
n
t
1,
2
10
‐01
‐20
2
4
b
1
1%397,616 ‐ 213,740 1 183,876
Pl
a
n
n
i
n
g
#5
FL
A
M
I
N
G
O
YO
U
T
H
CE
N
T
E
R
FA
C
I
L
I
T
Y
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
09
‐24
‐20
2
7
1
1%250,000 167,701 33,880 0 48,418
Pl
a
n
n
i
n
g
#4
6
OC
E
A
N
RE
S
C
U
E
NO
B
E
FA
C
I
L
I
T
Y
Pu
b
l
i
c
Sa
f
e
t
y
C
a
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
08
‐20
‐20
2
9
1
1%1,000,000 202,166 110,829 0 687,004
Pl
a
n
n
i
n
g
Su
m
18
20%$1,647,616 $369,867 $358,449 $919,298
Pl
a
n
n
i
n
g
Co
u
n
t
3
3%3 3 3 3
Pe
n
d
i
n
g
#2
7
LO
G
CA
B
I
N
Pa
r
k
s
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
(b
l
a
n
k
)
1
1%1,076,000 ‐ ‐ ‐ 1,075,999
Pe
n
d
i
n
g
#3
0
SK
A
T
E
PA
R
K
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
(b
l
a
n
k
)
1
1%683,000 49,708 39,726 0 593,565
Pe
n
d
i
n
g
#2
9
WE
S
T
LO
T
S
‐
TR
A
N
C
H
E
1
Pa
r
k
s
Ec
o
n
o
m
i
c
De
v
e
l
o
p
m
e
n
t
1
(b
l
a
n
k
)
1
1%1,000,000 ‐ ‐ ‐ 1,000,000
Pe
n
d
i
n
g
#1
8
SC
O
T
T
RA
K
O
W
IC
E
RI
N
K
FL
O
O
R
S
Pa
r
k
s
Pa
r
k
s
& Re
c
r
e
a
t
i
o
n
1
(b
l
a
n
k
)
1
1%413,640 ‐ ‐ ‐ 413,640
Pe
n
d
i
n
g
Su
m
28
31%$3,172,640 $49,708 $39,726 $3,083,204
Pe
n
d
i
n
g
Co
u
n
t
4
4%4 4 4 4
89
100% $157,351,110 $34,406,798 $84,889,243 54% $38,055,014
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
7/11/2024 ‐ 11:16 AM
www.GOMBInfo.com
Bold
2024 CONSTRUCTION COMMENCEMENTS$32.7 Million Total GOB Budget
First Quarter
Second Quarter
-Soundscape Storage
-Pedestrian Bridge
-Flamingo Park Lodge
Third Quarter
-Soundscape Storage
-Pedestrian Bridge
-Bayshore Traffic Calming
-Street Lighting
-N. Shore Playground
-Police HQ
-Flamingo Pk Butterfly Garden *
Fourth Quarter
-Police HQ
-Flamingo Park Softball Field
-MSD Park Lighting
-23rd Streetscape
-Fire Station 1 (if it remains
at current site)Bold Text Indicates Projects have Commenced in Calendar Year
Red Text Indicates Projects that have changed from last month
*Contingent upon Fire Station 1 Project
EXHIBIT C
Page 1 of 1
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, FL 33139 Tel. 305-673-7010 Fax: 305-673-7782
Office of the City Manager
MEMORANDUM
TO: Karen Rivo, Chair, and G.O. Bond Oversight Committee, (the “Committee”)
FROM: Maria Hernandez, G.O. Bond Program Director
DATE:July 18, 2024
SUBJECT: Funding Swap for GO #7 La Gorce Park
From GO #30 Skate Park
GOB PROJECT FUNDS RE-ALLIGNMENT, TRANSFER, & SCOPE CHANGE PROTOCOL
•Protocol #6: Advancement of Future Tranche Project to an Active Tranche. Refer to attached
Protocols Chart.
