Loading...
R7J-Approve Increase To The Owner�s Contingency Sunset Islands I And II ProjectCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Approving An Increase To The Owner's Contingency For The Right-Of-Way Infrastructure Improvement Program, Neighborhood No. BE Bayshore, Sunset Islands I & !I Project, In The Amount Of $696,285, For The Additional Work Related To Construction Of Permanent Street Ughting System In Sunset Island I, Suitable And Unsuitable Fill Material Overruns, Outfall Reconstruction And Upsizing, Sanitary Sewer Pipe Uning, And Driveway Harmonization As A Result Of Unforeseen Conditions And Improvements With Previously Appropriated Funding In The Amount $73,292 From Fund 304 -Capita! Reserve, $34,017 From Fund 424 -Water & Sewer Bonds 2000 Series, $491 ,550 From Fund 431 - Storm Water Bonds 2011, And $97,426 From Fund 427 -Storm Water Enterprise Fund For A Grand Total Of $696,285. Key Intended Outcome Su~orted: Ensure value and timely delivery of a quality capital project. Improve storm drainage citywide, and maintain the Cj!y-='s'-'i7nf=-ra=-s::..:tc..:ru::.::c:.;;.tu;;;c.r-::e:-.· ~----,-.,--::--~- Supporting Data (Surveys, Environmental Scan, etc.): The 2012 Customer Satisfaction Survey indicated that over 81% of residents rated recently completed capital improvement projects as "excellent" or "good". Recently completed capital improvement projects (81%), storm drainage (37°/o), and condition of roads (44%). Item Summary/Recommendation: On July 13, 2011, the City Commissron pursuant to lnvltation to Bid (ITS) 27-10/11 approved the award of a construction Contract to David Mancini & Sons, Inc. for the construction of the City of Miami Beach Right-of-Way Infrastructure Improvement Program Neighborhood No. 8E Bayshore, Sunset Islands 1 & II project. The City is requesting replenishment of expended contingency to cover additional costs for the installation of a permanent lighting system, for the removal of unsuitable backfill material and installation of suitable material required above the originally estimated quantities. As the work has progressed, the City has identified the additional scope of work related to these unforeseen conditions and improvements to be completed that wiU need to be funded in the amount of $765,128 plus a 10% variance of $76,513, totaling $841 ,641. This amount less the remaining contingency balance of $145,356 represents an additional $696,285 required to address the additional requests in the project required to bring it to finalization. The administration is requesting that the remaining funding required be allocated to the project contingency, so as to allow change orders to be negotiated and properly executed pursuant to the requirements stated in the construction contract. The Administration recommends that the Mayor and City Commission approve the resolution. Advisory Board Recommendation.:'-----· ~----------~· ------~-------------- Financiallnformat_ion~----,---~--rR= ~ Source of ~ Amount Account __ ~--- Funds: L ___ 1_--t---====~$=7?=-~,2::-:9:-::2--lf-----_-_-_-_-____ _;3;_;;,0-'-4~-'2-'"'66~5-'-0~6:c::9.c:.3,;:..57'-------- D,~r,,··l ~ 2 $34,017 1 424-2665-069357 3 $97,426 1 427-2665-069357 ---l 4 $491 ,550 ! 