C7C-Execute Amendment 4 Agreement w- Zaha Hadid And Berenblum BuschCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Authorizing The Mayor And City Clerk To Execute Amendment No.4 To The Professional Architectural And Engineering (AJE) Services Agreement With The Joint Venture Ol Zaha Hadid Limited TIA Zaha Hadid Architects And Berenblum Busch Architecture, lnc., Dated May 3, 2012, For The Additional Services Related To Raising The Proposed Ground Floor Elevation To Base Flood Elevation Plus (3) Three Feet, ForThe Design, Permitting And Construction Administration Of Certain Right-Of-Way lmprovements Required By Miami-Dade County Public Works Traffic Division, And For The Replacement Of A Sanitary Sewer Line Along Liberty Avenue; ln The Negotiated Not-To-Exceed Amount Of :With Build n orioritv infrastructure with full Supporting Data (Surveys, Environmental Scan, etc.): The Cultural Campus is currently serviced by 55 parking spaces on two surface parking lots; these will be replaced with a oarkino structure of over 400 lssue: and Commission the Resolution? AGENDA ITEM cac Item Summary/Recommendation: On April 16,2014, the Flooding Mitigation Committee requested staff to evaluate the design impact of the implementation of a freeboard elevation of two (2) and three (3) feet above Base Flood Elevation. ln order to comply with a freeboard elevation of three feet above Base Flood, the new finish floor elevation will need to be set at approximately 4.59 feet higher than the existing sidewalk. On May 15, 2014, the design team presented a preliminary concept that resolves this challenge by elevating the entire site and gradually sloping the sidewalk along Park Avenue and 23rd Street to meet the required finish floor elevation. This solution preserves the natural pedestrian flow into each retail space as well as egress from ad.iacent buildings, while still accommodating American Disability Act requirements throughout. The Committee recommended raising the proposed ground finish floor elevation to Base Flood Elevation plus a freeboard of (3) three feet (9.45 NAVD) to the City Commission. As a result of the necessary design revisions, several disciplines including architecture, civil engineering, Structural engineering, and parking design will be impacted. The total negotiated fee requested for this additional effort is $192,500. ln addition, as a condition for granting approval of the project, the Miami-Dade County Public Works Traffic Engineering Division has requested the implementation of certain righlof-way improvements such as a roundabout at lhe intersection of Park Avenue and 22nd Street, and a median along Park Avenue between 22nd and 23'd Streets to minimize the potential traffic impact to Dade Boulevard, as a result of the queuing to the proposed entrance to the garage at Park Avenue. The negotiated fee for the design, permitting and construction administration for the added scope of work is $42,920. And finally, upon investigation of the existing sanitary sewer line along Liberty Avenue, the Public Works Department has determined that it must be replaced. The negotiated fee for the design, permitting and construction administration for the added scope of work is $14,028. The total amount to be approved under Amendment No. 4 is $249,448, which the Administration believes to be a fair and reasonable request given the level of effort required. THE ADMINISTRATION RECOMMENDS APPROVAL OF THIS RESOLUTION. Floodino M Committee Source of Funds: Amount Account 1 $192,s00 Fund 365 - City Center RDA 365-2801-061357 2 $ 56,S48 Fund 365 - City Center RDA 365-2953-061357 Total $249,448 Financial lmpact Summary: Clerk's Office David Martinez, P.E. ext. 6972 -4. DeoartmE DM rctorlAssistanl,St$.ERaserlCity a&aqerJ I .tt-MMT T:\AGXENDA\2014\JurtlcollMtark Place -($)pFnt e"rt Place - zHA and BBA 4-Summary-Rev E MIAMIBEACH D,r]E 6'l/- lq225 g MIAMIBEACH Design: $192,500 $ 56.948 $249,448 BACKGROUND On March 21,2012, the City Commission adopted Resolution No.2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited Va Zaha Hadid Architects and Berenblum Busch Architecture, lnc. (the Consultant) for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services for the Collins Park Place Project. The Agreement was executed in the amount of $1,969,000. City of Miomi Beoch, l70O Conveniion Center Drive, Miomi Beoch, Florido 33139, www.miomibeochfl.gov COMMISSION MEMORANDUM TO:Mayor Philip Levine and Members ofllthe City FROM: Jimmy L. Morales, City Manager DATE: June '1 1, 2014 SUBJECT:A RESOLUTION OF THE MAYOR ND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 4 