Tishman 130503_SBACE_MBCC LOI Part 2[1]Base Case MasterplanExhibit 1a
1 Convention Center Renovation (including hotel parking)
Existing Halls 502,000 sf
Existing Meeting 127,000 sf
Additional Meeting+ Ballroom 125,000 sf
2 Hotel Complex
Hotel Total Area: 633,730 sf
3 F&B Venue (Part of hotel development)
F&B Venue Total Area: 40,000 sf
28 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
C. FISHER HOUSE
CITY
HALL
PARKING JACKIE
GLEASON
THEATER
HOLOCAUST
MEMORIAL
BOTANICAL
GARDENS
LOADING
LOADING
HALL A
HALL B
HALL D
HALL C
WEST CONCOURSEEAST CONCOURSE18TH ST
CONVENTION CENTER DRIVECITY HALL
PARKING JACKIE GLEASONTHEATER
17TH STREETPARKINGGARAGE
LOADING
17TH ST
MERIDIAN AVEWASHINGTON AVE19TH ST
18TH SREET
17TH ST
19TH STREET
DADE
B
L
V
D
BOTANICAL
GARDENS
HOLOCAUST
MEMORIAL
COLLINS PARK
MIAMI BEACH GOLF CLUB
23R
D
S
T
R
E
E
T
BASS
MUSEUM
L I N C O L N R O A D PARK AVENUE1
3
2
Exhibit 1aBase Case Masterplan
29 South Beach ACE Letter of Intent
Phase 1 Components MasterplanExhibit 1b
1 Convention Center Renovation (including hotel parking)
Existing Halls 502,000 sf
Existing Meeting 127,000 sf
Additional Meeting+ Ballroom 125,000 sf
2 Hotel Complex
Hotel Total Area: 633,730 sf
3 F&B Venue (Part of hotel development)
F&B Venue Total Area: 40,000 sf
4 P-Lot Multifamily and Parking Development
Residential Area: (approx 261 units) 342,000 sf
5 Jackie Gleason Refurbishment
Theater (seats) 2,700 seats
6 Cultural Amenity
Culture Total Area: 18,000 sf
7 17th Street Garage and Development
Retail 59,500 sf
Parking 1,750 spaces
8 Additional Parking Development
Additional Parking 499,400sf
1,388 Spaces
Community Center 9,000 sf
(2 Levels, under bermed landscape)
9 Info Center
Info Center 9,361 sf
10 Public Amenities
Office 15,000 sf
(Reallocated Office above Hall C in CC
to replace 555 17th St Office and 22nd St Community Center Office)
30 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
1
3
4
5
6
7
8
10
2
9
Exhibit 1bPhase 1 Components Masterplan
31 South Beach ACE Letter of Intent
Future Components MasterplanExhibit 1c
1 Convention Center Renovation (including hotel parking)
Existing Halls 502,000 sf
Existing Meeting 127,000 sf
Additional Meeting+ Ballroom 125,000 sf
2 Hotel Complex
Hotel Total Area: 633,730 sf
3 F&B Venue (Part of hotel development)
F&B Venue Total Area: 40,000 sf
4 P-Lot Multifamily and Parking Development
Residential Area: (approx 261 units) 342,000 sf
5 Jackie Gleason Refurbishment
Theater (seats) 2,700
6 Cultural Amenity
Culture Total Area: 18,000 sf
(assumed assembly space) 15,000 sf
7 17th Street Garage and Development
Retail 59,500 sf
Parking 1,750 spaces
Residential: (approx 80 units) 105,000 sf
8 Additional Parking Development
Additional Parking 499,400 sf
1,388 Spaces
Community Center 9,000 sf
(2 Levels, under bermed landscape)
9 Info Center
Info Center 9,361 sf
10 Public Amenities
Office 15,000 sf
(Reallocated Office above Hall C in CC
to replace 555 17th St Office and 22nd St Community Center Office)
32 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
3
4
5
6
7
9
8
10
2
1
9
Exhibit 1cFuture Components Masterplan
33 South Beach ACE Letter of Intent
South Beach ACE
Convention District Letter of Intent Page 1
Exhibit 2 802
Renovation Program 803
1) New Outdoor Function Space 804
2) New Executive Conference Center and Business Center 805
3) Renovated Food Courts / Concessions 806
4) Existing Exhibit Hall Improvements 807
a) Halls need to be reconfigured so they can be subdivided into four halls from North to South. With this 808
configuration, the skywalk will be removed. 809
b) One of the subdivided halls needs the capability to be further subdivided for smaller events. 810
c) Each subdivided exhibit hall needs access to approximately nine (9) loading docks (36 in total). 811
d) Each subdivided exhibit hall needs one (1) 30’ x30’ freight door and four (4) 15’ x 24’ freight doors. 812
e) Provide appropriate show offices adjacent to each hall. 813
f) Repair exhibit floor to provide for 350 lbs per sf load 814
g) Repair/improve infrastructure under exhibit halls (plumbing, electrical and data/telecomm) to Class A 815
standards. 816
h) Replace exhibit hall air handlers and install new VFD’s 817
5) Existing Meeting Rooms/Pre-Function 818
a) Provide a general renovation of existing meeting spaces and Pre-function areas including all finishes 819
(carpet, wall coverings, ceiling, etc.) and fixtures, lighting and lighting controls, sound systems, 820
automatic projector screens, rigging points, etc. 821
b) Install floor power in C 123-126 and D 128-131 822
6) Existing Support Areas 823
a) Carpet replacement throughout facility 824
b) Add new restrooms and expand existing to achieve the appropriate number of facilities. 825
c) Upgrade and/or expand kitchen facilities to meet Class A standards. 826
d) Renovate concession stands 827
e) Provide for a business center with approximately 1,500 square feet (could be in conjunction with hotel 828
needs) 829
