Loading...
Tishman 130503_SBACE_MBCC LOI Part 2[1]Base Case MasterplanExhibit 1a 1 Convention Center Renovation (including hotel parking) Existing Halls 502,000 sf Existing Meeting 127,000 sf Additional Meeting+ Ballroom 125,000 sf 2 Hotel Complex Hotel Total Area: 633,730 sf 3 F&B Venue (Part of hotel development) F&B Venue Total Area: 40,000 sf 28 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ C. FISHER HOUSE CITY HALL PARKING JACKIE GLEASON THEATER HOLOCAUST MEMORIAL BOTANICAL GARDENS LOADING LOADING HALL A HALL B HALL D HALL C WEST CONCOURSEEAST CONCOURSE18TH ST CONVENTION CENTER DRIVECITY HALL PARKING JACKIE GLEASONTHEATER 17TH STREETPARKINGGARAGE LOADING 17TH ST MERIDIAN AVEWASHINGTON AVE19TH ST 18TH SREET 17TH ST 19TH STREET DADE B L V D BOTANICAL GARDENS HOLOCAUST MEMORIAL COLLINS PARK MIAMI BEACH GOLF CLUB 23R D S T R E E T BASS MUSEUM L I N C O L N R O A D PARK AVENUE1 3 2 Exhibit 1aBase Case Masterplan 29 South Beach ACE Letter of Intent Phase 1 Components MasterplanExhibit 1b 1 Convention Center Renovation (including hotel parking) Existing Halls 502,000 sf Existing Meeting 127,000 sf Additional Meeting+ Ballroom 125,000 sf 2 Hotel Complex Hotel Total Area: 633,730 sf 3 F&B Venue (Part of hotel development) F&B Venue Total Area: 40,000 sf 4 P-Lot Multifamily and Parking Development Residential Area: (approx 261 units) 342,000 sf 5 Jackie Gleason Refurbishment Theater (seats) 2,700 seats 6 Cultural Amenity Culture Total Area: 18,000 sf 7 17th Street Garage and Development Retail 59,500 sf Parking 1,750 spaces 8 Additional Parking Development Additional Parking 499,400sf 1,388 Spaces Community Center 9,000 sf (2 Levels, under bermed landscape) 9 Info Center Info Center 9,361 sf 10 Public Amenities Office 15,000 sf (Reallocated Office above Hall C in CC to replace 555 17th St Office and 22nd St Community Center Office) 30 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 1 3 4 5 6 7 8 10 2 9 Exhibit 1bPhase 1 Components Masterplan 31 South Beach ACE Letter of Intent Future Components MasterplanExhibit 1c 1 Convention Center Renovation (including hotel parking) Existing Halls 502,000 sf Existing Meeting 127,000 sf Additional Meeting+ Ballroom 125,000 sf 2 Hotel Complex Hotel Total Area: 633,730 sf 3 F&B Venue (Part of hotel development) F&B Venue Total Area: 40,000 sf 4 P-Lot Multifamily and Parking Development Residential Area: (approx 261 units) 342,000 sf 5 Jackie Gleason Refurbishment Theater (seats) 2,700 6 Cultural Amenity Culture Total Area: 18,000 sf (assumed assembly space) 15,000 sf 7 17th Street Garage and Development Retail 59,500 sf Parking 1,750 spaces Residential: (approx 80 units) 105,000 sf 8 Additional Parking Development Additional Parking 499,400 sf 1,388 Spaces Community Center 9,000 sf (2 Levels, under bermed landscape) 9 Info Center Info Center 9,361 sf 10 Public Amenities Office 15,000 sf (Reallocated Office above Hall C in CC to replace 555 17th St Office and 22nd St Community Center Office) 32 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 3 4 5 6 7 9 8 10 2 1 9 Exhibit 1cFuture Components Masterplan 33 South Beach ACE Letter of Intent South Beach ACE Convention District Letter of Intent  Page 1     Exhibit 2 802 Renovation Program 803 1) New Outdoor Function Space 804 2) New Executive Conference Center and Business Center 805 3) Renovated Food Courts / Concessions 806 4) Existing Exhibit Hall Improvements 807 a) Halls need to be reconfigured so they can be subdivided into four halls from North to South. With this 808 configuration, the skywalk will be removed. 809 b) One of the subdivided halls needs the capability to be further subdivided for smaller events. 810 c) Each subdivided exhibit hall needs access to approximately nine (9) loading docks (36 in total). 811 d) Each subdivided exhibit hall needs one (1) 30’ x30’ freight door and four (4) 15’ x 24’ freight doors. 812 e) Provide appropriate show offices adjacent to each hall. 813 f) Repair exhibit floor to provide for 350 lbs per sf load 814 g) Repair/improve infrastructure under exhibit halls (plumbing, electrical and data/telecomm) to Class A 815 standards. 816 h) Replace exhibit hall air handlers and install new VFD’s 817 5) Existing Meeting Rooms/Pre-Function 818 a) Provide a general renovation of existing meeting spaces and Pre-function areas including all finishes 819 (carpet, wall coverings, ceiling, etc.) and fixtures, lighting and lighting controls, sound systems, 820 automatic projector screens, rigging points, etc. 821 b) Install floor power in C 123-126 and D 128-131 822 6) Existing Support Areas 823 a) Carpet replacement throughout facility 824 b) Add new restrooms and expand existing to achieve the appropriate number of facilities. 825 c) Upgrade and/or expand kitchen facilities to meet Class A standards. 826 d) Renovate concession stands 827 e) Provide for a business center with approximately 1,500 square feet (could be in conjunction with hotel 828 needs) 829 f) Locate engineering shops and their offices in best location given hall reconfiguration 830 g) Provide the appropriate number of permanent ticket booths on the exterior of the facility. Ideally one for 831 each hall with at least eight (8) windows. 