Loading...
R7B-Grant Certificate Of Appropriateness Demolition Of 340 23rd StreetCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Accepting the Recommendations Of The Historic Preservation Board (HPB) And Granting A Certificate Of Appropriateness For The Total Demolition Of An Existing Single Story Bullding And The Construction Of A New 5-Story Parking Garage With Accessory Ground Level Commercial Space At 340 23'<~ Street (Collins Park Garage). Key Intended Outcome Supported: Ensure value and timely delivery of quality capital projects; improve parking availability. Supporting Data (Surveys, Environmental Scan, etc.): The Cultural Campus is currently serviced by 55 parking spaces on two surface parking lots, these wiH be replaced with a parking structure of over 400 parking spaces. Item Summary/Recommendation: On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited tla Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant) for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services for the Collins Park Garage Project (the Project). The Agreement was executed on May 3rd, 2012, and on May 24,2012, the Notice to Proceed for the Planning Phase was issued. The proposed parking garage wm be constructed on the two properties currently occupied by surface parking lots located on 23rd Street, behind the Miami Beach Regional Library and the Miami City Ballet building, bridging over Liberty Avenue. The ground level of the proposed structure, between Park and Liberty Avenues, wm provide approximately 17,500 sq. ft. of retail space, while the upper five (5) levels of the parking garage will accommodate approximately 470 parking spaces. There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet, which must be demolished In order to accommodate for the new structure. On November 21, 2012, the Historic Preservation Board (HPB) granted approval of the Certificate of Appropriateness for the total demoHtion of the existing building, and construction of the new five-story parking garage with accessory ground level commercial space. Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of Appropriateness for demoHtion of any building, structure, improvement, or landscape feature located within a historic district and located on City-owned property, shall be advisory with the right of approval or disapproval vested with the City Commission. On December 12, 2012, the City Commission approved Resolution No. 2012-28076, setting a Public Hearing to consider the issuance of a Certificate of Appropriateness for the total demolition of an existing single story building and the construction of a new five-story parking garage with accessory ground level commercial space at 340 23rd Street (Comns Park Garage). The Administration recommends approval of the Resolution. Board Recommendation: Financial Information: Source of I Amount Account Funds: 1 I I 2 OBPI Total Financia.llmpact ~~mmary: -- Cit~ Clerk's Office Legislative Tracking: I Fernando Vazqld_e:::.:z:.L.'..:::.e:..;.;xt:.:.... 6.:::..1.;...:3::..:5'---~~---------~---------~--=:J Si n-Offs: MIAMI BEACH 411 AGENDA ITEM _i ...... ~_/--'8"-· _ DATE 1-flr"/:3 (9 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, F!orido 33139, www.miomibeachfl.gov TO: FROM: DATE: SUBJECT: COMMISSION MEMORANDUM Mayor Matti Herrera Bower and Members ~; the cyommission Kathie G. Brooks, Interim City Manager ;f fi / · January 16, 2013 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATIONS OF THE HISTORIC PRESERVATION BOARD, AND GRANTING A CERTIFICATE OF APPROPRIATENESS FOR THE TOTAL DEMOLITION OF AN EXISTING SINGLE STORY BUILDING AND THE CONSTRUCTION OF A NEW 5wSTORY PARKING GARAGE WITH ACCESSORY GROUND LEVEL COMMERCIAL SPACE AT 340 23RD STREET {COLLINS PARK GARAGE}. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure value and the timely delivery of a quality capital project. Improve parking availability. ADMINISTRATION RECOMMENDATION Adopt the Resolution. ANALYSIS On May 11, 2011, the Mayor and City Commission approved the issuance of Request for Qualifications No. 31-10/11 (the RFQ) for the Architectural, Engineering, Design, Bid and Award, and Construction Administration Services for the Collins Park Garage Project (the Project). The RFQ was issued on June 17, 2011, and on September 14, 2011, the City Commission approved Resolution No. 2011-27735 authorizing the City Manager to negotiate with the top ranked firm of Zaha Hadid Limited t!a Zaha Hadid Architects. On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t!a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant) for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services. The Agreement was executed on May 3rd, 2012, and on May 24, 2012, the Notice to Proceed for the Planning Phase was issued. 