Loading...
C7L-Accept Recommendation Approve Work Orders For Monument Island Lighting ProjeCOMMISSION ITEM SUMMARY Condensed Title: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE GITY MANAGER TO APPROVE THE WORK ORDERS FOR THE MONUMENT ISLAND LIGHTING PROJECT UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLTANCE (NJPA) COOPERATTVE CONTRACT FOR CONSTRUCTION SERVICES WITH THE GORDIAN GROUP. Advisorv Board Recommendation: Financia! !nformation : Source of Funds: Amount Account 1 $37,000 301-2463-069357 2 $30,000 01 1-9322-000353 $233,000 Subject to approval of 2"" capital budget amendment FY 2014t15 Total $300,000 Financial lmpact Summary: Clerk's Office islative Tracki -Offs: T:\AGENDA\2015Uanua lsland Lighting Project NJPA - Summary.doc AGENDA nevt C7 L Maximize Miami Beach as a World Class Destination. Streamline the Delivery of Services through all Data Environmental Scan, etc: N/A Item Summary/Recommendation: The Administration has identified the Flagler Memorial lsland lighting project as a priority project, As such, the Administration is seeking to expedite the supply, and install all necessary labor, materials and transportation for the installation of a solar lighting package on Flagler Memorial lsland. The work will consists of the furnishing of all labor, equipment and supplies to: install three (3) solar electric power collector assemblies; remove eight (B) existing lights; install eight (8) new lighting fixtures; installtwo (2) pole-mounted surveillance cameras; and, install a control & communications system. All work is to be executed in accordance with existing design, plans and technical specifications for this Project. To expedite priority projects, on April 23,2014, the City Commission approved a recommendation by the Administration to utilize the indefinite quantity contract (lQC) for construction services awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group to expedite the delivery of construction projects up to $250,000 or for emergency projects as approved by the City Manager. The IQC process is similar to the JOC process previously used by the City but with tighter controls, including a limit on design, additional competition on certain items and a small project threshold that limits the City's exposure. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA), a public sector cooperative, to the Gordian Group. ln an effortto expedite the Flagler Memorial Solar Lighting project, the City Manager recommends that the Mayor and City Commission approve the use of NJPA IQC Contract in an amount not to exceed $300,000 as outlined in the attached work order. RECOMMENDATION The Administration recommends approving the Resolution authorizing the City Manager to approve the work order for the monument island lighting project utilizing the competitively bid National Joint Powers Alliance (NJPA) cooperative contract for construction services with the Gordian Group, for a project total not to exceed $300,000. & MIAMIBTACH oArE l-lv-tf323 MIAMIBEACH City of Miomi Beoch, l7O0 Convention Center Drive, Miomi Beoch, Florido 33,l39, www.miomibeochfl.gov COMMISSION MEMORANDUM To: Mayor Philip Levine and Members FRoM: Jimmy L. Morales, City Manager DATE; January 14,2015 suBrECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CIry MANAGER, TO APPROVE THE WORK ORDERS FOR THE MONUMENT ISLAND LIGHTING PROJECT UTILIZING THE COMPETITIVELY BID NATIONAL JOINT powERS ALLTANCE (NJPA) COOPERATTVE CONTRACT FOR CONSTRUCTION SERVICES WITH THE GORDIAN GROUP. ADMI NISTRATION RECOMM ENDATION The Administration recommends approving the Resolution. KEY INTENDED OUTCOME Maximize the Miami Beach brand as a world class destination. Streamline the delivery of services through all departments. FUNDING Flagler Memorial lsland Solar Lighting - $300,000.00 BACKGROUND The Administration has identified the Flagler Memorial lsland lighting project as a priority project, As such, the Administration is seeking to expedite the supply, and install all necessary labor, materials and transportation for the installation of a solar lighting package on Flagler Memorial lsland. The work will consists of the furnishing of all labor, equipment and supplies to: install three (3) solar electric power collector assemblies; remove eight (8) existing lights; install eight (8) new lighting fixtures; install two (2) pole-mounted surveillance cameras; and, install a control & communications system. All work is to be executed in accordance with existing design, plans and technical specifications for this Project. To expedite priority projects, on April 23, 2014, the City Commission approved a recommendation by the Administration to utilize the indefinite quantity contract (lQC) for construction services awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group to expedite the delivery of construction projects up to $250,000 or for emergency projects as approved by the City Manager. The IQC process is similar to the JOC process previously used by the City but with tighter controls, including a limit on design, additional competition on certain items and a small project threshold that limits the City's exposure. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively the City 324 Commission Memorandum - Monument lsland Lighting Proiect NJPA Page 2 of 2 awarded by the National Joint Powers Alliance (NJPA), a public sector cooperative, to the Gordian Group. ln an effort to expedite the Flagler Memorial Solar Lighting project, the City Manager recommends that the Mayor and City Commission approve the use of NJPA IQC Contract in an amount not to exceed $300,000 as outlined in the attached work order. CONCLUS!ON The Administration recommends approving the Resolution authorizing the City Manager to approve work orders for the monument island lighting project utilizing the competitively bid National Joint Powers Alliance (NJPA) cooperative contract for construction services with the Gordian Group, for a project total not to exceed $300,000. JLM/MT/EC/AD T:\AGENDAVo'l5Uanuary\PROCUREMENnMonument lsland Lighting Project NJPA - Memo'docx 325 gffipHnlAN ffi$ffiffi Work 0rder $ignature Document NJPA EZIQC Contract No.: FL-I\tlDCAE04{520'l4n PM I-il *"* work ordor [_l *oo,r, an Extsttng work ordor Work Order Number: 025982.00 Work Order Date: Work Ordsr Title: Flagler Memorial Lighting Owner Name: CitY of Miami Beach ContractorName: J.P. Moran, lnc. Contact: Edgar ZaPata Contact: Jim Moran phone: 786199-01 1B Phone: Work to be Performed Work to be performed as per tlre Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FL-MDCAE04-052014-JPM. Brief Work Order Descriotion: This proposal includes the cost for Labor, Matorial, Equipnrenl and lransportation for the installation of the Solar Liohtino Packao6 at Flaoler lsland Tinre of Peformance Estimated Slarl Date: 0111212415 Estimaled Completion Date: 04l l 3/201 5 Liquidated Damages Wllapply: n Will not apply:IE Work Order Firm Fixed Price: $299,E59.15 Orvner Purchase Order Number: Approvals t+u",) (l )'YL*e) Owner Date Work 0rder Signature gccumont ezlQC-NJPA-FL Paga 1 ot 1 12t18t2014 PDF created with pdfFactory trial version Bryw.odffactorv.com 326 E&RilIAM re$ffiilDetailed Scope of Work To: Jinr Moran J,P. Moran, lnc. 13288 SW 120th Slreet Miami, FL 33186 No Data lnpul Dat€ Prlnted: Work Order Numbec Work Ordsr Till6: Brief Scope: From: Edgar Zapaia Cily of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33133 786-299{1 18 December 16,2414 025982.00 Fla gler Menrorial Lighting This proposal includes the cost for Labor, Material, Equipment and transportation for the instalhtion o{ the Solar Lighting Package at Flagler lsland I--l ereltmtnary Flnal The following items detail the scopo of wr:rk as discussad at th6 sit6. All requirements nec€ssary to accomplish tha ilems set forth below shall be considerecl part of this scope of work. Thisproposal IsbasedonPlansandSpeclficatlonDate9/20149pages; E-0.0. E-I.0, E-2.0, E-2.1, E-j.0, E-3.1, E.3.2, S-'l and S-2 by Calvin, Giordano &amp; Associates, lnc., Geo Tech Report by Nutting Engineers daled 6/2014 and pre-bid walk through on 1111412014 to supply and inslall af necessary labor, materials and lransportation for the installation of a Solar Lighting Package on Flagler lsland. Limitalions and Exclusions The manufacturer will supply JP Moran rvjth 4 hours of training for the purpose of connections and torminations, Service is to include I site visit for the purpose of conneclions varilicalion as well as syslem start-up, lt is to also include 1 day of system set up and night prograntnring. Should any site visits be required after the initial installation and system start-up The City of Miami Beach will be charged 1he current rate of S1200.00 per day by the nranufaclurer. This rate is only guaranleed for a period of 1 year after that the current daily rate vrill apply. The City of Miami Beach is to provido appropriate doek space for transportation lo 6nd from the lsland during construclion. {urn,) (i ') )/*rn"x*) Contractor --l )^ -*I ".!t'4 ((LbLL Date Scupe of Vy'ork ezlQC-NJPA-FL Psge 1 ol'l 't2t16!2014 PDF created with pdfFactory trial version u ,\ ,v.pdffactory.com 327 Contractor's Price Proposal . Summary Date: Rsr Decembor 16,2014 IOO Masler Contract i? Wo* Order #: Owner PO #: Tirle; Contractor: Proposal Value: FL-MOCAE0<{5201 4arpld 025982.00 Flagler Memolal Lighting J.P. lr!oran, lnc. s1 09.1 37.50 01 . General Requirements $1 1.1,245.60 02. Site Work sl,299.01 03 - Cotrcrete $23,267.S{ 05 - Metale i3,382.13 07. Thermal & Molsture Protection $13.84 08 - Openingt t1,585.16 09 . Finishes s2,815.90 23. Haatlng, Ventllatlng, And Alr.Conditionlng (HVAC)$1,793.21 26 - Electrical $130,M1.09 27 - Communlcalions $9,645.30 28 - Electronic Safety And Seeurity $240.S8 3't . Earlhwork $5,578.16 32 - gxterlor lmprovementB $1 ,171 .98 33 - Utllltles sr,7{8.85 Proposal Total $299.859.1 5 CortrEctor's Pr.m Prcpc*l - Srnrmary ezlAC-NJPA-FL Pag6 'l 01 1 12t16t2414 PDF created with pdfFactory trial version @ 328 Contractor's Price Proposal - Detail Dat.: D6cemb6r'16,2A14 Re: IQC Masler Contracl #: FL-MOCAE01'o520r4{Pl'i Work Order #: Owner PO *: Title: Conlractor: Froposal Value: 025982.00 lilagler Msmorlal Lighling J.P. Moran. lnc. s109,1 37.60 Sscl. ltam lloditsr UOM Ooscripllon Llne lotal Lsbor Equip. Matedrl {Ex.ludsd it m.rt.d wilh an X) 01 - Gonsral Requirements 1 A1 22 16 00OC02 EA RajntbureablaFsasRolmbuBabbfeeswillbapaidtotn€contrsctorforths 325,370.10 actual co6l. wthout mad{-up, for which a receipt or bil is recefuad. The Adjustm6nl Factor appled to ReinrbursaHe Fass wI bs 1.07$0. Tho labo, cost hvdveo rn obtainin0 ai pamrts rs tn thc Adiusllnonl Ftctor. The base co6t ol the RoinrbursabL Fe€ is 9.|.00. The quanllty used vJill a.jlust lhe base cort to th€ aclusl R{rimt uf*$bls F€€ (a.9. qusntily ol 1 25 = Sl25.O0 Roimburacbh Fee). It there are multiplo Rermbrsable Fees, mqh one shellbe listod 66parateb wih a comment in tho 'nol6' Ho6k to rdaniify tlro Rormbursablo Fsos 1o.9, sidewak closurs, road fft, variour pemrits, axtendod wanant6e, sxpBdiled Ghlpping cosls, 6lc.). A copy ot €ach recsipt shall bc lnduded with the Proposal. Quantly Unit P,ice Factor Tol0lInstatladcn 21,000.00 x j.o0 x "1j0gl . 