832 7) Infrastructure Improvements 833 a) Replace existing escalators 834 b) Replace existing elevators, including relocating/installing freight elevators driven by hall reconfiguration. 835 c) Replace buss duct on west side interior 836 d) Replace exterior doors and windows with impact glass 837 e) Replace all west side air handlers 838 f) Install roof drain vents 839 g) Replace chiller and cooling tower 840 34 South Beach ACE Letter of Intent South Beach ACE Convention District Letter of Intent  Page 2     h) Replace west side chilled water piping 841 i) Assess and replace/improve all life safety function’s including fire sprinkler pump replacement, fire 842 sprinkler valve room replacement, and fire panel replacement to include strobe lighting 843 j) Replace generator 844 k) Replace cooling tower piping 845 l) Chilled water insulation replacement 846 m) Chilled water valve replacement 847 n) Upgrade Compressed air system 848 o) Reduce humidity and condensation problems within the building 849 p) Replace exhaust fans 850 q) Replace exterior sidewalk, stairs and handrails 851 r) Add portable/telescopic riser seating (minimum 4,000 seats) 852 s) Replace all existing interior doors and hardware, including card swipe locking system 853 8) Sustainability Improvements – Advise on and implement viable sustainability measures within the facility. 854 This could include, but not limited to, solar roof panels, rain water collection, natural light, etc.) Achieve 855 LEED certification. 856 9) Technology 857 a) Add a Distributed Antenna System (cell phones) 858 b) Expand Wi-Fi to entire facility 859 c) Add digital read boards throughout facility for meeting rooms, exhibit halls 860 d) Add Exterior digital signage and marquee 861 10) ADA – Ensure facility is compliant with all ADA requirements, including push button door openers. 862 35 South Beach ACE Letter of Intent 863 864 865 South Bea Convention    ach ACE District Lettter of Intent  P   Potential Ava Exhibit 3 ailable Additioonal Proceedss Page 1    36 South Beach ACE Letter of Intent South Beach ACE Convention District Letter of Intent  Page 1     Exhibit 4 866 Hotel Program 867 Area Count Notes Traditional Hotel Keys 737 Keys 278,586 SF / 737 Bays Junior Suites 30 Keys 17,010 SF / 45 Bays Premier Suites 15 Keys 11,340 SF / 30 Bays Deluxe Parlor Only 16 Keys 14,364 SF / 38 Bays Presidential 2 Keys 3,780 SF / 10 Bays Total Hotel Keys 800 Keys 325,080 SF / 860 Bays Other Guestroom Areas 81,150 SF Corridors, Elevator Lobbies, Maid Closets, Vending, Elevator Core, etc. Total Guestroom Areas 406,230 SF Lobby & Entrance 8,490 SF Retail / Sundry 1,710 SF F&B Outlets 16,380 SF 5 outlets with 540 F&B Seats Club Lounge 2,240 SF Total Public Areas 28,820 SF Ballroom 20,000 SF Jr. Ballroom 15,000 SF Meeting Rooms 20,000 SF (2) 5,000 SF Rooms, (4) 1,500 SF Rooms, (4) 1,000 SF Rooms Board Rooms 1,200 SF (2) 600 SF Board Rooms Pre-Function 21,000 SF Support & BOH 21,300 SF Total Function Space 98,500 SF Administrative Areas 12,020 SF Front Desk & Office, Accounting, Executive Offices Service Areas 38,515 SF Kitchens, F&B Storage, Housekeeping, Laundry, etc. Employee Facilities 5,900 SF HR, Cafeteria, Lockers & Toilets Maintenance & Engineering 31,385 SF Engineering, Mechanical Plant Recreation Facilities 12,360 SF Health Club, Sauna, Spa Hotel Gross Indoor SF 633,730 SF 792 GSF per Key / 737 GSF per Bay Outdoor Recreation 136,255 SF Includes (2) Outdoor Pools, (2) Pool Decks, & Balconies Hotel Parking 848 Spaces 500 South of Hotel & 348 Spaces Located in CC Parking Facility Hotel Accessory F&B 40,000 SF Separate Facility Outside the Hotel *Typical Bay is 14’ Wide x 27’ Deep = 378 GSF, or 340 NSF.868 37 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ Exhibit 5 Ground Floor Convention Center Hall A = 172,500 sf Hall B = 179,700 sf Hall C = 148,700 sf Meeting Rooms = 57,500 sf 35’ clear Concourse Flex Space = 75,000 sf Convention Center / Hotel Floor Plans Hall C Hall B Hall A1 ToiletsToiletsToiletsToiletsRecycling BOH / Shops Apron +4’ NVGD Crate Storage 194 Parking Spaces Loading Dock BOHBOHBOH Hall A2 35’ clear Concourse Flex Space Front Office KitchenRetail Lobby Bar ConciergeHotel Lobby Restaurant Convention Meeting Space Convention Meeting Space Registration Concourse Concourse Food Court Food Service Storage Toilets ToiletsToilets Toilets Toilets Meeting Room Meeting Room Meeting Room Meeting Room Community Center 9000sf on 2 levels Theater Toilets BOH BOHBOH Toilets 180'390'210'-6" 872' 290'275' 266' 276'-6" 904'-6" 342' 240' 47'-6" F1 38 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F2 Convention Center Meeting Rooms = 67,700 sf Open To Below Open To Below Open To Below 10k Ballroom Open To Below Open To BelowKitchen Terrace 3 Meal Restaurant Open To Below Upper Lobby Mech. Convention Meeting Space Convention Meeting Space Open To Below Open To Below Open To Below BOH Show Managers Office Show Managers Office Convention Meeting Space Mech.Mech. ToiletsToilets Toilets 180'390'47'-6"210'-6" 872' 266' 276'-6" 904'-6" 342' F2 Exhibit 5Convention Center / Hotel Floor Plans 39 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F3 Central Plant Mechanical Plant 