C7D-Execute Supplemental Work Orders w- BDI Scott Rakow Youth Center Ice RinkCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Authorizing The City Manager To Approve And Execute SupplementalWork Orders With BDI Construction For Additional Scope Associated With The Scott Rakow Youth Center lce Rink Utilizing The Existing NationalJoint Powers Alliance (NJPA) Contract ln The Amount Of $16,379.09 With ndation: On August 14, 2014, Thornton Construction Company (TCC) submitted a GMP proposal for the additional scope of work previously requested by Commission, in the amount of $456,715. This amount exceeded the City's proposed budget. Negotiation with TCC took place in order to lower the construction amount. Several meetings were held and on August 22, 2014,TCC submitted a revised GMP proposal in the amount of $394,562. Since the City and TCC were not able to negotiate a final GMP Amendment No. 2; and, in an effort to expedite the additional scope at Scott Rakow Youth Center lce Rink, the National Joint Power Alliance (NJPA) lndefinite Quantity Contract (lQC) contract was utilized to procure the necessary construction services, an alternate method of procurement. On October 29,2014, the Mayor and the City Commission approved Resolution No. 2014-28806 authorizing the City Manager to execute the work order with BDI Construction Company, in a not to exceed amount of $329,000, for the associated work at the Scott Rakow Youth Center lce Rink to include new showers, lockers, multi-purpose room and skate rental area utilizing the NJPA cooperative contract for construction services with the Gordian Group. During the course of the project, several request for supplemental work orders were presented to the City for unforeseen conditions and scope not included in the original proposal. BDI Construction Company submitted cost proposals totaling $11,379.09 to furnish and install additional scope. The additional scope includes re-routing fire alarm conduits found in existing wall and in conflict with new opening at men's and women's locker room, installation of new 2" empty conduit for installation of voice/data cables for new multi-purpose room and skate rental room, re-routing of existing electrical conduits found in existing demolished wall and relocated to adjacentwall to maintain lighting circuit homeruns, and installation of new sub-electrical panel LC 100A to expand existing capacity of existing electrical panel (See Attachment A). The Architect of Record, Bermello Ajamil & Partners, lnc., provided their assessment of the proposed costand submitted their recommendation letter stating that the proposal submitted by BDI is fair and reasonable (see Attachment B). The Parks & Recreation Department requested to provide windows on the south wall of the recently completed multi-purpose room. The cost of the windows installation should not exceed $5,000. The total additional scope shall not exceed the sum of $16,397.09. The total amount of the work order with BDI shall not exceed $345,397.09. The NJPA contract requires the Mayor and City Commission approval for any work order exceeding $250,000. On October 29, 2014,hhe Mayor and City Commissioned approved Resolution 2014-2880G and approved a notto exceed amount of $329,000 for the additional scope associated with Scott Rakow Youth Center lce Rink, since the requested amount of $16,397.09 will increase the work order beyond the established threshold of $250,000 the administration is requesting thatthe Mayorand City Commission approve the work. The Administration recommends that the Mavor and Citv Commission approve the Resolution. Financial I nformation: Source of Funds: N d1'\> Amount Account 1 $ 16,379.09 306-2054-069357 MB Quality of Life Resort Tax- 