C7B-Execute Amendment 8 South Pointe Park Pier ProjectCondensed Title: A Resolution Of The MayorAnd City Commission Of The City Of Miami Beach, Florida, Authorizing The MayorAnd City Clerk To Execute Amendment No. 8 To The Professional Services Agreement With Atkins North America, For Extended Construction Administrative And Resident Project Representative Services, For The South Point Park Pier Project; ln The Not to Exceed Amount Of $45,989 With Previously Appropriated Funding From Fund 388 MDC CDT TDT COMMISSION ITEM SUMMARY lssue: Item Summary/Recommendation : On April 13,2011 , the City Commission pursuant to Request for Qualifications (RFQ) No. 04-10111, adopted Resolution No. 201 1-27628, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Atkins North America, lnc. (Atkins) for Professional Services for the South Pointe Pier Project. On February 9, 2012, Amendment No. 1 to the Agreement was executed approving additional services required pursuant to the USACOE permit RAl process related to a new coral recipient site in Government Cut, in the not-to- exceed amount of $12,950. Subsequently, on July 1,2012, Amendment No. 2 to the Agreement was executed to provide additional bidding and award services required under a Construction Management at Risk method of procurement in the not-to-exceed amount of $11,974. Amendment No. 3 for an amount of $15,120 is pending approval. On January 16, 2013, the Mayorand City Commission adopted Resolution No.2013-28106 approving Amendment No. 4 in the not-to-exceed amount of $300,852. On June 28,2013, Amendment No. 5 to the Agreement was executed to provide material and laboratory testing services in the not-to-exceed amount of $9,032. On February 24, 2014, pursuant to Resolution 2014-28464, Amendment No. 6 to the Agreement was executed to provide extended Construction Administration and Resident Project Representative services in the not-to-exceed amount of $81 ,000. On March 10, 2014, Amendment No. 7 to the Agreement in the not-to-exceed amount of $4,008.36 was executed to provide additional material testing Pursuant to approval of Amendment No. 8 the Construction Administration and Resident Project Representative services will be extended for a period of up to three (3) months for a total not-to-exceed amount of $45,989. Atkins' revised contract amount will total $834,805.36. The additional services will be added to the Atkins Professional Services Agreement as requested by the City. The Administration has determined that additional services are warranted due to 75 calendar days the project is delayed, not due to the consultant fault. On May 22,2014, the Construction Manager at Risk was issued a Notice-Of- Default identifying project delays and not achieving substantial completion as per approved project schedule. The negotiated price submitted by Atkins has been reviewed by City staff and found to be fair and reasonable. The Administration recommends of the resolution. Advisory Board Recommendation : Supporting Data (Surveys, Environmental Scan, etc.): The 2012 CustomerSatisfaction Survey indicated that over 87Yo and 83% of City residents and businesses respectively, rated the appearance and maintenance of public buildings as excellent or good; and over 81o/o of residents rated recently completed capital improvement projects as Financial !nformation: Amount Account 1 $45,989 388-2577-067357 2 Total $45,989 Financial lmpact Summary: Roberto Rodriguez, Ext. 6122 AGENDA 'TEil C?BE MIAMIBEACH D^TE ?+?/q366 E MIAMIBEACH City of Miomi Beoch, 1700 Convention Cenler Drive, Miomi Beoch. Florido 33.l39, www.miomibeochfl.gov COMMISSION MEMORANDUM TO: Mayor Phillip Levine and Members ol the City FROM: Jimmy L. Morales, City Manager DATE: July 23,2014 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF M!AM! BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 8 TO THE PROFESSIONAL SERVICES AGREEMENT WITH ATK!NS NORTH AMERICA, !NC. FOR EXTENDED CONSTRUCTION ADMINISTRATION AND RESIDENT PROJECT REPRESENTATIVE SERVICES, FOR THE SOUTH POINTE PARK PIER PROJECT; !N THE NOT TO EXCEED AMOUNT OF $45,989, WITH PREVIOUSLY APPROPRIATED FUNDING FROM FUND 388, MDC CDT INTERLOCAL.CDT/RESORT TAX. ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTGOME Ensure Value and Timely Delivery of Quality Capital Projects. FUNDING Funding has been previously appropriated from Fund 388, South Pointe Capital Fund. BACKGROUND On April 13, 2011, the City Commission pursuant to Request for Qualifications (RFO) No. 04- 10111, adopted Resolution No. 201 1-27628, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Atkins North America, lnc. (Atkins) for Professional Services for the South Pointe Pier Project in the amount of $369,000. On February 9,2012, Amendment No. 1 to the Agreement was executed approving additional services required pursuant to the USACOE permit RAI process related to a new coral recipient site in Government Cut, in the not-to-exceed amount of $12,950. Subsequently, on July 1 ,2012, Amendment No. 2 to the Agreement was executed to provide additional bidding and award services required under a Construction Management at Risk method of procurement in the not- to-exceed amount of $1 1 ,974. Amendment No. 3 for an amount of $15,120 is pending approval. On January 16, 2013, the Mayor and City Commission adopted Resolution No. 2013-28106 approving Amendment No. 4 to the Agreement to provide supplemental Construction Administration services in the not-to-exceed amount of $300,852. On June 28, 2013, Amendment No. 5 to the Agreement was executed to provide material and laboratory testing services for the project in the not-to-exceed amount of $9,032. On February 24,2014, the Mayor and City Commission adopted Resolution No.2014-28464 approving Amendment No. 6 to the Agreement to provide extended Construction Administration and Resident Project Representative Services in the not-to-exceed amount of $81,000 for a period of three months, co/missionb 367 Commission Memorandum - Atkins North America Amendment 8 for South Pointe Park Pier Project July 23,2014 Page 2 of 2 due to approved time extension to Construction Contract. On March 10, 2014, Amendment No. 7 to the Agreement was executed to provide additional material and laboratory testing services in the not-to-exceed amount of $4,008.36. ANALYSIS Due to the Construction Manager at Risk (CMR) delay in completing the project, the Administration has determined that additional services are warranted to Atkins. The completion of the project has been delayed by approximately 75 days, at no fault of the Consultant. On May 22,2014, the CMR was issued a Notice-Of-Default identifying project delays and not achieving substantial completion as per approved project schedule. Pursuant to approval of Amendment No. 8, the Construction Administration and Resident Project Representative services are required for the continued monitoring of the construction phase and environmental permitting requirements for an additional period of three (3) months. Amendment No. 8 is for a total not-to-exceed amount of $45,989. Atkins' revised contract amount will total $834,805.36. The additional services will be added to the Atkins Professional Services Agreement as requested by the City (see attached). The negotiated price submitted by Atkins has been reviewed by City staff and found to be fair and reasonable. GONGLUSION: The Administration recommends that a Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, authorizing the Mayor and City Clerk to execute Amendment No. 8 to the professional services agreement with Atkins North America, lnc. for extended Construction Administration and Resident Project Representative services, for a period of up to three (3) months, for the South Pointe Park Pier Project; in the negotiated not-to-exceed amount of $45,989 with previously appropriated funding from Fund 388, MDC CDT lnterlocal-CDT/Resort Tax. ,,-_mn, ATTACHMENT - Atkins Amendment No. 8 T:\AGENDA\2014\July\ClP\Atkins\South Pointe Park Pier Atkins Amendment 8 - MEMO.docx 368 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY GOMMISSION OF THE CIry OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND GITY CLERK TO EXECUTE AMENDMENT NO. 8 TO THE PROFESSIONAL SERVICES AGREEMENT WITH ATKINS NORTH AMERICA, INC., DATED MAY 9, 2011, FOR EXTENDED CONSTRUCTION ADMINISTRATION AND RESIDENT PROJECT REPRESENTATIVE SERVICES, FOR THE SOUTH POINTE PARK PIER PROJECT, IN THE NOT TO EXCEED AMOUNT OF $45,989, WITH PREVIOUSLY APPROPRIATED FUNDING FROM FUND 388, MDC CDT ! NTERLOCAL-CDT/RESORT TAX. WHEREAS, pursuant to Request for Qualifications (RFO) No. 04-10/11, the Mayor and City Commission adopted Resolution No. 201 1-27628 on April 13,2011, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement (Agreement) with Atkins North America, lnc. for Professional Services for the South Pointe Park Pier Project (Project); and WHEREAS, the Agreement provides for the design, bid, award and construction administration services for the Project, in the not-to-exceed amount of $369,000; and WHEREAS, on February 9, 2012, Amendment No. 1 to the Agreement was executed, approving additional services required pursuant to the USACOE permit RAI