159 Parking Space 50,933sf Cooling Towers Exhibit Hall Truss Zone Convention Administration Offices Executive Offices Open To Below Open To Below Open To Below Concourse Mech. Mech.Relocated Office SpaceMech. Mech.Mech. Mech. Mech.Mech. Mech. Mech. 266' 276'-6" 546' 196' 342' 872' 252' 178' F3 Exhibit 5Convention Center / Hotel Floor Plans 40 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F4 Convention Center Meeting Rooms = 25,000 sf Ballroom = 61,300 sf Exterior Terrace = 8,500 sf Hotel Meeting Rooms = 15,000 sf Ballroom = 15,000 sf + 20,000 sf Toilets Toilets Concourse Toilets HotelMeetingRooms Hotel Meeting Rooms Open To Below Furniture Storage Skylight 15k Ballroom 20k Ballroom Operable Terrace Prefunction Toilets Banquet KitchenHotel Board Room Convention Meeting Room Toilets Prefunction 60k Ballroom Comissary Banquet Kitchen Furniture StorageEmp. LockersEmp.Break Room Uniform Issue Concourse Concourse Terrace Toilets Convention Meeting Room Hotel BOH 211' 358' 684' 872' 180' 225'252'170'-4"211' F4 Exhibit 5Convention Center / Hotel Floor Plans 41 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F5 Convention Center Ballroom = 41,100 sf Exterior = 6,500 sf Hotel Meeting = 6,000 sf Furniture Storage Mechanical Toilets Open To Below Open To Below Toilets Toilets Toilets Convention Center Junior Ballroom Convention Center Junior Ballroom Open To Below Terrace Hotel Board Room Hotel Meeting Rooms 680' 204' 358' 243' 884' 890' 252'640' F5 Exhibit 5Convention Center / Hotel Floor Plans 42 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ Hotel Spa / Gym Pool 284' 890' 606' 211' 890' 606' 73'-6" 284' F6 F6 Hotel - Amenity Level Deck Space = 60,000 sf Pool = 5,000 sf Health Club and spa = 12,000 sf Exhibit 5Convention Center / Hotel Floor Plans 43 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F7 Open To Below Toilets Toilets Toilets Hotel Board Room Hotel Meeting Rooms 606' 606' F7 73'-6" Exhibit 5Convention Center / Hotel Floor Plans 44 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F8 Hotel Spa / Gym 606' 606' F8 73'-6" Exhibit 5Convention Center / Hotel Floor Plans 45 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F9 471' 471' 73'-6" F9 Exhibit 5Convention Center / Hotel Floor Plans 46 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F10 F10 471' 471' 73'-6" Exhibit 5Convention Center / Hotel Floor Plans 47 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F11 437' 437' 73'-6" F11 Exhibit 5Convention Center / Hotel Floor Plans 48 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F12 367' 367' 73'-6" F12 Exhibit 5Convention Center / Hotel Floor Plans 49 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F13 296' 296' 73'-6" F13 Exhibit 5Convention Center / Hotel Floor Plans 50 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ F14 Concierge Lounge 240' 240' 73'-6" F14 Exhibit 5Convention Center / Hotel Floor Plans 51 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ 0 50’100’200’400’ Restaurant/ Bar F15 153' 153' 73'-6" F15 Exhibit 5Convention Center / Hotel Floor Plans 52 South Beach ACE Letter of Intent Exhibit 5Elevations F1 - 0’F1 - 0’F2 - 18’F2 - 18’F3 - 38’F3 - 38’F4 - 54’F4 - 54’F5 - 74’F5 - 74’F6 - 94’F6 - 94’F7 - 104’F7 - 104’F8 - 114’F8 - 114’F9 - 124’F9 - 124’F10 - 134’F10 - 134’F11 - 144’F11 - 144’F12 - 154’F12 - 154’F13 - 164’F13 - 164’F14 - 174’F14 - 174’F15 - 184’F15 - 184’South ElevationWest Elevation025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’53 South Beach ACE Letter of Intent Exhibit 5Sections F15 184’F14 174’F13 164’F12 154’F11 144’F10 134’F9 124’F8 - 114’F7 - 104’F6 - 94’F5 - 74’F4 - 54’F3 - 38’F2 - 18’F1 - 0’E-W SECTION THROUGH EAST CONCOURSEAASection AA0’ToiletsToiletsCCMeetingCCMeetingCCMeetingCCMeetingCCMeetingPre-Func.CCMeetingPre-Func.Pre-FunctionPre-FunctionPre-FunctionPre-FunctionHotel MeetingHotel MeetingHotel MeetingHotel MeetingExec. Of.Upper LobbyRestaurantHotelLobbyRetailF1 - 0’F2 - 18’F3 - 38’F4 - 54’F5 - 74’F6 - 94’F7 - 104’F8 - 114’F9 - 124’F10 - 134’F11 - 144’F12 - 154’F13 - 164’F14 - 174’F15 - 184’194’94’-6”AtriumPre-Func.CCMeetingToiletsStorageCC MeetingHotel Junior Ballroom 20kHotel Junior Ballroom 15kCC MeetingCC MeetingToiletsToiletsRegistration25’50’100’200’54 South Beach ACE Letter of Intent S-N SECTION THROUGH HALL CN-S SECTION THROUGH HALL A025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’025’50’100’200’ELEVATION SCALESECTION SCALE025’50’100’200’BCSection BBSection CCBC60,000sf Ballroom20,000sf Ballroom20,000sf BallroomPre-func.Pre-functionPre-F.Pre-F.AtriumMech.BarRestaurantFront DeskHotel LobbyExec. Of.Exec. Of.F1 - 0’0’0’25’25’50’50’100’100’200’200’F2 - 18’F2 - 18’F1 - 0’F3 - 38’F3 - 38’F4 - 54’F4 - 54’F5 - 74’F5 - 74’F6-F15194’-0”94’-6”HotelMeetingAtriumCC MeetingHall CSelf-Parking Level 3Self-Parking Level 3Self-Parking Level 2Self-Parking Level 1ClimbingWallSelf-ParkingTennis CourtsHotel Junior BallroomMech.KitchenC.C. MeetingC.C. MeetingHall AGreen Roof with PV’sCooling TowersBOHApronLoadingMech. PlantServ.Serv.Climbing WallLoadingBOH94’-0”54’-0”Exhibit 5Sections 55 South Beach ACE Letter of Intent Parking Requirements New parking facilities replace parking removed by the development and provide additional parking capacity to meet the code requirements for the new programs. 