Loading...
C7E-Execute Baywalk Authorization Agreement With Lincoln Bay Towers AssociationCOMMISSION ITEM SUMMARY Gondensed Title: A Resolution Approving and Authorizing the Mayor and City Clerk to Execute the Baywalk Authorization with Lincoln Bav Towers Association. a a a Build and Maintain Priority lnfrastructure with Full Accountability Supporting Data (Surveys, EnvironmentalScan, etc.): N/A ltem Summary/Recommendation : The City of Miami Beach is in the process of developing a Baywalk that will create a contiguous pathway running north/south adjacent to the Biscayne Bay from 5 Street to Lincoln Road. The Baywalk project is part of the larger Atlantic Greenway Network which aims to promote the use of alternative transportation to reduce traffic congestion and improve public access to Biscayne Bay. The City's Baywalk Master Plan (Attachment A) illustrates portions of the walkway that have already been constructed, and those segments that will need to be constructed over water to maintain continuity. The Lincoln Bay Condominium located at 1450 Lincoln Road, as part of the Design Review Board approval, has agreed to allow the City to design, permit and construct an over-water public baywalk section westward of the subject property's seawall and pool deck. This agreement has since been drafted and has been signed by the condominium association offlcers (Attachment B). The existing rear pool deck extends over the seawall and projects into the bay. Consequently, the only method of connection from the western street-end of Lincoln Road to the north side of the Mae Capri baywalk is to construct an overwater baywalk adjacent to Lincoln Bay Tower Condominium. The agreement has been finalized for recordation and includes the release of riparian rights by the property in order to carry out the construction of the public baywalk segment in this area. ln addition, the City has agreed to ensure complete and total responsibility for the construction, repair, and maintenance and operation of all baywalk improvements necessary to maintain the structure in a safe and functional condition. The City will also be responsible for obtaining all necessary local, state and federal permits as well as approvals that may be required on occasion for the purposes of constructing, repairing, or maintaining the baywalk. Execution of the Baywalk Authorization Agreement with Lincoln Bay Towers Association will allow the City to construct the baywalk and provide a vital link for the continuity of the streetend at Lincoln Road to the southern baywalk segment. Administration Recommendation - Adopt the Resotution. Financial ! nformation : Source of Funds: Amount Account 1 2 3 OBPI Total Financial lmpact Summary: This item requires no funds. Elizabeth Wheaton x6121 AGEITTDA trEM C7 E o^rE //-l?4qMIAMIBEACH192 g MIAMIBEACH Jimmy L. Morales, City Manager November 19,2014 Cify of Miomi Beoch, I 700 Convention Center Drive, Miomi Beoch, Florido 33,l 39, www.miomibeochfl.gov COMMISSION MEMORANDUM To: Mayor Philip Levine and Members From: Date: Subject: OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE BAYWALK AUTHORIZATION AGREEMENT WITH LINCOLN BAY TOWERS ASSOCIATION. ADMINISTRATION RECOMMEN DATION Adopt the Resolution. BACKGROUND The City of Miami Beach is in the process of developing a Baywalk that will create a contiguous pathway running north/south adjacent to the Biscayne Bay from 5 Street to Lincoln Road. The Baywalk project is part of the larger Atlantic Greenway Network which aims to promote the use of alternative transportation to reduce traffic congestion and improve public access to Biscayne Bay. The City's Baywalk Master Plan (Attachment A) illustrates portions of the walkway that have already been constructed, and those segments that will need to be constructed over water to maintain continuity. The Lincoln Bay Condominium located at 1450 Lincoln Road, as part of the Design Review Board approval, has agreed to allow the City to design, permit and construct an over-water public baywalk section westward of the subject property's seawall and pool deck. This agreement has since been drafted and has been signed by the condominium association officers (Attachment B). ANALYSIS The existing rear pool deck extends over the seawall and projects into the bay. Consequently, the only method of connection from the western street-end of Lincoln Road to the north side of the Mae Capri baywalk is to construct an ovenruater baywalk adjacent to Lincoln Bay Tower Condominium. The agreement has been finalized for recordation and includes the release of riparian rights by the property in order to carry out the construction of the public baywalk segment in this area. ln addition, the City has agreed to ensure complete and total responsibility for the construction, repair, and maintenance and operation of all baywalk improvements necessary to maintain the structure in a safe and functional condition. The City will also be responsible for obtaining all 193 City Commission Memorandum Lincoln Bay Towers Baywalk Authorization Agreement November 19,2014 Page 2 of 2 necessary local, state and federal permits as well as approvals that may be required on occasion for