process related to a new coral recipient site in Government Cut, in the not-to-exceed amount of $12,950; and WHEREAS, on July 1, 2012, Amendment No. 2 to the Agreement was executed, approving additional bidding and award services required under a Construction Management at Risk method of procurement, in the not-to-exceed amount of $11 ,974i and WHEREAS, Amendment No. 3 to the Agreement is pending approval for additional coordination in the FDEP - CCCL permit RAI process, in the not-to-exceed amount of $15,120; and WHEREAS, on January 16, 2013, pursuant to Resolution 2013-28106, Amendment No. 4 to the Agreement was approved for an amount of $300,852, as supplemental Construction Administration services for an on-site representative, to monitor the construction and environmental permitting requirements for a period of twelve (12) months; and WHEREAS, on June 28,2013, Amendment No. 5 to the Agreement was executed approving material and laboratory testing services, in the not-to-exceed amount of $9,032; and WHEREAS, on February 24,2014, pursuant to Resolution 2014-28464, Amendment No. 6 to the Agreement was executed to provide extended Construction Administration and Resident Project Representative services, in the not-to-exceed amount of $81,000, for a period of 3 (three) months; and 369 WHEREAS, on March 10, 2014, Amendment No. 7 to the Agreement, in the not-to- exceed amount of $4,008.36, was executed to provide additional material testing; and WHEREAS, the Administration has determined that additional services for the Project are warranted. The completion of the project has been delayed by approximately 75 days, at no fault of the Consultant. On May 22,2014, the Construction Manager at Risk was issued a Notice-Of-Default identifying Project delays and the failure to achieve substantial completion as per the approved Project schedule; and WHEREAS, the total value of the revised agreement, including Amendment No. 8, is $834,805.36. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission of the City of Miami Beach, Florida, hereby authorize the Mayor and City Clerk to execute Amendment No. 8 to the Professional Services Agreement with Atkins North America, dated May 9, 2011, attached here to and incorporated by reference herein, for extended Construction Administration and Resident Project Representative services, for a period of up to three (3) months, for the South Pointe Park Pier Project, for a total negotiated not-to- exceed amount of $45,989; with previously appropriated funding from Fund 388, MDC CDT I nterlocal-CDTiResort Tax. PASSED AND ADOPTED THIS ATTEST: DAY OF 2014. Rafael E. Granado, City Clerk Philip Levine, Mayor APPROVED AS TO FORM & LANGUAGE (^t lr *lr Dote + T IAGENDA\20'14\July\Atkins\South Point Park - Aikrns Anrenoment 8 RESO 12) cjoc 370 AMENDMENT NO.8 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CIry OF MIAMI BEACH, FLORIDA AND ATKINS NORTH AMERICA, INC., DATED May 9,2011 FOR EXTENDED CONSTRUCTION ADMINISTRATION AND RESIDENT PROJECT REPRESENTATIVE (RPR) SERVTCES IN THE NOT-TO-EXCEED AMOUNT OF $45,989 ThisAmendmenttotheAgreementmadeandenteredthis-dayof-,2o14,byand between the City of Miami Beach, a Municipal Corporation existing under the laws of the State of Florida (hereinafterreferred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and Atkins North America, lnc., a Florida Corporation having its principal office at 4030 West Boy Scout Boulevard, Suite 700, Tampa, Florida, 33607 (hereinafter referred to as CONSULTANT). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 04-10/1 1 , the Mayor and City Commission adopted Resolution No. 201 1-27628 on April 13,2011, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with Atkins North America, lnc., (CONSULTANT) for Professional Services for the South Pointe Pier Project (PROJECT); and WHEREAS, the Agreement provides for the design, bid, award and construction administration services for the South Pointe Pier Project in the not-to-exceed amount of $369,000; and WHEREAS, on February 9, 2012, Amendment No. 1 to the Agreement was executed approving additional services required pursuantto the USACOE permit Ml process related to a new coral recipient site in Government Cut, in the not-to-exceed amount of $12,950; and WHEREAS, on July 1,2012, Amendment No. 2 to the Agreement was executed to provide additional bidding and award services required undera Construction Managementat Risk method of procurement in the not-to-exceed amount of $11 ,gT4; and WHEREAS, Amendment No. 3 to the Agreement shall be executed to provide additional coordination in the