2g,g?0.10 Task r€F$ants @sl to transporl !tscomdand smal lools toand fm llra lsland on a drrly basis, Cost ,ncludas Boat, Captaln. lnsuranm and Fual, Crty of Miami Boach lo provtda dock spaco 2 O'l 22 16 000002 EA RoimbursabbFeesReimbursabhfeeswjll bepaidtothecontsctorforthB 53,225"00 aclurl co!t, wilhouf mark-{rp, forr,rhich e rsceipl oa bitr lg rocclvod. Th. Ad.iustment Faclor appled to Relmbursable Fees WI be 1.0750, The labor cosl invdved in oblaining aI pemits is in the Adiustm€nl Faclor. The base ccr of rh8 Relmbucsbb Fee is 31 .00. Ths quanrity ueed yrill sdiust the base ccsl 1o the aclual Reimbursalrle Fee (e.9. quantity ot 1?5 = S l25.00 R6imbur6ahb F6s,. lfthers ars muhpla Rarmbursabla F666, oach one shall bB li6r6d gBparalely w\th a cmmsnt in thB'note' Hock to idantify thg RehtburGablo Fees {e.S. sldewak ctrsure, road c{rt, vadorc peilnltG, .xtanded waranlBg, axp.dit6d Ehipping isits, ctc.), A copy o{ sach r!csipl shall be induded with ihe proposal. Quanlity Uoil Pricc Factor Totalhrslalla$on J.000.00 I 1.00 x 1,07s0 = 3'225.00 Peilnit Fo€s, Tne eslimatBd amdnt is lo/i, adu3l o6t to be detBrminsd. City PM to nBgotiats wi8ldg Depl. lo reduce lBc as much as posjble, 3 01 22 16 000002 EA Reimbi:BabhFeesReimburgablefeorwlllbepaldlothecontractorforthe $980.00 aclual cost, wilhout m8rk{p. for which a rec€ipt o. bil is rocsived. The ,Adjustment Faclor appled to Reimbursaue Feos wi! bB 1,0750. The lsbof €st invdved in obtaining al permits is in the Adiust nenl Factor. The b€se mt of ths R8imburssbla Fee is $1,00, The qua$til.y ussd wllladjust th8 base @st to tlE ddilal Roinrbursabb Fee (o,9, quantily ot 125 . 5125.00 Rermbursable Feel. f lhsre are muliiplo Reinrb,ursablo Fees, each one shallbe lislod separately rlh a cornment in lho'nole'8o.* to rdontity lhe Rermbursablo Feas 1e.9. sidowak c.losure. road ilt, variou6 penlits. exl6nded wananlsa, oxpediled shipping costs, 6tc.). A copy of 6aci rcmipt shall bc lndudsd with 0ro P,oposrL Ousn$ry Unlt Price Factor lotallnstallalhn 9s0.00 x 1.00 x 1.0000 = s80.00 Buildor Ri6k lnsulance lo covot lho proioct mate.ials and oquiprnanl contract8d lhmugh JP Moran lnc. (This rnsuranos doss not mver fralerials or oquiptrisrrt purchasad by mar,l Coniractor's Pnm Propcffil - Delail CZIQC-NJPA.FL PDF created with pdfFactory trial version www.odffaclory.com Pag6 1 of 14 12h6t7014 329 eonrarto,ls Price Froposal - Detail Continues.. Work Order Number: 025982.00 Work Order Title : Flagler Mentorial Lightittg Sest. hcm ltlodlfer UOM Oesslpllon Llne Totsl Labor Equip, Material (Exclu&d ,t mBrkrd wilh an X) 0'l - General Requiremenls 4 0l 22 16 00OC02 EA ReimbursabloFessRoimbursablafeess'llb6paidlolh€contraclorforlho aclual cosl, wilhoul mrrk.up, {orufrlch a ror*ipt s bil is receivad. The Adiust&ont Faclor appfad lo RelmbursablB Foos vril be ,|.0750. The labor cosl invdved in obtaining al pBmits is in the Ad.lustmont F3clsr. Tho bsss 6st of the RelmbuEable F* is 31.00. The qlanuly uscd wlll rdlust lhe base @st to the sclual Rehnbursble F€e (s.9, quaotity of 125 = 5125.00 Reimbursabb Fee), lf drere are multipls ftsimbursbla Fees. ach ono shall be liste d separately wth a cohnrenl itr tlre 'note' Uock to identity lhe Rernrtrursabh Fees 1e.9. sdervak dosure, road oJl, vsrious permit6. exl8ndod Barmnt88, 6xpedited shipping rsst6, elc,), A cBpy st sach roBipl shall be induded wth lhe t}mposal, Quantity Unit Price Factor TolallnstButtlon 6,000,00 r 1.00 x 1.0000 = 6,000.00 Bond Cosl (2i,6 Msx). Rough .sl.imats 36.000.00 5 0l 22 ?0 000010 HR Elec?iqanTa6ksinthoCTCincludoapproplaleco6tstocoverlabrr.These ta6ks will be raquo6l6d spacifioally by the o$rer lor ffiiscollanerrrs wod< nol covorsd in tho CTC, Qiran$ly Unit Price Factor Totallnslallslion 12.00 x 32.06 x ,.4,t3s = 628.61 Nlg htime Starl-up/Tesl/Adjust/Troublerhool 6 Cl 2? 20 000010 HR ElectriqrnTasksinrhaCTGincfudaapprcpriata6slElomverlabor.Th€sB 5?,41?,70 tasks rvill be roqu*ted $p€cificafu by tho owner {u miscelhrrerus work nol covarod in lho CTC. Ouanlily Unit Pric6 Factcr TolalInslsllalion 34.00 x 37.00 x .t.208.1 = 2,417.7A Tmvd timc to and from lsland, V A1 22 20 000013 HR EquipmentOperalor,Light(B8c*hos.Bobcat)Tasksin$eCTCinclude SAl5,03 appropral€ costs to cover labor. These Iasks rvrll be requesled specrfically by the ownar for mismlanerus work not mverad in lhs CTC, Ouanlily Unit P{ice Factor Totallnstallatlon t8.00 x 37,48 x 1ro8r = 815.03 Tfavd tmo lo and frm lsland I 01 22 20 000015 HR LabcrerTaskslntheCTCincfudeapproprlatecoststocoverhbor.These 55,004,43 tasks will be requested specrlica[y by lire ourer l(r rniicelkrleo{is wort nol overed ir tre CTC. Quanlity Unit Pro Factor Tolrllnstalladon 160.00 r 25.89 x 1.2061 = 5,004.43 L0ad arld unload barge I 01 22 23 00 0263 M0 ?,50C LB Capaoty, 8o'V!ride, Trackad Skrd.steer Loedor (Bobcat) With $21,406.52 Full-TinrB Opsralor Quanlity Unil Prie Faclor Tolal Inslallrlian 2.00 x 8,859.58 x jJ0B1 = 21,4C6.52 Requirsd to movts mat€rials. toob and equlpmenl sround tha island to and frorn lhe job 6iloi lo litl heavy obiBcl6 vritir lorklif( atlachm€ntl to mix mnorels w/ mix$ atladlftsnt; to harll oxcesr material nnd d€bris ( 50'; rdo tilno ri,/o operator. Conlrzclor's Pnco Proposal - Oelail 10 0l 22 23 000263 0075 [tOD ForEquipmantWtroutoprralor,Doducl -$2,A0?.32 QuanUty Unit P.rre Faclor ,otrllnstallsdcn ,,00 x .8.462.48 x r.208r = -7.887.32 30% idle tim. PagB 2 of 14 12t16!2414EZIQC. NJPA. FL PDF created with pdfFactory trial version $ dtdrodfFaciorv.com 330 Contractofs Prioe Propusal - Detail Continues.. Work Order Numben 025982.00 Wort Order Title: Flagler Memorial Lighting S!ct. ham ltlodlfsr UOll Oesslptlm Llne Total Libd Eq.rip, lrta{aLl {€x*lo&dt wlcdr*}raX} 01 - General Requirements 11 0'l 22 23 00 02{i0 M0 Forldill Allacim€nl Fd Skkl.Sleer Loade.s $637.01 Qrranlity Unit Price Factor Tolal lnstsll8tion ?.00 x ?63.61 x t2OBr = 637.01 Skid-$teer I Fcrtlitt requlred to nrovB maledal trom beac[ to job site. tZ 01 22 23 0O 0374 MO 6,OCB LB Mini{xmvalor rl,ilh Ful}TitrE O?salor (Bobcat 325 Or 328} Quantity Unit Price Fador Total I lnstallation 2.00 x 2,070.9? x 1.i081' 5,003.88 Equiptrrenl needed for sx€vation and back.fill ol tNndstims and trsnche6 for elactii€l conduits, Rofllil @mpanros arB asaossin0 axlra t€as ror u6B naar sah.!ral6r. s5.003.88 ,:) 01 22 23 0003E5 DAY 1teTo5/8CY.65HF,Loader€ackhoolMthStandardBuc*6rAndFultTrmo OPcffit{r s?,941.68 Ouantily Unil Pncr Fact0r Tolallnslallatior 4.00 x 608.74 x r208i = 2,941.68 Load and unlood mrterial€nd rubbish to and {.om bsrge and inland, ln 01 22 23 00 063., MO 6.5 KW. 13 HP Gas Pmered cenerator Set s1,960.20 Qoantily Unil Prim Factor Tolal Inslallation 3.m r 540.85 x 12081 = 1,960.20 ,5 01 22 ?3 000736 EA FudReinrbureemtFo.Generatonpurohasesmadebythemtradorfor S1,f47.70 fuel wit bo rermbursod to the Cmlrsctor at ths aElual cst ot tha purchsse, withilt m&rk{p, for whlch a raorpl or b4l is ramivad, Tha Adiustmsnt Factor apflied to Reimbursble Fe6 \yi[ ba 1.OO00. The base Goit ot the purchasg is $1,00, quanfty wil adiust cosl lo aclual purchaso 6o6t; i.o., quantily of ,l25 = $ 1 25.00 pur6,hsso. if ihsrs ara mulliple purchasos, cach one shal b€ isted 6epar6lely \{ith a commant h ths'nola" block to identity th6 O.rrchase. Ousnlity Unii Pricc Factor Totallnslallallcn 9S0.0O x i.00 x tr0gr = 1,1.17.70 Eslimaled amount lor Ue sakB ot csldrlatins the lot3l cost of the proiect. Acual rmount to be deleminBd. 