1o/o 2 3 Total $ 16,379.09 Build and maintain infrastructure with full accountabili Supporting Data (Surveys, Environmental Scan, etc.): The 2012 Customer Satisfaction Survey indicated that over 87% and 83% of City residents and businesses respectively, rated the appearance and maintenance of public buildings as excellent or ; and over 81% of residents rated David Martinez, Director ext#6972 T:\AGENDA\201 Rakow - lce Rink NJPA - SUMMAR NN IAAN IBEACH 252 r -e" ^f.I-,^.n ---E- City of Miomi Beoch, I700 Convention Center Drive, Miomi Beoch, Florido 33I39, www.miomibeochfl.gov COMMISSI N MEMORANDUM TO:Mayor Philip Levine and Members the City tsston FROM: Jimmy L. Morales, City Manager DATE: March 11, 2015 SUBJECT: A RESOLUTION OF THE MA MIAMI BEACH, FLORIDA, AND CITY COMMISSION OF THE CITY OF THE CITY MANAGER TO APPROVE AND EXECUTE SUPPLEMENTAL WORK ORDERS WITH BDI CONSTRUCTION FOR ADDITIONAL SCOPE ASSOCIATED WITH THE SCOTT RAKOW YOUTH CENTER ICE RINK UTILIZING THE EXISTING NATIONAL JOINT POWERS ALLTANCE (NJPA) CONTRACT tN THE NOT TO EXCEED AMOUNT OF $16,379.09 WITH PREVIOUSLY APPROPRIATED FUND!NG ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME SUPPORTED Build and maintain priority infrastructure with full accountability. FUNDING $16,379.09 306-2054-069357 SR Projects for RT-Mid Beach QOL 1% BACKGROUND On August 14,2014, Thornton Construction Company (TCC) submitted a GMP proposal for the additional scope of work previously requested by Commission, in the amount of $456,715. This amount exceeded the City's proposed budget. Negotiation with TCC took place in order to lower the construction amount. Several meetings were held and on August 22, 2014, TCC submitted a revised GMP proposal in the amount of $394,562. Since the City and TCC were not able to negotiate a final GMP Amendment No. 2; and, in an effort to expedite the additional scope at Scott Rakow Youth Center lce Rink, the National Joint Power Alliance (NJPA) lndefinite Quantity Contract (lOC) contract was utilized to procure the necessary construction services, an alternate method of procurement. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group. On September 12,2014, the City met with NJPA vendor, BDI Construction Company (BDl) at the 253 Commission Memorandum -Scott Rakow Youth Center lce Skating Rink - Change Order No.1 Page 2 Scott Rakow Youth Center site and performed a scope meeting. On October 10, 2014, BDI Construction submitted a bid proposal utilizing the NJPA cooperative contract system in the amount of $334,001.21. A follow up meeting with BDI took place to review the proposal and minor revisions were incorporated to the bid proposal. On October 23,2014, a revised proposal was transmitted to the City in the amount of $329,000. On October 29, 2014, the Mayor and the City Commission approved Resolution No. 2014-28806 authorizing the City Manager to execute the work order with BDI Construction Company, in a not to exceed amount of $329,000, for the associated work at the Scott Rakow Youth Center lce Rink to include new showers, lockers, multi-purpose room and skate rental area utilizing the NJPA cooperative contract for construction services with the Gordian Group. The project budget had allocated a ten percent contingency for unforeseen conditions. ANALYSIS During the course of the project, several request for supplemental work orders were presented to the City for unforeseen conditions and scope not included in the original proposal. BDI Construction Company submitted cost proposals totaling $11,379.09 to furnish and install additional scope. The additional scope includes re-routing fire alarm conduits found in existing wall and in conflict with new opening at men's and women's locker room, installation