R5C-Building Department Permit Fees -Malakoff-m .....
COMMISSION ITEM SUMMARY
Condensed Title:
Second Reading/Public Hearing of an Amendment to Building Department Fee Ordinance, Chapter
14 "Building Regulations", Article II "Construction Standards", Division 2, "Permit Fees, Section 14-61
through 14-71 of the City Code.
Key Intended Outcome Supported:
Increase Community Satisfaction with City Government.
Supporting Data (Surveys, Environmental Scan, etc 48% of residential respondents and 55% of
businesses rate the effort put forth by the City to regulate development is "about the right amount."
Item Summary/Recommendation:
SECOND READING/PUBLIC HEARING
Tile Building Department is proposing amendments to Chapter 14 "Building Regulations", Article II "Construction Standards",
Division 2, "Permit Fees", Sections 14-61 through 14-71 of the City Code. The following is a brief summary of the changes
proposed.
"Triplex" has been removed from Residential fees per the Florida Building Code. This is a change from First
Reading.
Reference to Department of Community Affairs has been changed to new name, the "Florida Building Commission.
This is a change from First Reading.
• Customers will pay a flat fee for individual expedited plans review, and a new express plan review service will be
available for entire projects.
• Fees will be administratively adjusted annually to reflect the Consumer Price Index for the Southeast United States.
• The re-evaluation of fees where the permit costs exceed 10% of the job value is eliminated as it is no longer required
due to the new method of fee calculation.
• Fees for Phased Permits are established.
• A discount of 25% or 12.5% is provided for projects that utilize private providers based on the level of utilization of
City services.
• Time limitations and other standards are clarified and established for requesting refunds from the Building
Department.
Fees and procedures for obtaining Certificates of Occupancy, Completion and Use are establislled.
Processes and Fees are clarified and established for obtaining Annual Facility Permits.
• Various "stand-alone" fees in "Appendix A" are rounded either up or down to simplify calculations.
• Commercial Permit fees for all Building, Mechanical, Electrical and Plumbing permits for which the cost of
construction is $30,000,000 or less will be 2% of the cost of construction, and 1% for any amount over
$30,000,000 (emphasis added).
• Residential Permit Fees for all Building, Mechanical, Electrical and Plumbing Permits for which the cost of
construction is $1,000,000 or less will be 1.8% of the cost of construction, plus 1% of the construction cost
for any amount over $1,000,000 (emphasis added).
Advisory Board Recommendation:
I None.
Financial Information:
Source of Amount Account
Funds: 1
D 2
3
OBPI Total
Financial Impact Summary:
In accordance with Charter Section 5.02, which requires that the "City of Miami Beach shall consider
the long term economic impact (at least 5 years) of proposed legislative actions," this shall confirm
that the City Administration evaluated the long term economic impact (at least 5 years) of this
proposed legislative action. The Amendment to the Ordinance will have no impact on the City's
finances.
1slat1ve Track1n
MIAMI BEACH Rs c__
AGE N DA ITEM ---::-;:;-:-.=-""i"T""r
DATE 3-:5-/ ~ 309
~ MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
TO:
FROM:
DATE:
SUBJECT:
COMMISSION MEMORANDUM
Mayor Philip Levine and Members of he City 1:•:
Jimmy L. Morales, City Manager
March 5, 2014
SECOND READING/PUBLIC HEAR NG
AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 14 OF THE
CITY CODE, ENTITLED "BUILDING REGULATIONS," BY AMENDING
ARTICLE II, ENTITLED "CONSTRUCTION STANDARDS,", BY
AMENDING DIVISION 2, ENTITLED "PERMIT FEES," BY AMENDING
THE FOLLOWING SECTIONS THEREIN, TO WIT: SECTION 14-61,
ENTITLED "PERMIT FEES, GENERALLY"; SECTION 14·62, ENTITLED
"BUILDING PERMITSu; SECTION 14-63, ENTITLED "PLUMBING
PERMITS"; SECTION 1~64, ENTITLED "ELECTRICAL PERMITS";
SECTION 14-65, ENTITLED "MECHANICAL PERMITS"; SECTION 14-
66, ENTITLED "ANNUAL FACILITY PERMIT"; SECTION 1~67,
ENTITLED "FORTY-YEAR BUILDING RECERTIFICATION PROGRAM";
SECTION 1~68, ENTITLED "OCCUPANT CONTENT SIGN"; SECTION
14-70, ENTITLED "GENERAL INFORMATION"; SECTION 1~71,
ENTITLED "TEMPORARY STRUCTURE"; TO PROVIDE FOR EXPRESS
PERMITS, PHASE PERMITS, PRIVATE PROVIDER FEE DISCOUNTS,
PERMIT FEE REDUCTIONS AND REFUNDS, AND TO PROVIDE FOR A
MORE EFFICIENT, EFFECTIVE, AND TRANSPARENT WAY TO
ASSESS FEES FOR BUILDING PERMIT SERVICES, AND BY
AMENDING CORRESPONDING PORTIONS OF DIVISION 2 OF
APPENDIX A OF THE CITY CODE, ENTITLED "PERMIT FEES,"
RELATING TO BUILDING, PLUMBING, ELECTRICAL, AND
MECHANICAL WORK, AND OTHER BUILDING DEPARTMENT
ACTIVITIES; PROVIDING FOR REPEALER, SEVERABILITY,
CODIFICATION, AND AN EFFECTIVE DATE.
ADMINISTRATION RECOMMENDATION
Approve the Ordinance.
BACKGROUND
On January 13, 2010, the City Commission adopted Ordinance No. 2012-2670, modifying
permit and inspection fees for building, plumbing, electrical and mechanical work and for other
Building Department activities. That ordinance went into effect on February 1, 2010. Among the
many changes brought about at that time, the basic fee structure was changed to provide for
310
City Commission Memorandum -Building Department Fee Ordinance Revision
Page 2 of 3
fees based on the square footage and use of the project being permitted. Additional changes
were adopted by the City Commission in September 2011 and September 2012, as staff gained
experience with the new fee system and adjusted for certain unintended inequities and issues
that arose, as well as Consumer Price Index adjustments.
During the past four years since implementation, the Building Department and City
Administration have had ample opportunity to receive feedback regarding fees from
homeowners, residents, design professionals, expediters, staff members and other customers
who are involved in the development review process. Generally, the Department's customers
complain that the fee ordinance is entirely too complicated, lacks transparency in the sense that
it is difficult or impossible to accurately predict permitting costs in advance due to its
complexities, and poses many challenges for Building Department staff. Many customers have
also complained that the actual fees as a percentage of job values vary dramatically for certain
types of permits, resulting in certain permit types (i.e. residential) bearing a disproportionate
burden of costs. Additionally, both internal and external auditors have commented on the
complexity of the current fee structure, and the difficulties and risks associated with deriving
accurate and consistent fees.
The proposed changes to the fee ordinance involve charging a flat rate of 1.8% of job values for
residential permits, and 2.0% of job values for commercial projects. It is important to note that
these rates represent the Building Department's best efforts at estimating the generation of
sufficient fees to cover the Department's costs of operation (as required by law) based on
information available to staff in Permits Plus, the City's current permitting technology. As with all
changes to the method of calculating permit fees, it is likely that staff will need to adjust these
rates in the future once the actual revenues generated are determined. Revenues will be
monitored closely and staff will return to the City Commission with proposed rate adjustments
as determined necessary. Additionally, the Planning, Public Works and Fire Departments, who
also collect fees as part of the development review process, and have their own separate fee
ordinances, are considering changing their ordinances as well and may come forward with
proposed changes in the near future.
The Building Department is proposing amendments to Chapter 14 "Building Regulations", Article
II "Construction Standards", Division 2, "Permit Fees", Sections 14-61 through 14-71 of the City
Code. The following is a brief summary of the changes proposed. Please note that there are two
minor changes from the First Reading of this Ordinance.
• "Triplex" has been removed from the residential category for fee purposes per the
Florida Building Code. This is a change from the First Reading of this Ordinance.
• A reference to the "Department of Community Affairs" has been changed to the "Florida
Building Commission". This is a change from the First Reading of the Ordinance to
reflect the new name.
• Customers will pay a flat fee for individual expedited plans review, and a new express
plan review service will be available for entire projects.
• Fees will be administratively adjusted annually to reflect the Consumer Price Index for
the Southeast United States.
• The re-evaluation of fees where the permit costs exceed 1 0% of the job value is
eliminated as it is no longer required due to the new method of fee calculation.
• Fees for Phased Permits are established.
• A discount of 25% or 12.5% is provided for projects that utilize private providers based
on the level of utilization of City services.
311
City Commission Memorandum -Building Deparlment Fee Ordinance Revision
Page 3of3
• Time limitations and other standards are clarified and established for requesting refunds
from the Building Department.
• Fees and procedures for obtaining Certificates of Occupancy, Completion and Use are
established.
• Processes and Fees are clarified and established for obtaining Annual Facility Permits.
• Various "stand-alone" fees in "Appendix A" are rounded either up or down to simplify
calculations.
• Commercial Permit fees for all Building, Mechanical, Electrical and Plumbing
permits for which the cost of construction is $30,000,000 or less will be 2% of the
cost of construction, and 1% for any amount over $30,000,000 (emphasis added).
• Residential Permit Fees for all Building, Mechanical, Electrical and Plumbing
Permits for which the cost of construction is $1,000,000 or less will be 1.8% of the
cost of construction, plus 1% of the construction cost for any amount over
$1,000,000 (emphasis added}.
CONCLUSION
The City Administration recommends that the Mayor and Commission adopt the
Ordinance provided as Attachment A.
ATTACHMENTS
Attachment A: Proposed Ordinance
JLM/JJ/MVF/SS
T:I.AGENDA\2014\MARCHS\BidgFee0rdAmdtMemo2NDRead.doc
312
ORDINANCE NO. ___ _
AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER
14 OF THE CITY CODE, ENTITLED "BUILDING
REGULATIONS," BY AMENDING ARTICLE II, ENTITLED
"CONSTRUCTION STANDARDS,", BY AMENDING DIVISION 2,
ENTITLED "PERMIT FEES," BY AMENDING THE FOLLOWING
SECTIONS THEREIN, TO WIT: SECTION 14-61, ENTITLED
"PERMIT FEES, GENERALLY"; SECTION 14-62, ENTITLED
"BUILDING PERMITS"; SECTION 14-63, ENTITLED
"PLUMBING PERMITS"; SECTION 14-64, ENTITLED
"ELECTRICAL PERMITS"; SECTION 14-65, ENTITLED
"MECHANICAL PERMITS"; SECTION 14-66, ENTITLED
"ANNUAL FACILITY PERMIT"; SECTION 14-67, ENTITLED
"FORTY-YEAR BUILDING RECERTIFICATION PROGRAM";
SECTION 14-68, ENTITLED jjOCCUPANT CONTENT SIGN";
SECTION 14-70, ENTITLED "GENERAL INFORMATION";
SECTION 14-71, ENTITLED "TEMPORARY STRUCTURE"; TO
PROVIDE FOR EXPRESS PERMITS, PHASE PERMITS,
PRIVATE PROVIDER FEE DISCOUNTS, PERMIT FEE
REDUCTIONS AND REFUNDS, AND TO PROVIDE FOR A
MORE EFFICIENT, EFFECTIVE, AND TRANSPARENT WAY TO
ASSESS FEES FOR BUILDING PERMIT SERVICES, AND BY
AMENDING CORRESPONDING PORTIONS OF DIVISION 2 OF
APPENDIX A OF THE CITY CODE, ENTITLED "PERMIT FEES,"
RELATING TO BUILDING, PLUMBING, ELECTRICAL, AND
MECHANICAL WORK, AND OTHER BUILDING DEPARTMENT
ACTIVITIES; PROVIDING FOR REPEALER, SEVERABILITY,
CODIFICATION, AND AN EFFECTIVE DATE.
