Loading...
R7C-Execute GMP Amendment 1 Construction Of 6th And 53rd Street Restrooms ProjecCOMMISSION ITEM SUMMARY A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute A Guaranteed Maximum Price (GMP) Amendment No.1, To The Pre-Construction """\!'"''"'Agreement With Thornton Construction Company, inc., Dated July 6, 2012, For The Construction Of The 6th and Street Restrooms Project, in The Amount Of $1,200,493, Plus An Owner's Contingency in The Amount Of For A Total Of ,320,542; With Previously Appropriated In The Amount Of $568,539 From SP Post RDA COT and Municipal Resort Tax Fund $107,215 from SB Quality of Life Resort Tax Fund 305, And $644,788 From t Financed-"B;;..<.....;B;;;;.;o;:;.;.n:.;;;d;;;;:;s_;;.F_;;;u;.;..;nc;;;;d_;;;3;.;:;0.:..1'-. -----------------------' The scope of work for this project consists of the demolition of the existing restroom facility located at Lummus Park at 599 Ocean Drive (6th Street Restrooms), and construction of a new 1,500 SF facility; and the demolition of the existing restroom facility and Ocean Rescue office (53rd Street Restrooms), located at 53rd Street and Collins Avenue. and construction of a new 864 SF restroom facility and 546 SF office for the Ocean Rescue Department. On October 19, 2011, the Mayor and City Commission adopted Resolution No. 2011-27762 accepting the recommendation of the City Manager, pursuant to Request For Qualifications No. 40-10/11, for a Construction Manager at Risk firm to provide pre-construction services and construction phase services via a Guaranteed Maximum Price {GMP) amendment for the 6th and 53rd Street Restrooms Project and authorizing the administration to enter into negotiations with the top-ranked firm, Thornton Construction Company, Inc. (Thornton); and further authorizing the Mayor and City Clerk to execute an Agreement for Pre-Construction Services. The Agreement for Pre-Construction Services was executed on January i 3, 2012, in the amount of $23,000. On April 28. 2012, Thornton submitted the first draft of the GMP proposal for review by the City and C3TS, in the amount of $1,250,921. Following negotiations, and evaluation of value-engineering options, the final negotiated GMP is $1,200.494 ($614,322 for 6th Street Restrooms and $586,171 for 53rd Street Restrooms). It is important to note that Thornton obtained bids from sub-contractors in order to reach the best possible GMP. The Schedule of Values per discipline is included as Attachment A. in order to obtain further assurance that the best value for this project had been negotiated, the City also contracted Atkins of North America (Atkins) to perform an independent construction cost estimate (Attachment B). Atkins' estimated construction cost of this project is $1,388,000, which is approximately 15% higher than the negotiated GMP. The Administration is of the opinion that the final GMP is competitive, fair and a reasonable price for the construction of the 6th and 53rd Street Restrooms Project. THE ADMINISTRATION RECOMMENDS APPROVAL OF THIS RESOLUTION. Financial information: Source of Funds: lA IBE H Account 388-2680-069357 SP Post RDA COT & Mun. Resort Tax 388-2680-000356 SP Post RDA COT & Mun. Resort Tax 305-2680-069357 SB Quality of life Resort Tax Fund 305-2680-000356 SB Quality of Life Resort Tax Fund 301-2679-069357 Cap. Projects Not Financed by Bonds 301-2679-000356 Cap. Pro·ects Not Financed by Bonds 364 AGENDA ITEM----:--- !:lATE _:..;;:_...;__2-...!.....::::: IBE H City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 331 39, COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the FROM: Kathie G. Brooks, Interim City Manager DATE: October 24, 2012 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1, TO THE PRE~CONSTRUCTION SERVICES AGREEMENT WITH THORNTON CONSTRUCTION COMPANY, INC., DATED JANUARY JULY 6, 2012, FOR THE CONSTRUCTION OF THE 6TH AND 53RD STREET RESTROOMS PROJECT, IN THE AMOUNT OF $1,200,493, PLUS AN OWNER'S PROJECT CONTINGENCY OF $120,049, FOR A TOTAL OF $1,320,542; WITH PREVIOUSLY APPROPRIATED FUNDING IN THE AMOUNT OF $568,539 FROM SP POST RDA COT AND MUNICIPAL RESORT TAX FUND 388, $107,215 FROM SB QUALITY OF LIFE RESORT TAX FUND 305, $644,788 FROM CAPITAL PROJECTS NOT FINANCED BY BONDS FUND 301. ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure a quality, well constructed capital project. FUNDING Funding in the total amount of $1,320,542, has been previously appropriated as follows: 6th Street Restrooms: $568,539 from South Pointe Post RDA CDT and Municipal Resort Tax Fund 388 and 107,215 from SB Quality of Life Resort Tax Fund 305. 53rc Street Restrooms $644,788 from Capital Projects not Financed by Bonds Fund 301. ANALYSIS The scope of work for this project consists of the demolition of the existing restroom facility located at Lummus Park at 599 Ocean Drive (6th Street Restrooms), and construction of a new 1,500 SF facility; and the demolition of the existing restroom facility and Ocean Rescue office (53rd Street Restrooms), located at 53rd Street and Collins Avenue, and construction of a new 864 SF restroom facility and 546 SF office for the Ocean Rescue Department On July 13, 2011, the City Commission approved the issuance of an RFQ for a Construction Manager at Risk Firm to Provide Pre-Construction Services and Construction Phase Services via a Guaranteed Maximum Price (GMP) Amendment for the 6th Street and 53rd Street Restroom Projects. RFQ No. 40-10/11 was issued on July 18, 2011. On October 19, 2011, the Mayor and City Commission adopted Resolution No. 2011-27762 accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ} No. 40-1 0/11, for a Construction Manager at Risk firm to provide pre-construction services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the 6th and 365 Commission Memonmdum -61h and 53"' Street Restrooms GMP October 24, 2012 Page 2 of2 53rct Street Restrooms Project; and authorizing the administration to enter into negotiations with the top-ranked firm, Thornton Construction Company, Inc. (Thornton); and further authorizing the Mayor and City Clerk to execute an Agreement for Pre-Construction Services. The Agreement for Pre-Construction Services was executed on January 13, 2012, in the amount of $23,000. On April 9, 2012, Thornton held a bid opening which was attended by representatives the City and the Architect of Record -Corzo Castello Carballo Thompson Salman (C3TS). Subcontractors submitted sealed bids which were opened by Thornton in the presence of the City and C3TS. On April 28, 2012, Thornton submitted the first draft of the GMP proposal for review by the City and C3TS, in the amount of $1,250,921. Following negotiations, and evaluation of value-engineerin~ nnt·inn,.:: Thornton submitted the final negotiated GMP in the amount of $1,200,493 ($614,322 for et Street Restrooms and $586,171 for 53ro Street Restrooms). It is important to note that Thornton obtained competitive bids from sub-contractors in order to reach the best possible GMP. The Schedule of Values per discipline is included as Attachment A. In order to obtain further assurance that the best value for this project had been negotiated, the City contracted Atkins of North America (Atkins) to perform an independent estimate of probable construction costs (Attachment B). Atkins' estimated construction cost of this project is $1,388,000, which is approximately 15% higher than the negotiated GMP. The Administration is of the opinion that the final GMP is competitive, fair and a reasonable price for the construction of the 6th and 53rct Street Restrooms Project Upon City Commission's approval of the GMP, and as contemplated in any GMP Amendment(s), Thornton will deliver all of the Construction Services required to complete