Loading...
99-23234 RESO RESOLUTION NO. 99-23234 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE AGREEMENT WITH CARR SMITH CORRADINO, DATED JULY 16, 1997, IN THE AMOUNT OF $74,977, FOR THE PROVISION OF ADDITIONAL SERVICES NOT INCLUDED IN THE ORIGINAL SCOPE OF WORK, INCLUDING SEVERAL SCHEMATIC DESIGNS FOR THE APPROVAL OF THE SCOTT RAKOW YOUTH CENTER ICE RINK (AT LEAST 17 DIFFERENT SCHEMES AND COST ESTIMATES AND A SCALE MODEL FOR PRESENTATIONS), PLAN REVISIONS AND REDESIGNS REQUESTED BY THE DESIGN REVIEW BOARD TO GAIN BOARD APPROVAL FOR FLAMINGO PARK, NORMANDY ISLE PARK, AND THE SCOTT RAKOW YOUTH CENTER; AND ADDITIONAL COSTS FOR SURVEYING; AND FURTHER APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE AGREEMENT WITH REG ARCHITECTS, INC., DATED JULY 16, 1997, IN THE AMOUNT OF $6,512.40, FOR ADDITIONAL SERVICES NECESSARY TO ACCOMPLISH THE DESIGNS AND PLANS FOR THE GROUP "A" PARKS. WHEREAS, on July 16, 1997, the Mayor and City Commission entered into Professional Services Agreements with the firms of Carr Smith Corradino and REG Architects, Inc., respectively, for the architectural design and development of construction documents for various parks included in the City's $15 million General Obligation Parks Improvements Bond Program; and WHEREAS, on May 20, 1998, the Mayor and City Commission approved the schematic plans for these park facilities pursuant to the Master Plan; prepared preliminary cost estimates; developed a draft construction schedule; and authorizing the Administration to proceed with construction documents; and WHEREAS, based on the recommendations of the Administration and the City's Design Review Board, at its regular meetings on July 14, September 15 and October 13, 1998 and April 20, 1999, it was necessary for Carr Smith Corradino to modify the designs, construction documents and bid specifications for the Flamingo Park and Normandy Isle Park and Scott Rakow Youth Center projects, resulting in increased scope of work and costs for said projects; and WHEREAS, REG Architects, Inc., was requested by the Administration to do additional design work as a result of additional construction required for safety and security and maintenance considerations at Crisp, Stillwater, LaGorce and Palm Island Parks; and WHEREAS, as a result of the increased scope of work, as delineated in the attached correspondence from Carr Smith Corradino and REG Architects, Inc. requesting these amendments, the Agreement with Carr Smith Corradino needs to be amended by $74,977.00; and with REG Architects, Inc., by $6,512.40, to compensate them for these additional services. NOW THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein approve and authorize the Mayor and City Clerk to execute Amendment No.2 to the agreement with Carr Smith Corradino, dated July 16, 1997, in the amount of $74,977 for the provision of additional services not included in the original scope of work, including several schematic designs for the approval of the Scott Rakow Youth Center Ice Rink (at least 17 different schemes and cost estimates and a scale model for presentations), plan revisions and redesigns requested by the Design Review Board to gain Board approval for Flamingo Park, Normandy Isle Park, and the Scott Rakow Youth Center; and additional costs for surveying; and further approving and authorizing the Mayor and City Clerk to execute Amendment No.2 to the agreement with REG Architects, Inc., dated July 16,1997, in the amount of $6,512.40, for additional services necessary to accomplish the designs and plans for the Group "A" Parks. PASSED and ADOPTED this 7th day of July, 1999. 1tt! MAYOR ATTEST: ~~!c~ T:\AGENDA \ 1999\JUL0799\CONSENT\ADDSER V. RES APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ~.'