Loading...
R7I-Execute CO 3 Installation Of Additional Check Valves Protection From Tidal FCOMMISSION ITEM SUMMARY Gondensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No. 3 To Southern Underground lndustries, lnc., Dated May 26, 2015 (The Agreement); Said Change Order ln The Amount Of $417,309, Plus A Project Contingency ln The Amount Of $41,731; For A Total Cost Of $459,040; For lnstallation Of Additional Check Valves On Outfalls ln Various Locations Requiring Protection From Tidal Flooding : lndian Creek Drive, From 26th Street To 41"tStreet. Item Summary/Recommendation : Pursuant to lnvitation to Bid (lTB) 2014-087-SR for the Citywide Tidal Flooding Mitigation Project, the City Commission authorized an award for construction contract with Southern Underground lndustries in the amount of $788,315, at its April 9, 2014 meeting. At the August28,2014 meeting, the City Commission approved Amendment No. 1 to the Agreement, in the amount of $661,980, plus a project contingency in the amount of $88,019.50, for a total cost of $750,000, for additional scope of work including: engineering services, temporary pump station drainage structures, the installation of drainage pipe, and check valves for existing outfalls citywide. At the February 12,2015 meeting, the City Commission approved Amendment No. 2 to the Agreement, in the amount of $180,000 to extend the services citywide, plus a project contingency in the amount of $30,000, for a total cost of $210,000. Continuing with the initiative to protect residents from tidal flooding within the Cig of Miami Beach, the Public Works Department is requesting an additional scope of work from Southern Underground lndustries, lnc., (Southern Underground) for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding including: lndian Creek Drive, from 26th Street to 41$ Street and trial installation on 3 drainage wells around the City. Southern Underground lndustries, lnc. shall provide all necessary labor and equipment for the installation. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTTON. Board Recommendation: Financial lnformation : Source of I iFunds: I t ISt .ru'fi-1 ffir ,F- oBPl i Total l$a Financial lmpact Summary: 429-2454-061357 Eric Carpenter, Public Works X6012 T:\AGENDA\2015Uune\PUBLIC WORKS\Citywide High Tide Mitigation Project Change Order No3. Summary.doc AGENDA ITEM R?TE MIAMIBEACH DArE 6- lo-ts596 g MIAMIBEACH City of Miomi Beoch, 1700 Convention Cenler Drive, Miomi Beoch, Florido 33139, www.miomibeochfl.gov COMMISSION MEMORANDUM Mayor Philip Levine and Members of the Cit Com Jimmy L. Morales, City Manager 429-2730-069357 429-2454-061357 431-2730-061357 DATE: June 10,2015 sUBrECr: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER No. 3 TO SOUTHERN UNDERGROUND INDUSTRIES, tNC., DATED MAy 26, 2015 (THE AGREEMENT); SAID CHANGE ORDER IN THE AMOUNT OF $417,309, PLUS A PROJECT CONTINGENCY lN THE AMOUNT OF $41,731; FOR A TOTAL COST OF $459,040; FOR INSTALLATION OF ADDITIONAL CHECK VALVES ON OUTFALLS IN VARIOUS LOCATIONS REQUIRING PROTECTION FROM TIDAL FLOODING INCLUDING: INDIAN CREEK DRIVE, FROM 26TH STREET TO 41ST STREET. ADMINISTRATION RECOMMENDATION The Administration recommends adopting the Resolution TO: FROM: FUNDING $180,962 $251,968 $ 26 110 $459,040 Total BACKGROUND Pursuant to lnvitation to Bid (lTB) 2014-087-SR for the Citywide Tidal Flooding Mitigation Project, at its April 9,2014 meeting, the City Commission authorized an award for construction contract with Southern Underground lndustries in the amount of $788,315.00. At the August 28, 2014 meeting, the City Commission approved Amendment No. 1 to the Agreement, in the amount of $661 ,980, plus a project contingency in the amount of $88,019.50, for a total cost of $750,000, for additional scope of work including: engineering services, temporary pump station drainage structures, the installation of drainage pipe, and check valves for existing outfalls citywide. At the February 12,2015 meeting, the City Commission approved Amendment No. 2 to the Agreement, in the amount of $180,000 to extend the services citywide, plus a project contingency in the amount of $30,000, for a total cost of $210,000. 