Loading...
R7H-Execute CO Roadway Improvements Along 6th St And West Ave And Seawall At 1Condensed Title: Seawall At iqth Street, Further lnCreasinq The Cost Of The Aqreement To $3,006.544. A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No. 2 To The Agreement With Bergeron Land Development, lnc., Dated April 30, 2014 (The Agreement), Related To The Completion Of Roadway lmprovements Along 6th Street And West Avenue Between sth And 6th Streets And A New Item Summary/Recommendation : During the construction, it has been determined that drainage improvements along 6"' Street and West Avenue between 5'n and 6'n Streets will require significant removal of the existing pavement to construct the 6th Street storm water pump station. fimng into consideration that the City has already programmed and budgeted a West Avenue and Bay Road Design Build Neighborhood lmprovement project coming up in the fall of 2015 and the condition of the City's infrastructure on Alton Road, and Public Works staff recommends that both drainage and neighborhood improvements are dealt with at the same time, in order to minimize construction impacts along these neighborhood corridors. The City is submitting a request to execute Change Order No. 2, for an additional scope of services to be performed by Bergeron (ATTACHMENT A) along 6tn Street and West Avenue between Sth and 6th Streets. The work shall include the replacement of City underground utilities and other aspect of a typical neighborhood improvement project: street lighting, sidewalk replacement, roadway reconstruction and landscaping. ln addition to this work on 6th Street, it was found during the construction of the 14th Street pump station that the existing seawall had a crack and the seawall required replacement. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. AGEHDA trEM fql H COMMISSION ITEM SUMMARY Ensure value and of oualitv Caoital Proi Data (Survevs. Environmental Scan. etc.): N/A Financial lnformation: Source of Funds: Amount Account 1 $ 62.280 365-2336-069355 2 $ 30,000 304-2336-061657 3 s 1.278.417 384-2336-061 357 4 s 252.102 424-2336-061357 { <lt/\)5 $ 8.801 428-2336-061357 \#/6 $ 694.944 431 -2336-061 357 7 $ 600.000 South Pointe Caoital 8 $ 80.000 435-2473-069357oBPr I I$3,OOO,Saa Financial lmpact Summary: I Total ts Eric T.ext.6012 (B MIAMIBEACH oxre l- 3o'ltf279 g MIAMIBEACH City of Miomi Beoch, ,l700 Convention Cenler Drive, Miomi Beoch, Florido 33.l 39, www.miomibeochfl.gov COMMISSJON MEMORANDUM TO:Mayor Philip Levine and Members q the City FROM: Jimmy L. Morales, City Manager DATE: September30,2014 SUBTECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO THE AGREEMENT WITH BERGERON LAND DEVELOPMENT, !NC., DATED ApRtL 30, 2014 (THE AGREEMENT), RELATED TO THE COMPLETION OF ROADWAY TMPROVEMENTS ALONG 6TH STREET AND WEST AVENUE BETWEEN sTH AND 6TH STREETS AND A NEW SEAwALL AT 14TH STREET, FURTHER INCREASING THE COST OF THE AGREEMENT TO $3,006,544. ADMI NISTRATION RECOMMENDATION The Administration recommends adopting the Resolution FUNDING FY 2013t14 Amount $ 80,000 $ 62,280$ 30,000 $ 1,278,417 $ 252,102 $ 8,801 $ 694,944$ 600.000 $ 3,006,544 BACKGROUND At its February 12, 2014 meeting, Resolution number 2014-28498 was adopted by the City Commission, accepting the findings and recommendation of the City Manager in declaring an emergency, pursuant to Subsection 287.055(9Xc)(6)(aX1) of the Florida statute, and as permitted, pursuant to Section 2-367(e) of the City Code, waiving, by 5/7ths vote, the competitive bidding requirement, and authorizing the City Manager to take the following actions: To procure the necessary emergency design and construction services, pursuant to a negotiated design-build contract for the remaining stormwater pump stations for 6th, 1Oth and 14tn Streets, with Bergeron Land Development, lnc. (Bergeron), an Florida Department of Transportation (FDOT) contractor for the Alton Road lmprovements Project, in an amount not to exceed $11,250,000 to: 1) Prepare, whether through the City's Public Works Department or Account Number 435-2473-069357 365-2336-069355 304-2336-061657 384-2336-061 357 424-2336-061357 428-2336-061357 431 -2336-061 357 South Pointe Caoital Total 280 Commission Memorandum -Bergeron pump sfafions lmprovements - Change Order No. 2 Page 2 of 3 through retention of a professional outside design consultant, as determined by the City Manager, a Design Criteria Package (DCP) which complies with the specification set forth under Section 287.055(2)O of the Florida Statue; 2) Upon completion of the DCP, authorizing the City Manager to negotiate and, if successful, execute a design-build contract with Bergeron for the project, with a guaranteed maximum price (GMP) for services; and further, if the City Manager is successful in negotiating the contract, authorizing the Mayor and City Clerk to execute the contract. As a continuation of the initiative to protect residents from tidal flooding within the City of Miami Beach, and to improve the overall stormwater conveyance and discharge, the Public Works Department requested an addition to the scope of work in the existing Bergeron contract. At its June 11,2014, the City Commission approved Resolution No. 2014-28636, authorizing the Mayor and City Clerk to execute Change Order No. 1 to the Bergeron agreement, dated June 11,2014i said change order, in the amount of $1,000,000, plus a project contingency in the amount of $100,000, for a total cost of $1,100,000, for taking over additional services related to a prior contract with Ebsary Construction, which reached an impasse; with such additional services to include: a seawall construction at 1Oth Street, construction of an FDOT outfall per the current 1Oth Street Joint Participation Agreement (JPA), converting a Bay Road pump station to direct discharge to the bay at 14th Street, and installing additional check valves at various locations requiring protection from tidal flooding. CURRENT STATUS During the construction, it has been determined that drainage improvements along 6th Street and West Avenue between Sth and 6th Streets will require significant removal of the existing pavement to construct the 6th Street storm water pump station. Taking into consideration that the City has already programmed and budgeted a West Avenue and Bay Road Design Build Neighborhood lmprovement project coming up in the fall of 2015 and the condition of the City's infrastructure on Alton Road, and Public Works staff recommends that both drainage and neighborhood improvements are dealt with at the same time, in order to minimize construction impacts along these neighborhood corridors. The City is submitting a request to execute Change Order No. 2, for an additional scope of services to be performed by Bergeron (ATTACHMENT A) along 6th Street and West Avenue between Sth and 6th Streets. The work shall include the replacement of City underground utilities and other aspect of a typical neighborhood improvement project: street lighting, sidewalk replacement, roadway reconstruction and landscaping. ln addition to this work on 6th Street, it was found during the contruction of the 14th Street pump station that the existing seawall had a crack and the seawall required replacement. CONGLUSION The Administration recommends adopting the Resolution. JLM/MT/ETC/BAM/FRS T:\AGENDA\2014\September\Publlc Works\Bergeron Pump Stations Poect Change Order No 2 Memo.docx 281 RESOLUTION TO BE SUBMITTED 282