f) Locate engineering shops and their offices in best location given hall reconfiguration 830
g) Provide the appropriate number of permanent ticket booths on the exterior of the facility. Ideally one for 831
each hall with at least eight (8) windows. 832
7) Infrastructure Improvements 833
a) Replace existing escalators 834
b) Replace existing elevators, including relocating/installing freight elevators driven by hall reconfiguration. 835
c) Replace buss duct on west side interior 836
d) Replace exterior doors and windows with impact glass 837
e) Replace all west side air handlers 838
f) Install roof drain vents 839
g) Replace chiller and cooling tower 840
34 South Beach ACE Letter of Intent
South Beach ACE
Convention District Letter of Intent Page 2
h) Replace west side chilled water piping 841
i) Assess and replace/improve all life safety function’s including fire sprinkler pump replacement, fire 842
sprinkler valve room replacement, and fire panel replacement to include strobe lighting 843
j) Replace generator 844
k) Replace cooling tower piping 845
l) Chilled water insulation replacement 846
m) Chilled water valve replacement 847
n) Upgrade Compressed air system 848
o) Reduce humidity and condensation problems within the building 849
p) Replace exhaust fans 850
q) Replace exterior sidewalk, stairs and handrails 851
r) Add portable/telescopic riser seating (minimum 4,000 seats) 852
s) Replace all existing interior doors and hardware, including card swipe locking system 853
8) Sustainability Improvements – Advise on and implement viable sustainability measures within the facility. 854
This could include, but not limited to, solar roof panels, rain water collection, natural light, etc.) Achieve 855
LEED certification. 856
9) Technology 857
a) Add a Distributed Antenna System (cell phones) 858
b) Expand Wi-Fi to entire facility 859
c) Add digital read boards throughout facility for meeting rooms, exhibit halls 860
d) Add Exterior digital signage and marquee 861
10) ADA – Ensure facility is compliant with all ADA requirements, including push button door openers. 862
35 South Beach ACE Letter of Intent
863 864
865
South Bea
Convention
ach ACE
District Lettter of Intent
P
Potential Ava
Exhibit 3
ailable Additioonal Proceedss
Page 1
36 South Beach ACE Letter of Intent
South Beach ACE
Convention District Letter of Intent Page 1
Exhibit 4 866
Hotel Program 867
Area Count Notes
Traditional Hotel Keys 737 Keys 278,586 SF / 737 Bays
Junior Suites 30 Keys 17,010 SF / 45 Bays
Premier Suites 15 Keys 11,340 SF / 30 Bays
Deluxe Parlor Only 16 Keys 14,364 SF / 38 Bays
Presidential 2 Keys 3,780 SF / 10 Bays
Total Hotel Keys 800 Keys 325,080 SF / 860 Bays
Other Guestroom Areas 81,150 SF Corridors, Elevator Lobbies, Maid Closets,
Vending, Elevator Core, etc.
Total Guestroom Areas 406,230 SF
Lobby & Entrance 8,490 SF
Retail / Sundry 1,710 SF
F&B Outlets 16,380 SF 5 outlets with 540 F&B Seats
Club Lounge 2,240 SF
Total Public Areas 28,820 SF
Ballroom 20,000 SF
Jr. Ballroom 15,000 SF
Meeting Rooms 20,000 SF (2) 5,000 SF Rooms, (4) 1,500 SF Rooms,
(4) 1,000 SF Rooms
Board Rooms 1,200 SF (2) 600 SF Board Rooms
Pre-Function 21,000 SF
Support & BOH 21,300 SF
Total Function Space 98,500 SF
Administrative Areas 12,020 SF Front Desk & Office, Accounting, Executive
Offices
Service Areas 38,515 SF Kitchens, F&B Storage, Housekeeping,
Laundry, etc.
Employee Facilities 5,900 SF HR, Cafeteria, Lockers & Toilets
Maintenance & Engineering 31,385 SF Engineering, Mechanical Plant
Recreation Facilities 12,360 SF Health Club, Sauna, Spa
Hotel Gross Indoor SF 633,730 SF 792 GSF per Key / 737 GSF per Bay
Outdoor Recreation 136,255 SF Includes (2) Outdoor Pools, (2) Pool
Decks, & Balconies
Hotel Parking 848 Spaces 500 South of Hotel & 348 Spaces Located
in CC Parking Facility
Hotel Accessory F&B 40,000 SF Separate Facility Outside the Hotel
*Typical Bay is 14’ Wide x 27’ Deep = 378 GSF, or 340 NSF.868
37 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
Exhibit 5
Ground Floor
Convention Center
Hall A = 172,500 sf
Hall B = 179,700 sf
Hall C = 148,700 sf
Meeting Rooms = 57,500 sf
35’ clear Concourse Flex Space = 75,000 sf
Convention Center / Hotel Floor Plans
Hall C Hall B Hall A1
ToiletsToiletsToiletsToiletsRecycling
BOH / Shops
Apron +4’ NVGD
Crate Storage
194 Parking Spaces
Loading Dock
BOHBOHBOH
Hall A2
35’ clear
Concourse Flex
Space
Front
Office
KitchenRetail
Lobby Bar
ConciergeHotel
Lobby
Restaurant
Convention
Meeting
Space
Convention
Meeting
Space
Registration
Concourse
Concourse
Food
Court
Food
Service
Storage
Toilets
ToiletsToilets
Toilets Toilets
Meeting
Room
Meeting
Room
Meeting
Room
Meeting
Room
Community
Center
9000sf
on 2 levels
Theater
Toilets
BOH BOHBOH
Toilets
180'390'210'-6"
872'
290'275'
266'
276'-6"
904'-6"
342'
240'
47'-6"
F1
38 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F2
Convention Center
Meeting Rooms = 67,700 sf
Open To Below Open To Below Open To Below
10k Ballroom
Open To Below
Open To BelowKitchen
Terrace 3 Meal
Restaurant
Open
To Below
Upper
Lobby
Mech.