16 0l 22 23 00 0853 DAY garg*,lenlalwth Mounted Cr8ne And Full-tirxe Opemttrlncbding barge, $24,435.76 Quantity Unit P.ice Factor Tolallnstallalion ,2.00 x 1,6al.fs r 11081 = 24,435.76 t7 01 22 23 @ 1710 OAy 2,000 Gafon Waler Truct Wrlh FuS.Trme OpeBtor S{ ,05i,.t8 Ouanlty Unil Prrc* Factor Totalhstallation 1.00 x 870,36 1 1-2081 = 1,0s1.46 Necessary to lransport walor to the barge, [:ad on barge and tanspo.t lo the island whero it wi* bo pumped inlo stoa8ge mnks, 18 01 72 23 OO 1252 MO 500 To 600 GsEon WEls Traile. With Fump A$anfly Unitf,ncs iaclor Tald-hrslallafsn 4.00 r 1,043.sg x 1.2081 = 5,0'13.0! There is no lvater source on lhe isbnd. Water will need 10 be lranspo(ei in snd steed {nrinlmum 1 ,200 qallons iusl for concrelo mhing), $5,043.lX 19 C1 32 33 00 00C7 EA Aertal Phologrsphy, 1 SIte Within City. 15-20 Phoios, 6 Prmts Si,7C2.90 Quantjly Unll Price Faclor Totallnslallelion 1,00 x 1,104.i{ x 1.,t135 = 1,7a2.90 Nlghl time tdp to lsland lo photogrsph linished lighting per pro,ect requirerne{8. 2C Cl r5 23 0S 00C5 EA 6- Cmpaclim Crwcs Soib Tsr, ASTM D-1t57, Field Soils Tesl S645.S0 Qi,anljly Unit Piice aaclor Tolallnstallation z.oo x 267"2a x ?1081 = 645-80 Ferry teohniclan to and lrorn the island !o pqrtorm tBsL Assumo{ exjslinE malerisl ls coapectable lo 9pec, Conlracl6rS Pric6 Prcpos3l - O€iai, e lQC - NJPA - FL PDF created with pdfFactory trial version !vww.odtractory.com Page 3 ol '14 1211612A11 331 Contractor's Price Proposal - Detail Continues., Work Order Number: 025982'00 Work Order Titla: Flagler Memorial Lighting SesL llam liiodlfar UOtl Desctlotlm Llne lotal Labor Equip, Lt.rial (Erclr&d il m*trd wilh u Xl 22 0t 52 19 00 l-'003 MO Pnt3ue Toilels, Chqriial 5724.86 Quirntily Unit Priss Faclor Tobl lnstallation 3.00 x 280,00 x tjogl = 724,06 ng facilities on islsnd lor use ol omer and visiting personnel. ?7 0l 71 23 li;0005 HR 2P6rsonSurv6yCrcw{UnitOf$earur6 lsPerc.6wHourWorted)hcludes 51,937.67 suiveyor. rodman, 6qLdpmsnl and tnslrumenls, Quan{ry Unlt Pric€ Faclor Tolallnslallarcn 10,00 x 160.39 x i,aoal = 1,937,6;7 13 01 66 19 0000C5 CY HandlingMaiorialForQvtrl2S'PerCYOrMatorial P6r125'Fofdelv6ry,dsmo t739.36 or miscdlanoous moving requlred by ourrcr, ousnnry unit Prics Faclor Totallnrlellauon 45O,0{J x 1.36 x r208r = 739,36 l"laul dsbrl6, materisl, etc. betwcen rob site and beach tor loadlng on barge. ?1 Cl 71 13 00 0003 EA Equipment Dslivery, Pickup, Mqbilzstion And Bsmoflilizatior ljsin0 A Tractw S3,i04.92 Trailer Wilh Up To 53' Bedlnct*das ddivsry of equipment, oft loadrng on sile, rigging, diBmanllng, loadhg and lransporting eway, Fo. equipmeni such as buldozers, motor scrirparB, hydrsulic oxcavalorB, gradalls, road gtBdBr3, lGdcr{ackhes, hsrvy duty consuuctjon load6rs. trado's, pewrs. ro*drs, bridg6 finishBrs, slraight most conskudion forklifrs, telesdoping boom rcugh lerrain mostructjon lorkltls. lBhscopin0 ahd 6rllcul6lin0 bmm mEnlifts with >40' tloo,n lengih6, €tc. Quanlily Unil Prrce Factcr lottl lnstallalio* 7.0{ x 402.63 x 1J0$t. 3,4A4.92 Ski$slee.loader & atlachmants 6x(xrwtor, 50O galm wal6t t6nt* lrailers, 25 0I 71 13 000003 EA EquipmonrOBtvBry,Fic*up,Mobilza$onAndDomoNizaricmUsingATra.tor 51,459.25 Tmilor With Up To 53' Eedlndudes ddivery of equipmonl. off loading o.r siie, tigging, dismontlng, loadirq and t anspoding alyoy. Fo. equipment such ae buldozers, nrotor scrapers, hydraulic excavalors, 0radslls, rood graders, loader-backhoes, heavy duty @nstruclion loade16, t aclur, pavers, ro$ers, bridge,inishers, strsight ffist construclion fcrldifts, tdescoplng boom rough lorrein construction foC(Ifts, loloscoping rnd arliculaling boom man!ffs wilh ,4(f boofi langths_ st6" Ouadity Unit Pric€ ?eclot Totallnstalledon 3.oo x 402,63 x 12081 = 1'459.25 €qulpmont to be d€livered for lha us. ol bading and unloading material and rubblgh to and tro.n bargs, 26 0l 71 23 16 0003 ACfi Ground Penolrating Radar (GPRI SuNorf"{irimsm quanrly rs 1l? 3cra por S1,347.67 prdecl, Quantily Unit Fric€ Factor Tolallnsl3lotion o.2s x 4.{62.11 r i.?o8t - r,git7.67 01 - General Requiremente 21 0, 52 13 00 0025 MO 8' x I x 40' Sltrage CtrtainH 992.90 Ouantry Unit Price Factcr Tolsl Instsllation 3.00 x 136.00 x rJ0Ar = 49?,90 Slorage for lightjng and sobr package h additior lo rnisc. equipmsnt" 28 01 74 19 000015 EA 20CYDump6tar(3Tm)'ConstruclionOebris'lrrcJudesdalivoryordumpster. S1,529.45 rsdal cosl, ,ick{rp $asl, hauhg, and disposal fec. No*razedoirs mst6rial. Quanlity Unil Price Factor Tatallnslallation 3.0s x 422.00 x 1.20g1 = 1,529.45 Dumpstenfll be k6pt on mainland and d8bris sil havo lo bB loadad on bargo, transprrtsd fronr island lo doc* and urioaded/dumped lnlo dumpsler on malnland tor plcfi-up by lrcsh haulng company. Cont.ador's Pnce ProEcsal - Delail Page 4 of 11 12116|?A11CZIQC. NJPA - FL PDF created with pdfFactory trial version www.odffactory.com 332 Sontractot's Frice Proposal - Oetail Continues.. Work Order Number: 025982.00 Work Order Title : Flagler Memorial Lighting ssct hem Modlfar UOItt Desslptls Llne !4q!,- Latror Equip. Material (Excludtd il martrd with an X) 03 - Concrete il$ 03 2't I I o0 0006 TON Up To {6, G/ade 60, Foolirgs And Slahs. Rernforcing Sleel t3,915.85 ouantity Unit Price Factor Tolal lnstsllation 1.75 x .t,B52.tg r 1:081 = 3,915.85 Rebar h