~ .. ? / ....ltv Aitom~ fclJv/ ~ Date Jun-Z4-9~ 05:Z0pm From-ab~ T-51Z P O~/09 F-B44 LAKf< ~M' I H lUKf<ADINO o z - o <( a:: a:: o u ENGINEERS ARCHlitCTS ERS CONSTRUCTORS ARCH. UC. NO. AA000295i April 7, 1999 Mr. Jorge Chartrand City of Miami Beach 1 700 Convention Center rive . .Miami Beach, Florida 33139 (REVISED May 7, 1999) RE: Flamingo Pork / ormondy Isle Perk I Scott Rakow Youth Center REQUEST FOR A DITIONAL SERVICES Deer Jorge, , Enclosed please find our r vised Request tor Additional Services for the above-referenced proiect. As negotiated in our lost meting March 25, 1999, we hove reduced the amount of this Additional Service Request by over $20,000.00 (20%) by removing 011 hou~ and effort of the Principal Architect, Eduardo Lame end by reevoluoting the number of hou~ appropriated for <:ADO Operators. The revised br ok-down for Additional Services is os follows: Scott Rakow Youth Center (see Exhibit A) (10% of Construction Cost or Alternate # l-Anolysis No. 10, Previous Bond ApprOvol 12/16/99) total Flamingo Pork (see Exhibit S) Normandy Isle Pork (see hibit C) Reimburscbles (see Exhibi D-2) Reimbu~cbles-Surveying (ee Exhibit E-3) Rakow Model (see Exhibit ADDIT10NAL SERVICES (excluding Exhibit F) $ 23,000.00 fNork In Progress) $12.49500 ($735 for each a/temote scheme: 7 totol) $35,495.00 $14,005.00 (Complete) $ 6,277.00 (Complete) $15,000.00 (Partially Complete) $ 4,200.00 (Complete) $ 3,50000 (Previously approved ond Complete) Effort for Normanydy" Fie ingo and Rakow: (Exhibits A, S & C ) $55,777.00 ( 70% of overall request) .. Reimbursables for Norman y, Flamingo end Rokow (Exhibits 0-2 & E-3) $19.200.00 (30% of overall request) $74,977 .00 .. ATTACHMENT I EXHIBITS A - F AOSS NW 97rh AVeNUE. MlAMl, FLOIlIDA :!3178 TeL 305.59A.on5 . FAX 305.59.40755 WWW.COItRADINO.COM Please see the attached Exhibits for a breakdown of the Effort and Back-up reimbursable documentation for this Additional Service Request. To summarize, 70 % of this Request for Additional Services encompasses work performed by our firm in all 3 projects and the remaining 30% is for reimbursables which include surveys, testing, photography, printing, renderings and other miscellaneous items associated with these projects. The actual cost of these items could not have been identified until actual work began and the scope of these reimbursable items was more clearly defined In conclusion, we are aware of the importance of these parks to the City and it's community and have continued working without haulting production at any time to maintain and expedite the parks schedule. We look forward to the expeditious approval of these services considering the fact that 90% of the work has been completed. I will be out of town until Monday, April 12, however, if you have any questions during that time, please contact Jim Chastanet. Sincerely, Principal J:\ 1979\Generol\Word\cmbodds040S99revisedOS0799 .doc C: Kevin Smith, CMB Michel Magloire, CMS Oda/ys Mon, CMS Jim Chastanet, Corradino Tony Pardo, Corradino EXHIBIT A SCOTT RAKOW YOUTH CENTER A. DESIGN DEVELOPMENT 1. Based on 10% of Construction Cost for Alternate #1-AnaJysis No.1 0, Previous Bond Approva/12/16/99 8. MASTER PLANNING SERVICES (Through December 16, 1998) 1. Preparation of Alternate Configurations and Cost Estimates (over 17 Schemes) CORRADINO STAFF HOURS BILLABLE RATE TOTAL 2,295.00 6,450.00 3,750.00 ~. I . I Average of $735 r.:er scheme Note: Principal's time spent at numerous staff and community meetings has been removed. TOTAL - Scott Rakow Youth Center Additional Services S 35,495.00 EXHIBIT B FLAMINGO PARK 1. Design and Preparation of exhibits for