C7U-Approve Assignment To Existing Agreements w- C3TS To Stantec Consulting ServCOMMISSION ITEM SUMMARY
Condensed Title:
Approve Assignment to Existing Agreements between the City and Corzo Castella Carballo Thompson
Salman, P.A. "C3TS" as Assi nor, to Stantec Consultin Services Inc. as Assi nee
Maximize efficient delivery of services
Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Customer Satisfaction Survey
indicated that 79% of businesses rated recently completed capital improvement projects as "excellent"
or "good."
Item Summa /Recommendation:
The City of Miami Beach entered into Professional Services Agreements with Corzo Castella Carballo
Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3) solicitations:
• Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-approved list of
Professional Construction Engineering And Inspection (CEI) Firms to provide various CEI
services on an "as-needed" basis;
• RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria package for
the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project, and
• RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria package for
the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement Project.
The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for Professional
Construction Engineering And Inspection (CEI) firms to provide various CEI services on an "as-needed"
basis.
C3TS has notified the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the
result that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see Attachment
A).
In its due diligence, the City requested Stantec to provide information on how the firm meets the
minimum requirements for each of the agreements to be assigned (see Attachment B). Stantec's
qualifications comply with the requirements of the relevant solicitation and are nearly identical to those
proposed by C3TS at the time of their proposal reviews and awards. In addition, Stantec was asked to
confirm whether it would agree to all terms and conditions for each agreement and that the same project
team members proposed and approved by the City for each agreement are still in place (for the
exception of one individual). Stantec also affirmed that it will comply with all terms and conditions
presented in each agreement (see Attachment C).
RECOMMENDATION
Based on Stantec's confirmation letter, due diligence review by the Procurement Division and
confirmation by the Office of Capital Improvement Projects (CIP) that C3TS I Stantec performance has
been acceptable, the City Manager recommends to the Mayor and City Commission to adopt
resolutions assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to
Requests for Qualifications 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon successful
ne otiations.
Advisory Board Recommendation:
IN/A
Financial Information:
Source of
Funds:
Amount
1 N/A
OBPI
MIAMI BEACH
448
Account
AGENDA ITEM _C_.:...if_fA._:.__
DATE 7-17-(3
!\ '~ jt'\ f\ I~ I BE· AC v \ r'"\ I v \ .. · ,_ ·
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Matti Herrera Bower and M bers of the.tPity Commission
l
\
FROM: Jimmy L. Morales, City Manager
DATE: July17,2013 (
SUBJECT: APPROVE ASSIGNMENT TO E ISTING AGREEMENTS BETWEEN THE CITY
AND CORZO CASTELLA CAR ALLO THOMPSON SALMAN, P.A. ("C3TS")
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE):
1. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
AGREEMENT FOR THE ESTABLISHMENT OF A PRE-APPROVED LIST
OF PROFESSIONAL CONSTRUCTION ENGINEERING AND INSPECTION
(CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES ON AN "AS
NEEDED" BASIS (NO. 01-07/08) BETWEEN THE CITY AND CORZO
CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS") (AS
ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013.
2. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA
PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR
THE PALM AND HIBISCUS NEIGHBORHOOD RIGHT-OF-WAY
IMPROVEMENT PROJECT (RFQ 35-10/11) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS")
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013.
3. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
PROFESSIONAL SERVICES AGREEMENT FOR A DESIGN CRITERIA
PROFESSIONAL TO PREPARE THE DESIGN CRITERIA PACKAGE FOR
THE SUNSET ISLANDS 3 & 4 NEIGHBORHOOD RIGHT-OF-WAY
IMPROVEMENT PROJECT (NO. 04-11/12) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS")
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), RETROACTIVELY DATED NOVEMBER 30,2013.
4. A RESOLUTION APPROVING AN ASSIGNMENT TO THE EXISTING
AGREEMENT FOR PROFESSIONAL CONSTRUCTION ENGINEERING
AND INSPECTION (CEI) FIRMS TO PROVIDE VARIOUS CEI SERVICES
ON AN "AS NEEDED" BASIS (NO. 52-11/12) BETWEEN THE CITY AND
CORZO CASTELLA CARBALLO THOMPSON SALMAN, P.A. ("C3TS")
(AS ASSIGNOR), TO STANTEC CONSULTING SERVICES INC. (AS
ASSIGNEE), UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
449
Commission Memorandum -Consent to Assignment C3TS to Stantec
July 17, 2013
Page 2 of 2
KEY INTENDED OUTCOME SUPPORTED
Ensure Well-Designed, Quality Capital Projects.
ANALYSIS
The City of Miami Beach entered into Professional Services Agreements with Corzo Castella
Carballo Thompson Salman, P.A. ("C3TS") (Assignor), pursuant to the following three (3)
solicitations:
• Request for Qualifications (RFQ) No. 01-07/08, for the establishment of a pre-
approved list of Professional Construction Engineering And Inspection (CEI) Firms to
provide various CEI services on an "as-needed" basis;
• RFQ No. 35-10/11, for a design criteria professional to prepare the design criteria
package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement
Project, and
• RFQ No. 04-11/12, for a design criteria professional to prepare the design criteria
package for the Sunset Islands 3 & 4 Neighborhood Right-Of-Way Improvement
Project.
The City is also in current negotiations with the firm pursuant to RFQ No. 52-11/12, for
Professional Construction Engineering And Inspection (CEI) firms to provide various CEI
services on an "as-needed" basis.
In a letter dated November 30, 2012, Mr. Ramon Castella, Vice-President of C3TS, notified
the City that Stantec Consulting Services Inc. purchased the assets of C3TS with the result
that the ongoing business and affairs of C3TS are now wholly owned by Stantec (see
Attachment A).
On June 27, 2013, the City requested from Stantec to provide information on how the firm
meets the minimum requirements for each of the agreements to be assigned (see
Attachment B). In addition, Stantec was asked to confirm whether it would agree to all terms
and conditions for each agreement. On July 8, 2013, Stantec confirmed that the same
project team members proposed and approved by the City for each agreement are still in
place (for the exception of one individual) and that their qualifications are the same as those
evaluated at the time of award by the City. Stantec also affirmed that it will comply with all
terms and conditions presented in each agreement (see Attachment C).
CITY MANAGER'S DUE DILIGENCE & RECOMMENDATION
Based on Stantec's confirmation letter, due diligence review by the Procurement Division
and confirmation by the Office of Capital Improvement Projects (CIP) that C3TS I Stantec
performance has been acceptable, the City Manager recommends to the Mayor and City
Commission to adopt resolutions assigning Stantec Consulting Services, Inc. the
agreements awarded to C3TS pursuant to Requests for Qualifications 01-07/08, 35-10/11,
04-11/12, and RFQ 52-11/12 upon successful negotiations.