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A'/E) SERVICES AGREEMENT WITH THE JOINT VENTURE oF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3, 2012, FOR THE ADDITIONAL DESIGN SERVICES RELATED TO RAISING THE PROPOSED GROUND FLOOR ELEVATION TO BASE FLOOD ELEVATTON PLUS A FREEBOARD OF THREE (3) FEET, FOR THE DESIGN, PERMITTING AND CONSTRUCTION ADMINISTRATION SERVICES OF CERTAIN RIGHT.OF.WAY IMPROVEMENTS REQUIRED BY MIAMI-DADE COUNTY PUBLIC WORKS TRAFFIC DIVISION, AND FOR THE REPLACEMENT OF A SANITARY SEWER LINE ALONG LIBERTY AVENUE; IN THE NEGOTIATED NOT-TO- EXCEED AMOUNT OF $249,448 WITH PREVIOUSLY APPROPRIATED FUNDING. ADM INISTRATION RECOMM ENDATION Adopt the Resolution. KEY INTENDED OUTCOME Build and mainlain priority infrastructure with full accountability. FUNDING Previously appropriated funds for this project will be allocated as follows: Fund 365 - City Center RDA Fund 365 - City Center RDA 365-2801-061357 365-2953-061357 226 Commission Memorandum - Collins Park Place - ZHA and BBA Amendment No 4 June 11 , 2014 Page 2 of 3 On January 16, 2013 the City Commission adopted the Basis of Design Report (BODR), as well as Resolution No.2013-28120 granting a waiver of certain development regulations regarding the maximum building height, allowing an additional six (6) feet in height. On September 30, 2013, Amendment No. I was executed in the amount of $8,935, for the provision of additional surveying services, and extended representation during the July City Commission Meeting. On December 9, 201 3, Amendment No. 2 was executed in the amount of $12,114, for the provision of a Phase ll Environmental Site Assessment, for the investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report. On May 28,2014, Amendment No. 3 was executed in the amount of $24,969, for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation two (2) and three (3) above Base Flood Elevation. ANALYSIS The proposed ground finish floor elevation for Collins Park Place is set at approximately 6.13 NAVD. Base Flood Elevation for this area is 6.54 NAVD, while the existing sidewalk elevation is at approximately 4.86 NAVD. On April 16,2014, the Flooding Mitigation Committee requested staff to evaluate the design impact of the implementation of a freeboard elevation of two (2) and three (3) feet above Base Flood Elevation. ln order to comply with a freeboard elevation of three feet above Base Flood, the new finish floor elevation will need to be set at approximately 4.59 feet higher than the existing sidewalk. On May 15, 2014, the design team presented a preliminary concept that resolves this challenge by elevating the entire site and gradually sloping the sidewalk along Park Avenue and 23rd Street to meet the required finish floor elevation. This solution preserves the natural pedestrian flow into each retall space as well as egress from adjacent buildings, while still accommodating American Disability Act requirements throughout. The Committee recommended raising the proposed ground finish floor elevation to Base Flood Elevation plus a freeboard of (3) three feet (9.45 NAVD) to the City Commission. As a result of the necessary design revisions, several disciplines including architecture, civil engineering, structural engineering, and parking design will be impacted. The total negotiated fee requested for this additional effort is $192,500. ln addition, as a condition forgranting approval of the project, the Miami-Dade County Public Works Traffic Engineering Division has requested the implementation of certain right-of-way improvements such as a roundabout at the intersection of Park Avenue and 22no Street, and a median along Park Avenue between 22"d and 23'd Streets to minimize the potential traffic impact to Dade Boulevird, as a result of the queuing to the proposed entrance to the garage at Park Avenue. The negotiated fee for the design, permitting and construction administration for the added scope of work is $42,920. And finally, upon investigation of the existing sanitary sewer line along Liberty Avenue, the Public Works Department has determined that it must be replaced. The negotiated fee for the design, permitting and construction administration for the added scope of work is $14,028. The total amount to be approved under Amendment No. 4 is $249,448, which the Administration believes to be a fair and reasonable request given the level of effort required. 