50’200’ 100’ 1/128” = 1’ Hotel 848 Culture 50 Residential 154 Retail 80 Residential 503 Surface Parking Loss 900 Surface Parking Loss 140 Exhibit 6Parking Requirements 56 South Beach ACE Letter of Intent 1 Convention Center Within Existing 2,490 Parking Spaces to remain or be replaced on site 2 Hotel 800 Units 400 spaces (@ 0.5 parking space per unit) 55,000 sf Hotel Meeting 410 spaces (45,000sf @ 1 parking space per 105sf - 15sf per hotel unit) 10,000 sf Food and Beverage 38 spaces (10,000sf - 15sf per 2 hotel units / 105sf per parking space) 2,000 sf Retail 0 spaces (2,000sf @ 1 per 500 sf - 7.5sf per hotel unit) TOTAL 848 spaces F&B Venue (40,000sf @ 1 space per 500sf) as agreed per meeting with CMB 4/2/13 80 spaces 3 Residential /Parking Residential Parking 503 spaces (262 units @ 1.75 spaces/unit+ 10% guest parking) TOTAL 503 spaces 4 Jackie Gleason (to remain) “Existing Non Conforming” 5 Culture Cultural Assembly 50 spaces (assumption 15,000sf assembly space at 1 space / 300sf)- as agreed per meeting with CMB 4/2/13 6 17th Street Parking (Existing) / Retail/ Residential Retail Spaces (59,500sf) 0 spaces parking district 2 - retail exempt Residential (80 units @ 1 space per 1.75 spaces/unit+ 10% guest parking) 154 spaces TOTAL 154 spaces Additional Parking Program 1,635 spaces Existing parking (2490) P-LOT -900 spaces Additional Surface Parking -140 spaces Total -1040 spaces Total Replacement Parking 1,040 spaces Total On Site Parking Required 4,125 spaces 1,635 (new) 2,490 (existing) Exhibit 6Parking Requirements 57 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ Public Parking (Program Allocation) The public parking component is located in an above- grade garage north of the Convention Center. This garage is accessed via Convention Center Drive and Washington Avenue. To fulfill its code-requirement, the hotel reserves the right to utilize 348 spaces within this facility when needed. 1,388 REPLACEMENT: 1040 (100%) HOTEL : 348 (41%) (AVAILABLE FOR USE) Exhibit 6aProposed Public Parking 58 South Beach ACE Letter of Intent 50’200’ 100’ 1/128” = 1’ Proposed Parking (Program Allocation) Parking facilities are strategically arranged throughout the site to provide access adjacent to drop offs and prefered access points. Access to Valet parkting (underground south of the Hotel and above Hall C in the North parking facility) is arranged to prevent valet traffic burdening adjacent neighborhood roads or new pedestrian corridors. 1,388 REPLACEMENT: 1040 (100%) HOTEL : 348 (41%) 503 RESI : 503 (100%) 500 (VALET) HOTEL : 500 (59%) 1,750 EXISTING: 1450 17TH ST RESIDENTIAL: 154 (100%) F&B / CULTURE : 130 (100%) EXTRA = 16 Exhibit 6bProposed Parking Total 59 South Beach ACE Letter of Intent Total Existing Parking 2,490 Total New Parking Program 1,635 Replacement Parking 1,040 17th Parking 1,450 Total Parking Required 4,125 North 1,388 0’ – 194 (Self Park) 10’ – 92 (Self Park) 20’ – 400 (Self Park) 30’ – 132 (Self Park) 40’ – 159 (Self Park) Over Hall C (38’) - 411 (274 Valet Stacker, 137 Self Park) P - LOT Residential 503 1 level at grade, under landscape Hotel/Culture - Btwn17th and 18th 500 1 level at Subterranean Valet with Stackers 17TH ST Garage 1,750 Existing Parking 1450 Loss Of Spaces For Retail -360 Add 2 Levels Self Park Total 660 Total Parking Provided 4,141 60 South Beach ACE Exhibit 6bProposed Parking Total Letter of Intent The following pages briefly summarize our traffic plan as well as analysis of the impact of the new program and the effects of our proposals on existing traffic patterns and densities. With the exception of a centrally managed Intelligent Transport System (ITS), which would require a city-wide infrastructural commitment beyond the scope of this masterplan, all of the measures discussed herein are integral to our plan and have been evaluated for cost impact and feasibility. Please see our full traffic report, to be delivered May 13, for a more detailed description of our plan and analysis. The main concept of the traffic plan was inspired from the direct observation of traffic patterns occuring during events at the Miami Beach Convention Center. Currently traffic from the the Julia Tuttle and Mac Arthur Cause- ways routes along Alton Road and then on 17th Street in order to reach both the parking facilities and drop-off kerbs next to the Halls. The current orientation of the building and the existing distribution of parking avail- ability in the area conveys the idea that 17th street is the more convenient route to access the MBCC. However, despite the intense traffic on 17th street, it is common experience, also supported by quatitative measurements of traffic flows, that north of the Convention Center Dade Boulevard operates instead under capacity. Circulation Plan - Cars The main proposed arrangement of traffic takes advan- tage of this opportunity, reverting the current paradigm and proposing the main entrance for the vehicular flows from the north of the site branching off Dade Boulevard. This reorientation was made possible through an inte- grated design approach between traffic engineers and masterplanner: the former optimizing the traffic lights in the area, along Dade Boulevard especially, and exploit- ing the existing residual capacity, the latter by allowing in the masterplan such distribution of flows. With respect to the circulation plan, the key benefits of the chosen approach are: • the closure of Convention Center Drive between 17th and 18th street in order to inhibit through traffic, con- verting the space into a shared surface and reserving the street for MBCC operation traffic only; • the creation of dedicated off-street facilities for drop- off and pick-up for both private cars and buses; • the creation of a pedestrian exclusive area on the southern side, where flows from the drop-offs, the public transport stops and the adjacent cultural ven- ues gather and engage with the MBCC to the north and Lincoln Rd to the south. • the creation of an internal circulation loop that enables valet service to function effectively without impacting on the operation of adjacent roads; • a private exclusive access for both the hotel and the residential program; • a flexible arrangement of the internal circuit that allows the use of Convention Center Drive as an outdoor exhibition space. • Parking structures for the MBCC and the Hotel are provided at the north and the south of the exhibi- tion and meeting space with 1,388 and 500 spaces respectively. Most of the self parking will be located in the north facility which can be accessed by Con- vention Center Drive and Washington Av., as shown below. Additional parking space remains within the 17th Street parking garage. The residential area on the east side of Meridian Av- enue is served by a 503 spaces parking lot accessed via Meridan Avenue. Alternatively, private cars using valet service will access the kerbs located at the south- ern edge of Convention Center Drive as well as on 18th street directly adjacent to the south meeting rooms. Traffic heading to the hotel will route in a counter-clock- wise fashion around a landscaped berm to reach the drop-off kerb. Afterwards, vehicles will be valeted to the parking below the hotel lobby through a roundabout and a ramp accessible from beneath the berm. The propos ed layout also allows self-parking, avoiding drop-off when necessary. Finally, the berm clearance, the roundabout radii and the ramp slope are designed to allow goods vehicles access into the basement loading facility servicing the hotel. - please refer to Figures 1 and 2. ITS As part of the proposal, parking structures will be equipped with sensors monitoring in real time the degree of occupancy of each sector and reverting this in- formtaion and other diagnostics back to the control room of the MBCC. This will result in a set of Variable Mes- sange Panels (VMP) which will be locoated along the perimetral roads of the MBCC advising drivers on park- ing availability and status. These can also be considered proper ITS devices and can be assumed as the first step of a broader strategy for dynamic wayfing which could be used in the future to provide information on traffic conditions and advise motorists on the proper route to reach the MBCC. Exhibit 7Traffic Plan 61 South Beach ACE Letter of Intent To valet drop-off Car deposit Car return Leave Hall C P-lot (4th level) Hotel P-lot (basement) Drop-off Public P-lot IN Public P-lot OUT Public P-lot Residential P-lot IN Residential P-lot OUT Residential P-lot Figure 1 - Proposed entrance and exit patterns to the parking facilities (mainly self-parking) Figure 2 - Proposed entrance/exit patterns to the drop-off facilities on Convention Center Drive and 18th street (top), valet circuit (middle) and of the Hotel (bottom). However, digital panels located as far as the causeways require a full network of sensors and a centralized traffic control unit which can only be integrated in the city in- frsatructure. This also applies to real-time monitoring of public transport vehicles location in relation to the infor- mation distributed to passengers through applications or latest generation bus stops panels. All these layers of technology rely on protocols which require integration from a supervising entity in order to operate seamlessly. This is the reason for having to necessarily rely on the involvement of City Administration to address this wider strategy prior to contributing to it. All this provided, it is deemed that contribution from ITS and other forms of digital technology can ease the mo- bility of motorists and people in general and it is highly recommended that actions are taken in this direction.Washigton Av.Meridian Av.Dade Bl v. 17th street Washigton Av.Meridian Av.Dade Bl v. 17th street Exhibit 7Publicly Funded Open Space Areas 62 South Beach ACE Letter of Intent Circulation Plan - Goods Vehicles Similarly to the private traffic, goods vehicles are planned to follow the same strategy: • The main flow of goods vehicles is related to the operation of the MBCC and will access the site from Dade Blvd., exploiting the length of Convention Center Drive to orderly proceed towards the gate of the loading area at the north end of the halls. This will mainly occur during move-in and move-out days. • The secondary flow of