R7U-Approve Washington Avenue Storm Water Pipe Replacement ProjectCOMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving The Washington Avenue Storm Water Pipe Replacement Project, From 20th Street To Collins Avenue (Project), Having An Estimated Construction Cost Of $2,500,000, Plus A $250,000 Project Contingency, ForA Grand Total Of $2,750,000 And Further Authorizing The City Manager To Procure The Project Construction Services Utilizing The Competitively Bid National Joint Powers Alliance (NJPA) Cooperative Contract For Construction Services With The Gordian Build and maintain priority infrastructure with full accountability. Streamline the delivery of services through all Data (Surveys, Environmental Scan, etc: N/A Item Summary/Recommendation: As authorized by Florida Statutes, the Finance and City-Wide Projects Committee endorsed a recommendation by the Administration to utilize the indefinite quantity contract (lQC) for construction services to expedite the delivery of construction projects under $250,000 or for emergency projects as approved by the City Manager. The Committee's endorsement of the IQC process for small and emergency projects was approved by the City Commission on April 23, 2014. The IQC process is similar to the previously used process by the City but with tighter controls, including a limit on design, additional competition on certain items and a small project threshold that limits exposure. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA)to the Gordian Group. The proposed construction project replaces the existing storm drainage system at the north end of Washington Avenue near the Convention Center to Collins Canal. The existing storm drain system north of the Convention Center will be abandoned and removed during the construction of the Ballroom. The project incorporates large diameter storm drain pipes with an approximately 50 square foot cross sectional area which will connect to a large future storm water pump station in the vicinity of the Washington Avenue Bridge over Collins Canal. The work will be open cut in Washington Avenue and is expected to be completed before December 1't or suspended during the first two weeks of December and completed in January. The duration of the construction will take approximately six (3) months to complete. The storm water drainage improvements includes installing approximately 425 linear feet of 10 foot x 6 foot box culvert pipe, 21 0 linear feet of 6 foot x 5 foot box culvert pipe, and five structures with manholes; traffic control and all ancillary and miscellaneous work. ln order to expedite the project, the Public Works Department contacted the Procurement Office to request the use of the NJPA cooperative contractor procurement process to build the project. The contractor submitted for review a proposal to complete the work. lt is the City Engineer's opinion of probable construction cost and the NJPA Project Manager Review of the proposal submitted by DMSI, lnc. that the final amount of $2,500,000 has been considered reasonable for the scope of work that is included. DMSI, lnc. has a record of completing projects on time and on budget. This project surpassed the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award. Accordingly, in orderto move forward with the completion of this project, Commission approval is required to exceed the $250,000 project threshold limit which includes $250,000 for project contingency, for a project total not to exceed $2,750,000. The project supports the KIO of maintaining the City's infrastructure. THE ADMINISTRATION RECOMMENDS APPROVING THE RESOLUTION. Financial lnformation: Source of l'11";, o Amount Account 1 2,750,000 365-2327-069357 Total 2,750,000 Financial lmpact Summary: T:\iAGENDAU01s\SeptembeAPUBLlC WORKSlAgenda NJPA\Washington Avenue Drainage lmprovement CD A^I,A.^^IBFACH Agenda ltem R-] \A Date 9-2.1f989 g MIAMIBTACH City of Miomi Beoch, 1700 Convention Center Drive, Miomi Beoch, Florido 331 39, www.miomibeochfl.gov COMMISSION MEMORANDUM Mayor Philip Levine and Members of FRoM: Jimmy L. Morales, City Manager DATE: September 2,2015 suBrECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE WASHINGTON AVENUE STORM WATER PIPE REPLACEMENT PROJECT, FROM 2OTH STREET TO COLLINS AVENUE (PROJECT), HAVING AN ESTIMATED CONSTRUCTION COST OF $2,500,000, PLUS A $250,000 PROJECT GONTINGENCY, FOR A GRAND TOTAL OF $2,750,000 AND FURTHER AUTHORIZING THE CITY MANAGER TO PROCURE THE PROJECT CONSTRUCTION SERVIGES UTILIZING THE coMPETTTTVELY BrD NATTONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT FOR CONSTRUCTION SERVICES WITH THE GORDIAN GROUP. ADMINISTRATION RECOMMENDATION The Administration recommends approving the Resolution. FUNDING $2,750.000 365-2327-069357 $2,750,000 ToTAL BACKGROUND As authorized by Florida Statutes, the Finance and City-Wide Projects Committee endorsed a recommendation by the Administration to utilize the indefinite quantity contract (lQC) for construction services to expedite the delivery of construction projects under $250,000 or for emergency projects as approved by the City Manager. The Committee's endorsement of the IQC process for small and emergency projects was approved by the City Commission on April 23,2014. The IQC process is similar to the previously used process by the City but with tighter controls, including a limit on design, additional competition on certain items and a small project threshold that limits exposure. The IQC process is used extensively by the local, state and federal governmental agencies throughout the United States to expedite the delivery of construction projects. The City, as a governmental agency member, is authorized to utilize the IQC contract for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group. The proposed construction project replaces the existing storm drainage system at the north end of Washington Avenue near the Convention Center to Collins Canal. The existing storm drain system north of the Convention Center will be abandoned and removed during the construction City 990 Commission Memorandum -Washington Avenue Storm Water Pipe Replacement NJPA Page 2 of 2 of the Ballroom. The project incorporates large diameter storm drain pipes with an approximately 50 square foot cross sectional area which will connect to a large future storm water pump station in the vicinity of the Washington Avenue Bridge over Collins Canal. The work will be open cut in Washington Avenue and is expected to be completed before December 1tt or suspended during the first two weeks of December and completed in January. The duration of the construction will take approximately six (3) months to complete. The storm water drainage improvements includes installing approximalely 425linear feet of 10 foot x 6 foot box culvert pipe, 210 linear feet of 6 foot x 5 foot box culvert pipe, and five structures with manholes; traffic control and all ancillary and miscellaneous work. ln order to expedite the project, the Public Works Department contacted the Procurement Office to request the use of the NJPA cooperative contractor procurement process to build the project. The contractor submitted for review a proposal to complete the work. lt is the City Engineer's opinion of probable construction cost and the NJPA Project Manager Review of the proposal submitted by DMSI, lnc. that the final amount of $2,500,000 has been considered reasonable for the scope of work that is included. DMSI, lnc. has a record of completing projects on time and on budget. This project surpassed the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award. Accordingly, in order to move fonrvard with the completion of this project, Commission approval is required to exceed the $250,000 project threshold limit which includes $250,000 for project contingency, for a project total not to exceed $2,750,000. The project supports the KIO of maintaining the City's infrastructure. CONCLUSION The Administration recommends approving the Resolution authorizing the City Manager to approve the Washington Avenue storm water pipe replacement project utilizing the NJPA IQC method and approve the project as proposed by DMSI, lnc. JLM/Mri{re HlFtg#lR T:\AGENDA\201S\September\PUBLIC WORKS\Washington Avenue Drainage lmprovement NJPA - Memo rev.docx 991 RESOLUTION TO BE SUBMITTED 992