of new 2" empty conduit for installation of voice/data cables for new multi-purpose room and skate rental room, re-routing of existing electrical conduits found in existing demolished wall and relocated to adjacent wall to maintain lighting circuit homeruns, and installation of new sub-electrical panel LC 100A to expand existing capacity of existing electrical panel (See Attachment A). The Architect of Record, Bermello Ajamil & Partners, lnc., provided their assessment of the proposed cost and submitted their recommendation letter stating that the proposal submitted by BDI is fair and reasonable (see Attachment B). City staff also reviewed the proposals and found that the amount was fair and reasonable. The Parks & Recreation Department requested to provide windows on the south wall of the recently completed multi-purpose room. The cost of the windows installation should not exceed $5,000. The total additional scope shall not exceed the sum of $16,397.09. The total amount of the work order with BDI shall not exceed $345,397.09. The NJPA contract requires the Mayor and City Commission approval for any work order exceeding $250,000. On October 29, 2014. the Mayor and City Commissioned approved Resolution 2014-28806 and approved a not to exceed amount of $329,000 for the additional scope associated with Scott Rakow Youth Center lce Rink, since the requested amount of $16,397.09 will increase the work order beyond the established threshold of $250,000 the administration is requesting that the Mayor and City Commission approve the work. CONCLUSION The Administration recommends that the Mayor and City Commission adopt the attached resolution, approving and authorizing the City Manager to execute Supplemental Work Orders with BDI Construction Company in the not to exceed amount of $16,379.09. Attachment A - BDI Construction Company Cost Proposal - SupplementalWork Order Attac\ment B - Bermello Ajamil & Partners, lnc. Recommendation Letter lr-rrrrl$orrryse T:\AGENDA\2O1S\March 11\Scott Rakow - lce Rink Mechanical Repairs and Building Renovation\approval-Memo.doc 254 EffiRBIANmtmrWork Order Signature Document Approvals Owner City Manager Date Contractor Date Department Director Date NJPA EZIQC Contract No.: FL06-022912-BDI l_l *"* work order Fl nooitv an Existins work order Work Order Number.; 024496.01 Work Order Date: Work Order Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 Owner Name: City of Miami Beach Contractor Name: BDI Construction Contact: Roberto Rodriguez Contact: Phone: 3056737000 ext6122 Phone Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FL06-022912-BDI. Brief Work Order Descriotion: The City Commission directed staff to study the feasibility of incorporating several items such as pro shop, an accessible lobby at the front of the building, locker rooms with showers within the ice rink building, a multi-purpose room, and relocation of the current skate rental office. The following existing spaces will be rearranged with the proposed improvements: -Men's locker room 1 1 9a into skate rental #1 19a -Women's locker room #120a into a multi-purpose room 120a -Coache's office room # 123a into women's changing room # 123a -Skate rental room # 125 into women's locker room # 125 -Pro-ShoD room # 129 into men's locker room # 129 Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: tr \Afil nor anntv. E Work Order Firm Fixed Price: $11,379.09 Owner Purchase Order Number: Work Order Signature Document ezlQC-NJPA-FL Page 1 of 1 212712015 ATTACHMENT - A255 EffiRNIANffirtJfDetailed Scope of Work To: Carlos Rosell BDI Construction CO 7270 NW 12 St Miami, fl 33126 No Data lnput Date Printed: Work Order Number: Work Order Title: Brief Scope: From: Roberto Rodriguez Cig