CONCLUSION
The Administration recommends that the Mayor and City Commission adopt resolutions
assigning Stantec Consulting Services, Inc. the agreements awarded to C3TS pursuant to
Requests for Qualifications Nos. 01-07/08, 35-10/11, 04-11/12, and RFQ 52-11/12 upon
successful negotiations.
JLM/MT/KGB/DM/AD
T:\AGENDA\2013\July 13\Procurement\Consent to Assignment-C3TS to Stantec-MEMO.doc
450
Engineer&
Archite~;h
Planners
E!Hl005022
AAC002142
November 30, 2012
City of Miami B~ch
Capita! Improvement Projects
177 -1 ih Street
Miami Beach, 33139
Nh:~. Kathle G. BI"'C!ks. AICP, City Managtlr
Cont~c:t: POJBPO 014004-53m StrHt Restrooms
POIBPO 015574-6111 StrMt & Ocean DriVe Res.trooms
POIBPO 018213-flamingo Park Football Field & Trnc:t Project
PO/BPO 019515-Neighborhood 13-Palm & Hlbill;cus isla:nds.
V14 Reao~utk:m -Sunset Jsla:nd!S 3 & 41mprovements
POIBPO IJ1!!19J! -Review Contractor's Claim South Pointe Ph U
POIBPO 01!61 0-overview punch list fir& Statlon #2
C3TS Project l\10$, 01311..013; 014; 016; 011; 018; 019; 021
Dear Ms. Brooks;
Please be Informed that on November 30. 2012, Stantec Consulting Services Inc, (~Stante<c") purchased
certain of the assets of Corzo CastE~IIa Carballo Thompson Salman, PA ("ClTS") with the result that the
ongoing buslness and affairs of C3TS is now wholly owrH!.!d by Stantec. Stanloo will maintain the present
office locations or C3TS with no interruption ln operations or client servlces, and aU future projects and
operations will be under the Stantec name. Stante<: provides professional cx:msulting services in planning,
engineering, architecture, interior design, landscape ::m:::hitecture, surveying, environmental sciences.
project management, and project ecollOmics for infrastn.1cture and facilities projects, We support publiC
and private sector clients in a diverse range of markets at every stage, from the initial conceptualization
and ftnanciaf feasibHil:y study to project comp,letion and beyond. Our senrlces are provided em projects
around the world through approximataty 12,000 employees operating out of more than 190 I!:'J!Cations in
North America and 4 locations internationally.
Stantec's vision includes working with the best clients on the best projects and providing the best
services. Accordingly, please be assured that the continuity of your current project will be unaffected by
this new arrangement The caliber of the personne~ currently working on your will not change and,
except for tile assignment requested herein, no other aspect will be affected.
In regard, we request your approval to assign all exlst!ng contracts in the name of C3TS to Stantec.
Kindly indicate your consent to the request for assignment by retuming a duplicate copy of this letter,
executed on behaif of City of Miami Beach to Stantac: Consulting Services, !nc ..
Sincerely,
MPSON SALMAN, f.A.
The undersigned hereby consents to the asslgnment of 'the Contract noted above to Stantec Consulting
SerVIces !nc. effectiVe , 2.012.
City of Mf,ami S41!aeh
901 Pooce de leon S~ite 900, C0«:1l Gobles, florido 33 i 34 30$.445.2900 1 ,ll'OO.A48.0227 fouimlle 305,44.5.3366
\IVtlb Site: www.c3is.c>em Equal Employer
451
MIAMI
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DIVISION
Tel: 305-673-7490, Fax: 786-394-4624
June 27,2013
VIA E-MAIL: ramon.castella@stantec.com
Ramon Castella,
Stantec Consulting Services, Inc.
901 Ponce de Leon Boulevard, Suite 900
Coral Gables, FL 33134-3070
OF
SALMAN, P.A. (C3TS)
THOMPSON
Due to Stantec Consulting Services, Inc.'s (Stantec) acquisition of Corzo Castella Carballo
Thompson Salman, P.A. (C3TS), the contracts for the following solicitations must be assigned,
through City Commission approval, from C3TS to Stantec:
• RFQ 01-07/08 -For the Establishment of a Pre-Approved List of Professional
Construction Engineering and Inspection Services (CEI) Firms to Provide Various
Services on an "As Needed"
• RFQ 35-10/11 -For a Design Criteria Professional to Prepare the Design Criteria
Package for the Palm and Hibiscus Neighborhood Right-of-Way Improvement Project,
which Is Intended to Be a Design-Build Contract; and to Serve as the City's
__ J3.epraaEIDtativ.eJ:ludngJtteSe1~G-tkmJltihe~~gn-6uil~LEtrm for the Project,~Oonperning~~
the Evaluation of the Responses Submitted by the Design-Build Firms; Review and
Approve for Compliance of the Detailed Working Drawings for the Project; and for
Evaluation of the Compliance of the Project Construction with the Design Criteria
Package
• RFQ 04-11/12 -For a Design Criteria Professional to Prepare Design Criteria
Package for the Sunset Islands 3 & 4 Neighborhood Right-of-Way Improvement Project,
which Is Intended to Be a Design~Build Contract; and to Serve as the City's
Representative During the Selection of the Design-Build Firm for the Project, Concerning
the Evaluation of the Responses Submitted by the Design-Build Firms; Review and
Approve for Compliance of the Detailed Working Drawings for the Project; and for
Evaluation of the Compliance of the Project Construction with the Design Criteria
Package
• RFQ 52-11/12-For Professional Construction Engineering and Inspection (CEI) Firms
to Provide Various Services on an "As Needed" Basis
As part of the City's responsiveness review, Stantec must provide the following information
confirming that it meets the minimum requirements/documentation in the solicitations noted
above:
• RFQ 01-07/08
o Organizational Chart
o Project Team licenses, certifications, resumes
We ore commllled to providing excellent public service and safely to all who live, work, ond play in our vibrant, tropical, historic community.