BACKGROUND
GO#7 La Gorce Park was originally contemplated as a Tranche 2 project of the 2018 General
Obligation Bond.
La Gorce Park has also been identified as one of the artistic playgrounds to be developed as part of
the Artistic Playgrounds Project (GOAC #17) from the Arts & Culture General Obligation Bond. A
vendor has already been selected and site surveying is currently underway. Funding from the 2018
G.O. Bond will be required for the execution of the project.
In order to advance GO#7 La Gorce Park to Tranche 1, a funding swap from other projects in the
Parks Category is necessary.
RECOMMENDATION
The Administration proposes the temporary re-alignment of funding in the amount of $150,000 from
the Skate Park Project (GO#30) since it is anticipated that this project will not require these funds until
after the issuance of Tranche 2 in the Parks category.
The revised distribution of funding between Tranches is as follows:
This funding swap will require a budget amendment which will be addressed through the Capital
Budget process.
Tranche 1
Current
Budget
Swaps
Tranche 1
Amended
Budget
Tranche 2
Current
Budget
Tranche 2
Amended
Budget
Total Budget
#7 La Gorce Park -$ 150,000$ 150,000$ 150,000$ -$ 150,000$
#30 Skate Park 683,000$ (150,000)$ 533,000$ 67,000$ 217,000$ 750,000$
EXHIBIT D
Ac
t
i
v
e
Ph
a
s
e
No
.
Pr
o
j
e
c
t
Na
m
e
Ca
t
e
g
o
r
y
D
e
p
a
r
t
m
e
n
t
Tr
a
n
c
h
e
A
n
t
i
c
i
p
a
t
e
d
En
d
Da
t
e
↑
Co
u
n
t
%
C
o
u
n
t
$
Budget $ Encumbered $ Spent % Spent $ Available
Cl
o
s
e
d
14
M
B
BA
N
D
S
H
E
L
L
CA
N
O
P
Y
PR
O
J
E
C
T
I
O
N
MA
P
P
I
N
G
C
i
t
y
Ow
n
e
d
Gr
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
01
‐30
‐20
2
4
1
2%153,000 ‐ 153,000 1 ‐
Cl
o
s
e
d
07
A
R
T
DE
C
O
LA
D
D
E
R
/
R
O
O
F
AC
C
E
S
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
05
‐10
‐20
2
4
1
2%15,600 ‐ 720 0 14,880
Cl
o
s
e
d
Su
m
‐
0%168,600 ‐ 153,720 14,880
Cl
o
s
e
d
Co
u
n
t
2
4%2 2 2 2
Co
m
p
l
e
t
e
05
C
O
L
O
N
Y
EL
E
C
T
R
I
C
A
L
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
01
‐05
‐20
2
4
1
2%134,200 117,538 286 0 16,376
Co
m
p
l
e
t
e
20
M
B
CL
A
S
S
I
C
A
L
MU
S
I
C
FE
S
T
I
V
A
L
Ot
h
e
r
Pr
o
j
e
c
t
s
L
o
a
n
1
02
‐29
‐20
2
4
1
2%1,500,000 ‐ 1,484,757 1 15,243
Co
m
p
l
e
t
e
01
B
A
S
S
AU
T
O
M
A
T
I
C
SH
A
D
E
SY
S
T
E
M
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
06
‐18
‐20
2
4
1
2%230,600 43,568 53,491 0 133,541
Co
m
p
l
e
t
e
05
C
O
L
O
N
Y
FF
&
E
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
12
‐09
‐20
2
5
1
2%445,400 18,770 949 0 425,681
Co
m
p
l
e
t
e
Su
m
‐
0%2,310,200 179,876 1,539,484 590,839
Co
m
p
l
e
t
e
Co
u
n
t
4
9%4 4 4 4