nral fwndatior shb per Struc.twal Orawing s,1. ,239.42 41 03 31 13 000051 CF HancjMixAndPlaceConoataForusas,har6oonv6ntionnlequlpmentacaoss 59,8'12.69 is limited or vrhcn dirsclad by lh6 ownar, Quanfity UnI Pric€ Factor Totsl lnrtallatlon 6zs_o0 x 12.O? x ti0&1 = S,842.69 I'he lsland ls lnaccsslble to standard cmsele lrucksldelivede3, On6lte illxlng ol bag mix concrele i3 requked for this isdatsd bcation and water will nead lo be imporltsd. Cons6te wi{ bs ruixed per manulaclu.er's inEtructions lo attajn 3.000 psi comprossivs slronglh bui may nct comply wi& aI specs on tha plans calling for'ready mix'concrBts. This it6m indirdBs Uro 3 foundalior/podestal sots ehom on plans, 4$ 03 ?1 l1 0t) 001.1 TON Up To {6, Grade 60, Be*rns, GobrrmB Arrd Walls, Reinlueing Slrel 51,525,19 Quanlity Unil Price Factor Total lnstallatior 0.6? x i,B84.ao x 1.20g1 = 1.525,19 Reber in pedestals pe. Structurdl Drawing S-,l. 42 03 31 13 00 0089 CY 50' Haul, Non l4olsized, Concrsls Buggy Quantity Unit Prim Fa0lor Tolal lnstallation - 239.1227.00 x 7.34 x 1.2A91 ' {3 03 35 16 00 0002 SF Conseta F}mr Finighes, Suesd $162,22 Ouantty Unlt Prico Factsr ToEllnstallatlon 420,00 x 0.30 x 1.2081 = a52.22 Screed fnlsh anly on top surface of mal loundatior slab. 44 03 35 16 00 0006 SF Concrele Floor Flnkhes, Siecl Tro'*d $2?4.00 Quanlity Unil Pricd Factor Total lnstallation 420.00 x 0.S4 x l.z0a1 = 274.oo 45 03 62 13 000006 Sf 2'DeepNonshrir*Nonmelellccrord,ForGrootingB*s*a S766.85 Ouantity Utril Price FactoI Tolal lnsrsllauon 20.00 x 22.6t x tj0Bt o 766.85 Croul pola bases pel sh*l S-1. Subtotal for 03 - Cotrcrete t23,267.S,t Sact. llsm llodller UOM Dorcriptim Lino Total Labor Equlp, Matsrlal (Ercluded if mtfked wilh !n X) 05 - Metals 46 05 05 19 00007.1 EA 3lB"DiarrrsterxS'Lsnglh.31$$lalnlBssStoel,WedgoAnclrorExparsiorEo[ 5185.93 Quantity Unit Prioe Factor Totallnelallalion 18.00 x 8.ss x .r-208r = 185,93 47 05 73 00 000005 LF stainlessSteelomamentalHandrallVertlcalSqusreBarsAt6',ShepedTop Ratl s3, rs6.20 Outrlily Unil Ptits Factor Total lnstallation 1g,m x 1.lO.gB x t.Z0g1 3 3,196.20 Roproornll6" r 6" x 1/4' Sl,ainlBss SloelAngls ior baltory 6bin6l mdjniiflg. Sublotal for 05 - ltletals $3,382.1 3 Conlrector's Pica Propossl - Ostail EZIQC - NJPA. FL PDF created with pdfFactory trial version $n{wpdffactorv.com Pa0e 6 oi 14 12116!2014 333 Contractor's Prlc* Froposal - Detail Continues., Work Order Number: 025982'00 Work Order Title: Flagler Mernorial Lighting Subtotal for 01 - General Requlrements St14,245.80 Soct. hom ifodifor UoM Oo3criptioo Ltno Tot l L6bor Equlp. Matorlal (Excludsd It marktd wllh an R 02 - Site Work 29 02 {l 16 13 0030 CF Oenro R6inrorced Conc{8to Fooling Quantity Unit Prrce Fpclor tolal lnsli*lation J2.00 : g,50 x 1.2081 = 328-60 Per Sho6t E-2.'t 'l",fodrfy uppat sgcficn of concrsto pededal as raquitod lol n:crunt ng of ptopossd 'B' llxture (lnclqding cotnplala demolilion il toqulrad)". 30 02 dl 16 130C50 CF OemoConcreteFooringForFence,GsteOrPlaygroundEquipm8nlPosl, Ss70.41 Elc.lodudes excavatlsn. Qusnrily Unll Ptre Factor Total Inctallslion t35.0o , 5.95 r r2gEl * 970,.11 Subtotal for 02 - Slte Work $1,299.01 Llnc TotalSoct, hom Modifar UOM OltcdPtlil $3?8"60 Lrbor Equip. Mtterlll {Ercludod il mtrkod wlth an )q 03 - Concrete 31 03 C5 00 00 0003 CY Set R6tsrd:ng, Typ€ B Concretc Admixlu.e SE9.70 Olr6nn9 Unit Prca Factor Total lnslallBtlon 33,00 x Z.2S x 1,AoBl = 89.70 32 03 1'l 13 000005 SF MstFoundalionwood Fommrk 51,1.+4.19 Quanlity Unit Price Factor Total lnslsllation 231,00 x 4,10 x t2ggr = 1,144"19 Quanlig Unil Price Faclor Totallnstallstion 231.00 * 0.7a x t.20Er = 206,51 34 03 11 13 000010 LF >6"To12'HighShtlEdg8sndBbck-Outw6odFonnwork 952,33 Quanlly Unit Pne Faclot Tolal lnstallation V.Ol r 3.61 x 12081 = 52.33 33 03 11 13 000005 0s0'l Foi < 1,0O0, Add s206.51 35 03 11 13 000075 LF 2,|'DiameterRourdFibcrTube Formwork s1,322,14 Quantily Unit Pri6s Faclor Tolallnstsllatkrn 60.00 x 1g.24 , r.208r = '!',322,14 Sonotuba forms fo, Pedaslsb 36 03 15 19 000086 EA 1-114'Diamelerx54"Length,PhinSleel,L-TypeCalllnphceAnchorBoi S1,153.83 O[Enlity Unit Ptic. Faclor Tot8l lnstallalion 28.00 x 34..t1 x rZ0Br = 1,153.83 S6l Anchor golts for aluminum polrs. 37 03 15 19 00 0066 0157 Fs Stoinl63s Steel, Add Osantily Unit PricB Faotot Tolal lnslallstion ?8.00 x 76.92 x 1J0Bl * 2,603.65 s2,603.65 38 03 15 10 000066 0158 For >1 0 To 50, 0edu$l -s20.63 Quantity Unit Price Faclor Trlal lnstallation 28.00 x -0.61 x ,"Z0gl . -?0.63 Conlraclor's Pflcs P,oposal - Oetail EI,QC. NJPA. FL PDF created with pdfFactory trial version snmil.pdfactorv.com Pags 5 of 14 12116!2014 334 Ccntractols Pric* Fropusal - Detail Continues.. Work Order Number: 025982'00 Work Order Title: Flagler Menrodal Lighting Seci. ltem Modlfer UOil Oegcrlpdm Llnp Total Labor Equlp. ldatcrial (Excluded ifmrkld wilh snX) 07. Thermal & Moisture Protection 48 07 11 13 O0 0009 CSF 2 CMls, Asdral{ic Paint Oanrpprooling, Bruehed On Quanlity Utrit Price Factor Tolal lnstsllstion 0.40 | ga.72 x 1-2081 - {3.84 ApDly to top ot friers p€r sheel S-1. s43.8{ Subtotal for 07 - Thermal & Moislure Protection Secl. ltern lllodtfor Uoll Descrlptln $43.84 Llne Total Labor Equlp, Mntetial (Ercluded i, marked wilh an X) 08 - Openings 49 08 12 13 130044 EA 4'x6'€'ThoughTr'x5{/4'DeopMelalDoorFramB,16Gauge Ouantity Unit Price Factor TotalhstsllBtion 1.00 x 236.28 x 1.2o8l = 285.45 Demctfion 1,00 x 42,A5 ; 1,?081 * $0,80 Rernove and replare dou lrarra m elacldc rcom. Removrl o[ pln{ofr, dmr and 2x4 harne. s336.25 54 08 12 13 13004.1 0069 For Auxihary Framo Reintorcamcnt Fo, Hinges. Add O$trlty Un[ Pnm Fa6tor Tolallnstallstlon 1.50 x 2z.gl x 1j08r - 41.37 s41.37 5t 08 12 13 13 OO4.l 007{ EA For Welded Franreg, Add 554.36 Quantily Unit Pri@ Factot Totallnstall8tjon 1.00 x 45.00 x ,t,20gr = 54.36 52 08 'l? 13 13 004.1 0075 For Galvani:ed Framos, Add Quantily Unil Pne Factor Tolallnslall.tion 1.oo x ra.26 x r.208r = 22.w 53 08 13 13 130050 EA 4'x$-B'x1.3/4"lSc8ugBMctalDoor(Utrrated) ${7C.Sg