412 Commission Memorandum -Collins Park Garage -Setting Public Hearing for Certificate of Appropriateness January 16, 2013 Page 2 of2 The proposed parking garage will be constructed on the two properties currently occupied by surtace parking lots located on 23rd Street, behind the Miami Beach Regional Library, and behind the Miami City Ballet building, bridging over Liberty Avenue. The ground level of the proposed structure, between Park and Uberty Avenues, will provide approximately 17,500 sq. ft. of retail space, while the upper five (5) levels of the parking garage will accommodate approximately 470 parking spaces. The Project also contemplates a large public plaza at the ground level, just east of Liberty Avenue, which will merge into the Liberty Avenue right of way, between 22nd and 23rd streets, encouraging the pedestrian connectivity between the garage, Collins Park, the Miami Beach Regional Library and the Miami City Ballet. The design concept for the Project was presented to the Community on September 5, 2012. The meeting was well attended and the Project was very well received. There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet, which must be demolished in order to accommodate the new structure. On November 21, 2012, the Historic Preservation Board (HPB) granted approval of the Certificate of Appropriateness for the total demolition of the existing building, and construction of the new five-story parking garage with accessory ground level commercial space. Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of Appropriateness for demolition of any building, structure, improvement, or landscape feature located within a historic district and located on City-owned property, shall be advisory with the right of approval or disapproval vested with the City Commission. On December 12, 2012, the City Commission approved Resolution No. 2012-28076, setting a Public Hearing to consider the issuance of a Certificate of Appropriateness for the total demolition of an existing single story building and the construction of a new five-story parking garage with accessory ground level commercial space at 340 23rd Street (Collins Park Garage). CONCLUSION The Administration recommends that the City Commission accept the recommendations of the Historic Preservation Board, and grant a Certificate of Appropriateness for the total demolition of an existing single story building and the construction of a new five-story parking garage with accessory ground level commercial space at 340 23rd Street (Collins Park Garage). 413 r --·---·.·---.···-------------------------·---·--·------------------·--·---·---·--·-·---····M----------------------------·--· ·-------·----.,.'- MIA/v\lBEACH CITY OF MIAMI BEACH NOTICE OF PUBLIC HEARINGS llOfiCE IS lfEIIEBY given that a public hearl~g wiii be held by the; Mayor and City Commission of the City ol Miami Beacn, Aorida, in \he Commission Chambers, 3rd Floor, City Hall, 1700 Convention C'A:nh;r Drive, Miami !leaCh. Florida, on Wednesday, January 16, 2013, to consider the tol!owing: 10:50a.m. A Resolution PurSiJar.t To Miami Beach City Code Section 118·tit>3, To Consider Granting A Certificate Of Appropriateness for Tile Totnl DemolitiOn or An Existing Single Story Building And Tile Cnnstnu:lion Of A lk>w S·Story Parking Garage With 1\ccessory Ground Level Commercial Space At 340 23rd Stroot (Collins Park Garage}. Inquiries may be directed to the Capital improvements Office (306) C73· 7071. 1 I INTERESTED PARTIES arc !n'lltea 10 appear at this meeting, or be rr:oresented by an agent, or to express their views in wri~ng addressed to l the City Commissio.'l, c/o the City Clerk, 1700 Convention Center Drive. 1st Floor, City Hall, Miami Bear.h, Fio.ida 33139. Copies of tl1~>SC items are avai!flbie tor public iflSl)1Jction during normal business ho\lrS in tile City Clerk's Office, 1700 Convention Center Drive, 1st Floor, City Hall, Miami Beach, Aorida 33139. This melliing moy be continued, and under such C•rcumstnnces additional \ega! notice will no! be provided. i (Due 10 The Miami Herald's deadline, ordinances and/or resoMions 1Mt are tallleo. denies or willldrown will appear in this advertisemen~. , Ra!Bll! E. Granado, City Clelk 1 City ol Miami Beach ! Pursuant to Section 286.0105, F!a Stat, the City hereby advises 1M public thai: if a person decides to appeal anv decisioo made by the City COmmission with respect to any matter coosidere<t at its meding or its hearing, such person must ensure that a verbatim record of the proceedings is made, whicll record inc!udas the testimony ann twiflllnce upon which the appeal is to be based. This notice does not constitute consent by the City IOi the introdiJclion or admissi!ln r•l oth<J,'Wisi! inadmissible or irrelevant evidence, nor does it authorize challenges or appeals oot otherwise allowed by law. To request this material In accessible format sl!)n k1lli)UI\{Ie interpreters, Information on access lor peroons with disabililles. and/Or any accommodation to review any document or participate in any Ci!y-sponsored proceeding, please contact us live diiys In advance at (305) 673-741 l(Yoice) orm users may also call the Florida Relay Service at 711. ~~ i ~------------------------------------------~' 414 RESOLUTION TO BE SUBMITTED 415 THIS PAGE INTENTIONALLY LEFT BLANK 416