the purposes of constructing, repairing, or maintaining the baywalk. Execution of the Baywalk Authorization Agreement with Lincoln Bay Towers Association will allow the City to construct the baywalk and provide a vital link for the continuity of the streetend at Lincoln Road to the southern baywalk segment. CONGLUSION The Administration recommends executing the Baywalk Authorization Agreement with Lincoln Bay Towers Association. JLM/JJ/ MF/ESWTYP ATTACHMENTS: A: BAYWALK MASTER PLAN B: BAYWALK AUTHORIZATION AGREEMENT T:\AGENDA\2014\November\Baywalk Authorization Agreement - Lincoln Bay Towers MEMO.doc 194 City of Miami Beach: Public Baywalk Master PIan ATTACHMENT A Legend 0 300 600- -----------rFeet Baywalk Status Existi ng/Under Construction Potential Baywalk Overwater Solution 195 ATTACHMENT B This instrument prepared by: Gary M. Held, First Asst. City Attorney '1700 Convention Center Drive Miami Beach, FL 33139 / (This space for Clerk) BAYWALK AUTHORIZATION AG REEM ENT This BAYWALK AUTHORIZATION AG MENT ("Agreement") is made as of the date set forth below by and between fui "Granto/') and The City of Miami Beach ("Grantee") for the following and purposes. RECITALS: Grantor is the owner in fee simple of that certain tract or parcel of real propertv lvinq and being in Miami-Dade County^, Florida, known asL,,r,,4t,.1nu frue,cs t*sia.,it t'.i*{dh'or" address is t4{o L;rro/^l /4^.t , t4ia^:&.L ft- legal description attached as Exhibit "A" hereto and made a part hereof (the "Property"). in the The Grantee desires to obtain, and Grantor has agreed to convey, certain easements and/or riparian rights, to allow Grantee to obtain a sovereignty submerged lands lease or other use authorization from the Board of Trustees of the lnternal lmprovement Trust Fund of the State of Florida ("Board of Trustees") and construct, repair, maintain and operate an ovenrvater, independent pile supported public walkway structure known as the "Baywalk" and associated improvements ("Baywalk") upon sovereign submerged lands located immediately waterward (west) of the Property. NOW, THEREFORE, Grantor and Grantee hereby covenant and agree as follows: 1. Recitals: The recitals set forlh above are true and correct, and incorporated into this Agreement. 2. Grant of Riparian Rights: Grantor hereby grants and conveys to Grantee, the following riparian rights related to the Property: a. Riparian rights for the purpose of allowing Grantee to construct, repair, maintain and operate a public Baywalk located, or to be located, by Grantee on sovereignty submerged lands pursuant to a Sovereign Submerged Land Lease or other use authorization between Grantee and the Board of Trustees; b. Grantor hereby reserves riparian rights for pedestrian ingress and egress across the Baywalk to all existing or future constructed docks or piers waterward (west) of the Baywalk, for purposes of access to and from the waters of Biscayne Bay, and for fishing, swimming and other recreational uses, to the extent consistent with the rights granted in paragraph 2.a. above. Grantor hereby reserves the right to provide a ,nar^rr$:k,,tnithkZ 'r 196 4. BAYWALK AUTHORIZATION AG REEM ENT Page 2 of 4 locked gate watenarard of the Baywalk to prevent public access to existing or future authorized private docks or piers, or the Property. 3. Baywalk: Grantee shall have complete and total responsibility for the construction, repair, maintenance and operation of all Baywalk improvements necessary to maintain the structure in a safe and functional condition. Grantee shall be responsible for obtaining, at Grantee's cost, all necessary local, state, and federal permits and approvals that may be required from time to time for purposes of constructing, repairing, and maintaining the Baywalk. Grantor, as fee simple owner of the Property, agrees as necessary, to affirm to any permitting agency for the purpose of issuance of a required permit authorization for Baywalk construction, and assist Grantee, at Grantee's cost, as may be reasonably necessary, including but not limited to the execution of such forms as required for such permits. Grantee shall be solely responsible and liable for complying with any local, state, or federal permits, requirements, obligations and duties (if any), related to the construction, repair, and maintenance of the Baywalk. Grantee agrees to undertake reasonable efforts so that the Baywalk will be offset a minimum of twenty (20) feet away from the Grantor's pool deck, subject to final determination of location by environmental agencies with permitting jurisdiction over the Baywalk based upon environmental conditions. Maintenance, Repair and lmprovements: Grantee shall, at its sole cost and expense, timely perform all maintenance, repair and replacement of the Baywalk and shall at all times maintain the Baywalk in a safe condition. ln the event Grantor's seawall and/or pool deck requires repair or maintenance necessitating access from the water side, the Grantee, at its sole cost, and providing such work cannot othen,rise be reasonably accomplished, agrees to remove one or more sections of the Baywalk, or necessary portions thereof, so that the Grantor can have access to the