Loading...
C7U-Approve Assignment To Existing Agreements w- C3TS To Stantec Consulting ServCOMMISSION ITEM SUMMARY Condensed Title: Approve Assignment to Existing Agreements between the City and Corzo Castella Carballo Thompson Salman, P.A. "C3TS" as Assi nor, to Stantec Consultin Services Inc. as Assi nee Maximize efficient delivery of services Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Customer Satisfaction Survey indicated that 79% of businesses rated recently completed capital improvement projects as "excellent" or "good." Item Summa /Recommendation: The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations: • Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-approved list of Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI services on an "as-needed" basis; • RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and • RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement Project. The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed" basis. C3TS has notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment A). In its due diligence, the City requested Stantec to provide information on how the firm meets the minimum requirements for each of the agreements to be assigned (see Attachment B). Stantec's qualifications comply with the requirements of the relevant solicitation and are nearly identical to those proposed by C3TS at the time of their proposal reviews and awards. In addition, Stantec was asked to confirm whether it would agree to all terms and conditions for each agreement and that the same project team members proposed and approved by the City for each agreement are still in place (for the exception of one individual). Stantec also affirmed that it will comply with all terms and conditions presented in each agreement (see Attachment C). RECOMMENDATION Based on Stantec's confirmation letter, due diligence review by the Procurement Division and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS I Stantec performance has been acceptable, the City Manager recommends to the Mayor and City Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful ne otiations. Advisory Board Recommendation: IN/A Financial Information: Source of Funds: Amount 1 N/A OBPI MIAMI BEACH 448 Account AGENDA ITEM _C_.:...if_fA._:.__ DATE 7-17-(3 !\ '~ jt'\ f\ I~ I BE· AC v \ r'"\ I v \ .. · ,_ · City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and M bers of the.tPity Commission l \ FROM: Jimmy L. Morales, City Manager DATE: July17,2013 ( SUBJECT: APPROVE ASSIGNMENT TO E ISTING AGREEMENTS BETWEEN THE CITY AND CORZO CASTELLA CAR ALLO THOMPSON SALMAN, P.A. ("C3TS") (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE): 1. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING AGREEMENT FOR THE ESTABLISHMENT OF A PRE-APPROVED LIST OF PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS (NO. 01-07/08) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS") (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013. 2. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR THE PALM AND HIBISCUS NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT (RFQ 35-10/11) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS") (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013. 3. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR THE SUNSET ISLANDS 3 & 4 NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT (NO. 04-11/12) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS") (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013. 4. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING AGREEMENT FOR PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS NEEDED" BASIS (NO. 52-11/12) BETWEEN THE CITY AND CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS") (AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS ASSIGNEE), UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS. ADMINISTRATION RECOMMENDATION Adopt the Resolution. 449 Commission Memorandum -Consent to Assignment C3TS to Stantec July 17, 2013 Page 2 of 2 KEY INTENDED OUTCOME SUPPORTED Ensure Well-Designed, Quality Capital Projects. ANALYSIS The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations: • Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre- approved list of Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI services on an "as-needed" basis; • RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and • RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement Project. The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed" basis. In a letter dated November 30, 2012, Mr. Ramon Castella, Vice-President of C3TS, notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment A). On June 27, 2013, the City requested from Stantec to provide information on how the firm meets the minimum requirements for each of the agreements to be assigned (see Attachment B). In addition, Stantec was asked to confirm whether it would agree to all terms and conditions for each agreement. On July 8, 2013, Stantec confirmed that the same project team members proposed and approved by the City for each agreement are still in place (for the exception of one individual) and that their qualifications are the same as those evaluated at the time of award by the City. Stantec also affirmed that it will comply with all terms and conditions presented in each agreement (see Attachment C). CITY MANAGER'S DUE DILIGENCE & RECOMMENDATION Based on Stantec's confirmation letter, due diligence review by the Procurement Division and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS I Stantec performance has been acceptable, the City Manager recommends to the Mayor and City Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful negotiations. CONCLUSION The Administration recommends that the Mayor and City Commission adopt resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to Requests for Qualifications Nos. 