Loading...
C7H-Execute CO 2 To Agmt Biscayne Point Neighborhood ROW Improvements ProjectCondensed Title: A Resolution Of The MayorAnd City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No.2 To David Mancini & Sons, lnc. (DMSI), Dated April 1, 2015; Said Change Order, For Additional Engineering Services, Seawall Replacement, Enhancement Landscaping, Milling And Repaving And Bridge Repair For The Biscayne Point Neighborhood Right-Of-Way lmprovements Project, As Part Of A Flood Mi iect On Crespi Boulevard, For A Total Cost Of $325,000, COMMISSION ITEM SUMMARY The Biscayne Point Neighborhood Right of Way improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements needed to be made, including drainage on Crespi Boulevard, from 79th Street to 84"'Streets, and a water main replacement, from 79'n to 85'n Streets. AtitsOctober29,2014 meeting,theCityCommissionapprovedResolutionNo.20l4-28816 authorizingtheexecution of a change order to David Mancini & Sons, lnc. (DMSI), for additional engineering services, drainage structure modification, drainage pipe, storm water pump station, pollution control structure, milling and repaving and water main replacement for the Biscayne Point Neighborhood Right-Of-Way lmprovements Project, as part of a Flood Mitigation Project on Crespi Boulevard, for a total construction cost of $3,550,876 that included a contingency of $500,000. The said contingency has been used up due to the modification of the original design resulting in upsizing of pipes from 36 inch to 72 inch and additional linear foot of pipes in some areas. ln order to complete the pump station phase of the project, including the outfall, it is necessary to replace the seawall and raise the elevation to meet the current City approved standard of 5.7 NAVD. An enhancement of the landscaping is also being proposed, to give the area more of a park-like appearance. Other areas of the neighborhood improvement that are in need of immediate attention have also been.added, including milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue, as well as 77'n Street bridge repairs. Public Works statf has requested an additional scope of work from DMSI to include: The 81't Street end seawall replacement, enhanced landscaping for the pump station, milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue as well as77"'Street bridge repairs. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Board Recommendation: Clerk's Office islative Trackin -Offs: Item Summary/Recommendation : Financial lnformation : Source of Funds: 302-2452-069357 302-2452-061357 OBPI Financial 431-2321-069357 Eric Public Works X6012 T:\AGENDA\201 AGENDA N"* C7 H ome U-lftf209 @ MIAMIBEACH City of Miomi Beoch, 1700 Convention Center Drive, Miomi Beoch, Florido 33139, www.miomibeochfl.gov COMMISSION MEMORANDUM Mayor Philip Levine and Members Jimmy L. Morales, City Manager April 15,2015 A RESOLUTION OF THE MA MIAM! BEACH, FLORIDA, APP NG AND AUTHORIZING THE MAYOR AND CIry CLERK TO EXECUTE CHANGE ORDER NO.2 TO THE AGREEMENT WITH DAVTD MANC|N! & SONS, tNC. (DMS!), DATED ApRtL 1, 2015 (THE AGREEMENT); FOR ADDITIONAL ENGINEERING SERVICES, SEAWALL REPLACEMENT, ENHANCEMENT LANDSCAPING, MILLING AND REPAVING AND BRIDGE REPAIR FOR THE BISCAYNE POINT NEIGHBORHOOD RIGHT.OF. WAY IMPROVEMENTS PROJECT, AS PART OF THE FLOODING MITIGATION PROJECT ON CRESPI BOULEVARD, FOR A TOTAL COST OF $325,000. ADMINISTRATION RECOMM ENDATION The Administration recommends adopting the Resolution FUNDING $ 15,000 302-2452-000356 $ 8,000 302-2452-061351 $150,000 302-2452-069357 $ 12,000 302-2452-061357 $140.000 431-2321-069357 $325,000 TOTAL BACKGROUND The Biscayne Point Neighborhood Right of Way improvement Project is currently in the process of being closed out. One of the intents of the project was to correct the storm water drainage within the neighborhood, but after further