Convention
Meeting
Space
Convention
Meeting
Space
Open To Below
Open To Below
Open
To Below
BOH
Show
Managers
Office
Show
Managers
Office
Convention
Meeting
Space
Mech.Mech.
ToiletsToilets
Toilets
180'390'47'-6"210'-6"
872'
266'
276'-6"
904'-6"
342'
F2
Exhibit 5Convention Center / Hotel Floor Plans
39 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F3
Central Plant
Mechanical Plant
159 Parking Space
50,933sf
Cooling Towers
Exhibit Hall Truss Zone
Convention
Administration
Offices
Executive
Offices
Open
To Below
Open
To Below
Open
To Below
Concourse
Mech.
Mech.Relocated Office SpaceMech.
Mech.Mech.
Mech.
Mech.Mech.
Mech.
Mech.
266'
276'-6"
546'
196'
342'
872'
252'
178'
F3
Exhibit 5Convention Center / Hotel Floor Plans
40 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F4
Convention Center
Meeting Rooms = 25,000 sf
Ballroom = 61,300 sf
Exterior Terrace = 8,500 sf
Hotel
Meeting Rooms = 15,000 sf
Ballroom = 15,000 sf + 20,000 sf
Toilets
Toilets
Concourse
Toilets
HotelMeetingRooms
Hotel Meeting
Rooms
Open
To Below Furniture
Storage
Skylight
15k
Ballroom
20k
Ballroom
Operable
Terrace
Prefunction
Toilets Banquet KitchenHotel
Board
Room
Convention
Meeting Room
Toilets
Prefunction
60k Ballroom
Comissary Banquet Kitchen
Furniture StorageEmp. LockersEmp.Break
Room
Uniform
Issue
Concourse
Concourse
Terrace
Toilets
Convention
Meeting Room
Hotel
BOH
211'
358'
684'
872'
180'
225'252'170'-4"211'
F4
Exhibit 5Convention Center / Hotel Floor Plans
41 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F5
Convention Center
Ballroom = 41,100 sf
Exterior = 6,500 sf
Hotel
Meeting = 6,000 sf
Furniture
Storage Mechanical Toilets
Open To Below
Open To Below
Toilets
Toilets
Toilets
Convention Center
Junior Ballroom
Convention Center
Junior Ballroom
Open
To Below
Terrace
Hotel
Board
Room
Hotel
Meeting
Rooms
680'
204'
358'
243'
884'
890'
252'640'
F5
Exhibit 5Convention Center / Hotel Floor Plans
42 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
Hotel Spa / Gym
Pool
284'
890'
606'
211'
890'
606'
73'-6"
284'
F6
F6
Hotel - Amenity Level
Deck Space = 60,000 sf
Pool = 5,000 sf
Health Club and spa = 12,000 sf
Exhibit 5Convention Center / Hotel Floor Plans
43 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F7
Open To Below
Toilets
Toilets
Toilets
Hotel
Board
Room
Hotel
Meeting
Rooms
606'
606'
F7
73'-6"
Exhibit 5Convention Center / Hotel Floor Plans
44 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F8
Hotel Spa / Gym
606'
606'
F8
73'-6"
Exhibit 5Convention Center / Hotel Floor Plans
45 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F9
471'
471'
73'-6"
F9
Exhibit 5Convention Center / Hotel Floor Plans
46 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F10
F10
471'
471'
73'-6"
Exhibit 5Convention Center / Hotel Floor Plans
47 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F11
437'
437'
73'-6"
F11
Exhibit 5Convention Center / Hotel Floor Plans
48 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F12
367'
367'
73'-6"
F12
Exhibit 5Convention Center / Hotel Floor Plans
49 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F13
296'
296'
73'-6"
F13
Exhibit 5Convention Center / Hotel Floor Plans
50 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
F14
Concierge
Lounge
240'
240'
73'-6"
F14
Exhibit 5Convention Center / Hotel Floor Plans
51 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
0 50’100’200’400’
Restaurant/
Bar
F15
153'
153'
73'-6"
F15
Exhibit 5Convention Center / Hotel Floor Plans
52 South Beach ACE Letter of Intent
Exhibit 5Elevations F1 - 0’F1 - 0’F2 - 18’F2 - 18’F3 - 38’F3 - 38’F4 - 54’F4 - 54’F5 - 74’F5 - 74’F6 - 94’F6 - 94’F7 - 104’F7 - 104’F8 - 114’F8 - 114’F9 - 124’F9 - 124’F10 - 134’F10 - 134’F11 - 144’F11 - 144’F12 - 154’F12 - 154’F13 - 164’F13 - 164’F14 - 174’F14 - 174’F15 - 184’F15 - 184’South ElevationWest Elevation025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’53 South Beach ACE Letter of Intent
Exhibit 5Sections
