Loading...
Resolution 2025-33513RESOLUTION NO.2025-33513 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA,APPROVING AND AUTHORIZING THE CITY MANAGER AND THE CITY CLERK TO EXECUTE AMENDMENT NO.1 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH,FLORIDA AND BROOKS +SCARPA ARCHITECTS, INC.,FOR THE PROVISION OF ADDITIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR ADDITIONAL SCOPE TO PROVIDE UPGRADES TO STRING LIGHTS,TREE LIGHTING AND INFRASTRUCTURE FOR LPR CAMERAS,FOR THE 41ST STREET CORRIDOR REVITALIZATION PROJECT,FOR A NOT TO EXCEED AMOUNT OF$391,277.18. WHEREAS,on September 2,2021,pursuant to the Request for Qualifications (RFQ)No.2021-196-ND,the City Commission adopted Resolution No.2021-31838 approving and authorizing the Mayor and City Clerk to execute an Agreement with Brooks +Scarpa Architects (B+S)for Architectural and Engineering Design Services,for the 41 st Street Corridor Revitalization project in the amount of $1,664,012.62;and WHEREAS,on March 29,2022,the City issued Notice to Proceed to B+S to start the design of the Project,and prepared updated concept drawings,30%design documents,which were compliant with the scope identified in the Conceptual Design;and WHEREAS,on November 15,2022,the project received favorable support from FOOT since the 41 st Corridor is state-owned road and requires their approval;and WHEREAS,on July 5"2023 the 30%design documents were presented to the Design Review Board (ORB)for advisory review and received a favorable recommendation;and WHEREAS,subsequent meetings with FOOT,at the 30%and 60%design phases,yielded several comments warranting significant design changes,B+S prepared updated 60%design documents incorporating comments received from the community, neighborhood committees,City staff and FOOT;and WHEREAS,on July 2,2024,the 60%Design Documents,reflecting the FOOT requested design modifications were presented to ORB on an advisory basis,where they provided favorable comments with recommendations,including; •Explore utilizing other bright colors (besides Miami Beach pink)for the canopy structures. •Miami Beach pink is acceptable for the sidewalk pavement and furniture that emerges from the sidewalk. •Miami Beach pink sidewalks should have the same branding features as the gray sidewalks •Utilize the proposed canopy structures to provide shade •Utilize the proposed canopy structures to call attention to and embrace the palm trees or shade trees •Option 2 regarding lighting (up and down light for every other Royal Palm tree)is recommended •Recommend increasing the number of shade trees and widening sidewalks, including a reduction in the number of on-street parking •Recommend signage be provided for navigation to adjacent parking garages and surface lots. •Although not in the existing scope,recommend replacing the existing acorn lamp posts with a more contemporary type of lighting •Explore relocating either the utility pole or Starchild art piece at Liebman Square, as they conflict with each other;and WHEREAS,staff requested direction from the City Commission on the additional scope of work requested by ORB,the BID and Blue Ribbon Committee,which was not included the original scope of work;and WHEREAS,on December 11,2024,the City Commission adopted Resolution No. 2024-33446,approving the design for the 41 st Street Corridor Revitalization Project, directing staff to include the up-lights at every other Royal Palm tree to light the fronds, provide the electrical infrastructure for LPR cameras,include the replacement of the temporary string lights with permanent string lights and the required permanent infrastructure with the funding for the additional scope to be requested through the Fiscal Year 2026 Capital Budget process;and WHEREAS,B+S has submitted a negotiated proposal for the additional Architectural and Engineering (NE)services to incorporate the additional scope directed by the City Commission to add string lights at each palm with permanent infrastructure, up lights at every other palm,infrastructure for LPRs,coordinate the PWD water main replacement project with the corridor revitalization project,identify easements and coordinate easement approval with affected property owners,and provide photometric analysis of existing City and FOOT lighting along the corridor as requested by FOOT;and WHEREAS,this Amendment No.1 includes the above additional NE services for 41 st Street Corridor Revitalization Project in the amount of $391,277.18;and WHEREAS,City staff has reviewed the negotiated proposal for the additional design,permitting,bidding and construction administration services and found it reasonable for the effort required from the consultant;and WHEREAS,this Amendment No.1 will revise the total contract amount to $2,055,289.80. NOW,THEREFORE,BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH,FLORIDA that the Mayor and City Commission approve and authorize the City Manager and City Clerk to execute Amendment No.1 to the Agreement between the City Of Miami Beach,Florida And Brooks +Scarpa for the provision of additional architectural and engineering services for additional scope to provide upgrades to string lights,tree lighting and infrastructure for LPR cameras,for the 41 st Street Corridor Revitalization Project,for a not to exceed amount of$391,277.18. PASSED and ADOPTED this _?