FDEP - CCCL permit RAI process in the not-to-exceed amount of $15,120; and WHEREAS, on January 16,2013, the Mayorand CityCommission adopted Resolution No. 2013-28106 approving Amendment No. 4 to the Agreement to provide supplemental Construction Administration services in the not-to-exceed amount of $300,852; and WHEREAS, on June 28,2013,Amendment No. 5 to the Agreementwas executed to provide material and laboratory testing services in the not-to-exceed amount of $9,032; and WHEREAS, on February24,2014. pursuantto Resolution20l4-28464, Amendment No.6 to the Agreementwas executed to provide extended Construction Administration and Resident Project Representative services in the not-to-exceed amount of $81,000 for a period of 3 (three) months; and WHEREAS, on March 10,2014, Amendment No. 7 to the Agreement in the not-to-exceed amount of $4,008.36 was executed to provide additional material testing; and 371 WHEREAS, this Amendment No. 8 to the Agreement was executed to provide extended Construction Administration and Resident Project Representative services in the not-to-exceed amount of $45,989 for a period of three (3) months; and WHEREAS, the total revised agreement including Amendment No. 8 is $834,805.36. NOW, THEREFORE, the parties hereto, and in consideration of the mutualpromises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true, correct and are incorporated as part of this Amendment No. 8. 2, MODIFICATIONS The Agreement is amended to include "Exhibit A-8", which is attached and incorporated herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The CITY and CONSULTANT ratify the terms of the Agreement, as amended by this Amendment No. 8. lN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 8 above. ATTEST:CITY OF MIAMI BEACH By Gity Clerk ATTEST: By. TITLE: Print Name ATTACHMENT A: Exhibit A-8 - including Schedule Compensation and Schedule C - Hourly Billing Rates Gity Mayor CONSULTANT: ATKINS NORTH AMERICA, INC., TITLE: Print Name APPROVED AS TO A- ScQCmffqaE 0eeLB6$ule B-Consultant's & FOR EXECUTION 3.{ 0..1^. City Attomey 372 ATKINS EXHIBIT A.8 SCHEDULE A TO THE PROFESSIONAL SERVICE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND ATKINS NORTH AMERICA, INC. SCOPE OF SERVICES Extended Construction Administration Services for the South Pointe Park Pier Project: As extended services to the TASK 4 - CONSTRUCTION ADMINISTMTION SERVICES, Atkins North America, lnc. (CONSULTANT) shall perform Construction Administration Services as described herein for an extended period of three (3) calendar months to July 31 ,2014. The extended service period will enable the CONSULTANT to perform necessary Construction Administration and Special Inspector Services in concert the latest construction schedule which shows the project is to be Substantially Completed on July 04,2014. The duration of the CONSULTANT Construction Administration and Special lnspector Services was initially established as twelve (12) consecutive months. Amendment No.6 to the Professional Services Agreement extended the CONSULTANT services an additional three (3) months for a total service period of fifteen (15) consecutive months. This Amendment will extend the service period an additional three (3) months for a CONSTRUCTION ADMINISTRATION SERVICE period of eighteen (18) consecutive months, which coincides with the latest construction schedule. Task 4: Extended Gonstruction Administration Services The CONSULTANT will provide Construction Administration Services during the extended three (3) month service period from May 01 through July 31 , 20'14. The services listed below are those services which require extension and these are described under the Professional Services Agreement, Schedule A - Scope of Services. Other tasks not listed herein are already completed or do not need to be extended since they have not been undertaken as yet. Task 4.2 - Weekly Construction Progress Meetings Task 4.3 - Requests for lnformation/Contract Document Clarifications (RFl's and GDC's) Task 4.4 - Requests for Changes to Construction Cost and/or Schedule Task 5: Extended Speciallnspection Services: The CONSULTANT will continue to provide the services of an on-site, full time construction representative acting as a Special lnspector, to provide oversight of the Construction Manager at Risk's (CONTRACTOR's) project progress and quality control programs as well as, to facilitate coordination between the design team, the CONTMCTOR, the CITY and applicable regulatory agencies. The CONSULTANT will continue to perform project documentation work off-site, in a construction