re-submittals to ORB on 09/15/98 and 10/13/98 due to change of location and request to re-visit previously approved master plan. CORRADINO STAFF HOURS BIW\BLE RATE TOTAL Note: Principal's time spent at numerous staff and community meetings has been removed. TOTAL - Flamingo Park Additional Services $ 14,005.00 EXHIBIT C NORMANDY ISLE PARK 1. Design and Preparation of exhibits for re-submittal to ORB on 09/15/98. due to request to re-vist previously approved master plan. CORRADINO STAFF ~, HOURS BILLABLEAATE TOTAL Note: Principal's time spent at numerous staff and community meetings has been removed. TOTAL - Normandy Isle Park Additional Services $ 6,277.00 EXHIBIT D REIMBURSABLES TOTAL REIMBURSABLE EXPENSES THROUGH MARCH 30,1999 = S24,898.38 REIMBURSABLES (THROUGH March 3D, 1999) . .. . TOTAL: . 1 ...... 2 Completed Completed Completed Completed Completed Com leted vs. $15,000 as )er contract . will only be use :J if needed EXHIBIT E SURVEYING 1 2 3 EXHIBIT F RAKOW MODEL Jur-.J-24-1999 18:27 I N C lTY OF MIRMI BERCH P.02/04 A R C H I T E C T s c 0 R P 0 R A T E D . INTERIOR DESIGN * PLA..~Ll"G R E G ARcmTECTURE MEMORANDUM DATE: October I, 1998 (Revised May 3, 1999) TO: Jorge Chartrand, Capital Project Coordinator, CMB Public Works Michel Magloire. Capital Project Coordinator. CMB Public Works FROM: Rick Gonzalez, A.I.A., President, REG Architects, Inc. RE: Request for Additional Services Miami Beach Park Improvements Group "A" MIAMI BEACH PROJECT NO. POO07CM REG PROJECT NO: 97007 The following is our request for payment tabulation based on the following services provided. A. Items added to the scope of work S 3,542.40 B. Changes to the design ~fter final construction documents were submitted. S 3,970.00 TOTAL ADDITIONAL SERVICES RENDERED S 6,512.40 As you know, we prepared final documents based on com.m~ts received by the follo\\'ing departments in February 1998 on the design development submitted in January . Planning . Police . Building . Property Management . Recreation Culture and Parks . Public Works We revised our documents to include all comments made by the above mentioned departments and submitted multiple sets of review dOC'UI11ents as we approa~hed the 100% submittal. No fwther major coxnments were made, and minor comments were promptly inco:porated. .' It was not until we submitted 100% construction documents that we received additicmal major revisions, primarily regarding the landscape design. Many of these revisions were in direct conflict with the directives given m February, including the location, species, type and amoWlt of plant material as well as the general design principals to be followed. Feel free to give me a call uyou need further clarification or descriptions for the work perfonned. 420 LtDeoll\. Roa4 1'1.0."" (:1051 612.109' 3.30 C1ematit Suellt l'l'>c~ (561: 659 . :l3l~ Bun:. 363 Swn 114 Mtalll:l1 Beach Weal Palm Beacb nodu 33139 FU; t~S) <'T1-jOr2 nori4A 33401 Ft.1:O 15611 6S9.s54-6 U._.~T .. . ATTACHHENT II EXHIBIT G JUN-24-1999 18:27 CITY OF MIAMI BEACH P.03/04 Revised May 3, 1999 Memorandum RE: Request for Ac1dltional Sevices October 1, J 998 page~Ofl ~ REQu~TFOR^DDn10NALSER~CE A Based on Items added to the scope of work requested by the City of Miami Beach Srlllwater Park No. Item . Net Cost C,OH &; P Totals 35% 1 Lightniru; Protection S 5,000.00 S 1,750,00 S 6,750,00 2 Waterproofing Membrane S 2.400.00 $ 840.00 S 3.240,00 Estimated Cost $ 9,990.00 Additioaal Services Fee (8%) S 799.20 S 799.20 I Crespi Park No, Item Net Cost e.OH & P Totals 35% 1 Lightning Protection S 3.000.00 $ 1,050.00 $ 4,050.00 2 W aterDroofln~ Membrane S 900.00 S 315.00 S 1,215.00 Estimated Cost S 5,265.00 A.dditioaal Services