F15 184’F14 174’F13 164’F12 154’F11 144’F10 134’F9 124’F8 - 114’F7 - 104’F6 - 94’F5 - 74’F4 - 54’F3 - 38’F2 - 18’F1 - 0’E-W SECTION THROUGH EAST CONCOURSEAASection AA0’ToiletsToiletsCCMeetingCCMeetingCCMeetingCCMeetingCCMeetingPre-Func.CCMeetingPre-Func.Pre-FunctionPre-FunctionPre-FunctionPre-FunctionHotel MeetingHotel MeetingHotel MeetingHotel MeetingExec. Of.Upper LobbyRestaurantHotelLobbyRetailF1 - 0’F2 - 18’F3 - 38’F4 - 54’F5 - 74’F6 - 94’F7 - 104’F8 - 114’F9 - 124’F10 - 134’F11 - 144’F12 - 154’F13 - 164’F14 - 174’F15 - 184’194’94’-6”AtriumPre-Func.CCMeetingToiletsStorageCC MeetingHotel Junior Ballroom 20kHotel Junior Ballroom 15kCC MeetingCC MeetingToiletsToiletsRegistration25’50’100’200’54 South Beach ACE Letter of Intent
S-N SECTION THROUGH HALL CN-S SECTION THROUGH HALL A025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’BCSection BBSection CCBC60,000sf Ballroom20,000sf Ballroom20,000sf BallroomPre-func.Pre-functionPre-F.Pre-F.AtriumMech.BarRestaurantFront DeskHotel LobbyExec. Of.Exec. Of.F1 - 0’0’0’25’25’50’50’100’100’200’200’F2 - 18’F2 - 18’F1 - 0’F3 - 38’F3 - 38’F4 - 54’F4 - 54’F5 - 74’F5 - 74’F6-F15194’-0”94’-6”HotelMeetingAtriumCC MeetingHall CSelf-Parking Level 3Self-Parking Level 3Self-Parking Level 2Self-Parking Level 1ClimbingWallSelf-ParkingTennis CourtsHotel Junior BallroomMech.KitchenC.C. MeetingC.C. MeetingHall AGreen Roof with PV’sCooling TowersBOHApronLoadingMech. PlantServ.Serv.Climbing WallLoadingBOH94’-0”54’-0”Exhibit 5Sections
55 South Beach ACE Letter of Intent
Parking Requirements
New parking facilities replace parking removed by the
development and provide additional parking capacity to
meet the code requirements for the new programs.
50’200’
100’
1/128” = 1’
Hotel
848
Culture
50
Residential
154
Retail
80
Residential
503
Surface Parking Loss
900
Surface Parking Loss
140
Exhibit 6Parking Requirements
56 South Beach ACE Letter of Intent
1 Convention Center
Within Existing 2,490 Parking Spaces to remain or be replaced on site
2 Hotel
800 Units 400 spaces
(@ 0.5 parking space per unit)
55,000 sf Hotel Meeting 410 spaces
(45,000sf @ 1 parking space per 105sf - 15sf per hotel unit)
10,000 sf Food and Beverage 38 spaces
(10,000sf - 15sf per 2 hotel units / 105sf per parking space)
2,000 sf Retail 0 spaces
(2,000sf @ 1 per 500 sf - 7.5sf per hotel unit)
TOTAL 848 spaces
F&B Venue (40,000sf @ 1 space per 500sf) as agreed per meeting with CMB 4/2/13 80 spaces
3 Residential /Parking
Residential Parking 503 spaces
(262 units @ 1.75 spaces/unit+ 10% guest parking)
TOTAL 503 spaces
4 Jackie Gleason (to remain) “Existing Non Conforming”
5 Culture
Cultural Assembly 50 spaces
(assumption 15,000sf assembly space at 1 space / 300sf)- as agreed per meeting with CMB 4/2/13
6 17th Street Parking (Existing) / Retail/ Residential
Retail Spaces (59,500sf) 0 spaces
parking district 2 - retail exempt
Residential
(80 units @ 1 space per 1.75 spaces/unit+ 10% guest parking) 154 spaces
TOTAL 154 spaces
Additional Parking Program 1,635 spaces
Existing parking (2490)
P-LOT -900 spaces
Additional Surface Parking -140 spaces
Total -1040 spaces
Total Replacement Parking 1,040 spaces
Total On Site Parking Required 4,125 spaces
1,635 (new) 2,490 (existing)
Exhibit 6Parking Requirements
57 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
Public Parking (Program Allocation)
The public parking component is located in an above-
grade garage north of the Convention Center. This
garage is accessed via Convention Center Drive and
Washington Avenue. To fulfill its code-requirement, the
hotel reserves the right to utilize 348 spaces within this
facility when needed.
1,388
REPLACEMENT:
1040 (100%)
HOTEL : 348
(41%)
(AVAILABLE FOR USE)
Exhibit 6aProposed Public Parking
58 South Beach ACE Letter of Intent
50’200’
100’
1/128” = 1’
Proposed Parking (Program Allocation)
Parking facilities are strategically arranged throughout
the site to provide access adjacent to drop offs and
prefered access points. Access to Valet parkting
(underground south of the Hotel and above Hall C in
the North parking facility) is arranged to prevent valet
traffic burdening adjacent neighborhood roads or new
pedestrian corridors.