the work in strict accordance with the Contract Documents, and deliver the Project to the City at or below the GMP and within the Contract time. anticipated Project Schedule for the construction of the 6th and 53rct Street Restrooms Project is Commission GMP Awarded: October 24, 2012 Notice to Proceed Number One: December, 2012 Notice to Proceed Number Two: January, 2013 Construction Start: January 2013 Construction Completion: July 2013 CONCLUSION The Administration recommends approval of the attached Resolution, authorizing the Mayor and City Clerk to execute a Guaranteed Maximum Price (GMP) Amendment No.1 to the Pre~Construction Services Agreement with Thornton Construction Company, Inc., for 6th and 53rct Street Restrooms Project, in the amount of $1,200,493, plus an owner's contingency in the amount of $120,049, for a project total of $1,320,542; with previously appropriated funding in the amount of $568,539 from SP Post RDA COT and Municipal Resort Tax Fund 388, $107,215 from SB Quality of life Resort Tax Fund 3~nd $644,788 from Capital Projects not Financed by Bonds Fund 301. KB\JG~D Attachments: A Schedule of Values Discipline B. independent Estimate of Probable Costs prepared by Atkins 366 RESOLUTION NO. ----- A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1, TO THE PRE~CONSTRUCTION SERVICES AGREEMENT WITH THORNTON CONSTRUCTION COMPANY, INC., DATED JANUARY 13,2012, FOR THE CONSTRUCTION OF THE 6TH AND 53RD STREET RESTROOMS PROJECT, IN THE AMOUNT OF $1,200,493, PLUS AN OWNER'S PROJECT CONTINGENCY OF $120,049, FOR A TOTAL OF $1,320,542; WITH PREVIOUSLY APPROPRIATED FUNDING IN THE AMOUNT OF $568,539 FROM SP POST RDA CDT AND MUNICIPAL RESORT TAX FUND 388, $107,215 FROM SB QUALITY OF LIFE RESORT TAX FUND 305, $644,788 FROM CAPITAL PROJECTS NOT FINANCED BY BONDS FUND 301. WHEREAS, on July 13, 2011, the City Commission approved the issuance of a Request for Qualifications (RFQ) No. 2011-27762 a Construction Manager at Risk Firm to Provide Pre-Construction Services and Construction Phase Services via a Guaranteed Maximum Price (GMP) Amendment for the 6th Street and 53rd Street Restrooms Project (the Project); and WHEREAS, the scope of work for this project consists of the demolition of the existing restroom facility located at Lummus Park at 599 Ocean Drive (6th Street Restrooms), and construction of a new 1,500 SF facility; and demolition of the existing restroom facility and Ocean Rescue office (53rd Street Restrooms), located at 53rd Street and Collins Avenue, and construction of a new 864 SF restroom facility and 546 SF office for the Ocean Rescue Department; and WHEREAS, on October 19, 2011, the Mayor and City Commission adopted Resolution No. 2011-27762, accepting the recommendation of the City Manager, pursuant to RFQ No. 40-10/11, and authorizing the Administration to enter into negotiations with the top- ranked firm, Thornton Construction Company, Inc. (Thornton); and further authorizing the Mayor and City Clerk to execute a Pre-Construction Services Agreement; and WHEREAS, the Pre-Construction Services Agreement was executed on January 13, 2012, in the amount of $23,000; and WHEREAS, the City Administration and Thornton have negotiated a GMP, in the amount of $1,200,493 and, accordingly, the City Manager requests that the Mayor and City Commission accept and approve the GMP, plus an owner's contingency in the amount of $120,049, and authorize the Manager and City Clerk to execute the GMP Amendment No. 1 to the Pre Construction Services Agreement, in the aforestated amount. 