@__day t _fer«y ,2025. ATTEST: MAR 0 3 2025 Rafael Steven Meiner,Mayor APPROVED AS TO FORM &LANGUAGE &FOR UTION z8 /2ozs Date Resolutions -C7 B MIAMI BEACH COMMISSION MEMORANDUM TO:Honorable Mayor and Members of the City Commission FROM:Eric Carpenter,City Manager DATE:February 26,2025 TITLE:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THECITY OF MIAMI BEACH,FLORIDA,APPROVING AND AUTHORIZING THE CITY MANAGER AND THE CITY CLERK TO EXECUTE AMENDMENT NO.1 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH,FLORIDA AND BROOKS +SCARPA ARCHITECTS,INC.,FOR THE PROVISION OF ADDITIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR ADDITIONAL SCOPE TO PROVIDE UPGRADES TO STRING LIGHTS,TREE LIGHTING AND INFRASTRUCTURE FOR LPR CAMERAS,FOR THE 41ST STREET CORRIDOR REVITALIZATION PROJECT,FOR A NOT TO EXCEED AMOUNT OF$391,277.18. RECOMMENDATION The Administration recommends that the Mayor and City Commission (City Commission)adopt the Resolution. BACKGROUND/HISTORY On September 2,2021,pursuant to the Request for Qualifications (RFQ)No.2021-196-ND,the City Commission adopted Resolution No.2021-31838 approving and authorizing the Mayor and City Clerk to execute an Agreement with Brooks +Scarpa Architects (B+S)for Architectural and Engineering Design Services,for the 41 st Street Corridor Revitalization project (Project)in the amount of $1,664,012.62. On March 29,2022,the City issued Notice to Proceed to B+S to start the design of the Project. B+S has worked to prepare updated concept drawings,and 30%design documents,compliant with the scope identified in the Conceptual Design,and the conditions identified by the City Commission.B+S along with City staff have conducted public engagement meetings and have presented the Project to the Mayor's 41 st Street Blue Ribbon Committee (Blue Ribbon Committee).The 41 st Street Corridor is a state-owned road and therefore,B+S initially submitted schematic plans to FOOT on November 15,2022,and received favorable support for the Project. The 30%design documents were presented to the Design Review Board (ORB)for advisory review and received a favorable recommendation during the July 5,2023,ORB meeting. Subsequent meetings with FOOT,at the 30%and 60%design phases,yielded several comments warranting significant design changes.B+S prepared updated 60%design documents incorporating comments received from the community,neighborhood committees,City staff and FOOT.Many of the design elements previously proposed within the street portion of the right-of- way,were rejected by FOOT during subsequent reviews and therefore removed from the scope of work,and replaced with additional design elements along the corridor,as allowed,and at the intersection of Pine Tree Drive and 41 st Street,at Lieberman Square. In May 2024,the updated 60%design documents including the material changes,were submitted for another round of review by City staff,FOOT and the ORB. Page 377 of 1310 The Project includes design elements to enhance the pedestrian experience with new,widened concrete sidewalks,the relocation of trees and hardscape or lighting that obstruct the pathway, new fixed outdoor seating walls at four (4)mid-block locations,strategically placed bike racks, alteration of limited on-street parking spaces to create more sidewalk area,planting of native canopy trees with the required irrigation,incorporation of public art in the form of canopy structures and gateway features,and the creation of a public space at the intersection of 41 st Street and Pine Tree Drive,at Henry Liebman Square. A separate and independent project,under the purview of Public Works (PWD),utilizing separate funding,for the replacement of existing water transmission and distribution lines along 41 st Street is currently in the permitting phase.To minimize disruptions to the community,CIP will manage the construction of the utility replacement project,to occur concurrently with this Project. On July 2,2024,the 60%Design Documents,reflecting the FOOT requested design modifications were presented to ORB on an advisory basis,where they provided favorable comments with recommendations.The ORB recommendations included the following: •Explore utilizing other bright colors (besides Miami Beach pink)for the canopy structures. •Miami Beach pink is acceptable for the sidewalk pavement and furniture that emerges from the sidewalk. •Miami Beach pink sidewalks should have the same branding features as the gray sidewalks. •Utilize the proposed canopy structures to provide shade. •Utilize the proposed canopy structures to call attention to and embrace the palm trees or shade trees. •Option 2 regarding lighting (up and down light for every other Royal Palm tree)is recommended. •Recommend increasing the number of shade trees and widening sidewalks,including a reduction in the number of on-street parking. •Recommend signage be provided for navigation to adjacent parking garages and surface lots. •Although not in the existing scope,recommend replacing the existing acorn lamp posts with a more contemporary type of lighting. •Explore relocating either the utility pole or Starchild art piece at Liebman Square,as they conflict with each other. In consideration of ORB advisory review and recommendations,and input from the community, the 41 st Street Business Improvement District (BID)and the Blue Ribbon Committee,staff