Follow up Q&A - 72nd Street Community Center Follow up Q&A following January 14, 2025 Presentation on 72nd Street Community Center How much has been spent on the project to date? - The project cost incurred to date is approximately $5M and includes Feasibility Study, Design Criteria Package (DCP), Design Build Process , Architectural / Engineering (A/E) design, Construction Manager at Risk (CMR) constructability / cost estimate , and CIP management fees. At the 30% Design, what is the cost of the Aquatics component? - The Aquatics Construction Cost from the 30% Cost Estimate is approximately $34.3M What is the output of the Photovoltaics ? - This facility will incorporate a solar power system to supply electricity to specific building components, including general lighting, means of egress lighting, and perimeter/security lighting. The system will consist of essential components such as solar panels, support structures/mounting brackets, inverters, and control panels. o The initial system design (as per the 30% CD Set) was estimated to generate approximately 100 kilowatts of power, with output subject to weather variations. o Given the addition of the new program, the system's expected output will require reassessment. o As the design progresses, further collaboration with the city will be crucial to precisely define the system's requirements.