of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 3056737000 ext6122 February 27,2015 024496.01 Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 The City Commission directed staff to study the feasibility of incorporating several items such as pro shop, an accessible lobby at the front of the building, locker rooms with showers within the ice rink building, a multi-purpose room, and relocation of the current skate rental office. The following existing spaces will be rearranged with the proposed improvements: -Men's locker room 1 19a into skate rental #1 19a -Women's locker room #120a into a multi-purpose room 120a -Coache's office room # 123a into women's changing room # 123a -Skate rental room # 125 into women's locker room # 125 -Pro-Shop room # 129 into men's locker room # 129 n eretiminary Revised The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. RCO #1 .1 . Re-route fire alarm conduit that are feeding fire alarm horn/strobes in what will become Mens locker 129 & Womens Locker '125. Conduit was found at new opening at the vestibule between the new men's and women's locker room and needed to be relocated so that the new openings could be completed. The conduit was unforeseen as it was located within the masonry walls that were demolished per the drawings. This portion was verbally agreed to not delay the project. See line item#2 for remainder of change order.2. The above conduit was also associated with the pull station adjacent to the managers office. The pull station needs to be roughed in with new conduit and run new wiring from the pull station to the and spliced in to the junction box located in the crawl space above. RCO #2 1. Per the owners request, provide and install new 2" empty conduit from existing managers office to the new multipurpose room 120A. Two junction boxes will also be installed and the conduit will be left with a pull string. Conduit will be installed exposed under the panels. See attached sketch for further details. RCO#3 1. Re-route existing electrical conduit with lighting circuit homeruns. Conduit was found at multipurpose room new opening and needs to be relocated so that the opening can be completed. The conduit was unforeseen as it was located within the masonry wall that was demolished per the drawings. We have identified the conduit and it is a homerun lighting circuit that runs under the concrete all the way back to the panel. We feel its best to chip out the floor and extend the conduit to the adjacent new partition wall where it can be re-routed and concealed. 2. Concrete patch at area where concrete is to be chipped out after electrical wiring has been relocated. Steel rebar will be epoxied into the existing concrete to fortify the patch when complete. RCO# 5 Provide and install: new sub panel LC 100A, newfeederforpanel LCfeedfrom Panel L3A, new l00Abreakerforpanel LC, conduitandassociated wiring. Rearrange existing panel L3A breakers to make space for new 100A breaker for panel LC. Provide new label and panel schedule for panel LC. Final Scope of Work ezlQC-NJPA-FL Page 1 of 2 212712015 256 Detailed Scope of Work Continues.. Work Order Number: 024496.01 Work Order Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 Contractor Date Owner City Manager Date Department Director Date Scope of Work ezlQC-NJPA-FL Page 2 ol 2 2t27t2015 257 Contractor's Price Proposal - Summary Date: Re: February 27,2015 IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: FL06-02291 2-BDl 024496.O1 Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 BDI Construclion $1,984.34 Section - 01 $1,46s.57 Section - 02 $428.45 Section - 03 $591.66 Section - 09 $474.10 Section - 26 $7,990.89 Section - 28 $428.42 Proposa! Total Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. $11,379.09 