presented the 60%design documents to the City Commission,highlighting changes since the approval of the AECOM conceptual design and additional scope that was not factored into the initial project scope or budget. Staff requested direction from the City Commission regarding the inclusion of additional scope as the Project moves towards the 90%design.The additional scope of work requested by the community,ORB,the BID and the Blue Ribbon Committee,includes: •Replacement of the string lights,with permanent up and down lights,at every other palm tree,and providing the appropriate electrical infrastructure. •Providing infrastructure,including underground conduit for power and data,new service racks in alley with associated panels and electrical service for nine (9)license plate readers (LPR),as required by the Miami Beach Police Department. •Replacing 44 existing city owned,acorn light fixtures and poles,with more contemporary type of lighting. Page 378 of 1310 ANALYSIS On December 11,2024,the City Commission adopted Resolution No.2024-33446,approving the design for the 41 st Street Corridor Revitalization Project,directing staff to include the up lights at every other Royal Palm tree to light the fronds,and providing the electrical infrastructure for LPR cameras.They also directed staff to include the replacement of the temporary string lights with permanent string lights with the required permanent infrastructure.The City Commission did not accept the ORB recommendation to replace the acorn light fixtures with a more modern light fixture.Funding for the additional scope will be requested through the Fiscal Year 2026 Capital Budget process. B+S has submitted a negotiated proposal for the additional Architectural and Engineering (AVE) services to incorporate the additional scope directed by the City Commission in resolution 2024- 33446.The proposal also includes services required to coordinate the PWD water main replacement project with the corridor revitalization project,identify easements and coordinate easement approval with affected property owners,and for photometric analysis of existing City and FOOT lighting along the corridor as requested by FOOT. This Amendment No.1(Exhibit A)includes the above additional A/E services for the 41st Street Corridor Revitalization Project in the amount of $391,277.18.The total revised contract amount is $2,055,289.80. City staff has reviewed the negotiated proposal for the additional design,permitting,bidding and construction administration services and found it reasonable for the effort required from the consultant. FISCAL IMPACT STATEMENT The total Amendment is for a not-to-exceed amount of $391,277.18,subject to the approval of the fourth capital budget amendment to the FY 2025 Capital Budget. Does this Ordinance require a Business Impact Estimate? (FOR ORDINANCES ONLY) If applicable,the Business Impact Estimate (BIE)was published on: See BIE at:https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/ FINANCIAL INFORMATION $391,277.18 Subject to approval of the fourth capital budget amendment to the FY 2025 Capital Budget. CONCLUSION The Administration recommends that the City Commission approve the resolution. Applicable Area Middle Beach Page 379 of 1310 Is this a "Residents Right to Know"item, pursuant to City Code Section 2-17? Yes Is this item related to a G.0.Bond Project? Yes Was this Agenda Item initially requested by a lobbyist which,as defined in Code Sec.2.481, includes a principal engaged in lobbying?No If so,specify the name of lobbyist(s)and principal(s): Department Capital Improvement Projects Sponsor(s) Cg-sponsor(s) Condensed Title Execute Amendment 1,PSA for 41 st Street Corridor Revitalization Project.GIP Previous Action (For City Clerk Use Only) Page 380 of 1310 EXHIBIT A AMENDMENT NO.1 TO TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF NIAMI BEACH,FLORIDA AND BROOKS +SCARPA ARCHITECTS,INC. DATED,MARCH 15,2022 FOR THE PROVISION OF ADDITIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR ADDITIONAL SCOPE ro PROVIDE UPGRADES TO STRING LIGHTS,TREE LIGHTING AND INFRASTRUCTURE FOR LPR CAMERAS,FOR A NOT-TO-EXCEED AMOUNT OF $391,277.18 This Amendment No,1to the Agreementis made and entered this day of 2025,by and between the CITY OF MIAMI BACH,a municipal corporation existing under the laws of the State of Florida (the "City"),having its principal offices at 1700 Convention Center Drive,Miami Beach,Florida 33139,and BROOKS +SCARPA ARCHITECTS,INC.,a Florida Corporation,having its principal office at 1147 NE 7W Avenue,Fort Lauderdale,FL 33304 "Contractor"), RECITALS WHEREAS,on September 2,2021,pusuant to the Request for Qualifications (RFQ)No. 2021-196-ND,the City Commission adopted Resolution No.2021-31838 approving and authorizing the Mayor and City Clerk to execute an Agreement with Brooks +Scarpa Architects (B+S)for Architectural and Engineering Design Services,for the 41 st Street Corridor Revitalization project in the amount of $1,664,012.62;and WHEREAS,on March 29,2022,the Cityissued Notice to Proceed to B+S to start the design of the Project,and prepared updated concert drawings,30%design documents,which were compliant with the scope identified in the Conceptual Design;and WHEREAS,on November 15,2022,the roject received favorable support from FDOT since the 41 st Corridor is state-owned road and requires