1,388
REPLACEMENT:
1040 (100%)
HOTEL : 348
(41%)
503
RESI : 503 (100%)
500 (VALET)
HOTEL : 500 (59%)
1,750
EXISTING: 1450
17TH ST RESIDENTIAL: 154 (100%)
F&B / CULTURE : 130 (100%)
EXTRA = 16
Exhibit 6bProposed Parking Total
59 South Beach ACE Letter of Intent
Total Existing Parking 2,490
Total New Parking Program 1,635
Replacement Parking 1,040
17th Parking 1,450
Total Parking Required 4,125
North 1,388
0’ – 194 (Self Park)
10’ – 92 (Self Park)
20’ – 400 (Self Park)
30’ – 132 (Self Park)
40’ – 159 (Self Park)
Over Hall C (38’) - 411 (274 Valet Stacker, 137 Self Park)
P - LOT Residential 503
1 level at grade, under landscape
Hotel/Culture - Btwn17th and 18th 500
1 level at Subterranean Valet with Stackers
17TH ST Garage 1,750
Existing Parking 1450
Loss Of Spaces For Retail -360
Add 2 Levels Self Park Total 660
Total Parking Provided 4,141
60 South Beach ACE
Exhibit 6bProposed Parking Total
Letter of Intent
The following pages briefly summarize our traffic plan as
well as analysis of the impact of the new program and
the effects of our proposals on existing traffic patterns
and densities. With the exception of a centrally managed
Intelligent Transport System (ITS), which would require
a city-wide infrastructural commitment beyond the scope
of this masterplan, all of the measures discussed herein
are integral to our plan and have been evaluated for cost
impact and feasibility. Please see our full traffic report, to
be delivered May 13, for a more detailed description of
our plan and analysis.
The main concept of the traffic plan was inspired from
the direct observation of traffic patterns occuring during
events at the Miami Beach Convention Center. Currently
traffic from the the Julia Tuttle and Mac Arthur Cause-
ways routes along Alton Road and then on 17th Street
in order to reach both the parking facilities and drop-off
kerbs next to the Halls. The current orientation of the
building and the existing distribution of parking avail-
ability in the area conveys the idea that 17th street is the
more convenient route to access the MBCC. However,
despite the intense traffic on 17th street, it is common
experience, also supported by quatitative measurements
of traffic flows, that north of the Convention Center Dade
Boulevard operates instead under capacity.
Circulation Plan - Cars
The main proposed arrangement of traffic takes advan-
tage of this opportunity, reverting the current paradigm
and proposing the main entrance for the vehicular flows
from the north of the site branching off Dade Boulevard.
This reorientation was made possible through an inte-
grated design approach between traffic engineers and
masterplanner: the former optimizing the traffic lights in
the area, along Dade Boulevard especially, and exploit-
ing the existing residual capacity, the latter by allowing in
the masterplan such distribution of flows.
With respect to the circulation plan, the key benefits of
the chosen approach are:
• the closure of Convention Center Drive between 17th
and 18th street in order to inhibit through traffic, con-
verting the space into a shared surface and reserving
the street for MBCC operation traffic only;
• the creation of dedicated off-street facilities for drop-
off and pick-up for both private cars and buses;
• the creation of a pedestrian exclusive area on the
southern side, where flows from the drop-offs, the
public transport stops and the adjacent cultural ven-
ues gather and engage with the MBCC to the north
and Lincoln Rd to the south.
• the creation of an internal circulation loop that
enables valet service to function effectively without
impacting on the operation of adjacent roads;
• a private exclusive access for both the hotel and the
residential program;
• a flexible arrangement of the internal circuit that
allows the use of Convention Center Drive as an
outdoor exhibition space.
• Parking structures for the MBCC and the Hotel are
provided at the north and the south of the exhibi-
tion and meeting space with 1,388 and 500 spaces
respectively. Most of the self parking will be located
in the north facility which can be accessed by Con-
vention Center Drive and Washington Av., as shown
below. Additional parking space remains within the
17th Street parking garage.
The residential area on the east side of Meridian Av-
enue is served by a 503 spaces parking lot accessed
via Meridan Avenue. Alternatively, private cars using
valet service will access the kerbs located at the south-
ern edge of Convention Center Drive as well as on 18th
street directly adjacent to the south meeting rooms.
Traffic heading to the hotel will route in a counter-clock-
wise fashion around a landscaped berm to reach the
drop-off kerb. Afterwards, vehicles will be valeted to the
parking below the hotel lobby through a roundabout and
a ramp accessible from beneath the berm. The propos
ed layout also allows self-parking, avoiding drop-off
when necessary.
Finally, the berm clearance, the roundabout radii and the
ramp slope are designed to allow goods vehicles access
into the basement loading facility servicing the hotel.
- please refer to Figures 1 and 2.
ITS
As part of the proposal, parking structures will be
equipped with sensors monitoring in real time the degree
of occupancy of each sector and reverting this in-
formtaion and other diagnostics back to the control room
of the MBCC. This will result in a set of Variable Mes-
sange Panels (VMP) which will be locoated along the
perimetral roads of the MBCC advising drivers on park-
ing availability and status. These can also be considered
proper ITS devices and can be assumed as the first step
of a broader strategy for dynamic wayfing which could
be used in the future to provide information on traffic
conditions and advise motorists on the proper route to
reach the MBCC.
