R7E-Execute Change Order Biscayne Point Neighborhood ROW Improvements ProjectCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Approving And Authorizing The Mayor And City Clerk To Execute A Change Order To David Mancini & Sons, lnc., For Additional Engineering Services, Drainage Structure Modification, Drainage Pipe, Storm Water Pump Station, Pollution Control Structure, Milling And Repaving And Water Main Replacement For The Biscayne Point Neighborhood Right-OtWay lmprovements Project, As Part Of A Flood Mitiqation On Crespi Boulevard. For A Total Construction Cost Of $3.550.876. Ensure value and of qualitv Caoital Su Data (Survevs. Environmental Scan. etc.): N/A ln preparation for the October 9'" King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during this event. lnitial flooding was observed on Crespi Boulevard, from 80th to 84th Streets. To alleviate the flooding, staff utilized water pumps and installed temporary plugs; however, a more permanent solution is required. CURRENT STATUS The Biscayne Point Neighborhood Right of Way lmprovement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements need to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from BOm to 85th Streets. The Public Works staff has requested an additional scope of work from David Mancini & Sons, lnc. (DMSI) that would include: the replacement of a water main in Crespi Boulevard, the installation of a new storm water collection system in Crespi Boulevard and construction of a pump station at the 81"1 Street End. The proposed pump station would be designed to fit the City's criteria and would include a pollution control system and outfall that meets permit requirements. At the completion of this underground work on Crespi Boulevard, the road sections impacted by this work would be milled and a new asphalt would be overlaid. The storm water pump system would be functionally complete by April2015, just in time to address the expected flooding during the Spring High Tides. COST ANALYSIS DMSI has submitted a cost proposal in the approximate amount of $3,000,000 (Attachment) for drainage and $536,376 lor water mains. The City's Public Works Department has reviewed the proposal and deems the amounts to be reasonable. During review there were deficiencies noted that would make the work inconsistent with the latest drainage criteria. We have discussed the deficiencies with DMSI and increased the contract for a total of $3,550,876, which includes a 10o/o contingency. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION Board Recommendation: Financial lnformation: Source of Funds: Amount Account 1 2 OBPI I Total Financial lmpact Summary: T:\AGENDA\2014\October\October 2g\PUBLIC WORKS\Crespi Change Order No 1 . Summary.docx Agenda ttem R) E Date /0-&9-/?& AAIAMIBFACH 150 E MIAMIBEACH City of Miomi Beoch, 1700 Convention Center Drive, Miomi Beoch, Florido 33I39, www.miomibeochfl.gov COMMISSION MEMORANDUM Mayor Philip Levine and Members the City Jimmy L. Morales, City Manager October 29,2014 A RESOLUTION APPROVING ANBI AUTHORIZING THE MAYOR AND CIry CLERK TO EXECUTE A CHANGE ORDER TO DAVID MANCINI & SONS, INC., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, STORM WATER PUMP STATION, POLLUTION CONTROL STRUCTURE, MILLING AND REPAVING AND WATER MAIN REPLACEMENT FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT.OF.WAY IMPROVEMENTS PROJEGT, AS PART OF A FLOOD MITIGATION PROJECT ON CRESP! BOULEVARD, FOR A TOTAL CONSTRUCTION COST OF $3,550,876. ADM!NISTRATION RECOMMEN DATION The Administration recommends adopting the Resolution FUNDTNG BACKGROUND ln preparation for the October gth King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during this event. lnitial flooding was observed on Crespi Boulevard, from 80th to 84th Streets. To alleviate the flooding, staff utilized water pumps and installed temporary plugs; however, a more permanent solution is required. CURRENT STATUS The Biscayne Point Neighborhood Right of Way lmprovement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements need to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 80th to 85th Streets. FROM: DATE: SUBJECT: 151 Com mission Memorandu m -Crespi Boulevard Neig hborhood I mprovements Page 2 of 2 The Public Works staff has requested an additional scope of work from David Mancini & Sons, lnc. (DMSI) that would include: the replacement of a water main in Crespi Boulevard, the installation of a new storm water collection system in Crespi Boulevard and construction of a pump station at the 81't Street End. The proposed pump station would be designed to fit the City's criteria and would include a pollution control system and outfall that meets permit requirements. At the completion of this underground work on Crespi Boulevard, the road sections impacted by this work would be milled and a new asphalt would be overlaid. The storm water pump system would be functionally complete by April 2015, just in time to address the expected flooding during the Spring High Tides. COST ANALYSIS DMSI has submitted a cost proposal in the approximate amount of $3,000,000 (Attachment) for drainage and $536,376 for water mains. The City's Public Works Department has reviewed the proposal and deems the amounts to be reasonable. During review there were deficiencies noted that would make the work inconsistent with the latest drainage criteria. We have discussed the deficiencies with DMSI and increased the contract for a total of $3,550,876, which includes a 10o/o contingency. CONCLUSION The Administration recommends adopting the Resolution Attachment - DMSI cost proposal 'n fil'fr JLM/MT/UC/BAM/FRS T:\AGENDA\20 1 4\October\October 29\PUBLIC WORKS\Crespi Change Order No 1 . Memo.doc 152 DAVII) MAN(-INI N. StrNs.l\t . 5 BO 600 700 30 I T 1 L 3000 2700 600 1LS 1LS 1LS 1LS 1LS 20 EA EA EA LS LS SF SF LfF EA LF LF LF General Conditions Mob/Demob/Stagging Engineering Design Permitting Const. Eng. Inspection Man-Hole/lnlets Pollution Control Structure/Weir 1B" Drainage Pipe 24" Drainage Pipe 30" Drainage Pipe 48" Drainage Pipe Centrifugal Storm Treatment Duplex Pump Station Outfall upsize 24"-48 MOT Crosswalk Restoration Sidewalk Restoration Concrete Curb $ 145,000.00 $ 32,000.00 $ 105,000.00 $ 14,800.00 $ 120,000.00 $ 8,200.00 $ 24,000.00 $ 240.00 $ 260.00 $ 320.00 $ 380.00 $ 67,000.00 $ L,545,000.00 $ 165,000.00 $ 26,500.00 $ 20.00 $ 10.00 $ 21.00 $ 145,000.00 $ 32,000.00 $ 105,000.00 $ 14,800.00 $ 120,000.00 $ 164,000.00 $ 120,000.00 $ 19,200.00 $ 156,000.00 $ 224,000.00 $ 11,400.00 $ 67,000.00 $ 1,545,000.00 $ 165,000.00 $ 26,500.00 $ 60,000.00 $ 27,000.00 $ 12,600.00 $ 3,0L4,500.00 1939 NW 40d' Ct. Pompano Beach, FL 330&1 Ph: 95497 7 -3556 F ax: 954-977 -2M0 Water Main Replacement B5th Street -B0th Street $ 536,376.00 Excludes: Permitfees, offduty police, nightwork, Public lnformation 536,376.00 Total $3,550,876.00 1210 Washington Ave. #250 Miami Beach, FL 33139 Ph: 305-532-8827 Fax: 305-532-8835 153 RESOLUTION TO BE SUBMITTED 154 THIS PAGE INTENTIONALLY LEFT BLANK 155