WHEREAS, on January 13, 2010, the City Commission adopted Ordinance No. 2010-
3670 ("Ordinance") which modified permit and inspection fees for Building, Plumbing, Electrical,
and Mechanical Work, and for other Building Department activities; and
WHEREAS, the Ordinance went into effect on February 1, 2010 and provided
comprehensive amendments to the fee structure for the City's Building Department; and
WHEREAS, the City Administration has worked with the new fee structure since its
implementation, and the City Commission adopted additional changes in September 2011 and
September 2012 as a result of concerns raised by the development community, as well as by
staff, regarding the fee amounts and the complexity of the fee structure; and
WHEREAS, the City Administration has reviewed the Building Department's fee
structure and determined more efficient, effective, and transparent fees for these services would
be accomplished with a fee structure similar to those that have been successfully implemented
in other municipalities in Miami-Dade County; and
WHEREAS, in an effort to align revenues to the incurred costs of the Building
Department, the fee structure set forth in this Ordinance should be adopted; and
313
WHEREAS, the City Administration recommends that the City Commission approve the
Building Department fees relative to the Building Development Process as set forth herein.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION
OF THE CITY OF MIAMI BEACH, FLORIDA:
Section 1. That Chapter 14 11 8uilding Regulations", Article II "Construction
Standards", Division 2 "Permit Fees", Sections 14-61 through 14-71 of the
City Code is hereby amended as follows with other existing sections being
provided for reference purposes:
Section 14-61. Permit fees, generally.
(a) Levied. Permits, inspections and other fees of the building department of the city
are hereby levied and imposed and shall apply to building, plumbing, electrical and
mechanical permits and other activities undertaken by that department.
(b) Double fees. Any person who commences any work on a building, structure,
electrical, gas, mechanical or plumbing systems before obtaining the building
official's approval or the necessary permits shall be subject to a penalty of 1 00
percent of the required permit fee, in addition to the required permit fees, plus a
penalty for the first, second and subsequent offenses as outlined in appendix A.
(c) Reinspection fees.
(1) With respect to inspections, if the city finds it necessary, in order to enforce
compliance with the Florida Building Code, to conduct an inspection, after an
initial inspection and one subsequent reinspection, of any project or activity for
the same code violation specifically and continuously noted in each rejection,
including but not limited to, egress, fire protection, structural stability, energy,
accessibility, lighting, ventilation, electrical, mechanical, plumbing, and gas
systems, or other requirements identified by the rule of the Florida Building
Commission, a fee of four times the cost of initial inspection or first
reinspection, whichever is greater, for each subsequent reinspection shall be
paid. The inspection cost is determined by multiplying the actual time spent by
the inspector by the inspection fee hourly rate, as defined in subsection 14-
61 (g) and as specified in appendix A.
(2) Payment of the reinspection fee shall be required before any subsequent
permits will be issued to the person or entity owing same. Further inspections
may be withheld until payment of reinspection fees has been made.
(d) Lost plans fee. When permitted set of plans are lost by the applicants, owners,
contractors, or any of their representatives, a recertification fee will be required to
2
314
reproduce, stamp and approve a new set of plans as a field copy. Such fee shall be
based on a cost per page as specified in appendix A, plus an administrative
processing fee as outlined in appendix A.
(e) Revised plans processing fee. The charge for plans processing of revisions to a
permitted set of plans shall be based on the plan reviewer's actual review time
multiplied by the hourly rate as specified in appendix A, plus an administrative
processing fee as outlined in appendix A.
(f) Lost permit card fee. After a permit has been issued, if the permit inspection card
has been lost, a replacement fee as specified in appendix A shall be charged.
(g) Plans review and inspection fee hourly rate. The plans review and inspection fee
hourly rate, as specified in appendix A, is determined at the beginning of each fiscal
year based on the building department's approved overhead and indirect costs and
the resources assigned to the plan review and inspection program.
(h) Dedicated inspectors. Dedicated inspectors may be requested by the applicant to
be assigned solely to their project for a specified number of hours per day. This
request may be granted by the building official, at his/her sole discretion and
judgment. If a request is granted, the building official will use city inspectors for this
effort and secure a contractor to back-fill the regular duties of the city inspector. The
applicant will, in addition to the regular permit and other applicable fees, reimburse
the direct cost incurred by the city to pay for the services of the contractor who is
back-filling for the city inspector.
(i) Plans re-review fee. When extra plans reviews are due to the failure to correct code
violations specifically and continuously noted in each rejection, including, but not
limited to, egress, fire protection, structural stability, energy, accessibility, lighting
ventilation, electrical, mechanical, plumbing, and gas systems, or other
requirements identified by the rule of the Florida Building Commission, in
compliance with F.S. § 553.80(2)(b), each time after the third such review that plans
are rejected for the same code violation, a fee of four times the cost of the upfront
fee of that permit.
U) Expedited plans review and inspection fee. Upon request from the applicant, the
department may schedule an expedited plans review or inspection, on an overtime
basis by city staff. When such service is provided, the applicant will reimbl:lrse the
city for the cost of the city er:nployoo(s) a fee as specified in appendix A shall be
charged, in addition to the regular permit fee and other applicable fees. Express
plan review service may be requested by the applicant with a cost plus fee incurred
in addition to the regular permit fee and other applicable fees.
3
315
(k) Permits for work not identified in appendix A. If it is determined that no specific fee
category directly matches a permit application request, the building official may
identify a category that closely matches the level of effort or determine what the
work will be charged at based on the time dedicated for plans review and
inspection. The building official may require an upfront fee and a deposit to cover
the estimated cost of the services to be provided.
(l) City projects. The cost of enforcing the building code on city related projects will be
reimbursed based on the actual time spent in the processing, review and inspection
of such projects. The payment will be due prior to issuance of the certificate of
occupancy or completion for the project. Effective October 1, 2011, for any active
permit applied for on or after February 1, 2010, fees shall be based on the permit
fee schedule in place at the time of the permit application submittal, and should be
paid accordingly.
(m) The rates in appendix A pertaining to this division will be administratively adjusted
annually to reflect increase(s) or decrease(s) in the Consumer Price Index for
Consumers in the Southeast United States for all items.:., unless othervtise eliFected
by the city commission. Not>Nithstanding the preceding sentence, the rate
adjustments set to take plase in febr1:1ary 2011 and febr1:1ary 2012 shall be waived,
finding such waiver to be in the best interest of tho Gity and the publis.
(n) Electronic concurrent plan processing. In order to create a more efficient permitting
process, the building department has established procedures to process plans
electronically via a concurrent automated workflow. The department requests that
applicants submit plans in an electronic format. If the applicant chooses to submit
paper plans, the director, or his designee has the authority to invoice for
reimbursement of the conversion of construction documents submitted to an
electronic format.
(o) The rates in Appendix A for permit fees pertaining to this chapter shall be
reevaluated administratively no less than every three years from the last adopted
changes. Any recommended changes shall be brought to the city commission for
consideration and final approval.
(p) If the permit fee (including all city department permit fees, but not including any
o1:1tside agency fees or s1:1rcharges referenceel in section 14 69, 14 70, or 50 3(n)
herein) calculated at time of permit application submittal is greater than ten percent
of the ¥alue of construction as declared on the permit application, the permit fee will
be Feevaluated by the building official or histher designee. However, for those
permit applications 'lr'here the value of construction is less than $1 ,000.00 or the
4
316
permit fee is the minimum permit fee, no further evaluation shall be required and the
fees calculated at the time of permit application shall stand. For those permits
where there are no building department plan reviews or inspections required, this
responsibility shall be delegated to the department direstor in the required revie'.•J
departments (such as, for example purposes only, fire, planning, public works), or
their respective designees.
The permit application shall pay the up front prosessing fee, as outlined in the
applicable sections in Chapters 14, 15, 50 and 98 of the City Code, while the permit
fee is being ree'.'aluated.
The ree'v•aluation shall consist of the respective city representative(s) using industry
standard cost estimating resources (as determined by them in their sole and
reasonable discretion) to determine the estimated construction vah::1e. Using that
determined value, the permit fee shall not exceed ten percent or the minimum permit
fee identified for that type of '.vork, as outlined in appendix A, whishever is greater. If
the determined construction value cannot be determined by the above indicated
resources, the actual level of effort for plan review and inspestion shall be calculated
and sharged, but shall not exceed the originally calculated fee at time of permit
application. Refunds, if required, shall be given for any payment over a final permit
fee and subject to the provisions in the applicable sestions in shapters 14, 15, 50 and
98 of the City Code regarding permit fee refunds.
Phase permits. The Building Official is authorized by the Florida Building Code to
provide early start approval. The holder of such permit shall proceed at the holder's
own risk with the building construction and without assurance that a permit for the
entire structure will be granted. A fee as specified in appendix A shall be paid.
(g) Private Provider Fee. When a property owner uses the services of a licensed
private company for plan review and inspections services (Private Provider), the fee
will be assessed as a regular building permit with a discount of 25% of the original
building permit fee. If only the plan review or the inspections are done by the Private
Provider, then the fee will be assessed as a regular building permit with a discount of
12.5% of the original building permit fee.
Section 14-62. Building Permits.
(a) Up-front processing fee.
(1) When the building permit application is received, the applicant shall pay an "up
front" processing fee as specified in appendix A
5
317
(2} This processing fee is not refundable, but shall be credited toward the final
building permit fee. The "up front" processing fee, after it is calculated, shall be
rounded up to the nearest $5.00, with a minimum fee as specified in appendix
A.
(3) '.IVhen the I:JP trent processing fee is larger than the final permit fee, net
including si:Jrcharges, any overages shall ee refunded in fi:JII, sueject te the
limitatiens in suesection 14 €12(9).
(b) Refunds, time limitations, cancellations, change of contractor. The fees charged
pursuant to the schedule in appendix A, provided the same are for a permit
required by Section 1 05.1 of the Florida Building Code, may be refunded by the
building official subject to the following:
(1) No refunds shall be_made on requests involving:
a. Permit fees of $100.00 or less; or
b. Permits revoked by the building official under authority granted by the
Florida Building Code; or
c. Permits cancelled by court order; or
d. Permits which have expired; or
e. Permits under which work has commenced as evidenced by any
recorded inspection having been made by the department, unless the
refund is due to an overcharge by the city.
(2} A full refund shall be granted to a permit holder who takes out a permit
covering work outside the jurisdictional inspection area.
(3} A full refund less the minimum up-front permit fee and any outside agency
fees shall be granted to a permit applicant who requests a refund in writing
within one year of payment, provided that no plan review has commenced.
A full refund less $100.00 or the up-front permit fee, whichever amount is
greater, rounded down to the nearest dollar, and any outside agency fees shall
be granted to a permit applicant who requests a refund in writing within one
year of payment, provided that a permit has not been issued.
A full refund less $100.00 or the up-front permit fee, whichever amount is
greater, rounded down to the nearest dollar, and any outside agency fees shall
be granted to a permit holder (to whom a permit has been issued) who requests
a refund in writing within one year of payment , provided:
6
318
a. That the permit holder makes a written request prior to the permit
expiration date; and
b. That no work as evidenced by any recorded inspection has
commenced under such permit.
(4) Where there is a change of contractor {for all permit types) a fee as specified
in appendix A shall be paid. involving a permit for which a fee of more than
$100.00 was paid:
a-The original permit holder-:-is not entitled to any refund.
1. Is not entitled to any refi:Jnd if the permit has expired or if ·...-ark, as
evidenced by any recordeel inspeotion, has oommenced under such
permit;
2. Is entitled to a full refi:Jnel less $100.00 or the up front processing
fee, ·...-hiohever amoi:Jnt is greater, whore the permit has not m<pireel
and no work, as evielenceel by any rooordoel inspection, has
commenced.
b. The second permit holelor shall pay:
1. ,A, full permit fee if the original permit has expired; or
2. If the permit has not expires:
i. A fee specified in apponelix A to aovor tho cost of transferring the
data from the original to the second permit; anel
ii. The full permit fee less $1 OO.QO or the 6113 front permit fee,
'A'hichever amount is greater.
(5) Where there is a change of architect or engineer (for all permit types) a fee as
specified in appendix A shall be paid. invol•.ring a permit for which a fee of more
than $100.00 was paid:
-a-The original permit holder-:-is not entitled to any refund.
