R7E-Execute Amendment 1 Bayshore Neighborhood 8E - Sunset Islands I And II ProjeCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Authorizing The Mayor And City Clerk To Execute Amendment No. 1 To The Construction Contract Between The Of Miami Beach, Florida, And David Mancini & Sons, Inc., For The Construction of The City Of Miami Beach Right Of Way Infrastructure Improvement Project, Bayshore Neighborhood No. BE, Sunset islands I & II Project, Dated July 13, 2011 (The Contract), In The Amount Of $386,465 Plus An Owner's Contingency Of $38,646, For A Grand Total Of $425,111, For The Construction Of A Temporary And Permanent Street Lighting System As a Result of an Unforeseen Condition For The Sunset Island 1 & 2 Project Limits With Previously Appropriated Funding In The Amount From Fund 304-Capital Reserve, $28,2'15 From Fund 423-Gulfbreez:e 2006 Water & Sewer Bonds, $99,320 From Fund 424-Water & Sewer Bonds 2000 Series, And From Fund 431 -Storm Water Bonds 2011. ey indicated that over Issue: I Shall the City Commission adopt the Resolution? On July 13, 2011, the City Commission pursuant to invitation to Bid (!TB) 27-10/11 approved the award of a construction Contract to David Mancini & Sons, Inc. for the construction of the City of Miami Beach Right-of-Way Infrastructure improvement Program Neighborhood No. 8E Bayshore, Sunset Islands I & !I project in the amount of $5,611,04 i, plus an Owner's Contingency in the amount of $561,104. On December 12, 2011, David Mancini & Sons, Inc. was issued the second Notice to Proceed {NTP 2) to mobilize and commence construction activities. The is anticipated to be substantially completed during April 2013. The Administration has determined that scope of work is warranted due to unforeseen utility conflicts discovered during the construction phase, The added scope consist of: 1. Installation of a Temporary & Permanent Street lighting System consisting of a wired network connecting the power source to the existing light poles (approximately 59 light fixtures). This wire will be held up by 2 inch galvanized pipes to a height of 18 feet in the longitudinal direction and 18-20 feet when r-rA'"<::ir•n the roadway, A PVC conduit will also be secured to the existing light poles to protect the wires coming down to the pole base ports. The system will be removed by DMSI upon completion of the permanent system. 2. Removal and replacement of all direct buried street lighting cable connections from existing service point to each street light pole within the limits of construction. Furnish and install new 2 inch PVC conduit directly behind the new valley gutter, .. Ali work will with the Florida Building Code and City of Miami Beach Public Works Department Codes and Standards. On July 9, 2012, the Administration presented this cost estimate to the Finance & Citywide Projects Committee. On September 27, 2012 the City Commission approved the additional funding to the 2013 Capital Budget in the amount of $828,645 for the additional scope. The Administration requests approval of Amendment No. i to the Construction Contract, between the City of Miami Beach, Florida, and David Mancini & Sons, Inc., for the construction of the City of Miami Beach Right of Way Infrastructure Improvement Project Neighborhood No. BE Bayshore, Sunset Islands I & II dated July 13, 2011, (the Contract in the amount of $386,465 !us an owner' · $38, tal of $425 111. Amount $77,292 $7,729 $28,215 432 Account 304-2665-069357 304-2665-000356 423-2665-069357 424-2665-069357 431-2665-069357 AGENDA ITEM! --"-"---=-- DATE ___..~~......:......:::: H TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Kathie G. Brooks, Interim City Manager DATE: October 24, 2012 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO THE CONSTRUCTION CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND DAVID MANCINI & SONS, INC., FOR THE CONSTRUCTION OF THE CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, BAYSHORE NEIGHBORHOOD NO. 8E, SUNSET ISLANDS I & II PROJECT, DATED JULY 13, 2011 (THE CONTRACT), IN THE AMOUNT OF $386,465 PLUS AN OWNER'S CONTINGENCY OF $38,646, FOR A GRAND TOTAL OF $425,111, FOR THE CONSTRUCTION OF A TEMPORARY AND PERMANENT STREET LIGHTING SYSTEM AS A RESULT OF AN UNFORSEEN CONDITION FOR THE SUNSET ISLAND 1 & 2 PROJECT LIMITS WITH PREVIOUSLY APPROPRIATED FUNDING IN THE AMOUNT $85,021 FROM FUND 304 ~ CAPITAL RESERVE, $28,215 FROM FUND 423 ~ GULFBREEZE 2006 WATER & SEWER BONDS, $99,320 FROM FUND 424 ~ WATER & SEWER BONDS 2000 SERIES, AND $212,555 FROM FUND 431 ~ STORM WATER BONDS 2011. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure value and the timely delivery of a quality capital project. FUNDING Funding in the amount of $386,465 plus an Owner's Contingency of $38,646, for a grand total of $425,111 has been previously appropriated in the Capital Budget with Funding as follows: $ 85,021 $ 28,215 $ 99,320 $212,555 $425,111 ANALYSIS Fund 304 -Capital Reserve Fund 423-Gulf Breeze 2006 Water & Sewer Bonds Fund 424-Water & Sewer Bonds 2000 Series Fund 431 -Storm Water Bonds 2011 On July 13, 2011, the City Commission pursuant to Invitation to Bid (ITB) 27-10/11, approved the award of a construction Contract to David Mancini & Sons, Inc. (DMSI) for the construction of the City of Miami Beach Right-of-Way Infrastructure Improvement Program Neighborhood No. 8E Bayshore, Sunset Islands I & II project in the amount of $5,611,041. On December 12, 2011, OMS I was issued the second Notice to Proceed (NTP 2) to mobilize and commence construction activities. The Administration has determined that additional scope of work is warranted due to unforeseen utility conflicts discovered during the construction phase. The following new scope of work 433 Commission Memorandum -David Mancini & Sons, Inc. Contract Amendment for Sunset Islands 1 & 2 October 24, 2012 Page 2 of 2 (Exhibit A) to be added to the DMSI construction contract was requested by the City and includes the following: 1. Installation a Temporary and Permanent Street Lighting System consisting of a wired network connecting the power source to the existing light poles (approximately 59 light fixtures). This wire will be held up by 2 inch rigid galvanized pipes to a height of 18 feet in the longitudinal direction and 18-20 feet when crossing the roadway. A PVC conduit also be secured to the existing light poles to protect the wires coming down to the pole base ports. The system will be removed by DMSI upon completion of the permanent system. 2. Removal and replacement of all direct buried street lighting cable connections from existing service to each street light pole within the limits of construction. Furnish and install new 2 inch PVC conduit directly behind the new valley gutter, with i 2 inch cover. work will comply with the Building Code and City of Miami Beach Public Works Department Codes and Standards. On July 9, 2012, the Administration presented this cost increase to the Finance & Citywide Projects Committee. On September 27, 2012 City Commission approved additional funding to the 2013 Capital Budget for the replacement and relocation of shallow street light circuits in conflict with on-going construction. The negotiated price submitted by DMSI for the above scope has been reviewed by the Project Engineer of Record (EOR) Chen Moore & Associates, Inc., Resident Project Representative (RPR) Schwebke-Shiskin & Associates, and City staff and found to fair and reasonable. Project Schedule The additional Scope of Work will add thirty (30) calendar days to the overall project. The contractor's original request for an additional sixty (60) calendar days was negotiated down to thirty (30) calendar days by the RPR and City staff. CONCLUSION: The Administration recommends that a Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, be authorized by the Mayor and City Clerk to execute Amendment No. 1 to the Construction Contract, between the City of Miami Beach, Florida, and David Mancini & Sons, Inc., for the construction of the City of Miami Beach Right of Way Infrastructure Improvement Program, Bayshore Neighborhood No. 8E, Sunset Islands I & II Project, dated July 13, 2011, (the Contract) in the amount of $386,465 plus an owner's contingency of $38,646, for a grand total of $425,111, for the construction of a Temporary and Permanent Street Lighting System as a result of an unforeseen condition for the Sunset Island I & II project with previously appropriated funding in the amount $85,021 from Fund 304 ~ Capital Reserve, $28,215 from Fund 423-Gulfbreeze 2006 Water & Sewer Bonds, $99,320 from Fund 424 ~Water & Sewer Bonds 2000 Series, and $212,555 from 431 -Storm Water Bonds 2011. ATTACHMENTS: Exhibit A-OMS! proposal dated June i 2, 2012 434 Exhibit A ) \\ "'' !'\.