Exhibit 7Traffic Plan
61 South Beach ACE Letter of Intent
To valet drop-off
Car deposit
Car return
Leave
Hall C P-lot (4th level)
Hotel P-lot (basement)
Drop-off
Public P-lot IN
Public P-lot OUT
Public P-lot
Residential P-lot IN
Residential P-lot OUT
Residential P-lot
Figure 1 - Proposed entrance and exit patterns to the parking
facilities (mainly self-parking)
Figure 2 - Proposed entrance/exit patterns to the drop-off facilities
on Convention Center Drive and 18th street (top), valet circuit
(middle) and of the Hotel (bottom).
However, digital panels located as far as the causeways
require a full network of sensors and a centralized traffic
control unit which can only be integrated in the city in-
frsatructure. This also applies to real-time monitoring of
public transport vehicles location in relation to the infor-
mation distributed to passengers through applications or
latest generation bus stops panels.
All these layers of technology rely on protocols which
require integration from a supervising entity in order to
operate seamlessly.
This is the reason for having to necessarily rely on the
involvement of City Administration to address this wider
strategy prior to contributing to it.
All this provided, it is deemed that contribution from ITS
and other forms of digital technology can ease the mo-
bility of motorists and people in general and it is highly
recommended that actions are taken in this direction.Washigton Av.Meridian Av.Dade
Bl
v.
17th street Washigton Av.Meridian Av.Dade
Bl
v.
17th street
Exhibit 7Publicly Funded Open Space Areas
62 South Beach ACE Letter of Intent
Circulation Plan - Goods Vehicles
Similarly to the private traffic, goods vehicles are
planned to follow the same strategy:
• The main flow of goods vehicles is related to the
operation of the MBCC and will access the site from
Dade Blvd., exploiting the length of Convention
Center Drive to orderly proceed towards the gate of
the loading area at the north end of the halls. This will
mainly occur during move-in and move-out days.
• The secondary flow of goods vehicles is related to
the hotel and its loading facility located underneath
the concourse next to the lobby. The entry to the
facility is either from Convention Center Drive or
Figure 4 - Proposed entrance/exit sequence for loading facilities
Circulation Plan - Buses
In terms of buses circulation and drop-off, the proposed
operational and geometric scheme makes allowance for
the stacking of up to 25 buses divided in two facilities:
• along the western edge of Hall C, and
• along the southern facade next to the meeting rooms.
The double kerb offers the possibility to better distribute
the flows and occasionally to close Convention Center
Drive for events without imèairing the functionality of the
facility.
Drop-off
Way in
Way out
Figure 3 - Proposed entrance/exit sequence of Buses
Meridian Av. and, as per the valet, through the
roundabout and the ramp beneath the landscaped
berm down to the lower level. Vehicles entering from
Meridian Av. can reach the ramp without circulating
in front of the hotel's main entrance and drop-off.
• Finally, the loading area of the Jackie Gleason
Theater will be accessed from the drop-off along 18th
street.
Summary of proposals
The main modifications on the existing road network can
be summarized in three major topics:
• pedestrian safety
• seamless integration with public transport facilities,
and
• protection of adjacent residential neighborhoods from
through traffic heading to/coming from the Miami
Beach Convention Center.
The primary objective is reached by introducing:
• a landscaped median along 17th street providing a
safe space for pedestrians who can't complete the
crossing;
• a pedestrian-only traffic light along 17th street in
combination with the proposed crossings in the me-
dian and adjacent to the newly proposed/relocated
bus stops;
• a pedestrian.only traffic light along 17th street in as-
sociation with the connection to Soundscape Park;Washigton Av.Meridian Av.Dade
Bl
v.
17th streetWashigton Av.Meridian Av.Dade
Bl
v.
17th street
Exhibit 7Publicly Funded Open Space Areas
63 South Beach ACE Letter of Intent
• a traffic signal with associated pedestrian crossing
along Meridian Av. at the crossing with 18th street;
• a pedestrian crossing ensuring continuity along Dade
Boulevard @ Meridian Av.
In second place, the integration with the public transport
service is ensured by relocation and, where necessary,
addition of bus stops in the vicinity of the MBCC.
In particular a bus stop was added along 17th street at
the corner with Pennsylvania Av. in order to facilitate
the accessibility of those arriving by transit, and also to
engage such flows in the public pedestrian space at the
south of the Convention Center.
Furthermore, the consciousness of the potential devel-
opment of transit within South Beach as envisaged by
several planning documents and studies, led the design
of the masterplan public realm.
Being accessible on three out of four sides, the plan is
flexible in receiving flows of passengers from either the
southern (17th street) as well as the eastern side (Wash-
ington Av.) whenever decisions will be made at higher
levels of Public Administration on the routing of the so-
called Bay Link.
Currently, the plan shows the provision for bus stops
with dedicated lay-bys along 17th street, Meridian Av
and Washingtoin Av.
FIGURE 5 - Excerpts of the road layout plan showing ameliorments proposed for Washington Av., 17th street and Convention Center Dr.Washigton Av.Washigton Av.17th street17th streetConvention Center DriveExhibit 7Publicly Funded Open Space Areas
64 South Beach ACE Letter of Intent
Finally, an important part of the strategy for managing
the mobility needs of the new MBCC is the safeguarding
of neighboring residential communities from rat-running
related to traffic heading to the Convention Center. This
traffic is the main cause of excessive speeding, aggres-
sive driving, but also noise and pollution for the residents
of Palm View and Bayshore.
It is believed that only a physical barrier can ensure
the level of enforcement required for this strategy and
for this purpose two controlled accesses are proposed
along 18th street and 19th street in the first block west
of Meridian. These controlled locations will automatically
filter vehicular traffic demanding to cross the neighbor-
hood in relation to the possession of permit released by
the municipality.