1. Is not entitled to any refund if the permit has ex13iroel or if work, as
evielenceel by any recorded ins13ection, has commenceel uneler such
permit;
2. Is entitleel to a full refunelless $100.00 or the up front processing
fee, whichever amount is greater, where the permit has not expired
and no work, as evidenced ey any recorEieel inspection, has
commenced.
b. The second permit hoiEier shall pay the full permit fee.
(6) A fee as specified in appendix A shall be paid by the permit holder who
submits a written request for a permit extension as authorized under Section
1 04.5.1.4 of the Florida Building Code.
7
319
(7) Where the permit is revoked, or becomes null and void, or expires because of
lack of work or abandonment, a new permit covering the proposed construction
shall be obtained before proceeding with the work, pursuant to Section 1 05.4.1.1
of the Florida Building Code. If no more than 180 days of the expiration date of the
original permit has passed, and no refund has been made according to this
section, the applicant may apply to renew the permit. The reapplication must be
covering the same project and involving the same plans, and must be submitted
with the plans and the applicant's validated copy of the original permit. A fee of 25
percent of the original permit fee, plus an additional $57.00 processing fee, shall
be charged for a renewal under these circumstances.
Where the permit is revoked, or becomes null and void or expires because of lack
of '.York or abandonment, a new permit coverin§ the proposed construction shall
be obtained before proceedin§ with the ·norl<, pursuant to Section 105.4 .1.1 of the
Florida Building Code. If more than 180 days but no more than 365 days since the
expiration date of the original permit has passed, and no refund has been made
according to this section, the applicant may apply to rene\'t' the permit. The
reapplication must be coverin§ the same project and involving the same plans,
and must be suemitted 'Nith the plans and applicant's validated copy of the original
permit. A fee of 25 percent of the ori§inal permit 'fee, plus a fee of 20 percent of
the new permit fee shall be charged for a rene'lo'.'al under these circumstances.
For permits that have expired where the only missing component is one or more
final inspections, the fee for reopening the permit, performing the final
inspection(s), and providing a final approval on the permit shall be charged based
on the time dedicated for inspection(s) minimum building permit fee.
(8) The euilding department director is authorized to char!iJe the fees assessed
prior to February 1, 2010, to those applications that are scheduled for suecontract
permits, where the master euilding permit was issued prior to Feeruary 1, 2010.
Every application submitted for permit will be evaluated and fees assessed
accordingly whether it is for a master permit. a stand alone permit or a
subcontract/trade subsidiary permit. All submittals will be assessed the fees as
prescribed in appendix A or the minimum permit fee, whichever is greater.
~ The building department director is authorized to char!iJe an interest to any
amount due when not paid by the d1::1e date. The interest rate shall be at the
highest legal limit authorized by la·N; plus collection costs and attorneys 'fees.
(c) Building permit fees are as specified in appendix A.
8
320
Section 14-63. Plumbing Permits.
Plumbing permit fees are as specified in appendix A.
Section 14-64. Electrical Permits.
Electrical permit fees are as specified in appendix A.
Section 14-65. Mechanical Permits.
Mechanical permit fees are as specified in appendix A.
Section 14-66. Annual Facility PerFnit. Certificates of Occupancy or Completion and
Certificate of Use.
The annual facility permit is adopted as outlined in Florida Building Code, Section 1 0,
and the annt:Jal fees are:
(1) Calculation of the initial and final annual facility permit fee. Each firm or organization
which obtains an annual facility permit shall inslude in their application for such permit
the total n~.::~meer of Fflaintenanse personnel including helpers and trainees there 1.::1nder
assigned to building, electrical, plt:Jmbing or Frlechanisal work. The fee shall be computed
ey m~.::~ltiplying the total n1.::1mber of such employees times $40.00. The Frlinimum annual
facility permit fee shall be as specified in appendix A. At the expiration of the annual
facility perffiit the job log shall be submitted to the euilding department for the salc~.::~lation
and payFFient of any additional fee d1.::1e for the work performed according to the job log.
No now annual facility perFFiit shall be issued until the f1.::1ll amount for the prior year has
been paid.
Certificate of occupancy or completion. In order to obtain a certificate of temporary;
partial, or final occupancy or completion as required by the Florida Building Code, the
following original fees shall be paid for the purpose of defraying the costs of processing
the certificate, including any necessary inspections.
a. Final certificate of occupancy or completion. Certificate of occupancy or completion
fees shall be as specified in appendix A.
b. Temporary or partial certificate of occupancy or completion. Temporary or partial
certificate of occupancy or completion fees shall be as specified in appendix A.
\'\'hen the final certificate of occupancy or completion is issued, the appropriate final
fee charge shall be paid. The certificate of occupancy or completion is the certificate
of use for that facility for the first year of operation or part thereof.
(1) Certificate of use.
a. No new building or premises or part thereof, except one-and two-family residences,
shall be occupied until a certificate of use is issued by the city. Certificates of use
shall not be issued until the premises have been inspected and found to comply with
all requirements of this Code.
9
321
1. Apartment buildings, hotels and other multiple residential occupancies
containing three or more units and occupied by only residential tenants shall
require one certificate of use. Where these occupancies contain commercial
activities in addition to residential tenants, an additional certificate of use for
each commercial activity contained in the building shall be required.
2. Industrial, office and commercial buildings being occupied by a single tenant
shall require one certificate of use. If an industrial, office or commercial
building contains more than one tenant, an additional certificate of use shall
be required for each unit occupied therein.
b. A certificate of use must be obtained annually. Certificate of use renewal fees are
due and payable on June 1 of each year. Any person failing to timely apply for the
annual renewal of a certificate of use may be issued a certificate of use only upon
payment of a delinquency penalty of ten percent for the month of July or portion
thereof and an additional five percent for each month of delinquency thereafter or
portion thereof until paid. Renewal payments must be received by the license section
prior to the first day of each penalty month to avoid additional penalties.
c. The first certificate of use issued in conjunction with a new building shall be issued at
the time when a certificate of occupancy is issued and at no cost. Where individual
certificates of use are required, a certificate of use shall be obtained and the charge
shall be as established in subsection g., below.
d. As of the effective date of this subsection, all existing buildings or premises subject
to this subsection must obtain a certificate of use.
e. Upon the issuance of a certificate of use for a building or premises, an annual
inspection will be conducted thereafter to determine that each building or premises
complies with all code requirements of the city.
f. In order to obtain a certificate of use, an original fee shall be paid for the purpose of
defraying the costs of all the original inspections. An annual renewal fee shall be paid
to defray the costs of these annual inspections necessary to determine compliance.
g. The fees for certificates of use shall be as specified in appendix A
Sec. 14-67. Forty-year building recertification program.
(a) There shall be a fee per building as specified in appendix A for the 40-year building
recertification program, as required under Miami-Dade County Code Chapter 8,
Section 8-11 (f) and as said section may be amended from time to time.
(b) If a building has not been recertified in the time limitation established by the county
code section referred to in subsection (a), a late compliance fee as specified in
appendix A shall be paid in addition to the regular recertification fee. This fee shall
also apply if the building is declared unsafe and posted and the time limitation for the
requirement of a new inspection and report does not apply. However, if the building
has an open permit for complete alteration and remodeling, and the building is not
currently occupied, the late fee will be waived if the recertification report is included
at the time of the application for the certificate of occupancy or completion.
10
322
(c) When the building recertification process has not been completed for a particular
building within the maximum time limitations established by the county ordinance, a
notice of violation shall be issued. If the process is not completed within 45 days of
the notice of violation date, the building shall be declared unsafe and vacated at
owner's expense. The building shall remain secured while vacant. If the
recertification is not complete within 90 days of the date when the building was
declared unsafe a new inspection report with a new fee as specified in appendix A
shall be processed before the building can be declared safe for occupancy.
Sec. 14-68. OGGupant Gantent sign. Annual Facility Permit.
Thoro shall be a foe as Sf30cifiod in appondi* ·"'· for tho intake of an occupant load sign as
specified in Florida Building Code Section 1 OOJ.
The Building Official is authorized by the Florida Building Code to issue an annual facility permit.
Each firm or organization which obtains an annual facility permit shall include in their application
for such permit a list of licensed maintenance personnel assigned to building. electrical,
plumbing or mechanical work and the estimated annual maintenance costs. The fee shall be
computed using the permit fee specified in appendix A for commercial alteration/remodeling.
The minimum annual facility permit fee shall be as specified in appendix A. At the expiration of
the annual facility permit. the job log shall be submitted to the building department for the
calculation and payment of any additional fee due for the work performed according to the job
log. No new annual facility permit shall be issued until the full amount for the prior year has been
paid.
Sec. 14-69. Employee training. education, safety and technology enhancements.
A surcharge to building, electrical, mechanical, plumbing and demolition permits will be added
for training, education and safety of the building department employees, and to procure and
implement the latest technologies available for enhancement of services provided by the
department, according to the schedule specified in appendix A.
Sec. 14-70. General information.
This section contains a list of other fees collected by the building department for other
departments or agencies. Specific amounts are given in appendix A.
(1) A Department of Business and Professional Regulation/Florida Building Commission
surcharge will be added to building permits fer the state to study building code
requirements for radon gas, to all permit fees associated with enforcement of the
Florida Building Code for the Professional Regulation Trust Fund as per F.S. §
553.721. This amount is nonrefundable.
(2) A surcharge will be added to building permits for the code compliance program
established by tRe Miami-Dade CGounty. This amount is nonrefundable.
{3) A Department of Business and Professional Regulation /Building Code
Administration and Inspectors Board surcharge to tho building permits will be added
\·vhon processing marino structures accoFEling to schedule established by city
ordinance. to all permit fees associated with enforcement of the Florida Building
Code for the Building Code Administrators and Inspectors Fund as per F.S. §
468.631. This amount is nonrefundable.
11
323
(4) A fee shall be charged to any building or structure for which a certificate of
occupancy is being issued.
(5) A sanitation surcharge shall be charged for all building, electrical, plumbing, and
mechanical and demolition permits.
(6) A separate fire safety, public works and/or zoning review fee associated with the
building permit process shall be charged as outlined in appendix A
Sec. 14-71. Temporary structure.
Notwithstanding any provision of the zoning ordinance, a temporary structure used as
construction offices shall be permitted in conjunction with the construction of a building for which
a valid building permit has been issued, subject to the following:
(1) The use of the temporary structure shall relate directly to the building for which a
valid building permit has been issued.
(2) The temporary structure shall be located on the same lot as the building to which it
relates or on a lot within 400 feet of the lot to which it relates.
(3) The temporary structure shall be permitted only after issuance of a building permit for
the building to which the temporary structure relates, and such temporary structure
shall be removed prior to ~ issuance of a certificate of occupancy for such
building, or within 30 days after the building permit for such building expires,
whichever comes first.
~ Prior to approval of the temporary structtJre by the building official, a $2,000.00 cash
bond shall be placed on deposit with the city to assure removal of such struoture in
accordance with the pro·.'isions stated in this seotion.
Section 3. That Appendix A is hereby amended as follows:
Section this Description Amount (Effective October 15,
code ~June 2 2014)
Division 2. Permit Fees.
14-61(b) Double fees for starting work prior to issuance of
permit, _Q]us the following _penalty:
First offense 119.29
120.00
Second offense 238.51
239.00
Subsequent offenses 599.28
597.00
14-61 (c)(1) Reinspection Fee:
In compliance with Fla. Stat. 553.80(2)(c), any
subsequent reinspection after the first reinspection
shall be charged four times the cost of first
inspection or first reinspection, whichever is
greater. The cost of inspections is calculated
12
324
based on the actual time spent by the inspector
multiplied by the inspection fee hourly rate, as
specified in subsection 14-61 (h). The actual time
of inspection is rounded up to the next quarter
hour segment.
First reinspection 0.00
Second and subsequent re-inspection(s) Based on four times the cost of
first inspection or first re-
inspection, whichever is greater.
Reinspection of existing building to determine Based on four times the cost of
compliance with the applicable Building Code first inspection or first re-
inspection, whichever is greater.