227 Commission Memorandum - Collins Park Place - ZHA and BBA Amendment No 4 June 11 , 2014 Page 3 of 3 GONCLUSION The Administration recommends approval of the attached Resolution, authorizing the Mayor and City Clerk to execute Amendment No. 4 to the Professional Architectural and Engineering (fuE) Services Agreement with the Joint Venture of Zaha Hadid Limited TIA Zaha Hadid Architects and Berenblum Busch Architecture, lnc., dated May 3, 2012, for the additional services related to raising lhe proposed ground floor elevation to base flood elevation plus three feet, for the design, permifting and construclion administration services of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division, and for the replacement sanitary sewer line along Liberty Avenue; in the negotiated not-to-exceed amount of $249,448; with previously approprialed funding. Attachment: Amendment No. 4 Lrnrffiour T:IAGE NDA\2014\June\Collins Park Place - ZHA and BBA Amendment No 3\Collins Park P ace - ZHA and BBA Amendment No 4.docx 228 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISS]ON OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHOR]ZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.4 TO THE PROFESSIONAL ARCHITECTURAL AND ENGTNEERTNG (A/E) SERVICES AGREEMENT WITH THE JOTNT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITEGTURE, INC., DATED MAY 3,2012, FOR THE ADDITIONAL SERVICES RELATED TO RAISING THE PROPOSED GROUND FLOOR ELEVATION TO BASE FLOOD ELEVATION PLUS A FREEBOARD OF THREE (3) FEET, FOR THE DESIGN AND IMPLEMENTATION OF CERTAIN RIGHT.OF.WAY IMPROVEMENTS REQUIRED BY MIAMI-DADE COUNTY TRAFFIC DIVISION, AND FOR THE DESIGN OF A REPLAGEMENT SANITARY SEWER LINE ALONG LIBERTY AVENUE; lN THE NEGOTIATED NOT-TO- EXCEED AMOUNT OF $249,448 WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on March 21 ,2012, the City Commission adopted Resolution No. 2012- 27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited tla Zaha Hadid Architects and Berenblum Busch Architecture, lnc. (the Consultant), in the amount of $2,951,823, forthe Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services; and WHEREAS, the Basis of Design Report (BODR) was adopted by the City Commission on January 16, 2013; and WHEREAS, on September 30, 2013, Amendment No. 1 was executed in the amount of $8,935, for the provislon of additional surveying services, and extended representation during the July City Commission Meeting; and WHEREAS, on December 9, 2013, Amendment No. 2 was executed in the amount of $12,114, for the provision of a Phase ll Environmental Site Assessment, for the investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report; and WHEREAS, on May 28, 2014, Amendment No. 3 was executed in the amount of $24,969, for the provision of design studies and a rough order of magnitude cost estimate related to raising the proposed ground floor elevation to two and three feet above Base Flood; and WHEREAS, the following Amendment No. 4 to the Agreement, in the amount of $249,448, is for construction documents revisions required as a result of the implementation of the Flooding Mitigation Committee's recommendation to raise the proposed finish floor elevation to Base Flood plus three (3) feet, for the design and implementation of certain right-of-way improvements required by Miami-Dade County Traffic Division, and for the design of a replacement sanitary sewer line along Liberty Avenue, requested by the City's Public Works Department; and WHEREAS, the new total amount of the agreement is $3,247,289. 229 NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission of The City of Miami Beach, Florida, authorize the Mayor and City Clerk to Execute Amendment No. 4 to the Professional Architectural and Engineering (A/E) Services Agreement with the Joint Venture of Zaha Hadid LimitedflAZaha Hadid Architects and Berenblum Busch Architecture, lnc., dated May 3,2012, for the additional services related to raising the proposed ground floor elevation to base flood elevation plus a freeboard of three (3) feet, for the design and implementation of certain right-of-way improvements required by Miami-Dade County Traffic Division, and for the design of a replacement sanitary sewer line along Liberty Avenue, requested by the City's Public Works Department; in the negotiated not-to-exceed amount of $249,448 with previously appropriated fund ing. PASSED AND ADOPTED this 11th day of June, 2014. ATTEST: Philip Levine, Mayor Rafael Granado, City Clerk APPROVED AS TO FORM. LANGUAGE AND FOR EXECUTION City Attorney Date T:\AGENDAU014\June\Collins Park Place - ZHA and BBA Amendment No 3\Collins Park Garage - ZHA and BBA Amendment No 4 - Reso.doc APPROVED AS TO FORM & LANGUAGE & FNH EXECUTION 230 AMENDMENT NO.4 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A/E) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND A JOINT VENTURE OF ZAHA HADID LIMITED T/A ZAHA HADID