Co
n
s
t
r
u
c
t
i
o
n
1
1
N
B
O
C
CO
M
M
U
N
I
T
Y
RO
O
M
FU
R
N
I
T
U
R
E
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
4
1
2%78,600 59,891 168 0 18,541
Co
n
s
t
r
u
c
t
i
o
n
0
1
B
A
S
S
LI
G
H
T
I
N
G
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
11
‐14
‐20
2
4
1
2%463,000 278,931 67,134 0 116,936
Co
n
s
t
r
u
c
t
i
o
n
1
9
C
O
L
L
I
N
S
PA
R
K
RO
T
U
N
D
A
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
02
‐26
‐20
2
5
1
2%1,500,000 1,088,977 234,613 0 176,410
Co
n
s
t
r
u
c
t
i
o
n
0
1
B
A
S
S
MI
S
C
E
L
L
A
N
E
O
U
S
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
06
‐16
‐20
2
5
1
2%833,000 62,807 20,922 0 749,272
Co
n
s
t
r
u
c
t
i
o
n
0
3
W
F
HO
U
S
I
N
G
(C
O
L
L
I
N
S
PA
R
K
)
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
CI
P
1
10
‐18
‐20
2
5
1
2%4,000,000 ‐ 4,000,000 1 ‐
Co
n
s
t
r
u
c
t
i
o
n
0
5
C
O
L
O
N
Y
TE
C
H
N
O
L
O
G
Y
IM
P
R
O
V
.
Ci
t
y
Ow
n
e
d
Gr
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
11
‐11
‐20
2
5
1
2%2,594,000 ‐ 550,000 0 2,044,000
Co
n
s
t
r
u
c
t
i
o
n
0
8
N
E
W
WO
R
L
D
SY
M
P
H
O
N
Y
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
10
‐09
‐20
2
6
1
2%5,700,000 ‐ 415,649 0 5,284,351
Co
n
s
t
r
u
c
t
i
o
n
1
2
H
I
S
P
A
N
I
C
CO
M
M
U
N
I
T
Y
CN
T
R
.
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
0 7-
3
0
-2
0
2
5
1
2%767,000 ‐ 62,334 0 704,666
Co
n
s
t
r
u
c
t
i
o
n
Su
m
‐
0%15,935,600 1,490,606 5,350,819 9,094,175
Co
n
s
t
r
u
c
t
i
o
n
Co
u
n
t
8
17%8 8 8 8
De
s
i
g
n
11
N
B
O
C
DO
O
R
S
& WI
N
D
O
W
S
SE
A
L
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
10
‐01
‐20
2
4
1
2%161,800 3,662 345 0 157,793
De
s
i
g
n
11
N
B
O
C
SO
U
N
D
SY
S
T
E
M
& AC
O
U
S
T
I
C
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
10
‐01
‐20
2
4
1
2%408,300 78,903 19,785 0 309,612
De
s
i
g
n
17
N
O
R
T
H
SH
O
R
E
AR
T
I
S
T
I
C
PL
A
Y
G
R
O
U
N
D
Ot
h
e
r
Pr
o
j
e
c
t
s
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
11
‐29
‐20
2
4
1
2%238,000 ‐ ‐ ‐ 238,000
De
s
i
g
n
18
A
Q
U
A
T
I
C
SC
U
L
P
T
U
R
E
PA
R
K
‐
PH
.
1O
t h e r Pr
o
j
e
c
t
s
G
r
a
n
t
1
12
‐02
‐20
2
4
1
2%1,589,237 ‐ ‐ ‐ 1,589,237
De
s
i
g
n
01
B
A
S
S
FI
R
E
AL
A
R
M
SY
S
T
E
M
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
12
‐30
‐20
2
4
1
2%2,305,900 416,581 4,915 0 1,884,404
De
s
i
g
n
11
N
B
O
C
CA
T
E
R
I
N
G
KI
T
C
H
E
N
EX
P
A
N
S
I
O
N
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
02
‐14
‐20
2
5
1
2%392,900 156,316 838 0 235,746
De
s
i
g
n
01
B
A
S
S
ME
C
H
A
N
I
C
A
L
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
03
‐14
‐20
2
5
1
2%290,500 120,023 6,137 0 164,340
De
s
i
g
n
05
C
O
L
O
N
Y
BL
D
G
.