Quantlty Unit Price Faclaf Totallnslallatlon 1.00 x 397J1 x 11091 = 479.9s 54 08 13 13 130060 0095 ForlSGauge,Gradetl,HearyDuty,Add Ouantily Unit PrG Facls Trtal ln$tsllrtion 1.00 x 69.ss x rj0g1 . u,o? s22.0{j 5i 08 13 13 130060 0117 Fo/SsanlessEdgc(Welded),Add Quantity Unit Price Fsctor Tolallnslallario4 1.00 x d3.4g x 1.20g1 = 52.54 i52.s4 56 08 71 16 000020 PR 4-1lTx4-llrSlsndardDuty,HallSur{ace,EallBearing,Eres3/Bronze,satln Cfrmme Finish Hinoe Ouanliiy Unil Pfic€ Factor Tolallnstalledon t,50 x 121.t5 x 1.A0Bl r 220.63 57 08 71 tG 000C20 O22A PR ForFairofNon-RemovablePins,Add S1O,s/ Ouantiiy Unit Pnce Fa6tor Tohllnstallauon i.50 x 6,00 x 1j081 = 10.67 5, 08 7'l 16 00 2056 EA 1' Diurleierslainlsss Stssl Ctfa€t Dotr PuIs. 10'Lmg $90.98 Cuantity Unit PriE Faolor Totat[rstallation i.00 x 75,31 x i,20E1 = s0,98 Conlraclor's pflcs Proposal - OBtail $220.63 PsgB 7 ot 14 1zfi612014CZIQC . NJPA. FL PDF created with pdfFactory trial version www.odffactory.com 335 Cnntractols Price Proposal - Oetail Continues,. tA/ork Order Number: 025982,00 Work Order Titls: Flagler Memorial Lighting SecL [em ModlfEr UOlt DosalpUm -,!!ttg'lgt4 , Labor Eguip. f,lotarial {Excfudod if nrarlcd with an X} 08 - Openings 59 0S 71 16 00 2326 EA Mortisod Ooadbot, Koy Ono Srds, Knob Ono SidoAN$l Grado 1, $192,04 jnlerchanEeab,o corss, aI finiehes. Cese 6iz6 4-1/2' r 6' {ncmlnal}. Ouanliiy Unit Price Faclcr Totallnstalladon 1.00 x 158.98 x r2o8r = '192.04 Subiotal for 08. Openings $1,585.16 Sect hsm t{odlfar UoU Desdlptlon Llno Tqra!- Labor Equlp. Matorial (Excludsd il mart{6d with en X) 00 ' Finishas tt) 0g 91 13 00 022'l tf Pahrt Nlelal Dm Frame And Trim, I Coat Frimer, BruBhrRoller Work 56.38 Q.Jantily Unit Price Faclor Total lnstsllatioo e.OO x 0.44 r i"?0A1 . 6.38 61 09 Cl 13 000226 LF PahtMor6looorFramoAndTrim,2cort6P6int,Brush/Rol6rwo* 513.92 Quantily Unit Price Factor Total lnitallation 12.00 x 0.96 x r.208r = ,3.92 62 09 91 13 00 0?31 EA Painl Ext6rifl Dos, Eolh Facas, I Coat Pnmtr, 8rush/Roll6l Wtrk $12.77 Ousntlty Unlt P(ice Factor Totrllnslallalion 1.00 x 35,40 r 1-2og.t = 42.n 63 09 91 13 00 0233 EA Painl Exlerior Bos, Bolh Faces, 2 Coats Paint, BrushlRdler Wort $77.69 Ouanlity Unil Prica Factor Total lnstallation .|.0O x 64,A1 x i"20S1. 77.$g 66 0& 91 t3 O0O381 SF PaintcratingsAndFram€EonocoatPdmgr 51,080.52 Quantily Unit Price Factor Total hrstallarion 6g8.00 x 1.30 x r.Z0gr = 1,080.52 PRllr,lER COAT... light ixlure cages inledor and artBrior, 67 09 91 13 O0O383 SF PainlcratngsAndFramesF$ocoatsParnl 51,562.60 Ooantty Unil P.iB Factor Total lnst3llatlirn 6gg.00 x 1.gg x 1.2081 = 1,562.60 FINISH COATS - pAINT light frxture cages lnlerJor and exterior. M 0g 01 13 0{ 0331 LF Painl Csduit. Stxl Pip'e 2- To 3-1ff Dianreter, One Cnal Primer 55.15 Quantily Unit Prioe Factor Totalhrslallation 6.00 x 0.71 x 1.2081 = 5.15 Peinl €xisting pipe supporls fry lghl fixtures, 65 0S 91 13 D00341 LF Paintco.iduit,StoelPips21"To3-1/2"Diam0lor,Twocorts 526.87 Ouanlity Unit Prlcg Factor Totallnstallatbn 10,00 x 1.39 x rio8r = 26.87 Painl exlstlng plDe supFrts for lghl flxtures. Subtotal for 09 - Finishes SecL ltem Modifer UOff Oe6diDuon $2,81 5.90 Lin€ Total Labor Equip. irEt€ri8l (Excluded if markcd wiih ah X) 23. Heatlng, Ventllatlng, And Alr.CondlUonlng (HVAC) Conlraclor's Pncg Proposal - Delsil EZIQC. NJPA . FL Pag6 8 of '14 12t16t2414 PDF created with pdfFactory trial version $fidtry.pdffactorv.com 336 Cortractor's Price Proposal - Oetxil Continues.. Work Order Number: 025982.00 Work Order Title: Flagler Memorial Lighting ss6t. hem Modlfer Uottt Dssslpda Llna Total Labor Eqoip. Malcrial (Excluded if marktd wlth an X) 23 - Heating, Ventilating, And Alr-Conditloning (HVAC) 68 23 09 23 0O 0006 HR EMCS Syslenr Conlrob T(aining $1,793.21 Quaslity Unit Priqs Factor Total lnstallation .!6,00 , gl.tt x tr08r = 1,793.21 Sepco Technlcal T16ining Subtotal for 23 - Heating, Ve nlilating, And Air-Conditioning (HVAC) sect. ltem l\lodlle r Uol, Dsscrlptlm $'1,793.21 Llna fotal Labor Equlp. Materlal (Ercfuded lf mlrked wlth .n X) 26 - Electrical 7A 26 05 19 160176 MLF flzAWGCabla-TypaTHHN.THWN600VCoppe(Singl6Strandod,Placedln Condult Ouantily Unil Pr'e Facior Total Installatlcn 1.93 x 355.15 x t:OBr = 828.08 s828.08 71 26 05 19 1S0?79 MLf t6AWGCable-TypeTHHN-THll'/l,l 600VCopper,SingleStranded,Phmdln Conduit Ouantity Unil Prre Factor Tolal,nslallalion 0.o8 x r,02S.3.1 x 1,208r = 92.10 72 26 05 ?6 00 msg EA 5r8" Dianrettr x 'lO' Long Capperclad Ground Rods 8412.30 74 26 05 26 OO0l79 EA UpTofOA\i/GCadleebConneclionForS$ico.Lug,croundRod,RebarOr $000.29 Strucural Ste ellnclldeg nrolds, male.ials and a[ neese ary lools to make connsctions, Ouantity Unit Prira Factof Total Installarion 9.00 x 5g.et x 1.2081 = 600.29 75 26 05 29 000008 EA UpTol'Lungthxl{18'Wid6x13116'Hlgh, 12Gauga.StffilUnistrulChannsl s87.76 Qdandry Unil Prics Factor Total lnstallalion 6.00 x 56.00 x t,a0B1 3 412.30 73 ?6 05 26 0oo133 EA 12'x12"x12'Polym6r0orrrretsGroundAccessWe[ 51,186.64 Quantily Unit Prrre Faclot Tol,allnslalladon 4-00 x 2{5-s6 x 1.?0Bi - 1'186'64 Ouantrly Unil Prre Factor Tolal lnslallation 8.o0 x 9.0A x t.2081 = 87.76 ?6 26 05 29 00 OO40 EA ,'Diometer, Rigid Stesl Corduil Clrmp For Unistrut Channel 577,32 Quonlity Unit Price Factor Total Instsllation 32.00 x 2,00 x t.208r = ?7,32 77 26 05 33 13 1875 LF l"SrJredulsi0PVCConduitWthGlusdCoupllogs, OirgotBudal Ouantity Unit Price Factor TolalInslallation t.3z3.OO x 1.50 x 1.20g1 = 2,488.08 78 26 05 33 131888 EA l'ScheduledoPvccohduitgooegreeElbow,DirectBudal Sl,?91.70 Qr,antty Unlt Prics Feclor Totial lrslallation 88.00 x 12^lg x :,2081 = 1,?s1.70 6?,188.08 Conlr8clor's Pttc€ ptotlosal - Dslail EZIQC. NJFA . FL PDF created with pdfFactory trial version www.oqffactory.com Pags 9 of 14 12t14t2014 337 Contractor's Price Proposal - O*tail Continues.. Work Order Numbar: 025982.00 Work Order Title: Flagler Menrerrial Lighting Sscl. tam ilodlfor UoU Dssslptlm Llno fotal Labor Equlp, Malerial (Excluded il maked with an Xl 26 . Electrlcal 79 26 05 33 13 1S01 EA 1" PVC Conduil Adaplar, Direct Butd 3119,46 Qu8nlity Unil Price Factcr Tolal lnstallation f6.00 x 6.1g x tjogr = 119.45 8C 26 05 33 13192,i EA 1'PvcconduitTorminalAdarnrs,DksclBudsl i583.14 Qua/tIty Unit Prie Factor Tolal lnsl8llallon ?9.00 " 6.11 x r.208r = 583.14 81 26 05 33 132357 LF l'LiquidTightrlexconduil S261.02 Ouanlity Unll Price Fs€lor Totsl lnstsllaliorr 00,00 x ?.Tl x 1-2081 = 261.92 82 26 05 33 13 2368 EA l'Sraighr Liquid Tlght Connedd tt82.9.1 Quanlily Unil Pri6,s Faclor Tolal lnstallsdon - 182,9120,00 x 7.5? x 1,2081 - 83 26 05 33 132378 EA 1'gooegieeAngloliquidlghtoonnedor $277.62 Quantity Unit Price Factor Totalln6tallallon 20.00 x .