\ GENERAL CONTRACTOR 1 '2+7 At to@ fh,::d, ,\1iami fL $1 s ::!9 I'll (JOS) $JJ-SSQ7 (J<lfi.) 5.32-8835 2012 Office 1700 Convention Center Drive Miami H 33139 Re: Proposal for Temporary and Permanent Str~Qt Lighting Mrs, a~•d•, rL ;50#4 FAlC (9M) 944-~0+0 In order to facilitate construction, minimize cost and minimize loss of street to DMSl to A for this street Permanent for both Islands #1 & #2. The total amount is $386,464.50 and will 60 calendar days be Time to this work is summarized island as follows. Sunset Sunset v'l/e can to alleviate some of the immediate Please advise if additional is Juan P.E. David Mancini & Inc. 435 RESOLUTION NO. 2012~ __ _ A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO THE CONSTRUCTION CONTRACT, DATED JULY 13, 2011, BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND DAVID MANCINI & SONS, INC., FOR THE CONSTRUCTION OF THE CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, BAYSHORE NEIGHBORHOOD NO. 8E, SUNSET ISLANDS I & II PROJECT (THE CONTRACT); IN THE AMOUNT OF $386,465 PLUS AN OWNER'S CONTINGENCY OF $38,646, FOR A GRAND TOTAl OF $425,111, FOR THE CONSTRUCTION OF A TEMPORARY AND PERMANENT STREET liGHTING SYSTEM AS A RESUlT OF AN UNFORSEEN CONDITION FOR THE SUNSET ISLAND 1 & 2 PROJECT liMITS; WITH PREVIOUSLY APPROPRIATED FUNDING IN THE AMOUNT $85,021 FROM FUND 304 *CAPITAl RESERVE, $28,215 FROM FUND 423 ~ GULFBREEZE 2006 WATER & SEWER BONOS, $99,320 FROM FUND 424 *WATER & SEWER BONDS 2000 SERIES, AND $212,555 FROM FUND 431 ~ STORM WATER BONOS 2011. WHEREAS, On July 13, 2011, the City Commission, pursuant to Invitation to Bid (ITB} No. 0/11, approved the award of a construction contract to David Mancini & Sons, Inc. for the construction of the City of Miami Beach Right~of-Way Infrastructure Improvement Program Neighborhood No. 8E Bayshore, Sunset Islands I & II Project, in the amount $5,611,041 (the Agreement and the Project respectively); and WHEREAS, on December 12, 2011, David Mancini & Sons, Inc. was issued the second Notice to Proceed (NTP 2) to mobilize and commence construction activities; and WHEREAS, the Project is anticipated to be substantially completed during April 2013;and WHEREAS, during the construction of the Project, the Administration determined that additional scope of work was warranted; and WHEREAS, the additional scope of work consists of installation of a temporary and permanent lighting system consisting of a wired network connecting the power source to the existing light poles (approximately 59 light fixtures); and. WHEREAS, David Mancini & Sons, Inc. submitted a cost proposal for the work, in the amount of $386,465, including a request for a sixty (60) calendar day contract time extension for the work which City staff negotiated down to thirty (30) calendar days; and WHEREAS, in order to implement the above stated additional scope of work, it will be necessary approve Amendment No. 1 to the Agreement, in the not to exceed amount of $386,465; and 436 WHEREAS, on July 9, 201 the Administration presented this cost increase to the Finance & citywide Projects Committee; and WHEREAS, on September 21, 2012 the City Commission approved additional funding to the 2013 Capital Budget for the replacement and relocation of the additional scope of work; and WHEREAS, the Amendment No. 1, to the Contract with David Mancini & Sons, Inc. will result in a revised contract amount of $5,997,506. NOW, THEREFORE, BE IT RESOlVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FlORIDA that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Amendment No. 1 to the construction contract, dated July 13, 2011, between the City of Miami Beach, Florida, and David Mancini & Sons, Inc., for the construction of the City of Miami Beach Right of Way Infrastructure Improvement Program, Bayshore Neighborhood No. 8E, Sunset Islands I & II Project (the Contract); in the amount of $386,465, plus an Owner's Contingency of $38,646, for a grand total of $425,111, for the construction of a Temporary and Permanent Street Lighting System as a result of an unforeseen condition for the Sunset Island I & !I Project limits; with previously appropriated funding in the amount $85,021 from Fund 304-Capital Reserve, $28,215 from Fund 423 -Gulfbreeze 2006 Water & Sewer Bonds, $99,320 from Fund 424 - Water & Sewer Bonds 2000 Series, and $212,555 from Fund 431 -Storm Water Bonds 2011. PASSED AND ADOPTED this __ day of ____ , 2012. ATTEST: RAFAEl E. GRANADO, CITY ClERK MATTI HERRERA BOWER, MAYOR 437