431-2665-069357 i r-~~~4---~.--~~~------------~ $696,285 / Ci!Y Clerk's Office Legislative TrctEkinJJ.: --=---::c::-:::-:------~-----· L Maria Hernand§.Z, Senior Capital Projects Coordinator Ext. 2584..:._ ____ ~-------------j Si n-Offs: MIAMI BEACH 481 AGENDA ITEM __,R_.,7,..;=J::.....-_ DATE /-/6·--!3 (9 MIAMIBEACH City of Miami Beach, 1700 Convention Cenier Drive, Miami Beach, Florida 33139, www.miomlbeachfLgov TO: FROM: DATE: SUBJECT: COMMISSION MEMORANDUM Mayor Matti Herrera Bower and Members of the Ci;y jmission Kathie G. Brooks, Interim City Manager ~ / • January 16, 2013 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AN INCREASE TO THE OWNER'S CONTINGENCY FOR THE RIGHT~OF-WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8E BAYSHORE, SUNSET ISLANDS I & II PROJECT, IN THE AMOUNT OF $696,285, FOR THE ADDITIONAL WORK RELATED TO CONSTRUCTION OF PERMANENT STREET LIGHTING SYSTEM IN SUNSET ISLAND I, SUITABLE AND UNSUITABLE FILL MATERIAL OVERRUNS, OUTFALL RECONSTRUCTION AND UPSIZING, SANITARY SEWER PIPE LINING, AND DRIVEWAY HARMONIZATION AS A RESULT OF UNFORSEEN CONDITIONS AND IMPROVEMENTS WITH PREVIOUSLY APPROPRIATED FUNDING IN THE AMOUNT $73,292 FROM FUND 304 ~ CAPITAL RESERVE, $34,017 FROM FUND 424-WATER & SEWER BONDS 2000 SERIES, $491,550 FROM FUND 431-STORM WATER BONDS 2011, AND $97,426 FROM FUND 427 -STORM WATER ENTERPRISE FUND, FOR A GRAND TOTAL OF $696,285. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure value and the timely delivery of a quality capital project. Improve storm drainage citywide. Maintain City's infrastructure. FUNDING $ 73,292 $ 34,017 $ 97,426 $491,550 $696,285 Fund 304 -Capital Reserve Fund 424-Water & Sewer Bonds 2000 Series Fund 427 -Storm Water Enterprise Fund Fund 431 -Storm Water Bonds 2011 BACKGROUND On July 13, 2011, the City Commission pursuant to Invitation to Bid (ITB) 27-10/11, approved the award of a construction Contract to David Mancini & Sons, Inc. (DMSI} for the construction of the City of Miami Beach Right-of-Way Infrastructure Improvement Program Neighborhood No. 8E Bayshore, Sunset Islands I & II project in the amount of $5,611,041. The contract is a Unit Price contract After clarifications and reductions took place prior to issuance of the second notice to proceed ( NTP 2), the final approved contract amount was reduced to $5,293,041. On December 12, 2011, DMSI was issued NTP 2, allowing commencement of construction activities on January 11, 2012. As of January 16, 2013 the project is 85% completed and has expended $415,748 (74%) of its original allocated contingency amount of $561,104. The breakdown of currently expended contingency is as follows: 482 Commission Memorandum -Sunset Islands 1 & 2 Increase to Owner's Contingency January 16, 2013 Page 2of3 ., p~~~~~·l .. TABLE 1A ........... . ! ......... J~~~~ti~".~L~'_R~SJ£aiflif1\! ()_?_sketsJQ") .•.... . ~-.. . ............. I ... ·:·;;~-::·:'-· ·l 2 --~LO:J .. ~'.'.£2~9:'!~~~':~!!3ewer Mains (UF)~~~-~.----+--····'·:.;:;·""--+~--~=+z .................. ~-+"-.....~~'=+"------··--·-----------1 3 , 12" Watermain@ Bridge (IMP) ---~-I.:]~itJ.~:~r~~i~;;~::~~;E~~:Q;~~z~;~~-i~:;.--~~--~-~ __ §!~~g __ -~-----~:~0~~1~: :t .. ~: 1 Q~~~~j~ t ......... ?.