Loading...
R7F-Execute Change Order 2 West Avenue And Bay Road In Sunset HarbourClerk's Office Summary.docx COMMISSION ITEM SUMMARY Harbour Pump Stations lmprovements Change rcm R7F Condensed Title: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO LANZO CONSTRUCTION CO., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, AND WATER MAIN REPLACEMENT FOR THE SUNSET HARBOUR PUMP STATTONS RETROFIT AND DRAINAGE IMPROVEMENTS PROJECT, TO REPLACE FAILING WATER SUPPLY DTSTRIBUTION AND IMPROVE DRAINAGE ON WEST AVENUE AND BAY ROAD IN SUNSET HARBOUR, AND EMERGENCY LINING OF SEWER FORGE MAINS ON SUNSET ISLANDS, FOR A TOTAL CONSTRUCTION COST OF 718, PLUS CONTINGENCY- Ensure value and delive of Data s, Environmenta! Scan, etc.): N/A Item Summary/Recom mendation: ln preparation for the October 9'n King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during these events. lnitial flooding was observed at Sunset Harbour, West Avenue and Bay Road. To alleviate the flooding, staff utilized pumps and installed temporary plugs; however, a more permanent solution is required. Previous change orders processed by the City are addressing drainage concerns on 18th and 20th Streets and the proposed work will complete the drainage system at Sunset Harbour. However, the water distribution system at Sunset Harbour is approximately 80 years old and in need of replacement. An upgrade is being proposed to complete the water system at the same time the drainage system is scheduled to be installed. The cost proposed will achieve this water system upgrade to also include an Automated Meter Reading System consistent with all new water projects in the City. The completion of the sanitary sewer system lining would be performed under a separate project. Additional areas of concern were referenced at the October 14, 2014, Mayor's Blue Ribbon Panel on Flood Mitigation Committee meeting, while reviewing the effects of the October 9tn King Tides. As a result, an additional scope of work is being proposed to Lanzo, which will include the following: 1. Water main for sunset harbor neighborhood2. Drainage for Sunset Harbour neighborhood 3. 20'n Street water main replacement (credit)4. lBth Street drainage (CrediQ COST ANALYSIS Lanzo Construction Co. has submitted a cost proposal in the amount of $4,532,200.00 (Attachment) for services stated above. Additionally, Lanzo has submitted a cost proposal in the amount of $558,518.00 to rehabilitate an eight (8") sewer force main in the Sunset lslands that has experienced multiple failures in the past couple of months causing interruption of service. The City's Public Works Department has reviewed the proposal and the cost breakdowns and deems the cost to be fair and reasonable. We are also recommending a project contingency of $500,000 which is approximately 10%. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION Financial lnformation : Source of Funds: Amount Account ,l 2 OBPI I Total Financial !mpact Summary: Eric T.ext.6012 Agenda M MIAMIBFACH Date lo'Aq-/c/ - 156 h:MIAMIBEACH City of Miomi Beoch, lZ00 Convention Center Drive, Miomi Beoch, Florido 33,l39, www.miomibeochfl.gov COMM SION MEMORANDUM TO:Mayor Philip Levine and Members the Ci Commission FROM: Jimmy L. Morales, City Manager DATE: October 29,2014 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 2 TO LANZO CONSTRUCTION CO., FOR ADDITIONAL ENGINEERING SERVICES, DRAINAGE STRUCTURE MODIFICATION, DRAINAGE PIPE, AND WATER MAIN REPLACEMENT FOR THE SUNSET HARBOUR PUMP STATIONS RETROFIT AND DRAINAGE IMPROVEMENTS PROJECT, TO REPLACE FAILING WATER SUPPLY DISTRIBUTION AND IMPROVE DRAINAGE ON WEST AVENUE AND BAY ROAD IN SUNSET HARBOUR, AND EMERGENCY LINING OF SEWER FORCE MAINS ON SUNSET ISLANDS, FOR A TOTAL CONSTRUCTION COST OF $5,090,718, PLUS $5OO,OOO CONTINGENCY. ADMINISTRATION RECOMMEN DATION The Administration recommends adopting the Resolution FUNDING BACKGROUND At its May 8th, 2014 meeting, pursuant to lnvitation to Bid (lTB) 060-2O13TC for the Sunset Harbour Pump Station Retrofit and Drainage lmprovements Project (Project), the City Commission awarded a contract to Lanzo Construction Co. (Lanzo). The project's scope of work included drainage improvements within the Sunset Harbour Neighborhood, consisting of new retrofit pumps, connections for direct