597 Commission Memorandum -Citywide Tidal Mitigation lmprovements - Change Order No. 1 Page 2 of 2 Continuing with the initiative to protect residents from tidal flooding within the City of Miami Beach, the Public Works Department is requesting an additional scope of work from Southern Underground lndustries, lnc., (Southern Underground) for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding including: lndian Creek Drive, from 26th Street to 41't Street and trial installation on 3 drainage wells around the City. Southern Underground lndustries, lnc. shall provide all necessary labor and equipment for the installation. COST ANALYSIS Southern Underground has submitted a cost proposal in the amount of $417,309 (ATTACHMENT) for the installation of additional check valves on outfalls in various locations requiring protection from tidal flooding. A base project contingency of 10o/o in the amount of $41,731 has been added, totaling a construction cost of $459,040. This cost proposal has been submitted to the City's Public Works Department for further review and recommendation. City staff reviewed the proposal and found that the amount was fair and reasonable. CONCLUSION The Administration recommends adopting the Resolution Attachments - Southern Underground lndustries. Cost Proposal dated 0512712015 JLM/Mr/ft/BAM/EA T:\AGENDAV0lSUune\PUBLIC WORKS\Citywide High Tide Mitigation Project Change Order No 3 Memo.docx 598 /A sour*eRv UNDER6ROUND INDUSTRIES May 27,2015 Mr. Eugene Egemba, P.E. City of Miami Beach Public Works Department 1700 Convention Center Dr. Miami Beach, FL 33139 Project: City Wide High Tide Mitigation Project Re: Change Order #3 Proposal, Vertical Well Valve Trial on Meridian Ave, Additional Backflow Valves on Belle Isle and Along Indian Creek Dr from 24 ST to 4l ST Mr. Egemba, As per your request, Southern Underground Industries has reviewed the field conditions and made some preliminary assessments of required scope of work in the following areas and we have prepared the following proposal. Additional measures are necessary to protect the following areas from Tidal Flooding conditions. As per the attached breakdown, we propose that the following scope of work be added to the City Wide High Tide Mitigation Project. between 8th Street and 14th Street. As per our previous discussions it is evident that tidal upflow from existing gravity drainage wells is contributing to flooding conditions and we propose to reduce this added backflow by installing a drainage backflow valve and grate in the vertical position on the existing casings as per the attached detail. investigation we found that there are 2 existing outfalls which are contributing to the tidal flooding conditions on Belle Isle. These can be resolved via installation of backflow valves. One location will require installation of a structure within the easement to facilitate valve installation. Street to 41 Street. Although more perrnanent solutions are in planning by FDOT, we propose to install approximately l9 valves along the Indian Creek outfalls to temporarily mitigate the tidal flooding conditions in this area until a more permanent solution is reached. 3075 NW South tuver Drive, Miami, FL 33142 (954)650-4699 Page 1 of2 599 fA sourHeRv UNDER6ROUNT) INDUSTRIES areas, additional funds are required to supplement backflow installation efforts in several areas including Monad Terrace, 59 Street on East side of Alton Road, and additional of top slab modification for 24" valve installation on 48 ST. Based on this scope of work and as per the attached detailed breakdown, Southern Underground Industries proposes to complete this work for a lump sum price of $417,308.83 and we would recommend that a l0olo contingency be added to this change order for unforeseen changes which would require resolution, bringing the total