~,~g?_ .... ~.--J~i.S,.9!~11".~~0,t!.S_It~ll);;_!'!:'_d_\l_r:'2~~~1<SJLJF) . ,.,. ... . ... ~21_1Q!g_ --~·-··· ..... _5~,_3Q]_ t. . ~~:~2~ .. $ 7 1Miscellanoous Kerns and Credit True-Ups (MISC)~ In Process $ (16,263) $ 35,367 $ ~_2"--.4""94'-1-"$--....~:.'o.:.::"'"-l TOTAL AMOUNT TO OATE 415,7411 $ 185,611 $ 118,959 $ FTOTALCURREJ:!TCONTINGENCY 561~4 $ 209,242 $ 274,742 $ ~-ANCEREMAINING -----$ 145,356 $ 23,631 $ 95,783 1 $ Legend: (OR} Ovvner Requested: (UF) Unforeseen Condition; (IMP) Improvement I Betterment; (MISC) Miscellaneous. ANALYSIS-FUTURE FUNDING REQUIREMENTS 51,177_ 77,121) 25.943 The City is requesting replenishment of expended contingency to cover additional costs for the installation of a permanent Hghting system for Sunset Island 1 as a result of conflicts with the installation of the valley gutter. Similar relocation was conducted for Sunset Island No. 2 and was covered under the original project contingency (See Table 1A, Change Order No. 4). Funding is also being required for the removal of unsuitable backfill material and installation of suitable material required above the originally estimated quantities. The replenishment of these funds, particularly stormwater bonds, will allow the City to continue with other necessary improvements such as the complete reconstruction of an outfall on Sunset Island No. 2 found to be partially collapsed, as well as three (3) outfalls, which require spot improvements to achieve proper stormwater discharge. Moreover, approximately 19 out of 133 driveways, all of which are located on the east side of Sunset Island No. 2 and which are below the newly installed edge of the valley gutters, will require harmonization to achieve positive flow from the driveways to the streets. As the work has progressed, the City has identified the additional scope of work related to these unforeseen conditions and improvements that will require funding in the amount of $765,128 plus a 10% variance of $76,513, totaling $841 ,641. This amount less the remaining contingency balance of $145,356 represents an additional $696,285 required to address additional needs in the project required to bring it to finalization. It is important to underline that some of the items have been negotiated and approved by the Resident Project Representative, Schwebke-Shiskin & Associates, Inc. (SSA) and the Engineer of Record, Chen Moore & Associates, Inc. (EOR) such as the permanent lighting cost and the suitable and unsuitable material overage. Both of these negotiated items are attached herein as Exhibits A -C. Staff is still negotiating the remainder of the PCO's with the contractor; however these amounts are based on best available information provided by the RPR. In addition, the Public Works Department is requesting additional funding for the lining of sewer mains on Sunset Island No. 1. The breakdown of the required additional scope is as follows: -.. -----.--~.~-~~--~~--~----.---T~A~B~L~E~~1Br---~--~--~~---------------~ CHANGE . BOND AI..LOCATION ORDER NO. SCOPE AMOUNT -----.. ~-.---~-.,.,-~---,--j f----+-----·-------------·--t-----i-5-to_rm_w_at_er __ + Water-Sewer 1 .Ailove Ground Additionai PCO's Pendingto Process (Sstimat0~) . . .. ~--_90,~. $ 9~,~-$ .... .......... $ (),;;;;~r:: ;:~;,~ 4 ;:;.;~,.;;;;~ -iii'@ 2:7o_\i~~~-iuF;-.. $ so. 7oo $ 5o.7oo ..1. .. ------:.