discharge to Biscayne Bay, control panel modifications at Pump Stations No. 1 and No. 2, and the complete reconstruction of Pump Station No. 3, including associated drainage pipes. At its September 30,2014 meeting, the City Commission approved a Resolution pertaining to the Project, accepting the findings and recommendation of the City Manager in declaring an emergency pursuant to Subsection 287.055(9xc)(6), Florida Statutes; and, as permitted pursuant to Section 2-367(e) of the City Code, waiving, by 5/7th vote, the competitive bidding requirements, finding such waiver to be in the best interest of the City; and authorizing the City Manager to take the following actions to procure the necessary emergency design and construction services for the project, pursuant to a negotiated design-build contract for the amount negotiated as part of the settlement, the existing contract shall not exceed 157 Commission Memorandum -Sunsef Harbour Pump Stations lmprovements Page 2 of 2 $6,836,940.74 which included the $2,586,940.74 construction award value of the current Lanzo construction contract and the proposed design/build amount of $4,250,000. The Contractor is currently finalizing drainage installation within 20th Street and is closing out punch list items. The Contractor is also moving forward with the Stormwater improvements for the 18th Street area, which will address most of the remaining deficiencies in this neighborhood. CURRENT STATUS ln preparation for the October 9th King Tides (an especially high tide event that occurs twice a year, when there is alignment of the gravitational pull between sun and moon), Public Works staff conducted a field inspection throughout the areas that are known to be affected during these events. lnitial flooding was observed at Sunset Harbour, West Avenue and Bay Road. To alleviate the flooding, staff utilized pumps and installed temporary plugs; however, a more permanent solution is required. Previous change orders processed by the City are addressing drainage concerns on 18th and 20th Streets and the proposed work will complete the drainige sysiem at Sunset Harbour. However, the water distribution system at Sunset Harbour is approximately 80 years old and in need of replacement. An upgrade is being proposed to complete the water system at the same time the drainage system is scheduled to be installed. The cost proposed will achieve this water system upgrade to also include an Automated Meter Reading System consistent with all new water projects in the City. The completion of the sanitary sewer system lining would be performed under a separate project. Additional areas of concern were referenced at the October 14, 2014, Mayor's Blue Ribbon Panel on Flood Mitigation Committee meeting, while reviewing the effects of the October 9th King Tides. As a result, an additional scope of work is being proposed to Lanzo, which will include the following: 1. Water main for sunset harbor neighborhood 2, Drainage for Sunset Harbour neighborhood 3. 20th Street water main replacement (credit) 4. 18th Street drainage (Credit) COST ANALYSIS Lanzo Construction Co. has submitted a cost proposal in the amount of $4,532,200.00 (Attachment) for services stated above. Additionally, Lanzo has submitted a cost proposal in the amount of $558,518.00 to rehabilitate an eight (8") sewer force main in the Sunset lslands that has experienced multiple failures in the past couple of months causing interruption of service. The City's Public Works Department has reviewed the proposal and the cost breakdowns and deems the cost to be fair and reasonable. We are also recommending a project contingency of $500,000 which is approximately 10o/o. 158 Commission Memorandum -Sunsef Harbour Pump Sfafions lmprovements Page 3 of 2 CONCLUSION The Administration recommends adopting the Resolution Attachment - Lanzo cost proposals dated October 20,2014 r(t fhA/r JLM/MT/E[Q/BAM/FRS T:\AGENDA\2014\October\October 29\PUBLIC WORKS\Sunset Harbour Pump Stations lmprovements Change Order No 2. Memo.doc 159 LANZcJ COffiINUGNil GOMPAI{Y 0€,f[fr0affi0,,bt,8Dtfitutraffiilb'0lrn,BM Octnber 20,2014 BruceMowry, Ph. D,, P.E, City Engineer City of Miami Beach, Florida Public Works De,parment - Enginoering Division 1700 Convention Center Drive Miami Beach, FL 33139 