assessment, additional improvements needed to be made, including drainage on Crespi Boulevard, from 79th Street to 84th Streets, and a water main replacement, from 79th to 85th Streets. At its October 29,2014 meeting, the City Commission approved Resolution No. 2014-28816 authorizing the execution of a change order to David Mancini & Sons, lnc. (DMSI), for additional engineering services, drainage structure modification, drainage pipe, storm water pump station, TO: FROM: DATE: SUBJECT:AND CITY GOMMISSION OF THE CITY OF 210 Commission Memorandum -Crespi Boulevard Neighborhood lmprovements Page 2 of 2 pollution control structure, milling and repaving and water main replacement for the Biscayne Point Neighborhood Right-Of-Way lmprovements Project, as part of a Flood Mitigation Project on Crespi Boulevard, for a total construction cost of $3,550,876 that included a contingency of $500,000. The said contingency has been used up due to the modification of the original design resulting in upsizing of pipes from 36 inch to 72 inch and additional linear foot of pipes in some areas. ln order to complete the pump station phase of the project, including the outfall, it is necessary to replace the seawall and raise the elevation to meet the current City approved standard of 5.7 NAVD. An enhancement of the landscaping is also being proposed, to give the area more of a park-like appearance. Other areas of the neighborhood improvement that are in need of immediate attention have also been added, including milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue, as well as 77th Street bridge repairs. Public Works staff has requested an additional scope of work from DMSI to include: The 81't Street end seawall replacement, enhanced landscaping for the pump station, milling and repaving at the intersection of Crespi Boulevard and Hawthorne Avenue as well as 77th Street bridge repairs. COST ANALYSIS Public Works has negotiated the additional scope of work with DMSI in the amount of $325,000. CONCLUSION The Administration recommends adopting the Resolution. Attachment - DMSI cost proposal JLM/MT/ETC/BAM/FRS 211 l)\\ ll) \1,\\r I "rl.\ .'.t.t\.:, l\jt. . rero washington Ave, suite e5o. Miami Beach, o" r",rf;ENERAL CONTRACTOR PH: (so5) 1se-aae1 FAX: (eo5) 5se-88s5 April2, 2015 Eugene Egemba, PE Civil Engineer III City of Miami Beach 1.700 Convention Center Drive Miami Beach, FI33139 Proposed Lump Sum Cost: Scope B: Proposed Lump Sum Cost: Scope C: Proposed Lump Sum Cost: 1939 N.w .1o.h Ct. Pompano Beach, FL 9906,1 PHr (954,) 97?-3556 FAX: (95,!) 94.1-eo,ro Re: Crespi Blvd Improvements - Breakdown of proposals for additional work to be performed Mr. Egemba, Please see below the breakdown for the proposals for additional work to be performed in the above referenced project: Scope A:Construction repairs to the 77th Street Bridge consisting in the restoration of delaminated concrete and repairing cracks on selected bridge substructure components including piles, pile caps, beams and slabs, as per CES, lnc. plans issued for bid (02-20-741as amended. S 65,000.oo Mill and Resurface the intersection of Hawthorn Avenue and Crespi Blvd. including restoration of all traffic signal loops, and pavement markings. S ss,ooo.oo Design/Build of Enhanced landscape and Hardscape improvements to 81st Street Pedestrian Bridge approach. s 23,ooo.oo 212 l),\\ ll ) ,\1,\\( l\l (\ :t:\). i\..l . GENERAL CONTRACTOR l9to Washington Ave, Suite 95o. Miami Beach, FL sgtgg PH: (so5) 5se-EE97 FAX: (3o5) 5s9-88s5 Scope D: Proposed Lump Sum Cost: lgsg NW 4,o,tr Ct. Pompano Beach, FL 3806,1 PH: (D5.r) 9z?-s556 FAX: (95,r,) e44-eo,lo Design/Build of approximately 60 LF of Seawall at Street-end of 81st Street and Crespi Blvd. to and final elevation of 5.7 NAVD utilizing Tru-Line System or equal. s 182,000.00 Respectfully, 213 RESOLUTION TO BE SUBMITTED 214