Fee (8%) S 421.20 S 421.20 I Palm Island Park No. Item Net Cost C.OH&P Totals 35% 1 Li2htnint ProteCtion S 1,500.00 $ 525.00 S 2.025.00 2 Waterproofing Membrane S 20.000.00 S 7,000.00 $27.000.00 Estima1ed Cost S29,025.oo Additional Sutiees Fee (8%) $ 2.322.00 $ 2,322.00 I TOTAL AMOUNT FOR ADDmONAL SERVICES S 3,542.40 C. OH & P = C011tingeo...'j'. Over-Head and ProfIt JW-24-1999 18:28 C ITT' OF M] AM] BEACH P.04/04 Revised May 3, 1999 Memorandwn RE: Request for Additional Service& October 1,1998 Revised May S, 1999 page~ of! ~ B Bas.ci on chaDgtS requested on laDdie.ping after 100 % CD 'iubmittal StWwater Park No. Class Staff Co. Task Rate Hrs. Total 10 Professional. 1 Steve Lefton URG LA Designs $ 70 4 $ 280.00 12 Professional - 1 Matt Bulkolt URG Document Preparation S 50 3 S 150.00 11 Professional - 1 SteVe Lefton URG Drawing Coordination S 70 1 S 70.00 Subtotal 1 $ 430.00 Crespi Park No. Class Staff Co. Task Rate Hrs. Total 10 Professional - 1 Steve Lefton URG LA Designs $ 70 3 S 210.00 12 Professional - 1 Matt Bulkolt URG Document Preparation S 50 3 $ 150.00 II Professional - I SteVe Lefton URG Drawing Coordination S 70 1 S 70.00 Subtotal 1 S 360.00 LaGorgce Park No. Class Staff Co. Task Rare HI'S. Total 10 Professional - 1 Steve Lefton URG LA Designs S 70 3 S 210.00 U Professional - 1 Man Bulkolt URG Document Preparation S 50 :; $ 150.00 11 Professional - 1 Steve Lefton URG Drawing Coordination S 70 1 $ 70.00 Subtotal 7 S 360.00 Palm IslllJJd Park No. Class Staff Co. Task Rate Hrs. Total 10 Professional - 1 Steve Lefton URG LA Designs S 70 3 $ 210.00 12 Professional. 1 Mat[ Bulkolt URG Document Preparation $ 50 3 S 150.00 11 Professional - 1 Srcve Lefton URG Drawing Coordination S 70 1 S 70.00 Subtotal 7 $ 430.00 7S S $ 70 4 S 70 3 $ 3 S 3 4 22 TOTAL A.\tO~T FOR ADDITIONAL SERVICES o $3,970.00 f TOTHL.. P.04 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 hllp:\\ci. m iam i-beach. fl. us COMMISSION MEMORANDUM NO. .:l17 - Cfi- TO: Mayor Neisen O. Kasdin and Members of the City C mmission DATE: July 7, 1999 FROM: Sergio Rodriguez City Manager SUBJECT: A RESOLUT N OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE AGREEMENT WITH CARR SMITH CORRADINO, DATED JULY 16, 1997, IN THE AMOUNT OF $74,977, FOR THE PROVISION OF ADDITIONAL SERVICES NOT INCLUDED IN THE ORIGINAL SCOPE OF WORK, INCLUDING SEVERAL SCHEMATIC DESIGNS FOR THE APPROVAL OF THE SCOTT RAKOW YOUTH CENTER ICE RINK (AT LEAST 17 DIFFERENT SCHEMES AND COST ESTIMATES AND A SCALE MODEL FOR PRESENTATIONS), PLAN REVISIONS AND REDESIGNS REQUESTED BY THE DESIGN REVIEW BOARD TO GAIN BOARD APPROVAL FOR FLAMINGO PARK, NORMANDY ISLE PARK, AND THE SCOTT RAKOW YOUTH CENTER; AND ADDITIONAL COSTS FOR SURVEYING; AND FURTHER APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE AGREEMENT WITH REG ARCHITECTS, INC., DATED JULY 16, 1997, IN THE AMOUNT OF $6,512.40, FOR ADDITIONAL SERVICES NECESSARY TO ACCOMPLISH THE DESIGNS AND PLANS FOR THE GROUP "A" PARKS. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Funds are available in the $15,000,000 Parks Bond Fund 370. : c': r!::./.:"~r:'~''.'~~'. AGENDA ITEM C.l::t 7 -7 .qq DATE BACKGROUND: Carr Smith Corradino On July 16, 1997, the City Commission approved a professional services agreement with the firm of Carr Smith Corradino for the design and construction documents for the Scott Rakow Youth Center, Flamingo Park and Normandy Isle Park. Since that approval. the Carr Smith Corradino staff have been working in cooperation with City staff to accomplish the same. The $74,977 for additional fees is attributable to $55,770 for additional work on all three projects and $19,200 for additional reimbursable expenses. The increased fees for