-r"'-$ -------'-! !RE~AI~ING ~~~~;;,;~~~i~~ii~1~;~~~~;~i~:r:~Tu~·iiMP·)··--=:.::~~-~-1:~;:~~ ~ ...... 1 ~i~~~ .. L__ ·! ···· 25 ._QOO j COs :'.f'!!.n:r!.~~~nt~l~!'.ti~)LI~I~;>~NIJ .. 1.(Y£'J.I":!PJ.... . ................................ J . ..13Q,4?8. ~-. .~§.21_~ .. 1.... • '$ 65,214 1 ~ilr:l~~J~~~d;,~iJ~~i;~~~b9£tl()~~~~P,J. -----·-~-: L_ ______ 1j~:~~ ;····· ..... S.~~~~-1-:L~ . __ }ii2g9iL ............... --~- t !ProjectiOn: Driveway Harmonir.at'9os -19 froperties (UF) $ 160,000 $ 160,000 $ • l $ • l!QTAL PENDING WORK: $ 765,128 $ 556,914 $ 118,000 j $----~ f ADDITIONAl. 10% VARIANCE $ 76,513 $ 55,691 $ 11,800 l $ 9,021 iTOTAL AMOUNT PENDING WORK $ 841,641 $ 612,605 12.9,800._t!_ ____ ~ BALANCE REMAINING -SEE TABLE 1A $ (1411,~ ...!____!31631 195,783)f $ (25,943 ~-TlONAL AMOUNT REQUIRED $ 696,285 $ 586,975 , $ 34,017 $ 73,292 .. Items already negotiated-See attachments. Legend: (OR) Owner Requested: {UF) Unforeseen Condition; (IMP) Improvement I Betterment; (M!SC) Miscellaneous. 483 Commission Memorandum -Sunset Islands 1 & 2 Increase to Owner's Contingency January 16, 2013 Page 3 of3 The administration is requesting that the remaining funding required be allocated to the project contingency, so as to allow change orders to be negotiated and properly executed pursuant to the requirements stated in the construction contract. The contract requires that any changes resulting in changes in the contract price or the contract time be authorized only by change orders, approved in advance, and issued in accordance with the provisions of the City. These additional changes will bring all necessary funding for projected completion of the project which is currently scheduled for May 1, 2013. CONCLUSION The Administration recommends that a Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, be authorized by the Mayor and City Clerk to approve an increase to the owner's contingency for the right-of-way infrastructure improvement program, Neighborhood No. 8E Bayshore, Sunset Islands I & II project, in the amount of $696,285, for the additional work related to construction of permanent street lighting system in Sunset Island I, suitable and unsuitable fill material overruns, outfall reconstruction and upsizing, sanitary sewer pipe lining, and driveway harmonization as a result of unforeseen conditions and improvements with previously appropriated funding in the amount $73,292 from Fund 304 -Capital Reserve, $34,017 from Fund 424 -Water & Sewer Bonds 2000 series, $491,550 from Fund 431 -Storm Water bonds 2011, and $97,426 from Fund 427-Storm Water Enterprise Fund for a grand total of $696,285. ATTACHMENTS: Exhibit A-OMS I Lighting proposal dated June 12, 2012 Exhibit B-Schwebke-Shiskin & Associates, Inc. -Lighting Estimate Exhibit C-Schwebke-Shiskin & Associates, Inc.-Suitable & Unsuitable Projection KGB\JGG\FV\OM\MH 484 Exhibit A ""' -!'<,_ GENERAL CONTRACTOR 1 ~+": .\h:on Road. \lhuni Bt"<lch, FL S'1.:i9 Plh {:JOl>)SSll-381!1 F.