seawall and/or pool deck for such repairs or maintenance. At the conclusion of the repairs or maintenance, the reconstruction of this section of the Baywalk shall be at the sole cost of the Grantee. Govenants Running with the Land: The riparian rights and Baywalk authorization conveyed herein shall be deemed to be covenants appurtenant to and running with the ownership of the Property, or any portion thereof. lndemnification and Hold Harmless: The Grantee will assume and defend all liability of Grantor, with respect to the Baywalk, except for any liability arising in whole or in part from the negligence or willful acts of the Grantor, its officers, owners, residents, guests and employees. Nothing contained in this paragraph or elsewhere in this Agreement is intended to be a waiver of the limitations on the Grantee's liability to third parties as set forth in Section 768.28, Florida Statutes; however, the limitations under such statutory provision shall not apply to the Grantee's contractual obligations to defend Grantor and to cover, pay and/or reimburse any and all costs, expenses, liabilities, claims, actions, causes of action, losses, demands and damages, including, without limitation, reasonable attorneys' fees (including the cost of in-house counsel) and disbursements at the trial level and all levels of appeal, relating to death of or injury to persons, or loss of or damage to property, incurred by Grantor and occurring with respect to the Baywalk, resulting from, arising out of, or incurred in connection with, use of the Baywalk by the Grantee, except as excluded herein. 5. 6. tnitiab)@ lnitialsr%_ 197 BAYWALK AUTHORIZATION AGREEM ENT Page 3 of 4 7. Assignment: This Agreement shall be binding successors and assigns of the parties hereto. lN WITNESS WHEREOF. Grantor and Grantee as of this ea aay or AeiSl_. 2ota upon, and inure to the benefit of the L SIGNED, SEALED AND DELIVERED Grantor: ay, /)rt.a The by Grantee: THE Clry OF MIAMI BEACH, FLORIDA, a Florida municipal corporation By. have executed this Agreement effective IN THE PRESENCE OF: srArE orilar/& ) COUNTY OF My Commission Expires: Printed, typed or stamp SIGNED, SEALED AND DELIVERED IN THE PRESENCE OF: Name: Name: Attest: By: City Clerk Approved as to form and language and for execution: me this{day of on behalf company. JENNITEF RAMIREZ Notary Public - State o, Florida My Comm. Expires Jul 25,2014 Commission # EE 2131 198 BAYWALK AUTHORIZATION AG REEMENT Page 4 of 4 6-)P- 20/g Dated STATE OF FLORIDA COUNTY OF MIAMI-DADE The foregoing instrument was acknowledged before me this day of20_ by and respectively, for the City of Miami Beach, Florida, on behalf of City. Signature of Notary Public My Commission Expires; Printed, typed or stamp and the By: F:\ATTO\HELG\Baywalks\Lincoln Bay ToweABAYWALK AUTHORIZATION AGREEMENT - 9-28-2012.doc rnitiarsM* tnitiats # 199 RESOLUTION NO. RESOLUTION OF THE MAYOR AND CIry COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE BAYWALK AUTHORIZATION AGREEMENT WITH THE LINCOLN BAY TOWERS ASSOCIATION. WHEREAS, the City is developing a series of bicycle/pedestrian/greenway projects called the Atlantic Greenway Network; and WHEREAS, the Atlantic Greenway Network is made up of two main trail systems: the Coastal Corridors, which extend north/south adjacent to the Atlantic Ocean and adjacent to Biscayne Bay; and the Neighborhood Trails, which extend in easVwest as well as north/south directions through the South, Middle, and North Beach neighborhoods; and WHEREAS, the administration and City Attorney's Office have diligently worked over the past decade to create a Baywalk from the southern tip of Miami Beach, past 5th Street and to Lincoln Road, to create a northbound/southbound multi-purpose public access corridor along Biscayne Bay that will serve as a connection between businesses, residential areas, schools, parks, and the bay; and WHEREAS, Lincoln Bay Towers Association owns the property at 1450 Lincoln Road and has riparian rights to the Bay adjacent to their property; and WHEREAS, accordingly the administration, the City Attorney's Office, and Lincoln Bay Towers have negotiated the attached agreement whereby Lincoln Bay Towers agrees to convey riparian rights to the City to allow the City to construct, repair and maintain and operate an ovenruater independent pile supported public walkway structure and associated improvements upon sovereign submerged lands located immediately watenruard of the property; and WHEREAS, the agreement creates the right, but not the obligation, for the City to design, permit and construct an over-water public baywalk section westward of the subject property's seawall and pool deck, in order to complete the Baywalk between Sth Street and Lincoln Road. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission of the City of Miami Beach, Florida, approve and authorize the Mayor and City Clerk to execute the Baywalk Authorization Agreement with the Lincoln Bay Towers Association. PASSED and ADOPTED this day of ,2014. ATTEST: CITY GLERK APPROVED AS TO MAYOR Attorney Date T:\AGENDAV014\November\Baywalk Authorization Agreement - Lincoln Bay Towers RESO.doc 200 THIS PAGE INTENTIONALLY LEFT BLANK 201