|1.49 x 12081 = 217.62 U 26 05 33 160175 EA 1'.TypeFS,ShaflouSlngleGangCastNuminumBoxonohub. 9871.19 Ouanlily Unit Pric€ Fsctor Tolal lnsBllstion 16,00 x 4s.07 x 12081 = 871.10 85 2lt 05 83 000'123 EA 3Port,#l4to2l0,PushOnGalSlilbSflicoKrtKitcontaincconnoclor,gelriled 51,176.01 cap and cap clamp. Ousntity Unit Pic€ Factor Totatlnslallation 32.00 x 30..t2 x t208t ' 1,178,01 86 20 05 83 00 0124 [A 4 Pott,*14 to 2, Gel Iap SpIm Kit Ouantily Ur)il Price Faclor Tolal lnslallation li.oo x zg,g2 x r.z0Br = 38?.99 ta? 26 27 26 000251 EA BlankCover,SingleGsng,Cartilleto&cWosthsrproolCover(K,larl@FSBC) S'17S.99 Quantty Unit Prics Faclor Totallnsl,ollati:n 16.00 x 9.26 x 1.2001 = 178.9S A8 26 31 00 00 009S EA 255 Ah. 12 Volt, Seslod Abso.bad class Mar (AGM) B5(cry (Conco.de $812.21 Pvx_2580T) Quantily Uoit P.ice Ftclor Tolal x lnstallation IA,o0 x 37,35 r 1_?0g,1 . g1z.z1 SP Represent 45C0AH ot baltery capacity 89 26 3t O0 000114 EA 31'x36"x'14'NEMA3RAluminumPhotovciaioBattaryEnclosurs(lronRidge 567.92 8ETSBR827BP) Ouantily Unit Prics Factar Total1 lnstalldrion 3.00 x 18.74 x 1.2081 = 67.92 SP 90 26 56 36 000257 EA 200LEOS,221 Systemwats.AdjustablcArmMount,Rodengular,LEDFkrod $611.98 Light (CREE& BetaLEBO EdgeO FLO€DG) Quanfly Unll Pr:ce Factor Tolal 1 lnstalBricn 4.00 x 126.64 x 12081 = 611.08 SP Rspresonrs Whhe Flood Unh 3382.99 Conrractofs Pris Proposel - Detail czlQC-NJPA-FL PDF created with pdfFactory trial version unqr/.odfiactorv.com Page l0 of 14 1 2/i 6t2014 338 Contractot's Price Proposal - Detail Gontinues., Work Order Number: 025982.00 Work Order Title: Flagler Menrorial Lighting Llna TotalS€ct" hem Modllar UOU DoscrlPtlm Labor Equlp. Mat6rirl (Erclud6d if mrrt*d Yllh 6n )0 26 - Electrical S1 26 56 36 000258 EA 2{0LEDS,264Systemlliats,Adjust6bloArmMornl,Rgda*gular,LEDFhod Lishr (cREEO BatsLE0O EdgeO rLD-EDG) Ouantity Unit Price Factor Total y lnslallarlon 4.OO x t3t.E0 x r.2081 = 63i.46 SP Reprssents RGB Flood Unit. s635.46 gz 26 56 43 o0 o0r.t EA 400 Walt tdstdl Haldo 1705 Series Lithonia Hish Pedormance Fbod Light $741.87 Quadity Unit Prca Factor "foial lnstallatlon 0.00 x 1.1?9.95 x 1.Z0Sj = 0.00 Denlotitron E.OO x 76.76 x 1,2081 - 741'87 Subtotal for 28 - Electrlcal $eet. lt8m tlodifer Uoltl D.3crlp6on s130,041 .09 Lina Total Labor Equip. Maledal (Ercluded il marked wlth an X) 27 . Communications 93 27 1{ 13 130006 EA ModulsrPlugForNon.shraldedCopparCommunicalonsCabbUpto &DositionlS{nta6,t non-drieHed nrodular Dlu0 (or sdid or gtlandod Mro, lndud* lermination. Ouantity Unlt Prlc* Factor Total lnslallation 40.00 x g.sz * r.206r = 460.04 $460.0,1 94 27 14 13 130006 0030 For >'10. Deducl .s'107.76 Ouontity Unit Price Factor Totalln6t6ll6tioD 40.00 x -2.23 x 12081 = -147.74 95 27 1{ 13 130010 PR CerliS'l-PairofACopperComnxrnicationsCablo S?2.00 Ouanliiy Unil Prlce Faclor Total lnrtalladon - 72,0020.00 x 2.98 x t.?081 - 96 21 14 13 16OU47 MLF 4PakszOAWG,Sofid,Lowvohr6ge,placedlncortduit,AlarmAnd 52,641.08 Comm!.rnicalion5 C€bls Ouadity Unit Prica Factor TotsllnstallaUon 1.X2 x r,656.17 r r,?o8r = 2,S41.08 gl 27 11 23 130046 EA 1,440w4u,'l20vohAcSohrPorverSlatiwt 52JX2.74 Ouanlity Unit Prim Factor Tolal I lnstallatlon 1.00 r t.7Bi.3? r l2o8l = 2,'132.71 SP Repressnts 1 Solar Station 98 27 14 23 130049 EA 2,8a0watt, l2ovo[AcsohrPoworstntion 32,843.67 Oud{rlily Unit Pri@ Faclor Tolal x lnstalladon l.O0 x 2,853,84 x 1-2081 = 2,813.67 SP Repre8onts 2 SohrSlrl'0|}6 99 27 14 33 16 0015 MLF RG.6Aru Coaxral0slribulion Cablo, ln Conduit 51,573.45 Qlrantity Unit Pri@ Factor Total Installation 0.25 x 5,209.67 { 1.20g1 = 1,573.45 1OO 27 41 16 000038 EA TvcameraoutlelPkg Qusniity Unil Ptica Factor TotBl X lnstallalion j.00 x 24.90 x 12081 = 30.08 s30.08 Subtotal lor 27 - Communicatlons 39,645.30 Contraclor's Pom Ptotlosal . Oel6il EZIQC. NJPA - FL Psg€ ll ot'14 12t16!2014 PDF created with pdfFactory trial version lyww.pdffactorv.com 339 Crntractor's Price Proposal - Detail Continues.. Work Order Nurnber: 025982.00 Work Order Tiile: Flagler Memorial Lighting Ssct, hem Modifer UOtl tcsa.tlptlm Llne Total Labor Equip. f,{aterial (Ercfudod if makcd wilh an X} 28 - Electronic Satety And Security lu 28 ?3 00 000153 EA lmpoct-Rs6israntCameraDorfio,??XHig[ResolrrlionCamoraLenslncludeg variable'epeed drive, a[rninum uppor housing, lower pdycatbonals domo and 22X high.rascblim cokrr camora/lons. Vicon modd SVfT-i122. Ouantity Unit Ptire Factor Tolal I lnslallatlon i.oo x 199..t7 x r .208r = 240.95 SP $240.98 Subtotal for 28 - Elactronic Safety And Socurity SrcL lum Modfcr UOil D.scrlFdott $240.e8 Lln! Total Labor Eeulp, Moiarlsl (Excludcd lf msrkld wllh sh X) 31 - Earthwork t02 31 05 16 000013 CY {9srone^ggregsreFl[(114'6lcen) 348.92 Quantlty Unit Prle Faclor Tolal lnstalla$on 1.00 x 40,49 x 1.2081 = 48.92 Handhole Gravel 103 31 05 16 0000'13 0050 For Uo To 10. Add S 14.11 $506.08 Ouantily Unit Pri*F€clor Tolal lnslsll3tioo 1,o0 x it.68 x 1.208r = '14,11 1A4 31 11 00 000003 ACR Cl8arturdGrublightstumpsonlyuplo6'Diamlsr 513{.03 Ouantily Unit Prie Factor Total lnslallation 0.30 x 1,,97.56 x 1.20A1 = 434.03 105 31 11 0O 000012 AcR Chlpping-MedtumBrush Ouanflly Unit Prica Faclor Tolrllnslall.ilcn 0.30 r 1.3g6.3s x 1.20s1 = 508,08 1Ae 31 11 00 00001/ CY HandLoadingOfClearedArdGrubbadMaierial Ousntily