\X> (:l<:l~) S'U•SS$$ H)!J!.i S\'V +n~~ Ct. Pom:pa.no Hcach. FL .:S:lO!H PH: (96+} 97~-3656 f'.U:, {9H) 94l-~O.W June 12, 2012 Maria Hernandez Capital Improvements Projects Office 1700 Convention Center Drive Miami Beach, FL 33139 Project: Neighborhood No. BE, Sunset Islands 1 & 2 Re: Proposal fQr Temporary and Permanent Street l.ighting Mrs. Hernandez, As you know, during the installation of the stormwater system, DMSI has encountered multiple conflicts with the existing street lighting system. Also, based on the location and depth of the existing street lighting conduit, it appears to be in conflict with the proposed valley gutter installation throughout the island. In order to facilitate construction, minimize cost impacts to the City, and minimize loss of street lighting to the residents, the City has asked DMSI to provide a proposal for 1) A Temporary Lighting System, and 2) Permanent relocation of the street light conduits. Please find the attached cost breakdown for this comprehensive street lighting proposal for Temporary and Permanent systems for both Islands #1 & #2. The total additional lump sum proposal amount is $386,464.50 and will require that 60 calendar days be added to the Contract Time to complete this work. This price is summarized by island as follows. Sunset Island # 1: Temporary Lighting System .............. $36,335.00 Permanent Lighting System .............. $130.428.05 Sunset Island #2: Temporary Lighting System .............. $44,612.50 Permanent Lighting System .............. $175,088.95 We would appreciate it if at least a partial approval for temporary lighting can be granted to alleviate some of the immediate conflicts we are encountering in the field. Please advise if additional information is required to process this request. Thank you. Respectfully, Juan Barreneche, P.E. David Mancini & Sons. Inc. 485 Exhibit A Estimated Cost Breakdown· Buried Street lighting for Sunset Islands 1 & 2 PROJECT: Neighborhood #1/ Biscayne Point, City of Miami Seach CONTRACTOR: David Mancini & Sons, Inc. (DMSI) Scope: Provide temporary overhead electrical service and to aflow for future replacement of aU direct buried street lighting cable connections from existing service point to each street light po!e within the limits of construction. TEMPORARY LIGHTING SUBCONTRACTOR WORK Item 1 2 Description SUNSET ISLAND lt! -Furnish and Install an overhead wire network connecting the power source to the existing !ight poles {approximately 27 lights). This wire will be held up by 2" rigid galvanized pipes to a height of 18 ft in the longitudinal direction and 18-20 ft when crossing the roadway. A PVC conduit will also be secured to the existing !ightpoles to protect the wires coming down to the pole base ports. SUNSET !£AOOJ. Ja · Furnish and Instal! an overhead wire network connectlng the power source to the existing light poles {approximately 32 lights). This wire will be held up by 2'' rigid galvanized pipes to a height of 18 ft in the longitudinal direction and 18·20 ft when crossing the roadway. A PVC conduit will also be secured to the existing lightpoles to protect the wires coming down to the pole base ports. SUBTOTAL-SUBCONTRACTOR Contractor's Fee (7.5%) Quantity 1 1 TOTAL FOR TEMPORARY liGHTING (BOTH ISlANDS) 486 Unit Unit Price Total LS $ 33,800.00 $ 33,800.00 LS $ 