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful negotiations. JLM/MT/KGB/DM/AD T:\AGENDA\2013\July 13\Procurement\Consent to Assignment-C3TS to Stantec-MEMO.doc 450 Engineer& Archite~;h Planners E!Hl005022 AAC002142 November 30, 2012 City of Miami B~ch Capita! Improvement Projects 177 -1 ih Street Miami Beach, 33139 Nh:~. Kathle G. BI"'C!ks. AICP, City Managtlr Cont~c:t: POJBPO 014004-53m StrHt Restrooms POIBPO 015574-6111 StrMt & Ocean DriVe Res.trooms POIBPO 018213-flamingo Park Football Field & Trnc:t Project PO/BPO 019515-Neighborhood 13-Palm & Hlbill;cus isla:nds. V14 Reao~utk:m -Sunset Jsla:nd!S 3 & 41mprovements POIBPO IJ1!!19J! -Review Contractor's Claim South Pointe Ph U POIBPO 01!61 0-overview punch list fir& Statlon #2 C3TS Project l\10$, 01311..013; 014; 016; 011; 018; 019; 021 Dear Ms. Brooks; Please be Informed that on November 30. 2012, Stantec Consulting Services Inc, (~Stante<c") purchased certain of the assets of Corzo CastE~IIa Carballo Thompson Salman, PA ("ClTS") with the result that the ongoing buslness and affairs of C3TS is now wholly owrH!.!d by Stantec. Stanloo will maintain the present office locations or C3TS with no interruption ln operations or client servlces, and aU future projects and operations will be under the Stantec name. Stante<: provides professional cx:msulting services in planning, engineering, architecture, interior design, landscape ::m:::hitecture, surveying, environmental sciences. project management, and project ecollOmics for infrastn.1cture and facilities projects, We support publiC and private sector clients in a diverse range of markets at every stage, from the initial conceptualization and ftnanciaf feasibHil:y study to project comp,letion and beyond. Our senrlces are provided em projects around the world through approximataty 12,000 employees operating out of more than 190 I!:'J!Cations in North America and 4 locations internationally. Stantec's vision includes working with the best clients on the best projects and providing the best services. Accordingly, please be assured that the continuity of your current project will be unaffected by this new arrangement The caliber of the personne~ currently working on your will not change and, except for tile assignment requested herein, no other aspect will be affected. In regard, we request your approval to assign all exlst!ng contracts in the name of C3TS to Stantec. Kindly indicate your consent to the request for assignment by retuming a duplicate copy of this letter, executed on behaif of City of Miami Beach to Stantac: Consulting Services, !nc .. Sincerely, MPSON SALMAN, f.A. The undersigned hereby consents to the asslgnment of 'the Contract noted above to Stantec Consulting SerVIces !nc. effectiVe , 2.012. City of Mf,ami S41!aeh 901 Pooce de leon S~ite 900, C0«:1l Gobles, florido 33 i 34 30$.445.2900 1 ,ll'OO.A48.0227 fouimlle 305,44.5.3366 \IVtlb Site: www.c3is.c>em Equal Employer 451 MIAMI City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DIVISION Tel: 305-673-7490, Fax: 786-394-4624 June 27,2013 VIA E-MAIL: ramon.castella@stantec.com Ramon Castella, Stantec Consulting Services, Inc. 901 Ponce de Leon Boulevard, Suite 900 Coral Gables, FL 33134-3070 OF SALMAN, P.A. (C3TS) THOMPSON Due to Stantec Consulting Services, Inc.'s (Stantec) acquisition of Corzo Castella Carballo Thompson Salman, P.A. (C3TS), the contracts for the following solicitations must be assigned, through City Commission approval, from C3TS to Stantec: • RFQ 01-07/08 -For the Establishment of a Pre-Approved List of Professional Construction Engineering and Inspection Services (CEI) Firms to Provide Various Services on an "As Needed" • RFQ 35-10/11 -For a Design Criteria Professional to Prepare the Design Criteria Package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, which Is Intended to Be a Design-Build Contract; and to Serve as the City's __ J3.epraaEIDtativ.eJ:ludngJtteSe1~G-tkmJltihe~~gn-6uil~LEtrm for the Project,~Oonperning~~­ the Evaluation of the Responses Submitted by the Design-Build Firms; Review and Approve for Compliance of the Detailed Working Drawings for the Project; and for Evaluation of the Compliance of the Project Construction with the Design Criteria Package • RFQ 04-11/12 -For a Design Criteria Professional to Prepare Design Criteria Package for the Sunset Islands 3 & 4 Neighborhood Right-of-Way Improvement Project, which Is Intended to Be a Design~Build Contract; and to Serve as the City's Representative During the Selection of the Design-Build Firm for the Project, Concerning the Evaluation of the Responses Submitted by the Design-Build Firms; Review and Approve for Compliance of the Detailed Working Drawings for the Project; and for Evaluation of the Compliance of the Project Construction with the Design Criteria Package • RFQ 52-11/12-For Professional Construction Engineering and Inspection (CEI) Firms to Provide Various Services on an "As Needed" Basis As part of the City's responsiveness review, Stantec must provide the following information confirming that it meets the minimum requirements/documentation in the solicitations noted above: • RFQ 01-07/08 o Organizational Chart o Project Team licenses, certifications, resumes We ore commllled to providing excellent public service and safely to all who live, work, ond play in our vibrant, tropical, historic community. 452 _, -1 I o Florida Department of Professional Regulation license o List of all projects in the past five (5) years-254 or 330 would suffice o List of all legal claims In the past five (5) years o Minimum of five (5) similar projects-please provide scope of work, client contact information, project cost, and project start and completion dates o Minimum experience and qualifications (see Attachment A) 11 RFQ 35-10/11 and RFQ 04-11/12 o Firm's number of years providing similar service o Project Team licenses, certifications, resumes for each project o Ten (10) client references o List of similar projects in the past ten (1 0) years o List all legal claims in past five (5) years o Demonstrate prior experience in serving as the Design Criteria Professional for public facilities and in the preparation of Design Criteria Packages for public and municipal facilities in particular in horizontal right-of-way construction o Project Teams must include a professional civil engineer licensed in Florida o Project Managers must have a minimum of five (5) years of experience developing Design Criteria Packages for horizontal right-of-way construction and ----three (-3) projects valued at $5 million-or greater--------- ----- o Minimum of five (5) completed similar projects -please provide scope of work, client contact information, project cost, and project start and completion dates o Narrative descriptions for each project o Methodologies and approaches for each project o Organizational Chart II 52-11/12 o Ten (10) client references o Project Team licenses, certifications, resumes o Florida Department of Professional Regulation License o List all projects in the past five (5) years -254 or 330 would suffice --o-tist-o-rall-1-e-g-al-clai ms-i n-th-e-p-ast-five-tB")-years~--- o Project Manager must have a minimum of five (5) years of experience and have completed three (3) similar projects o Minimum of five (5) similar projects-please provide scope of work, client contact information, project cost, and project start and completion dates o Minimum experience and qualifications (see Attachment A) o Organizational Chart o Project methodology and approach In addition, Stantec must also confirm that it agrees to the contract terms and conditions for each project; as well as, the conditions provided in the RFQ proposal responses submitted by C3TS at the time of the RFQ solicitations, which were provided to your courier today. Please submit the required information by Wednesday, July 3, 2013. Should you need additional information, please contact me at 305-673-7000 ext. 6230 or e-mail: theocarrasco@m iami beachfl. gov. Thea Carrasco, Ph.D., CPPO, CPPB Senior Procurement Specialist We are committed Ia excel/en/ servim and to all who live, work, in our vi bran/, historic community. 453 Stantec Consulting Services inc. 901 Ponce de Leon Blvd., Suite 900 Coral Gables, Florida 33134 Ph (305_ 445-2900 Fax: (305) 445-3366 July 8, 2013 City of Miami Beach Procurement Division 1700 Convention Center Drive Miami Beach, Florida 331 Attention: Theo Carrasco, Ph. D., Senior Procurement Specialist Reference: Assignment of Contracts from Corzo Castella Carballo Thompson Salman, P.A. to Stantcc Consulting Services Inc. 01-07/08, RFQ 35-10/11, 04-11/12, RFQ Dear Mr. Carrasco: In response to your recent request additional information and confirmation concerning this matter, please note that the C3TS local staff, offices, management, organization and resources are now all part of Stantec. In response to specific items, please note the following: • RFQ 01-07/08 o Organizational Chart All project personnel and roles are as detailed in our original Statement of Qualifications, except for Mr. William Francis-who is no longer with the firm. o Project Team licenses, certifications, resumes All project team licenses, certifications and resumes are as contained in our original Statement of Qualifications, except for Mr. William Francis -who is no longer with the firm. o Florida Department Professional Regulation License Please see Florida Department of Professional Regulation licenses, as well as FDOT & Miami-Dade County Pre-qualification certificates for Stantec, included in Attachments. o List of projects the five years-254 or would suffice The list of local projects in the past five years -254, are as included in our original Statement of Qualifications. 0 of an legal claims the past five (5) years List of local claims in the past jive years is as included in our original Statement of Qualifications. 454 July a. 2:tl1S City of M!ami Beam Procu~ment Division Page2of4 o :1\>fininmm of five (5} similar pt·ojeets -please provide scope of work, client contact information, project cost, and project dart and completion dUes Similar loctii projects are as included in our origiru1l Statement of Qualifications. o Minimum expedem:e and qulllificadotu (see Attachment A) Minimum local experient..Y! and are as included ow original Statement of • RFQ 35-10/11 and RFQ 04~ 11 o Firmts l!lumber of years prO'it'iding simUar service The finn's number providing similar locally is as detailed in our original Statement c{Qualifications. o Project Team Lh:enses, certUicathms, resumes. for eacb.Ju·oject All team resumes are as contained in .'Hnrv"~''"'"J ()fQ:ualificaUons, William Francis-who is no longer o Ten (10) client refercmees The r~ferences are as comained in our original Statement o List of :d:milar projects in t.he past ten (1 0) years '""'·•••u local projects {tre as detailed in our orfginl.ll""'0 '"'.,. o List all legal claims in tile past five {5) yeus of local claims past five is as in our Statement o D<lmonstr:de prior experience :in servh:tg as the Desigu Cdterbt Professimud for public fac.iUti.es and .in the preparation of Design Crlteri~a Packages for pnbHe aaad municipal facilities in p:artlcn.lar m bo.rizmmtal rigld~of~wmy construction Prior local in serving as DCP for public facilities is as detailed in our Statement of Qual{(ications, o Project Teams must inchldc a professional dvU engineer licensed i:n Florida Project team inchules several professional engineers licenses ln Florida, as in our original Statement of Qualification.t o Project Managers must have a minimum of five (5) years of experience developing Design Criteria Pa<::kages fo:r hmizmrtal righN>f~way collst:rncdott and three (3) projects valued at $5 mnlion or greater Project 1\tfanagers are as detailed our Statement of Qualifications. o Minimum of five (5) completed similar projects -please provide scope of work, dient contad information, project cost, :ilnd project start :and completion dates Similar {W£ as ift our original Stater~umt q( Qualifications. o Narrative descriptions for ea.ch projtct description project are as detailed our original ..,..,~·~"'u~n Qutz#fications, 455 July&, 2013 Clty of Miami Seooh Procur0mii$rlt DMs!on Pi~ige3 of 4 o Methodologies and approaches for each proj~t The methodologies and approl:ches are as detailed Qualifications. in our original Statement of o Organb!:atimud Cluu1: All personnel and are as detailed our Statement QuaiijlcatiorLS, except for .,~fr. William -who is no longer with the }inn. • RFQ 52~11/12 o Ten (1 0) client referen~es The are as contained in our original Statement o Project Team licenses, eeroficatio:n.s, :resumes ..,,.;,,,.,, team and resumes are as (,':lmtained our original LllLUt::l'nt::<•u (!