Unit Frrce Faclor Tolal hstallation 40.00 x 11.9, , r,zoBr = 575.54 I t0 31 23 16 13 000.1 0055 For >20 To 50, Add Ouaniity Unil Pric€ 9575.54 1A7 3t 13 13 0O0C02 EA UpTo6"OianetorSlunrpR*rovallndudsex€valimn#srylormove $11,{.66 stlmp and lmdrng. Ouanlity Unit Price Factor Tolal lnslallalion 2.00 x S9.B? x 12081 = 1{4.66 108 31 13 13 00 0012 EA Up To O'D.B,H, {Diam€tsr Al Broast Hoioht} Troo Removalhcludei cufting up 5614.87 tr6o, chipplng and loading. Ouantity Unit Prjce Faclor Tot6lkrstallauon 2.OO x ?S,18 x 1.2081 = 614.87 109 31 23 f 6 13 000.1 Cy 12" wlda 6r Las8, Excavallon tor'f ronchlng by Machins ln Lmso Rmk $389.01 Quantity Unit Prrce Faclor 'total lnstallaiion 4o_o0 x 8.05 x 1j081 = 389.01 s1s4.75 FBclor Tolallnsuall8tion d0.00 x 4.03 , 1.a08r' 191.,75 111 31 23 i6 13OOCB CY ExcavationForTranchingByHandlnLooscRocklodudesstockpilngexcess msledals and trinrming sldes and botldn ol trench, Quanlity Unit Prie FBctoI Tolallnstallaiion 4.00 x 62.,{ x 1260r = 325.80 9325.80 Conlr:,clor's Prrca ltoposal - Ootail EZIQC. NJPA. FL Psg€ 'l? of 14 12rr612014 PDF created with pdfFactory trial version w$/w.pdffactory.com 340 Cnntractor's Price Proposal - Detail Gontinues.. Work Order Number: Work Orde r Title: 025982,00 Flagler Memorial Lighting SBcl"llsm Hodllsr UOU Dcsslptlq Llm Total Labor Equip, Material (Excludod if madrod with on X) 3l . Earthwork / 12 3t 23 1ri 13 00'11 BacHilling or placiog Subbrso lor Trenchss wilh lmporlod or Slockp,lsd Materials by Hand Or:anlity Unit Price s39_58 ln$snauoo 3,O0 x 't0.92 x Fa6lor r.2o8r = Toral 3s.58 1r3 31 23 18 13CO44 LF Backnu 6'Wda, ,?' 06€p Tranch, Wlh Cmp3cton 31?5.64 Ouantity Unil Pnelnstallar.ion 800.00 x 0.13 r F aclcr 1 2081 Tolal 125.U 114 31 23 16 330007 CY Sprwding, Shaping, and Rouqh Graoing lmporled or Slockpiled Materialls Bulk Excavalion by Machine Faclor 1.2081 s253.0? Ouanlity Unrt Pr,mlnstallailon n.W x 2.72 x Sprsading ild shaping / m!gh grading of conilru6uon area, Tol.l 253,02 115 31 23 16 360010 CY Excsvation For guiHiflg Foundations And Other Structures 8y Hsnd in Lorse Rock Quanlily Unil Prire s r,034.42 lnslallation fi.7A r Excavahon of ( 4 ) mal roundations, 67.42 x Faclor t.zo8r -Total 1"034.42 116 ill 23 16 360C13 CY Rdmating On Sits Exoavated Malerid Fmr Exavgtion For Buildhg Foundations and Other Stuctures >300'to 500' Quntity Unit Price lnstallation 28.00 x 3.02 x $r?2.45 Factor 1 .2081 Total 122.45 Move Bx€ss llH from loljndation excavalrurs to anothcr spol on the island and dump iru prle. ,17 3t 23 16 360013 0016 For >20 To 50, Add Ouanlitylnstallaucn 28.00 r s92.01 Unit Price 2.72 x Factor 1 .2oBl Tolal 92.01 118 31 23 ,,6 360019 CY Backfllling Around Buildlng Foundalions And Othrr Structur6s By Hand s271.39 Ouanfty Unil Prie Factor Tolal 271.39lnstallatlon g.OO x 18.72 x Eacdil around ( 4 ) mat foundations and ( l0 ) peddsials, 119 31 23 16 360021 CY Compaclion Of Flll Or Sutfme Fa Euilding Fomdalloos and Other Strucluies by Vibmtory Phle, Air Tampar, Etcatwa Quantily Unit Pncs $280.1 3 lnstalladon 62.50 x Fa6to, 1.2081 = Total 280.1 33-71 x 12A 31 23 16 3600?1 0021 Fs >50 To 250. Add OuantitYlnslallstion 62.50 31 1 1.75 Unit Price 1.48 Factor 12081 = Totsl 1't 1.75 St biotal for 31 . Earthwork SBGL tem irodifar Uotl Osscrlptim s5,s78.16 Lins Total Labor Equip, Malorial (Excludod it markod wilh an Xl 32 - Exterior lmprovemenls 121 3? 31 13 000076 LF 2' Oulsrde Oiameter Galvaiized Siesl Po6t. 7'To l0'!n LeIgth s288.98 Ouanlllylnslallatiorr 0.O0 r Denrclition 260"00 t Unit Price 5.36 x 0.9? r Factor 1:0Br 1 2081 Tolal 0-00 286.98 Conlraclor's Prie Prcposal - Ootail EZIQC.NJPA.FL PDF created with pdfFactory trial version w\4,.odffactory.com Page 13 of 14 't211612A1a 341 Cantraetofs Frice Proposal - Detall Continues.. Work Order Number: 025982.00 Work Order Title: Flagler Memorial Lighling ssc.t hsm ilodlhr Uotl Dasslptlm Llne Tolql -, Labor Equip, f,laterial (Excluded il marlsd with an X) 32 - Exterlor lmprovements 12? 32 3, 13 000030 LF 3"Oulcldo0iametercslvani2edsteelPost,T'Tolo'lnlenglh 326.10 Quantity Unit Price Factor -folal lnstallaiion 0.00 x g.0e x 1.2001 " 0.00 Oemdilion 20.00 x 1.08 x lJO8l = 26'09 123 3? 3l 13 00017S LF 10'FollHBrghtFabricGhainLinkdgGsrrgo, l.2OzCorlin0,f Mssh 3719.30 Oudntity Unil Price Factcr Total lnslallatlnn 0.00 x 12.35 x 1.208,1 . 0.00 Domol;tion 260.00 x 2.29 x 1.2081 s 719.30 124 32 31 13 00 0379 EA 20' \Mds x 10'High Doubls Gat6 Oalvanred Slselwthout Barbsd Wre 574.?l Qu8nlily Unit Price Faoto, Total lnstaflati,on O.O0 x 1,860,33 x .t.ZO61 = 0.00 Demolition 1.00 x 61.48 x 1.2081 : 74.27 125 3? 84 23 000247 EA SpreadspectrumYagrAnlenna(CalsonsesR-YAc|) 963.33 QlBntily tjnit Prie Faclot Tolal x lnslallation 1.00 x s2.42 x l2o8t = 53.33 SP Subtotal for 32 - Exterior lmprovements s.ct ltam Modl{cr Uollt Olscription $1,171.98 Llnr Totrl Lat or Equlp. M:t€rhl (Excludsd If mrrlad with an X) 33. Utlllties 126 33 01 30 51 0281 LF 1'Tenrporary Service Hose With Fitlingslndudes removal afler use. $177.$9 Quantity Unit Price Faclor Total lnslallalion ICO.OO x 1.42 x .t .208.1 = 177.59 Connecl lrose for use *,ith lemporary rvater stofa$e containers 6l the iob site. 127 33 05 16 130168 EA 11^x20',12"o€plh,22,500LBDesignLoad,Gasksted.OpBnBotlom, 52,993.09 Slralght Sides, Potymer Concr.t€ Handhda Endosure Ouantily Unil Prics Factor Totallnstsllalion 12.00 x 206.46 x 1:0g,1 = 2,993,09 128 33 0S 1E 130370 EA 11'x rB', 15,000LBDesigrlLoad, HeavyDuty, PolflrerConcreleHsndhoh 51,578.17 Endosure Cover Wth Gsskel Quantly Unit Price Faclor Tolallnstallalion 12.00 x 10g.06 { 1.20g1 = 1,575.17 Subtotal for 33 - Utllltlos 54,?"$.85 Proposal Total $299,853.'t5 This total lepregen(s the ccnecr tc:al for the proposal. Ar')y discrepancy b€tween lne totsls. sutxolals aff lhe proposal lotal is cue lo rounding" Sutlenkaclor Lisling AZIQC. NJPA. FL PDF created with pdfFactory trial version www.pdffactory.conl Paga 14 of 14 1U1612014 342 RESOLUTION TO BE SUBMITTED 343 THIS PAGE INTENTIONALLY LEFT BLANK 344