field office provided by the CONTMCTOR, the CITY and/or at the home ofiice of the CONSULTANT. The CONSULTANT will provide Special lnspector Services on a full-time basis during the extended service period through July 1 5,2014, if deemed desirable and necessary by the CITY. Page 1 of 6 373 Task 5.7.1 General Coordination: The CONSULTANT will communicate periodically with the CITY and CITY's inspector related to progress on the project and any issues that are being addressed. The CONSULTANT will report on concerns as it relates to the construction effort and activities. ln addition, the CONSULTANT shall also coordinate with the contractor's Public lnformation Officer where notifications such as utility outages, road closures, etc. may be required. The CONSULTANT will monitor and verify that the CONTMCTOR has made the required notifications to the utility owners, residents and businesses as may be required. Task 5.7.2 Full-Time Field Representative lnspections: The CONSULTANT will conduct field inspections throughout the extended service phase on a full{ime basis through July 15, 2014,'fi deemed desirable and necessary by the CITY. The field representative shall be present at the construction site daily during the construction phase of the project and will be expected to be available, as needed, throughout the CONTMCTOR's 8-hour work day, 40-hour work week, excluding weekends and CITY holidays. The CONSULTANT may perform project documentation work off-site, in a construction field office provided by the CONTRACTOR, the CITY or at the home office of the CONSULTANT. Task 5.7.3 Delivery of Unaccepted Materials to Jobsite: As new materials are delivered to the jobsite, the CONSULTANT will check the materials certifications and samples and verifo that an approved shop drawing was submitted for the material in question. lf it is determined that a submittal as not been approved, the CONSULTANT shall immediately notify the CITY and issue a Non-Compliance Notice. The CONSULTANT will direct and supervise the sampling and testing of materials to be performed by the CIW's independent testing laboratory. The CONSULTANT shall maintain test report logs which shall be submitted to the CITY for review on a monthly basis and uploaded to the CITY's E-Builder document management system on a weekly basis. CONSULTANT shall also review invoices submitted by the independent testing laboratories and recommend payment by the CITY. Task 5.7.4 lssuance of Non-compliance Notices: The CONSULTANT will be responsible for notifying the CITY when they become aware of a condition that is believed to be in non-compliance with Construction Documents. Anytime the CONSULTANT notices a potential construction problem or a condition that could result in non-complying materials, equipment or workmanship, the CONSULTANT will need to determine whether the condition poses an immediate threat to public health or safety. lf a condition does not pose a threat to public health or safety, immediate verbal notification or "Pre- Noncompliance Notice" of the potential non-compliance should be made to the CONTMCTOR and the ClW. This verbal notice shall be documented in the CONSULTANT's daily report and shall advise the CONTRACTOR of potential construction problems, errors, or deficiencies that can be promptly resolved and do not warrant a Non-compliance Notice. lf the CONTMCTOR fails to respond to the verbal notification within a reasonable timeframe, the CONSULTANT will notify the CIW and the CIW's Projects Coordinator will issue a Non-compliance Notice. lf a condition poses an immediate threat to public health or safety, the CONSULTANT will notify the CONTRACTOR and CITY imrnediately and the CITY's Projects Coordinator will issue a Non-compliance Notice to the Contractor. Non-compliance Notices will include a description of the Work that does not meet the construction contract requirements, along with a required timetable for corrective work to be implemented by the Contractor. Other items that should be included in the Notice include a reference to the provision of the Construction Documents that has been violated. Task 5.7.5 Damage to Existing Facilities: The CONSULTANT will identify any existing facilities damaged by the CONTMCTOR and verify that the CONTRACTOR has notified the respective owner(s). lnclude record of such occurrences in the daily reports. Task 5.7.6 Schedule: CONSULTANT will review the construction schedule, monitor the progress of construction, and ensure that Contractor's adherence to the schedule. The CONTMCTOR will be required to submit a detailed schedule