goods vehicles is related to the hotel and its loading facility located underneath the concourse next to the lobby. The entry to the facility is either from Convention Center Drive or Figure 4 - Proposed entrance/exit sequence for loading facilities Circulation Plan - Buses In terms of buses circulation and drop-off, the proposed operational and geometric scheme makes allowance for the stacking of up to 25 buses divided in two facilities: • along the western edge of Hall C, and • along the southern facade next to the meeting rooms. The double kerb offers the possibility to better distribute the flows and occasionally to close Convention Center Drive for events without imèairing the functionality of the facility. Drop-off Way in Way out Figure 3 - Proposed entrance/exit sequence of Buses Meridian Av. and, as per the valet, through the roundabout and the ramp beneath the landscaped berm down to the lower level. Vehicles entering from Meridian Av. can reach the ramp without circulating in front of the hotel's main entrance and drop-off. • Finally, the loading area of the Jackie Gleason Theater will be accessed from the drop-off along 18th street. Summary of proposals The main modifications on the existing road network can be summarized in three major topics: • pedestrian safety • seamless integration with public transport facilities, and • protection of adjacent residential neighborhoods from through traffic heading to/coming from the Miami Beach Convention Center. The primary objective is reached by introducing: • a landscaped median along 17th street providing a safe space for pedestrians who can't complete the crossing; • a pedestrian-only traffic light along 17th street in combination with the proposed crossings in the me- dian and adjacent to the newly proposed/relocated bus stops; • a pedestrian.only traffic light along 17th street in as- sociation with the connection to Soundscape Park;Washigton Av.Meridian Av.Dade Bl v. 17th streetWashigton Av.Meridian Av.Dade Bl v. 17th street Exhibit 7Publicly Funded Open Space Areas 63 South Beach ACE Letter of Intent • a traffic signal with associated pedestrian crossing along Meridian Av. at the crossing with 18th street; • a pedestrian crossing ensuring continuity along Dade Boulevard @ Meridian Av. In second place, the integration with the public transport service is ensured by relocation and, where necessary, addition of bus stops in the vicinity of the MBCC. In particular a bus stop was added along 17th street at the corner with Pennsylvania Av. in order to facilitate the accessibility of those arriving by transit, and also to engage such flows in the public pedestrian space at the south of the Convention Center. Furthermore, the consciousness of the potential devel- opment of transit within South Beach as envisaged by several planning documents and studies, led the design of the masterplan public realm. Being accessible on three out of four sides, the plan is flexible in receiving flows of passengers from either the southern (17th street) as well as the eastern side (Wash- ington Av.) whenever decisions will be made at higher levels of Public Administration on the routing of the so- called Bay Link. Currently, the plan shows the provision for bus stops with dedicated lay-bys along 17th street, Meridian Av and Washingtoin Av. FIGURE 5 - Excerpts of the road layout plan showing ameliorments proposed for Washington Av., 17th street and Convention Center Dr.Washigton Av.Washigton Av.17th street17th streetConvention Center DriveExhibit 7Publicly Funded Open Space Areas 64 South Beach ACE Letter of Intent Finally, an important part of the strategy for managing the mobility needs of the new MBCC is the safeguarding of neighboring residential communities from rat-running related to traffic heading to the Convention Center. This traffic is the main cause of excessive speeding, aggres- sive driving, but also noise and pollution for the residents of Palm View and Bayshore. It is believed that only a physical barrier can ensure the level of enforcement required for this strategy and for this purpose two controlled accesses are proposed along 18th street and 19th street in the first block west of Meridian. These controlled locations will automatically filter vehicular traffic demanding to cross the neighbor- hood in relation to the possession of permit released by the municipality. Accordingly, • the residents will continue experiencing the same ac- cessibility to their homes as today; • the non residents will be prevented from travelling RFID antenna – INBOUND/OUTBOUND Bollard/Physical barrier. ECU/Control Unit – coordinates RFIDs response and triggers the mechanics of the bollards. VOIP intercom to remote check-point within administration or local police (potentially) – in the semi-gated option, it is not required as back-up accesses are always available from 17th street. FIGURE 6 - Below a diagram representing the potential layout of the gates along Meridian Avenue. through the neighborhood (as a shortcut); • access to the properties by non-residents will still be granted freely and at all times by accesses along 17th (Lenox, Michigan, Jefferson) which is deemed acceptable in relation to the advantages. This strategy is based on the implementation of barriers (mainly pneumatic bollards) equipped with RFID tech- nology sensors which will recognize and give access to vehicles of Palm View residents while inhibiting through traffic in the neighborhood. This system does not require connection to a remote da- tabase of authorized vehicles and it can be considered a proper wlocalized intelligence unit that doesn’t require city-wide infrastructure to be implemented. For this very reason it is readily implementable and ef- fective from day one. The same concept is proposed for Bayshore where the gate is proposed on Prairie Av. @ W 28th Street. 