41,500.00 $ 41,500.00 $ 75,300.00 $ 5,647.50 I s so,s47 .so J Exhibit A SUNSET ISLAND #1-PERMANENT LIGHTING Scope: Remove and replace all direct buried street lighting cable connections from existing service point to each street light pole within the limits of construction. This proposal assumes that the existing service points will not require modification. We also assume that ALL conduit can be installed directly behind the new valley gutter, with 12" minimum cover. SUBCONTRACTOR WORK Item 1 la lb 1c 2 2a 2b 3 4 4a Description Permanent connection to existing light poles INCLUDES: Furnish and Install Ground Rods INCLUDES: Pull Boxes INCLUDES: Caldwe!d 2" PVC Conduit {incl. hand excavation just behind vaHey gutter) INCLUDES: 2" PVC 90 degree elbows INCLUDES: Duct Seal Connect to Existing Service Points Wire #6 (3 wires per conduit) INCLUDES: Waterproof Splices SUBTOTAL-SUBCONTRACTOR Contractor's Fee (7.5%} DMSIWORK 5 6 7 Removal and Disposal of Existing Conduit Sod Restoration Autocad asbullts of new system SUBTOTAL· DMSI Work Contractor's Fee (10.0%) GENERAL CONDITIONS 8 Bonds and Insurance (1.0%) 9 Additional MOT 10 Public lnformatlon I Uason Services 11 Other General Requirements SUBTOTAl· General Conditions ESTIMATED TOTAL· SUNSET ISLAND 1#1 Additional Contract Time Requested Quantity 27 5600 3 17500 5600 200 1 0.01 1 1 1 30 Unit Unit Price EA $ 612.83 LF $ 8.60 EA $ 3,000.00 LF $ 1.46 LF s 1.00 SY $ 4.00 LS $ 4,500.00 PERCENT $ 113,740.64 MONTH $ 3,100.00 MONTH $ 3,750.00 MONTH $ 8,700.00 cal. days Total $ 16,546.41 $ . $ . $ - $ 48,160.00 $ - $ $ 9,000.00 $ 25,550.00 $ - $ 99,256.41 $ 7,444.23 $ $ s $ $ $ $ $ $ 5,600.00 800.00 4.500.00 6.400.00 640.00 1,137.41 3,100.00 3,750.00 8,700.00 s 16,687.41 $ 130,428.05 NOT£: Only sod restororion around poles included. Additional payment will be required for all other restoration. 487 Exhibit A SUNSET ISLAND #2-PERMANENT LIGHTING Scope: Remove and replace aH direct buried street lighting cable connections from existing service point to each street light pore within the limits of construction. This proposal assumes that the existing service points wm not require modification. We also assume that ALL conduit can be installed directly behind the new valley gutter, with 12" minimum cover. SUBCONTRACTOR WORK Item 1 la 1b lc 2 2a 2b 3 4 4a Description Permanent connection to existing lightpoles INCLUDES: Furnish and Install Ground Rods INCLUDES: Pull Boxes INCLUDES: Caldweld 2" PVC Conduit (incl. hand excavation just behind valley gutter) INCLUDES: 2" PVC 90 degree elbows INCLUDES: Duct Seal Connect to Existing Service Paints Wire #5 (3 wires per conduit) INCLUDES: Waterproof Splices SUBTOTAL-SUBCONTRACTOR Contractor's Fee (7.5%} OMS{ WORK 5 6 7 Removal and Disposal of Existing Conduit Sad Restoration Autocad asbullts of new system SUBTOTAl· DMSI Werle Contractor's Fee (10.0%) GENERAL CONDITIONS 8 Bonds and Insurance (1.0%) 9 Additional MOT 10 Public Information I Uason Services 11 Other General Requirements SUBTOTAL· General Conditions ESTIMATED TOTAl.