to the CONSULTANT at the pre-construction meeting. This schedule will be reviewed and approved by the CONSULTANT and the CITY. This schedule will be updated on a by weekly basis by the Contractor; however, the CONSULTANT will be responsible for Page 2 of 6 374 reviewing the Contractor's schedule to confirm accuracy of the work activities completed. Analysis of the CONTMCTOR schedule will be on the basis of planned versus actual costs for the month and construction contract to date. CONSULTANT shall verify that the CONTMCTOR is uploading approved schedule and schedule updates to the CITY's E-Builder document management system. Task 5.7.7 Daily Reports: The CONSULTANT will prepare daily reports, on the same date as construction occurs, to record the daily performance of the CONTMCTOR as well as other significant construction related matters. Daily Reports shall be uploaded to the CITY's E-Builder document management system by the CONSULTANT. The daily reports shall include records of when the CONTRACTOR is on the job-site, general field observations, weather conditions, change orders, changed conditions, list of job site visitors, daily drilling and testing activities, testing results, testing observations, and records of the outcome of tests and inspections. At a minimum the daily reports will contain the following information: . Weather and general site conditions. Contractor's work force counts by category and hours worked. Description of work performed including location. Equipment utilized. Name of visitors to the jobsite and reason for the visit. Tests made and results. Construction difficulties encountered and remedial measures taken. Significant delays encountered and apparent reasons why. Description of (potential) disputes between the CONTMCTOR and CITY. Description of (potential) disputes between the CONTMCTOR and residents. Summary of additional directions that may have been given to the Contractor. Detailed records of materials, equipment and labor used in connection with extra work, or where there is reason to suspect that a claim or request for Change Order may be submitted by the Contractor. Summary of any substantive discussions held with the CONTRACTOR and/or CITY. SummaU of nonconforming work referenced to corresponding Non-Compliance Notice. A log of photographs taken. Photographic Record: CONSULTANT shall provide a photographic record of the overall progress of construction, beginning with preconstruction documentation, following with on-going construction documentation, and ending with post-construction documentation. Photographs shall be digital snapshot type take to define the progress of the project and shall be filed electronically by month in the CITY's E-Builder document management system, labeled by date, time and location. The CONSULTANT will upload all photos to the E-Builder document management system on a weekly basis. Task 5.7.8 Pay Requisitions: CONSULTANT shall verify Contractor's pay requisition and sign-off on all pay requisition quantities in the field. CONSULTANT shall be responsible for reviewing with the CONTRACTOR the monthly payment requisition to conflrm the status of completed and uncompleted work and stored materials. The CONSULTANT shall advise the CITY of quantities being approved for subsequent concurrence for payment purposes. Payment requisitions shall be certified by the CONSULTANT. Task 5.7.9 Record Drawings: CONSULTANT will monitor that record drawing mark-ups are properly maintained by the Contractor. At a minimum, the CONSULTANT will review the record drawing mark-ups every month, or more often, as deemed necessary. Contractor's failure to maintain the record drawings in upto-date condition may be deemed grounds for withholding Contractor's monthly payment requisitions until such time as the record drawings are brought up-to-date. The CONSULTANT will notify the CITY if it considers the mark-up documents insufficient. The CITY will make final determination of payment withholding. Task 5.7.10 Safety: CONSULTANTs will be expected to recognize ahazard that any reasonable non- safety professional might be expected to recognize. ln addition, those safety obligations extend only to Page 3 of 6 375 recognizable hazards that the CONSULTANT may note while in the normal conduct of onsite business. lf a situation presents itself, the following procedures should be followed: . lmmediately direct personnel to remove themselves from the apparent danger,. Notify the CONTRACTOR's superintendent of the apparent condition that caused the concern and that the affected personnel were directed