C7N-Increase In Escrow Account Drainage Improvements From 5th St To Michigan AvCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Add Additional Funds To The Existing Joint Participation Agreement (JPA) Between The City And Florida Department Of Transportation (FDOT), For Additional $500,000 For Utility Work By FDOT Highway Contractor For The Construction Of Water, Sewer And Stormwater Drainage lmprovements Within The Project Area, As Part Of The State Road 907/Alton Road Proiect From 5th Street To Michiqan Avenue. Well Maintained lnfrastructure Su Data Environmental Scan, etc. Item Summary/Recommendation : The Florida Department of Transportation (FDOT) is executing construction improvements on Alton Road/State Road (SR) 907 from 5'n Street to Michigan Avenue (Project). The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction, significant drainage improvements including construction of three (3) stormwater pump stations at 5'n Street, 10'n Street, and 14'n Street, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. ln order for FDOT to include the construction of the City owned drainage and water main improvements as part of the Project, the City and FDOT executed a JPA stipulating funding sources and responsibilities among the parties. At its April 23,2014 meeting, the City Commission approved Resolution 2014-28557, to add additional funds to the existing Joint Participation Agreement (JPA) between the City and FDOT, for an additional $240,000 for utility work by the FDOT highway contractor, for the construction of water, sewer and stormwater drainage improvements within the project area, as part of the State Road 907/Alton Road Project from Sth Street to Michigan Avenue. The Alton Road construction has revealed that City utilities are in worse condition than originally anticipated and additional work is required due to the fragile nature of the aged pipe, as well as additional improvements that should be performed while the road is under construction. The value for additional work, including the replacement of storm drain pipes, additional water meters and water lines is estimated at an additional $500,000. THE ADMINISTRATION RECOMMENDS APPROVING THE RESOLUTION. Financial lnformation: Source of Funds: Amount Account 1 OBPI 2 Total Funding will be available upon approval of the Sixth Amendment to the Capital Budget for Fiscal Year 2013-14, reappropriating $500,000 to the {ton Road 51h Street to Michigan Avenue Capital Project from the Collins Avenue Utilitv from sth to 1srh Street. AGETTTDA trEM C7 N€ MIAMIBTACH DATE458 @ MIAMIBEACH City of Miomi Beqch, I200 Convention Center Drive, Miomi Beoch, Florido 33,l39, www.miomibeochfl.gov COMMISSION MEMORANDUM TO: Mayor Philip Levine and Members FROM: Jimmy L. Morales, City Manager DATE: July 23,2014 the City SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEAGH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO ADD ADDITIONAL FUNDS TO THE EXISTING JOINT PARTICIPAT|ON AGREEMENT (JPA) BETWEEN THE CITY AND FLORIDA DEPARTMENT OF TRANSPORTATTON (FDOT), FOR ADDITIONAL $500,000 FOR UTILITY WORK BY FDOT HIGHWAY CONTRACTOR FOR THE CONSTRUCTION OF WATER, SEWER AND STORMWATER DRAINAGE IMPROVEMENTS WITHIN THE PROJECT AREA, AS PART OF THE STATE ROAD 907/ALTON ROAD PROJECT FROM sTH STREET TO MICHIGAN AVENUE. The Florida Department of Transportation (FDOT) is executing construction improvements on Alton Road/State Road (SR) 907 from sth Street to Michigan Avenue (Project). The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction and significant drainage improvements, including construction of threel3; stormwater pump stations at 5th Street, 1Oth Street, and 14th Street, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. ln order for FDOT to include the construction of the City owned drainage and water main improvements as part of the Project, the City and FDOT executed a JPA stipulating funding sources and responsibilities among the parties. ADM INISTRATION RECOMM EN DATION The Administration recommends approving the Resolution. FUNDING Funding will be available upon approval of the Sixth Amendment to the Capital Budget for Fiscal Year 2013-14: re appropriating $500,000 to the Alton Road Sth Street to Michigan Avenue capital project from