· SUNSET ISLAND lt2 Additional Contract Time Requested Quantity 32 8100 4 25000 8100 215 1 0.01 1 1 1 30 Unit Unit Price EA s 612.83 LF s 8.60 EA s 3.000.00 Lf $ 1.46 LF $ 1.00 SY $ 4.00 LS $ 4,500.00 PERCENT $ 157,959.35 MONTH $ 3,100.00 MONTH $ 3,750.00 MONTH $ 8,700.00 caL days Total $ 19,610.56 $ - $ . $ - s 69,660.00 $ - s - $ 12,000.00 s 36,500.00 $ . $ 137,770.56 $ 10,332.79 $ s $ s $ $ $ $ $ $ 8,100.00 860.00 4,500.00 8,960.00 896.00 1,579.59 3,100.00 3,750.00 8,700.00 17,129.59 $ 175,088.95 NOT£: Oniy sod restoration around pales included. Additional payment will be required for all other restoration. SVMMARY Temporary Lighting Permanent Ligt1ting Replacement-Sunset til Permanent Lighting Replacement· Sunset #2 GRAND TOTAL 488 $ 80,947.50 $ 130,428.05 $ 175,088.95 $ 386,464.49 co ...... ·-..0 ·-..c: >< w t H#~J L .. <\ND PI ~"\N~CRS E'l(HNt.t::R~ " LA~~D SCH<VEYnR:;.; Ct~.#:"-7 ~~~-=-~ ~>reject Name: Description: Oatc; Sunset !$lands 1 g, 2 Temporary Street Ughung for Suns"t Island iJ 1 11!26/2012 "'" G~sed on 21 b:is,tH"l~ ti~h~ pok:~ ~::wd t! Servkc i'o~nt Connections. l have reviewed this document and found it to be fai\\~{\~\~ltl¥1?))able. //.~\\ c~R R .$. 11;1 I ~o~ .. ;~~~~!i~:'b~< ~ t ~o~~;r.-,7 //~,0 ~ ~ ·-N' ' .... ~~{!12 o. 61612 \ :: --o, "" ·*--..-r'l., . ..._ ::::. 0 \ STATE OF' / !1: E: ~~\ t'.. /!.t.J-.::: ~~~~~~9.~!1?~··6~1.<;.§' /;/;~1~0NAL €.~ ''"> '·,ltfii!!\\\\\' rzr:z.~ 0) co -.:::t co :!::! .0 ·-.!:. X Ul !JJ:lSi !.'\i'D !'LANO:I:R'\ • E'<GL'll;l;RS ' l"\~<D SHRVJ'YOlc$ =======""'""'"'""""""""';;;;;;.,;,;;;;;,;;,;,;;;;=,.,;~~,;;=;;.,~,:;,;;,~;,;;:~:,;,;;,;;,;:;,;;;;;,;~~;;;;;,;;_,;~~~;,,:,~=,,;,;;,;;:;,""' tlAflE Ct\HS-t j?\t}$)6~1~7010 ... fAX' Proiect N3mc: Oestriptkm: Oat;?: sunset :slands 1 & 2 Tcmpomry Street Lighting for Sunsellsland 11 Z !1/26/lO!Z ~;;;;;.··· ~;;~~::~~~~~~ r--"-··-, ~ ~·-· ~ ihscO Of'. 32 tr.i~tiog i!~h! pr;lc:5 .;'lrd S S!!r'I!CI? P~mt Conflc::t~ons .. ·,\Wilii{Jfi,. I h~# 'Ye-,tew~JP llii5r,.4ocument and found it ~~F~~~qle. '~ <&,o· .:::-.(/ !V ..4 \ -./~··; ·~0;.)336,1?.(·:', :::1'"' v .. /,...-...-//~ ''7'>yl. / ' ~ 3(t)CCL.-<1 \~~·~~'-...<:::: ~ ~,>.. SiAr,r:0,. : ... ,.. ~~,1112 .., r / ft: ~ ~--.,~9RrD~/:#~,·. :,;., &t ---~ ,.,\(?,' . -'/;1,0NAL t:.\"' ·t/IJ/11' , ' "i 0 0) -.:::t OJ ......... .c ..c: X w Prcject t•!ame: Description: D<lle: ' Sunset ts!ands 1 & 2 Permane!1t Str~et Lighting fo~ Suns.\?t lsJands ! & 2 11/25/?..0t?. li;mcJ c.om:;;JO,ion cornptere m pt~ce. Ai:o;o mdude De-moht!on "tf E.~!stmg i hi1nd ~xcrttt~~Hon. ·, CsHrn.-,tr:C b(<:HZd on 1.0 BI'Jciihon,;i cor•tr~n dnv~ , , . · ~ H o: ~ · \''''""'"''/, ,..;;,\ ,,.p..R R ··: l h~~1it~i~~pcument and found it to~ f'1~( ana reas&rlaple: __ $'{(? No. 6i6'i2 '. ~. ,, ,..;.. /'? ~'"''· ' .. . r-' /,./ '?:{". !/{/ l :k ~ ~~ .. c.,.;/ ( ,..~-~.l.1::::; ~ $ <-! \ " S'r:ATE OF ! .+:;;;: . ~;Q ' ; fl; 1~: ?!lJ.: :r .... ~~~OR!Dt';~·;§' ,:=: "',.;', <;>f •••• #~ """ ·--~ :l'/111 ONAL '€'.'='\ •S'" '11/f! II H\\\ """'" 0) -.:::t Prtr;t&.,;t M~'~Jag-?.t Exhibit C LB"37 l.A:SD PLA.N\iEf<S '' [NG'i\:f'FRS '' i.X'\fD 5UR\'TYORS fAc?fP .J.!AI.• CORPOR,\ TE \-\A Y " tvllRA:>.iAR. FLORfD,\ 33025 '' BRO\\ARD. (95~) B:q(qO '' DADE (3{)5} 6j2-70:0 ,, FAX. ('iii) .m-328~ Project Name: De.s.criptior.: Date: Sunset tsiancls 1 and 2 Unsuitable/Suitable ProJ::c~kH"l !Estknate ~ 't J""t:.j'''O'P· -~-Ltl 4:. --L L w -----·~'ToP'·~ ..... _iiorro~li .. r-.. j:i;-~4 tl:? . ~~-~--. S-2 S-1 ~~~.