Reference:Sunset Harbour Pump Station Retrofit - ITB No. 60-2013TC Sunset Harbour Re-Design Proposal Design and Constnrction of Sunset Drainage Improvement Change Summary Entire Sunset Harbour Drainage and Water Main Installation Dear Bruce, Please find below and as attached a srunmary of the proposals you have requested for additional improvements to Sunset Harbour. Item 1 2 3 4 Activiry Water Main for Sunset Harbour Neighborhood Drainage for Sunset Harbour Neighborhood 20th Street Water Main Replacement (Credit) 18th Street Drainage (Credit) Total Total $ 4,074,876.00 s 2,240,924,00 S-1,119,344.00 S - oo+,zso.oo $ 4532,200.00 We have included all of the separate proposals, applicable scopes, drawings and quantity take-offs. I am available to meet with you to answer any further questions you may have. James Tilli I-anzo Constrrction Company Attachment(s) CC: LCC/File 125 SE 5m CourtDeerEeldBeachFL 33441-4749 Phone (954) 979-OEO2 wwwlianzo.net Sincerely, Fa"x (954) 979-9897 160 &lr,i,,e.frruhffir',0ffi, tu&mtorteii'[,talrb October 20,2014 BruceMowry, Ph. D, P.E. City Engineer City of Miami Beach, Florida Public Works Department - F'nginseriag Division 1700 Convention Ce,nter Drive Miami Beach, FL 33139 Reference:Sunset Harbour Pump Station Retofit - ITB No. 60-2013TC Sunset Harbour Re-Design Proposal Remove and Replace rffater Maiu in Sunset Harbour Dear Bruce, Lanzo Constnrction Co., FL., proposes to desip., permit and construct tle water main replacement, in Sunset Ha$our. The scope of work is as agreed upon by the City and Lanzo, and is reflected in the attached drawing and unit breakdown sheet. All work per City Standard Details and as summarized below. L Install 20'DIP from Alton Road to Purdy Avenue along 20e Strea and tie into Existing Mains. 2. Install 20'DIP from 20s Street to Dade Blvd along Purdy Ave and tie into Existing Mains. 3. Install 12" DIP from 20t Street to Dade Blvd along N. Bay Rd and tie into Existini Mains. 4. Install 12' DIP from 20m Street to Dade Blvd along West Ave and tie into Existing Mains. 5. Install 12" DIP from Alton Rd to Purdy Ave along lEft Street and tie into Existing Mains. 6. Remove all trees. 7. Maiutenance of Traffic and Allowance for Police. 8. Remove and Replace All Unzuitable Material per Crty Shndards. 9. Rernove all Abandoned DI Water Main, Replaced by the New DI Water Main. 10. Reconnect All Services ias[uding New Boxes and Digital Metexs (2" Meters, 90 each). The Desip and Constnrction duration is (335) days from NTP. Total Lump Sum Price S4,074,876.00 Lanzo Construction Company Attachment(s) CC: LCCffile 125 SE5u CourtDeerfieldBeachFL 3344L4749 Phone(954) 979-0802 Fax(95a) 9'19-9897 www.lanzo.net 161 162 trilILANZO[- lffi 0ctrgloo M. hfutr,llm tfu bEd',iltrlflr,,f,,dlb October 20,2014 Bruce Mowry, Ph. D, P.E. City of Miami Beach, Florida Public Works Departnent - Fnginsering Division 1700 Convention Center Drive Miami Beach, FL 33139 Refereirce:Sunset HarbourPump Station Retrofit -ITB No. 60-20l3TC Sunset Harbour Re-Desigrr Proposal Design and Lrstallation of Sunset Harbour Drainage Dear Bruce, Lanzo Constnrction Co., FL., proposes to design, perurit and construct the drainage, on 18ft Street, West Avenue, N. Bay Rd, & Purdy Avenue. Please note that the hydraulics of the attached drainage design is based on the gravity outfalls on Dade Blvd rernaining in service. The scope of work is as agreed upou by the City and Lanzo, and is reflected in the attaohed drawing and unit breatdown sheet. All work per City Standard Details and as suomarized below. 1. Install New 42" RCP, 36", 30",24" & 18" A2000 Drainage Pipe & Tie-In to Existing. 2. hstall (4) 84" x 84" Junction Boxes. 3. Install (4) 84- x 84" Large Junction Boxes. 4. Install (15) 48" Round Catch Basin. 5. Instsll (12) 60" Round Catch Basin. 6. Replace Damaged Curbing and Sidewalk with Gray Concrete Hardscape 7, Patch Pave Damaged Asphalt, 8. Remove and Replace all Unzuitable Material per Ctty Standards. 