their approval;and WHEREAS,on July 5"2023 the 30%design documents were presented to the Design Review Board (ORB)for advisory review and received a favorable recommendation;and WHEREAS,subsequent meetings with [DOT,at the 30%and 60%design phases,yielded several comments warranting significant design changes,B+S prepared updated 60%design documents incorporating comments received from the community,neighborhood committees,City staff and FOOT;and WHEREAS,on July 2,2024,the 60%Design Documents,reflecting the FOOT requested design modifications were presented to ORB or an advisory basis,where they provided favorable comments with recommendations,including; •Explore utilizing other bright colors (besices Miami Beach pink)for the canopy structures. •Miami Beach pink is acceptable for the sidewalk pavement and furniture that emerges from the sidewalk. •Miami Beach pink sidewalks should have the same branding features as the gray sidewalks •Utilize the proposed canopy structures tc provide shade Page 381 of 1310 EXHIBIT A •Utilize the proposed canopy structures o call attention to and embrace the palm trees or shade trees •Option 2 regarding lighting (up and fown light for every other Royal Palm tree)is recommended •Recommend increasing the number of shade trees and widening sidewalks,including a reduction in the number of on-street parkng •Recommend signage be provided for navgation to adjacent parking garages and surface lots, •Although not in the existing scope,reconmend replacing the existing acorn lamp posts with a more contemporary type of lighting •Explore relocating either the utility pole or Starchild art piece at Liebman Square,as they conflict with each other;and WHEREAS,staff requested direction fr011 the City Commission on the additional scope of work requested by ORB,the BID and Blue Ribton Committee,which was not included the original scope of work;and WHEREAS,on December 11,2024,the City Commission adopted Resolution No.2024- 33446,approving the design for the 41 st Street Corridor Revitalization Project,directing staff to include the up-lights at every other Royal Palm tree to liht the fronds,provide the electrical infrastructure for LPR cameras,include the replacement of the tenporary string lights with permanent string lights and the required permanent infrastructure with the funding for the additional scope to be requested through the Fiscal Year 2026 Capital Budget precess;and WHEREAS,B+S has submitted a negaiated proposal for the additional Architectural and Engineering (NE)services to incorporate the alditional scope directed by the City Commission to add string lights at each palm with permanet infrastructure,up lights at every other palm, infrastructure for LPRs,coordinate the PWD Nater main replacement project with the corridor revitalization project,identify easements and ccordinate easement approval with affected property owners,and provide photometric analysis of exsting City and FOOT lighting along the corridor as requested by FOOT;and WHEREAS,this Amendment No.1 inclules the above additional A/E services for 41 st Street Corridor Revitalization Project in the amount of $391,277.18;and WHEREAS,City staff has reviewed tte negotiated proposal for the additional design, permitting,bidding and construction administraion services and found it reasonable for the effort required from the consultant WHEREAS,this Amendment No.1will revise the total contract amount to $2,055,289.80. 1.ABOVE RECITALS The above recitals are true and ccrect and are incorporated as a part of this Amendment No.1. 2.MODIFICATIONS (a)The Agreement is amened,as provided he rein and in Schedule "A" attached hereto. (b)In consideration for the sevices to be performed under this Amendment No. 1,City shall pay Consultant the not-toexceed amount of $391,277.18 as provided in Schedule "B",attached hereto, Page 382 of 1310 EXHIBIT A 3.OTHER PROVISIONS. All other provisions of the Agreement,as amended,are unchanged and shall remain in full force and effect. 4.RATIFICATION. The City and Consultant ratify the terms of the Agreement,as amended by this Amendment No.1 IN WITNESS WHEREOF,the parties hereto have caused this Amendment No.1 to be executed in their names by their duly authorized official as of the date first set forth above. ATTEST: EricCarpenter,City Manager Rafael E.Granado,City Clerk ATTEST: Secretary Print Name CONSUL TANT: Brooks +Scarpa Architects,Inc. President Prirt Name Page 383 of 1310 EXHIBIT A SCHEDULE A BROOKS 4SCARPA Jan 28,2025 Attn: Colette Satchell Senior Project Manager Capital Improvement Projects Office 1700 Convention Center Drive, Miami Beach,FL 33139 305.673.7071 ColetteSatchell@miamibeachfl.gov Herman Fung Project Manager Capital Improvement Projects Office 1700 Convention Center Drive, Miami Beach,FL 33139 305.673.7071 HermanFung@miamibeachfl.gov Re:Additional Scope for the 41st Street Revitalization Projct (21015.0) Dear Colette and Herman, 1147 NE 7TH AVENUE FORT LAUDERDALE,FL 333041T.