Loading...
R7O-Execute Change Order 5 Disposal Of Soils From West Avenue Neighborhood ProjeCOMMISSION ITEM SUMMARY Advisory Board Recommendation: Financial Information : Source of I Funds: {>' Amount Account 1 $434,833 303-2717-ffi9357 4 $1,565,167 Storm Water Bond (<U oeer Financial lmpact Sum rotal | $2,000,000 mary: Citv Glerk's Office Eric T. Caroenter. ext. 6012 iqn-otts: Deoartment Director Assistant Oitv Manaqer Citv Mi arer ETC MTI I JLM/ T:\AGENDA\201s\September\PUBLIC WORKS\Bergeron CO No. 5 - AGHOA ITEI{ - oa?s - Asenda ltem 8] 0 oate ?-2- [S Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving And Authorizing The Mayor And City Clerk To Execute Change Order No. 5 To The Design-Build Agreement With Bergeron Land Development, lnc., Dated April 30, 2014 (The Agreement), Related To The Disposal Of Soils From The West Avenue Neighborhood Project, Provide Rental Generators To Reduce Flooding and Street Light Design Standard Development, lncreasing The Cost Of The Agreement By $2,000,000. Ensure value and of Data (Su Environmenta! Scan. etc.): N/A Item Summary/Recommendation : At its February 12,2014 meeting, the City Commission approved and authorized the City Manager to procure the necessary emergency design and construction services, pursuant to a negotiated design-build contract for the remaining stormwater pump stations for 6'n, 1Otn and 14tn Streets, with Bergeron Land Development, lnc. (Bergeron), a Florida Department of Transportation (FDOT) contractor for the Alton Road lmprovements Project, in an amount not to exceed $11,250,000; and As a continuation of the initiative to protect residents from tidal flooding, the Public Works Department requested an additional scope of work to the existing Bergeron contract for an additional scope of work to include the removal of soils with elevated arsenic levels, provide rental generators to reduce flooding and in establishing street I ighting standard. CURRENT STATUS During the West Avenue Construction lmprovement Project, it was determined by Miami-Dade County that Miami Beach soils have naturally occurring arsenic and soils removed from the site shall not be disposed as contaminated soil. The cost of permitting, testing and disposal has been estimated at$1,544,220, not included in the original contract. Public Works is submitting a request to execute Change Order No. 5, for additional scope of services to be performed by Bergeron for permitting, testing and disposal of all soils from the site, due to naturally occurring arsenic. ln addition, in order to reduce street flooding, the City requested Bergeron to local rental pumps to pump storm water to the bay. The estimated cost for this activity is $437,180.00. Bergeron's consultant who performed the lighting design of West Avenue will also assist the City in developing lighting standards for this and all future projects. Completing the lighting study of the West Avenue Neighborhood will create the new standardization which will be incorporated into the Public Works Manual for street lighting in the City. The estimated cost for this activity is $18,600. Subject to the 6th Capital Budget Amendment being approved on September 2,2016, R74 THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION S MIAMIBEACH 953 C MIAMI BEACH City of Miomi Beoch, I700 Convention Center Drive, Miomi Beoch, Florido 33'I39, www.miomibeochfl.gov C MEMORANDUM Mayor Philip Levine and Members of City Jimmy L. Morales, City Manager September 2,2015 A RESOLUT]ON OF THE MAY MIAMI BEACH, FLORIDA,AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDER NO. 5 TO THE DESIGN.BUILD AGREEMENT WITH BERGERON LAND DEVELOPMENT, INC., DATED APRIL 30, 2014 (THE AGREEMENT), RELATED TO THE DISPOSAL OF SOILS FROM THE WEST AVENUE NEIGHBORHOOD PROJECT, PROVIDE RENTAL GENERATORS TO REDUCE FLOODING AND ESTABLISH STREET LIGHTING STANDARDS FOR THE CITY, FURTHER INCREASING THE COST OF THE AGREEMENT BY $2,000,000. ADM! NISTRATION RECOMMEN DATION The Administration recommends adopting the Resolution. FUNDING TO: FROM: DATE: SUBJECT: FY 2014t15 Amount $ 434,833 n AND CITY COMMISSION OF THE CITY OF Account Number 303-2717-069357 - Seawall Biscayne Bay Streetend $1.565.167 Storm Water Bonds $2,000,000 Total BACKGROUND At its February 12, 2014 meeting, the City Commission approved and authorized the City Manager to procure the necessary emergency design and construction services, pursuant to a negotiated design-build contract for the iemaining stormwater pump stations for 6th, 1Oth and 14th Streets, with Bergeron Land Development, lnc. (Bergeron), a Florida Department of Transportation (FDOT) contractor for the Alton Road lmprovements Project, in an amount not to exceed $1 1,250,000; and As a continuation of the initiative to protect residents from tidal flooding, the Public Works Department requested an additional scope of work to the existing Bergeron to include the removal of all arsenic-contaminated soils as requested by Miami-Dade County, to construct the extension of the West Avenue/Collins Canal and assist the City in establishing street lighting 954 Commission Memorandum -Bergeron pump sfafions lmprovements - Change Order No. 5 Page 2 of 3 standard. CURRENT STATUS During the West Avenue Construction lmproject project, it was determined by Miami-Dade County that all Miami Beach soils have naturally occurring arsenic and all soils removed from the site shall be disposed as contaminated soil. The cost of permitting, testing and disposal estimated at$1,544,220 and was not included in the original contract. Public Works is submitting a request to execute Change Order No. 5, for additional scope of services to be performed by Bergeron for permitting, testing and disposal of all soils from the site, due to naturally occurring arsenic. ln addition, in order to reduce street flooding, the City requested Bergeron to local rental pumps to pump storm water to the bay. The estimated cost for this activity is $437,180.00. Bergeron's consultant who performed the lighting design of West Avenue will also assist the City in developing lighting standards for this and all future projects. Completing the lighting study of the West Avenue Neighborhood will create the new standardization which will be incorporated into the Public Works Manual for street lighting in the City. The estimated cost for this activity is $18,600. CONCLUSION The Administration recommends adopting the Resolution. JLM/MT/ETC/BAM/FRS T:\AGENDA!2O1S\SeptembeAPUBLlC WORKS\Bergeron CO No. 5 - MEMO.docx 955 RESOLUTION TO BE SUBMITTED 956