Loading...
C7I-Waive Bidding-Execute Contract Install A Hybrid Sheet Piling Seawall SystemCondensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Waiving, By 5/7ths Vote, The Formal Competitive Bidding Requirement, Finding Such Waiver To Be ln The Best Interest Of The City, And Authorizing The City Manager To Negotiate And Execute A Service Contract With Mai Engineering Services, Inc, To lnstall A Hybrid Sheet Piling Seawall System Manufactured By Truline, ln The Amount Of $390,000 Plus A Total Project Contingency ln The Amount Of $'19,500; For A Total Amount Of $409. 500. COMMISSION ITEM SUMMARY Advisory Board Recommendation: Financial lnformation: lntended Outcome Su Ensure a viable seawall Supporting Data (Surveys, Environmental Scan, etc: The seawall at Muss Park is structurally Item Summary/Recommendation: ln December 2013, the City contracted the services of Atkins North America, lnc., to design the rehabilitation of a 330 linear foot of seawall at Muss Park. An evaluation of the seawall discovered that the wall had cracks and structural deficiencies, and even some portions of the wall had fallen off. Atkins North America, lnc. designed a wall with a traditional steel sheet pile system, incorporating tie-back anchors, The design was completed in May 2014. ln June 20'14, Public Works staff members attended an engineering conference where they were introduced to Truline, a manufacturing company specializing in industrial valves. One oi highlights of the presentation was a hybrid sheet piling system. Staff took special interest in this product for its potential usage for seawall construction, including the following benefits: . lt is a steel-reinforced, concrete filled, polymer U-channel that provides the strength of a traditional wall;. The installation method is efficient and boasts a 50 year service life (a kaditional seawall service life lasts approximately 30-a0 years); andr The cost estimate to construct a traditional sheet pile system at Muss Park is approximately $776,000, The cost estimate to construct a Truline hybrid sheet pile system is $390;000, representing a \Qo/o cost saving for the City. The proposed hybrid sheet pile system is manufactured by Truline and installed by MAI Engineering Services. Their experience with using this product in the past few years in the State of Florida has prorren to be successful. Public Works staff would like to try out a pilot program for the Muss Park seawall, and execute a contract agreement with MAI Engineering Services to construct the hybrid seawall. THE ADMINISTRATION RECOMMENDS APPROVING THE RESOLUTION. 302-276'l -069357 caoital - contracts City Clerk's Office Legislative Tracking: Sign-Offs: Department _ Director AssistaftEd 'lt{anager r\City lv nager ETC Y(tuT u/JLM l^ S\February\PUBLIC WORKS\Bid Waiver - suMMARY.docx ( * MIAMIBTACH --AGENDA ,rz* C7I olrre 2'll'l{ 295 g MIAMIBEACH City of Miomi Beoch, I200 Convenlion Center Drive, Miomi Beoch, Florido 33,l 39, www.miomibeochfl.gov COMMISSION MEMORANDUM TO:Mayor Philip Levine and Members oflthe City FROM: Jimmy L. Morales, City Manager DATE: February 11,2015 SUBJECT: A RESOLUTTON OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, WAIVING, BY 5/7THS VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, FINDING SUCH WAIVER TO BE IN THE BEST INTEREST OF THE CITY, AND AUTHORIZING THE GITY MANAGER TO NEGOTIATE AND EXECUTE A SERVICE CONTRACT WITH MAI ENGINEERING SERVICES, INC. TO INSTALL A HYBRID SHEET PILING SEAWALL SYSTEM MANUFACTURED BY TRULINE, IN THE AMOUNT OF $39O,OOO PLUS ATOTAL PROJECT CONTINGENCY lN THE AMOUNT OF $19,500; FOR A TOTAL AMOUNT OF $409,500. FUNDING $409.500 302-2761-069357 Capital- Contracts $409,500 BACKGROUND Total ln December 2013, the City contracted the services of Atkins North America, lnc., to design the rehabilitation of a 330 linear foot of seawall at Muss Park. An evaluation of the seawall discovered that the wall had cracks and structural deficiencies, and even some portions of the wall had fallen off. Atkins North America, lnc. designed a wall with a traditional steel sheet pile system, incorporating tie-back anchors. The design was completed in May 2014. ln June 2014, Public Works staff members attended an engineering conference where they were introduced to Truline, a manufacturing company specializing in industrial valves. One of highlights of the presentation was a hybrid sheet piling system. Staff took special interest in this product for its potential usage for seawall construction, including the following benefits: o lt is a steel-reinforced, concrete filled, polymer U-channel that provides the strength of a traditional wall;o The installation method is efficient and boasts a 50 year service life (a traditional seawall service life lasts approximately 30-40 years); and. The cost estimate to construct a traditional sheet pile system at Muss Park is approximately $776,000. The cost estimate to construct a Truline hybrid sheet pile system is $390,000, representing a 50% cost saving for the City. 296 Commission Memorandum Muss Park pilot program February 1 1, 201 5 F*15* l2 The proposed hybrid sheet pile system is manufactured by Truline and installed by MAI Engineering Services. Their experience with using this product in the past few years in the State of Florida has proven to be successful. Public Works staff would like to try out a pilot program for the Muss Park seawall, and execute a contract agreement with MAI Engineering Services to construct the hybrid seawall. CONCLUSION The Administration recommends approving the Resolution. rLMtMrt#HR T:\AGENDA\201S\February\PUBLIC WORKS\Bid Waiver_Muss Park Seawall_Truline_MAl - MEMO.doc 297 RESOLUTION TO BE SUBMITTED 298