(954)683 1236 Brooks+Scarpa requests additional funds to include additical scope in the project as requested.This request will cover the cost of incorporating the additional scope into the project costs under the current scope of work.The following are the scope of work items that are included in tte project scope: 1)Additional FOOT Permitting Requirements •Grading analysis,as requested by FOOT. o FDOT did not permit the design tam to modify drainage patterns in the corridor,which led to extraordinary coordination anl redesign to achieve the required grading. •Identification of required easements and reparation of easement package for CMB and FDOT's use/reference. •Preparation of electric lighting point-by-pint calculations for existing street lighting as requested by FOOT.The purpose of the photometric cal:ulations is to demonstrate to FOOT that the proposed trees will not adversely affect the existing ighting illumination.The lighting consultant will only perform photometric calculations at isolat!d conflict locations. o Includes ongoing communicationwith FOOT to gather technical information related to existing conditions and approvedlighting standards. 2)Additional lighting scope •Consideration of upgrading pede trian lighting to more modern fixtures involved updating renderings and preparing a prelininary ROM cost for the upgraded pedestrian light.Note: The City of Miami Beach Commision ultimately vetoed the upgraded fixture and decided to keep the current acorn light. •Installation of permanent string lght fixtures and the infrastructure to make string lights on every Royal Palm Tree in the corrdor permanent. 1of 3 Page 384 of 1310 EXHIBIT A SCHEDULE A •Installation of Uplights as directe!by the City Commission 3)Incorporation of LPRs •FDOT advised infrastructure for LPRs shoud be incorporated at this stage.However,the LPR equipment will be installed under a future permit.The following tasks will be required for the future LPR permit: •Scope per Miami Beach Police: 1.Provide a set of plans signed andsealed for the FDOT permit. 2.Design team to review locations ,f the LPRs within the Right of Way as defined in FDOT guidelines. 3.Design of the LP Rs to include thefollowing: a.Empty Conduit: b.Handholes c.Pole's base d.Pole's details e.Pole's wind loal calculation f.Panel Schedule g.LPR Enclosure pecs (to be provided by MBPD) h.License Plate Rader Camera Detail (to be provided by MBPD) 4.Assist the City through the genenl use permit process as defined in FOOT guidelines. 5.MBPD will provide a formal letterrequesting the installation of LPRs in this project and authorizing the design team as He individual to submit the permit application on behalf of the City. 4)Interweaving the concurrent water main utilityproject. •Interweaving and coordinating the concurently running utility project as we go from 60%to Closeout. Reviewing plans from the water main projct,coordinating site features,and adjusting drawings as required •Excludes water main project under Steinberg bridge. 5)Additional Meetings •Includes 10 meetings 6)Survey •Perform updates to the survey at the 90%Design Phase. o The surveyor will update and revse the previous survey to accurately reflect any changes or removal of significant aboveground improvements within the survey limits. Page 385 of 1310 EXHIBIT A SCHEDULE A Financial Allocation We are requesting $376,277.18 as additional funds for the iems listed above,plus a not-to-exceed fee of $15,000 for any required meetings which are not included in our curren contract.See Exhibit B for the proposed allocation of funds. Tota l Finan ci al Alloc ation Su m m ary Task Funds Proposed Additional Service (Items 1-6 above)$376,277.18 Anticipated additional meetings (10 meetings)$15,000.00 (Not to exceed) Sincerely, Jeffrey Huber,FAIA,ASLA,NCARB,LEEDap,WEDG,Principal Brooks+Scarpa Architects CC:Isabella Pedrosa,Project Designer,Brooks +Scarpa Archtects Page 386 of 1310 EXHIBIT ASUMMARY NOTES £XHIT rooks +Scarpa Archtiects,Inc.ANHOUR ESTI MATES (Additional Services] 1147 NE 7h Ave.1015041:Street Corridor evtalzaten Project Fort Lauderdale,FL 33304 dtnai Scope Office (954)683-1236 REV January I4,2025 $TANTEC.,BROOKS +SCARPA,HLBA,MASU EN,LONGITU DOt I Senior I I I9roe¢t Project Senior Senior Landscape Senior CA D/CAO/drnun rcpa'Marater Architect Eguree Architect Technician I Designer !Techrca Assistant Ts Tota'iI$200.0 $174.00 !$165.00 $165.00 $165.00 $125.00 !$113.00 $70 02 I $44.56 6ox pun porersand Perretibeitta Additioral FDOT Permitting Requirements +outs 63 144 6 50 35 100 183 80 I 4 Rate $12.600 00 $25.056 00 $990.00 I $8.250 00 $5,775.00 $12,500.00 $20,679 00 $5,601 60 I $17824 $91,629.84 Additional Lighting Scope Hours 27 145 10 75 10 65 75 50 Rate $5,400.00 $25,230 .00 $1.650 00 $12,375.00 $1,650 00 $8,125.00 $8.475.00 !$4,201 20 sooo $67,106.20 I Incorporation of PRs Scope +ours 36 104 10 35 65 45 40 Rate $7,200 00 $18.096.00 $1.550.00 $5.775 00 $0.00 $8,125.00 $5,085.00 $2,800 80 $0 00 $48,731.80 Coordinating Utityroget outs 8 18 I See rotes in individual consultant fee breakdown i Ratel $1.600.00 $3,132.00 S0.00 $0.00 $0.00 $0 00 '$0 00 $0.00 ,$0.00 $4,732.00 Additiorat Meers +urs ID 7 I I I l 'See notes n indidual consultant fee breakdown Rate $2.000.00 $1,218.00 $0 00 $165 00 I $0 00 $125.00 I $0.00 $70.02 I SO DO $3,578.02 TOTAL $215,777.86 90%DesinDocurents Additional DOT Permuting Requirements Hours l I I Rate 50 00 $0 00 $000 $0 00 I $0.00 $0.00 I $0.00 $0.00 50.00 $0.00 I Additional Lighting Scope ours 12 80 10 10 I ID 10 I 100 50 2 I I !I I I I See rotes n individual consultant fee breakdown .J $2.400 00 $13.920.00 $1.650.00 I $1.650.00 $1.650.00 $1,250.00 $11,300.00 $3,501 00 $s9 12 I $37.410.12 II Incorporation