367 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve the Guaranteed Maximum Price (GMP) Amendment no. 1, to the Pre~Construction Services Agreement with Thornton Construction Company, Inc., dated January 13, 2012, for the construction of the 6th and 53rd street restrooms project; said amendment, in the amount of $1,200,494, plus an owner's project contingency of $120,049, for a total of $1 ,320,542; with previously appropriated funding in the amount of $568,539 from SP Post RDA CDT and Municipal Resort Tax Fund 388, $107,215 from SB Quality life Resort Tax Fund 305, and $644,788 from Capital Projects not Financed by Bonds Fund 301. PASSED AND ADOPTED THIS ___ DAY OF ____ .2012. ATTEST: Rafael Granado, CITY CLERK Matti Herrera Bower, MAYOR KB\JGG\FV\DM T:\AGENDA\2012\10-24-12\6 and 53rd St Restrooms ·Thornton GMP Amendment 1\6th and 53rd St Restrooms-Thomton- GMP Amendment 1· RESO.doc 368 NTON Project Name: City of Miami Beach. Slh & 53rd Street Restrooms !late: July 6, 2012 PROJECT BREAK!lOWN ITEM No. TRADE PACKAGE 53RO ST 6TH ST VALUE PROPOSED SUBCONTRACTOR 1 GENERAL CONDITIONS 79.900 83,263 163.163 Thornton Ce>r1structlon Co. 2 GENERAL REQUIREMENTS $ 2.685 s 2,685 5.370 Thornton Construction Co. 3 DEMOLITION ! ASBESTOS ABATEMENT $ 11,480 $ 11,515 23.995 Berg Osmolition 4 MAINTENANCE OF TRAFFIC s 12,35C s 12,350 $ 24,700 Thornton Cormtructicm Co. 5 SITEWORK $ 65.236 $ $4,409 $ 119,647 Miguel Lopez Jr., Inc 6 SITE FURNISHINGS $ 841 $ 841 1,682 Schedule 10 LANDSCAPING & IRRIGATION s 14,15f 32.425 $ 46,581 Aquatic Landscaping Design 8 CONCRETE $ 78,665 108.388 $ 187,053 Shellcrata 9 LIGHT WEIGHT INSULA TED CONCRETE 4,000 N!A $ 4.900 Don Wo·i<s 10 MISC. CARPENTRY 8,450 6237 14,687 Thornton Construction Co. 11 CABINETRY 1,235 NIA $ 1.235 Mica Craft 12 ROOFING s 15,002 16 533 $ 31,535 Bob Hilson Roofing 13 W.P. & CAULKING $ 1,400 1.200 2,600 Thornton Construction Co. 14 DOORS. FRAMES. HOW. s 13,500 10 575 $ 24,075 Lotspiech Go. of Florida 15 STOREFRONTIGLA21NG 3,800 13280 17.080 J& D Glazing 16 STUCCO ! SKIM COAT PLASTER $ 19,45() 18.780 38,230 Gold Coast Plastenng DRYWALL 9,060 N/A 9,060 Cornerstone Ccontracting 18 ACOUSTICAL CEILING $ 620 NIA 820 AH Square Acoustics 19 FLOORING (STONE/TILE) $ 31,705 $ 53302 85,007 Proffesiona! Flooring Contractors 20 EPOXY FLOORING $ 7.418 $ 15.066 22AB4 Durabor.d 21 PAINTINGIVVVC $ 5,971 $ 7.080 13,057 Xpres:s Painting 22 LOUVERS $ 8,i05 $ 4,681 $ 12.786 Aim lite 23 SPECIALTIES 18.416 19.131 $ 37,547 Specialties Source 24 PLUMBING 35.45() 41,000 $ '76,450 Centerline P!umbing 25 HVAC 12,800 6,300 $ 19,100 Apex 26 ELECTRICAL 71,500 40,700 $ 112,200 Hi-r ech Electrical TRADES SUBTOTAL $ 534,097 G.C. FEE@ 7.0% 37.387 $ 39,182 76.569 PAYMENT & PERFORMANCE BOND@ 1.5% 8.011 $ 8,396 16.408 GENERAL LIABILITY INSURANCE 1.3% 6676 6,987 13,673 GUARANTEE MAXIMUM PRICE $ 586,171 $ 614,322 $ 1,200,494 C:\Documan!s and Settings\ptittley\Desktop\GMP-PresentationiGMP ESTIMATE -Co~Jlal!!l> 1 of 1 369 Cl F lA I BEACH 53RD ST. & COLLINS AVE. AND 6TH ST. & OCEAN DRIVE uNEW RESTROOM FACIUTIESn CITY OF MIAMI BEACH PROJECT NO. TBD ESTIMATE OF PROBABLE CONSTRUCTION COSTS JUNE 2012 fOR: SUBMITTED BY: I S 370 ST. AND COLLINS AVE., ST. ANO OCEAN DRIVE-COST ESTIMATE 1 SCOPE OF WORK ....................................................................................................................................................... 4 2 REFERENCE DOCUMENTS .......................................................................................................................................... 4 3 COST ESTIMATING METHODOLOGY .......................................................................................................................... 4 4 COST ESTIMATE SUMMARY ...................................................................................................................................... 5 5 COST ESTIMATE ASSUMPTIONS AND EXClUSIONS ................................................................................................... 6 5.1 ASSUMPTIONS NOT ALL 6 S.2 EXCLUSIONS .............................................................................................................................................................. 