Accordingly,
• the residents will continue experiencing the same ac-
cessibility to their homes as today;
• the non residents will be prevented from travelling
RFID antenna – INBOUND/OUTBOUND
Bollard/Physical barrier.
ECU/Control Unit – coordinates RFIDs response and
triggers the mechanics of the bollards.
VOIP intercom to remote check-point within administration or
local police (potentially) – in the semi-gated option, it is not
required as back-up accesses are always available from 17th
street.
FIGURE 6 - Below a diagram representing the
potential layout of the gates along Meridian
Avenue.
through the neighborhood (as a shortcut);
• access to the properties by non-residents will still
be granted freely and at all times by accesses along
17th (Lenox, Michigan, Jefferson) which is deemed
acceptable in relation to the advantages.
This strategy is based on the implementation of barriers
(mainly pneumatic bollards) equipped with RFID tech-
nology sensors which will recognize and give access to
vehicles of Palm View residents while inhibiting through
traffic in the neighborhood.
This system does not require connection to a remote da-
tabase of authorized vehicles and it can be considered
a proper wlocalized intelligence unit that doesn’t require
city-wide infrastructure to be implemented.
For this very reason it is readily implementable and ef-
fective from day one.
The same concept is proposed for Bayshore where the
gate is proposed on Prairie Av. @ W 28th Street.
3
2
4
1
3
4
1
3
2
1 4
Exhibit 7Publicly Funded Open Space Areas
65 South Beach ACE Letter of Intent
XX MONTH 2012 / pgProf. Dennis Frenchman &
Prof. Carlo Ratti
with
EXISTING
CONDITION
•Scenario 1 – 2013 condition with event → 20455 veh/3h
•Scenario 2 – 2013 condition without event→ 20237 veh/3h
PROJECT
•Scenario 3 ‐Project Scenario without additional traffic → 20237 veh/3h
•Scenario 4 –Project Scenario with traffic produced by event → 22671 veh/3h
•Scenario 5 –Project Scenario with traffic produced by event and signal optimization → 22671 veh/3h
Traffic Model
All the proposed intervetions on the road network were
assessed by means of a traffic microsimulation model
which enabled a real-time assessment of the traffic con-
ditions across the entire network enclosed in the study
area.
This technique was chosen as it enables the assess-
ment of the mutual effects of conditions at adjacent
junctions. This allows, for example, evaluating the
presence of back-blocking phenomena of intersections
downstream as, for instance, the case of the intersection
between Alton Rd and Dade vs. the intersection between
Alton Rd and 17th Street. It is well known that the traffic
problems at the former are dictated by lack of perfor-
mance at the latter.
An extensive traffic survey exercise was carried out dur-
ing two weeks in the month of February 2013 during and
after the Boat Show 2013, thus providing the team with
the necessary information to develop the model.
Figure 7 - Diagram of the modelled road network within the study area in the existing (left) and proposed scenario (right)
Traffic Analysis Zone
Parking zone
Traffic Analysis Zone
Parking zone
New MBCC zone
Existing condition scenario
The existing condition scenario addresses the cur-
rent road newtork layout (i.e. current scheme, current
arrangement of bus stops, traffic signals, pedestrian
crossings etc...) against two situations: with and without
events taking place at the MBCC.
In the full traffic report technical details about the calibra-
tion and validation of the model can be found.
Project scenario
The Project Scenarios are evaluated by introducing one
step at a time the modifications to either the road net-
work and the amount of traffic estimated.
These are:
• Road network as per the revised geometry + traffic
as conditions without event;
• Road network as per the revised geometry + traffic
as conditions with event and additional program;
• Road network as per the revised geometry + traf-
fic as conditions with event and additional program
+ traffic signal optimization (i.e. with the proposed
mitigation measures).
Exhibit 7Publicly Funded Open Space Areas
66 South Beach ACE Letter of Intent
Figure 8 - Chart representing the average cumulative speed on the modelled network over the entire duration of the 3 hours long
simulation. This is a typical key performance indicator of dynamic microsimulation models and shows the accounts for the average
travelling speed of each vehicle that during the simulation perioda has demanded to be assigned on to the network.
0
2
4
6
8
10
12
14
16
18
20
17.0117.0817.1517.2217.3017.3717.4417.5117.5818.0518.1218.1918.2618.3318.4018.4718.5419.0119.0819.1519.2219.2919.3619.4319.5019.57Mean Speed [mph]Scenario 1
Scenario 2
Scenario 3
Scenario 4
Scenario 5
Trip Generation
The project scenario includes the share of traffic related
to the redeveloped MBCC and to the additional program
located across the site.
This inlcudes:
• 633,730 sqf of hotel space,
• 447,000 sqf of residential space, and
• nearly 100,000 sqf or retail space of which 59,500 sqf
concentrated on 17th street at Pennsylvania Av.
The amount of traffic added on the road network and
due to the additional program is:
• 216 veh/h in the AM peak, and
• 422 veh/h in the PM as a bi-directional value.
The amount of traffic added on the road network and
due to the activity of the MBCC is:
• 1460 veh/h in the AM peak, and
• 1422 veh/h in the PM peak.
Detailed assessment of the traffic generated by all com-
ponents of the masterplan is included in the full traffic
report.
