Loading...
Resolution 2025-33837 202533837 RESOLUTION NO. RESOLUTION OF THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER TO WAIVE, BY 5/7TH VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, IN ACCORDANCE WITH SECTION 2367 OF THE CITY CODE, FINDING SUCH WAIVER TO BE IN THE CITY'S BEST INTEREST, AND AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICESAGREEMENT WITH PROFESSIONALSTONE DESIGN LLC., TO PROVIDE SERVICES INCLUDING ACID WASHING AND CLEANING OF SIDEWALK STONES AND FISHPOND AT THE 7700 BLOCK OF LINCOLN ROAD, USING PREVIOUSLYAPPROVED FUNDS IN FISCAL YEAR 2025, IN THE NOT TO EXCEED AMOUNT OF $140,000. WHEREAS, at the May 21, 2025 City Commission meeting, the Pedra Portuguesa sidewalk maintenance item (C4J)was separated for discussion by Commissioner Kristen Rosen Gonzalez; and WHEREAS, the item was discussed at length, and a motion was made to include $140,000 for sidewalk repair in the Capital Budget Amendment (R7F), which passed 7-0; and WHEREAS, the Capital Budget Amendment item, including the Pedra Portuguesa repair, was adopted by Resolution No. 2025-33683 by a 7-0 vote during the same meet- ing; and WHEREAS, since its contract with UTA Management, LLC terminated in 2019, the City has led maintenance of the 1100 block of Lincoln Road, including the stone sidewalk and adjacent fishpond; and WHEREAS, over the last six years, City contractors have performed routine maintenance on the sidewalk; and WHEREAS, in early 2024, the City engaged Team Contracting for significant stone restoration and repair work at a total cost of$227,525; and WHEREAS, Pedra Portuguesa paving, while aesthetically pleasing, presents sig- nificant maintenance challenges due to labor-intensive upkeep, costly skilled repairs, vul- nerability to damage, and safety hazards when wet. WHEREAS, City staff and UTA Management met in early 2025 to discuss potential solutions for repairing or replacing the stones and adjacent fishpond; and WHEREAS, following Ihat meeting, UTA Management provided a proposal dated November 20, 2024 from Professional Stone Design LLC in the amount of $138,000, covering nighttime pressure-washing, crack and hole repairs, missing-stone replacement, grout installation, and sealer application; and WHEREAS, Professional Stone Design LLC was the original installer and has the most extensive knowledge of this Pedra Portuguesa installation; and WHEREAS, City staff also received a quote dated May 11, 2023 from Arquigreen Corp. for complete resurfacing and material replacement on the 1100 block of Lincoln Road, totaling $420,400, not including annual maintenance; and WHEREAS, after review, City staff recommended engaging Professional Stone Design LLC for the repair work due to their extensive knowledge and familiarity with the Pedra Portuguesa sidewalk; and WHEREAS, under Sections 2366 and 2367 of the City Code, the City Manager may waive bid requirements for construction-related services up to $300,000. NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager to waive, by 5/7th vote, the formal competitive bidding requirement, in accordance with Section 2-367 of the City Code, finding such waiver to be in the City's best interest, and authorize the City Manager to execute a Professional Services Agreement with Professional Stone Design LLC., to provide services including acid washing and cleaning of sidewalk stones and fishpond at the 1100 block of Lincoln Road, using previously approved funds in Fiscal Year 2025, in the not to exceed amount of$140,000. PASSED and ADOPTED THIS a� day of �u/ 2025. ATTEST: G� // _ L(:Cn�vl-- JIi;. ) 5 )�2� even Meiner, Mayor Rafael E. Granado, City Clerk APPROVED AS TO FORM BLANGUAGE & FOR EXECUTION 1 �, �� �� I$ � .