452
_, -1
I
o Florida Department of Professional Regulation license
o List of all projects in the past five (5) years-254 or 330 would suffice
o List of all legal claims In the past five (5) years
o Minimum of five (5) similar projects-please provide scope of work, client contact
information, project cost, and project start and completion dates
o Minimum experience and qualifications (see Attachment A)
11 RFQ 35-10/11 and RFQ 04-11/12
o Firm's number of years providing similar service
o Project Team licenses, certifications, resumes for each project
o Ten (10) client references
o List of similar projects in the past ten (1 0) years
o List all legal claims in past five (5) years
o Demonstrate prior experience in serving as the Design Criteria Professional for
public facilities and in the preparation of Design Criteria Packages for public and
municipal facilities in particular in horizontal right-of-way construction
o Project Teams must include a professional civil engineer licensed in Florida
o Project Managers must have a minimum of five (5) years of experience
developing Design Criteria Packages for horizontal right-of-way construction and
----three (-3) projects valued at $5 million-or greater--------- -----
o Minimum of five (5) completed similar projects -please provide scope of work,
client contact information, project cost, and project start and completion dates
o Narrative descriptions for each project
o Methodologies and approaches for each project
o Organizational Chart
II 52-11/12
o Ten (10) client references
o Project Team licenses, certifications, resumes
o Florida Department of Professional Regulation License
o List all projects in the past five (5) years -254 or 330 would suffice
--o-tist-o-rall-1-e-g-al-clai ms-i n-th-e-p-ast-five-tB")-years~---
o Project Manager must have a minimum of five (5) years of experience and have
completed three (3) similar projects
o Minimum of five (5) similar projects-please provide scope of work, client contact
information, project cost, and project start and completion dates
o Minimum experience and qualifications (see Attachment A)
o Organizational Chart
o Project methodology and approach
In addition, Stantec must also confirm that it agrees to the contract terms and conditions for
each project; as well as, the conditions provided in the RFQ proposal responses submitted by
C3TS at the time of the RFQ solicitations, which were provided to your courier today.
Please submit the required information by Wednesday, July 3, 2013. Should you need
additional information, please contact me at 305-673-7000 ext. 6230 or e-mail:
theocarrasco@m iami beachfl. gov.
Thea Carrasco, Ph.D., CPPO, CPPB
Senior Procurement Specialist
We are committed Ia excel/en/ servim and to all who live, work, in our vi bran/, historic community.
453
Stantec Consulting Services inc.
901 Ponce de Leon Blvd., Suite 900
Coral Gables, Florida 33134
Ph (305_ 445-2900
Fax: (305) 445-3366
July 8, 2013
City of Miami Beach
Procurement Division
1700 Convention Center Drive
Miami Beach, Florida 331
Attention: Theo Carrasco, Ph. D.,
Senior Procurement Specialist
Reference: Assignment of Contracts from Corzo Castella Carballo Thompson Salman, P.A.
to Stantcc Consulting Services Inc.
01-07/08, RFQ 35-10/11, 04-11/12, RFQ
Dear Mr. Carrasco:
In response to your recent request additional information and confirmation concerning this matter,
please note that the C3TS local staff, offices, management, organization and resources are now all part
of Stantec. In response to specific items, please note the following:
• RFQ 01-07/08
o Organizational Chart
All project personnel and roles are as detailed in our original Statement of Qualifications,
except for Mr. William Francis-who is no longer with the firm.
o Project Team licenses, certifications, resumes
All project team licenses, certifications and resumes are as contained in our original
Statement of Qualifications, except for Mr. William Francis -who is no longer with the firm.
o Florida Department Professional Regulation License
Please see Florida Department of Professional Regulation licenses, as well as FDOT &
Miami-Dade County Pre-qualification certificates for Stantec, included in Attachments.
o List of projects the five years-254 or would suffice
The list of local projects in the past five years -254, are as included in our original
Statement of Qualifications.
0 of an legal claims the past five (5) years
List of local claims in the past jive years is as included in our original Statement of
Qualifications.
454
July a. 2:tl1S
City of M!ami Beam
Procu~ment Division
Page2of4
o :1\>fininmm of five (5} similar pt·ojeets -please provide scope of work, client contact
information, project cost, and project dart and completion dUes
Similar loctii projects are as included in our origiru1l Statement of Qualifications.
o Minimum expedem:e and qulllificadotu (see Attachment A)
Minimum local experient..Y! and are as included ow original Statement of
• RFQ 35-10/11 and RFQ 04~ 11
o Firmts l!lumber of years prO'it'iding simUar service
The finn's number providing similar locally is as detailed in our original
Statement c{Qualifications.
o Project Team Lh:enses, certUicathms, resumes. for eacb.Ju·oject
All team resumes are as contained in
.'Hnrv"~''"'"J ()fQ:ualificaUons, William Francis-who is no longer
o Ten (10) client refercmees
The r~ferences are as comained in our original Statement
o List of :d:milar projects in t.he past ten (1 0) years
'""'·•••u local projects {tre as detailed in our orfginl.ll""'0 '"'.,.
o List all legal claims in tile past five {5) yeus
of local claims past five is as in our Statement
o D<lmonstr:de prior experience :in servh:tg as the Desigu Cdterbt Professimud for public
fac.iUti.es and .in the preparation of Design Crlteri~a Packages for pnbHe aaad municipal
facilities in p:artlcn.lar m bo.rizmmtal rigld~of~wmy construction
Prior local in serving as DCP for public facilities is as detailed in our
Statement of Qual{(ications,
o Project Teams must inchldc a professional dvU engineer licensed i:n Florida
Project team inchules several professional engineers licenses ln Florida, as in
our original Statement of Qualification.t
o Project Managers must have a minimum of five (5) years of experience developing
Design Criteria Pa<::kages fo:r hmizmrtal righN>f~way collst:rncdott and three (3)
projects valued at $5 mnlion or greater
Project 1\tfanagers are as detailed our Statement of Qualifications.
o Minimum of five (5) completed similar projects -please provide scope of work, dient
contad information, project cost, :ilnd project start :and completion dates
Similar {W£ as ift our original Stater~umt q( Qualifications.
o Narrative descriptions for ea.ch projtct
description project are as detailed our original ..,..,~·~"'u~n
Qutz#fications,
455
July&, 2013
Clty of Miami Seooh
Procur0mii$rlt DMs!on
Pi~ige3 of 4
o Methodologies and approaches for each proj~t
The methodologies and approl:ches are as detailed
Qualifications.
in our original Statement of
o Organb!:atimud Cluu1:
All personnel and are as detailed our Statement QuaiijlcatiorLS,
except for .,~fr. William -who is no longer with the }inn.