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1,
2
05
‐08
‐20
2
5
1
2%639,500 65,457 10,073 0 563,970
De
s
i
g
n
17
L
A
GO
R
C
E
AR
T
I
S
T
I
C
PL
A
Y
G
R
O
U
N
D
Ot
h
e
r
Pr
o
j
e
c
t
s
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
09
‐30
‐20
2
5
1
2%674,000 ‐ 9,991 0 664,009
De
s
i
g
n
17
S
.
PO
I
N
T
E
AR
T
I
S
T
I
C
PL
A
Y
G
R
O
U
N
D
Ot
h
e
r
Pr
o
j
e
c
t
s
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
10
‐30
‐20
2
5
1
2%1,126,000 ‐ 9,554 0 1,116,446
De
s
i
g
n
11
N
B
O
C
PA
I
N
T
I
N
G
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
11
‐24
‐20
2
5
1
2%141,400 66,500 301 0 74,599
De
s
i
g
n
05
C
O
L
O
N
Y
SE
C
U
R
I
T
Y
& CO
M
M
.
SY
S
T
E
M
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
12
‐10
‐20
2
5
1
2%286,900 ‐ 612 0 286,288
De
s
i
g
n
02
M
C
B
EL
E
C
T
R
I
C
A
L
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%393,500 ‐ 839 0 392,661
De
s
i
g
n
02
M
C
B
EL
E
V
A
T
O
R
MO
D
E
R
N
I
Z
A
T
I
O
N
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%524,800 ‐ 1,119 0 523,681
De
s
i
g
n
02
M
C
B
FF
&
E
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%719,100 ‐ 1,533 0 717,567
De
s
i
g
n
02
M
C
B
ME
C
H
A
N
I
C
A
L
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%900,000 ‐ 1,918 0 898,082
De
s
i
g
n
02
M
C
B
MI
S
C
E
L
L
A
N
E
O
U
S
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%1,944,600 ‐ 4,145 0 1,940,455
De
s
i
g
n
02
M
C
B
TE
C
H
.
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Gr
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐30
‐20
2
6
1
2%7,518,000 ‐ 248,609 0 7,269,391
De
s
i
g
n
01
B
A
S
S
TE
C
H
N
O
L
O
G
Y
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
09
‐30
‐20
2
6
1
2%604,000 ‐ 1,288 0 602,712
De
s
i
g
n
09
H
O
L
O
C
A
U
S
T
ME
M
O
R
I
A
L
MB
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
12
-
3
0
-
2
0
2
5
1
2%7,150,000 ‐ 128,000 0 7,022,000
De
s
i
g
n
Su
m
‐
0%28,008,437 907,442 450,002 26,650,993
De
s
i
g
n
Co
u
n
t
20
43%20 20 20 20
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
7/12/2024 ‐ 10:51 AM
EX
H IB
I
T
E
G.
O
.
BO
N
D
AR
T
S
AN
D
CU
L
T
U
R
E
PR
O
J
E
C
T
LI
S
T
BY
PH
A
S
E
G.
O
.
BO
N
D
AR
T
S
AN
D
CU
L
T
U
R
E
PR
O
J
E
C
T
LI
S
T
BY
PH
A
S
E
Ac
t
i
v
e
Ph
a
s
e
No
.