f (PR5 5cope +ours 6 20 30 5 31 18 I Rate $1,200 .00 $3,480 00 $0 00 $4,950 00 $0.00 $625 00 $3,503.00 ;51.26036 I $0.00 $15,018.36 Cordinating t it rot H U TS 9 30 30 5 59 18 I 2 Rate $1.800.0 $5.220.00 $0.00 $4,950.00 $0 00 $625.00 $6,667 00 $1.260 36 I $89.12 s 20.611.48 Addition al Meetings Hours I Rate $0.00 $0 00 I $0 00 $0 00 50.00 $0 00 $0.00 $0.00 $0.00 I $0.00 Survey /Survey Coordnaton Hours 16 I 103 6.2 7 I I See notes in indiduai consultant fee breaidown Rate $3.200.00 $17.922.00 $0.00 $0.00 $0 00 $715.00 $791 00 I $0 00 sooo $22,688.00 TOTAL]$95,727.96 1,Ceesttrutie pout3,gin Additiorai DOT oermittinz Req uirements tours I I Rate 0 D D 0 0 0 0 D I 0 I Additional Lighting Scooe Hours ID 2s 15 20 35 I I Rate $2.000 00 $4,350 00 $2,475 00 I $0 00 $3,300 00 $0 00 I $3.955.00 $0.00 I $44 .56 $16,124.56 incor po ra t on of 1PRs 5cope +ours 5 16 18 20 I 2 Rate $1.000 00 $2,784.00 $0.00 $2,970.00 $0.00 $0 00 $2,260 00 $0 00 i $89.12 $9,103.12 Coo rd ina ti n g Utility Proj ect ours 4 16 18 34 I Rate $800.00 $2,784 00 $0 00 $2,97000 $0.00 I $0.00 $3,842.00 $0 00 i $0.00 $10,396.00 Additional Meetings +our$I ate $0.00 $0 00 $0 00 $0.00 $0.00 $0 00 I $0.00 $0.00 I $0.00 $0.00 TOTI $35,623.68 Construction drinistratlion Ad dition al FDgT erm uti ng Req uirements Hour's I Rate $0 00 sooo $0 00 $0.00 $0.00 50.00 $0.00 $0.00 i $0.00 $0.00 Additional Lig hti n g Scope Hours 3 10 6 I I a te $600 00 $1,740.00 $0.00 I $0.00 $0.00 $0 00 $678 00 I $0 00 544 56 I $3,062.56 ncororation gt P Rs Sope Hours 5 35 18 26 I 2 Rate $1,000.00 $6,090 .00 $0 00 $2,970 00 $0.00 $0 00 I $2,938 00 !$0.00 $89.12 $13,087.12 Coordinating Utility Project +ou rs 5 35 18 26 Rate $1,000 00 $6,090 00 $0 00 $2.970.00 $0.00 $0.00 $2,938.00 I $0.00 !$0.00 '$12,998.00 Addition3 Meetings Hours Rate $0.00 $0 00 $0 00 $0.00 $0.00 0 00 $0.00 $0.20 $0.00 $0.00 Survey /Survey Coordination +lour$C D D I Rate $$0 00 $0 00 $0 00 $0.00 $0 00 $0.00 $0 00 !$0 00 $0.00 TOTAI $29,147.6a SCHED ULE A STANT,ROOKS +SCARPA,HS,MASUrN,owGrruor rorA/_$37627.1s ] Page 387 of 1310 EXHIBIT A B+S SCHEDULE A /NO TEs ROOKS +SCARPA I I I Senor IIocPro)et Ser.or Senwor Landscape Seno A0DOI CAD!Air.n r rc ii Mara?e Arzu?et t nee I Ar"tet I Ihm€9 Desue T"nan Ass+stat as«"0al $200¢I $17400 5165.30 $165.00 $165.00 $12500 5113.00 570.02 $44 55 Den Duetsand Perrott $btta I Additional DOT eerur.g eq unerems]+our 29 45 6 I 35 I I 119 !I I Rate $5.8000 $7,830 00 $99000 S000 $5,775 00 I $0 00 $13,447 20 i 50 00 $44 56 $33,886 56 Additional Lighting Sc0el Hut 10 so 10 I 10 I I I I a;e $2.000 O $8.700 00 $1,550.00 $0 00 $1,650 00 I S000 I $0 00 s0 00 $0.00 $14,000 .00 incorporaton ot 1?Rs 5ope]Hour 16 59 iO I I I I i Rate $1,200O $10,266.00 $1.550.00 50 00 S000 S000 I S000 I 0 00 I 50 00 $15.116.00 ekde2 hours tr ccorcapon meet"ztrproe:rs,Coord ratng tit Pro»et ]Hu 10 I I I I rdudes tour for ianreewtoroo,ecncal,Hu0es 2 I I I Itourstorcoordinationmeetgfoeprojectmanager,induces 8 I Itoursftpareview,coordination ad adreegtv asks for roe!r31age Ratel $600 ¢$174000 $O 00 S000 $0 00 $0.00 $0 00 50 00 s0 00 $2.340 .00 ddrt oral Meetinas l Hours l I 5 I I I I I !I !II±des hours fr past cord.naun reetrgs Rae $1.0000 $870 00 $0 00 $0 00 $0 00 $0 00 $0 00 50 00 $0 00 $1,870.00 TOTAL $67,212.56 94DeDocents Add itional Da T rutting Requ iremen ts]Mou$I I I I I I Rate I I I I I I +nudes burs'or coordrarng add:9lgtg ope /tr'g ddtonat Lt Scope'Hour I 20 10 I 10 I I 20 I I gets,@etas.oorcirw.iggtsserent att 2d :a I I I2enudedtoacheeerequiredfight/eeis n corridor,I I I f.ng au-iht placement ate $400.¢$3.480.00 $1.650.00 $0.00 $1,552 00 $0.00 $2.260 00 $0 00 $44 56 $9,484.56 Incorportaton of PRs Sco pel Houts I I I I I ate]I I ! ordnatg ttrty Project]Hour 2 I 14 I I ate $400 ¢$1.044 00 $0 00 $0 00 $0 00 50 00 I $1,582 00 $0.00 $0.00 $3,026.00 Additional Meetings ]Hur 0 0 I I I I Rate $0 0 $0 00 $0 00 $0 00 $0 00 $0.00 I $0.00 I 50 00 !$0.00 $0.00 Sue or .ration]Hou!$1 I 7 !I I Rate $200.¢$52200 $0.00 $0.00 S0.00 sooo I $791.00 I 50.00 I sooo $1,513.00 TOTAI $14,023.56 Let.ruction Doesd tiding Additional +DOT ermttn Requirements Hour$I I I !ate I 0 I I Addtoat Lignting Scooe]Hur3 10 25 15 20 I 15 I I l I Rate $2,000 O $4,350 00 $2,475.00 i $0 00 $3.300 00 sooo $3,955 00 $0 00 '$4456 $16,124.56 incorportaton of Rs Sco pe]Houts I I I I Rate 5400 $1.044 00 50 00 50 00 $0 00 0 00 50 00 sooo 50 00 $1,444 .00 Coordrating Utility Project Houri 6 I 14 I I 1 I 3te $400 0 $1.044 00 $O 00 $0 00 $0 00 $0.00 I $1.582.00 $0.00 I $0.00 $3,026.00 t Addit ion.gt Mtin «Hours 0 0 I 0 I I I Rate $0 0 $0.00 $0.00 $0 00 $0 00 $0 00 S000 I $0 00 I sooo I $0.00 TOTAL]$20,594.56 netrueten heinitration Additional OT errvrting Requirements]Hur I I I I I I Rate 0 0 50 00 $0 00 $0 00 I $0.00 50 00 I $0 00 !