• RFQ 52~11/12
o Ten (1 0) client referen~es
The are as contained in our original Statement
o Project Team licenses, eeroficatio:n.s, :resumes
..,,.;,,,.,, team and resumes are as (,':lmtained our original
LllLUt::l'nt::<•u (!{Qualifications, eJ.::ceptfor Mr. William -1ovho is no longer the firm.
o Florida Department of Profes:do:wud Regulation License
Plet::kw~ see Department of Rc;gulation lice:ns.es, as well a .. li' FDOT &
Miami-Dade Counry Pre~qualijication Stantec, included in Attachments.
o List of aU projects in tbe past five (.S) yean-SF 254 o:r 330 would suffice
The list in the -254, are as included in our ''"'"['"''''"
Statement
o List of aU legaJ dai:ms in tbe past five (5) years
in the past years is as included in our ""'""'" Statement
o Project Manager mnst have a minimum of five {5) years of e%pt'!rience and haw
completed three (3) simihn" projeC!ts
v .. ,.,,,,"1 Manager experience is as detl2iled in our original Statement of
Qual(ficatiom.
o Minimum of fi.ve (5) simHu p:rojeds -please provide scape af iii!'Ork, client contact
infunnation" pmj«:t cost, and project start and completion dates
Similar are as our original Statement ofQual~/ications.
o Min:in:mm expnience and quaLifications (see Attachm·ent A)
A!inimum experience qualifications are as in our Statement
o P.rojed Methodologies and app.ro~ch
The methodologies approac/1 are as
Stantec agrees to the contract te.rn1s and conditions of current contracts being asstgned for RFQ
07/08, RFQ 35-10/11 & RFQ 04-11/12. Regarding RFQ 52~11112, we have a few minor as
previously detailed to by Mr. Sean Compel.
456
457
is out: homed under thee
.. to the public through o
:212812015.
228201501954
458
~o off:f!r ~"lifieerina services
Chopter·•i11~ flori<lo Statutes •
CA lJ~. Noi
. 27013
STAT! OF FlORIDA
OF SUSUNESS AND PROFESSIONAL
459
¥Ill FtORI&ASOD.
' \"'
\
\
Miami-Dade County, Florida
Internal Sarvices Department
PQ Ceriiflcat~ No.: 200~112167170..o4
A,pprov~t Ol!ltli!l: 41:312013
Expntion Dam; 413012014
·Stant& Consulting Services fnc.
Tbi.r mtifimtt u hl.nl~ i.rJU~~J tu: 90 1 Ponce de loon Blvd~ Suite 900
Coral Gables. FL 33134
The abow name appUcant Is pr~ualil'ied ro provide profeulorml JIJE servle1eS far Mlaml-Daoo County for !he period indiC<ll~
abCI'W. The npplicam tms oommiled its flrm t<i comply 'IMih the ~~~ OO&'lditicms limed beh':~w:
1. Pra-Oualiftoo to offll!lr profes.a!onaf seNicoo only rn the Mlami--llade County tecllnk:al categooes shown In the
a!±arooo •struamant of Technical QIJii:llificatic.M$." Atl technical category restrictions must be ~trieUy oooored to.·
2. Pre-Oualfflootron Cmtlficatlon (PQC
regls~n into one strcwnlined
the technical e&rtffi~tion. affil'!'mltive action plan, and vendor
esulting In the issuane& of a P~ualiftcatfon Certificate.
:3 .. Rllilport any signfficant changes, such as oonmct pemon, qualifier, ownership, ftrm address, etc.,,to Professional
· S<ll\rvlces Qrif~eation l~ed at 111 NW 11fA Stn;et, Suite 1300, Miami, fL 33128, within 30 days of sud'! a
cl'iange. Fallum tn report said chang~ to the Cc.nJnty result In the Immediate :suspension or terminatiOn of
your firm's P'l'e-Qualif~eation Certfficatlon.
4, Firms are responsJb!e for observing and adhering to Mlami·Oade County's Admirtis:trati\fe Order 3~9 ~standard
Pf'O~ for construction of capital improvemente, acquiSition of professional services, oonstructioo o<:mtracting,
cl'l~e orders and reportirtg",
5. Fatlura to renE~W your firm'!li PQC at least thirty {30) days prior to your firm's ourroot expiration date may result in
the suspension and/or terminatkm from Ccunty programs and current or Mum contracts unm your firm's P!'&-
Oualif~Cl!loon Certme:atlon has been properly renewed. My tapses in the oertifleatlon of any of~ required PQC
areas (vendor registration, affirmat.i've adlon ptan, or teehn!~l certiftoatlon) wtll result in a lapse in your PQC.
Firms are :respoosible for oooeNlng <?!lid ad he ring to all submission deadlines.
6. Any reMwal applio:atrons and/or liiUpportlng doouments submitted after the application deadline might delay the
revfew of your firm's PQC eertificatlon to the next available Techn~l Certiflc:l!dlon Committee meeting. The
PQC application, submms!on deadi!nes. and the Tet'lhn~i Certification Comm~ meeting calendar can oo
found on Proourement Management "~~Veb . site loomed athttp~.mfamldelB·ii9"/lnternatsealc.isl!:u:~
gyaiUfitatfon-qrttfit;~tl'Qn.asQ
1. Permit Miamt~Dade County rnpresel'ltattves to nave~ during normal buslooa. 11oum to audit boob :r»nd
records to \f1ltrify information submittoo wil:h thfs applicaoon. Thls fight of access shall oommenca on ffie
approval date of this certlfk:ate and ah~ll tel'l11im:il:e on tts expin:mon d!iite.
Please ~ th<~t If at any tlme Miami..Oade Coo11ty's has reason to believe ttlm any parson or firm ms willfully and
knowtngly provided lnconect Information ot made false stt~temerats, ·the C()lJnty may refer too ma~r to the State
AJ:tomey's ~ and/or other Investigative agendas, initiate debarmant procedures, and/or pursoo saMtlons or
other legal remedies in accordafi.Oiii with Mismi~Dooe County pot&:;y aMior applicable feder;al, state and focal lam,
/
Nu:hia Jarquin
Professional Servicu Certifleatfon
31~1$.5631
460
Miami-Dade County
Internal Services Department
Statentent qfTechnical Certification Categories
Firm: STANTEC CONSUlTING SERViCES lNC.
901 Ponce de Leon BlVd Suite 900 ·
CATEGORY
t:!Q;.