{Qualifications, eJ.::ceptfor Mr. William -1ovho is no longer the firm. o Florida Department of Profes:do:wud Regulation License Plet::kw~ see Department of Rc;gulation lice:ns.es, as well a .. li' FDOT & Miami-Dade Counry Pre~qualijication Stantec, included in Attachments. o List of aU projects in tbe past five (.S) yean-SF 254 o:r 330 would suffice The list in the -254, are as included in our ''"'"['"''''" Statement o List of aU legaJ dai:ms in tbe past five (5) years in the past years is as included in our ""'""'" Statement o Project Manager mnst have a minimum of five {5) years of e%pt'!rience and haw completed three (3) simihn" projeC!ts v .. ,.,,,,"1 Manager experience is as detl2iled in our original Statement of Qual(ficatiom. o Minimum of fi.ve (5) simHu p:rojeds -please provide scape af iii!'Ork, client contact infunnation" pmj«:t cost, and project start and completion dates Similar are as our original Statement ofQual~/ications. o Min:in:mm expnience and quaLifications (see Attachm·ent A) A!inimum experience qualifications are as in our Statement o P.rojed Methodologies and app.ro~ch The methodologies approac/1 are as Stantec agrees to the contract te.rn1s and conditions of current contracts being asstgned for RFQ 07/08, RFQ 35-10/11 & RFQ 04-11/12. Regarding RFQ 52~11112, we have a few minor as previously detailed to by Mr. Sean Compel. 456 457 is out: homed under thee .. to the public through o :212812015. 228201501954 458 ~o off:f!r ~"lifieerina services Chopter·•i11~ flori<lo Statutes • CA lJ~. Noi . 27013 STAT! OF FlORIDA OF SUSUNESS AND PROFESSIONAL 459 ¥Ill FtORI&ASOD. ' \"' \ \ Miami-Dade County, Florida Internal Sarvices Department PQ Ceriiflcat~ No.: 200~112167170..o4 A,pprov~t Ol!ltli!l: 41:312013 Expntion Dam; 413012014 ·Stant& Consulting Services fnc. Tbi.r mtifimtt u hl.nl~ i.rJU~~J tu: 90 1 Ponce de loon Blvd~ Suite 900 Coral Gables. FL 33134 The abow name appUcant Is pr~ualil'ied ro provide profeulorml JIJE servle1eS far Mlaml-Daoo County for !he period indiC<ll~ abCI'W. The npplicam tms oommiled its flrm t<i comply 'IMih the ~~~ OO&'lditicms limed beh':~w: 1. Pra-Oualiftoo to offll!lr profes.a!onaf seNicoo only rn the Mlami--llade County tecllnk:al categooes shown In the a!±arooo •struamant of Technical QIJii:llificatic.M$." Atl technical category restrictions must be ~trieUy oooored to.· 2. Pre-Oualfflootron Cmtlficatlon (PQC regls~n into one strcwnlined the technical e&rtffi~tion. affil'!'mltive action plan, and vendor esulting In the issuane& of a P~ualiftcatfon Certificate. :3 .. Rllilport any signfficant changes, such as oonmct pemon, qualifier, ownership, ftrm address, etc.,,to Professional · S<ll\rvlces Qrif~eation l~ed at 111 NW 11fA Stn;et, Suite 1300, Miami, fL 33128, within 30 days of sud'! a cl'iange. Fallum tn report said chang~ to the Cc.nJnty result In the Immediate :suspension or terminatiOn of your firm's P'l'e-Qualif~eation Certfficatlon. 4, Firms are responsJb!e for observing and adhering to Mlami·Oade County's Admirtis:trati\fe Order 3~9 ~standard Pf'O~ for construction of capital improvemente, acquiSition of professional services, oonstructioo o<:mtracting, cl'l~e orders and reportirtg", 5. Fatlura to renE~W your firm'!li PQC at least thirty {30) days prior to your firm's ourroot expiration date may result in the suspension and/or terminatkm from Ccunty programs and current or Mum contracts unm your firm's P!'&- Oualif~Cl!loon Certme:atlon has been properly renewed. My tapses in the oertifleatlon of any of~ required PQC areas (vendor registration, affirmat.i've adlon ptan, or teehn!~l certiftoatlon) wtll result in a lapse in your PQC. Firms are :respoosible for oooeNlng <?!lid ad he ring to all submission deadlines. 6. Any reMwal applio:atrons and/or liiUpportlng doouments submitted after the application deadline might delay the revfew of your firm's PQC eertificatlon to the next available Techn~l Certiflc:l!dlon Committee meeting. The PQC application, submms!on deadi!nes. and the Tet'lhn~i Certification Comm~ meeting calendar can oo found on Proourement Management "~~Veb . site loomed athttp~.mfamldelB·ii9"/lnternatsealc.isl!:u:~ gyaiUfitatfon-qrttfit;~tl'Qn.asQ 1. Permit Miamt~Dade County rnpresel'ltattves to nave~ during normal buslooa. 11oum to audit boob :r»nd records to \f1ltrify information submittoo wil:h thfs applicaoon. Thls fight of access shall oommenca on ffie approval date of this certlfk:ate and ah~ll tel'l11im:il:e on tts expin:mon d!iite. Please ~ th<~t If at any tlme Miami..Oade Coo11ty's has reason to believe ttlm any parson or firm ms willfully and knowtngly provided lnconect Information ot made false stt~temerats, ·the C()lJnty may refer too ma~r to the State AJ:tomey's ~ and/or other Investigative agendas, initiate debarmant procedures, and/or pursoo saMtlons or other legal remedies in accordafi.Oiii with Mismi~Dooe County pot&:;y aMior applicable feder;al, state and focal lam, / Nu:hia Jarquin Professional Servicu Certifleatfon 31~1$.5631 460 Miami-Dade County Internal Services Department Statentent qfTechnical Certification Categories Firm: STANTEC CONSUlTING SERViCES lNC. 901 Ponce de Leon BlVd Suite 900 · CATEGORY t:!Q;. Coral Gabfes, FL 34 1Jl1 TRANSPORTATION PlANNING~ URBAN AREA AND REGIONAl TRANSPORTATION PLANNlNG ::un MASS TRANSlT SYSTEMS~ MASS TRANSIT FEASIBiliTY & TECHNICAl STUDIES ~tOO MASS TRANSIT SYSTEMS· MASS TRANSIT SAFElY CERTJFICATKiN FOR SYSTEM ElEMENTS ' 3JJ1 HiGHWAY SYSTEMS· SfTE DEVElOPMENT AND PARKING lOT DESIGN :t02 H~GHWAYSYSTEMS-HIGHWAY DESIGN 3.03 HIGHWAY SYSTEMS-BFUDGE DEStGN 3.04 HtGHWAY SYSTEMS-ENGINEERING STUDiES 3,()6 HIGHWAY SYSTEMS -CAlMiNG 3.00 HIGHWAY SYSTEMS-SIGNING, PAVEMENT MARKING, AND CHANNEUZATJON .3. 