ARCHITECTS AND BERENBLUM BUSCH ARCHITECTURE, INC. DATED MAY 3RD,2012, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE COLLINS PARK GARAGE PROJECT IN THE AMOUNT oF $249,448 This Amendment No. 4 to the Agreement made and entered this _day of_ , 2014, by and between the CITY OF MIAMI BEACH, a municipal corporation existing underthe laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 331 39, and a Joint Venture ot Zaha Hadid Limited tla Zaha Hadid Architects, a company certlfied by the Registrar of Companies for England and Wales, having its principal office at 10 Bowling Green Lane, London, EClR 0BQ,United Kingdom (hereinafter referred to as the "Prime Architect'; and Berenblum Busch Architecture, lnc., a Florida corporation, having its principal office at 2700 North Miami Avenue, Suite 601 , Miami, Florida 33127 (hereinafter referred to as the "Executive Architect"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 31-10/1 1, the Mayor and City Commission adopted Resolution No.2Q12-27869 on March 21,2012, approving a Professional Services Agreement (the Agreement) between the City and a joint venture of Zaha Hadid Limited Va Zaha Hadid Architects and Berenblum Busch Architecture, lnc., in the amount of $2,951 ,823, for the Planning, Architectural, Engineering, Design, Bid and Award, And Construction Administration Services for the Collins Park Garage Project; and WHEREAS, Amendment No.1 to the Agreement, for the provision of additional surveying services and extended representation during July City Commission meetings, was executed on September 30, 2013, in the amount of $8,935; and WHEREAS, Amendment No.2 to the Agreement, forthe provision of a Phase ll Environmental Site Assessment, forthe investigation of recognized environmental conditions (RECs) identified on the Phase I Environmental Site Assessment report, was executed on September 30, 2013, in the amount of $12,114" and WHEREAS, Amendment No. 3 to the Agreement, for the provision of design studies and a rough order of magnitude cost eslimate related to raising the proposed ground floor elevation between two (2) and four (4) feet (Base Flood Elevation plus 2 or 3 feet), was executed on May 28, 2014, in the amount of $24,969; and WHEREAS, the following Amendment No. 4 to the Agreement, in the amount of $249,448, is for construction documents revisions associated with raising the proposed finish floor elevation to Base Flood plus three (3) feet for the design, permitting and construction administration services of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division; and for the design, permitting and construction administration for the replacement sanitary sewer line (and associated structures if required) along Liberty Avenue, requested by the City's Public Works Department; and WHEREAS, the new total amount of the agreement is $3,247,289; and Page 1 of 3 Collins Park Garage - Amendment No. 4 231 2. NOW. THEREFORE. the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1.ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.4. MODIFICATIONS The Agreemenl is amended as defined in Schedule "A-4", attached herein. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. RATIFICANON. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.4. lN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 4 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST:CITY OF MIAMI BEACH 3. 4. Rafael Granado City Clerk ATTEST: Signature / Secretary: Print Name ATTEST: Signature / Secretary: Print Name Page 2 of 3 Collins ParR Garage - Amendment No. 4 Philip Levine Mayor PRrME ARCHTTECT (P.A.y ZAHA HADrD LIMITED T/A ZAHA HADID ARCHITECTS Signature / President Print Name EXECUTTVE ARCHTTECT (E.A.y BERENBLUM BUSCH ARCHITECTURE, ING. Signature / President Print Name APPROVEDASTO FORM & LANGUAGE &FOREXECUTION 1\i\r4 --CityAttomey Date232 SCHEDULE "A.4" SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: Add the following under Task 6 - ADDITIONAL SERVICES Task 6.5.1 - Design and Construction Documents Revisions - Finish Floor Elevation: Design and construction documents revisions associated with raising the proposed ground finish floor elevation to Base Flood plus three (3) feet, as recommended by the Flooding Mitigation Committee. Task 6.5.2 - Right-of-Way lmprovements required by Miami-Dade County Public Works Traffic Division: Design, permitting and construction administration of certain right-of-way improvements required by Miami-Dade County Public Works Traffic Division, during the January 31 ,2014 meeting, as a condition for project approval. These include a roundabout on the corner of Park Avenue and 22no Street, and a median along Park Avenue between 22nd and23'd Streets, and bulb-out on LibertyAve. Task 6.5.3 - Sanitary sewer line replacement: Design, permitting and construction administration services forthe replacementof the existing gravity sewer line along Liberty Avenue (including associated structures if required), as requested by the City's Public Works Department. PAYMENT AND COMPENSATION The total fee proposed for this Scope of Work is $249,448 (refer to Exhibit A-4 attached herein). COMPENSATION Zaha Hadid Limited Berenblum Busch Architectu re Total Orioinal Aqreement Amount $1,276.000 $1.675,823 $2,951,823 AmendmentNo. 