Coral Gabfes, FL 34
1Jl1 TRANSPORTATION PlANNING~ URBAN AREA AND REGIONAl
TRANSPORTATION PLANNlNG
::un MASS TRANSlT SYSTEMS~ MASS TRANSIT FEASIBiliTY & TECHNICAl
STUDIES
~tOO MASS TRANSIT SYSTEMS· MASS TRANSIT SAFElY CERTJFICATKiN FOR
SYSTEM ElEMENTS '
3JJ1 HiGHWAY SYSTEMS· SfTE DEVElOPMENT AND PARKING lOT DESIGN
:t02 H~GHWAYSYSTEMS-HIGHWAY DESIGN
3.03 HIGHWAY SYSTEMS-BFUDGE DEStGN
3.04 HtGHWAY SYSTEMS-ENGINEERING STUDiES
3,()6 HIGHWAY SYSTEMS -CAlMiNG
3.00 HIGHWAY SYSTEMS-SIGNING, PAVEMENT MARKING, AND
CHANNEUZATJON
.3. 10 HfGHWAY SYSTEMS~ liGHTING
3.11 HIGHWAY SYSTEMS ·SIGNALIZATION
5.01 PORT AND WATERWAY SYSTEMS~ ENGINEERING DESIGN
5.09 PORT AND WATERWAY SYSTEMS-ENVIRONMENTAL DESIGN
6.G1 WATER AND SANITARY SEWER SYSTEMS-WATER DfSTR!SU110N AND
SANITARY SEWAGE COLLECTION AND TRANSMISSfON SYSTEMS
6.02 WATER AND SANITARY SEWER SYSTEMS-MAJOR WATER AND
SANITARY SEWAGE PUMPING FACILITIES
APPROVAl EXPIRATION
OATE ~
41312013 413012015
413/2013 413a/2015
4/:312013 4/3012015
4/3.1:2013 4/3012015
413/2013 4/30/2015
4/3!2013 4/30!2015
413f2013 4/3012015
4!312013 41'3012015
4/312013 4/3012015
413/2013 41301:2015
41312013 4130/2015
4/312013 4/3012015
Luisa M. Mlllan, R. A, Chsirpemon
Chief, Professional Services Division
lmerna! Slli:mlm De-partment
461
Miami,..Dade County
lntemal Services Departntent
Statement of Technical Certlficatiolt Categories
Firm: STANTEC CONSULTING SERVICES INC.
90'1 Ponce de Leoo Blvd Suite 900
Coral Gabtas, Fl 33134
CATEGORY
NO: CATEGORY DESCRIPTION
6.03 WATER AND SANITARY SEWER SYSTEMS-WATER AND SANITARY
SEWAGE TREATMENT PLANTS
1Ci.01 ENVIRONMENTAL ENC31NEER~NG-STORMWATER DRAINAGE DESIGN
ENGINEERING SERVICES
10.03 ENVJRONMENTAL ENGINEERING~ BIOLOGY SERVICES
10,05 ENVIRONMENTAl ENGINEERING~ CONTAMiNATION ASSESSMENT AND
MONITORING
10.10 ENVfRONMENTAL ENGINEERING· COASTAL PROCESSES AND OCEAN
ENGINEERmG
1Ul0 GENERAl.. STRUCTURAl ENGINEER~NG
12.00 GENERAL MECHANtCAt ENGINEERING
13.00 GENERAL ElECTRICAl ENGINEERING
14.00 ARCHITECTURE
16J)O GENERAL CML ENGINEER~NG
17.00 ENGINEERING CONSTRUCTION MANAGEMENT
18.00 ARCHITECTURAL CONSTRUCTION MANAGEMENT
2200 ADA TinE II CONSULTANT
APPROVAl EXPIRATION
t!AI.t QATE
'41312013 4/30/2015
41312013 4/3012015
4{312013 4/3012015
4/3/2013 4/30/2015
4/312013 4/3012015
4/31:2013 4130/2015
41312013 413012015
413/2013 4/3012015
4/312013 4/3012015
Luisa M. Mi!an, R. A, Chai'person
Chief, Prof&$$1onal Service:s DMskm
tnternai_Selilices Oepartmem
462
Florilltl IJej1art1nent t~f TraJ1S11tJrtation
HI< h o.,t Oil
(,0\ I il\(}1{
Robert , PE, V1ce President
STANTEC CONSUlTING SERVICES,
901 Ponce Deleon 900
Cora! Florida 33134
Dear Me
15,2013
Transportation has r""'·''"'"''"'n
is adequate to
2
3
and Environmental (PD&E) '-'U·"""·""
~Roadway
3.'1
3.2
Group 4 -Highway Design -
4.1,1
4:L2
4.2 1 -
3
5
-Concrete
Design-Steel
Design -Segmental
5.1 Bridge
5.2 ,. Movable Bridge
-Complex Bridge Inspection
5A -Bridge load Rating
6 -Traffic Engineerlng and Operations Studies
-TraftJc Engfneering Studies
S\gnal Timlng 6.2
6.3.1 -
6.
Transportation Systems Analysis and Design
Transportation Systems
Engineering Systems Communications
7
-Signing, Pavement and
-Signalization
463
.\~,\~T!ll'R\\ Ill, 1'.1':,
S!::CRFI .. \1{\
package and
8 ~ Survey and Mapping
8. 1 -Control Surveying
8.2 -Design, Right of Way &
8.3 .. Photagrammetric
8.4 of Mapping
9 Material Testing and Foundations
9.1 Exploration
9.4. 1 -Standard Foundation Studies
10 Engineering
10 1 -Roadway Engineering lnspecUon
10.3 -Construction Materials
10.4 -Minor Bridge &
iO .. !i 1 -Brldge CEI· Concrete
1 2 -Major Bridge CEI • Steel
Group 13
13 3
13.4
13.5
13.6
7
• Engineering Contract
-Planning
14 ·Architect
15 -Landscape Architect
and Management
of June 30, 2014 at such as
due to Department's requirement on overhead
45 to 60 days to your update
On the of data submitted the Department has approved accountlng
rates b-elow as acceptable purposes,
Home/Branch
Overhead
you
Facllitles
Capltai Cost
of Monel:'
tl494°/¢*
Overtime
Premium
Reimbursed
rate .. These costs
office.
be
, please
464
Lorraine E. Odom
Professional Services
and considers
Direct Ex~tense
09.91% (Home)*
14J30% (Field),.,
on contracts
Terrance N. Glunt PE
Senior Proiect Manager, Civil
Mr. Glunt has over 36 years of experience in the management and administration of engineering divisions responsible for
all aspects of design and construction of government and agency related facilities including marina and boating access
facilities, recreation complexes, urban and Interstate roadways and bridges, utility corridors, municipal public works and
administration facilities, nuclear power plants, landfills and aviation facilities throughout Florida and the United States. His
specific experience includes engineering design and coordination of multiple proieds, construction engineering and
inspection, quality control I constructability review, rigid and flexible pavement design and analysis, hydrologic
evaluations, geotechnical and environmental studies, DRI and PD&E involvement, environmental and drainage permitting,
preparation of grant applications and coordination of numerous miscellaneous civil and structural contracts with Stale,
County and Municipal entities. Mr. Glunt has been responsible for the start-up of numerous offices for his current firm, as
well as for his previous employers; involving research and development, establishment of budgets and of all
facilities, equipment, vehicles and staff. He has been a Resident Engineer on FDOT construction proiects in numerous
Districts and the Engineering Manager and Director of both Geotechnical and Construction Divisions for a medium-sized
engineering firm.