10 HfGHWAY SYSTEMS~ liGHTING 3.11 HIGHWAY SYSTEMS ·SIGNALIZATION 5.01 PORT AND WATERWAY SYSTEMS~ ENGINEERING DESIGN 5.09 PORT AND WATERWAY SYSTEMS-ENVIRONMENTAL DESIGN 6.G1 WATER AND SANITARY SEWER SYSTEMS-WATER DfSTR!SU110N AND SANITARY SEWAGE COLLECTION AND TRANSMISSfON SYSTEMS 6.02 WATER AND SANITARY SEWER SYSTEMS-MAJOR WATER AND SANITARY SEWAGE PUMPING FACILITIES APPROVAl EXPIRATION OATE ~ 41312013 413012015 413/2013 413a/2015 4/:312013 4/3012015 4/3.1:2013 4/3012015 413/2013 4/30/2015 4/3!2013 4/30!2015 413f2013 4/3012015 4!312013 41'3012015 4/312013 4/3012015 413/2013 41301:2015 41312013 4130/2015 4/312013 4/3012015 Luisa M. Mlllan, R. A, Chsirpemon Chief, Professional Services Division lmerna! Slli:mlm De-partment 461 Miami,..Dade County lntemal Services Departntent Statement of Technical Certlficatiolt Categories Firm: STANTEC CONSULTING SERVICES INC. 90'1 Ponce de Leoo Blvd Suite 900 Coral Gabtas, Fl 33134 CATEGORY NO: CATEGORY DESCRIPTION 6.03 WATER AND SANITARY SEWER SYSTEMS-WATER AND SANITARY SEWAGE TREATMENT PLANTS 1Ci.01 ENVIRONMENTAL ENC31NEER~NG-STORMWATER DRAINAGE DESIGN ENGINEERING SERVICES 10.03 ENVJRONMENTAL ENGINEERING~ BIOLOGY SERVICES 10,05 ENVIRONMENTAl ENGINEERING~ CONTAMiNATION ASSESSMENT AND MONITORING 10.10 ENVfRONMENTAL ENGINEERING· COASTAL PROCESSES AND OCEAN ENGINEERmG 1Ul0 GENERAl.. STRUCTURAl ENGINEER~NG 12.00 GENERAL MECHANtCAt ENGINEERING 13.00 GENERAL ElECTRICAl ENGINEERING 14.00 ARCHITECTURE 16J)O GENERAL CML ENGINEER~NG 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 18.00 ARCHITECTURAL CONSTRUCTION MANAGEMENT 2200 ADA TinE II CONSULTANT APPROVAl EXPIRATION t!AI.t QATE '41312013 4/30/2015 41312013 4/3012015 4{312013 4/3012015 4/3/2013 4/30/2015 4/312013 4/3012015 4/31:2013 4130/2015 41312013 413012015 413/2013 4/3012015 4/312013 4/3012015 Luisa M. Mi!an, R. A, Chai'person Chief, Prof&$$1onal Service:s DMskm tnternai_Selilices Oepartmem 462 Florilltl IJej1art1nent t~f TraJ1S11tJrtation HI< h o.,t Oil (,0\ I il\(}1{ Robert , PE, V1ce President STANTEC CONSUlTING SERVICES, 901 Ponce Deleon 900 Cora! Florida 33134 Dear Me 15,2013 Transportation has r""'·''"'"''"'n is adequate to 2 3 and Environmental (PD&E) '-'U·"""·"" ~Roadway 3.'1 3.2 Group 4 -Highway Design - 4.1,1 4:L2 4.2 1 - 3 5 -Concrete Design-Steel Design -Segmental 5.1 Bridge 5.2 ,. Movable Bridge -Complex Bridge Inspection 5A -Bridge load Rating 6 -Traffic Engineerlng and Operations Studies -TraftJc Engfneering Studies S\gnal Timlng 6.2 6.3.1 - 6. Transportation Systems Analysis and Design Transportation Systems Engineering Systems Communications 7 -Signing, Pavement and -Signalization 463 .\~,\~T!ll'R\\ Ill, 1'.1':, S!::CRFI .. \1{\ package and 8 ~ Survey and Mapping 8. 1 -Control Surveying 8.2 -Design, Right of Way & 8.3 .. Photagrammetric 8.4 of Mapping 9 Material Testing and Foundations 9.1 Exploration 9.4. 1 -Standard Foundation Studies 10 Engineering 10 1 -Roadway Engineering lnspecUon 10.3 -Construction Materials 10.4 -Minor Bridge & iO .. !i 1 -Brldge CEI· Concrete 1 2 -Major Bridge CEI • Steel Group 13 13 3 13.4 13.5 13.6 7 • Engineering Contract -Planning 14 ·Architect 15 -Landscape Architect and Management of June 30, 2014 at such as due to Department's requirement on overhead 45 to 60 days to your update On the of data submitted the Department has approved accountlng rates b-elow as acceptable purposes, Home/Branch Overhead you Facllitles Capltai Cost of Monel:' tl494°/¢* Overtime Premium Reimbursed rate .. These costs office. be , please 464 Lorraine E. Odom Professional Services and considers Direct Ex~tense 09.91% (Home)* 14J30% (Field),., on contracts Terrance N. Glunt PE Senior Proiect Manager, Civil Mr. Glunt has over 36 years of experience in the management and administration of engineering divisions responsible for all aspects of design and construction of government and agency related facilities including marina and boating access facilities, recreation complexes, urban and Interstate roadways and bridges, utility corridors, municipal public works and administration facilities, nuclear power plants, landfills and aviation facilities throughout Florida and the United States. His specific experience includes engineering design and coordination of multiple proieds, construction engineering and inspection, quality control I constructability review, rigid and flexible pavement design and analysis, hydrologic evaluations, geotechnical and environmental studies, DRI and PD&E involvement, environmental and drainage permitting, preparation of grant applications and coordination of numerous miscellaneous civil and structural contracts with Stale, County and Municipal entities. Mr. Glunt has been responsible for the start-up of numerous offices for his current firm, as well as for his previous employers; involving research and development, establishment of budgets and of all facilities, equipment, vehicles and staff. He has been a Resident Engineer on FDOT construction proiects in numerous Districts and the Engineering Manager and Director of both Geotechnical and Construction Divisions for a medium-sized engineering firm. EDUCATION Bachelor of Science in Civil Engineering, Florida International University, Miami Beach, Florida, 1985 Bachelor of Science in Environmental Sciences, Juniata College, Huntington, Pennsylvania, 1976 Certification, Threshold Inspector, No. 0950, 2012 Certification, ACI, Level 1 field Technician, 2012 OSHA, 40-hour Hazardous Materials Technician, HAZMAT, 2012 REGISTRATIONS Professional Engineer #40130, State of Florida 465 PROJECT EXPERIENCE Bridges 1Oth Avenue North Palm Beach Over the Keller Conal*, Florida feSI~OII'SIDIE' for the a rehabilitation oF an existing 5 lane tensioned traffic with two new ! 25' steel modifications included the removal of the sidewalks and ovtside prestressed the pier bents, imtallation of new ""''·'trr><.;e,ri W<CIDW·nf/; and rJrcii11ClnA ""''"n'"'·" /(()(JrJ\A!CiV rJrrlinr'"" modi fica lion,; lcnr·,mllm'" hundrail installation, sidewalk block wvetment on the canal banks for slope protection and pavement ond signage. Permits were from Loke Worth Druinage District For inclusion in their canal R/W. Lugo Avenue Bridge Abutment Remediation I Rehabilitation*, Coral Florida for the of erosion For the abutments. CEI Construction Services, Non-Interstate Terminal Replacement* for removal and rep/acem,en Barrier of nee u Senior Nicodemus Senior Geotechnical Engineer for of earthen dike and for SFWMD field station access. Evaluation included flow net St. lucie Boulevard Bridges*, Florida Senior forensic for the determination of the cause of failure of three revetments construction. The investigation resulted in rehabilitation of I 000 lirwor feet of Foiled sheet wall. The repair scheme included a combilwtion of tie-backs and rubble rip-rap revetment in an en•;wrmnnmltnl'lv sensitive wetland. .,;,.,,hhr"+"v'ri signs, a the east side lo sepom/e this site from ,_,,,-,hlv"inn comm<~rcial site, a central turf area 511rrounded and on--street This r1llows for access to a future C. 12 Conal Multi Use Recreational Tmi/ *denotes catnm1eled with ather firms 466 Design Review of Facilities & Processes Reviews for Various FDOT or five C. I.?. decks on DOT beams, drilled shafts and MSE walls; 1 95 I US /7 ·~·~,,·rl,.