Scenario avg. travel
time [sec]
vehicles
assigned
mean veh
speed
[mph]
tot. vehicle
travelled
distance [m]
tot.
travelled
time [h]
matrix
dimension
assigned
vehicle vs n°
of veh. in
matrixScenario 1 160 20397 12.3 11119 905 20455 100%
Scenario 2 143 20169 13.8 11025 802 20237 100%
Scenario 3 165 20322 12.2 11283 929 20237 100%
Scenario 4 480 20883 4.3 11832 2784 22671 92%
Scenario 5 174 22777 12.0 13121 1098 22671 100%
Performance
Results
The assignment of traffic demand to the network pro-
duces different consequences in relation to the road
network characteristics. With reference to the chart and
table here below, the behavior of the network can be
explained:
1. The existing condition with event operates at a
mean speed value of 12.3 mph (includes time spent
in line, time spent at the traffic lights etc...) which
improves to 13.8 mph (+12%) when events are not
in place.
2. The modifications to the road network induced by
the MBCC, excluding the traffic signal optimization
(e.i. with the same traffic signals as of today), shows
a decrement of the performance of the network of
11.5%
3. Scenario n° 4, featuring the proposed road network
with the total additional traffic, but without traffic sig-
nal optimization produces a significant loss in per-
formance reaching values of 4.3 mph and inducing
queues beyond the extent of the study area (i.e. 8%
of the vehicles demanding to enter the study area
don't manage to do so and are queuing outside).
4. Finally, the proposed traffic signal optimization is
introduced in Scenario n°5 showing traffic perfor-
mances similar to the existing condition; 12.0 mph
vs 12.3 mph (i.e. a negligible decrease of only 2%).
Exhibit 7Publicly Funded Open Space Areas
67 South Beach ACE Letter of Intent
Figure 9 - Length of average queues at traffic signals within the
study area during an event in the existing condition (upper) and in
the proposed condition (lower) - e.i. with the new road layout and
with the optimized traffic signals.
Figure 10 - Distribution of traffic flows within the study area during an
event in the existing condition (upper) and in the proposed condition
(lower) - e.i. with the new road layout and with the optimized traffic
signals.
EXISTING CONDITION
PROJECT CONDITION
In other words, the proposed strategy, manages to offset
completely the impacts of the additional traffic related to
the proposed program and MBCC operation during an
event.
The Figures 9 and 10 below also show in a diagrammatic
form the existing condition vs the proposed optimized
project condition in terms of queues distribution (Fig. 9)
and traffic flows (Fig.10) on the road network.
It is clearly evincible the effect of displacement of traffic
from 17th street toward Dade, as desired, with the con-
sequential benefit for 17th Street current congestion.
Comparing the project and the existing condition, it is
noted that queues at intersections along 17th Street
reduce while they slightly increase along Dade.0-200201-300301-400401-500501-600601-700701-800801-900901-10001001-2000Vehicle /h
EXISTING CONDITION
PROJECT CONDITION
Similarly, the traffic flows are shifted north from the exits
of the car park on Convention Center Drive and Wash-
ington Avenue.
Also, from the diagram of the project scenario it is noted
that the internal valet circuit operates with flows lower
than 200 veh/h which is compatible with the concept of
pedestrian friendliness that inspired the shared public
space.
Meridian Avenue, which bears all traffic to/from the Hotel
and the Residential program is also operating with flows
lower than 500 veh/h similarly to the existing condition,
thus suggesting that the impact is offset.
The full traffic report with all the details on the calculation
of trips and the modelling process will be issued on May
13th, 2013.
Exhibit 7Publicly Funded Open Space Areas
68 South Beach ACE Letter of Intent
Exhibit 8
December 2015
December 2016
-Temporary meeting at North and South
-West concourse, north loading, and south loading under
construction
-Main entry at East concourse
-Reduced loading access maintained at north and south
via phased construction
-Hall C + ballroom/meeting complete
-North temporary meeting rooms removed
-South lobby/meeting under construction
-Main entries move to west and east ends
of new concourse
-All loading at North
-North Parking and Community Center under
construction
LOADING
LOADING
-Temporary meeting at North and South
-West concourse, north loading, and south loading under
construction
-Main entry at East concourse
-Reduced loading access maintained at north and south via
phased constructionCONSTRUCTION500,000 SF
TEMP.
MEETING
ROOMS
TEMP.
MEETING
ROOMSCONCOURSE + MEETINGDecember 2015
LOADING
-Hall C + ballroom/meeting complete
-North temporary meeting rooms removed
-South lobby/meeting under construction
-Main entries move to west and east ends
of new concourse
-All loading at North
-North Parking and Community Center under construction
TEMP.
MEETING
ROOMS
CONSTRUCTION
LOADING
CONCOURSE
December 2016
C B A
500,000 SF
LOADINGNEW BALLROOM AND
MEETING ABOVE
CONCOURSE + MEETINGCONSTR.
Phasing
69 South Beach ACE Letter of Intent
Exhibit 8Phasing
December 2017
December 2018
-East concourse undergoing phased renovation
-Hotel under construction
-South meeting operational
-Complete
-East concourse undergoing phased renovation
-Hotel under construction
-South meeting operational
LOADING
NEW
MEETING
December 2017
500,000 SF
C B A RENOVATIONLOBBYCONSTR.
CONCOURSE
MEETING
NEW BALLROOM AND
MEETING ABOVE
-Complete
LOADING
CONCOURSE
HOTEL LOBBY MEETING
December 2018
500,000 SF
C B A MEETINGNEW BALLROOM AND
MEETING ABOVE
70 South Beach ACE Letter of Intent