EDUCATION
Bachelor of Science in Civil Engineering, Florida
International University, Miami Beach, Florida, 1985
Bachelor of Science in Environmental Sciences, Juniata
College, Huntington, Pennsylvania, 1976
Certification, Threshold Inspector, No. 0950, 2012
Certification, ACI, Level 1 field Technician, 2012
OSHA, 40-hour Hazardous Materials Technician,
HAZMAT, 2012
REGISTRATIONS
Professional Engineer #40130, State of Florida
465
PROJECT EXPERIENCE
Bridges
1Oth Avenue North
Palm Beach
Over the Keller Conal*,
Florida
feSI~OII'SIDIE' for the
a rehabilitation oF an existing 5 lane
tensioned traffic with two new ! 25' steel
modifications included the removal
of the sidewalks and ovtside prestressed
the pier bents, imtallation of new ""''·'trr><.;e,ri
W<CIDW·nf/; and rJrcii11ClnA ""''"n'"'·" /(()(JrJ\A!CiV
rJrrlinr'"" modi fica lion,;
lcnr·,mllm'" hundrail installation, sidewalk
block wvetment on the canal banks for
slope protection and pavement ond signage. Permits
were from Loke Worth Druinage District For inclusion
in their canal R/W.
Lugo Avenue Bridge Abutment Remediation I
Rehabilitation*, Coral Florida
for the of erosion
For the abutments.
CEI Construction Services, Non-Interstate
Terminal Replacement*
for removal and rep/acem,en
Barrier
of
nee u
Senior
Nicodemus
Senior Geotechnical Engineer for of earthen
dike and for SFWMD field station access.
Evaluation included flow net
St. lucie Boulevard Bridges*, Florida
Senior forensic for the determination of
the cause of failure of three revetments construction. The
investigation resulted in rehabilitation of I 000 lirwor feet of
Foiled sheet wall. The repair scheme included a
combilwtion of tie-backs and rubble rip-rap revetment in an
en•;wrmnnmltnl'lv sensitive wetland.
.,;,.,,hhr"+"v'ri signs, a
the east side lo sepom/e this site from
,_,,,-,hlv"inn comm<~rcial site, a central turf area 511rrounded
and on--street This r1llows for
access to a future C. 12 Conal Multi Use Recreational Tmi/
*denotes catnm1eled with ather firms
466
Design Review of Facilities & Processes
Reviews for Various FDOT or
five
C. I.?. decks on DOT beams, drilled shafts and MSE walls; 1 95
I US /7 ·~·~,,·rl,.-,,"~~
wastewater collection lines to main treatment
Road; Primo Vista Boulevard
over St. Lucie River, Two 4-Lane
beams, one bridge with six bents
four over woterway; Evon's
Aiartin County over St. Lucie River, 4-Lane
driven over woterway; Port
St. Lucie Boulevard over St. Lucie River 4-1ane
Bridges: deck on DOT beams, Four bents each an driven
""'vinnhiA waterway; SR 7
Braward County, 6-Lone
siCJV·il1·oloc'e forms supported on steel
Rood
Bmwarci
Drainage and Stormwater Planning & Design
Port Everglades Container Terminal Stormwater Well*,
Fort lauderdale, Florida
Senior Geotechnical for the of a 24 inch
diameter slormwoler well in corgo conloiner terminal. 'vVe/1 was
in povement orea with all components below
ue>~u'''"'" and Broward EPD
and FOE?. Full scale flow testing was in Field to
and copadties.
r~ce
Senior
& Master Plan*, Coral
master
improvements needed to in
the corridor. The involved the relJiacetTJei··JI
system and
components of the project. Three resi&mtial sub..c!ivisions
bordered the project and each had requirements for
borders and entrance Features. The was widened ol
various locations to accommodate turn Iones into these
communities. Two separate districts bordered the
corridor and involved permitting both agencies for
storm water collection and eventual outfall into their facilities.
Project to accommodate occess to resident
Sanford Avenue
Beach, Florida
& , Palm
in Charge for this project which included the full re·
of a two-block section of Sonford Avenue in the Town of
Palm Beach. The design included of the mr"'"'""'
system, water,. sewer ond street
components of the Town of Palm Beach
low curb elements and new
existing while still
charactt,ristics. of the sanitary and water systems had to
lie in to existing facilities at eoch end of the project, while
mrw"''"""" piping and A1AS structures. olso included
cable television, Bel/South and FP&L to eliminate
over/wad service lines. to
Basins "A" and "B" Stormwaler Stations*,
Florida
Senior engineer for these projects which both
40,000 gpm line shaft axial flow pumps with
gas engines with a lhird pump for
operate in on automatic mode and start when storm stage levels
rise, The includes a reinforced masonry structure that
houses the engines, controls generator and communications
equipment. The projects were comlructed within a combined
of $3.5 million.
* denotes proieds corJJp,fetE>d with other firms
467
Basin D-8 Drainage Basin
Florida
, Palm
improvements. Additional duties included surveying,
locates, relocation,
invosligalion, and permiffing the South
Florida Water District
Plantation Midtown Florida
ClA/QC officer for this system of
o mixed use
area with Commercial and Institutional The
purpose of the was to a backbone
system that would allow future and retiev'elc,on1en
in accordcmce with the Moster Plan. The existing system was
modeled using /CPR with information from available records
and survey of the existing drainage system. Future de,tei1Jornen
was also modeled in accordance to the maximum omml<mnnen
of the area, The recommends ,.,,,rwvmA
improvements that would ollovv the future and
creates Wl integrated system to he maintained by the
These recommendations were coordinated info current
and future CIP
projects in order lo minimize construction in the urea, The
"'""""m'.'" in the ond construction
plom for improvement.; were
Old Plantation Woter Control District, SFWMD ond the
of Plantation.
Basin D-2 Stormwater Station•, Palm Beach
County, Florida
Senior design engineer of o storrnwater
for the Town of Palm Beach in Palm Beoch
"'''"'r'mlinn of the
large reinforced concrete
discharges thru three to o d":c11nrrm
structure and then via a into Lake Worth. The control
houses on 800 kW diesel '"""'"'"'"n'~"
Control Center, the Aulomalic Transfer
Stotion Control Pone!.
u
Environmentcd Engineering
Environmental / PD&E Studies*, Florida
PD&E Studies for the projects: PD&E
M'''"'ar"Jr project on US I in Pine
Drive from Rd. to the
.v»Mmn« Expressway in Broward PD&E for
/-·/allandale Beach Boulevard from I 95 to West of SR 7 in
Broward PD&E For Okeechobee Road west of Le
Jeune Rood in Dode PD&E for NW 36th Street
from NW 27th Avenue to
PD&E Line to
for Roosevelt
Boulevord in
Facilities on in Monroe
Geotedmicc:'li Investigations
Geotechnical , Florida
Geotechnical invostigotion for pavement, systems,
foundations and woll for various FDOT ond
lllll'!I"CflCl!IOB for
Broword
Broword and Polm Beach Counties; At/untie
Avenue extension with Broword Lontana Road,
Prima Vista Boulevard with St.
l.ucie Martin Grade Road, Martin Counly; Geotechnical
Investigation for $250 million solid waste ot Central
Sanitary Landfill in Broward
Maintenance Facilities
Pine Island Maintenance Florida
Director h1r the engineering and architecture
permitting and coordination for this 50+ ocm
works The project included mason1y
construe/ion, on·site retention ond septic systems,
major eorthwork and foundation improvements ond hazardous
materials storage considerations.