9. Maintenance of Traffic and Allowance for Police. The Design and Construction duration is (255) days from NTP. TotalLump S+m Price $2,2/;0,9U.00 James Tilli Lanzo Construction Company Attachment(s) CC: LCClFile 125 SE 5m Court Deerfield Beach FL 334414749 Phone (954) 979-08A2 Fax (95a) 9't9-9897 www.lanzo.net 163 164 LANZO COI{SIRUCTI OT GOM PAI{Y 0eqfrU sslrffi bfrrdltcfrm lr*tlblts fufrntum,rtq;mzwnk October 17,2014 City of Miami Beach Mike Alvarea CGC, PWLF Public Works Department mikealvarez@miamibeachfl.gov 1700 Convention Center Drive 3054734620 Miami Beach, FL 33139 F786-39+4698 Sunset Island Quote Request, From PSl3, (Excludes Subaqueous Crossing) to W 25 St. Emergency 8" Force Main Repair utilizing CIPP (Option 2) Plan Date Sewer Atlas 9/3/14 File Path U:\CMB Sanitary Force Main Network.mxd / Email Attached datd9/5114 from Hasan Riani Lanzn Estimate Number U-l441- Revised 10-I7-2014 Ancillary Products and Services Providedo Cleaning he & Post CCTV Inspection and Pipe Logs - Includedo End Seals at all pipe tenninations, hansitions and Tee Junctions - Includedo Testing of Liner Shots By Hydrostatic Head During Inversion - lncluded 125 SE 5n Court Deeffiets Beach FL 9U414749 Phone (954)979{8V2 Fax(954)9799897 Proposal Lanzo is to offer the I Mobilization, [nsurance & General Conditions I LS $65,000 $65"000 2 Prep Work for Lining Operation I LS $68,?00 $68J00 3 Cured ln Place Line of Existing 8" FM (905) LF I LS $346.818 $346,8t8 4 Restoration and Reconnection of Lined Main l t-s $78,500 $78,500 Total s558.5t8 Page 1 of3 www.lanzo.net 165 10t172014 o Third Party Testing of Liner Pipe Samples to validate Fully Deteriorated Design basis - lncluded o Slate of Florida P.E. sealed calculations for liner- Included. Asphalt disturbed by our work will be rcpaired in kind - Included . Sod disturbed by oru work will be repaired in kind - Included o Upon completion of work the existing easements will be graded and sodded - Includedo Erosion control items included - Included We hereby propose to furnish materials. equipment and labor in accordance with the plans referenced above as follows: Cleaning, CCTV Pre & Post Video inspections, CIPP Lining per ASTM F 1216, 100 psi Proof Testing, Third Party Testing of materials & Warranty. Qualifications and Exclusions o Insurance shall be fumished naming the City of Miami Beach as "additionally insured"o Testing to 100 psi perAWWA specifications o A Five (5) Year waranty on all materials and workmanship for the CIPP portion and one (l) year for all other work shall be made part of this ageement o We will require rrccess to a suitable water source as needed o This proposal is submitted, based on the incomplete plans provided, and is subject to change upon receipt and reviewof final plans o This proposal may be withdrawn ifnot accepted within 2l dap o Final Payment will be made based on the actual units installed in accordance with the unit prices contained herein o All invoices submitted by the 25th are due and payable within 30 dayso Exclusions noted shall supersede the notes in the plans dated as noted aboveo Payment and Performance Bonds are excluded but can be provided at an additional cost of2%o o Owner to furnish temporary easement for installation 5' beyond the noted l0' wide easememts o Excludes replacing home owner improvement such landscaping and hardscaping like walkways, fence and walls which have encroached upon the 10' or the 5' temporary easement that will be removed and disposed of as a part of this worko This proposal is submitted, based on plans and correspondence as noted above.o Any other items that are not shown above should not be considered. 125 SE 5n Court Deerfeld Beach FL 3U414749 Phone (934) 979-0802 Fax (954) 979-9897 Page 2 of 3 www.lanzo.net 166 10t1712014 o o o o o Acceptance of Proposal The above prices, specification and conditions are satisfactory and are herby accepted. you are authorized to do work as specified. By: 125 SE 5H Coutt Deerfield Beach FL 3Y41474g Phone (954) 979{802 Fax (9S4) 97$,9897 No posted bridge weight restrictions are available and this proposal assumes none that will hinder our operations Permits, engineering layout, certified as-builts, utility adjustments and density testing are excluded from this proposal. Proposal excludes temporary drainage of any kind. Police Officer (If needed) not included Unsuitable material remor.al and replacement is excluded Bypass operations tbr (10) days with Vac Trucks, by others Subaqueous portion excluded Respectfu lly Submitted. Page 3 of3 www.lanzo.net 167 RESOLUTION TO BE SUBMITTED 168 THIS PAGE INTENTIONALLY LEFT BLANK 169