services are for work completed for Normandy Isle Park and for Flamingo Park beyond the scope stipulated in the basic services schematic design section of the Agreement, along with substantial revisions to the plans resulting from various meetings to incorporate the comments of the Design Review Board. In preparation for the Design Review Board presentations, Carr Smith Corradino also took aerial photographs of the related sites and neighborhoods, developed several color renderings for each project, prepared mailing lists of homeowners and notified each affected neighborhood of the Design Review Board meeting(s), and conducted geotechnical testing and comprehensive surveys for Flamingo and Normandy Isle Parks. The request for reimbursables includes these surveys, geotechnical testing, aerial photography, printing, color renderings, the building of a detailed scale model of the planned Rakow Youth Center Ice Rink, complete with three (3) interchangeable volumes representing the current northern section of the facility and two (2) options for the proposed ice rink, and other miscellaneous items associated with accomplishing the design of these projects. The cost of these services could not be identified until actual work began and the scope of the reimbursable items was more clearly defined. (Please see Attachment I - Exhibits A-F for detailed breakdowns). REG Architects. Inc. On July 16, 1997, the City Commission also approved a professional services agreement with the firm of REG Architects, Inc. for the design and construction documents for ten parks. Included were the Stillwater, Crespi, La Gorce, Palm Island, Tatum, Island View, Fisher, Fairway, Washington. and Muss Parks. REG Architects, Inc. is requesting $6,512.40 for additional services required in the scope of work at Stillwater, Crespi. LaGorce and Palm Island Parks and for revisions requested by the Administration. The additional $6,512.40 in fees is attributable to added lightning protection and flood protection (waterproofing) as required by FEMA (Federal Emergency Management Agency) to the Stillwater and Crespi buildings totalling $3,540.40 and landscape drawings revisions totalling $3,970. The request for revisions was initiated by the Administration after an initial approval to complete the construction documents for the landscape plans was given and then further evaluated for cost efficiency, maintenance, materials selection and security considerations. The drawings were reworked and the construction drawings and bid specifications revised. (See Attachment II - Exhibit -G for detailed breakdown) ANAL YSIS: The Administration is requesting the approval for these amendments to the agreements for both Carr Smith Corradino and REG Architects, Inc. because the work performed by these firms was considered to be above the contractually agreed upon scope of services and necessary to accomplish the projects. The majority of Carr Smith Corradino's request is a result of modifications required to satisfy the Design Review Board's requirements and to develop an acceptable solution for the Scott Rakow Ice Rink. The remainder of their request is for additional reimbursables such as geotechnical services, aerial photography and surveying. Included in their request is an additional allowance of $5, I 0 1 that will only be used, if necessary, to complete their projects. REG Architects, Inc.' s request is based on additional design work required as a result of additional construction required for safety, security and maintenance considerations at Crespi, Stillwater, LaGorce and Palm Island Parks. CONCLUSION: Adopt the Resolution. S~Il@IOM/ef T :\AG ENDA \ 1999\JUL0799\CONSENT\ADDSER V .COM