the Collins Avenue Utility from Sth to 15rh Street Capital Project. BACKGROUND 459 Commission Memorandum - FDOT Agreements for Alton Road from sth Street to Michigan Avenue April23,2014 Page2 of 2 At its April 23, 2014 meeting, the City Commission approved Resolution 2014-28557, to add additional funds to the existing Joint Participation Agreement (JPA) between the City and FDOT, for an additional $240,000 for utility work by the FDOT highway contractor, for the construction of water, sewer and stormwater drainage improvements within the project area, as part of the State Road 907/Alton Road Project from 5th Street to Michigan Avenue. The breakdown of these expenditures is attached. The Alton Road construction has revealed that City utilities are in worse condition than originally anticipated and additional work is required due to the fragile nature of the aged pipe as well as additional improvements that should be performed while the road is under construction. The value for additional work, including the replacement of storm drain pipes, additional water meters and water lines is estimated at an additional $500,000. ANALYSIS Utilitv Work bv Hiohwav Contractor Aoreement As part of the FDOT project, relocation of the City-owned water main system along Alton Road was required. Considering the age and condition of the City utility infrastructure in this area, staff determined that it would be advantageous to the City to upgrade the existing water main system as part of the FDOT project. ln addition, the Project will also include upgrading the water main laterals that service the side streets along the Project corridor. During construction it was determined the connecting water, sewer and stormwater infrastructure required upgrading or failure could occur in the next few years. These funds will be utilized to make these improvements. Utilitv Work bv Hiohwav Contractor Memorandum of Aoreement This Agreement will add to the existing escrow account established by FDOT with a deposit in the amount of $500,000 funded by the City for the purpose of the construction of new water main system on Alton Road Avenue from 5th Street to Michigan Avenue as part of the Project. CONCLUS!ON The Administration recommends that the proposed stormwater drainage and water main improvements be constructed with the Alton Road improvements in order to reduce the risk of failure of the water, sewer and stormwater system, as well as the potential need to perform repairs in the new roadway shortly after completion. The Administration recommends approving the Resolution authorizing these funds. Attachment: FDOT JPA Expenditure Breakdown rr-rrru{€ruJF/BAM/DCS T:\AGENDAVO14Uuly\Public Works\FDOT additional funding Alton Road from 5th Street to Michigan Avenue - Memo.docx 460 Attachment !<L .trcrzc c q c I q ci aQ ci F 5o U, E J ol - 6-ts q \ zIFe ccoo UJo trUotro Ytro = o oo :: a ! t se o E =, E E E t : E ci o t'a ! ,i E o @ Eo 6 E .g =o 6 .9 t .l N. uJ ! E a ; E 'i o J q .9 E E E a.i: .i o ;:loir59 flE.E c- TggE 5E $s Eq6E =a-o>9 ".S CN a,h5! EE Fa Eg fi; g9 9e p3-6E aF &' d) EEa!;9a;co6El EC 3E!! E.9 9E E; 9o ol OEgo DE -a E P:: c!E'E:etE".3 i;;O )5o ;ou 4g6 ri;g:! f, o.s.E9 oaq J oc E I J E E. 6 F E =d E Ii c o 6 E o 6tsEo4 oUol -qi c: 6EECfa 3E 2E<6 =oUG ,E $s=E:6=s:=gE iEfrii=(?J rEE U trodyZ Go I io D. (oooo Eo =oc =og) Gc6 =o =ao_ ON LOs8J*t-utEogG-oeyC 6sB* oo at, oco C')tr coo o o c;z Po Eq 5 $=Eid s5ttp!E1;oF6 EE5 ca 461 5=E rzo $E E at ..i 8; .i s $ R *I ci ae * e E *I *8 ts 59 dEJ E 3 E E E. qI d q s ci E 8 d B E zIFG Eooqo GUoEo YEo3 ot ;6 0Ei 3 =E i e8 E !f : t: : €t -E oP 3 =r IFr I SE ; E3 ts 66 ! l; :Ea E Pi -d =E E iE - 93 ; 6oi: s 9:it _P =3E !eg s aF 6 Ei! 66Y Na_:. u i,3 E :6Pe ;r? 9;o dEb q nE g 93 a33 3 5i P99 3- = ;o o 9 op .lg - ra:; IJ;E! Co it]t!BiE EE Eo EE}EqE i,E!EoE 9iEg 6J E*t€ EE p6 3E 3P,= ,6 .eo>; C8 9p =: =:o9ol ,9; E! 6q ]l !? E: ES Eq €Y 6F 6e bf >d !ie !; je ;- 59 b&rEo! 6 *: Al freeFi{833rx6-Nq, FEx;r "ooo i EbsR; FFtsF; s&*si 9909: ;;.; i'6',6',. 