*denotes
468
Broward Traffic Engineering Maintenance
Florida
permitting ond
coordination for this 2. I million works for
the Traffic Center. The project included tilt
and comrnunicotion sensitive
areas and hozardous molerials storage comiderations.
Marine/Waterfront Engineering
Matheson Hammock Marina Pier KeialalcemEmts
Dade florida
,Miami-
services, water, sonitmy, and
electrical and fire protection were
piers and for future of four other piers. The existing
bulkheads were rehabilitated or as needed due to
corrosion. A.ioinlenance was a
and fill permit for the moin channel as well os the
individuol channels for eoch pier. Six boat ramp
piers were with new precast concrete piers and
Crandon Park Marina Pier
Biscayne, Florida
Project manager for project that included of fou1· of
the concrete fixed piers with concrete docks.
New se1vices, water, sanitary, cable and
""'"'wr"me. electrical and fire protection were for these
piers and for future of four other piers. The existing
bulkheads were rehabilitated or as needed due to
corrosion .. Maintenance was o
ond fiil permit for the moin channel as well as the
individuol chon nels for ench pier. boa! romp
with new preens! concrete piers and
Old Man River Diversion Project, Corps of
River Basin*, louisiana
for installation of concrete for
and rip-rop diversion structures the
River. Duties also included inspection of sheet
rnoss excovafion ond operations and tremie
concroto.
nee u
Sonior
Cap's Restaurant*, lighthouse Florida
witness in over construction oF st~awall and rip-
rap revetment odiacen/ to mitigation and private dock and
marina.
Lauderdale Yacht Basin*, Fort
Senior for studies
for DR/ for maior commercial marina Duties included
scour fuming basin seawall, ramp and
as well as ovemll for cmd fill for
on New River.
Senior for the
and fill pro;ects in H 1 mui?>rrlniA
Point, Deerfiled Beach, Boca Raton,
Rivera Beach,
and Jensen Beach.
Palm Beach Seawall , Town of Palm Beach,
Florida
Senior for the rehabilitation of 2.5 miles of seawall
the Atlantic Ocean. The included the evoluation of
existing foiled sections. The of repairs included
various repair types. These included deadmen and
nlnr"""'"'"'of rubble
Tamarac Canal Bulkhead
Florida
, Tamarac,
~ ood
conslrudion administration for the rerlta,:erner
end bulkhead and culvert crossings for the of Tamarac at
different locations the as part of the first
of a Tamarac mointoins and controls the
canol system within the limits and due to and erosion
city street crossings, to repoir seawalls and
bulkheads ot their crossings. The firm wos selected
and and permit the rec>lac:errrents
* denotes projects corna!eter! with other firms
469
Alsdorf Park Boat Ramps*, Pompano, Florida
Project Engineer in charge permitting and
constmction odministrolion for the rehabilitation of o thme
boa! ramp The proiect included reconstruction
and approaches, boat trailer
space porking lot, and
irrigation uo,Drcrdc•s, oroH10D'<1
area,
ramp
Beach,
Deerfield Island Boardwalk and Docks*, Deerfield
Beach, Florida
Project for the
of a 2000 IF boardwoik '"r"n~"m"n'
is
service, ali construction materials hod to be
in on Phose II included marina ADA-
accessible docks, and additional
oil the pork amenitie5, res/rooms,
kiosk.
Burl Reynolds Park Boat
Florida
Staging Docks •, Jupiter,
for the and permitting of 285 LF of new
staging docks in the ICWW for access to the new boo/ romps,
Design ACOE for seagross
mitigation and mangrove protection. included
SPWMD, PDEP and ACOE permits o/ong a variance
letter from NOAA/N!v1PS.
Construction vsed wood timber
grating to allow to pass
propagation.
for seogross
nee
..,,.,,.,.,.,.," Park*, Jupiter, Florida
Project manager For development of new boat ramp in
northern Palm Beach Duties included sire
permitting and construdion administration
For this 30 acre natural pork Indiantown Rood and the
ICWW. issues included of o
tortoise reserve, mangmve and seagrass mitigotion,
with county manatee protection program, storm water runoff and
an FOOT permit for the entrance off of Indiantown Road .. The
project included 4 boot ramps, concrete dock
piers and staging docks, concrete .seawoll protection, educofion
kiosks, picnic restroom facilities, for 50 boat
troilers and on site and systems.
Materials Testing
Material Investigations*
Moteriol investigation for pavement ond
utilities, drainage systems, foundations and retaining wall
for various FOOT and
Beach;
bridges in Palm Beoch ond Morfin
of Atlantic Avenue in Beach; Federal
Rolon; Broward
Corridor
Military lnfrastrudure
West Naval Air U.S. Department of the
Resident for control
inspection and testing of $14 million con_slrucfion improvements
of on active oirfield. included
'""·'v"rnn of all construction inspection, testing, surveying ond
functions. Duties included drawing review,
approvol, mix as-built
contractor monpower projections ond pay
estimates. Received commendation From the US of
the Novy. also included installation of new storm droin
system with control devices ond retention amos.
West Naval Air Station for U.S. Deportment of the
*denotes with other firms
470
Mixed-Use
lakes*, Florida
Senior Geotechnical Engineer for rlmtA!cw>m
Mosier Excavation Plan for 1200 acre residentio! and
mitigotion oreos, and volume
compute~tions for 150+ oreos of lakes along 1-75.
eXCCIValed
shelves for mitigotion orem,
computations for 180+ oreos of interconnected lo.kes.
of
Route Phase I*,
and Greenway Transit
Florida
for the master engineering and
construction odministrotion of this proiect !hot consisted of
the entire centro/ bus!ne.1.> district of the City ond
creoting a mixed use orea conducive lo use
wJd occess. The project included the recoMtruc!ion of 2.5 miles
of mixed use textured crosswolk.s,
le~nd.«:or>etd medions, and a roundobout at o
The firm' will be the
improvements to follow in the midtown Grea. We hove
worked with the in the route thot the first
of the bus frons it will operote os well as them reseorch
the different type of frons if vehicles amilobie to them. In
hond in hand with the on this issue, we are
ensuring that the we deliver meets the needs and
expectations for the entire scope of their greenway proiec!.