proposal amount to $459,093.71 and will need 3-4 weeks to procure the necessary materials to begin work which should take approximately 30-45 days to complete. Feel free to call me with any questions regarding this proposal. Thank you for the opportunity. Sincerely, Southern Underground Vice President Industries, Inc. 3075 NW South River Drive, Miami, FL 33142 (9s4)6s0-4699 Page2 of2 600 /dsourHeRvuNoca6RouflotNougTtraJCO#3 - Well Backflow Valves Test, Belle lsle & lndian Creek Bockflow Valves City Wide High-Tide Mitigation Project, City of Miomi Beoch Description ut UNIT UNIT PRICE TOTAT PRICE SCOPE #3.a - 938 W 48 ST lMiami Heartl F&l Top Slab w/ USF 667 (Remove from CO2 Scope)1.0 LS s 8.s00.00 S 8.s00.00 Subtotal s 8.500.00 SCOPE #3.b - Belle lsle - Farrey Lane - Valve & Structure Mobilization 1.0 LS s 5.000.00 s s.000.00 MOT 1.0 LS s 500.00 S 500.00 Preliminary Field Measurements 1.0 EA s 700.00 s 700.00 15" lnline Check Valve (Material Onlv)1.0 EA S 5,564.00 s 5,564.00 15" lnline Check Valve (lnstallation Cost)10 EA S 4,000.00 s 4,000.00 F&l Precast Structure,48"dia. w/ USF 385 1.0 EA S 7.ooo.oo S 7.ooo.oo Restoration 10 LS s 5,000.00 S 5,000.00 Subtotal 5 27,764.00 SCOPE #3.c - Belle lsle - West Side of Venetian Cswv MOT 10 LS S 1,ooo.oo s 1.000.00 Preliminary Field Measurements 1.0 EA )700.00 S 7oo.oo 18" lnline Check Valve (Material Onlv)1.0 EA S 7,6so.so S 7,6so.so 18" lnline Check Valve (lnstallation Cost)1.0 EA s 6.700.50 S 6,7oo.so Subtotal s 16,051.00 SCOPE #3.d - 59 ST and Alton Road (East Pioel MOT LS s 500.00 S 500.00 Preliminary Field Measurements ,0 EA S 700.00 s 700.00 18" lnline Check Valve (Material Onlv),0 EA s 7.650.50 s 7.650.50 18" lnline Check Valve (lnstallation Cost).0 EA s 6.700.s0 s 6.700.s0 Subtotal s 15.551,00 SCOPE #3.e - Monad Terrace MOT 1.0 LS s s00.00 s 500.00 Preliminarv Field Measurements 1.0 EA S 700.00 s 700.00 12" lnline Check Valve (Material Onlvl 1.0 EA s 2.9S0.00 s 2.9s0.00 12" lnline Check Valve (lnstallation Costl 1.0 EA s 4.63S.00 s 4.63s.00 subtotal s 8.78s.00 SCOPE #3.f - Backflow at 303 E San Marino MOT 1.0 LS s so0.o0 S 500.00 Preliminarv Field Measurements 1.0 EA S 700.00 S 700.00 15" lnline Check Valve (Material onlvl 1.0 EA S s,s64.oo S s,s64.oo 15" lnline Check Valve (lnstallation Cost)1.0 EA S s,g2s.oo S s,g2s.oo Subtotal s 12,689.00 SCOPE #3.C - Vertical Well Backflow Valves Mobilization 30 LS S r,soo.oo S 4,500.00 MOT 3.0 LS S 1,2so.oo s 3,750.00 Preliminary Field Measurements 3.0 EA s 700.00 S 2.1oo.oo 24" lnline Check Valve w/ Cone Grate (Material)3.0 EA S 19,9so.oo s 59.850.00 24" lnline Check Valve (lnstallation Cost)3.0 EA S 9.500.00 s 28.s00.00 Cleaning of Structure 3.0 LS 1.200.00 S 3,600.00 Subtotal 102,300.00 SCOPE #3.h - lndian Creek Backflow Valves lAssumes No New Structuresl MOT (for Lane Closure where needed)14.0 EA s 800.00 s 11.200.00 Preliminarv Field Measurements 19.0 EA s 700.00 s 13.300.00 rz ilrrrE !iltL^ vdrvc trurrrS[ g iltsLdilr, l!r/ 29 ST-N, 30 ST-N, 31 ST, 32 ST, 34 ST, 35 ST, 38 ST-N, 38 ST-S, & 39 ST 9.0 EA s 7.585.00 s 68,265.00 1) rnilne LnecK varve lrurnrsn & rnslail, (E 24 ST. 2s ST, 26 ST. 29 ST-N. 41 ST 5.0 EA s 11.489.00 s s7.MS.OO 18" lnline Check Valve (Furnish & lnstall) @ 27 ST, 28 ST, 30 ST-N, 36 ST (lnside Ll2full 27"1 4.0 EA s 14.350.50 s 57.402.OO 21" lnline Check Valve (Furnish & lnstall) @ 40 ST 1.0 EA s 18.0s6.83 s 18.055.83 Subtotal s 225.668.83 601 l!? ii!! i: i! m1il+21 I ,. tsme ad .mb bdeE Roud br dshnce 201fiQ7 x1g4 l[ Er#tr\ iAl=\;,R --=; G Gll/21 n= =tl I I t.:o] + -Rr 'Gr Wo rske ing )und bor rslop housing ote flonge stop flonge t pipe I -€-D(l/s) B(tl2ol NOTE:l. 6 pieces ot ongle brockels olloched on existing pipe. Welded or bolted on eisling pipe.2. EPDM gosket 5eol beMeen lhickness of pipe ond woslop flonge.3. Bolls secures wostop to ongle brocl,elr.4. Conicolgole with hinge PM PM I 2015.04-23 SS-ISO2Z68-1v | 1:50 <@ PU, AISI 316 Wastop 59O I 24" well grate at inlet sidenql .o-gffi 1s0423-1 E lrrr 602 RESOLUTION TO BE SUBMITTED 603