-,,"~~ wastewater collection lines to main treatment Road; Primo Vista Boulevard over St. Lucie River, Two 4-Lane beams, one bridge with six bents four over woterway; Evon's Aiartin County over St. Lucie River, 4-Lane driven over woterway; Port St. Lucie Boulevard over St. Lucie River 4-1ane Bridges: deck on DOT beams, Four bents each an driven ""'vinnhiA waterway; SR 7 Braward County, 6-Lone siCJV·il1·oloc'e forms supported on steel Rood Bmwarci Drainage and Stormwater Planning & Design Port Everglades Container Terminal Stormwater Well*, Fort lauderdale, Florida Senior Geotechnical for the of a 24 inch diameter slormwoler well in corgo conloiner terminal. 'vVe/1 was in povement orea with all components below ue>~u'''"'" and Broward EPD and FOE?. Full scale flow testing was in Field to and copadties. r~ce Senior & Master Plan*, Coral master improvements needed to in the corridor. The involved the relJiacetTJei··JI system and components of the project. Three resi&mtial sub..c!ivisions bordered the project and each had requirements for borders and entrance Features. The was widened ol various locations to accommodate turn Iones into these communities. Two separate districts bordered the corridor and involved permitting both agencies for storm water collection and eventual outfall into their facilities. Project to accommodate occess to resident Sanford Avenue Beach, Florida & , Palm in Charge for this project which included the full re· of a two-block section of Sonford Avenue in the Town of Palm Beach. The design included of the mr"'"'""' system, water,. sewer ond street components of the Town of Palm Beach low curb elements and new existing while still charactt,ristics. of the sanitary and water systems had to lie in to existing facilities at eoch end of the project, while mrw"''"""" piping and A1AS structures. olso included cable television, Bel/South and FP&L to eliminate over/wad service lines. to Basins "A" and "B" Stormwaler Stations*, Florida Senior engineer for these projects which both 40,000 gpm line shaft axial flow pumps with gas engines with a lhird pump for operate in on automatic mode and start when storm stage levels rise, The includes a reinforced masonry structure that houses the engines, controls generator and communications equipment. The projects were comlructed within a combined of $3.5 million. * denotes proieds corJJp,fetE>d with other firms 467 Basin D-8 Drainage Basin Florida , Palm improvements. Additional duties included surveying, locates, relocation, invosligalion, and permiffing the South Florida Water District Plantation Midtown Florida ClA/QC officer for this system of o mixed use area with Commercial and Institutional The purpose of the was to a backbone system that would allow future and retiev'elc,on1en in accordcmce with the Moster Plan. The existing system was modeled using /CPR with information from available records and survey of the existing drainage system. Future de,tei1Jornen was also modeled in accordance to the maximum omml<mnnen of the area, The recommends ,.,,,rwvmA improvements that would ollovv the future and creates Wl integrated system to he maintained by the These recommendations were coordinated info current and future CIP projects in order lo minimize construction in the urea, The "'""""m'.'" in the ond construction plom for improvement.; were Old Plantation Woter Control District, SFWMD ond the of Plantation. Basin D-2 Stormwater Station•, Palm Beach County, Florida Senior design engineer of o storrnwater for the Town of Palm Beach in Palm Beoch "'''"'r'mlinn of the large reinforced concrete discharges thru three to o d":c11nrrm structure and then via a into Lake Worth. The control houses on 800 kW diesel '"""'"'"'"n'~" Control Center, the Aulomalic Transfer Stotion Control Pone!. u Environmentcd Engineering Environmental / PD&E Studies*, Florida PD&E Studies for the projects: PD&E M'''"'ar"Jr project on US I in Pine Drive from Rd. to the .v»Mmn« Expressway in Broward PD&E for /-·/allandale Beach Boulevard from I 95 to West of SR 7 in Broward PD&E For Okeechobee Road west of Le Jeune Rood in Dode PD&E for NW 36th Street from NW 27th Avenue to PD&E Line to for Roosevelt Boulevord in Facilities on in Monroe Geotedmicc:'li Investigations Geotechnical , Florida Geotechnical invostigotion for pavement, systems, foundations and woll for various FDOT ond lllll'!I"CflCl!IOB for Broword Broword and Polm Beach Counties; At/untie Avenue extension with Broword Lontana Road, Prima Vista Boulevard with St. l.ucie Martin Grade Road, Martin Counly; Geotechnical Investigation for $250 million solid waste ot Central Sanitary Landfill in Broward Maintenance Facilities Pine Island Maintenance Florida Director h1r the engineering and architecture permitting and coordination for this 50+ ocm works The project included mason1y construe/ion, on·site retention ond septic systems, major eorthwork and foundation improvements ond hazardous materials storage considerations. *denotes 468 Broward Traffic Engineering Maintenance Florida permitting ond coordination for this 2. I million works for the Traffic Center. The project included tilt and comrnunicotion sensitive areas and hozardous molerials storage comiderations. Marine/Waterfront Engineering Matheson Hammock Marina Pier KeialalcemEmts Dade florida ,Miami- services, water, sonitmy, and electrical and fire protection were piers and for future of four other piers. The existing bulkheads were rehabilitated or as needed due to corrosion. A.ioinlenance was a and fill permit for the moin channel as well os the individuol channels for eoch pier. Six boat ramp piers were with new precast concrete piers and