C7G-Accept Funds Reconstruction Of Surface Lot 01A - Penrods At One Ocean DriveCOMMISSION IIEM SUMMARY Gondensed Title: A Resolution Accepting $40,050 From Penrod Brothers, lnc. For The Re-Design And Development Of Construction Documents For The Reconstruction Of Surface Lot 01a - Penrods At One Ocean Drive. The Office of Capital lmprovement Projects (ClP) approved a Service Order in the amount of $106,538.34 on December 6,2013 to Milian Swain & Associates, lnc. (City's Consultant) to provide Professional Services to develop construction documents for the reconstruction of Surface Lot 01A - Penrods at One Ocean Drive. Pursuant to the Request for Qualifications (RFa) No. 01-09/10, adopted Resolution No. 2010-27415. The original Service Order to the Consultant includes providing a survey, geotechnical investigation, design services, permitting services, bidding and award services, and limited construction services. The design drawings were submitted to CIP for scope review and approval at 30%, 60% and 90% completion levels on March 17,2014; July 7, 2014, and October 24,2014 respectively. The City provided Penrods Brothers, tnc. (Nikki Beach) with the drawings for their review and comment at each completion level. On October 23,2014, CIP met with Mr. Steve Savola, a representative of Nikki Beach, to discuss the design of the parking lot. Mr. Savola presented a conceptual plan developed by their consultant, Alfredo M. Carbonell, P.E. lnc., which included building improvements and a new lay-out for the parking lot. The proposed lay-out was significantly different from the one developed by the City's Consultant. CIP stated to Mr. Savola that this new lay-out would modify the original design in its entirety. The City indicated that this would have to be sent to the Planning and Zoning Department, Transportation Department, and the Green Space and Environmental Divisions for their review and acceptance of the new lay-out. On October 24, 2014, our Consultant was submitting the 90% completion plans as scheduled. CIP obtained input from these City entities regarding the proposed lay-out for the parking lot presented by Nikki Beach, and based on their comments, it was determined that the new design was feasible. This new design includes the conversion of a green area into parking spaces, which would require review and approval from the Design Review Board. Alfredo M. Carbonell, P.E., lnc. will be responsible for obtaining said approval. The Department of Tourism, Culture, and Economic Development, the lease administrator for the City, advised Nikki Beach that the City would consider changing the lay-out to satisfy their needs as long as they would pay for the re-design cost to bring this new conceptual drawings up to 90% Completion Level, which was the completion phase reached by the City's Consultant. The City's Consultant provided CIP a proposal for redesigning of the 30, 60, and 90% plan development in the amount of $40,050. After several meetings to review and negotiate the fees proposed by the City's Consultant, the City and Nikki Beach agreed that Nikki Beach will pay the amount of $40,050 to the City for the accepted desiqn modifications. Adv Board Recommendation: Financial lnformation : Build and maintain priority infrastructure with full accountability. Supporting Data (Surveys, Environmental Scan, etc.): The 2012 Customer Satisfaction Survey indicated that over 81o/o of residents rated recently completed capital improvement proiects as "excellent" or N/A Financial lmpact Summary: Penrods Brothers, lnc. (Nikki Beach) has agreed to pay $40,050 for the re- design cost to bring this new conceptual drawings up to g0% Completion Level, which was the completion Max Sklar, ext. 6116 T:\AGENDA\201 & - AGENDA fiETT C7 G DArE 5-6-I)MIAMIBEACH 184 MIAMIBEACH City of Miomi Beoch, ,)700 Convention Center Drive, Miomi Beoch, Florido 33,l 39, www.miomibeochfl.gov COMMISSION MEMORANDUM Mayor Philip Levine and Me of the City mtsston Jimmy Morales, City Manager May 6, 2015 A RESOLUTION OF THE MAY TO: FROM: DATE: SUBJECT:AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE ADMINSITRATION TO ACCEPT $4O,O5O FROM PENROD BROTHERS, !NC. FOR THE RE.DESIGN AND DEVELOPMENT OF CONSTRUCTION DOCUMENTS FOR THE RECONSTRUCTION OF SURFACE LOT O,lA - PENRODS AT ONE OCEAN DRIVE. ADMINISTRATION RECOMM ENDATION Adopt the Resolution. BACKGROUND The Office of Capital lmprovement Projects (ClP) approved a Service Order in the amount of $106,538.34 on December 6, 2013 to Milian Swain & Associates, lnc. (City's Consultant) to provide Professional Services to develop construction documents for the reconstruction of Surface Lot 01A - Penrods at One Ocean Drive. Pursuant to the Request for Qualifications (RFO) No. 01-09/1 0, authorized pursuant to Resolution No. 2010-27415. The original Service Order to the Consultant includes providing a survey, geotechnical investigation, design services, permitting services, bidding and award services, and limited construction services. The design drawings (City's Conceptual Plan) were submitted to CIP for scope review and approval at 30%, 60% and 90% completion levels on March 17, 2014; July 7, 2014, and October 24, 2014 respectively. The City provided Penrods Brothers, lnc. (Nikki Beach) with the drawings for their review and comment at each completion level. On October 23, 2Q14, CIP met with Mr. Steve Savola, a representative of Nikki Beach, to discuss the design of the parking lot. Mr. Savola presented a conceptual plan developed by their consultant, Alfredo M. Carbonell, P.E. lnc., which included building improvements and a new lay-out for the parking lot (Nikki Beach Conceptual Plan). The proposed Nikki Beach Conceptual Plan was significantly different from the one developed by the City's Consultant. CIP stated to Mr. Savola that this new lay-out would modify the original design in its entirety. The City indicated that this would have to be sent to the Planning and Zoning Department, Transportation Department, and the Green Space and Environmental Divisions