$0 00 I $0 00 I dtoral LghtScopel Hour i 3 10 I I I I I I Rate S600¢$1.74000 $0 00 50 00 $000 $0 00 $67 00 $000 $4456 1 $3,062.56 rcorporation of LPRs $0e]Hur$25 I I I I 3te $5000 $4350 00 $0 00 $0 00 $0 00 $0 00 I $67 00 $0 00 $0 30 $5.628.00 Coo rdinating Utlty Project ]Hours 3 I 25 I 6 I I I Rate $600.0 I $4.350.00 $0.00 $0.00 $0 00 sooo I $678.00 I $0.00 I s0.00 $5,628.00 I Ad drton at Meet inasl Hu t5 I I I I I I Rate $0 9 I 50 00 $0 00 $0 00 S000 $0 00 I $0 00 50 00 $0 00 $0.00 TOTAL $14,318.56 I s+s AroA scot TOTAL[_$11619.24_ Page 388 of 1310 EXHIBIT A STANTEC SCHEDULE A STANTEC I 5erg I IroyetPro,ect Senior Senor Landscape Seo CA0 /CAI Admin,I is.pa Ma-aper Arch tect #rg.reer Ar0te Technician Designer 7ehrcian Ass·stat as«Tatal I $200.0 $174.00 $165.00 I $165.00 $165.00 $125.00 $113.00 I $70.02 I $44.56 0 DeanDeetsand Perritt tittad ddiugal FDOT emitting Recuirerents Hou rs 30 80 50 100 0 80 l ate $6.000 .0 $13,920.00 $0.00 $8.250 00 $0.00 $12,500 00 $0.00 $5.601.60 S44.56 $46,316.16 Additional Ligh ting Scope Hor3 15 85 75 65 50 60 3ate $3.000 0 $14,790 00 $0 00 $12.37500 $0 00 $8,125 00 $5 650 00 $4,201 20 50 00 $48,141.20 I Incorporation of {Rs SOpe Hours 20 45 35 65 45 40 I ate $4.0000 $7,830.00 $0 00 $5.715.00 $0.00 $8.125.00 $5.085.00 $2,800 80 $0.00 $33,615.80 ngge 2 o rs for coordinator reet.gr proect ordinating tutu#sty pro Hours I prinopai,tncdudes 3 hour for plan revoew tor project Ipncpal,Includes 10 /curs tr plan revew,coordraton and2gmsate tasis tor roe maier 8ate $1.000 .0 $1.392.00 S0.00 $0.00 $0 00 $0.00 50.00 50 00 5000 $2,392.00 Ad dition3i Meeting;Hour I I des tors 'or as cord utin meetings ate $1,000 0 $348.00 $0.00 $165.00 50.00 $123.00 $0.00 $7002 $0 00 I $1,708.02 To0Tau/$132,173.1 90%penDoreen dd onai #DO T er ring Requirere nts]Hour I I ate I Coordinatrg 'ght p'acem ent with 3ddtinl scope induded Additional Lighting Sco pe Hours I 10 10 to acheiewe required ght'eve's in corridor.fr3iing upo lght'aceme t Rate $0 00 $0 00 50 00 I $1,650 00 S000 $1.250 00 sooo 50 00 $0.00 $2,900.00 corporation of Ps 5cope Hou'20 I 30 31 18 ate $1,200.0 $3.480.00 $0 00 $4.950.00 $0.00 $625.00 $3,503.00 $1,260.36 $0.00 $15,018.36 ordinating Utility Project Hours 6 20 JO 5 l1 1 l 3ate $1,2000 $3,480 00 $0 00 I $4,950 00 $0 00 $623.00 $3,50 3.00 $1,260.36 $44 56 s 15,062.92 Additional Mt Hours I I 8ate I c roru $32,981.28 10i,ttrtieom Douet Additional #DOI Permitting Requirements Houf1 9ate Additional Light ing Scope Hours ate 0 Insration of {s 5ope Hours 3 10 1s 20 ate $600.0 $1.740.00 $0.00 $2,970 00 $0 00 $0 00 $2,260.00 $0 00 $89 12 $7,659.12 Coordinating ulty Pro;ect Hour 2 10 18 20 Rate $400 0¢$1.740 00 5000 $2.970 00 $0 00 $000 $2,260 00 $0 00 $0 00 I $1,370.00 Additiona l Meeti ngs Hours ate $0 00 $0.00 $0 00 $0.00 $0.00 50.00 $0.00 $0.00 $0 00 $0.00ror,$15.029.12 anatrotie dtitrton Addrt onat F DOT Permitting Requirements Hours ate Additional Lighting Scope Hours Rate Incorporation of [PRs 5ope Houf$10 1s 20 ate $400 0€$1,740.00 $0 00 I $2.970.00 50.00 $0.00 52,260.00 $0 00 $8912 $7,459.12 ordinatint utility Project Hou rs 10 I 18 20 I 2ate $400 0C $1,740.00 $0 00 I $2,970 00 $0 00 $0.00 $2.260 00 $0.00 I $7,370.00 Additional Meeti ngs Hour 0 I I I ate $200 0Cc I $0 00 $0 00 I $0 00 5000 $0.00 $0 00 5$0 00 $0 00 $0.00 I TOTA,$14,429.12 I sNTtcAoorTO NA scot TOTAL'_$19s,012.70' Page 389 of 1310 EXHIBIT A HLB SCHEDUIE A NOTS Ht8 I nrec ADDI es ne'ass 'Adrr. 52000 $174 3 $165 00 5165 00 $165 00 5125 00 $11300 570 02 $44 56 Add tori $QI ermiring Rarere nts +curs/3 15 ate,$60a0 $2,610.00 Additional lighting Scape{Hout 10 3ute $4000 $1.740 30 ncorporatvon ofRs Scope Hours 8ate Additional Meetings.Hours/ I $0.00 50.00 $0 00 I 5000 I 50 00 $0 00 $0 00 I $0 00 I I I I I I 'I I I 50 $5.650.00 50 00 25 52,825 00 50 00 I' I I 0 I 0 I 80 I 50 I $9.040.00 $3.501 00 I I I 54455 $8,904.56 I $0 00 $4,965.00 'I I TOTAL,$13.099.$6 I 0%Deign Duree Adt/tori FD0T ermttinz Reauirerents ou rs In€lades hours fer detailing additional hghting cope (string lights).daioagmimggo]jtlI"lilmin=itll and coordinating detats wth ahtect,adys!gntpaerent [l ah2ddrionat scencdedtoachreera,red kgtie/« rrdor,fnalzzu zhtpiacement at¢ nc orpor ation 3f 1R s Scope Hour Cord/raging Utility Project Hours] I I 0 I 0 I 1€60 I! $2.0000 $10.440 00 I 50 00 I I ate' dd torat Meetings{+oursi I I I I $0.00 $0 00 !3 00 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I $4456 $25,025.56I I I I I TOTAL}$25.025.56 ,{trtiDotg.lg Add.tiara!$DOT gritting Requirements Hours I I corportaton of Ls Scope Hours ?ate Coordinating Uti ty Project +ours ate ate/ T0TAU $0.00 onestrctee diitrtie Mo anti¢uti additiona l so oe. Attonz FDf perm ute Pequirren ts Hurt ate Ado /tuna /tghting Scopel ou rs incorportation af Rs Scope Hour ordnatn tilt rot ors ate I Add ion 2/Meet ing s ou rs I I I ate I TOTA}$0 00 [ HgAOtTIONALsc0 TOTAL]_$38.995_12 Page 390 of 1310 SCHEDUIE A EXHIBIT A MASUEN MASU EN NOTES Senior Project Project Sen.or Senior Landscape Senior CAD /CAD/Ad min. inc pal Manager Architect ngineer Architect Technician Designer Technician Assistant 1ask Total $200.0 $174.0 $165.0 165.00 $165.00 $125.00 Slll.00 $70.02 $44.56 609 Din Dcurents and Permit Submittal Additional FDOT Permitting Requirements Hours 1 4 14 I Rate $200.00 $696.00 $0.00 $0.00 $0 00 $0.00 $1.582.00 $0.00 $44.56 $2,522.56 Additional Lighting Scope Hours Rate 0 0 0 0 0 0 0 0 0 Incorportation of Rs Scope Hours Rate 0 0 0 0 0 0 0 0 0 Coordinating Utility roiect Hours Rate 0 0 0 0 0 0 0 0 0 Additional Meetings Htours Rate 0 0 0 0 0 0 0 0 0 TOTAi $2,522.56 90%Design Documents Additional FDOT Permitting Requirements Hours Rate Additional Lighting Scope Hours Rate 0 0 0 0 0 0 0 0 0 Incorportation of LPRs Scope Hours Rate 0 0 0 0 0 0 0 0 0 Coordinating Utility Project Hours I 4 14 I Rate 5200.00 $696 00 $0.00 $0.00 50.00 $0.00 $1,582.00 SO 00 $44.56 $2,522.56 Additional Meetings Hours Rate 0 0 0 0 0 0 0 0 0 TOTAi $2,522.56 