6 6 DETAILED COST ESTIMATE ........................................................................................................................................ 7 Page I 2 KiNS 371 ST" AN!J OCEAN !JR!V£ • COST ESTfMA TE Date: June 25, 2012 Ms. Thais Vieira .. RA Capital Projects Coordinator Capital improvement Projects City of Miami Beach Subject: 53'd St. & Collins Ave. and 61 " St. & Ocean Drive-New Restroom Facilities COMB Project No.: TBD 100% Construction Documents Submittal Estimate of Probable Construction Costs Dear Thais, submitted via e-mail Attached find the estimate of probable construction costs for the 100% construction documents submittal. Based on the documents received, we anticipate the probable cost of construction for both to be $1,388,000 or a range of construction costs for this project to be $1.2M to $:LSM 1 . The estimated range of costs accounts for the current market conditions and potential competitive bids. Please note the general basis, assumptions and qualifications that are accounted for in the development of this project's cost estimate (please see page 6 for more qualifications): Basis, Assumption and Exdusions: .. Estimate is based on 100% Construction Documents Submittal Drawings Planners, dated March 1, 2012 and Addendum #2 dated March 30, 2012. .. Intent of the cost estimate development at this phase of the project is to establish a reasonable cost range for the project. .. Estimate assumes a CM at Risk method. .. Unit costs are based on historical projects and standard references. We thank you for the opportunity to be part of this verv important project. Please contact me with any questions or comments at (305) 514.3211, Juan Alfonso, Assoc. AlA Assoc. VP, Group Manager Cc: File 1 Combined range for both restroom projects. Page I 3 KiNS 372 ST. AND OCEAN DR!V£ • COST EST!MA T£ The scope of work includes the development of an estimate of probable construction costs for the City of Miami Beach- 53'd St & Collins Av. and St. & Ocean Drive, New Restroom Facilities, based on the documents by C3TS Architects Planners, dt 03/01/2012. scope of the construction cost estimate includes: .. All related site work. " Cost estimate for New Restroom Facilities at 53'd Street and Collins Avenue. .. Cost estimate for New Restroom FacHities at Street and Ocean Drive. .. Deductive Alternates as per plans. 100% Construction Documents submittal dt. issued by C3TS Architects Planners Engineers. .. Addendums 1 & 2, issued by C3TS Architects Planners Engineers dt. 03/30/2012. .. Project scoping was conducted in conjunction with City of Miami Beach PM and C3TS PM to determine or clarify the overall scope of the project. .. Detailed quantities were developed using On Screen Takeoff (OST) software, as well as manual take·offs quantities (when appiJt:atlleJ .. Reasonable sub-contractor markups, taxes, and bond were added to the estimated direct costs, as applicable. .. Estimate does not account for any construction contingencies for unforeseen conditions. .. .. .. .. Page 14 Estimate includes construction costs for four (4) Deductive Alternates as per drawings and conversations with C3TS PM. Estimate includes contractor markups such as general conditions, overhead and profit which accounts for current market conditions. Estimate only includes construction costs and excludes any pre-construction costs. Estimate assumes normal bidding conditions and CM @ Risk delivery method . Intent of construction cost estimate is to establish a reasonable cost to construct this project Actual solicited sub-contract bids could vary from this estimate due to market conditions, material price fluctuations, competition, date, contractor means and methods, and perceived risk. KiNS 373 ST. AND COLLINS AVE., ST. AND OCEAN DRIVE· COST ESTIMA T£ Page I 5 KINS 374 St end