14-61 {d) Lost plans fee:
Administrative processing fee ~
50.00
Plus the cost per page reproduced:
• Letter (8 "Y2 x 11), Legal (8 Y2 x 14), & Ledger
(11 X 17) 1.04
• Arch 0 {24 x 36) & Arch E (36 x 48) 2.29
• Other copies, up to Legal Size 0.016
14-61 (e) Revised plans processing fee:
Administrative processing fee ~
50.00
Plus revised plans review fee: Based on actual time spent on
review multiplied by review fee
hourly rate, as specified in 14-
61 (g).
14-61 (f) Lost permit card fee: 7+-:1-8
78.00
14-61 (g) Plans review and inspection fee hourly rate
The plan review and inspection fee hourly rate is
calculated at the beginning of each fiscal year
based on the department's approved budget,
overhead and indirect costs and the resources
assigned to the inspection program.
14-61 (h) Dedicated Inspectors
The requester will pay for the dedicated inspector
in addition to the regular permit fee. The fee for the
dedicated inspector is based on actual time spent
on inspection multiplied by the dedicated
inspector's cost to the City or the inspection fee
hourly rate, as specified in subsection 14-61 {g),
whichever is greater.
14-61 (i) Plans re-review fee
First and second re-review 0.00
13
325
Third and subsequent re-reviews: Based on four
times the amount of the upfront fee as specified in
14-62{a) in compliance with F.S.S
553.80(2)(b),any subsequent re-reviews after the
third review shall be charged a fee four times the
amount of the proportion of the permit fee
attributed to the plans review. The fee for plans
review is calculated based on the actual time spent
by the plans reviewer multiplied by the plans
review hourly rate, as specified in subsection 14-
61 (g).
14-61 (j) Expedited Plan Review and Inspection Fee
Upon request from the applicant, the Department
may schedule an expedited plans review or
inspection on an overtime basis by Department
staff. ~All:! en SI:IGR seP.~ise is J')Fe~o~i el eel, tl=le
,A,J3J3Iisant will reimbldrse tl=le City fer tl=le sest of tl=lis 250.00 for each review or
seP.,ise. inspection requested
Exg_ress g_lan review -available for first review only 50% of the Building g_ermit fee
line item
14-61 (p) Phase Permits
Commercial New Construction 2 000.00
Commercial Alteration 1 500.00
Residential New Construction 1 000.00
14-62 (a) Up-front processing fee: percent of estimated
permit fee or the minimum processing fee,
whichever is greater
Percent of estimated permit fee rounded up to the
nearest $5.00 increment 20%
Minimum up-front fee §+..8§
50.00
14-62(b)(4)b.2. Change of Contractor Tmnsfer of elata from Baseel on one I:! our of work at the
ori§inal to sesonel euilelin§l I'JSFFAit l:!oleler 1,ttl:!ere no RO!:jrJy rate as sj3esifieel in
work l=las sommenseel "'' oh.,..o,...+i"n 1A~~1 /n\ 100.00
14-62(b)(4)b.2a Change of Architect or Engineer Transfer of elata
from OFi§iRal to sesenel 9uileliR§ j::)SFmit l=loleler 155.00
wl:!eFe werk l=las sommenseel 100.00
14-62(b )(6) One time request for Building permit extension 103.70
(permit must not be expired) 100.00
14-62(b )(6) Additional reguest for Building g_ermit extension 100% of Building g_ermit fee line
(permit must not be exoired) item
14
326
14-62 (c) Building Permit Fees:
Minimum Permit Fee ~GJ.7G
100.00
Commercial Permit Fees for Building Permits
Permit fee for a building whose estimated construction cost is egual to or less than ~30 million is 2.0% of
the cost of construction as a~~roved by the Building Official or his designee, glus 1.0% of the
construction cost for any amount over $30 million as approved by the Buildina Official or his desianee.
Residential Permit Fees for Building Permits
Residential: Sinale familY. Duplex
Permit fee for a building whose estimated construction cost is egual to or less than ~1 million is 1.8% of
the cost of construction as ag~roved by the Building Official or his designee, ~Ius 1.0% of the
construction cost for anY amount over $1 million as approved by the BuildinQ Official or his desianee.
GGGidPAAJG¥ +-YPE INGRfiMEN+At GGS+
~ ,lf!\IG~eA4eflt~Af:
1{){) SQIJARe .~r
hh:,., 11 l"r.n~#rr 1r-*i.r.n .r.r Oa, .~;. 1r<:>fi.r.n nf ~'"'""""'
Gest Pef 1{){) Sfti:JBffJ F6et ~Jasefl eR GSSI:JfJBRGY
~e as flefiRed 13;1 the • ~eFifia Sf:Jttfi.fRf} Gefie .
Samf)Jes ef GGSf:lfJBRGY Types are fJrfJvifiod fer
,\V-1:J8t:cat.ive f3f:lfJ39Ses ooly. aRfi. a.r:e Ret iRet~:~sive ef
""II 11<'1'"1~ tuifhin a.,,-.h /'"\,..,..,,,...,.,,.., THnn
+l=le fee is salsbllate9 9ase9 eA tl:le tetal SE11::18Fe
feeta~e FAblltij3lie9 By tRe Fate j3eF SE11::18F9 feet, iR
~ "" .... .... ... ~-, .. ,...,I., """' "'' =~= "' ... ,1.
I
INGREMEN=I=Ab
GGGYI=!,~NG¥ +¥1=1E GGS+ I=IER INGREMefiJ+.~.b~ GG
SQUARe Fee+
t>, ~ , .~.sseFAely Fixe9 ~eatiA~ (+l=leateF, GeAseFt
MaU1
a I In +n ':!. (\(\(\ c-r. '"''""' foot J~ ~. ~ G I
[;,.,.,,...... 'l f'lf'lf'l ..,...,, ,...,,....,. f,..,..~ ~"" -1 1=: (\(\(\ ~...,, ,,..,,. ..... foot abO¥e fee pl1::1s ~ I ' a l:"rnrn 1 t:; f'l(\1 .,.,, 1-:>ra faat t,.... !=;(\ (\(\(\ .,...,,,..,.,.o foot abeve fee J3h:l6 ~ ' ·~ ~_ ...... _,..,...~ ..... '1--'-
A 2, AsseFAely P:ee9 aREl blFiRI" (RestabiFaRt,
"'~ ... h+ f"lo .h c ... .-\
I
I In +n ':!.!=;(\ ~,..,, ,...,,..,. fo ..... + 6~~-~G
Crn'""' '::11=:(\ ,....., '""'""'"' foot t,., 1 7J::f'l ,..,., "'""ro fo..,t aeove fee pl1::1s 2G6.fHl '
.brJ"U"Y\ 1 71=:1 "''"'' ~-•• ~ ') J::f\('1 ~-abeve fee pi tiS 2G6.58 ' ' Crn ...... 'l J:;f\-1 .,...,, '""'""" f .......... t +'"' 17 t:;nn .,.,.., ,..,.,. ..... foot aeove fee pl1::1s ~G~.43 ' ' c ............ 17 J::f'l-t ~~· ............ !' .......... ~ +. J::f'l """ ~~' , ........... ~ ........... abeve fee J3l1::1s 4-9-:W ' '
A_'l At:>, " 1\/l/nr"hin limo h
' ' ' .
15
327
I I, •--t f\f\f\ ~~ ·~r" ,t,..._;.
'
C'r,..._ C. ('\('\~ "'"" '""'r" ,t,..._;. ;.,... ~('\ ('\('\('\ ,..,.. ,...r,... &--•
' ,
B, Bl:lsiness
.Cr .... _') z:::n~ ... ~, "'r" &,...,.... •-'')~:; nnn -~· ,...r,... & .... ,....
' ' c .. -"lC:. ('\('\~ ,.,.., ,..,~,.. &..:: ... ~ ~. c..n nnn
'
n1c n ...... ....~ c....~. ·--''---' '
. I 1 ... •-'l ('\('\('\ ,..,.. .... r,... f.-..-.+
'
I ~ 1,..,..;.;;., ,;.;""'"'I ... ~h• ,1..,+,..~,
I '
1 1 ... •--1 c:.nn ,..,.. .... r,.. &--•
'
L'r--7 :::n~ ....... ·-r-&,.. ....... _ I:;~ nnn ... ,.. ·-r-4'--·
' '
"") -.. : •... :
' ' T .I 1 ... ;.,... A £;('\('\ ,..,.., ,,.,,.,., j:,..,....
I
-c~ .......... A :::nn--F ......... + ...... ')') c:nn .,,..I ,,...r,... F ... ,....
' '
llll ··-r---· 'I,., rn,... ....... r<---· C"•-.... r'lro c-•-·'
'
L'r---t nnn ,.. ... -r-.t--· .. ,.. ::: nnn ... ,.., '"'p" .t--·
' '
~~ •• ,..r,...,.. ... , ;1,., [~..,,.. C'-1.,...;.;,.. ... \
'
. L'r--")~ nn~ "'"'' ..,r...._ &,...,..;. ;.,... 1:.~ f\f\f\ ,..,.., .... r .... & ........ ;.
' '
••••. ---•'1-ro ......... :l -r 1\11-----,..\ ' ~
.cr ... -"7 'c;n~ .,.,., .......... & ........ -~. ·-I:;~ nnn ... ,... .... r.-.. .t--· ' ,
R 11 Residential Transient (Boarding House,
u-•-1 •~-•-1\ ' .. ~
.I 1 ... ;.,.. "l ('\('\('\ ,..,.., ,,..r,... F .... ,..;.
'
16
328
311 '1 0
above fee pll:ls 14S.72
above fee pll:ls
311 '1 0
above fee pll:ls 265.39
above foe plus
above fee plus
311.10
136.39
311.10
above fee plus 1S0.20
above fee pl1::1s
311 '1 0
abo't'O foo plus
above fee pl1::1s
311.10
above fee pl~c~s 265.9Q
above fee plus
311 '1 0
above fee plus 452.00
above fee pl1::1s 130.13
above fee plus
311 '1 0
above fee plus 36Q.52
above fee plus 111.16
311.10
above fee plus 121.ij5
above fee plus
n ............. ;.......... Tirvto.c-h..,.-.o.\ ,
R J, Residential Permanent (D•.vellings, Custom
u .... ~ .... ~\ .., "'""":
R 4, Residential Assisted Living (6 16 persons)
.I 1-•~ -1 r::.JV\ -~' ·-~~ .&~~•
'
. c~--7 't:;n-1 ""'' .... ~ .... .t ................ t:;~ '""' .... ,.. .... ~ .... .& .........
' '
.c ...... ~ ~·(\(\1 ...... , ,., .. ,.. f'~o.~ ~ .... '"l~ nnn ........ , ............ ~~.
I I I
S 2, Storage Low Hazard (excluding Parking
~ ...... .., .......... \
.c ...... ~ ~~nn-1 '"' .... ' ~ .......... ;,... ..... + .... c;~ nnn ... ,.., ............. .t .........
I I
•Up to 7,500 square feet
.c ............. ' c:nn .,.,..,1 1..,,..,. ""'"'~ + .... ~:;n nnn .. ,..I ............. ~ .....
I I
.I 1 .... + .... -1.::; (\(\(\ .,.....,,,..., ...... ~ .....
' .c ...... -• ~ nnn ""'' , .......... .& ............ _ ~n nnn ~ .......... "--•
I I
311.10
above fee plus 399.10
above fee plus 117.g2
above fee plus
311.1 0
above fee plus 440.12
above fee plus 133.39
above fee plus 111.76
311.1 0
above fee plus 129.30
above fee plus
311.1 0
above fee plus 117.63
above fee plus 117.63
above fee plus
above fee plus
311.10
above fee plus 169.2g
above fee plus
155.36
196.71
above foe plus
150.19
above fee f)lus
F-or any square footage o•;.or 50, 000 squaro foot, a.Gm'o foo
per Occl:lpancy Type plfls:
OCCUPl\~JCY TYPE
17
329
I NCREMENT/\L
COST PER I NCREMENTAL1 00
SQUARE FEET
R, Residential
All other Oooupansy Types,
: ............... : .... -............... 1: ...... :+.-..,.j .... .
ft. A.-~ .. 1hh·
I I
Q, Q~::~sinoss;
E, Ea~::~oational; and,
M, Mercantile (Oepartment Store, Drug Store,
~ ..... C'~.. . ,\
Minim1:1FR Fee fer FRiner a.lieratiens net r:oq1:1iFiny
strf.JGtf.Jral review
.... :._ ... __ rot .... 1 __ .... 1-..1---~·-:-,..