3 2 4 1 3 4 1 3 2 1 4 Exhibit 7Publicly Funded Open Space Areas 65 South Beach ACE Letter of Intent XX MONTH 2012 / pgProf. Dennis Frenchman &  Prof. Carlo Ratti with EXISTING  CONDITION •Scenario 1 – 2013 condition with event → 20455 veh/3h •Scenario 2 – 2013 condition without event→ 20237 veh/3h PROJECT •Scenario 3 ‐Project Scenario without additional traffic → 20237 veh/3h •Scenario 4 –Project Scenario with traffic produced by event → 22671 veh/3h •Scenario 5 –Project Scenario with traffic produced by event and signal optimization → 22671 veh/3h Traffic Model All the proposed intervetions on the road network were assessed by means of a traffic microsimulation model which enabled a real-time assessment of the traffic con- ditions across the entire network enclosed in the study area. This technique was chosen as it enables the assess- ment of the mutual effects of conditions at adjacent junctions. This allows, for example, evaluating the presence of back-blocking phenomena of intersections downstream as, for instance, the case of the intersection between Alton Rd and Dade vs. the intersection between Alton Rd and 17th Street. It is well known that the traffic problems at the former are dictated by lack of perfor- mance at the latter. An extensive traffic survey exercise was carried out dur- ing two weeks in the month of February 2013 during and after the Boat Show 2013, thus providing the team with the necessary information to develop the model. Figure 7 - Diagram of the modelled road network within the study area in the existing (left) and proposed scenario (right) Traffic Analysis Zone Parking zone Traffic Analysis Zone Parking zone New MBCC zone Existing condition scenario The existing condition scenario addresses the cur- rent road newtork layout (i.e. current scheme, current arrangement of bus stops, traffic signals, pedestrian crossings etc...) against two situations: with and without events taking place at the MBCC. In the full traffic report technical details about the calibra- tion and validation of the model can be found. Project scenario The Project Scenarios are evaluated by introducing one step at a time the modifications to either the road net- work and the amount of traffic estimated. These are: • Road network as per the revised geometry + traffic as conditions without event; • Road network as per the revised geometry + traffic as conditions with event and additional program; • Road network as per the revised geometry + traf- fic as conditions with event and additional program + traffic signal optimization (i.e. with the proposed mitigation measures). Exhibit 7Publicly Funded Open Space Areas 66 South Beach ACE Letter of Intent Figure 8 - Chart representing the average cumulative speed on the modelled network over the entire duration of the 3 hours long simulation. This is a typical key performance indicator of dynamic microsimulation models and shows the accounts for the average travelling speed of each vehicle that during the simulation perioda has demanded to be assigned on to the network. 0 2 4 6 8 10 12 14 16 18 20 17.0117.0817.1517.2217.3017.3717.4417.5117.5818.0518.1218.1918.2618.3318.4018.4718.5419.0119.0819.1519.2219.2919.3619.4319.5019.57Mean Speed [mph]Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Trip Generation The project scenario includes the share of traffic related to the redeveloped MBCC and to the additional program located across the site. This inlcudes: • 633,730 sqf of hotel space, • 447,000 sqf of residential space, and • nearly 100,000 sqf or retail space of which 59,500 sqf concentrated on 17th street at Pennsylvania Av. The amount of traffic added on the road network and due to the additional program is: • 216 veh/h in the AM peak, and • 422 veh/h in the PM as a bi-directional value. The amount of traffic added on the road network and due to the activity of the MBCC is: • 1460 veh/h in the AM peak, and • 1422 veh/h in the PM peak. Detailed assessment of the traffic generated by all com- ponents of the masterplan is included in the full traffic report. Scenario avg. travel time [sec] vehicles assigned mean veh speed [mph] tot. vehicle travelled distance [m] tot. travelled time [h] matrix dimension assigned vehicle vs n° of veh. in matrixScenario 1 160 20397 12.3 11119 905 20455 100% Scenario 2 143 20169 13.8 11025 802 20237 100% Scenario 3 165 20322 12.2 11283 929 20237 100% Scenario 4 480 20883 4.3 11832 2784 22671 92% Scenario 5 174 22777 12.0 13121 1098 22671 100% Performance Results The assignment of traffic demand to the network pro- duces different consequences in relation to the road network characteristics. With reference to the chart and table here below, the behavior of the network can be explained: 1. The existing condition with event operates at a mean speed value of 12.3 mph (includes time spent in line, time spent at the traffic lights etc...) which improves to 13.8 mph (+12%) when events are not in place. 