Crandon Park Marina Pier Biscayne, Florida Project manager for project that included of fou1· of the concrete fixed piers with concrete docks. New se1vices, water, sanitary, cable and ""'"'wr"me. electrical and fire protection were for these piers and for future of four other piers. The existing bulkheads were rehabilitated or as needed due to corrosion .. Maintenance was o ond fiil permit for the moin channel as well as the individuol chon nels for ench pier. boa! romp with new preens! concrete piers and Old Man River Diversion Project, Corps of River Basin*, louisiana for installation of concrete for and rip-rop diversion structures the River. Duties also included inspection of sheet rnoss excovafion ond operations and tremie concroto. nee u Sonior Cap's Restaurant*, lighthouse Florida witness in over construction oF st~awall and rip- rap revetment odiacen/ to mitigation and private dock and marina. Lauderdale Yacht Basin*, Fort Senior for studies for DR/ for maior commercial marina Duties included scour fuming basin seawall, ramp and as well as ovemll for cmd fill for on New River. Senior for the and fill pro;ects in H 1 mui?>rrlniA Point, Deerfiled Beach, Boca Raton, Rivera Beach, and Jensen Beach. Palm Beach Seawall , Town of Palm Beach, Florida Senior for the rehabilitation of 2.5 miles of seawall the Atlantic Ocean. The included the evoluation of existing foiled sections. The of repairs included various repair types. These included deadmen and nlnr"""'"'"'of rubble Tamarac Canal Bulkhead Florida , Tamarac, ~ ood conslrudion administration for the rerlta,:erner end bulkhead and culvert crossings for the of Tamarac at different locations the as part of the first of a Tamarac mointoins and controls the canol system within the limits and due to and erosion city street crossings, to repoir seawalls and bulkheads ot their crossings. The firm wos selected and and permit the rec>lac:errrents * denotes projects corna!eter! with other firms 469 Alsdorf Park Boat Ramps*, Pompano, Florida Project Engineer in charge permitting and constmction odministrolion for the rehabilitation of o thme boa! ramp The proiect included reconstruction and approaches, boat trailer space porking lot, and irrigation uo,Drcrdc•s, oroH10D'<1 area, ramp Beach, Deerfield Island Boardwalk and Docks*, Deerfield Beach, Florida Project for the of a 2000 IF boardwoik '"r"n~"m"n' is service, ali construction materials hod to be in on Phose II included marina ADA- accessible docks, and additional oil the pork amenitie5, res/rooms, kiosk. Burl Reynolds Park Boat Florida Staging Docks •, Jupiter, for the and permitting of 285 LF of new staging docks in the ICWW for access to the new boo/ romps, Design ACOE for seagross mitigation and mangrove protection. included SPWMD, PDEP and ACOE permits o/ong a variance letter from NOAA/N!v1PS. Construction vsed wood timber grating to allow to pass propagation. for seogross nee ..,,.,,.,.,.,.," Park*, Jupiter, Florida Project manager For development of new boat ramp in northern Palm Beach Duties included sire permitting and construdion administration For this 30 acre natural pork Indiantown Rood and the ICWW. issues included of o tortoise reserve, mangmve and seagrass mitigotion, with county manatee protection program, storm water runoff and an FOOT permit for the entrance off of Indiantown Road .. The project included 4 boot ramps, concrete dock piers and staging docks, concrete .seawoll protection, educofion kiosks, picnic restroom facilities, for 50 boat troilers and on site and systems. Materials Testing Material Investigations* Moteriol investigation for pavement ond utilities, drainage systems, foundations and retaining wall for various FOOT and Beach; bridges in Palm Beoch ond Morfin of Atlantic Avenue in Beach; Federal Rolon; Broward Corridor Military lnfrastrudure West Naval Air U.S. Department of the Resident for control inspection and testing of $14 million con_slrucfion improvements of on active oirfield. included '""·'v"rnn of all construction inspection, testing, surveying ond functions. Duties included drawing review, approvol, mix as-built contractor monpower projections ond pay estimates. Received commendation From the US of the Novy. also included installation of new storm droin system with control devices ond retention amos. West Naval Air Station for U.S. Deportment of the *denotes with other firms 470 Mixed-Use lakes*, Florida Senior Geotechnical Engineer for rlmtA!cw>m Mosier Excavation Plan for 1200 acre residentio! and mitigotion oreos, and volume compute~tions for 150+ oreos of lakes along 1-75. eXCCIValed shelves for mitigotion orem, computations for 180+ oreos of interconnected lo.kes. of Route Phase I*, and Greenway Transit Florida for the master engineering and construction odministrotion of this proiect !hot consisted of the entire centro/ bus!ne.1.> district of the City ond creoting a mixed use orea conducive lo use wJd occess. The project included the recoMtruc!ion of 2.5 miles of mixed use textured crosswolk.s, le~nd.«:or>etd medions, and a roundobout at o The firm' will be the improvements to follow in the midtown Grea. We hove worked with the in the route thot the first of the bus frons it will operote os well as them reseorch the different type of frons if vehicles amilobie to them. In hond in hand with the on this issue, we are ensuring that the we deliver meets the needs and expectations for the entire scope of their greenway proiec!. Municipal North Miami Beach Public Works Facility*, North Miami Florida Manoger for construction odministrotion of !hi.