Loading...
R7P-Retroactively Approve Additional Service Agreement With CDM-SmithCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Retroactively Approving An Additional Service Agreement With COM-Smith For Work On The Stormwater Management Master Plan Relative To Neighborhood Concurrency Reviews, A Public Meeting, And Additional Madel Runs Requested As A Result Of That Meeting. Key Intended Outcome Supported: A well maintained infrastructure Supporting Data (Surveys, Environmental Scan, etc.): Per the 2011 Strategic Plan update, only 44% of residents and 45% of businesses rated storm drainage as excellent or good. Item Summary/Recommendation: At its June 9, 2010 meeting, the City Commission, via Resolution No. 2010-27422, authorized the City's consultant, Camp Dresser & McKee (now COM Smith), to prepare a new Storm Water Management Master Plan (SWMMP), and at its November 14, 2012 meeting, the City Commission, via Resolution No. 2010-27422, adopted the SWMMP. The consultant created a comprehensive, citywide model of the stormwater infrastructure, identified those basins that are experiencing a reduced level of service, projected sea level rise in order to provide minimum stormwater design criteria, and developed order of magnitude cost estimates for the improvements. Outside the base scope of services, the consultant used the model to provide concurrency reviews of ten neighborhood improvement projects that prompted changes to the stormwater designs of the neighborhoods due to inter-basin flows and resulted in improvements that will be more effective and more flexible to account for the uncertainty relative to the rate of sea level rise. At the June 28, 2012 Finance and Citywide Projects Committee meeting, the Committee directed staff to have a public discussion on sea level rise and to return with the results, and this public discussion was not included in the base scope of services. As a result of questioning at the public discussion, the consultant calculated the additional cost of the capital improvements for a 30-year time frame and presented an analysis of the costs differences between a 20-year planning horizon and a 30-year planning horizon. The consultant and City staff negotiated compensation based upon the work performed -paying for additional services (and not additional work required to further explain or justify analyses conducted under the base scope of services)-with a total cast of $57,804. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: I Approval by FCWPC Financial Information: Source of Amount Account ~unds:~ 1 $57,804 431-2730-069357 OBP Total Financial Impact Summary: Cit Clerk's Office Le islative Trackin RWS, Public Works 6565 n-Offs: Department Director Assistant c· ETC MT an-SUMMARY.docx MIAMI BEACH 1024 Approved AGENDA ITEM ___J8~/:,..:P:..___ DATE fl-//-/3 ~ MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miomibeochfl.gov TO: Mayor Matti Herrera Bower and Mem FROM: Jimmy L. Morales, City Manager DATE: September 11, 2013 SUBJECT: A RESOLUTION OF THE MAYOR NO CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RETROACTIVELY APPROVING AN ADDITIONAL SERVICE AGREEMENT WITH COM-SMITH FOR WORK ON THE STORMWATER MANAGEMENT MASTER PLAN RELATIVE TO NEIGHBORHOOD CONCURRENCY REVIEWS, A PUBLIC MEETING, AND ADDITIONAL MODEL RUNS REQUESTED AS A RESULT OF THAT MEETING. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the resolution. FUNDING $57, 804 Funding is available in the 2011 Stormwater Bonds Fund (431-2730-069357) Drainage Hot Spots BACKGROUND As a result of Request for Qualifications (RFQ) 03-09/10 and subsequent resolution 2010- 27334, the City Commission authorized the Administration to enter into negotiations with Camp Dresser & McKee, the top-ranked firm responding to the RFQ. At its June 9, 2010 meeting, the City Commission, via Resolution No. 2010-27422, authorized Camp Dresser & McKee (now COM-Smith) to prepare a new Stormwater Management Master Plan (SWMMP) in the amount of $1,091 ,435. At its November 14, 2012 meeting, the City Commission, via Resolution No. 2010-27422, adopted the SWMMP (Attachment A is the Executive Summary for the Plan). Per the base scope of services, the consultant created a comprehensive, citywide model of the stormwater infrastructure, identified those basins that are experiencing a reduced level of service, projected sea level rise in order to provide minimum stormwater design criteria, and developed order of magnitude cost estimates for the improvements, for which the consultant has been fully compensated according to their initial contract as negotiated at that time. ANALYSIS Outside the base scope of services, the