to remove themselves accordingly,. Notify the CONTMCTOR of the situation that arises concern, both in writing and verbally, . lssue a written Notice of Noncompliance stating that the CONTMCTOR should take immediate action as it deems necessary to correct the deficiency/condition,. Write a full report in the Daily Report on the condition found to be unsafe, all actions taken, and correspondence written, including times and names,. Take photographs of the concern,. lf the CONTRACTOR does not make corrections, the CONSULTANT should notify the CITY, . The CONSULTANT will review the situation with the CITY for further direction,. The condition, as wetl as all conversations and correspondence, will be recorded in the CONSULTANT's Daily Report,. ln case of a construction-related accident, CONSULTANT will notify the CITY of the accident. CONSULTANT will direct the CONTMCTOR to prepare an accident report with a copy forwarded to the CITY. Task 5.7.11 Quality Control: The CONSULTANT will review and monitor the Contractor's adherence to an acceptabte quaiity control program submitted by the CONTMCTOR prior to the issuance of the second Notice-to-Proceed by the CITY. This program will describe the Contactor's quality control, organizational procedures, documentation controts and processes for each phase of the work. Quality control during construction will be the responsibility of the Contractor; however, oversight and ensuring the CONTMCTOR complies with applicable jurisdictional construction standards will be enforced on the CITY's behalf by the CONSULTANT. Task 5.7.12 CONSTRUCTION MANAGER Request for Services: When the CONTMCTOR requires services from the CITY for issues such as water service shutdowns, tie-ins to existing water mains, electrical service interruptions and/or any special regulatory inspections, etc., a request shall be made in writing by the CONTMCTOR, and forwarded by the CONSULTANT to the CITY, a minimum of three (3) working days prior to when required. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements whether oral or written. lt is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless memorialized in written document approval and executed with the same formality and of equal dignity herewith. @PENsaIlo.N: . OriginalAgreement: $369,000. Amendment #1:. Amendment #2:. Amendment #3:. Amendment #4:. Amendment #5:. Amendment #6:. Amendment #7: $12,950 $11,974 N/A $300,852 $9,032 $81,000 $4,008.36 a . Total Revised Agreement: $834,805.36 Page 4 of 6 376 ATKINS SCHEUDLE B CONSU LTANT COM PENSATION Task Descriotion Pavment Method Limitino Fee Extended Construction Administration Services Extended on- site Special lnspector Services Reimbursable Expenses: Grand Total Limiting Fee not to exceed: Lump Sum * Hourly not-to-exceed *" Expenses not-to-exceed $ 9,000.00 $ 36,904.00 $ 85.00 s 45,989.00 lnvoicing Procedures: * The lump sum fee shall be invoiced in three (3) equal amounts of $3,000.00 for each month of extended Construction Administration Services in accordance with Schedule B of the Professional Service Agreement. These services shall extend through project completion projected to be on or before July 31, 2014. *" The labor costs for the on-site Special lnspector and inspector support services will be invoiced based on actual time expended by the CONSULTANT, times the applicable hourly billing rates per job classification as stipulate in Schedule C - Hourly Billing Rate Schedule. Certified time sheets shall be submitted with each invoice. These services shall extend through July 15, 20'14, if necessary, at which time the Special lnspector services are expected to be completed, based on the latest construction schedule. Page 5 of 5 377 SCHEDULE C HOURLY BILL!NG RATE SCHEDULE Extended Construction Administration Services ATKINS Hourlv Billino Rate $198.00 per hour $ 100.00 per hour $ 91.00 per hour Classification Project Manager Construction Engineer (lnspector) Engineer El (Project Controls) Note: Rates are per the Agreement between City of Miami Beach and Atkins North America, lnc for Professional Architecture and Engineering Services for the South Pointe Park Pier Project, Resolution No. 2011-27628. Page 6 of 6 378 ATKII{S SOUTH POINTE PARK PIER AMEMOMENT NO. 8 EXTENDED SPECIAL INSPECTOR SERVICES TO JULY 15, 2014 MANHOUR AND BUDGET CALCULATION SHEET 1 -Jun' 1 4 **,.&ai .MU ErNsmlgr/I6-lhtf,I,d.r 17 It Ln* ta t lEd g,7lr IdE. EI lhlEr Colhlr l.1't ,ts 165r oulEdo. andlddd.n ld a a5 !!@ *d l&.httuk g, hWEg;E $l s lu. l..;l*il; ;ta t7 t l1m UBTOTA q IERWEI ;RAND TOTAL NOT to EXCEED AMOUNT !rsp89 Notes: 379