' -Kitohen Renovation Single Family Home (RJ) or
Single Apartment Unit (R2) based on the roe for
rosonfiguration of space up to a maximum of (if 2
traaos or loss are req~::~iroa then apply minimum
........ ~ ...... i+ ¥..... ...,. .. + .. ..,.,J,.., \.
... .Qath Renovation (Single Family Homo (RJ) or
Single Apartment Unit (R2) based on tho foe for
roconfig~::~ration of space 1::1p to a maximum of (if 2
trades or loss are required then apply miniFrlUFrl
-:• &-.... ·~ +~-...1-\.
• Flooring per 500 sq~::~are feet or part thereof (if
fixture sets are included then a separate plumbing
• . • ...1\
Generator Commercial
18
330
Amount
(Effective
October 1,
~
I
Amount (Effective
February 1 I 2009
through
September aol
2012)Amount
(Effootive October
1 c:: .. ,,~ '"l\
I
111.16
129.6J
1096.11
678.20
18J.55
:i4J.25
407.54
189.00
• bl~der: ~ G,GGG SEJblar:e feet er: 11 96.QQ
"'"'"' 1;;,... .,....,;,...h ,.,... ............... ....,,..."'"''"""+'"''"
-1 n nnn +r. t::f'l nnn .,,.., ,.,,.o foo+ 149~.QQ , ,
"'hn '"" £;("\ nnn .,. ..... '"""'""" -Foo+ Hi9a.GQ ,
c-.••. ,,.. .. '1111-'· n.
C· ~:nnlo t:..,,...,;~, ~4§.QQ
c. ·• ,.., . • 1/1\JI, .1+; c. :I . aao.oo
=I=FaRSfeF ~Wi~SR faF p;:l:l~l:lFe (;;eReFa~aF ~!=19F l:lRi~~ 146.QQ
c ........ IA/..,J, ,,. ................. "" W.,QG
Cu,i ........ irorw o,.,.,.,.
Ne~.~.~ ~~t,ciFAFAiA~ !=!eel, ~1=1a eF F91:lA~aiA
Co.:>irlon+i"'l ;,..,..!. 1rlinn ,.,.., 1inW\on+ o..,,..h
' ' 1.,,..,...,. -1 nnn ..................... J97.17 ' 1 nn-1 _')~:; nnn + ... +..,I n .... ll.-.n ... 849.16 , ,
f"'luor-')£:: nnn + .... +.,1 ..,.,linn.,. 1,J11.81 ' c-.,,.;...,,....;.,,. o ........ o .... ., ..... ,...,,;,....., o ........ ~ ........ .,.: ....
fn,..,.., .,..j.,., ,,..+, ,,...,1\ :n,..lo ,,.j;,..,., ,.,,.., oin.-n,.,n+ JQJ.G~
.... c .... ...... ,.., · .... · ... ,.. ..,1; .... 1,376.06 '
~ih~oliFfiR=liR~ !=!aal, ~1=1a aF F91:lR~aiR GaFTIA=teFsial,
inl"'ll 1rlinn on ,i,....,.,on+ "'''"''h ,
I lnrlo.-1 (\(\(\ l"''"'ll"'n"' ~ ,698.6~ ' 1 nn-1 ')~:; nnn + .... + ......................... ~.741.8J ' ' r., ,,.,. ')£:: (\(\(\ ........... ,... .... u ........... J,JGG.77 '
Swimmi~~ ~eel ReRevatieR GemmeFGial ERe~ 1,679.94
<>+n ,,..., ,,..,1\ in,..ll 1rlinn .,.,.,, inr"l"'lon+
o ....... 1 c,.,,,;,..,,.....,.., ... + o ..... ..... .,. ~9El.66
Cr.nl t:n, •inW\ol"'lt Coni"'""'"""''"'+ 1GJ.7G
c,,.,;,.,.,.....,; .... ,.. o .......... 1 c,.,, ,,.;.,.,..i ...... ·
• ResiEieRtial ~
• Gemmer:sial ~87.~§
Sv.t.immiAfJ f}GGI !if}htiAfj ~wheA mstallat.iGA Ret
.JI-. .~ .. :+I·
• ResideAtial !=!eel eF Spa. ~
D ".J, i.,l f"' nrnhin<>+i,.,_,.. Onnl .,,..,.j Cn<> 1QJ.7G
,...,.,....,..., ....... ,..; ... 1 ...... 1\/1, .1+: .......... ; .. o ........ l ....... c ....... ~Q7.4G
• GemmeFGial GF M~;~lti family Gembi~atiG~ ~eel aREI ~Ela.H~
~
19
331
Parlial aREi Teta/ DemelilieR
Total Demolition
• Under 3 stories
• O'ler 3 stories
Partial Demolition
-I 1~....1~~ ~nn ~~ •~r~ .c .~,.
A'#aFiRe PeFmit&
Docks Residential (includes pilings associated
,.,:~h ...I ,,..!, ,.. .... ,..,...~ro ,,..;,...~ '"'...I 'l : ........ ,...\
• Under 100 square feet
• _1J\1 .::nn ,.. ....... fa~'
• Per 100 square feet or part thereof O"er 500 ~,.. o~r~ S:-'>
D?cks Commercial (includes pilings associated
••• :.h ................. ~-...... : ... ~ -....... .., -...... ; ......... ,
• 11 ... ....1. -tnn ,.,.. f ... ~ 'l::f'"' •· ~=~.~ 1 0~, square feet or part thereof over 500
~ .... ?ek.~epair Commercial replaee all but piles
t .... ·~ : ....... ,.._ ...... . .......... ;_ ................. \
~ook Repair Residential replace alibut piles
t .... l o~hin,.. ,.._ ,....1,.. • ,1 ..,,... ;_ • ....1 .. H
• Under 75 linear feet
• 75 150 linear feet
V\Latercraft Lift
OTTT ~
a I I '" 'l ,;,
~,.. ... _
........
20
332
~··'""'
380.58
437.€)1
228.00
737.31
1178.03
132.74
387.84
452.13
1026.63
1 ,03€1.04
1,400.99
23€1.51
148.29
494.65
906.34
gg,..1..5
462.50
205.33
fJI:J.~fiiRg SigR (ReR el-esf:fisj If. sigR has etestfisat
,..,..,,..., ... ,..,,,..,,1 "'' "',1-, ,,.....,,;I ,..· ....
'
• easl=l ~HU~G
C::J, .~, ' ~innc>•
·~-
t: .... ,..h {;,.. ,.,,.,1,.4;+; ...... + .... +h..,. ... ~ ...... {',..,"" ............. , .... , 7+.00
Temporary and Special Event Fees
Temporary Platforms for public assembly, first ~77.33
approval 104.00
Temporary Bleachers for public assembly, first ~
approval 95.00
Temporary Platforms or Bleachers for public ~
assembly, re-approval 20.00
Tents-excluding electric and plumbing, per tent
• Up to 1,000 square feet 118.22
104.00
• Each additional 1,000 square feet over 28.00
1,000
Temporary Structure !Trusses/statues (no electrical 325.62
orplumbing included) 104.00
Temporary Chiller 461.47
462.00
Temporary Generator 236.44
237.00
Construction Trailer, per trailer 567.24
568.00
Office Trailer, per trailer 685.46
686.00
Temporary Power for Construction 225.G3
225.00
Temporary Power for Test ~ 88.73
189.00
Temporary Multi-seat Toilet Trailer, per trailer ~
80.00
Temporary Individual Toilet, per event -1-e-:W
17.00
Amusement Rides 59-A-1-
60.00
Temporary electric work on circuses, carnivals, per 311.1G
show. 312.00
Temporary Fencing 148.29
150.00
Electrical Installation-Small events (1-1 0 tents,
bleachers staoes and other structures) 250.00
Electrical Installation -Large events (more than 10
tents bleachers staoes and other structures) 500.00
Mechanical Installation-Small events (1-1 0 tents,
bleachers staoes and other structures) 250.00
21
333
Mechanical Installation -Large events {more
than1 0 tents, bleachers, stages and other
structures) 500.00
Plumbing Installation-Small events (1-10 tents,
bleachers staqes and other structures) 250.00
Plumbing Installation -Large events (more than1 0
tents bleachers staaes and other structures_} 500.00
t:l.uil.#'II,.,. /"'"""""""""""""',.oF t:Ir""' o .... ,.,..;,..,..
• Geek:in§ l=jee€1 S~t3t3Fessien ~13er system~ 275.8'1
Multiple systems in same area (i.e. kitchen) will
be chaF§o€1 at 5Q% ef a89!-'8 foe for easFI
... rolroli+i ............ , .... +..,. .......
0 _Ciro ~' '""""~'"'"'"'i"'" ~""'+"'...,., /nor.,.. ,.,.to...-.\ 295.55
Ciro i\.1..,,.,...... ~ ,,.,+o,.......,. fl,.,..,.,..,., .... ....,,.., .,...., ,..,,.o foot\
.......... ., C:.l"\1"1 239.44 ' 2,5Q~ J,QQQ 325.82
J,QQ~ 5GQG 4~3.78
5,QQ~ ~G,GGG 53~ .98
~G.GQ~ ~5,GQG 739.38
~5,GQ~ JG,GQG 945.74
JG,GQ~ 75,GGG ~ ,4H~.82
75,GQ~ ~GG,QQG ~ ,89~ .49
WG,QG~ ~5Q,GGG 2,8QQ,8G
~ 5G,QQ~ 5GQ,GGG J.J~ Q,~ G
G\1er 5QQ,GGQ 4.G~QA~
0. • 0 Ciro i\.J...,_,.,..., C">nol f"''nh
1 .... + ... ., t:l"'n ~ ~S.22 ' 2,5Q~ J,QQQ ~ ~ R22
a,oo~ 5QQQ ~ ~ S.22
5,QQ~ ~G.GQQ ~ ~ S.22
~ Q,QQ~ ~5.GQQ ~ ~ S.22
~ 5,QQ~ JQ,QQQ ~ ~ 8.22
JQ,QQ~ 75,GQQ ~ ~ 8.22
75,QQ~ ~QQ,QQQ ~ ~ 8.22
~ QQ,QQ~ ~ 5Q,QQQ ~ ~ 8.22
~ 5Q,QQ~ 5QQ,QQQ ~ ~ 8.22
G1-'er 5GQ,QQQ ~ ~ 8.22
Fire E:le'-1ater recall +est
Base ~a~ .78
Per Fleer a&.-00
• electrical Smoke Qetest:ers (Fire ~eFmit~
• 61n€1er 5 Ele 1•1ises ~94.89
I In +n ') c:; rolo\li "'"'"' soe.Ge
• Per aEIEiitienal 25 Ele 1.,ises or 13art thereof ~
22
334
~A;,..,.,. ,..,,.L ,.., .... ,.,.~;,..+;,....,.., +,,.,.. ......... ,.,....
... ·~ c:: ~ .... ~ ..................... ~ U,-00
a .,. 1 c:: """"'"'""''""""'•~ Hl9.9J
• 1\Ainnr-,..,,....,. "'"' ,.,.~;.,.+;,..,,.., firo "'' .,..,.,..,.,. ..... 4-&.e+
D. :1. . -r ...... ~,.. o,.. ... .,.,.;o~ ...
0, "I...Ji ...... 1\Ai ... :~, ,...., o,..,,.....,;J;-c,..,..,. ~~-......... ~
tiAsi~;~Eies e~;~t Ret lirniteEI te: steFa§e sl=leEis, 10J.70
h ............ h .............. : ............... : ...... ,.. .. :,.. .. ..,J,..,... ....... \ , ,
B~;~iiEiiA€1 PeFrnit feF MiAeF Re13aiFs ~ d~.74
Painting Permit
• Residential-Based on Planning Fee Schedule 27.00
only
• Commercial 27.00
IRstallatian QF-FeplaGement af. vo~ind6vl5 and
eJlteRQI! deot:& in aU buildings, SIJutteto, ~ed
,., ... ,..,.. ,. ... .,...,,. ........ <# ... ,...,.,.,...