Contractor's Price Proposal - Summary ezlQC-NJPA-FL Page 'l of 1 2t27t2015 258 Contractor's Price Proposal - Detail Date: February 27,2015 Re: leC Master Contract #: FL06-0229'12-BDI Work Order #: 024496.01 Owner PO #: Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 C6ntra6t6r: BDI Construction ProPosal Value: $1,984 34 Sect. ltem Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section - 0'l 1 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor. These tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Totallnstallation 15.00 x 42.41 x 1.2033= 765.48 lnvestigate fire alarm system to properly address how to re-route conduits and devices that were affected by the new openings. $765.48 2 01 22 23 00 0053 WK 30' Electric, Sclssor Platform Litt 8700.09 Factor Total lnstallation 1 .OO x 581.81 x '1.2033 = 700.09 (1) Week for electrical installation and to paint. Height is approximalely 14'2" Quantity Unit Price Subtotal for Section - 01 $1,465.57 Section - 02 3 02 41 19 130049 EA SawCutMinimumChargeForprojectswherethetotal sawcuttingchargeis less than the minimum charge, use this task exclusively. This task should not be used in conjunction with any other tasks in this section. Quantity Unit Price Factor Totallnstallation 1.oo x 356.06 x 1.2033 = 42845 s428.45 Subtotal for Section - 02 $428.4s Section .03 4 03 01 30 71 0042 SF Patch > 16 SF Decks Or Floors, Rapid Set Concrete Repair Material Quantity Unit Price lnstallation $261.43 Factor Total 6.00 x 36.21 x 1.2033 = 261.43 5 03 21 11 000035 EA Epoxy Coated Straight Dowels, 518" x24" Long, #5 Rebar $39.56 Quantity Unit Price Factor Totallnstallation P.OO x 2.74 x 1.2033 = 39 56 6 03 21 11 00 0035 OO24 MOD For Drilling Hole lnto Concrete, Horizontal, Add Per lnch Of Depth $97.03 Quantity Unit Price Factor Totallnstallation z2.oo x 1.12 x 1 .2033 = 97 03 7 03 21 11 000053 EA #5 (5/8") Reinforcing Bar Clip Splicing, Sleeve And Wedge $1 93.64 Quantity Unit Price Factor Totallnstaflation 6.00 x 26.A2 x 1.2033 = 193.64 Subtotal for Section - 03 $591.66 Section - 09 8 09 91 13 00 0335 LF Paint Conduit, Steel Pipe 2" fo 3-112" Diameter, One Coat Paint Quantity Unit Price Faclor Totallnstallation 2OO.OO x $158.84 Contractor's Price Proposal - Detail ezlQC-NJPA-FL 0.66 x 1.2Oj3 = 1s8.84 Page 1 of 4 212712015 259 Contractor's Price Proposal - Detail Continues.. Work Order Number: 024496.01 Work Order Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 Section - 09 I 09 91 13 000340 Subtotal for Section - 09 Ouantity Unit Price Factor LF Paint Conduit, Steel Pipe 2" To 3-112" Diameter, Two Coats $31 5.26 $474.',10 Totallnstallation 2OO.OO x '1.31 x 1.2033 = 31s 26 Section - 26 10 26 05 19 1600'12 MLF #12 AWG Cable - Type THHN-THWN, 600 V Copper, Single Solid, Placed ln Conduit Quantity Unit Price $151 .93 Factor Totallnstallation 0.25 x 393.57 x 1.2033 = 118.40 Demolition o.25 1'11.46 x 1.2033 = 33.53 11 26 05 19 160012 MLF #12 AWG Cable - Type THHN-THWN, 600 V Copper, Single Solid, Placed ln Conduit Quantity Unit Price Faclor Totallnstallation o.5o x 393.57 x 1.203i = 236.79 Replaced/Re-routed approximately (4) conduit with approximately (10) cables in each conduit X 15 LF $236.79 12 26 05 19 160274 MLF #8 AWG Cable - Type THHN-THWN 600 v copper, Single Stranded, Placed ln Conduit Quantity Unit Price $44.96 Factor Totallnstallation o.o5 x 747.2g x t.2ol3 = 44.96 13 26 05 19 160282 MLF #3/o AWG Cable - Type THHN-THWN 600 V Copper, Single Stranded, Placed ln Conduit Quantity Unit Price Factor Totallnstallation o.2o x 4.511 .64 x 1 .2033 = 1,085.77 $1,085.77 14 26 05 29 00 0075 EA 1-114", One Hole Steel Conduit Strap Quantity Unit Price Factorlnstallation 4.oo x 2.06 x 1.2033 $9.92 Total 9.92 15 26 05 29 00 0096 EA 