> 1.5 million dollar coordinolion of o/1 inspection, testing, poy claims schedule review ond certification u s(:~nior of to existing facilities with recommendations for repairs. Parks, Open Spaces & Cemeteries Shenandoah Park*, Florida Project Manager for this project, master and construction management. This active included tennis end basketball courts, in-line rink project which included construction management lor oclive ond possive construction utilities and camtruclion inspection services. Deerfield Beach Middle School Park •, Deerfield florida aquatics over 300 vehicles. Duties include master and construction administmtion .. in hlr the management of a 36<.Jcre recreational bmebo/1/multi-use l)e/d, two soccer basketball and tennis and associated over 500 vehicles. Duties include modificotions and permitting. • denotes structural 471 vv.nt"'""''~"'~" Park*' Projecl manager for ""''""!romnm·,t in northern Palm Beach permitting and construction administration for this 30 acre natural pmk Indiantown Road and the ICWW. Permitting issues included of o tortoise reserve, mangrove and seagrass mitigation, with county manatee protection program, storm water runoff and an FOOT permit for the entrance off of Indiantown Road. The project included 4 boat ramps, concrete dock piers and sloging docks, concrete 5eawall protection, education kiosks, picnic for 50 boat trailers and an site Dora! Park*, turf FIFA soccer tennis courts; bmketboll courts; bocce and other lawn sports venues; toumoment snnd "''''""'"'"' community center; picnic ADA "'"'vnmc,nu.,, with fitness stations; areas; and a covered off For students accessing the adiocent school properly, The firm had to o program to facilitate the removol of !rash and debris from the site which had been estoblished as a class /I/ landfill prior to "'"'""'''"''m"n The covered student off was structures to meet current South Florido wind criterio. rhe turf soccer fields involved the installation tensile fobric as well as an under·droin system thot would allow the Fields to be on in less than an hour after o major rain Also included were bleochers establisfred on both side.> of eoch field for tournoment Roadways SR Road Interchange* Resident Engineer for the construction of o new $12 million "'"'"'""""' incorporating steel MSE wolfs, the state of Florida. construction of$ 8.3 was classified as major. nee continuous cn';Hn-rm.K<-> included extensive unt PE F'rojecl also included relocation city water, storm water, and as well as inslallotion of new storm water lines and arc:tmc:Jce injection wells. CEI Construction Services Resurfacing of Beeline from MP 0.0 to MP 8.4* ao;oro·xmnatelv 8 miles of JntJorriOClrll'!l·' ramps. Work WGS wit/J mGjor MOl ramp closures, notification to the and constant coordination effort with PHP, the Contractor and the PJO. CEI Construction Services of Florida's Turnpike from MP 217 to MP 242 * Resident Florida's with serious CEI Construction Services Resurfacing of Florida's Florida Resident Florida's from MP 21 7 to MP 242 *, Osceola in tourist area. with Senior of roadway construction of a 2-mile section of US I that involved and retaining and barrier wa/J siqna;r;zcttlon, striping, signoge, curb and CEI Construction Roadway Resurfacing* SR 994 Senior Project Engineer for all of a S-mile section of SR 994 signage, asphalt, embankment, MOT supervision, and railroad crossings. *denotes Roost Drive) striping, joint repairs, 472 Woodside Drive Drainage Florida , Coral Springs, fer this covering a one-mile- of Carol The project arc11nruw system, as well as improvement recommendations. &* for supervision of all construction nor.'rt"'"'v recanslruclion project that CEI Construction Services SR 834 (Sample RoadJ &* Resident for supervision of all construction o!cice.ment of concrete paw~ment, larJdsca;~m,:; and Primo Vista Boulevard •, St. Lucie County, Florida Senior Geotechnical Engineer for the of 1.2 miles of four-lane an caastol mitigation areo. The project involved the use for stabilization of muck, of rubble rip-rap wvetmenl A flow net evaluation was performed of channel slope protection for twa AASHTO Girder structures. St. lucie County Beach Access Florida , St. Lucie Manager for the and construction management of five beach access proiecls For St. Lucie Projects involved lots an beach side, and/or gotes, wooden boardwalks at dune crossover points and information as needed at various locations. Some of the were pre-existing but with no defined access walks and others were new locations with no former access. Sports, Recreation & Leisure Coral Gun Range*, Coral Nln"""'"'"~' far the master canstruC'Iion monagement for new gun ranges, enclosed utilities, and ""'""-nnmn nee Senior , Palm Beach project which and construction mo'naaei7JeiM of a 10- Additional services permitting, on-site visits and inspectiom. Florida Project Manager for this project that included the rehobilitation of o !2-court hord-courttennis for the Town of The cout1s were resurfoced ond the remainder of the was with new netting, and shade structures. Coconut Creek Recreational Center Coconut Florida in for this Recreational Center in the of Coconut Creek. The firm the master ond construcfion marwgement services for this oclive included three lot lots,. exercise stations, shelters and a vo,l/e\'.bCII/ cow1, in addition to the construdion of 168 linear feet of boardwalk an environmental wooded area. The boardwalk floor is constructed of a plastic lumber mwwfactured from recycled and the are mode of pressure treated timber. Florida Project project which included and construction management of interactive warterolo'v theme utilities, and concession area. to allow installation of some within an existing easement located on the property. * denotes projects corTiol'eted with other firms elements 473 Structural Engineering Studies* Project for investigation of roof integrity for numerous structures for purposes of relino,ncina operotions. Duties included inspection, evaluation and recommendations to lenders. Water methc,doloo•ies far well. Coordinated with well heod and treatment designers to incorporate into overall project. Oversaw field testing of well flows instollation to insure capocity. Ferndale 20" Wa!ermain /24" Force Main*, Beach, Florida This Included the and nPrm•Mrw,., inch diameter ductile iron water main olong with 200 LF of 24" Force Main. Included two oerial canal crossings of the Lake Worth DminGge District cands and direct burial piping Loke Ida Road~ Coordination with three other projects was needed for tie-ins at those locations. the included detGiled Investigations of utilities ond route of the moin. The project construction cost was The firm also construction administration conslruclion final certification to PDEP ond PBCHD. RESOLUTIONS TO BE SUBMITTED 474 THIS PAGE INTENTIONALLY LEFT BLANK 475