Pr
o
j
e
c
t
Na
m
e
C
a
t
e
g
o
r
y
D
e
p
a
r
t
m
e
n
t
T
r
a
n
c
h
e
A
n
t
i
c
i
p
a
t
e
d
En
d
Da
t
e
↑
Co
u
n
t
%
C
o
u
n
t
$
Budget $ Encumbered $ Spent % Spent $ Available
Pl
a
n
n
i
n
g
16
J
E
W
I
S
H
MU
S
E
U
M
OF
FL
O
R
I
D
A
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1
07
‐01
‐20
2
4
b
1
2%750,000 ‐ ‐ ‐ 750,000
Pl
a
n
n
i
n
g
10
B
Y
R
O
N
CA
R
L
Y
L
E
TH
E
A
T
E
R
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1,
2
03
‐31
‐20
2
5
b
1
2%10,590,000 ‐ 22,240 0 10,567,760
Pl
a
n
n
i
n
g
14
M
B
BA
N
D
S
H
E
L
L
BU
I
L
D
I
N
G
IM
P
R
O
V
E
M
E
N
T
S
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
10
‐23
‐20
2
6
1
2%3,617,000 345,632 7,596 0 3,263,772
Pl
a
n
n
i
n
g
13
C
O
L
L
I
N
S
PA
R
K
CU
L
T
U
R
A
L
CN
T
R
.
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
01
‐04
‐20
2
7
1
2%7,670,000 ‐ 16,108 0 7,653,892
Pl
a
n
n
i
n
g
06
M
I
A
M
I
BE
A
C
H
BO
T
A
N
I
C
A
L
GA
R
D
E
N
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
09
‐26
‐20
2
7
1
2%6,270,000 ‐ 13,168 0 6,256,832
Pl
a
n
n
i
n
g
01
B
A
S
S
MU
S
E
U
M
MU
L
T
I
P
U
R
P
O
S
E
AD
D
I
T
I
O
N
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1,
2
08
‐17
‐20
2
9
1
2%5,862,000 489,697 12,311 0 5,359,992
Pl
a
n
n
i
n
g
04
F
I
L
L
M
O
R
E
(J
A
C
K
I
E
GL
E
A
S
O
N
)
Ci
t
y
Ow
n
e
d
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1,
2
(b
l
a
n
k
)
1
2%12,406,000 ‐ 26,053 0 12,379,947
Pl
a
n
n
i
n
g
15
T
H
E
WO
L
F
S
O
N
I
A
N
No
n
‐Ci
t
y
Ow
n
e
d
G
r
a
n
t
‐
Fa
c
i
l
i
t
i
e
s
Ma
n
a
g
e
m
e
n
t
1,
2
(b
l
a
n
k
)
1
2%1,500,000 ‐ ‐ ‐ 1,500,000
Pl
a
n
n
i
n
g
Su
m
‐
0%48,665,000 835,329 97,476 47,732,195
Pl
a
n
n
i
n
g
Co
u
n
t
8
17%8 8 8 8
Pe
n
d
i
n
g
07
A
R
T
DE
C
O
MU
S
E
U
M
EX
P
A
N
S
I
O
N
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
(
b
l
a
n
k
)
1
2%1,248,400 ‐ 2,622 0 1,245,778
Pe
n
d
i
n
g
07
A
R
T
DE
C
O
LI
G
H
T
I
N
G
Ci
t
y
Ow
n
e
d
Ca
p
i
t
a
l
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
s
1
(b
l
a
n
k
)
1
2%156,000 ‐ 333 0 155,667
Pe
n
d
i
n
g
17
O
T
H
E
R
AR
T
I
S
T
I
C
PL
A
Y
G
R
O
U
N
D
S
Ot
h
e
r
Pr
o
j
e
c
t
s
P
a
r
k
s
& Re
c
r
e
a
t
i
o
n
1
(b
l
a
n
k
)
1
2%1,797,000 ‐ ‐ ‐ 1,797,000
Pe
n
d
i
n
g
18
A
Q
U
A
T
I
C
SC
U
L
P
T
U
R
E
PA
R
K
‐
PH
.
2O
t h e r Pr
o
j
e
c
t
s
G
r
a
n
t
1
(b
l
a
n
k
)
1
2%2,328,316 ‐ ‐ ‐ 2,328,316
Pe
n
d
i
n
g
18
A
Q
U
A
T
I
C
SC
U
L
P
T
U
R
E
PA
R
K
‐
PH
.