Nel,\l iAstallatieA GF Fej:llasemeAt, ef aee1.te listeEI
~
• ~ I.IAit 10J.70
•2~0~;~Aits 207.40 . ~ ~ JQ I.IAits J42.21
• J1 aO I:IAits 879.J8
• a~ aAEI FRGFe I.IAits ~Sf;)9Gial iASj39GtiGA F9Ejl:liFeEI~,
....................... :.: ............... c:: ..... :..... ...... .......... ·" 44-,4g
Shutteto:
........ : ............ u .... : ........ ,... ...................... ,.. ..... ,.. .... . ~ ao ~:~A its* Hl~.8~
c ...... h .............. :.: ........... -1 f\ .... : .... ,.,. ............. ·" ........... 'lf\ ~
* .:. : ........ ,.. .... ,.. ... · ....... ,..~ ............ -· ~·· ..... ·-·--
SooFetront iRGiuding wiROOII'/5 and 00910
the,:ein:
I 1 ... + .... -11"\1"\ ,.,.,.., ,...,,.,... _,,..,,..,+ J47.40
a 1f\1+ ... o~ nnn .......... ~ ... .r:. -• 877.30 ,
o,... ................ :.: .............. 1 f'll"\ ,.,.,..,, ....... ,.. .,,.. ......... ,,.. .. 1 f'lf\1"\ 118.11
23
335
_____ 336
• ~9F YRit ~5Q.QQ
~eQ.QQ
All Qtl=leF Gssl!~aRsies
• ~ 3Q YRits ~4€i.QQ
• eaGR aeeitiGRal ~ Q JdRits 9V9F 3Q H~e.QQ
f"...,r,..,..,... A ,.,...;,...~ ~Q7.4Q
~e~lase fa9FiG feF awRiR§, GaRG~y GF G9¥eF (RG
.-.h..,,.,..,. fn.r .,. innl.c f.,....,.jl, h"'""'"' \ 7&.+4
14-63 Plumbing permit fees:
Minimum plumbing permit fee: ~Q3.7Q
100.00
This minimum does not apply to permits issued as
supplementary to current outstanding permits for
the same job.
Commercial Permit Fees for Plumbing Permits
Permit fee for a building whose estimated construction cost is egual to or less than ~30 million is 2.0% of
the cost of construction as a~mroved by the Building Official or his designee, !;!IUs 1.0% of the
construction cost for anv amount over $30 million as approved bv the Buildina Official or his desianee.
Residential Permit Fees for Plumbing Permits
Residential: Sinale familv. Duplex
Permit fee for a building whose estimated construction cost is egual to or less than §1 million is 1.8% of
the cost of construction as a1212roved by the Building Official or his designee, !;!IUS 1.0% of the
construction cost for anv amount over $1 million as approved bv the Build ina Official or his desianee.
~lllmBiR!iJ QemelitieR ~eFmil ~78.~9
PlflmiJiRg PeRRits iRGiudiRg S1:1ildiRg, ~GIFiG .. .,.,., ... . .. • ,..,, ,...,..,..,., .4 •
I rri_..,.,fj,..,... C'• ,,...,...,..,...,...
• i=iFst i!:8R9 ~
• easl=l aelemieRal eeAe ~
WateF aRe QFaiRa§e RiseFs aRel MaiRs, ~eF ~ JdAit
l=leF ~iseF eF MaiR
r. .. ,,lti I lnit Co..,.lrlo.nti.-,1 f .... ,,..1, ,rl:n,.. CCU\
I 1 ... t .... J:: ,,...;t,.. ae~.Qa
• eaGR aec:iitieRal a 8¥9f a JG.m
• GemmeFsfal
25
337
l
>Lh-~ ·-·--. 1
' ··-· ..... ,,.., ' ~ l ~ ResideRtial ' , -etG -I
t
.~-;;;: .. ~ I I
-.:zriftt:i =± 1 ~•~·E~a~ch~~a~d~d·~·; ~~~~~~======~~~~~~=====il==~~~~~if
L
•-Com .1t1onal 5 O'ler-S ----===--t----===j
mmer""'l _1 I l==----+-~ .... ~·~·~-... ~~r::;.-~-~ ·194 .96 l • I; R ~-:-ItO__ I JOm-l •• addilieRal 5 e•er 5
===~~~E~Ie~c~t~ri~ca~l~t~~t~a~te~r~~~~~~~~~~~====~=======--~~----~~~6~6~~9e~6J
l
• ' ,, "' Heater er Peel Heal =
L
~:; """ er Wew -----+-------· ·-~ach addition;:u~l 1 0 a ---• ----------1 ---v&r-5 1----------I
Electrical water -~ ---------1-.!~~·,..,~·-~·"aGE~e¢·• l=leater or Pooll=l ~ """' eater· =I
•-Up to 5 blnits
-----1
Gas water h
l
.b:IJ-u-n-'--eat~r or pool heater "' . -. ~· neu S~ncsle r:: . -i Gas u<ate R ·'-"' ,_ •. ~--FaFR!Iy ---
l
f..r:ir. _ .. ·~•·;-_eater or pool he ate ~-ms -=~~~~~~~~·~:··~~-;;;;~~;r:n:e~~~~·G~~ [ -• EasR addT '-· "' ' •-•. •; ;;~mmercial -__ _
[ ' IORal 1 g ever 5 -~""""'
-
------
___ 84.-00 .
• Each additiona:-11_0 __
-r--overS
.QW---.:-,..
1 1 ~r· ·------=~-~-
.:tGG-,00
JGm
I
1
100.00
I
~
I
I
I
236.44
~ -
I -I .. ~;-=~ch additional 10 over-5
+ ._.11'"' ·~ r:: ••• ;.. =rtt
•E ~.o. -acH additional 1 0 ---· ..
---
1
-over-S
I '"'+• I.
f.
-~ ~---.._j_l .... ~ ,... ~ ....., ttt
L
-t
207.40
I ~
I I I
26
n.,. .... : .............. ,..,. ,..,.,.,.,..,.,.; ....... .,...
WateF QFaiAa~e ~FaiRwateF Feef iRiets, aFea EIFail=ls,
.,., ,,..;...,,...,. inlo.+.,.\
I 1 .. +"" r::. ,,...,;+., 2§9.2§
• e:asA aeeitieRal ~ Q e~JeF a JG:-G.7
GeREieRsatieR EIFaiRs
I I ... +~ r::. ,,...,;+~ 2Q2.~~
• e:asA aeeitieRal ~ Q e~JeF a JG:-G.7
l.O.tateF FReteF>tSI:ll:l FReteF GGRI=IeGtiGI=IS te wateF
Sl;lf')f')ly system 9F te a13131iaRsesiiRstallatie1=1s Ret
-1 h· fiv+, '""""'
I I"' +"" r::. , ,..,;+.,.. ~~fl~ 4 ... _
• e:aGR aeeitieRal ~ Q 9~•'9F a JCm
c, .h ........ ..,..,.,. .. :+h c...,,...~,fl,.., .., .. ,.. • ..,.,....;,_.., MO', ''""'
... I In +n 1:. ,...,;t.,. ~~a.Q3
• e:aGR aeeitieRal ~Q 9Y9F a JCm
o~~l,fl,.., ... ,.,..j.,..,..j.; ,.. ... ,.!,.. ,;,..,. ...
I I"'+.-. r::. ,.l.,..,;,...,..,. 22a.Q3
• e:aGR aeeitieRal ~Q 9Y9F a ~
Wells, Hlnks, Gas, Sev..ce,::
~ ... "' , ........ ; ... ,/t:'lo '"' o;, ; ... ,.... H39.99
n ,,.. 1~ nr r\j.,.,...h<:>rno \/\/oil<"
I 1 ... +" r::. ......... 2~8. ~ 4
• e:aGR aeeitieRal ~ G G!JeF § JG.,.Q.7
Nat~;~Fal ~as & liEf~;~efiee f')etFele~;m=l, ~ ~;~Rit f')eF e~;~tlet
...,..,,.l ..,..,..,I;...,..,,.,.,
I I ... + .... r::. .... ;+"' ~g7.2a
• e:aGR aeeitieRal ~ Q 9Y9F a JQ.,.Q.7
\II,..,.,..,.,,....,..,.. "",..;..,,.. ..,,....,. ~ ',..,;+
• FGF tFie fiFst §G Jeet ~~9.Q7
..._~_,..,.~,.~;+;,.. ...... 1 1 . ,...,;+ .......... ~::n f ......... a&-Q+
SaRitaFy, steFFR, GeREieRsatieR EIFaiRs aRe selleGteF
""'"'"' ............ . .....
• FGF tl=le fiFst aQ feet 2ij7_2§
........... ....,,.l,.li+: ........... l ... ,..,;+ "'"''" ~:::n fao.+ a&-G-7
14-64 Electrical permit fees:
Minimum electrical permit fee ;..,,..1, ,,..;..,,.., ,..,.,.,...,;,. ... ,. .. ~ ~QJ.7Q
27
339
.... .,. .. 1"\0I"rv-.i+ '"'I"'"" "+ho.-,...,;,.,;,...,, '""' .foo '"'' :&: 100.00 I
fThis minimum does not apply to permits issued as
supplementary to current outstanding permits for
the same job.j
Commercial Permit Fees for Electrical Permits
Permit fee for a building whose estimated construction cost is egual to or less than §30 million is 2.0% of
the cost of construction as a(;!(;!roved by: the Building Official or his designee, QIUS 1.0% of the
construction cost for any amount over $30 million as approved by the Buildino Official or his desionee.
Residential Permit Fees for Electrical Permits
Residential: Sinole family. Duplex and/or Triplex
Permit fee for a building whose estimated construction cost is egual to or Jess than §1 million is 1.8% of
the cost of construction as aQQroved by the Building Official or his designee, QIUS 1.0% of the
construction cost for anv amount over $1 million as aooroved bv the Buildino Official or his desianee.
~lestFis blemelitieR ffij.ae
Cl. ~ ... .f.-.+, """"'""' fr.r ,..,...,.,;,..,. """'"""""""'+ ~ ~4.Q7
~Jeslfis AlteJ=atteA er-Remeflel:
1\Jii ... i ...... ''""' c.,..,.. ,...,. ,,..,..j,...,. ,,.. ,.,... 1 ~::nn ~~ ,...,.,.,... .f,...,...,. H4.22
-D.o.r <>rlrlitir..-.<>1 1 nnn ""' o<>r.o. f.o.ot r.·,u::.r 1 ,;;nn ~
E-leGti4G Petmits inGiudiRg. Building, MeGhanisal
..... ,., t:u ....... l.; .. ,.. ,..,. .........
o ....... ~sa.~~
Assess GeRtFels,£GaF€1 Assess
• bJRS8F a S8\<ises ~e4.88
I 1,.. + ...... '>k. .... aQ6.Q6 --·---o, ...,_.,...!:+; ,.,...,I ')C: .-.1.-. •• .-. .... .-....+ lh ......... ,.f ~
E-lesti4G P.etmits Stand Alsne
C::.l.-..-.f.-i. co ................. ,f .........