�2� CilyAtlom�y r� UW Resolutions -C7 AJ MIAMIBEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of lhe Cily Commission FROM: Eric Carpenter, Ciry Manager DATE: July 23, 2025 TITLE: A RESOLUTION OF THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER TO WAIVE, BY 5/7TH VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, IN ACCORDANCE WITH SECTION 2367 OF THE CITY CODE, FINDING SUCH WAIVER TO BE IN THE CIN'S BEST INTEREST, AND AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH PROFESSIONAL STONE DESIGN LLC., TO PROVIDE SERVICES INCLUDING ACID WASHING AND CLEANING OF SIDEWALK STONES AND FISHPOND AT THE 1100 BLOCK OF LINCOLN ROAD, USWG PREVIOUSLY APPROVED FUNDS IN FISCAL YEAR 2025, IN THE NOT TO EXCEED AMOUNT OF $140,000. RECOMMENDATION The Administration recommends approving the Resolution. BACKGROUND/HISTORY At Ihe May 21, 2025 City Commission Meeting,the Pedra Portuguesa sidewalk maintenance item (C4 J) was separated for discussion hy the sponsoring Commissioner, Kristen Rosen Gonzalez. The item was discussed at length, and a motion was made by the sponsor to include funding in the amount of$140,000 for ihe repair of the sidewalk, in Ihe Capital Budget Amendment (R7 F),which passed 7-0. The Capital Budget Amendment item, including the Pedra Portuguesa repair,was subsequentty adopted by ResoWtion (202533683)7-0 during the same meeting. The City has taken ihe lead in maintaining the 1100 Bbck of Lincoln Road since its contract with UTA Management, LLC (UTA Management),terminated in 2019. Maintenance includes upkeep of the sidewalk material made of stones, and the adjacent fishpond. Over the last six years rou[ine maintenance of the sidewalk has 6een performed by City contractors. However, in eady 2024, the City engaged Team Contracting to perform significant stone restoratioNrepair work for a total $227,525. The Pedre Portuguesa, while aesthe[ically pleasing, does present signiticant maintenance challenges. 7he following reasons outline why it is so expensive to maintain and repair this specialty paving: labor-intensive upkeep,costly repairs (due to need for skilled craRsmen lo re-set paving stones), vulnerability to damage (can crack, sink, and become tliscolored due ro tempereture changes), safety wncems (wom stones can become slip hazards when wet). City staff and UTA Management met eady this year to discuss potential solutions to repaidreplace said stones and adjacent fishpond. Pollowing the meeting, UTA Management provided the City with a proposal of services (quote dated November 20, 2024, Attachment A) from Professional Stone Design LLC., in the amount of $138,000, which includes deep cleaning during nightlime hours with a pressure-washing machine and special cleaning products sui�able for the type of stone, deep cleaning of the main fountain, repair of all holes and cracks, the replacement of any missing stones in-kind to match the original sudacing, installa[ion of grou[where necessary, and Ihe application of a sealer coat to protect the stones. Professional Stone Design LLC was lhe original contrector and therefore, has the most extensive knowledge of Ihis installa�ion. City staff was also in receipt of a second quote from Arquigreen Corp. (quote dated May 11, 2023), for complete resurfacing, and replacemen�of materials of the 1100 Block of Lincoln Road Mall (Attachment B), in the amount of$420,400, not induding yeady maintenance. Upon City staff's review of all of the available information, it recommended that the original installing contraclor, Professional Stone Design LLC be engaged to provide the repair work needed, considering their eztensive knowledge and familiarity with the Pedra Portuguesa sidewalk located on the 1100 Block of Lincoln Road Mall. Under ihe City of Miami Beach's Code of Ordinances, Section 2366 and 2367,the City Manager has the authority to waive[he bid requirements far construction-related services, up lo $300,000. FISCAL IMPACT STATEMENT $140,000 Accoun[011-0840-000325. Does this Ordinance reuuire a Business Imoact Estimate? (FOR ORDINANCES ONLY) If applicable, the Business Impact Estimate (BIE) was published on: See BIE ak h[[ps:/Iwww.miamibeachfl.gov/city-hall/city-clerk/meeting-noticesl CONCLUSION The Adminisiration recommends for the City Manager to exercise his authority to issue a bid waiver in an amount not to exceed $140,000 and to engage Professional Stone Design, LLC to perform the required maintenance and repair of the Pedra Portuguesa sidewalk. Aoolicahle Area South Beach Is this a "Residents Rioht to Know" item. Is this item related to a G.O. Bond oursuantto Citv Code Section 2-17? Proiect? Yes No Was this Aoenda Item initiallv reauested W a lobbvist which, as defined in Code Sec. 2-081. includes a orincioal enqaqed in lobbvino? No If so, specity the name ot lobbyist(s) and principal(s): DeoaAment Public Works Soonsor(sl Commissioner Knsten Rosen Gonzalez Co-soonsorlsl Condensed Title Accept Rec, Acid Wash/Clean Sidewalk Stones 8 Fishpond At 1100 Block of Lincoln Rd. PW 5/7 Previous Action (For Citv Clerk Use Onlvl FACTURA : °;� Professional Stone Design LLC. iNv000zio� �� 14470sw 96th[err. miami,fl 33186 FECHA . �..305)'S49-4681 11/20/2024 y %��. � �`�'� tropi80@hotmail.com SALDO DEU�OR USD $138,000.00 CLIENTE LINCOLN 1111. 