3/4", Two Hole Steel Conduit Strap Quantity Unit Price s24.31 Factor Totallnstallation 1O.OO x = 24.312.02 x 1.2033 16 26 05 29 00 0096 0459 MOD For Work ln Restricted Working Space, Add $s.s4 Quantity Unit Price Factor Total 5.54lnstallation 1O.OO x 0.46 x 1.2ogg = 17 26 05 29 00 0096 EA 3/4", Two Hole Steel Conduit Strap Quantity Unit Price Factorlnstallation 4.oo x 2.o2 x 1.2033 $9.72 Total 9.72 18 26 05 33 130047 LF 1-1l4' RGS Conduit With Coupling, Mounted Exposed On Flat Wall Quantity Unit Price $1.573.97 Factor Totallnstallation 2O2.gO x 6.4s x 'l .2033 = 1'573 97 19 26 05 33 13 0049 LF 2" RGS Conduit \r'Vith Coupling, Mounted Exposed On Flat Wall Quantitylnstallation 2OO.OO x Height is approximalely 14'2" $2.341.62 Unit Price Factor Total g.73 x 1.2033 = 2'U1 62 20 26 05 33 13 0049 0326 MOD For lnstallation Above 14', Add QuantitYlnstallation 2OO.OO x $154.02 Unit Price Factor Total Contraclor's Price Proposal - Detail ezlQC-NJPA-FL 0.64 x 1.2033= 15402 Page 2 oi 4 2t27t2015 260 Contractor's Price Proposal - Detai! Continues.. Work Order Number: 024496.01 Work Order Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 Section - 26 21 26 05 33 13 0062 EA 2'RGS 90 Degree Elbow Quantity Unit Price Factor Totallnstallalion 6.00 x 37.8.1 x 1.2033 = 272.98 Height is approximately 14'2" $272.98 22 26 05 33 13 0062 0326 MOD For lnstallation Above 14', Add Quantitylnstallation 4.OO x Factor Total 3.23 x 1.2033 = 'ls 55 $15.55 Unit Price 23 26 05 33 130073 EA 1-114" RGS Plastic Bushing SetVvith Locknuts Quantity Unit Price Factor Totallnstallation 4.oo x 10.34 x 1.2033 = 49.11 $49.77 24 26 05 33 130075 EA 2" RGS Plastic Bushing Set With Locknuts Quantity Unit Price Factor Totallnstallation 6.00 x 15.31 x 1.2033 = 110 54 Height is approximately 14'2" $1 10.54 25 26 05 33 13 0075 0326 MOD For lnstallation Above 14', Add $8.76 lnstallation Quantity 4.00 x Unit Price Factor 1.82 x 1 .2033 Total 8.76 26 26 05 33 130114 EA 2" RGS Box Connector, lnsulated \Mth Set Screw Quantity Unit Price lnstallation Height is approximalely 14'2" Fac{or Total 4.OO x 39.97 x 1.2033 = 192.38 $1 92.38 27 26 05 33 130291 LF 3/4' EMT Conduit, Mounted Exposed On Flat Wall s1 56.67 Quantity Unit Price Factor Totallnstallation 5O.OO x 2.48 x 1.2033 = 149 21 0.62 x 1.2033 = 7.46Demolition 10.00 28 26 0s 33 130291 LF 3/4' EMT Conduit, Mounted Exposed On Flat Wall Quantity Unit Price Factor Total $261.12 lnstallation 7O.OO x Demolition 70.00 x 2.48 x 1.2033 = 208 89 0.62 x 1.2033 = 52.22 Re-Pipe new conduit to run new cables that were located in the new opening. 29 26 05 33 13 0291 0156 MOD For Work ln Restricted Working Space, Add $24.85 Quantity Unit Price Factor Totallnstallation 35.00 x 0.59 x 1.2033 = 24.as 30 26 05 33 130302 $15.52EA 3/4'EMT 90 Degree Elbow Quantitylnstallation 2.OO x Factor Total 6.45 x 1.2033= 1552 Unit Price 31 26 05 33 13 0302 EA 3/4" EMT 90 Degree Elbow Quantitylnstallation 8.OO x $80.09 Unit Price Factor Total 6.45 x 1.2033 = 62'09 8.00 18.00Demolition1.87 x 1.2033 = 32 26 05 33 13 0302 0156 MOD ForWork ln Restricted Working Space, Add Quantity Unit Price Factorlnstallation 4.OO x 1.40 x 1.2033 = $6.74 Total 6.74 33 26 05 33 13 0324 EA 3/4" EMT Compression Coupling QuantitYlnstallation 8.OO x Demolition 8.00 x Unit Price Faclor Total 3.15 x 1.2033= 30.32 1.10 x 1.2033= 10.59 Contractods Price Proposal - Oetail E/QC. NJPA - FL Page 3 of 4 212712015 261 Contractor's Price Proposal - Detail Continues.. Work Order Number: Work Order Title: 024496.01 Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 Section - 26 34 26 05 33 130324 0'156 MOD For Work ln Restricted Working Space, Add Quantity Unit Pricelnstallation 8.OO x 0.82 $7.89 Factor 1.2033 Total 7.89 35 26 05 33 130324 EA 3/4' EMT