100%ConstructionDocumentsA,idding Additional FDOT Permitting Requirements Hours Rate 0 0 0 0 0 0 0 0 0 Additional Lighting Scope Hours Rate 0 0 0 0 0 0 0 0 0 Incorporation ofRS Scope Hours Rate 0 0 0 0 0 0 0 0 0 Coordinating Utility Project Hours Rate 0 0 0 0 0 0 0 0 0 No anticpa ted Additional Meetings Hours additional Rate 0 0 0 0 0 0 0 0 0 scope. TOTAL $0.00 Construction Administration Additional FDOT Permitting Requirements Hours Rate 0 0 0 0 0 0 0 0 0 Additional Lighting Scope Hours Rate 0 0 0 0 0 0 0 0 0 Incorportation of PRs Scope Hours Rate 0 0 0 0 0 0 0 0 0 Coordinating Utility Project Hours Rate 0 0 0 0 0 0 0 0 0 No anticpa ted Additional Meetings Hours additional Rate 0 0 0 0 0 0 0 0 0 $cope. TOTAL $0.00 MASU EN ADDITIONAL SCO PE TOTAL]_$5045.12 Page 391 of 1310 SCHEDULE A EXHIBIT A LONGITUTDE SURVEYOR NOTES /LONGTUoE I I I I I I l St!nior l l i IroetProjc!Senior Se/v0 Senior ADO/CAI Adm.,I I re al Maae I rte.inree z Tehrwcan Jene I Iehrc.an i A865tat [as«Iota II$200.0 i $174.00 I $165.00 I $165.00 7 $165.00 I $125.00 $113.00 I $70.02 544.56 0,Due Dents and Perrett Stat Survey]Hours I l 1 7 I l I I I I Mo antic.pated additional scope.I Ratel 0 I 0 I 0 I 0 I 0 I 0 I 0 I 3 I 0 I TOTAL $0.00 90,n.a Doceti Survey]+ours 15 I 100 I I I I 62 I I I I $13.825 0 sill not bied from oredes chase I Ratel $3.000.00 ls17.4oooo l $0 00 50.00 I $0.00 I 5775 00 I $000 I $0 00 I $0.00 I $21,175.00 TOTA]$21,175.00 100%,Cottruction DOocurents #Aildi sunwed Hoursl I I I T 1 I I I I Mo anti€pated additional scope.I Ratel 0 I 0 I 0 I 0 7 0 I 0 I 0 :0 0 I TOTAL!$0.00 Construction Atr vi ation Survey!Hoursl 0 I 0 I I I I I 0 I I IIRatel5000I$0 00 I $0 00 I 50.00 I $0.00 I $0 00 l $0.00 I $0 00 I 50.00 I $0.00 Tora!$0.00 owGrruotoorowt scot TOTAL]$21,175.00I Page 392 of 131 O SCHEDULE B EXHIBIT A SUMMARY NOTES ExHuT rooks +Scarpa Archtiects,Inc.NHOUR ESTIMATES {Additional Series } 1147 NE 7th Ave.1015241st Street Cardo ?es.ta'/zatuon ?roe" Fort Lauderdale,FL 33304 dtonal 5ope O#le (954)683-1236 8Ev January 14,2025 STANTEC,ROOKS +SCARPA ,HLA,MASUEN,LON GITU DE Senor I roe?Project Senor 5e 10°Landscape Senor CA!CADOI 4drin. ria l Marage Architect nginee Architect Technician esigner Tech«ciar Assistant Task Total $200.00 $17400 $165.00 $165 00 I $165.00 $125.00 $113.00 $7002 I $44 56 I 609,pg Dotts arid hermit Submittal ddtonat #DOT Permitting Requirements +ours 63 144 s so 35 100 183 80 4 ate $12.600.00 $25,056.00 $990.00 $8.250 00 $5,775.00 $12,500.00 $20.679.00 $5.601.60 $178 24 $91,629.84 Additional ghtirg Scope ours 27 145 10 75 10 65 75 60 ate $5,400 00 $25,230 00 $1.550 00 $12.375.00 $1.650.00 $8,125.00 $8,475300 $4,201.20 $0 00 $67,106.20 ncorportaton of Rs Soe ours 36 104 10 35 65 45 40 ate $1.200 00 $18,096.00 $1,65000 $5,775.00 $000 $8,125 00 $5,085.00 $2.800 80 $0.00 $48,731.80 Coordinating Utility ?roe ours 8 18 Sects in ind.dual onslta:he rdwn ate $1.600.00 53,132 00 $0.00 $0 00 50.00 $0.00 $0.00 $000 $0.00 $4,732.00 Additional Meetings +lour$10 7 1 1 1 See oes in inddual consultant fee breakdown ate $2.000.00 $1,218 00 $000 $165.00 $0 00 $125 00 $0.00 $70.02 $0.00 $3,578.02 TOTI $215,777.96 90%tun currents Additional OT ermniting Requirements +our ate 0.00 $0 00 $0 00 $0 00 5000 $0 00 SO 00 $0.00 $0 00 $0.00 Additional Lighting Scooe ours 12 80 10 10 10 10 100 so 2 See rotes in rd»dual consultant fee re2down 8at¢$2,400 00 $13,920.00 $1.650 00 51.650.00 $1,650.00 $1.250.00 $11,300.00 $3,501 00 $89 12 $37,410.12 Ineorpo rtaton ot PR Scope tours 6 20 30 s 31 18 ate $1.200.00 $3,480.00 $0.00 $4,950.00 $0 00 $625 00 $3,503.00 $1.260.36 $0.00 $15,018.36 Coordinating Utiiitv Project +ours 9 30 30 5 $9 18 2 ate $1.$00 00 $5,22000 $0.00 $4.950.00 0 00 $625 00 $6,667 00 $1.250 36 $89 12 $20,611.48 Add:tonal Meeting +u r at¢$0.00 $0 00 $0 00 $0 00 $000 $0 00 5000 $0 00 $0 00 $0 00 Survey/'Survey Coordination out$16 103 6.2 7 See notes in urddual consultant fee breakdown ate $3,200 00 $17,92200 $0 00 $0.00 $0 00 $775 00 $791.00 $0 00 $0 00 $22,688.00 Toru $95,727.96 lg0 Contrctin DOoets bidding Additional £OT permitting Requirements +ours at 0 0 0 0 0 0 0 0 0 Additional Lighting Scooe +lours 10 25 15 20 35 I ate $2.000 00 $4.350.00 $2,475.00 5000 $3,300 00 5000 $3,955 00 $0 00 $44 56 $16,124.56 In/o tin PR So,e ours 5 16 18 20 2 ate $1,000 00 $2,784.00 $000 $2.970.00 $0 00 $0.00 $2,260 00 $0 00 $89 12 $9,103.12 Coordinatmt utility roiect ours 4 16 18 34 ate $800.00 $2,784.00 $0.00 $2,970.00 $0 00 $0 00 $3,842.00 $0 00 $0.00 $10,396.00 Additional Meetings lou rs ate $0 00 $0.00 $0.00 $0.00 $0 00 $0.00 $0 00 $0.00 $0 00 $0.00 TOTA $35,623.68 Constructiondeinitrattien Additional FDOT Permitting Requirements +ours ate 5000 $0 00 $0.00 $0 00 $0 00 $000 5000 $0 00 $000 $0.00 Additional ghting Scope ours 3 10 6 1 ate $600 00 51,74000 $000 50.00 $0.00 $0.00 $678 00 $0 00 $44 56 $3,062.56 Incorporation af Rs Scope ours 5 35 18 26 2 ate $1.000 00 $6,090.00 $0.00 $2,970 00 $0 00 $0 00 $2.938 00 $0 00 $89 12 $13,087.12 Coordinating Utility roiect ours 5 35 18 26 ate $1,00000 $6,090 00 $0.00 $2.970 00 5000 50.00 $2,938 00 $0 00 $0 00 5 12,998.00 Additional Meetings ours a¢$0 00 $0.00 $0.00 $0 00 $0 00 $0 00 $0.00 5000 5000 $0.00 Survey/Survey Coordination +lours 0 0 0 Rate $0 00 $0 00 $0 00 SO 00 $0.00 $0.00 $0.00 $0 00 $0 00 $0.00 rOu $29.147.68 s1Arc,goos •sA.Ha,MsurN._oG@rue_rou[_$32mus] Page 393 of 1310