Collins Ave/6th 5t ond Oeeon [)L, New Restroom Facilities City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 100% Construction Documents Estimate Summary-53rd St & Collins Ave. and 6th & Ocean Drive 01 General Conditions 02 General Requirements 03 Demolition/ Asbestos Abatement 04 Sitework 05 Site Furnishings 06 landscaping & Irrigation 07 Concrete (lncld. Masonry & Metals) 08 lightweight Insulated Concrete 09 Misc. Carpentry 10 Cabinetry 11 Roofing 12 W.P. & Caulking 13 Doors, Frames, Hardware 14 Storefront/Glazing 15 Stucco/Skim Coat Plaster 16 Drywall 16a Wall Finishes limestone Cladding, Misc.) 17 Acoustical Ceiling 18 Flooring (Stone/Tile) 19 Epoxy Flooring 20 Painting/VWC 21 louvers 22 Specialties 23 Plumbing 24 HVAC 25 Electrical Subtotal Constn.u.:tion Costs Overhead & Profit Bonds & Insurance Subtotal Construction Costs Estimate Contingency Page 15 375 $ 129,334 $ 3,500 $ 48,512 $ 111,236 $ 1,000 $ 117,768 $ $ 1,428 $ 1,500 $ 3,200 $ $ 28,995 $ $ 26,267 $ 35,268 $ 7,068 $ $ 699 $ $ 18,720 $ 58,104 $ 6,206 $ 49,165 $ 132,227 $ 37,415 $ 82,289 $ 1,207,114 6.5% $ 78,462 3% $ 36,213 $ 1,321,790 5% $ 66,089 $ 1\TKINS St. ond Co/lim Ave/6th St and Ocean OL,, New Restroom Facilities 53rd Street & Co!Hns Avenue Alt. 1 · Sealed Concrete Alt. 2 • Wa!!s A!t. 3 · Standard Concrete Plaza Alt. 4 • SoHd Plastic HDPE ToHet Partition 6th Street & Ocean Drive A!t. 1 • Sealed Concrete A!t. 2 • Walls A!t. 4 ·Solid P!astk HDPE Toilet Partition ATKINS 376 ST. AND COLLINS AVE., ST. AND OCEAN D!?JVE-COST ESTIMATE 5.1 ASSUMPTIONS (MAJOR, NOT All INCLUSIVE) • Estimate assumes that both projects will be done simultaneously with a shared Project Manager. 5.2 EXCLUSIONS • Estimate excludes Builder's Risk insurance. .. Estimate excludes owner's soft cost including FF&E, A/E Fees, Consultant Fees, Construction Engineering & Inspection (CE&I) Fees. .. Estimate excludes Environmental Remediation & Mitigation Fees, if required. .. Estimate excludes any other new scope not shown on drawings. • Estimate excludes escalation beyond 2012, all prices present day 2012) Estimate excludes Davis Bacon Wages. Page I 6 KiNS 377 !iT AND COLLINS AVE., ST. AND OCEAN DRIVE-COST ESTIMATE Page I 7 KINS 378 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 100% Construction Documents Estimate Summary-53rd St & Collins Ave. 01 General Conditions 02 General Requirements 03 Demolition/ Asbestos Abatement 04 Sitework 05 Site Furnishings 06 & 07 Concrete (lndd. Masonry & Metals) 08 lightweight Insulated Concrete 09 Misc. Carpentry 10 11 Roofing 12 W.P. & Caulking 13 Doors, Frames, Hardware 14 Storefront/Glazing 15 Stucco/Skim Coat Plaster 16 Drywall 16a Wall Finishes (Tile, 17 Acoustical Ceiling 18 Flooring (Stone/Tile) 19 Epoxy Flooring 20 Painting/VWC 21 louvers 22 23 Plumbing 24 1-IVAC 25 Electrical Subtotal Construction Costs Overhead & Profit Bonds & Insurance Subtotal Construction Costs Estimate Contingency Construction Costs 379 53rd St and Col.lins Ave., New Restroom Foci!itv June 25, 2012 $ 59,963 $ 2,000 $ 30,607 $ 73,533 N/A $ $ 77,386 $ 1,428 N/A $ 3,200 $ 8,534 $ 23,725 $ 18,560 $ 4,328 $ 17,531 $ 7,068 $ 12,833 $ 699 $ $ 5,490 $ 5,491 $ $ 26,775 $ $ 19,820 $ 45,546 $ 559,651 6.5% $ 36,377 3% $ 16,790 $ 612,818 5% $ 30,641 $ 643,459 ATKINS 5t end Collins Ave" New Restroom Facility 53rd Street & CcdHns Avenue A!t, 1 -5ea!ed Concrete Alt. 2-WaHs A!t, 3 -Standard Concrete Plaza Alt. 4-Solid Plastic HDPE Toilet Partition 1\TKINS 380 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53rd Street & Collins Avenue ~ Ocean , ""'"'"'"'"" & Restroom Estimate of Probable Construction Cost 381 June 25. 