consultant used the model to provide concurrency reviews of ten neighborhood improvement projects. These reviews prompted changes to the stormwater designs of the neighborhoods due to inter-basin flows. As a result, the neighborhood 1025 Citywide Stormwater Management Master Plan September 11, 2013 Page 2of3 improvements will be more effective in providing the required LOS and more flexible to account for the uncertainty relative to the rate of sea level rise. At the June 28, 2012 Finance and Citywide Projects Committee, there was a technical discussion on the existing mean high water and the rate of sea level rise. As a result, the Committee directed staff to have a public discussion on sea level rise and to return with the results. This public discussion was not included in the base scope of services. This SWMMP Sea Level Rise Discussion was held on Friday, August 17, 2012. The presentation (Attachment B) began with a discussion contrasting the City's previous SWMMP to the new SWMMP. The presentation then focused on sea level rise and the reports and data available to estimate mean high water and the rate of sea level rise. Following this, the consultant discussed how sea level rise was incorporated into the draft SWMMP and into the recommended capital improvements. It was stressed that there is a large degree of uncertainty with the rate of sea level rise. As a result, the City has developed a flexible capital improvement plan that can accommodate various rates of sea level rise. The capital improvements will rely on backflow preventers at the outfalls, more pump stations, raised seawalls, and stormwater storage. The City will need to monitor the rate of sea level rise and adjust the plan accordingly. As sea level rises, the stormwater system will rely more upon pumps, and as the existing pumps age, they will be replaced with larger pumps. The presentation was generally positive with acknowledgement that the City is in the forefront of developing a capital program to address sea level rise projections. There were also some concerns expressed about the SWMMP. It was questioned why the consultant developed a master plan with a 20-year horizon instead of a 30-year or 50-year horizon. It was explained that the life cycle of a pump is approximately 20 years. After 20 years, a pump that has reached the end of its life cycle could be replaced with a larger pump depending on the rate of sea level rise. The consultant calculated the additional cost of the capital improvements for a 30-year time frame. While it requires larger pumps in certain locations, the 30-year time frame does not change the requirements for catch basins, piping, and seawalls and the difference in cost was $10 million. There were also questions about the ability of the City to deal with sea level rise beyond the 20-year or 50-year horizons. It was stressed that the SWMMP provides flexibility beyond the time horizons discussed. At the August 22, 2012 Finance and Citywide Projects Committee, staff presented the results of the Discussion (Attachment C) and an analysis of the costs differences between a 20-year planning horizon and a 30-year planning horizon. The Committee approved the plan with the recommendation to use a 20-year planning horizon and not the 30-year planning horizon. The consultant has indicated that the work required for the presentation and required to develop a 30-year planning horizon was also outside the base scope of its services. City staff has negotiated what it believes is fair and reasonable additional compensation based upon the work performed: paying for additional services (but not paying for additional work required to more fully explain or justify analyses conducted under the base scope of services). Staff believes that it is appropriate to pay an additional: 1026 Citywide Stormwater Management Master Plan September 11, 2013 Page 3 of3 $24,690 for concurrency reviews of ten neighborhood improvement projects $25,935 for the planning and presentation of the August 17, 2012 public meeting $ 3,854 for stormwater modeling at the 30-year planning horizon $ 3.325 for estimating the difference in costs at the 30-year planning horizon $57,804 total in additional services CONCLUSION The Administration recommends that the Mayor and City Commission adopt the resolution. Attachments: A. Stormwater Management Master Plan -Executive Summary B. SWMMP Sea Level Rise Workshop Presentation C. August 22, 2012 Finance and Citywide Projects Committee Presentation MT/~JF/RWS T:\AGENDA\2013\September 11\Stormwater Management Master Plan • MEM01.docx 1027 RESOLUTION TO BE SUBMITTED 1028 THIS PAGE INTENTIONALLY LEFT BLANK 1029