Loading...
LTC 190-2025 Design Review Board Recommendation (DRB24-1048) - Terminal Island Water Booster Pump Station7, 190-2025 MIAMI BEACH OFFI CE O F THE C ITY MANAGER LTC# LETTER TO COMMISSION TO : FROM : Honorable Mayor Steven Meiner and Me ~fie C~y CommissK,n Eric Carpenter, City Manager ~ ~ 'Jt DATE : May 2025 SUBJECT : Design Review Board Recommendat ion (DRB24-1048) -Termi nal Island Water Booster Pump Stat ion On November 5, 2024, the Design Review Board (ORB) reviewed an application on an advisory basis for a project to harden the water booster pump station on Terminal Island. As part of the review of this application , the ORB provided a separate re commendation to the City Commission whic h, due to an oversight on the part of staff to the ORB , was not immediately transmitted to the City Commission. Project Description The Public Works Department submitted an application pertaining to a project to harden the water booster pump station on Terminal Island , for advisory review by the ORB. The project involves the installation of equipment that will improve the resilien cy and reliability of the existing water booster pump station on Terminal Island , and in c ludes a permanent generator, rep la cement of an air handler unit, repla cement of the perimeter fen c ing and a new access gate, and door frame improvements. The most visible portion of the project will be the new generator, whic h will be located immediately to the east of the existing building. Additional infrastru cture work that is not visible from the exterior will take pla ce inside the building and underground. The water booster station is lo cated adjacent to the MacArthur Causeway, the F isher Island Ferry and Garage , Coast Guard Station Miami, and surface parking. The proposed exterior modifications are sc reened from view along the MacArthur Causeway by large trees and shrubs and will not impact pedestrians . The proposed c hanges are ne cessary to improve the fun ctioning of the existing water booster pump station and ensure that it will be resilient to natural events. Overall , the project will benefit the surrounding neighborhood and help ensure that Miami Bea c h's potable water system fun ctions well. ORB Review and Recommendation On November 5, 2024 , the ORB approved a motion (6-0), transmitting a favorable re commendation to the City Commission for the pro je ct. Additiona ll y, the ORB re commended that there be as muc h landscaping as possible to sc reen the generator. If you have any questions regarding these re c ommendations , please feel free to contact Rogelio Madan , Development & Resiliency Officer, at extension 6131 . ec&rRM /RAM C : Rafael Granado , City Clerk Ricardo Dopico , City Attorney Joseph Centorino , Inspe ctor General