Loading...
Resolution 2025-33736 Resolution: 202533736 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE AN AMENDMENT TO THAT CERTAIN CONTRACT (THE "CONTRACT") DATED JUNE 2, 2023 BY AND BETWEEN THE CITYAND STRUCTURAL PRESERVATION SYSTEMS, LLC, PURSUANT TO INVITATION TO BID NO. 2023-042-DF, FOR REPAIRS TO BRIDGE NO. 876719 ON 77TH STREET (THE "77TH STREET BRIDGE") OVER THE TATUM WATERWAY; SAID AMENDMENT APPROVES ADDITIONAL CONSTRUCTION SERVICES IN THE AMOUNT OF $71,235.29 TO IMPLEMENT A TEMPORARY, ENGINEERED, SHORING SYSTEM IN KEY POINTS NEEDED TO PROVIDE STABILITY TO THE 77TH STREET BRIDGE DURING ITS REHABILITATION, UTILIZING THE REMAINING CONTRACT BALANCE IN THE AMOUNT OF $65,059.43, THEREBY INCREASING THE CONTRACT PRICE BY$6,175.86 TO A TOTAL PROJECT COST OF $665,059.36. WHEREAS, bridge no. 876719 on 77th Street (the "77th Street Bridge"), located in the Biscayne Point neighborhood between Hawthorne Avenue and Tatum Waterway Drive, serves as a critical path for residents and emergency services; and WHEREAS, based on consistent evaluations by the Florida Department of Transportation ("FDOT") in 2022 and 2024, the 77th Street Bridge has been receiving an average sufficiency rating of 62, below FDOT's recommended minimum threshold of 70; and WHEREAS, this average sufficiency rating of 62 indicates a borderline condition—not yet critical, but in need of attention — and acts as a decision point to begin planning repairs or more frequent monitoring to prevent further deterioration; and WHEREAS, pursuant to Invitation to Bid No. 2023-042-DF, Structural Preservation Systems, LLC ("SPS") was awarded a contract to perform substructure and superstructure work to the 771h Street Bridge, including concrete repairs, pile jacket installations and other restorative work (the "ProjecP'); and WHEREAS, the awarded contract amount to SPS totaled $658,883.50, including a 10% contingency of$59,898.50; and WHEREAS, [he Project began in June 2024; and WHEREAS, during Ihe restorative work, SPS encountered previously unidentified, severely deteriorated, concrete elements on key structural pillars including beams, bent caps and pilings; and WHEREAS, these deteriorated concrete elements were not visible or foreseeable when the bid was presented; and WHEREAS,to safely proceed with the Project, SPS implemented a temporary engineered shoring system (the "Shoring System") in key points (DU-14/15/16, DU-6/9/17 and PG20); and WHEREAS, the Shoring System involved the coordination of a third-party structural engineer, additional field crews, specialty equipment and an extended labor schedule; and WHEREAS, ihe conditions and additional work were documented ihrough daily Construction Engineering Inspection ("CEI") reports, TRM (time and materials) tracking and communications between the City, a CEI consultant and SPS; and WHEREAS, there is a remaining Project balance in the amount of $65,059.43, including a remaining contingency fund for the Project in the amount of$59,898.50, but the total cost of the Shoring System amounts to $71,23529; and WHEREAS, fhe Administration finds the cost for the Shoring System fair and reasonable; and WHEREAS, the Administration is requesting approval of an additional $6,175.86 to be added to the existing contract award in the amount of $658,883.50, for a total project cost of $665,059.36, to cover the excess cost for the Shoring Sys[em after application of the remaining contingency fund. NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITYOF MIAMI BEACH,FLORIDA,thatthe Mayor and City Commission hereby authorize the City Manager to negotiate and execute an amendment to that certain Contract(the"Contracl")dated June 2, 2023 by and between the City and Structural Preservation Systems, LLC, pursuant to Invitation to Bid No. 2023-042-DF, for repairs to bridge no. 876719 on 77th Street (the '77th Street Bridge") over the Tatum Watenvay; said amendment approves additional construction services in the amount of $71,235.29 to implement a temporary, engineered, shoring system in key points needed to provide siabili[y to the 77th Street Bridge during its rehabilitation, utilizing the remaining Contract balance in the amount of $65,059.43, thereby increasing the contract price by $6,175.86 to a total project cost of$665,059.36. PASSED and ADOPTED this aK day of JUp2 2025. r�i p�/1Ai+'F"- �//�L�*�-- Steven Meiner, Mayor ATTEST: iilh � � 7I125 :�:e�� B�c,y., � `: �i ; ;iwroAv autEo; ; � R ael . Granado, City Clerk ',,q:.. '�: � •�.4n�H;Z6�,`�:' R���� @ARBOU ,. APPROVED AS TO FORM 8 LANGUAGE & FO�N CityA rney ��� Dat���e�� Resolutions-C7 AA MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Enc Carpenter, City Manager DATE: June 25, 2025 TITLE: A RESOLUTION OF THE MAYOR AND CITV COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE AN AMENDMENT TO THAT CERTAIN CONTRACT (THE 'CONTRACT") DATED JUNE 2, 2023 BY AND BETWEEN THE CITV AND STRUCTURAL PRESERVATION SYSTEMS,LLC, PURSUANT TO INVITATION TO BID NO. 2023-042-DF, FOR REPAIRS TO BRIDGE NO. 876719 ON 77TH STREET (THE "77TH STREET BRIDGE") OVER THE TATUM WATERWAV; SAID AMOUNT^EOF $7P23O5.29 TODIMP EMENONAST EMPORARYREINGNEERED, SHORING SYSTEM IN KEY POINTS NEEDED TO PROVIDE STABILIN TO THE 77TH STREET BRIDGE DURING ITS REHABILITATION, UTILIZING THE REMAINING CONTRACT BALANCE IN THE AMOUNT OF $65,059.43, THEREBV WCREASING THE CONTRACT PRICE BY$6,175.86 TO A TOTAL PROJECT COST OF $665,059.36. RECOMMENDATION The Atlministration recommends approval of the increase to the contract award belween the City and Structural Preservation Systems, LLC ("SPS") in the amount of$6,175.86, for repairs b lhe 77th Street Bridge over Tatum Waterway,to implement a temporary, engineered, shoring system in key poinls, needed to provide stabiliry to the 77th Street Bndge, dunng its rehabilitacion, for a total project cost of$665,059.36. BACKGROUNDIHISTORV The 771h Streel8ridge, located in the Biswyne Point neighborhood, behveen Hawlhome Avenue and TaWm Waterway Drive, serves as a critical path tor residenls and emergency services. Based on consistent evaluations by the Flonda Department of Transportalion ("FDOT") in 2022 and 2024, the 77th SUeet Bndge has been receiving an average suffciency reting of 62, below FDOT'S recommended minimum Ihresholtl of 70.This rating indicates a bordedine wntlition -not yet critical, but in need of attention. It acts as a decision point to begin planning repairs or more frequent monitoring to prevent further deterioration. Pursuant to Invitation to Bid ("ITB") No. 2023-042-0F, Structural Preservation Systems, LLC (SPS). was awarded a wntract to perform substructure, superstructure, concrete repairs, pile jacket inslallations, and other restorative work to the 77th Street Bridge. The project began in June, 2024, and was completed in March. 2025. ANALYSIS During the restoretive work, SPS encountered newly unidentifed, severely deterioreted concrete elements on key structural pillars, including beams, bent caps, and pilings. These conditions were not visible or foreseeable when the bid was presented, exceeding the approved contract award in the amount of$658,883.50. 909 To safely proceed with the bndge's repairs, SPS implemented a temporary engineered shoring system in key points (DU-14/15/16, DU-6/9/17, and PC-20). These efforts involved the coordination of a third-party structural engineer, additional field crews, specialty equipment, and an extended labor schedule. The conditions and additional work were documented through daily Construclion Engineering Inspection ("CEI") reports, time and matenal ("T8M") trecking, and communications behveen the City, CEI consWtant ("CGA"), and the contractoc The total cost of the shonng work amounted to $71,235.29. There is a remaining balance in the amount of $65,059.43, exceeding the contract award by $6,175.86. The Administration fnds these costs fair and reasonable. The Administration is requesting approval of the additional $6,175.86 to the contract award in the amount of$658,883.50 for a total project cost of$665,059.36,to cover the shonng system needed to safely complete the 77th Street Bridge repairs. FISCAL IMPACT STATEMENT AccountCode: 302-0815-069357-29-414522-00-00-00-22920 $6,175.86. CONCLUSION The Administration recommends approval of the increase to the contract award between the City and Siructural Preservation Systems, LLC ("SPS") in the amount of$6,175.86, for repairs to the 77th Street Bridge over Tawm Waterway,to implement a temporary, engineered, shoring system in key points, needed to provide stability to the 77th Street Bridge, tlunng its rehabilitatioq for a total project cost of$665,059.3fi. Aoolicable Area North Beach Is this a "Residents Rinht to Know" item. Is this item ralated to a G.O. Bond punuanl to Citv Code Section 2-177 Proiect? Yes No Deoartmenl Public Works Soonsor CoSoonsor Condensed Title Execute Amendment 1 to SPS Agreement, 77Ih Street Bridge over Tatum Watenvay. PW Previous Action lFor Ciri qerk Use Onlv) 970 '