• GRe meteF, MiRim1:1m P:ee ~se.n:
• ~ a FR8t8FS 494.6a
• Per: aElEiitieRal meter: eveF a ~
:>,...,.,,..,, c....,,.,,,.,,..,..,,...,,..,,., •.
r'\ ·"" .... ,I IIlii ll"r'\ ~.0..0. ~sa.e~ '
")_t:;. "'"'"'"'I"' a~s.ae
C.-. •h .-...l...li+i.-. ... .-.1 C: ,.....,,...,.1~ ""'" ,.....,,.f +~.oro.-..f ..... +1-:1-8
o,,.,,,,..,. /,.,rf..,.l/..,.tinM'
28
340
14-65
• Unser 15 linear feet, Minirnurn Fee
• 1 a aO linear feet
• each assitienal aO linear feet sf part thereef ever
w
• Unser 5 se~;ices
I In +n ')!=; rl,
.&
• Per assitional 25 epenings er part thereef ever
~
• each adEiitienal 5 ever 5
Mechanical-permit fees:
Minimum mechanical permit fee:
This minimum does not apply to permits issued as
supplementary to current outstanding permits for
the same job.
Commercial Permit Fees for Mechanical Permits
256.14
384.73
255.10
178.36
307.99
199.70
236.44
103.70
100.00
Permit fee for a building whose estimated construction cost is equal to or less than $30 million is 2.0% of
the cost of construction as approved by the Building Official or his designee. plus 1.0% of the
construction cost for anv amount over $30 million as approved by the Building Official or his designee.
Residential Permit Fees for Mechanical Permits
Residential: Single family, Duplex
Permit fee for a building whose estimated construction cost is equal to or less than $1 million is 1.8% of
the cost of construction as approved by the Building Official or his designee. plus 1.0% of the
construction cost for any amount over $1 million as approved by the Building Official or his desianee.
Mechanical Oernelitien Perrnit
Air GORditieRiRg aRd re:fFigeratioR: (lnoluEies all
oernpenent parts of the systern except water, s~:~ct,
eleotric anEI gas lines anEI cennectiens that fees
..... ~~~~~+~!.,\
29
341
103.70
AC Unit Ne•A' Residential
• I ·-•-••-•· -·" .1-:• n;
• Installation of 2 5 units
• ~ach additional unit over 5
1'1f"" • .. r-.
• Under 2,000 CfM
• 0'•'er 2,000 CfM
AC Unit Reralacement, single ldnit ~ingle family
Home (R3) or Single Apartment Unit (R2)
Residential
'.I
• Under 2000 CFM
• Over 2000 C fM
~Unit Replacement for each and any additional
,..,;
~ni;...,,..T.
Pool 1=4oat P~:~mps(Replacemont)
Raise existing Mechanical ~E!Idipment en Roof for
Reroof
, ....... ...,. .....
Furnaces and heating equipment including
6&f!'FR&F6ia/ drieFs, a~<eR6 and ether fired
objects not elsevmere classified. (Includes all
eomp?nent. parts of the system e*cept fuel and
electncal lines.) (~or vented and unvented wall
=ers, see plumbmg permit fees, natural and L.P.
Gas or elf fyrnaGos:
• Residential
• Commercial
Hood Replacement
30
342
264.44
§§1.6g
150.37
g7Q.04
965.45
1 J5.g§
J16.29
352.58
1090.92
210.51
562.05
216.7J
34g.4J
642.94
271.69
~
294.51
352.58
n, ,,... \1\lr.rv 1\lou, r.r o., .... ,,,...~ ~~~·
ResieeRtial
II, ...1 H::: ~ ... -~~~~-~28.QQ
• eaSA a99itieRal a Sl.IFJFJIY GF9FJS Glo18F ~a, GF FJ8A ~
tl=leFeef
GemFReFsial
I I"' t .... .:::1"'11"'1 li ... .,..., .. f'oo+ ~29.QQ
• easR aeeitieRal 2GQ liReaF feet 9 1jeF aGQ liReaF ~
feet
E:"vh.., ,.,..+ \ /o,..,+il.-.+i"''"" 1\lo ,.... ... c., .......... 2a4.GG
Smoke Control Test
• -lJA.Gef Up to 10,000 square feet 2Q7.4Q
208,00
• 10,0001 to 50,000 square feet 7G7.2~
708.00
• Over 50,000 square feet 1 ,Ga2.aa
1063.00
+Fasl=l Gl=l~te 2QQ.QQ
n ... """"' \to .... + ~42.QQ
l.D/alk: iR seeleFs aRe lotJalk: iR ~Feei!:eFS easl=l 11 a.GG
fort11i"'""'"''""+ f.<>JQ.<>_ <>Jidj,_
Elevators, escalators and other lifting
apparatus:
Permit for new installation or major revamping_j)er
ASME A 17. 1 Section 8. 7 Building permit required.
(includes initial inspection and certificate.):
Installation of traction elevators and escalators, per
unit
• Up to three stories 2.2~7.~ ~
2218.00
• 3-10 stories 2,7Q4.5Q
2705.00
• Each-additional story over 1 0 84.00
Installation of hydraulic elevator, per unit
• Up to three stories 1,~aJ.~4
1154.00
• 3-1 0 stories 1 ,4a7.aa
1468.00
31
343
Installation of escalator, per unit 2,158.00
Installation of oarkina lifts oer unit 200.00
Installation of robotic parkinQ. per apparatus 3 000.00
Installation of residential elevator, per unit 1,212.25
1213.00
Installation of wheelchair lift, chair stairs and 975.ij2
dumbwaiter 976.00
Elevator ReJJair and Maintenance
Annual maintenance repair permit
(not to include major revamping) 601.46
602.00
Repairs (value over $5,000.00) per ASME 17.1, 6J2.57
Section 8.62 633.00
Repairs (Jack/Oil Lines)Up to $5,000.00 250.00
Repairs {Can Interior/other) Up to $5,000.00 250.00
Roof window cleaning machine, each machine 107.85
108.00
Permit for removal of elevator from service 570.35
570.00
Elevator Tests, Temporary Use, Variances and
Compliance Inspections:
Emergency Power Test 1,083.67
1084.00
Elevator Fire Recall Test, per unit 1,021.45
1022.00
Temporary Use Permit (must be renewed eve!.Y 30 1,316.99
da_y_s_l 1317.00
Temoorarv Use renewal 100.00
Application for variances from codes to install or 51ij.5Q
modernize equipment 519.00
Annual fees for certificate of operation and
Inspection
Certificate of Operation for each unit (mandated) 75.00
32
344
Renewal of Delinquent Certificate of Operation 100.00
Duplicate Certificate of Operation (mandated) 25.00
Dumbwaiters, elevators and escalators-certificate
and inspection:
Monitorina/Jurisdictional fee 200.00
o,..,.;,..,.j;,. I A,...,... ,..., ........... ,.. .... : ....... ~Q7.4Q
+l=le aRRI::Ial sl=laF§e is easeEI eR tl=le seREiitieR tl=lat
tl=le 8E11::1i!affi8Rt is I::IREier a ffiaiRteRaRse a§lreeffieRt
'l·1itl=l a 1::11::1alifieEI ffiaiRteRaRse semraaRy, iR WRiGR
sase tl=lere is Ra aeli§!atiaR far tl=le Gity IRsraestieR ta
ee §!i¥eR e¥eFy year:. If R9 ffiaiRteRaRGe a§lreeffieRt
is iR effest AI::I§!I::ISt ~st af 9 1f9Pi year, tt:le Gity
I RSJ3eGtieR will ee raeFferffieEI ever:y year: a REI a eave
sl=largas far tl=le A ext fissal year sl=lall ee ~ 5Q% ef
tl=1e eRe sl=lewR iR tl=1ese taeles.
Reinspection fee, each re-inspection 1QJ.7Q
104.00
Witnessing of 1-year tests per ASME A17.1, part X, ~Q7.4Q
section 1000, rule 1000.1 b 208.00
Witnessing of 5-year tests per ASME A 17.1 , Part X, ~59.~5
section 1000, rule 1000.1 b 260.00
Compliance inspection if witnessed test failed, per 1QJ.70
inspection 104.00
Any elevator, escalator, etc, owner who fails to
comply with the order to correct a violation issued
within 30 days, is subject to an administrative fine
up to $500.00 in addition to any other penalty
provided by law. Fines can be imposed for every 30
days period that the violation remains active.
These fines, before or after paid, can be appealed
to the Department Director whose decision shall be
final. No clearance for the use of the elevator shall
be given until these fines have been paid or
waived.
+l=le [)eJ3aftmeRt [)irester GaR Elele§late tRiS aJ3J3eal
f~.JRGtieR te tl=1e I::Jeraar:tmeRt AssistaRt blireGter:, tl=le
("'ih. Dt ilrlinrt f'\H;,...;.,t ,..r +ho no'"' th D tiiAinrt f"\H;,..;,.I
33
345
Boilers and pressure vessels, Installation
permit fees, including initial inspections and
certificate; does not include installation or
connection of fuel and water lines:
Boilers (as defined in the ASME Boiler and
Pressure Vessel Code)
BeileFs a REI PFeSSI::IFe Vessels, ~QQ,QQQ 4QQ,QQQ 393.Q3
B+Ys
Annual Inspection for Boilers ~a9.~a
260.00
Qf:R~fees:
PFessi::IFe aREI ~Fesess ~i~iR§, sl=leet FRetal aREI El1::1st ~5Q.95
!a'•l9Fk aREI eti=leF FR9GR8Rieal liRes:
14-66(21)a. Certificate of Occupancy fees:
~:: ...... _ ........ n ...... ., ........... T., .......
Residential Units R-1 R-2 and R-3 oer Unit 110.00
All commercial occupancies except R-1 and R-2 0.05 per sf
Minimum fee for commercial certificates of 250.00
occuoancv
When a tem12orarv certificate of OCCU(2anc~ or
com(21etion has been issued and the fee has been
12aid, the fee for a final certificate of occu12anc~ or
completion 0.00
A ...... ,..,..,..hl· @~~.87
B~::~siRess, MeFeaRtile
• bJREleF ~G,QQQ S~ldaFe feet 4~ 9.84
ro. ,.,.,. ')(\ (\(\() "''"" ,.,.,..,. foo+ 553.7@ ,
n,., ,,..,..,,.,..., C,-1, ,,..,..,+;,....,....,, I ... .-.+i+o ,+;,..,,..,..,, e7~ .98 ' .
0 __ 1 C_ 'J l:!t til,-iinn Co,. I lni+ ~Q9.9~ , '
c 'l c; ... ,..,, ..... ~::,.,..,..;" ,..,.....,....,n, ...... 1 ...... rr,.; ..... '"'" o ..... ,. lni+ 3~7.3~ , ,
C' "'' ''"' 4H~.87 ,
1:!, il,-linn Ch ..... ll .,... 7&;. .Foo+ 474.9§ -·-
o, '1,-1; ... ,.., C'h.... .... 7&;. ; ........ + 94§_74
34
346
14-66(~1)9. Partial and Temporary Certificate of Occupancy or
Completion fees:
o,.-~;,., ;~; ,.,f,...,..,.. , .... ,.., .......... ,.., ... .......
FOOS GRa~=QOd ~ased QA tAO j30FGenta§e Of tl=!e total
s~blaFe f:oota§e lao in§ Fe~blestee fer:
os61:113aRGy,iG9A'lpletien tiFRes tt:le sost of tl=le final
sertifisate of 066blj3ansy OF soFRt:~letion J:llblS a
SblFGRaF§O ef 2§% ef tt:le G9St ef tAO final GeFtifiGate
ef ess~:~j3ansy/sompletion for oasl=l paFtial seFtifisate
iss~:~ed
T,.....,...,..,,..,,...,,., ;~: ,..,,,.... ,..,f ,... .......... ', .... ,..,......... ,... ....... ,., ......... ,,...fj,.,...,
100% of final certificate of occupancy or completion
fee plus the cost of any additional required
inspections. Additional required inspections will be
charge based on actual time spend on inspection
multiplied by the hourly rate, as specified in Section
14-61(h)
Extension of temporary certificate of occupancy or 10J.70
completion, per period as set by the Building 100% of final
Official. certificate of
occuQancy or
completion fee
14-66(~1_)G Certificate of Completion fees:
Certificate of Completion fees for reconfiguration of
space are the same as Certificate of Occupancy
fees per section 14-66(2)a
Minimum fee for commercial certificates of 100.00
completion
Swimming Pool 236.44
237.00
Kitchen/Bath ~
79.00
Generator 197.99
168.00
Docks/Seawalls 2aa. 4 4
237.00
AJC Units and Cooling Towers per permit 187.70
188.00
35
347
All Other Certificates of Completion, Minimum Fee ~87.7Q
188.00
14-67.1 Reinspection of existing building to determine Based on actual
compliance with the applicable Building Code time spent on
inspection
multiplied by the
inspection fee
hourly rate, as
specified in 14-
61 (g).