Compression Coupling QuantitYlnstallation 4.OO x $15.16 Unit Price 3.15 x Factor 1.2033 Total 15.16 36 26 05 33 130884 EA 2" Junction Box Wth Cast lron Cover, GUAB, GUAC, GUAL, GUAN, RGS PVC Coated, Urethane Lined $447.46 Quantity Unit Price 185.93 x Faclor 1.2033 Total 447.46lnstallation 2.OO x Height is approximately 14'2" 37 26 05 33 130884 0294 MOD For lnstallation Above 14', Add QuantitYlnstallation 2.OO x $'13.53 Unit Price 5.62 x Factor t.zozs = Total 't3.53 38 26 05 33 160016 EA 4" Square Steel Box With Covet,2-118" Deep, Flush Mount $102.20 QuantitYlnstallation 3.OO x Demolition 3.00 x Unit Price 22.98 x 5.33 x Factor 1.2033 1.2033 Total 82.96 19.24 39 26 05 33 16 0016 EA 4" Square Steel Box With Cover,2-118" Deep, Flush Mount Quantity Unit Pricelnstallation 1.OO x $27.65 22.98 x Faclor 1.2033 Total 27.65 40 26 24 13 00 0034 EA 100 Amp Single Branch Switch Unit, 240 V, 3 Pole $502.57 QuantitYlnstallation 1.OO x Unit Price 417.66 Factor 1.2033 Total 502.57 Subtotal for Section - 26 $7,990.89 Section - 28 41 28 3'l 23 00 0518 EA Addressable Single Action Manual Pull Station (Simplex 4099-9001)$214.21 QuantitYlnstallation 1.OO x Demolition 1.00 x Re-use existing device Unit Price 156.67 x 21.35 x Factor 1.2033 1.2033 Total 188.52 25.59 42 28 31 23 00 0545 EA Wall Mounted Horn Strobe, 75Cd, Red (Simplex 4903-9426)9214.21 QuantitYlnstallation 1.00 x Demolition 2.00 x Re-use existing device Unit Price 146.00 x 16.01 x Faclor 1.2033 1.2033 Total 175.68 38.53 Subtotal for Section - 28 $428.42 Proposal Total This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. $11,379.09 Contracto/s Price Proposal - Detail ezlQC-NJPA-FL Page 4 of 4 212712015 262 Subcontractor Listing EffiRNIANffitmf Date: February 27,2015 Re: leC Master Contract #: FL06-022912-BD| Work Order #: 024496.01 Owner PO #: Title: Scott Rakow Youth Center - lce Rink Mechanical Repairs Supplemental 1, 2, 3, &5 ContraCtor: BDI Construclion ProPosal Value: $'l '1,379 09 Name of Contractor Duties Amount Yo No Subcontractors have been selected for this Work Order $0.00 0.00 Subcontractor Listing ezlQC-NJPA-FL Page 1 of 1 212712015 263 & Partners. lnc. ba Bermello Ajamrl Memorandum Architecture Engineering Planning Interior Design Landscape Architecture To: Roberto Rodriguez / Project Manager Capital lmprovement Project Office City of Miami Beach, Florida Date: February 24,2015 From: ;:xi:;,'iil?=;ft1;"n", ff-\AL Re: Scott Rakow Youth Center / lce Skating Rink Mechanical Repairs and Building Renovations Revision #2 - Change Order Review 2700 Sheridan Avenue Miami Beach, Florida I 33140 Permit No. 81500723 B&A Project No. 12095.001 To date, the Design Team has received and reviewed 4 Requests for Change Orders from BDI Construction Company, as follows:. Request for Change Order No. 1 in the Total Amount of ... ... $ 1 ,984.34 Re-route the Fire Alarm Conduits that are feeding the Fire Alarm Horn / Strobes. . Request for Ghange Order No. 2 in the Total Amount of ..... $ 4,731.03 lnstalla New 2" Empty Conduit from Managers Office to Multipurpose Room. . Request for Change Order No. 3 in the Total Amount of ... .. $ 1 ,396.76 Re-route Existing Conduit with Lighting Circuit Homeruns. . RequestforGhangeOrderNo.5intheTotalAmountof ...... $3.266.96 lnstall New Sub-Panel LC 100A. r Total $11,379.09 Based on the discussions that followed, it is the Design Team's opinion that Requested Change Orders described above are reasonable and acceptable. lf you have any questions, please do not hesitate to call me at your convenience. Thank you for your understanding and patience. 2601 So'rth Bayshore Drive. lOth Floor.Hirmi . Florida. lSll3 ' USA'Main 305 859 2050.Fax 305 860 3700 www.bermelloaiamil.com ATTACHMENT - B 264 RESOLUTION TO BE SUBMITTED 265