C7R-Approve Additional Funds To JPA w- FDOT Drainage Improvements -Alton Road-COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Add Additional Funds To The Existing Joint Participation Agreement (JPA) Between The City And The Florida Department Of Transportation (FDOT) ln The Amount Of $500,000, For Utility Work To lnclude: Construction Of Water, Sewer And Stormwater Drainage lmprovements Within The ProjectArea, As Part Of The State Road 907/Alton Road Project From 5'h Strelt ro Michioan Avenue. lntended Outcome Su Item Summary/Recommendation : The Florida Department of Transportation (FDOT) and the City executed a Joint Participation Agreement (JPA) for utility work by an FDOT highway contractor, dated October 2,2012, for utility improvements on Alton Road/State Road (S. R. ) 907, from 5'n Street to Michigan Avenue (Project), whereby the City agreed to use the services of an FDOT highway contractor for the Project. Simultaneously with the execution of the JPA, FDOT, the City, and the Department of Financial Services, Division of Treasury, executed a Memorandum of Agreement, which established an escrowaccountforthe deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of $2,680,670.52. The Alton Road construction revealed that the City utilities were in worse condition than originally anticipated, and that additional utility work was required due to the fragile nature of the aged pipes, as well as additional improvements. At its April 23,2014 and July 23,2014 meetings, the City Commission approved additional funds in the amounts of $240,000 and $500,000 to be added to the existing JPA between the City and FDOT, for utility work to be performed by the FDOT highway contractor, as part of the State Road 907/Alton Road from Srh Street to Michigan Avenue project. The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction and significant drainage improvements, including construction of three (3) stormwater pump stations at 5'n, 1O'n, and 14'n Streets, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. ln order for FDOT to include a City owned drainage and water main construction improvements, as well as additional replacement of storm drain pipes, additionalwater meters and water lines, the City is requesting an additional $500,000. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Clerk's Office lative T n-Offs: IC WORKS\1700 W 25 ST AGEIXDA I c1 R Financial lnformation : $193,397.00 420-2592-069357 Collins Ave. main. SP Drive to 72nd St t 3T$1lttlW3;1 ffittoBPl I rotat l$s Financial lmpact Summary: $100,093.00 424-2949-061 357 Upsizing Under $106,510.00 423-2948-069357 Misc. $100,000.00 427-2764-069357 Collins Ave Utilities sth to Lincoln Eric Carpenter, Public Works X6012 # MIAAAI*TATH aara 3-ll-li378 City of Miqmi Beoch, I200 Convention Center Drive, Miomi Beoch, Florido 33,l39, www.miomibeochfl.gov COMMISSION MEMORANDUM TO: FROM: DATE: SUBJECT: MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO ADD ADDITIONAL FUNDS TO THE EXISTING JOINT PARTTCTPATION AGREEMENT (JPA) BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORTATTON (FDOT) tN THE AMOUNT OF $500,000, FOR UTILITY WORK TO INCLUDE: CONSTRUCTION OF WATER, SEWER AND STORMWATER DRAINAGE IMPROVEMENTS WITHIN THE PROJECT AREA, AS PART OF THE STATE ROAD 907/ALTON ROAD PROJECT FROM sTH STREET TO MICHIGAN AVENUE. ADMINISTRATION REGOMMENDATION The Administration recommends approving the Resolution. FUNDING /N Mayor Philip Levine and Members of /rre Cltv Cop{Lission Jimmy L. Morates, City Manager f- ib March 11, 2015 t A RESOLUTION OF THE MEYONIEND GITY COMMISSION OF THE CITY OF E MIAMIBEACH $1 93,397.00 - 420-2592-069357 $100,093 00 - 424-2949-061357 $1 06,51 0,00 - 423-2948-069357 $1 00,000.00 - 427-2764-069357 $500,000.00 BACKGROUND Collins Ave. main. SP Drive to 72nd St. Upsizing Under Capacity Water Mains Misc. Wastewater & Water Upgrades Collins Ave Utilities Sth to Lincoln Total The Florida Department of Transportation (FDOT) and the City executed a Joint Participation Agreement (JPA) for utility work by an FDOT highway contractor, dated October 2,2012, for utitity improvements on Alton Road/State Road (S.R.) 907, from 5th Street to Michigan Avenue (Project), whereby the City agreed to use the services of an FDOT highway contractor for the Project. Simultaneously with the execution of the JPA, FDOT, the City, and the Department of Financial Services, Division of Treasury, executed a Memorandum of Agreement, which established an escrow account for the deposit of the payments due from the City to FDOT under the JPA, and in which escrow account the City deposited an initial sum of $2,680,670.52. 379 Commission Memorandum - FDOT JPA - Alton Road from sth Street to Michigan Avenue March 11,2015 Page2 of 2 The Alton Road construction revealed that the City utilities were in worse condition than originally anticipated, and that additional utility work was required due to the fragile nature of the aged pipes, as well as additional improvements.' At its April 23, 2014 and July 23, 2014 meetings, the City Commission approved additional funds in the amounts of $240,000 and $500,000 to be added to the existing JPA between the City and FDOT, for utility work to be performed by the FDOT highway contractor, as part of the State Road 907iAlton Road from sth Street to Michigan Avenue project. The project is under construction and expected to be completed in July 2015. The Project includes roadway, sidewalk, curb and gutter reconstruction and significant drainage improvements, including construction of three (3) stormwater pump stations at Sth, 1Oth, and 14th Streets, decorative lighting, landscaping, irrigation, and bonded aggregate improvements. ln order for FDOT to include a City owned drainage and water main construction improvements, as well as additional replacement of storm drain pipes, additional water meters and water lines, the City is requesting an additional $500,000. ANALYSIS Utilitv Work bv Hiohwav Contractor Aoreement As part of the FDOT project, a relocation of the City-owned water main system along Alton Road was required. Considering the age and condition of the City utility infrastructure in this area, staff determined that it would be advantageous to the City to upgrade the existing water main system as part of the FDOT project. ln addition, the Project will also include upgrading the water main laterals that service the side streets along the Project corridor. During construction, it was determined that the connecting water, sewer and stormwater infrastructure required upgrading, othenruise failure could occur in the next few years. These funds will be utilized to make these improvements. Utilitv Work bv Hiqhwav Contractor Memorandum of Aqreement This Agreement will add to the existing escrow account established by FDOT with a deposit in the amount of $500,000 funded by the City for the purpose of the construction of a new water main system on Alton Road, from Sth Street to Michigan Avenue as part of the Project. CONCLUSION The Administration recommends that the proposed stormwater drainage and water main improvements be constructed with the Alton Road improvements in order to reduce the risk of failure of the water, sewer and stormwater system, as well as the potential need to perform repairs in the new roadway shortly after completion. The Administration recommends approving the Resolution authorizing these funds. JLM/ETC/JJF/BAM T:\AGENDA\201S\March\PUBLIC WORKS\FDOT additional funding Alton Road from 5th Street to Michigan Avenue - Memo March 201 5 (2).docx 380 RESOLUTION TO BE SUBMITTED 381