~,~~ ..... , S-1 S-4 16 15 97 38 8 8 4.09 S-10 S-4 14 10 4 S-4 S·ll 16 10 I 4 ~~~. . ~:~2 ~~ 1 3 0 I 3'\ :t~~ !··· :; -3.81 7.9 -4 l' 8.09 -2 6 -2 ·2 ·4 ·2.25 -4 6 6 7.7 5.95 7.5 ~~~~ ==-r~~-'-:~-~~~~=--·--Yi -----.-::1~~-' -~; t 55~~_11 1!i li fl,~ -~3:.~5; ~~·.I . ;S-24 I 12 c ~:~~3 ·js--173 II 17 ~~ ~:~ 4 -4 -4.75 -4.75 -10.5 -10.5 ·5 26 -5.26 7.5 8.25 8.25 14 14 8.76 8.76 14 81 96 ~::, 1~~~~---~-r :. :: 5-129 15-175 1 14 10 3.5 S-175 I'S-15 I 51 8 S-129 5-55 ! G9 8 s .. ss ls-19 l 17 10 ~:~~ ~~~:~~ I ~~ ~ S-25 S-176 14 10 S-25 S-23 168 8 S-23 S-23 S-52 S-23 S-26 5~26 5·26 S-27 S-29 S-109 jS-lOS 5·106 S-52 S-177 ls-26 S-51 S-50 S-27 S-29 S-38 S-179 PC-8 15 10 I E,_l~ Y 1. . 10 __ _ w t ... 10 66 172 I 1o ! I I 28 13 8 8 10 10 10 3.3 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3 3.7 3.4 3.4 3.5 3.5 3.5 3.7 3.7 I ! ' I -10.5 -4.6 -6.1 -6.1 -2.6 -3.3 ~5.35 -5.35 -4.8 -48 -5.15 ·5.75 ·5.25 -4 25 -4.9 -3.9 -3.9 -275 ·2.5 -4.25 -6.1 Page 1 of 2 492 9.6 .. 5.9 68 8.85 8 85 8.3 8.3 8.65 .... 9 25 8.75 7.25 8.6 7.3 7.3 6 25 6 7.75 9.8 8.4 1,309.00 6,045.20 1,2q~.09 ____ , 43.5 223.9 44.4 659.40 883.29 927.74 1,059.00 38~~-965.63 9,360.00 346.7 1,313.29 1,155.00 42.8 1,]56.07 1,320.00 48.9 1.40.~-96 4,900.00 181.5 1,586.44 1,344.oo 1 49.8 1,(536.2~ 1.4ss.zo 1 s5.2 t69Us 1,osuo 1 38.9 1.730.31 9,100.00 337.0 2,067.~5 1,166.40 43.2 2,110.55 ! __1.&?4.0~ .§!£_ -2,178.10 l 2_:344.001_~~~" 2,227.88 . 2A07.20 .... ~. .. .?L~.?.-04 3,753 60 139 0 2,456.06 ·~~~' "·"'.,....--·--4'• •--~~. H-r~~·--- 1,504.50. -55.7' +--2,511.!~ :~;_1;?0.5~.'-~A_ ____ l ~---.~2.?~ .. 39 . ~:~~~:~~ .. ·. 3J34~1 .·. ·t' . _· .... ~:~~~-.·1~ .. -~1,625.60 __ 430~~ _______ Q;g}} 1,387.50 . . SL4 . .. .. . ,?,3_~51 2,18?.:_~. 81.0 3,364.53 "2, 726.00_ ~~-!-_91.0-. J ... 3~65.49 16,993.60 ; 629.4 1 4,094.~~ 730.00 l 27.0 ' 4,121.92 730.00 27.0 4,148.96 l 3,300.00 122.2 4,271.1~. 8,256.00 3058 l 4,576.96 775.00 28.7 4,605.671 2,744.00 101.6 I 4,707.29 1,092.00 40.4 ! 4,74~:7~] Exhibit C r ... ;nc~f ·1 ·· V]~::<r Tli:~c0J~~~IE¥T; 2.1~;11zol 98 1 4,B4S.R6 1 ;,. I l._,··J I IO? T. f~~-} 25 fsA,1 1s 4S 1 l~ ,~5 ::;.;~~ S·l63 S-17() 31 ll 1) 30 !70 Gf 312 32 ! 8 IJ I 10 fl "~ g I :{ :1S 3 65 I 3 \~) 3 In I ·' ; 34 38 l I 1 !S H,41•J.OO l 2,5\JS IY.) I 6~0SS. 20 .,l));'\.130 i 7!1a3sAo 1 £,38>).80! ~S·l68 S-109 i ?.?. 8 3.i$ -5.5 9 J. 2,3HO.SO \5-168 s-n 1 1 4S w :lAS 1:1 .~:lQ?~2Q ~s:J:(iij 5-ll 104 S .. 345. -2.5 S9'i 195040 'i2VS S1 1bi~ 4':1 96,) 5,%4.51; ?H 'l :t~S~!u ~n t::~ 5 5,7€2 :t~~ :!45.9 6)}Cil-!.l 8'32 t;,69S 38 83.2 5,7[_!.{ 5G t :~33.3 /,011.8~1 i J(G.3 1,201 7.4 ' 3224 1/~2 3 t14 f, ls:2T s-161 ·1 w : i3 9.3 ~~l.EE.9 ls'l;:·; . 1-s~2T ....... 1 .. 2S :tO ·····--·3!i·-·. -G ss .1-.'l.l.~_-.()q I;SO l 7,&11 611 !;,::db h-;c;::r ·.. 4o g l s.or; -VJ4 6 in~_~o nt 1 ,l 7,&st. n 1 !l;c-2 !s-7o 10 w 322 -6.7 9.!n 9noo :>67 7,7l!l'li>~ iPc-2 ls-171 1 so B Hi4 ·n r. 9.JH 4.401!.32 163.3 I 7,88?. nl ;s-70 ls-6'3 .. , .. 31 10 3 s2 ·3.S 1.02 1,176.20 80.6 I 7,%> 11 t ~~~~1~i~:~~~-~;; " J: _,;~~~~~~;:,~~ . ...: Assu;11e:> :soti strata tc be-fdtv U{iS.Uita~)h: w1th the t~:·c~ptk:n of ti:.:? u;:>per 1 foot 493 RESOLUTION TO BE SUBMITTED 494