for their review and acceptance of the new lay-out. On October 24, 2014, our Consultant was submitting the 90% completion plans as scheduled. CIP obtained input from these City entities regarding the proposed Nikki Beach Conceptual Plan, and based on their comments, it was determined that the new design was feasible. This new design includes the conversion of a green area into parking spaces, which would requlre 185 Commission Memorandum Penrods Redesign of Surface Lot 01A May 6,2015 Page 2 of 2 review and approval from the Design Review Board. Alfredo M. Carbonell, P.E., lnc. will be responsible for obtaining said approval. The Department of Tourism, Culture, and Economic Development, the lease administrator for the City, advised Nikki Beach that the City would consider changing the lay-out to accommodate the Nikki Beach Conceptual Plan so long as Nikki Beach paid for the re-design cost to bring this new conceptual drawings up to 90% Completion Level, which was the completion phase reached by the City's Consultant. The City's Consultant provided CIP a proposal for the cost of redesigning the City's Conceptual Plan as requested by Nikki Beach, in the amount of $40,050. After several meetings to review and negotiate the fees proposed by the City's Consultant, the City and Nikki Beach agreed that Nikki Beach will pay the amount of $40,050 to the City for the accepted design modifications. CONCLUSION AND RECOMMENDATION The Administration recommends the Mayor and City Commission adopt the resolution approving and authorizing the Administration to accept $40,050 from Penrods Brother, lnc. (Nikki Beach) for the re-design cost to bring the Nikki Beach Conceptual Plan up to 90% Completion Level, which was the completion phase reached by the City's Consultant. JLM/KGB/MAS T:\AGEN DA\201 S\May\TCED\Penrods\Penrods Memo.docx 186 ,\/\ L-l ONE OCEAN DRIVE, MIAMI BEACH, iliifit brfrcl t lin4v;vBe,o,tA, FL 33139 | 305-538-1111 | www.nikkibeach.com Aprit 1oth, 2015 City of Miami Beach Tourism, Culture and Economic Development Department 1755 Meridian Avenue Suite 500 Miami Beach, FL 33139 Re: Surface Lot 1A- One Ocean Drive, New Layout Proposal Attention Max Sktar: Please be advised that Nikki Beach has agreed to provide check to City of Miami Beach for the change order amount (S40k) from Milian, Swain & Associates. This change order atlows Milian, Swain & Associates to redesign and bring up to 90% construction documents the proposed Nikki Beach Surface Parking Lot Design by Atfredo M. Carbonett P.E. lnc. Witt anything be needed from Nikki Beach in order for this resotution to be created and adopted? Ptease advise so that we can expedite in a timely manner. Thank you very much for your assistance. -Nikki Beach Management 187 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE GITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE ADMINSITRATION TO ACCEPT $4O,O5O FROM PENROD BROTHERS, INC. FOR THE RE-DESIGN AND DEVELOPMENT OF CONSTRUCTION DOCUMENTS FOR THE RECONSTRUCTION OF SURFACE LOT O1A- PENRODS AT ONE OCEAN DRIVE. WHEREAS, the Office of Capital lmprovement Projects (ClP) approved a Service Order in the amount of $106,538.34 on December 6,2013 to Milian Swain & Associates, lnc. (City's Consultant) to provide Professional Services to develop construction documents for the reconstruction of Surface Lot 01A - Penrods at One Ocean Drive, pursuant to the Request for Qualifications (RFQ) No. 01-09/10, authorized pursuant to Resolution No. 2010-27415; and WHEREAS, the original Service Order to the City's Consultant included providing a survey, geotechnical investigation, design services, permitting services, bidding and award services, and limited construction services; and WHEREAS, the design drawings (City's Conceptual Plan) were submitted to CIP for scope review and approval at 30%, 60% and 90% completion levels on March 17, 2014; July 7, 2014, and October 24, 2014, respectively, and the City provided Penrods Brothers, lnc. (Nikki Beach) with the City's Conceptual Plan for their review and comment at each completion level; and WHEREAS, on October 23,2014, CIP met with Nikki Beach to discuss the design of the parking lot and Nikki Beach presented a conceptual plan developed by their consultant, Alfredo M. Carbonell, P.E. lnc., which included building improvements and a new lay-out for the parking lot (Nikki Beach Conceptual Plan); and WHEREAS, the proposed Nikki Beach Conceptual Plan was significantly different from the City's Conceptual Plan and therefore had to be submitted to the City's Planning and Zoning Department, Transportation Department, and the Green Space and Environmental Divisions for their review and approval; and WHEREAS, it was determined that the Nikki Beach Conceptual Plan was feasible, but would require review and approval from the Design Review Board, because it includes the conversion of a green area into parking spaces, for which Nikki Beach will be responsible for obtaining said approval; and WHEREAS, the Department of Tourism, Culture, and Economic Development, lease administrator for the City, advised Nikki Beach that the City would consider changing the design to accommodate the Nikki Beach Conceptual Plan so long as Nikki Beach paid for the re-design cost to bring the Nikki Conceptual Plan drawings up to 90% Completion Level (Redesign Costs), which was the completion phase reached by the City's Consultant; and WHEREAS, the City's Consultant provided CIP a proposal for the Redesign Costs, in the amount of $40,050, and Nikki Beach agreed to pay for said Redesign Costs. 188 NOW, THEREFORE, BE IT DULY RESOLVED THAT THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, hereby approve and authorize the Administration to accept $40,050 from Penrod Brothers, lnc. for the re-design and development of construction documents for the reconstruction of Surface Lot 01A - Penrods at One Ocean Drive. PASSED and ADOPTED this day of ATTEST: Rafael E. Granado, City Glerk T:\AGE NDAV0 1 S\May\TCED\Penrods\Penrods RESO.docx Philip Levine, Mayor 2015. 189