1 N/A $ 8.935 $ 8,935 Amendment No. 2 N/A $ 12,114 $ 12,114 Amendment No. 3 $ 17,509 $ 7,460 $ 24,969 Amendment No. 4 $ 109,981 $ 139,467 $ 249.448 Revised Aqreement Amount $1.403,490 $1.843.799 $3.247.289 Page 3 of 3 Collins Park Garage - Amendment No. 4 233 EXHIBIT A-,+ BEREN9LIaI E\rg,_rt Al16lil7E:al FE. iNa ]i,',:. ,,'" n, t't ay 22,2014 [Revised iuna 02. 201 4l M r. Humbe,io Cabanas City of Miami Beach ': 700 Conventjon Center Driva Miami Beach Fl. 33139 Re: AmendmEnt No.4 Adjustrnents to the proiect as follows: l-City's request to raise the ground floor finish ftoor 3 feet above the current Building F&rod Elevation. 2-Sanitary line replacement and extension along Liberty Avenue from 23d Street to 22d Street. 3- Design ol a ro;ndabout and median on Park Avenue between 22nd and 23'd Street, Dear llr. Cabanasr Berenbium Busch Archiieclure, lnc. (BBA) rs pleased to present the enclosed proposal for additional services related to design revisions requested by the City of [liami Beach. The revisions include lhe request to raise the ground floor finish elevation as shown on Strategy 2 (BFE+3) dated I'lay 14t . 2A14 presenled and approved by the Flooding Commiitee {Amendment #3), lor a previously approved amount of $25,000. This strategy includes creating a platform at the nerv elevation fcr the retail and sidelvalk portions of the prcject. u,hile slighlly ramping the public piaza and Liberty Avenues to lessen the impact oi the height increase. The revisions impact several disciplines includrng architecture, civit engrneerlng, slructural engineering. parking design and cost estimating Time extension to the ccntract: approximately 1.5 months upon receiving approval. The following additional fees are being requested: ZAHA HADID AHCHITECTS: BBA: LANGAN ENGINEEHING: Tli\l HAAS & Assoc. PACO GROUP: BBA Sub-Totai To:al {Not-to-Exce€di DE SltrONE: S 20.00C.00 s109.981 .00 s 44,718.95 s 15.000.00s 2.200.00S 600.00 s 32.518.9s s192,499.95 The saniiary iine extension concerns civri eng,,te€ring servlces for a gravriy saniiary extension aioog Liberty Avenu€ to repiace an exrsirnc 15" diamete'- line rr;itit a ne'r/ DIP graviiy sewei'and cuttino rn a rnanhoie co the axisirng si,stem JSafer'to socl)sad hei'e,litl proposai from Langan Engrneeringr Fee iNot-tc-exceed) Langan Engineering 514,028.C0 .Tii ? roundabo,.ri anC rnecian Cesiln lvas rgcuesi:,c o;r ,.lrami.)ade Co!nty rn reiailon to t1e Coll .rs Park Place pro ect. it en'rai s i,re georneiric destgn of t:^e cr.cie the curbing plan oi'ire proprlsad rounclahout aocj ine ti'aiic sepai'ator tn.it \rlli ext-=nci frcff 22'' tc 23: Siraei. p+r 234 oc.troo.)a(lJao-!():f(r4)(,.pou)itsq.9 di=i=9E\u (),ad-c-o-c<(ujq)N--i,fa oc i .EY '-o ') | oc) >\;..': ! i q)Ct cq di :6, qtr oS EE 5 i E8AE H i oi; * fE E ri{ EIEE it F$E ** :F gI flEsssiE= i#$eit EE\ :235 ZAHA HADID ARCHITECTS, TTD. AMENDMENT NO.4. FEE SCHEDULE FOR PROFESSIONAL SERVICES AND BILLING BREAKDOWN Ground Elevation Change - add 3'to Base Flood Elevation and adjust design accordingly Date: May 28,2014 Professional Personnel Rates Task 1 Principal Sr. Architect Sr. Designer Architect Architect s1s0.00 s11s,oo s11s.00 s101.00 s101.oo Hrs 49 230 240 240 241, Billable s7,3s0.00 s26,4s0.00 $27,600.00 s24,240.00 524,34L.00 Task 1. lmplernentation of construction documents revision related to ground floor at new elevation of BFE +3' and coordination with consultants and Berenblum Busch Architects 236 BERENBLUM BUSCH ARCHITECTURE, INC. AMENDMENT NO. 4. FEE SCHEDULE FOR PROFESSIONAL SERVICES AND BILLING BREAKDOWN Ground Elevation Change - add 3'to Base Flood Elevation and adjust design accordingly Date: May 28, 2014 [Revised June 02,2014] Professional Personnel Ratet Task 1 Principa I Sr, Architect Architect Architect s1s0.00 s11s,00 5101.oo s101.00 Hrs 2t 27.73 1.80 200 Billa ble $3,150.00 3,188.95 s18,180.00 s20,200.00 Task 1. lmplementation of construction documents revision related to ground floor at new elevation of BFE +3'and coordination with consultants and Zaha Hadid Architects 