3O
t h e r Pr
o
j
e
c
t
s
G
r
a
n
t
1
(b
l
a
n
k
)
1
2%1,082,447 ‐ ‐ ‐ 1,082,447
Pe
n
d
i
n
g
Su
m
‐
0%6,612,163 ‐ 2,954 6,609,209
Pe
n
d
i
n
g
Co
u
n
t
5
11%5 5 5 5 47
100% $101,700,000 $3,413,253 $7,594,456 7% $90,692,291
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
7/12/2024 ‐ 10:51 AM
www.GOMBInfo.com
2024 CONSTRUCTION COMMENCEMENTS
$21.1 Million Total GOBAC Budget
First Quarter
Colony Electrical Improv.
(Complete)
Second Quarter
Art Deco Welcome Ctr Roof
Access Ladder (Complete)
Bass Misc. Improvements
Bass Fire Alarm
Bass Mechanical
Collins Park Rotunda
Colony Technology
Colony FF&E (Complete)
Hispanic Comm. Center
Holocaust Memorial
NBOC Furniture
NBOC Kitchen
Third Quarter
Bass Fire Alarm
Holocaust Memorial
NBOC Doors/Windows Seal
NBOC Painting
NBOC Sound /Acoustics
NBOC Kitchen
N.Shore Artistic Playground
Fourth Quarter
Aquatic Sculpture Park PH1
Bass Mechanical
Bass Technology
Colony Bldg. Improv.
Colony Security & Comm.
Bold Text Indicates Projects have Commenced in Calendar Year
Red Text Indicates Projects that have changed from last month
EXHIBIT F
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, FL 33139 Tel. 305-673-7010 Fax: 305-673-7782
Office of the City Manager
MEMORANDUM
TO: Karen Rivo Chair and G.O. Bond Oversight Committee
FROM: Maria Hernandez, G.O. Bond Program Director
DATE:July 18, 2024
SUBJECT: ARTS & CULTURE BOND – GRANT PROJECTS SCOPE CHANGE
JEWISH MUSEUM OF FLORIDA
BACKGROUND
The final list of projects approved as part of the General Obligation Bond for Arts & Culture included
a $750,000 allocation for the Jewish Museum facility.
The scope of work was further defined as part of the Grant Agreement executed on December 20,
2023. The detailed scope of work is attached herein as Attachment 1.
REQUEST
The Jewish Museum of Florida (the Grantee) has requested the deletion of certain scopes of work
to be able to perform a full replacement of the facility’s air conditioning (AC) system, which was
unforeseen and is now time sensitive. The Grantee’s formal request is included herein as
Attachment 2. There is no cost to the City for this request.
The total estimated cost of the AC replacement, according to the Grantee, is $300,000, and the
total estimated cost of the scope of work to be removed is $307,000. The Grantee will be
responsible for all costs in excess of amounts approved by the City and will remain in full compliance
with the terms and conditions of the approved grant agreement.
As per sections 1.2, 2.1 and 7.3 of the Grant Agreement, City Commission approval is required for
any alterations to the previously approved scope of work. This request will be presented to the City
Commission for approval at the June 26, 2024 meeting and, if approved, will require an Amendment
to the Grant Agreement.
The City’s Bond Counsel and Tax Advisor have reviewed the request and have no objections.
REQUESTED RECOMMENDATION
In order to move this forward to the City Commission, the Administration requests a
recommendation from the GO Bond Oversight Committee.
Enclosures:
•Attachment 1 – Current Scope of Work
•Attachment 2 – Scope Change Request
cc: Jason Greene, CFO
Ricardo Dopico, City Attorney
Eric Carpenter, Deputy City Manager
Susan Gladstone, Jewish Museum of Florida
EXHIBIT G
DocuSign Envelope ID: DA1FBOE6-6E30-4DDE-9632-F 18E1B829408
EXHIBITC
BUDGET, FUNDING SOURCES AND CASH FLOW SCHEDULE
Upon receipt, funds can be deployed for construction and development within the range of six to
twelve months. It is estimated that the aforementioned improvements will take approximately one to
two years to complete.