0 305 370 5086. wc hung@u ia manageme nt.com ARTICUlO TARIFA CAf. -- PEDESTRIAN LINCOLN RD.— $138,000.00 (APROX.49.000 square fee[.) 1- Protection of green areas for their care. 2- Deep cleaning with a pressure machine and special products for that type of stone. This cleaning will be done at nigh[, meaning cleaning will be tlone 12:00 am to 6:00 am. ( deterdek and acid cleaning protlucts). 3- Deep cleaning of(he main fountain with special polishing antl santling for these types of stains. 4- Base preparation for greater firmness. If the repair hole is larger than 3"x 3"feet, a compaction machine will be used. (compaction with line rock.) 5- Repair of more than 100 holes and crecks. ( necessary ma[erials sand topping mix). 6- Installation of stones in necessary areas. (the same stone will be used). 7- Placing Grout in necessary areas. ( We will use grout RAPID SET to combine the same color.) ARTIWLO �ARIFA CA� 8- Finishing with a good quality sealer coa[. ( Supreme Sealer EAGLE.� ' THIS QUOTE INCLUDES ALL MATERIALS NEEDED FOR THIS PROJECT AND INCLUDES TRASH. `«THE CITV OF MIAMI BEACH.. ( you will need to provider protection, and also if more stones are necessary). '*" ESTIMATED WORK TIME OF 6 to 7 BUSINESS WEEKS. '** HE ADVANCED FROM 50% WHEN SIGNING THE CONTRACT. "*"'*'"'**"'*"'*"***'*' 25% AT 4 WEEKS WORK STARTED. .................<.«.._... 25% FINISHED. TOTAL $138,000.00 SALDODEUDOR USD $138�000.00 � DATE MaY11.2023 � ^��I� ^�u OuaGHonO M823-1 T T � CustomerlD MiamiBeach *'aNmurastde�a.{c:oi.�hn Ouotehonvalitlunfil: May31.2023 ,,_■ P°iy Prepaie06y. CatloOtloriui Arquigreen Corp. 6130NE4Nq MiamI,FL,3313] Phone 305-]1&5961 Fax 305-158-90I1 Blllto: MIamlBeaeM1 Job loca[ion: 1111 Lincoln Rd. Gomments or specisl ins[ructions: P�ices indudes�.Ma[enal tlellvery,MstallaHon,ma[erial setling.Petlra Potluguesa,labor,gmut,fnal cleani�g,sales�ax.Workmens comp antl Liabili�y Ins up to$ 2 Million 1117 Lincoln Rd. Mall -Surtace repairs 8 upgrade puanHty U.M. Dezcription P�ke AMWNT Areas that neetl complete resurFacing Removal antl tlisposal of exisling Pavea.install o�new s[ones.and Bmuting. 7,50000 Sf ColorsBlackandWhlle 5 40A0 $ 3WA�0.00 (are vetl and re-installetl Is bgqerMan eacM1 Indrvitlual pahM1.bewuse we neetl ro assure s�mcNral contiguity) Ckanin9.9rout reW�r antl seal 30,100.00 5f Special cleaning wirti speci(c tle[ergent antl bmsM1es,grw[repair(wM1ere neetletl�.antl sealing wnh g y.pp $ 120400.00 ItaliantecM1nologylmpregnanng Sealer. TOTAL f �i0 (Sales Tax Included7 ANNUHL MAINTENHNCE Annual maintenance: 30,100 00 Sf -)Every�M1ree months,special cleanin9�+'Rh speci(ic detergent antl brushes,reinstall ot pieces a grout 5 4 00 $ 120.400.00 repair -�Once a year it includes also sealing with ilalian technoligy Impegnaling sealer. DELIVERYTIME Material lead time,estimated In about 10I12 vreeks afler order confirmation Initial work,�o�e execu�ea In aboW 8110 weeks EXCLUSIONS Barriwdes,signs.sequiriry equipment,lighting,srone handling from storage to/inal pb site position NOTE: Pr¢ing wlcula[etl on Ne assumption oi continuous insWllation atjobsite,witti no intermptrons In case o�mobiliza[ion of crew.mobilization cos�s will be applietl Upon anival from overseas,ma�erial will be bmught tojobsite.In case ihere Is lack of sloraging capability at site,malerial will be warehouseE,wsis billeE Prices wiculaled vnih freighLS valitl at ihe tlate of 5/31123-In case of Irwrease,ddference will be billed GONDITION OF PAYMENT 50%wi�F PD.for new impotl of subsfiNte srone 25 0 30 days aXer starting 25 o at<ompletition This price excludes:permi�s,permi�lees,expediler.