Municipal
North Miami Beach Public Works Facility*, North Miami
Florida
Manoger for construction odministrotion of !hi.> 1.5
million dollar coordinolion of o/1 inspection,
testing, poy claims schedule review ond
certification
u
s(:~nior
of
to existing
facilities with recommendations for repairs.
Parks, Open Spaces & Cemeteries
Shenandoah Park*, Florida
Project Manager for this project, master
and construction management. This active
included tennis end basketball courts, in-line rink
project which included
construction management lor oclive ond possive
construction
utilities and camtruclion inspection services.
Deerfield Beach Middle School Park •, Deerfield
florida
aquatics
over 300 vehicles. Duties include master
and construction administmtion ..
in hlr the
management of a 36<.Jcre recreational
bmebo/1/multi-use l)e/d, two soccer
basketball and tennis and associated
over 500 vehicles. Duties include
modificotions and permitting.
• denotes
structural
471
vv.nt"'""''~"'~" Park*'
Projecl manager for ""''""!romnm·,t in
northern Palm Beach
permitting and construction administration
for this 30 acre natural pmk Indiantown Road and the
ICWW. Permitting issues included of o
tortoise reserve, mangrove and seagrass mitigation,
with county manatee protection program, storm water runoff and
an FOOT permit for the entrance off of Indiantown Road. The
project included 4 boat ramps, concrete dock
piers and sloging docks, concrete 5eawall protection, education
kiosks, picnic for 50 boat
trailers and an site
Dora! Park*,
turf FIFA
soccer tennis courts; bmketboll courts; bocce and other
lawn sports venues; toumoment snnd "''''""'"'"'
community center; picnic ADA "'"'vnmc,nu.,,
with fitness stations; areas; and a
covered off For students accessing the adiocent school
properly, The firm had to o program to facilitate the
removol of !rash and debris from the site which had been
estoblished as a class /I/ landfill prior to "'"'""'''"''m"n
The covered student off was
structures to meet current South Florido wind
criterio. rhe turf soccer fields involved the installation
tensile fobric as well as an under·droin system thot
would allow the Fields to be on in less than an hour after
o major rain Also included were bleochers establisfred on
both side.> of eoch field for tournoment
Roadways
SR Road Interchange*
Resident Engineer for the construction of o new $12 million
"'"'"'""""' incorporating steel MSE wolfs,
the state of Florida.
construction of$ 8.3
was classified as major.
nee
continuous cn';Hn-rm.K<->
included
extensive
unt PE
F'rojecl also included relocation city water, storm water, and
as well as inslallotion of new storm water lines and
arc:tmc:Jce injection wells.
CEI Construction Services Resurfacing of Beeline
from MP 0.0 to MP 8.4*
ao;oro·xmnatelv 8 miles of
JntJorriOClrll'!l·' ramps. Work WGS
wit/J mGjor MOl ramp closures,
notification to the and constant coordination
effort with PHP, the Contractor and the PJO.
CEI Construction Services of Florida's
Turnpike from MP 217 to MP 242 *
Resident
Florida's with
serious
CEI Construction Services Resurfacing of Florida's
Florida
Resident
Florida's
from MP 21 7 to MP 242 *, Osceola
in tourist area.
with
Senior of roadway
construction of a 2-mile section of US I that involved and
retaining and barrier wa/J
siqna;r;zcttlon, striping, signoge, curb and
CEI Construction
Roadway Resurfacing*
SR 994
Senior Project Engineer for all
of a S-mile section of SR 994
signage, asphalt, embankment,
MOT supervision, and railroad crossings.
*denotes
Roost Drive)
striping,
joint repairs,
472
Woodside Drive Drainage
Florida
, Coral Springs,
fer this covering a one-mile-
of Carol The project
arc11nruw system, as well as
improvement recommendations.
&*
for supervision of all construction
nor.'rt"'"'v recanslruclion project that
CEI Construction Services SR 834 (Sample RoadJ &*
Resident for supervision of all construction
o!cice.ment of concrete paw~ment,
larJdsca;~m,:; and
Primo Vista Boulevard •, St. Lucie County, Florida
Senior Geotechnical Engineer for the of 1.2 miles of
four-lane an caastol
mitigation areo. The project involved the use
for stabilization of muck, of rubble rip-rap
wvetmenl A flow net
evaluation was performed of channel
slope protection for twa AASHTO Girder structures.
St. lucie County Beach Access
Florida
, St. Lucie
Manager for the and construction management
of five beach access proiecls For St. Lucie Projects
involved lots an beach side, and/or gotes,
wooden boardwalks at dune crossover points and information
as needed at various locations. Some of the
were pre-existing but with no defined access walks
and others were new locations with no former
access.
Sports, Recreation & Leisure
Coral Gun Range*, Coral
Nln"""'"'"~' far the master
canstruC'Iion monagement for new
gun ranges, enclosed
utilities, and ""'""-nnmn
nee
Senior
, Palm Beach
project which
and construction mo'naaei7JeiM of a 10-
Additional services permitting,
on-site visits and inspectiom.
Florida
Project Manager for this project that included the rehobilitation
of o !2-court hord-courttennis for the Town of
The cout1s were resurfoced ond the
remainder of the was with new
netting, and shade structures.
Coconut Creek Recreational Center
Coconut Florida
in for this Recreational Center in the of
Coconut Creek. The firm the master ond
construcfion marwgement services for this oclive
included three lot lots,. exercise stations, shelters and a
vo,l/e\'.bCII/ cow1, in addition to the construdion of 168 linear feet
of boardwalk an environmental wooded area. The
boardwalk floor is constructed of a plastic lumber mwwfactured
from recycled and the are mode of pressure
treated timber.
Florida
Project project which included
and construction management of interactive warterolo'v
theme utilities, and concession area.
to allow installation of some
within an existing easement located on the property.
* denotes projects corTiol'eted with other firms
elements
473
Structural Engineering
Studies*
Project for investigation of roof integrity
for numerous structures for purposes of relino,ncina
operotions. Duties included inspection, evaluation and
recommendations to lenders.
Water
methc,doloo•ies far
well. Coordinated with well
heod and treatment designers to incorporate into
overall project. Oversaw field testing of well flows
instollation to insure capocity.
Ferndale 20" Wa!ermain /24" Force Main*,
Beach, Florida
This Included the and nPrm•Mrw,.,
inch diameter ductile iron water main
olong with 200 LF of 24" Force Main. Included
two oerial canal crossings of the Lake Worth DminGge District
cands and direct burial piping Loke Ida Road~
Coordination with three other projects was needed for tie-ins at
those locations. the included detGiled
Investigations of utilities ond route of the
moin. The project construction cost was The firm
also construction administration conslruclion
final certification to PDEP ond PBCHD.
RESOLUTIONS TO BE SUBMITTED
474
THIS PAGE INTENTIONALLY LEFT BLANK
475