Exterior hruoverents Landscape $ 10,000
Tree Removal/replanting $ 10,000
6 new sconces $ 5,000
Lawn sprinkler $ 5,000
Replace Tile on Front Steps $ 35,000
New & refurbish railings $ 10,000
Exterior lighting - parkingLED $ 7,500
Exterior lighting - building $ 35,000
Replace Sign Board $ 1,500
Parking lot security fences $ 50,000
Security Bollards $ 35,000
Paint exterior $ 50,000
Emergency generator $ 60,000
Collections Repair and paint stairwell $ 2,500
Replace flooring $ 5,000
Replace furniture $ 7,500
Create Storage $ 3,500
Replace lighting LED $ 2,000
Paint $ 2,000
Window coverings $ 1,000
Fire Protection upgrade at Collections $ 15,000
301 Building Install new lighting control system in Gallery $ 10,000
New exhibit & cove lighting fixtures LED $ 50,000
Purchase new man-lift $ 15,000
Repair and paint stairwells and lower areas $ 10,000
Pump system upgrade $ 5,000
Lighting at stain glass interior $ 5,000
311 Building Install new lighting control system in Gallery $ 10,000
New exhibit lighting fixtures LED $ 25,000
Create Storage in 311 Lobby $ 4,000
Kitchen/Receiving Replace Dish washer $ 1,000
Build storage Cabinets $ 8,000
BMG Upgrade Lighting Exhibits $ 15,000
Acoustical upgrades $ 20,000
Contingency $ 42,600
$ 573,100
Architectural Plans 10% $ 57,310
Permits $ 4,970
GC OH&P 20% $ 114,620
TOTAL $ 750,000
Attachment 1
Highlighted items to be removed from original scope.
Attachment 2
ATTACHMENT 2
Estimated Cost
SCOPE TO BE ADDED:
Air Conditioning Replacement 300,000$
Total scope to be added 300,000
SCOPE TO DELETED:
Tree Removal/replanting (10,000)$
Replace Tile on Front Steps (35,000)
New & refurbish railings (10,000)
Exterior lighting - building (35,000)
Replace Sign Board (1,500)
Parking lot security fences (50,000)
Emergency generator (60,000)
Repair and paint stairwell (2,500)
Create Storage (3,500)
FireProtection upgrade at Collections (15,000)
Install new lighting control system in Gallery (10,000)
Pump system upgrade (5,000)
Install new lighting control system in Gallery (10,000)
New exhibit lighting fixtures LED (25,000)
Upgrade Lighting Exhibits (15,000)
Acoustical upgrades (20,000)
Total scope to be deleted (307,500)
TOTAL SURPLUS (TO BE ADDED TO CONTINGENCY)(7,500)$
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, FL 33139 Tel. 305-673-7010 Fax: 305-673-7782
Office of the City Manager
MEMORANDUM
TO: Karen Rivo Chair and G.O. Bond Oversight Committee
FROM: Maria Hernandez, G.O. Bond Program Director
DATE:July 18, 2024
SUBJECT: ARTS & CULTURE BOND – GRANT PROJECTS SCOPE CHANGE
NEW WORLD SYMPHONY
BACKGROUND
The final list of projects approved as part of the General Obligation Bond for Arts & Culture included
a $5.7 million allocation for the New World Symphony facility.
The scope of work, as approved by the City Commission included a $750,000 allocation for a new
pergola at the Roof Garden. The detailed scope of work, as approved in the Grant Agreement
executed on October 11, 2023, is included herein as Attachment 1.
REQUEST
The New World Symphony (the Grantee) has requested the substitution of the pergola scope of
work for the replacement of the cameras and robotic control system in the Michael Tilson
Performance Hall. The Grantee’s formal request is included herein as Attachment 2. There is no
cost to the City for this request.