2. The modifications to the road network induced by the MBCC, excluding the traffic signal optimization (e.i. with the same traffic signals as of today), shows a decrement of the performance of the network of 11.5% 3. Scenario n° 4, featuring the proposed road network with the total additional traffic, but without traffic sig- nal optimization produces a significant loss in per- formance reaching values of 4.3 mph and inducing queues beyond the extent of the study area (i.e. 8% of the vehicles demanding to enter the study area don't manage to do so and are queuing outside). 4. Finally, the proposed traffic signal optimization is introduced in Scenario n°5 showing traffic perfor- mances similar to the existing condition; 12.0 mph vs 12.3 mph (i.e. a negligible decrease of only 2%). Exhibit 7Publicly Funded Open Space Areas 67 South Beach ACE Letter of Intent Figure 9 - Length of average queues at traffic signals within the study area during an event in the existing condition (upper) and in the proposed condition (lower) - e.i. with the new road layout and with the optimized traffic signals. Figure 10 - Distribution of traffic flows within the study area during an event in the existing condition (upper) and in the proposed condition (lower) - e.i. with the new road layout and with the optimized traffic signals. EXISTING CONDITION PROJECT CONDITION In other words, the proposed strategy, manages to offset completely the impacts of the additional traffic related to the proposed program and MBCC operation during an event. The Figures 9 and 10 below also show in a diagrammatic form the existing condition vs the proposed optimized project condition in terms of queues distribution (Fig. 9) and traffic flows (Fig.10) on the road network. It is clearly evincible the effect of displacement of traffic from 17th street toward Dade, as desired, with the con- sequential benefit for 17th Street current congestion. Comparing the project and the existing condition, it is noted that queues at intersections along 17th Street reduce while they slightly increase along Dade.0-200201-300301-400401-500501-600601-700701-800801-900901-10001001-2000Vehicle /h EXISTING CONDITION PROJECT CONDITION Similarly, the traffic flows are shifted north from the exits of the car park on Convention Center Drive and Wash- ington Avenue. Also, from the diagram of the project scenario it is noted that the internal valet circuit operates with flows lower than 200 veh/h which is compatible with the concept of pedestrian friendliness that inspired the shared public space. Meridian Avenue, which bears all traffic to/from the Hotel and the Residential program is also operating with flows lower than 500 veh/h similarly to the existing condition, thus suggesting that the impact is offset. The full traffic report with all the details on the calculation of trips and the modelling process will be issued on May 13th, 2013. Exhibit 7Publicly Funded Open Space Areas 68 South Beach ACE Letter of Intent Exhibit 8 December 2015 December 2016 -Temporary meeting at North and South -West concourse, north loading, and south loading under construction -Main entry at East concourse -Reduced loading access maintained at north and south via phased construction -Hall C + ballroom/meeting complete -North temporary meeting rooms removed -South lobby/meeting under construction -Main entries move to west and east ends of new concourse -All loading at North -North Parking and Community Center under construction LOADING LOADING -Temporary meeting at North and South -West concourse, north loading, and south loading under construction -Main entry at East concourse -Reduced loading access maintained at north and south via phased constructionCONSTRUCTION500,000 SF TEMP. MEETING ROOMS TEMP. MEETING ROOMSCONCOURSE + MEETINGDecember 2015 LOADING -Hall C + ballroom/meeting complete -North temporary meeting rooms removed -South lobby/meeting under construction -Main entries move to west and east ends of new concourse -All loading at North -North Parking and Community Center under construction TEMP. MEETING ROOMS CONSTRUCTION LOADING CONCOURSE December 2016 C B A 500,000 SF LOADINGNEW BALLROOM AND MEETING ABOVE CONCOURSE + MEETINGCONSTR. Phasing 69 South Beach ACE Letter of Intent Exhibit 8Phasing December 2017 December 2018 -East concourse undergoing phased renovation -Hotel under construction -South meeting operational -Complete -East concourse undergoing phased renovation -Hotel under construction -South meeting operational LOADING NEW MEETING December 2017 500,000 SF C B A RENOVATIONLOBBYCONSTR. CONCOURSE MEETING NEW BALLROOM AND MEETING ABOVE -Complete LOADING CONCOURSE HOTEL LOBBY MEETING December 2018 500,000 SF C B A MEETINGNEW BALLROOM AND MEETING ABOVE 70 South Beach ACE Letter of Intent