237 LANGAN ENGINEERING & ENVIRONMEIUTAL SERVICES 15150 NW 79th Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX (215) 864-0671 CONTRACT CHANGE ORDER FOR AODITIONAL SERVICES DATE: I April 2014 REVISED: 30 May 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO.: 300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENTI STATEMENT OFWORK: This change order has been prepared to identify additional scope and fees associated with regrading the proposed site of the Collins Park Garage. Currently the proposed grading reflects finished floor elevations that are 4 inches above the highest adjacent road crown elevations. We have been advised by Berenblum Busch Architecture that the City of Miami Beach is in the process of passing an ordinance that will require all new buildings to have the minimum finished floor elevation a minimum of 36-inches above the FEMA Base Flood Elevation. To meet the requirement of the proposed ordinance, the site plan will have to be modified by Berenblum Busch Architecture which in turn will require redesigning the site grading. This additional service proposal is for redesigning the site grading and drainage plan. This proposal excludes design of retaining walls and design of structural elements. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL:$ 15.084 (See attached man-hour allocation table) LANGAN will proceed with the above described scope of services upon receipt of this lorm signed byyou which authorizes Langan to begin work.. If notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification. All terms of the original agreement remain in effect. -- --' '' l - //..r..4,-J 'j-=.' .>- Agreement Authorrzed By : Gustavo Berenblum, AIA CC: for Langan: Leonardo Rodriguez, P,E. \\langan.com\data\N'[Mata8\30008930 I Marketing Data\Proposalse0l4-04-08 Rcvised Regrading Add SeraiccsEo l4-04-08 Site Regmding Add Services.docx 238 PROJECT NAME: COLLINS PARK GARAGE REGRADING (ADD. SERVICES) Jre :ATIOx: CIy ot f,rjarni B6ac}I IdbBU-Oad CotJn y, FL rASK PRIN 3150.00 PM 9120.00 PES 3r01.00 Cad 383.00 ln!p 383.00 CLER t35.00 AflOUNI Meelings witfi Ossign Team to aoo.dinat6 revised g.ading. Three meetings at foi.Jr hotJrt each. P.epars cqrceptual grading plan, Redesign d.ainage structures at nt..s6cton of 23rd Sf.et and Libefty Prepare 25% of th€ 5o%design Jevelopme. gradiog plan. Propare 50% ofthe 60% design l6Yelopm6nt grading plan. 2 2 2 8 8 12 24 r6 16 ,t0 50.00 i240.00 62.376.00 92,376.00 $4,108.00 85,984.00 90.00 Iotd 0 't0 52 104 0 0 fi 5.06400 239 nttOTFl//.ssoctATEs,lNc 40 NlV:rd Str-"et S(ile 1102 MtArlll. FL 33r23 T.305-532-7123 F.305'5S2-71 13 March '1 1, 2014 (revised May 22,2014) Mr. Mario Menendez Project Designer Berenblum Busch Architecture 2700 North Miami Avenue Suite 601 Miami, FL 33127 RE: Miami Beach Collins Park Garage Finish Floor Elevation & Additional Seruices Miami Beach, FL Dear Mr. Mendez: Timothy Haahs & Associates, lnc. (TimHaahs) is pleased to provide you with our scope of services and fee to provide additional services related to the City of Miami Beach Public Works implementing a change in determining finish floor elevations for all new buildings and renovations, including the Collins Park parking facility. We understand that this new regulation will require the finish floor to be set at +3 feet above the base flood elevation. SCOPE OF SERVICES The following is an outline of our proposed additional seryices: . Calculation of slope/ramp design to conform lo the necessary clearances required for programming space under the ramp.. Study possible relocation of PARC equipment to conform to any changes to ramp.. lnternal review of proposed design.r Coordination with ZHA and BBA. PROFESSIONAL FEE TimHaahs requests these additional services based on the scope of work outlined above for a Lump Sum Professional Fee of Two Thousand Two Hundred Oollars (92,200.00). Our hours will be broken down by staff member as follows: Principal 2 hours 87.00 Senior Designer 26 hours 67.00 Proiect Manaqer 4 hours $71.00 PtAltt\tltJC ARCHITECTI]RE E NG III EEN IN G PARKII] G 240 Mr. Mario Mendez Berenblum Busch Architecture Miami Beacj Collins Park Garage Additional Services March 11, 2014 (revised May 22,2014) Page 2 We appreciate the opportunity to provide you with our request for these additional services. We look fonvard to continuing to serve MDDA by providing these services in a prompt and professional manner. Sincerely, < -\, . ,/'ill/,1a./+r Timothy Haahs, PE, AIA President CC: Juan Ramos AUTHORIZATION Trusting the above is satisfactory, please sign and return one copy as our authorizatron to proceed. Signature: Name: Title: Date: TimHaalrs 241 NewYork 110 William Skeet 1 2th Floor New York, NY t 0038 t: 212.685.0578 f : 2'12.685.1379 Miami 7205 Corporate Cenler Ddve Suite 504 Miami, FL 33126 t: 305.666,3456 f: 305.666.8217 PACOGroup March 18, 2014 Berenblum Busch fu chitecture 2700 N. Miami Ave., Ste. 601 Miami, FL 33127 Aftn: Mario Menendez, Project Designer RE: FEE PROPOSAL FOR CPP FINISH FLOOR ELEVATION ADDITIONAL SERVICES Mario, Below please find a fee proposal for developing a cost estimate related to raising floor elevations and associated activities as per City of Miami Beach requirements. Fee Prooosrl ISSE: Estimate cost related to raising ground floor elevation and associated activities in compliance with +2 feet above Base Flood Elevation (BFE). Proiected Hours: 5 Emolovee Cateporv: Senior Estimator Hourlv Rate (as per Master Contracr): SI75.00 Should you havc any questions, please feel free to contact me at (212) 685-0578 or L['-Lso6paco giou:.con. Thank you. Luis Lugo, Jr. President & COO cc: C. Sanchez, H. An 242 Dote: Alorch 7,20I4 Project Nome: Collins Puk Googe DESIMONE Project Number 56&{ RE: Revbed Crreund Floor Beyolion Extended Service Request No.: L DESIMOI.{E NEW YORK MIAMI 5AN FRANCIsCO NEW HAVEN LAs VEGAS HONG (ONG ABU OHAEI SHANGHA] Descriplion of Servicer: \{e received o request from Berenblum Busch Architeclure to rev'se the ground floor retoil spoce slob elevqlion. The slob will be roised obove the bose flood elevolion ond thus o structuroldob tied down to the foundotions will no longer be requked. Ihis will require us io revise our drqwings os ouflined below: . Coordinole foundotions with new slob elevotions. . Provide odditionol gnode beoms b,roce smollercolumn foundotions. . Coordinote ond revire storefront to ground floor slob interfoce detoils. . Provide odditionol slob on grode detoils to reflect chonges in elevotions. r Provide detoils for romps ond sloin deloih. . Provide froming to support ADA lifts. we will provide revised drowings for ihe obove-rnenlioned items. we ore requesting compensotion for the engineering services requked. Work on these revisions will commence up on occeptonce of this proposol. lump Surn Fee:$20,0@ Terms ond conditions sholl be in occordonce with our originol proposol with Zoho-Hodid Architecls doted I l/00/l l. Romiro R. Areos, P.E., Projecl Monoger Approved; Gustovo Berenblum,Berenblum Busch Architects DESIMONE CONSULIING ENGINEERS 8OO ERICKETL AVENUE 6IS FTOOR MIAMI. FLORIDA 3313I F,305.44I.0755 F 305.4,'7.9023 243 LAIVGAN ENGINEERING & ENVIRONMENTAL SERVICES 15150 NW 79th Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX (215) 864-067 1 CONTRACT CHANGE OBDER FOH ADDITIONAL SERVICES DATE: B Aprn 2014 HEVISED: 30 Mav 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO,: 300089801 PROJECT TITLE: Collins Park Garage OROER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OF WORK: This change order has been prepared to identify additional scope and fees associated with civil engineering design of a gravity sanitary sewer extension along Liberty Avenue from 23'd Street to 22"d Street. The design wi I entail replacing the existing 15-inch diameter gravity sanitary sewer and manholes with a new DIP gravity sewer and cutting in a sanitary sewer manhole on the existing gravity sewer that runs along 22'd Street and 23d Street respectively. Our plans will show the proposed 15-inch gravity sewer in plan and profile view and will include notes and specifications on the plans. This proposal excludes surveying and design of sanitary sewer pumping stations, COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. CHANGE ORDER TOTAL: S 14.028.00 (See attached man-hour allocation table) LANGAN will proceed with the above described scope of services upon receipt of this form signed by you which authorizes Langan to begin work.. lf notified to stop work on these services, the client agrees to pay Langan for all work completed up to the stop-work notification, All terms of the original agreement remain in effect. . ,--..t ,,' L./ ;P2,*-7'{o i-=='.:- Agreement Authorized By : Gustavo Berenblum, AIA cc: for Langan: Leonardo Bodriguez, P.E. \\langan.com\d&ta\N'u\dala8\30008980 lMarketing Data\ProposalsuO l4{4-08 Sanitary Sewer Add SeTvices\2O l4-04-08 Sarirary Sewer Add Services.docx 244 Bk.2 Meetlngs: attend 1 meetingi Oty of MiamiBeach Public Wo s ark.3 Schomatic Plans: P.epare sanitayi sewEr allgnmant ask.l Conltrucllon Plans: Prepare and proflo vi6ws of he sanitary extnsion along Uberty Avenue. a3k-5 P.rmlt P.ocgsllngr Process plans th,augh City of Miami Utjlity Department and the Miami- County oepartnent of R€gulatory Economic Resources (RER). Con3trucilon