The total estimated cost of the new cameras and robotic control system, according to the Grantee,
is $1,545,051. The Grantee will be responsible for all costs in excess of amounts approved by the
City and will remain in full compliance with the terms and conditions of the approved grant
agreement.
As per sections 1.2, 2.1 and 7.3 of the Grant Agreement, City Commission approval is required for
any alterations to the previously approved scope of work. This request will be presented to the City
Commission for approval at the June 26, 2024 meeting and, if approved, will require an Amendment
to the Grant Agreement.
The City’s Bond Counsel and Tax Advisor have reviewed the request and have no objections.
REQUESTED RECOMMENDATION
In order to move this forward to the City Commission, the Administration requests a
recommendation from the GO Bond Oversight Committee.
Enclosures:
•Attachment 1 – Current Scope of Work
•Attachment 2 – Scope Change Request
cc: Jason Greene, CFO
Ricardo Dopico, City Attorney
Eric Carpenter, Deputy City Manager
David Phillips, New World Symphony
EXHIBITC
BUDGET, FUNDING SOURCES AND CASH FLOW SCHEDULE
Original Cash Flows
Project Description Budget Start End
Exterior Paint and Stucco 250,000 M ay 2023 Aug 2023
Replace Acoustical Panels 150,000 May 2023 Sep 2023
Replace Main Fire Alarm Panels 255,000 June 2023 July 2024
Facility-W ide Power Stabilization 150,000 Jun 2023 Jun 2024
Flood Barriers 650,000 Aug 2023 Sep 2024
New Pergola (Trellis) for Roof G arden 750,000 May 2024 Sep 2025
Acoustical Resurfacing of Perform ance Hall Sails 500,000 Jun 2024 Sep 2024
Elevator Modern ization 750,000 M ay 2023 Sep 2026
M ark-Ups 1,355,072
Contingency 889,928 Sep 2026
Totals 5 700 000
Notes
1. Curr ent budget based on pro posals and discussions with various contractors, or estimated.
2. AI I costs subject to change until contracts are executed.
3. Som e pro jects will require several contractors or subcontractors.
4. Som e projects will require perm its and other city approvals.
5. Tot al cost in excess of $5,700,000 will be funded by NW S or other donors.
6. All costs subm itted fo r reim bursem ent will com ply with term s and conditions of the executed grant agreement.
Attachment 1
Highlighted item to be removed from original scope.
May 31, 2024
Maria Hernandez
GO Bond Program Director
City of Miami Beach
1700 Convention Center Drive
Miami Beach FL 33139
Re: Arts & Culture Bond Grant Project Scope Change
Dear Maria:
New World Symphony respectfully requests the following change to our list of approved projects:
•REMOVE new pergola for the roof garden at New World Center.
•ADD new cameras and robotic control system for the Michael Tilson Thomas Performance Hall in
New World Center.
The funding allocation under the approved GO Bond grant to NWS will remain the same with no
incremental cost to the City. NWS will be responsible for any costs of this new project in excess of
amounts approved by the City of Miami Beach.
This request reflects a priority reassessment for constructing a pergola on our roof garden versus
approaching end-of-life for our current camera system. Our cameras and robotic control systems are at
the heart of most of the activities at NWS including WALLCAST® concerts, webcasts, and educational
activities (eg, masterclasses, distance learning, and remote connections with living composers). These
systems also provide support for rental activities in the performance hall which have included City of
Miami Beach Mayoral “State of the City” addresses, the Aspen Institute, and many other community
activations.
Separately, I have provided you with more detailed specifications and current pricing for the new camera
system and robotics. We will re-bid this in the spring of 2025 with the expectation that the work will occur
during the summer of 2025. This timeframe fits within the current schedules for completion of all NWS
GO Bond funded projects in Tranche One.
Thank you for your consideration of this change.
Sincerely,
David J. Phillips
Executive Vice President, Facilities and IT
Attachment 2