Forty-year recertification program fee:
14-67(a)
o~ 11. ~~ ·~ -~~1..~ 1.-1 J11.1 Q
Per Threshold building 5~8.5G
600.00
Building Official a1212roval of 6 month extension for
buildino recertifications 600.00
14-67(c) Late compliance fee, regular fee, plus 259.25
260.00
New inspection report fee if recertification not d~ ~.H;)
completed within 90 days of building's being 312.00
declared unsafe
14-67.2
Employee training, education, safety, and
technology procurement and implementation for
service enhancement surcharge is 6% of each and
every Permit Fee
14-70
Other general fees
14-70 (1)
Pursuant to Florida Statutes F.S. 553.721-ln order
for the Department of Business and Professional
Regulation to administer the Florida Building Code,
there is created a surcharge to be assessed at the
rate of 1.5 percent of the permit fee associated with
enforcement of the Florida Building Code. The
minimum amount collected on any permit issued
shall be $2.
14-70 (2)
Pursuant to Miami-Dade County Ordinance 8-12(e)
a Surcharge to building permits for County code
compliance program, per $1,000 of work valuation
14-70 (3)
Pursuant to Florida Statutes F.S. 468.631-The
Building Code Administrators and Inspectors Fund
shall be funded through a surcharge to be
36
348
assessed at the rate of 1.5 percent of all permit
fees associated with enforcement of the Florida
Building Code. The minimum amount collected on
any permit issued shall be $2.
14-70 (7)
Sanitation impact fee for all building, electrical,
plumbing, mechanical demolition permits,) 0.30% of
estimated cost of project:
Minimum 15.00
Maximum 1,500.00
SECTION 4. REPEALER.
All ordinances or parts of ordinances in conflict therewith be and the same are hereby repealed.
SECTION 5. SEVERABILITY.
If any section, subsection, sentence, clause, provision or phase of this ordinance is held to be
invalid or unconstitutional by any court of competent jurisdiction, then said holding shall in no
way affect the validity of the remaining portions of this ordinance.
SECTION 6. CODIFICATION.
It is the intention of the Mayor and City Commission of the City of Miami Beach, and it is hereby
ordained that the provisions of this ordinance shall become and be made a part of the Code of
the City of Miami Beach, Florida. The sections of this ordinance may be renumbered or
relettered to accomplish such intention, and that the word "ordinance" may be changed to
"section", "article", or other appropriate word.
SECTION 7. EFFECTIVE DATE.
This Ordinance shall take effect the 2nd day of June, 2014.
PASSED and ADOPTED this ___ day of _________ , 2014.
ATTEST:
PHILIP LEVINE, MAYOR
APPROVED AS TO
RAFAEL E. GRANADO, CITY CLERK ~· FORM & GUAGE
/. & FOR XECUTION
Underline denotes additions and strike through denotes deletiohs I ·· 2 1.., J ;u
. . · \ I/ Cl AT ORNEY =ti/F (Sponsored by Comm1ss1oner Joy Malakoff} ... ~->·-.. · · '""tf
37
349
w CJ'I 0 X MIAMI HERALD I MiamiHerald.com MIAMI BEACH CITY OF MIAMI BEACH NOTICE OF PUBLIC HEARINGS Nco THURSDAY. FEBRUARY 20. 2014 I 15NE NOTICE IS HEREBV given that a public hearing will be held by the Mayor and City Commission of the City of Miami Beach, Florida. In the Commission Cllambers, 3rd floor. City Hall. 1700 Convention Center Drive, Miami Beach, Florida, on Wednesday, March 5, 2014 to consider the following· 10:05 a.m. File No. 2f47. 4000 Alton Road, Talmudic University-FLUM Amendment-An Ordinance Amending The Future Land Use Map Of The Comprehensive Plan By Changing The Future Land Use Category for Parcels Of Land Adjacent To What Is More Commonly Known As The "Talmudic University,· More Particularly Described In The Legal Description Attached As El<hibit "A" Hereto, From The Current RDS, "Recreation And Open Space,"To The Future Land Use Category Of RM-2, "Residential Multifamily Medium Intensity;" Providing For Inclusion In The Comprehensive Plan, Transmittal, Repealer, Severability An<JAn Effective Date. (Inquiries may be directed to the Planning Departmental 305-673-7550.) 10:10 a.m. File No. 2148. 4000 Mon Road. Talmudic University-Zoning Map Change ·An Ordinance Amending The Official zonmg District Map, Referenced In Section 142-72 Of The Code OIThe City Of Miami Beach, Florida, By Changing The Zoning District Classification For Parcels Of Land Adjacent To What Is More Commonly Known As The "Talmudic University," More Particularly Described In The Legal Description Attached As Exhibit "A" Hereto, From The Current Zoning Classification GU, "Government Use District." To The Proposed Zoning Classification RM-2, "Residential Multi-Family Medium Intensity," Providing For Codffication. Repealer, Severability And An Effective Date. (Inquiries may be directed to the Planning Department at 305-673-7550.) 10:25 a.m. Alton Road Historic District Buffer Overlay-An Ordinance Amending The Code OfT he City Of Miami Beach, Florida, By Amending Chapter 142. "Zoning Districts And Regulations." Article Ill. "Overlay Districts," Creating Division 8 "Alton Road-Historic District Buffer Overlay," By Including Section 142-858 "location And Purpose," And Section 142-859 "Development Regulations," Including Among Other Provisions Regulations On Maximum Floor Area Ratio; Maximum Buildmg Height; Minimum Setbacks; Building Separation; Demolrtion Or Additions To Contributing Buildings In An Historic District; And land Use Regulations For location Of Retail Uses, Restaurants. Bars, Entertainment Establishments, Alcoholic Beverage Establishments And Similar Uses; Requiring Conditional Use Approval Of Such Uses In EKcess Of 10.000 Sq. ft.; And Prohibiting Alcoholic Beverage And Entertainment Establishments In Open Areas With Exceptions As Prescribed In The Ordinance; Providing For Codification; Repealer; Severability; And An EffecUve Date. (lnquines may be directed to the Planning Department at305-673-7550) 10:40 a.m. Building Department Permit Fees -An Ordinance Amending Chapter 14 Of The City Code. Entitled "Building Regulations:· By Amending Article II, Entitled "Construction Standards." By Amending Division 2. Entitled "Permit Fees," By Amending The Following Sections Therein. To Wit Section 14-61, Entitled "Permit Fees. Generally"; Section 14-62, Enutled "Building Permits": Section 14-63, Entitled "Plumbing Permits": Section 14-64, Entitled "Electrical Permits"; Section 14-65, EntiUed "Mechanical Permits"; Section 14-66, Entitled "Annual Facility Permit": Section 14·67. Entitled "Forty-Year Building Recertification Program"; Section 14-68, Entitled "Occupant Content Sign"; Section 14-70. EntiHed "General Information'; Section 14-71. Entitled "Temporary Structure"; To Provide For Express Permits. Phase Permits, Private Provider Fee Discounts, Permit Fee Reductions And Refunds, And To Provide For A More Efficient, Effective, And Transparent Way To Assess Fees For Building Permit Services. And By Amending Corresponding Portions Of Division 2 Of Appendix A Of The City Code, Entitled "Permit Fees." Relating To Building, Plumbing, Electrical, And Mechanical Work, And Other Building Department Activities; Providing For Repealer, Severability, Codification. And An Effective Date. (Inquiries may be directed to the Building Department at 305-673-761 0.) 10:50 a.m. Resort Tax Ordinance -An Ordinance Amending The Code O!The City Of Miami Beach. Florida, By Amending Chapter 102 Entitled "Taxation." By Amending Article IV Entitled "Resort Tax," By Amending Division 4 Entitled "Tax," By Amending Section 102-314 Entitled "Penalties And Interest," By Amending Subsection (F) Tlmreof (And Including The Corresponding Amendment To Appendix "A" Thereto), Regarding The Establishment Of A Fixed Late Reporting Penalty For Annual Returns Filed Late, Where No Tax Is Due; Providing For Codification; Repealer; Severability; And An Effective Date. (Inquiries may be directed to the Finance Department at 305-673-7466.) 11:00 a.m. An Ordinance Amending The Code Of The City Of Miami Beach, By Amending Chapter 2, En!Hied "Administration." By Amending Arlrcle Ill, Entitled "Agencies, Boards And Comminees." By Amending Section 2-27. Entitled "Reserved:' To Create A 5/7th Vote Requirement For The Creatron Of Agencies, Boards And Committees; Providing E~eptions Thereto; And Providing For Repealer, Severability, Codification. And An Effective Date. (Inquiries may be directed to the City Attorney's Office at305-673-7470.) 11:10 a.m. Fire And Police Pension Ordinance -An Ordinance Amending Part 1. Subpart B. Article IX, Related Special Acts, Of The Miami Beach City Code Entitled "Pension System For Disability And Retirement Of Members Of Police And Frre Departments"; Implementing Provisions Of The 2012-2015 Collective Bargaining Agreements Between The City And Fire Fighters Of Miami Beach, (lAFF} Local 1510. And Miami Beach Fraternal Order Of Police, William Nichols Lodge No. 8 (FOP): Implementing Recommendations Of The Budget Advisory Committee. A Memorandum Of Understanding And Other Changes; Amending Section 63 Entitled "Source Of Monies For Fund: Computation Of liability; Use And Investment Of Fund"; "Sefllice Record"; And Amending Section 66 Entitled "Service And Disability Benefits Generally"; Providing For Severability; Repealing All Ordinances In Conflict Therewith; And Providing For An Effective Date. (Inquiries may be directed to the Human Resources Department at 305-673-7524.} 11:20 a.m. A Resolution To Adopt The Thrrd Amendment To The Capital Budget For Fiscal Year (FY} 2013/14. (Inquiries may be directed to tile Office of Budget & Performance Improvement at 305-673-7510.) 11:30 p.m. RM-2 Hotel Office Uses -An Ordinance Amending The Land Development Regulations Of The Code Of The City Of Miami Beach, By Amending Chapter 142, "Zoning Districts And Regulations" Article II "District Regulations." Division 3 "Residential Multifamily Districts," Subdivision IV "Residential Multifamily, Medium Intensity," Section 142-212, "Main Permitted Uses," To Expand The Allowable Uses In The RM-2 District To Include Certain Types Of Office Uses That Are Associated With Nearby Hotels On Collins Avenue; Providing For Repealer; Severability; Codification; And An Effective Date. (Inquiries may be directed to the Planning Department at 305-673-7550.) INTERESTED PARTIES are invited to appear at this meeting, or be represented by an agent, or to express their views in writing addressed to the City Commission. c/o the City Clerk. 1700 Convention Center Drive, 1" Floor, City Hall. Miami Beach. Florida 33139. A copy of this item is available for public inspection during normal business hours in the City Clerk's Office, 1700 Convention Center Drive, 1" Floor, City Hall. Miami Beach, Florida 33139. This meeting or this item may be continued, and under such cin::umstances, additional legal notice need not be provided. Rafael E. Granado, City Clerk Crty of Mramr Beach Pursuant to Section 286.0105. Fla. Stat., t11e City hereby advises the pul:lllr. that: if a person decides to appeal any de~ision made by the City Commission wi\11 respect to any matter ~onsidered atlts meeting or its hearing, such person must ensure that a ver!Jatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. This notice does not constilllte consent by the City for the intrMuction or admission of otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. To request this material in accessible format, sign language interpreters. ir1formation on access for persons with disabilities and/or any accommodation to review any document or participate in any City-sponsored proceeding, please contact us five days in advance at (305) 673-7411(voice) or TIY users may also call the Florida Relay Service at711. A0#862