Pha3e Servlcoi: 3 sit6 ob€eavalion3. rsview drawlngg, address contractor for info.mallon and revielv as- $360.00 $1.400.00 $6.0r4.00 245 I-AIVGAT{ EIVGIIVEERIIUG & ENVIRONM ENTAL SERVICES 1 51 50 NW 796 Court Suite 200, Miami Lakes, FL 33016 (215) 864-0640 FAX (215) 864-0671 CONITRACT CHANGE ORDER FOR ADDITIONAL SERVICES DATE: I April 2014 REVISED: 30 Mav 2014 CHANGE ORDER NO: CONTRACT: PROJECT NO.:300089801 PROJECT TITLE: Collins Park Garage ORDER BY: Gustavo Berenblum COMPANY: Berenblum Busch Architecture (CLIENT) STATEMENT OFWORK: This change order has been prepared to identify additional scope and fees associated with civil engineering design of the roundabout requested by MiamiDade County for the Collins Park Garage. This proposal is for the design of the roundabout as shown on the attached response memorandum prepared by Kimley-Horn and Associates, lnc., dated 27th March 2014 and entitled "Collins Park Garage Miami-Dade County Conceptual Foundabout Comment Response. " Our plans will include the geometric design of the circle, the curbing plan for the proposed roundabout and the traffic separator that will extend from 22^d Street to 23'd Street. Also inciuded in this proposal is the design of the bump outs requested by Miami-Dade County at the intersection of Liberty Avenue and 22"d Street. We will also show on the plans the proposed grading and the pavement marking and signage. This proposal excludes surveying, signalization plans and utility relocations. COST: This additional work will be invoiced on a lump sum basis based upon the fee estimate. man-hour a llocation table)CHANGE OBDER TOTAL:$ 42..920.00 (See attached LANGAN will proceed with the above described scope of services which authorizes Langan to begin work.. lf notified to stop work on Langan for all work completed up to the stop-work notification. All in effect. upon receipt of this form signed by you these services, the client agrees to pay terms of the original agreement remain '/^,../..,':--,- i . ",'-a-?-'' : '.'-=------ Agreement Authorized By : Gustavo Berenblum, AIA cc: for Langan: Leonardo Rodriguez, P.E. \\langan.com\data\MMataS\300089801\N,larketiog Data\Proposalsu01443 -7 Trallic Circle Add ServicesVol4-05-30 Revised Traftic Circle Proposal\2o14-05-30 Rcvised Traffic Circle Add Scrviccs.docx 246 ssk.1 Projec{ Kickolti Attend khk- me6ting, conduct sita visit, rovisw dans, gr€p9re ths aequired survoy and roylaw th6 survey lrovided. t"lo.tlnglr attend 2 meetjngs Miama-Oads County and attend 3 with trl€ City of Miami geach Sch.mrtlc Pl.nr: Prspare georneEy plans for fie talfc ,rd lll€ roundabout .,1Con3tmction Plans: Prgpare gBom6tsy plans, gradhg plani, Pavement marking and plans and fnal pavem€ot and signags plans. P€mitProcEldng: ProcEss plans tirough Miaml-oade and b€ Oty ot Mhriri Beach Worls Oepanmer{ and address requests ba inf ormatjon, Conltruction Ph!3a Sarvlc$: 4 construcion meellngs, conduct silo obs€rvadgni, a6vi€w shop add.ass contractor requestt inlrrm align ard review as+uilt plans. $2,830,00 s1,870.00 s8,086.00 $13,738.00 247 7 afl Kn'ley''H;rr L-I/ \ 3ro i5sccr,r::s. rrc. Memorandum From: CC: To:Joan Shen, Ph.D, P.E., PTOE Miami-Dade County Public Works and Waste Management Department Traffic Engineering Division iT:'lh';i[:Y,i';iffi'A> I 600 N Pine lsland Road Suite 450 Fort Lauderdale, Florida 33324 Jeff Cohen, P.E., Miami-Dade County Eva Tiedemann; Zaha Hadid Chris Lepine; Zaha Hadid Thais Vieira, R.A.; City of Miami Beach Gustavo Berenblum, AIA; Berenblum Busch Architecture Date: Marchz7,20t4 Subject: Collins Park Garage Miami-Dade County Conceptual Roundabout Comment Respo nse Based on the comments provided in the March 6, 2014 e-mail from the Miami- Dade County Public Works and Waste Management Department, Traffic Engineering Division, the conceptual roundabout at the intersection of Park Avenue and 22nd Street has been revised, see attached. The following modifications have been made: At the intersection of Park Avenue and the parking garage driveway, a dedicated northbound right-turn lane and through lane are provided. Parking guide signs were revised on the southbound approach to the roundabout with appropriate illustrations for vehicle movement One-way direction of travel westbound along Washington Court confirmed. The proposed Collins Canal Trail was drafted on the plan. We trust that these responses adequately address the comments provided. Please contact us if you have any questions. K\m-TPTo\043439000{o linr Prrk caFte\cor.rpond.i..\m.6 o\O 3 271:lsh.i - p..k Av.nu! rf,d 22nd ske.t Ro!nd.bout..lo<E t TEL 954 535 5100 248 249 THIS PAGE INTENTIONALLY LEFT BLANK 250