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom facilities 53rd Street & Collins Avenue ~ Ocean Rescue & Restroom Estimate of Probable Construction Cost of Structure, Cross Bracing, Sound Insulation -5/ll" Gyp. BeL Up to 6" Abv, Ceiling, on 3-5/$" Metal Studs of Structure 382 June 25, 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53n::! Street & Collins AvemJe • Ocean Rescue & Restroom ~'*l'l•r-m1n1 Estimate of Probable Construction Cost DESCRIPTION Studs ) -Allowance 383 June 25. 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53rd Stre®t & Comns Avenue • Ocean Rescue & Restroom Estimate of Probable Construction Cost Electrical Panels Panel 'A' 1201240V, 200A, 1P. 3W 384 June 25. 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53rd Stre®t & Comns Avenue • Ocean Rescue & Restroom Estimate of Probable Construction Cost DESCRIPTION 100A, 1P, 3W Type A (CircJiar Wall Mounted) Type !3 (1' x 4' Light Fixture, Chain Hung) Type C (26' L Light Fixture, Wall Mounted) (Allowance) Type C (26' L Light Fixture, Wall Mounted, wl Batt Pack) (Allowance) 385 June 25, 201 2 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53rd S1reet & Co!Hns Avenue· Sitework Estimate of Probable Construction Cost June 25. 2012 386 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 53rd Street & Comn~ AvemJe • Sitework Estimate of Probable Construction Cost DESCRIPTION 53rd Stroot & Collins Avenue • Sitework 387 June 25, 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 100% Construction Documents Estimate Summary -6th St & Ocean Drive 01 General Conditions 02 General Requirements 03 Abatement 04 Sitework OS Site Furnishings 06 landscaping & Irrigation 07 Concrete & Metals} 08 Lightweight Insulated Concrete 09 Misc. Carpentry 10 11 Roofing 12 W.P. & Caulking 13 Doors, Frames, Hardware 14 Storefront/Glazing 15 Stucco/Skim Coat Plaster 16 Drywall 16a Wall Finishes Limestone Cladding, 17 Acoustical 18 Flooring (Stone/Tile) 19 Epoxy 20 Painting/VWC 21 louvers 22 Specialties 23 Plumbing 24 HVAC 25 Electrical Subtotal Construction Costs Overhead & Profit Bonds & Insurance Subtotal Construction Costs Design Contingency Construction Costs Page 17 388 53rd and Collins Ave., Nevi Restroom Facility June 25, 2012 $ 69,371 $ 1,500 $ 17,905 $ 37,703 $ 1,000 $ 74,518 $ 121,257 $ $ 1,500 $ $ 33,189 $ 5,271 $ $ 21,939 $ 17,738 $ $ 15,624 $ $ 216 $ 13,230 $ $ 2,663 $ 22,390 $ 67,460 $ 17,595 $ 36,743 $ 647,463 6.5% $ 42,085 3% $ 19,424 $ 708,971 5% $ 35,449 $ 144,420 1\TKINS 53rd and Collins Ave" New F?estroom Facility 6th Street & Oceaw~ Drive Alt. 1 ~ Sealed Concret®? Alt. 2 ~ W<:~l!s Alt. 4 ~Solid Plastic HOPE Toilet Partition Page 18 J\TKINS 389 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 6th Street & Ocean Driv€\ • Re:stroom Estimate of Probable Construction Cost 390 June 25, 20i 2 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 6th Street & Ocm::tn Drive -Ro~troom Estimate of Probable Construction Cost DESCRIPTION Keyed Dead Bolt (Assumed-Schlage B60N619) rdware Set B (Interior} Mortise Lock wr Lever {Schlage L9465) Hinges 4-1/2" x 4-1/2" SP (Hager 881199) Door Closer Push/Pull Plate/handle Hinges 4-112" x 4-1/2" SP (Hager BB1199) Door Closer Kick Plate 16" x 34" 391 Jure 25, 2012 City of Miami Beach 53rd St. &: Collins and 6th St. &: Ocean Drive New Restroom Facilities Sth Street & Ocean Drive -Restroom Estimate of Probable Construction Cost 392 June 25, 2012 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities Stl'l Street & Ocean Drive • Restroom Estimate of Probable Construction Cost 6th Street & Ocean Drive • Restroom Facility 393 June 25, 2012 Estimate Contingency @ 5% Es\imale Total ESTIMATE (Rounded) NS City of Miami Beach 53rd St & Collins and 6th St. & Ocean Drive New Restroom Facilities 6th Stn'l!et & Ocean Drive • Sitework Estimate of Probable Construction Cost June 25. 2012 394 City of Miami Beach 53rd St. & Collins and 6th St. & Ocean Drive New Restroom Facilities 6th Street & Ocean Drive ~ Sitework Estimate of Probable Construction Cost OESCR!PTlON ---' ------ 6th Street & Ocean Drive -Sitework 395 June 25.2012 NS