6 1E E E EI ,:;;l E,ES.EJ t'tii! EE'E, sE0&si &8888{ ogge9l EHBHHI CEEFEf!3333iI I ,E E! O I F E 3 ,6 E 63 B E E .E E 8 B E E c 5 o ; 8 I 3 !I e E 8 g q E o 3 8( o + .s b] E 6 .E ,E Eeo ,' 6 = E E I a d I ,6 'I ,g 3 E I ,P 'I 2 6 .9 E i E I 8 & E o I v * ot c E s ;c! &5 6E' Yd 3E qd FF 9p E6 ==99 '6 ',6 EEE!;] ES eq:: E$F 9.!5 !!q t56 S EE.OFE 5go & E E E t E !9 + i?' -p9oE{3: -:8 EE 6o EE9E c9 6E i3 €E8E .93E,9 gP :gl6 *s =qdo ;i E! i6 E9 6Ai {6 8s96*; &= 66 6re 6-g R6 i= €5 6eeIEog a: 3e3 :r.g 6a6 ? 6,; Eq; E EJ 96c 5Ei i!!OYYe Et 8PS!r? 9!g.g!q,9!EEE EgE ggE qEa iriE66 e aIEo9 E EEtt€ ab55;iEgg 9BE! 6999 E }PFi333l:rl 8 Eo 4v 6o E; ?= ?E=E!8 B€ 62 (6P; E! E9 EtgE .soEg56 Pt18g: ?6N! E= :f+Ae&s3 E3. 6O eE.9>iio ;e'6q sEig 6< 56 9i 55: ,E;g 4.: P ?os gB.E5{ c Z9= 8 E*e qtY cEh --E g 8X E t P;i.p E ,9 I 9. t] EF E! a9 E E 3I 6 9 -; 5 I '6 E .9 =; I ! 9 'd E I] i ti3t q6 6! Eft O9 -9 ilE 9E o6 is p E E I 0 .9 .9 F qi ,9 ,9 E c I ,6 Er]a 9 E .E = o g 8 I p I E o q !ot; E E.9 I E i ,9 E i a E .96 ! = 2 a 8 I E o a ts ci Pot d ,6 8 I 3 aE ,= E 'a E '6 ,a z e E 9 I I E t, I p E o d 6 oI j E ! : I t a & $ E I.t5 E j o : ozo tst6d 6u f !l E.J6i ol:tZ'<tf;(E {! BiBjr iEEI iE; oGodyZ tro;I a It 3 I E * s I *I E I 8* $ * t ; * E *I i $ oooo Eo; .EJ ooocaE o oiiOoZN FOegJqrENuJ cok r!o> Eo.OE =3E ocoec q oo E !E o I I zg L 9 I55og<* ,I6EAE'TdsiE.;oF6 E*EEEO 462 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEAGH, FLORIDA, APPROVING AND AUTHORIZING AN ADDITIONAL INCREASE IN THE ESCROW ACCOUNT, IN THE AMOUNT OF $5OO,OOO, ESTABLISHED PURSUANT TO THE JO!NT PARTICIPATION AGREEMENT BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), DATED OCTOBER 2, 2012, FOR UTILITY WORK BY THE FDOT HIGHWAY CONTRACTOR, FOR THE CONSTRUCTION OF WATER, SEWER AND STORMWATER DRAINAGE IMPROVEMENTS WITHIN THE PROJECT AREA, AS PART OF THE STATE RoAD goz/ALToN RoAD pRoJEcr, FRoM srH STREET To MtcHtcAN AVENUE. WHEREAS, the Florida Department of Transportation (FDOT) and the City have executed a Joint Participation Agreement for utility work by an FDOT highway contractor, dated as of October 2,2012 (JPA), for utility improvements on Alton Road/State Road (S.R.) 907, from sth Street to Michigan Avenue (Project), whereby the City has agreed to use the services of an FDOT highway contractor for the Project; and WHEREAS, the Project will improve the quality-of-life along the Alton Road corridor by including construction of water main and stormwater drainage improvements along Alton Road and intersecting side streets, which will help alleviate flooding along Alton Road and enhance the City's utility infrastructure system; and WHEREAS, simultaneously with the execution of the JPA, FDOT, the City, and the Department of Financial Services, Division of Treasury executed a Memorandum of Agreement, which establishes an escrow account for the deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of $2,680,670.52; and WHEREAS, on April 23, 2014, the Mayor and City Commission adopted Resolution 2014-28557, approving an additional deposit of $240,000 into the escrow account, for the construction of water, sewer and stormwater drainage improvements within the Project area; and WHEREAS, the Alton Road construction has revealed that the City utilities are in worse condition than originally anticipated, and additional utility work is required due to the fragile nature of the aged pipes, as well as additional improvements which should be performed while the road is under construction; and WHEREAS, the additional utility work, including the replacement of storm drain pipes, additionalwater meters and water lines, is estimated to cost $500,000. 463 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CIry COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize an additional increase in the escrow account, in the amount of $500,000, pursuant to the Joint Participation Agreement between the City and the Florida Department of Transportation, dated October 2,2012, for utility work by the FDOT Highway Contractor for the construction of water, sewer and stormwater drainage improvements, within the project area, as part of The State Road 907/Alton Road Project, from 5th Street To Michigan Avenue. PASSED AND ADOPTED THIS 23RD DAY OF JULY, 2014. Philip Levine, Mayor ATTEST: Rafael E. Granado, City Clerk T:\AGENDA\2014Uuly\Public Works\FDOT JPA ALTON ROAD FROM 5TH STREET TO MICHIGAN AVENUE ADDITIONAL FUNDING RESO (2).docx APPI?OVED AS TO FORM & LANGUAGE 464 THIS PAGE INTENTIONALLY LEFT BLANK 465